Communication Bldg 314, Grand Forks AFB, ND in strict...

127

Transcript of Communication Bldg 314, Grand Forks AFB, ND in strict...

Page 1: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 2: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 3: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

F2A3E14115A001

1.The contractor shall furnish all plant, labor, materials, and supervision necessary to complete project JFSD200143/JFSD949951 Repair

Communication Bldg 314, Grand Forks AFB, ND in strict accordance w ith construction specif ications and draw ings.

2. CLINS 0001 and 0003 have statutory cost limit not to exceed $750K.

3. The magnitude of this project is betw een $1M - $5M.

4. The NAICS for this project is 236220 and the size standard is $33.5M. This solicitation is unrestricted.

5. This project is subject to the bona fide need rule.

6. The period of performance is 330 calendar days after receipt of notice to proceed.

7. IAW FAR 52.219-9 (DEV), all Large Business Concerns providing offers must submit a Subcontracting Plan w ith the initial proposal.

8. In accordance w ith FAR 52.204-7(b), a prospective aw ardee shall be registered in System for Aw ard Management (SAM) database prior

to aw ard.

9. NOTICE TO OFFEROR(S)/SUPPLIER(S): FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS EFFORT. NO AWARD WILL BE MADE UNDER

THIS SOLICITATION UNTIL FUNDS ARE AVAILABLE. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION, EITHER

BEFORE OR AFTER THE CLOSING DATE. IN THE EVENT THE GOVERNMENT CANCELS THIS SOLICITATION, THE GOVERNMENT HAS NO

OBLIGATION TO REIMBURSE AN OFFEROR FOR ANY COSTS.

RYAN J. ALFIERI 701-747-2575

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

03-Jun-2014

(RFP)

(IFB)

X

CALL:

Repair Communication Squadron B314

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________330 calendar days after receiving

aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________

local time ______________07 Jul 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______155 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

319 CONTRACTING FLIGHT

575 TUSKEGEE AIRMEN BLVD

GRAND FORKS AFB ND 58205 6436

FA4659

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

.)

12B. CALENDAR DAYS

10

04:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

JFSD200143/JFSD9499

8. ADDRESS OFFER TO (If Other Than Item 7)

(701) 747-4215FAX:TEL: (701) 747-5287 TEL: FAX:

FA4659-14-R-0011 59

Page 4: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is

accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-

to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and

on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is

contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses,

representations, certif ications, and specif ications or incorporated by ref er-

ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Page 5: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 3 of 59

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot JFSD200143A Main Entry CS B314

FFP

The contractor is to furnish all plant, labor, materials, equipment, supplies, and

supervision necessary for JFSD200143A Construct Main Entry Communications

Squadron B314 IAW the attached technical specifications and drawings. THIS

CLIN IS SUBJECT TO A STATUTORY COST LIMITATION OF $750,000.00

IAW DFARS 252.236-7006, COST LIMITATION.

FOB: Destination

PURCHASE REQUEST NUMBER: F2A3E14115A001

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Lot JFSD200143B Repair CS B314

FFP

The contractor is to furnish all plant, labor, materials, equipment, supplies, and

supervision necessary for JFSD200143B Repair Communications Squadron B314

IAW the attached technical specifications and drawings .

FOB: Destination

PURCHASE REQUEST NUMBER: F2A3E14115A001

NET AMT

Page 6: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 4 of 59

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Lot JFSD949951A Add CS Parking Lot Lights

FFP

The contractor is to furnish all plant, labor, materials, equipment, supplies, and

supervision necessary for JFSD949951A Add Communications Squadron Parking

Lot Lights IAW the attached technical specifications and drawings. THIS CLIN IS

SUBJECT TO A STATUTORY COST LIMITATION OF $750,000.00 IAW

DFARS 252.236-7006, COST LIMITATION.

FOB: Destination

PURCHASE REQUEST NUMBER: F2A3E14115A001

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 1 Lot JFSD949951B Repair CS Parking Lot

FFP

The contractor is to furnish all plant, labor, materials, equipment, supplies, and

supervision necessary for JFSD949951B Repair Communications Squadron

Parking Lot IAW the attached technical specifications and drawings.

FOB: Destination

PURCHASE REQUEST NUMBER: F2A3E14115A001

NET AMT

Page 7: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 5 of 59

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 1 Lot JFSD949951C Landscape CS Parking Lot

FFP

The contractor is to furnish all plant, labor, materials, equipment, supplies, and

supervision necessary for JFSD949951C Landscape Communications Squadron

Parking Lot IAW the attached technical specifications and drawings.

FOB: Destination

PURCHASE REQUEST NUMBER: F2A3E14115A001

NET AMT

Page 8: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 6 of 59

Section E - Inspection and Acceptance

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996

Page 9: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 7 of 59

Section F - Deliveries or Performance

DELIVERY

DELIVERIES AND PERFORMANCE

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 330 dys. After Receipt of

Notice to Proceed

1 319 CES/CEC - F2A3E1

575 TUSKEGEE AIRMEN BLVD, BLDG

410, RM 15

GRAND FORKS AFB ND 58205-6219

FOB: Destination

F2A3E1

0002 330 dys. After Receipt of

Notice to Proceed

1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

F2A3E1

0003 330 dys. After Receipt of

Notice to Proceed

1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

F2A3E1

0004 330 dys. After Receipt of

Notice to Proceed

1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

F2A3E1

0005 330 dys. After Receipt of

Notice to Proceed

1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

F2A3E1

CLAUSES INCORPORATED BY REFERENCE

52.247-34 F.O.B. Destination NOV 1991

Page 10: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 8 of 59

Section G - Contract Administration Data

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit,

activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done

external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and

receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission

of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at

https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration

available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through

WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at

https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment

requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Construction Progress Invoice

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in

WAWF, as specified by the contracting officer.

N/A

Page 11: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 9 of 59

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in

applicable fields in WAWF when creating payment requests and receiving reports in the

system.

Routing Data Table*

--------------------------------------------------------------------------------------------

Field Name in WAWF Data to be entered in WAWF

--------------------------------------------------------------------------------------------

Pay Official DoDAAC F87700

Issue By DoDAAC FA4659

Admin DoDAAC FA4659

Inspect By DoDAAC N/A

Ship To Code F2A3CC

Ship From Code N/A

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) F2A3CC

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

--------------------------------------------------------------------------------------------

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes

appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit

price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F,

(e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional

Email Notifications” field of WAWF once a document is submitted in the system.

[email protected] [email protected]

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the

following contracting activity's WAWF point of contact.

SSgt Justin Baker, Phone: (701-) 747-5285

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

Page 12: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 10 of 59

Section H - Special Contract Requirements

SPECIAL CONTRACT REQUIREMENTS

SECTION H

SPECIAL CONTRACT REQUIREMENTS

H-1. REQUIRED INSURANCE (IAW FAR 28.306(b)

Reference FAR clause entitled “Insurance....” the contractor shall, at its own expense, procure and thereafter

maintain the following kinds of insurance with respect to performance under the contract.

a. Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to

be performed in a State which does not require or permit private insurance, then compliance with the statutory or

administrative requirements in any such State will be satisfactory. The required Workmen’s compensation

insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational

disease with a minimum liability limit of $100,000.

b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence

shall be required on the comprehensive form of policy.

c. Automobile Liability Insurance. The contracting officer shall require automobile liability insurance written on

the comprehensive form of policy. This policy shall provide for bodily injury liability and property damage

liability covering the operation of all automobiles used in connection with the performance of the contract.

Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per

person and $500,000 per occurrence for bodily injury and $25,000 per occurrences for property damage. The

amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality

and sufficient to meet normal and customary claims.

d. The Certificate of Insurance shall provide for thirty (30) days written notice to the Contracting Officer by the

insurance company prior to cancellation or material change in policy coverage. Other requirements and

information are contained in the aforementioned “Insurance” clause.

H-2. INSURANCE CERTIFICATE

The contractor agrees to execute an insurance certificate with the Contracting Office in accordance with Section H-

1, Required Insurance. This certificate shall be executed on the form entitled “Acknowledgement and Certification

of Compliance with Contract Insurance Requirements”. This certificate is also required for all subcontractors

working under this contract.

H-3. FEDERAL HOLIDAYS

The following Federal Legal holidays are observed by this base:

New Year's Day 1 January

Martin Luther King's Birthday Third Monday in January

Presidents Days Third Monday in February

Memorial Day Last Monday in May

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day 11 November

Thanksgiving Day Fourth Thursday in November

Christmas Day 25 December

H-4. BID AND PERFORMANCE/PAYMENT BONDS

a. A bid guarantee is required with the proposal. The offeror shall submit a bid guarantee in the form of a firm

commitment, e.g., bid bond (Standard Form 24) supported by good and sufficient surety or sureties acceptable

to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or under

Page 13: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 11 of 59

Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will

return any bid guarantee, other than bid bond, to the successful offeror upon execution of contractual documents

and bond (including any necessary coinsurance or reinsurance agreements) as required by the bid as accepted.

b. The amount of the bid guarantee shall be 20% of the bid price or $3 million whichever is less.

c. If the successful bidder (offeror), upon acceptance of its bid by the Government within the period specified for

acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of

the forms by the bidder (offeror), the contracting officer may terminate the contract for default.

d. In the event the contract is terminated for default, the offeror is liable for any cost of acquiring the work that

exceeds the amount of its offer and the bid guarantee is available to offset the difference.

e. Performance and Payment Bonds. In accordance with the Miller Act (40 U.S.C. 2701-270f), the bidder to

whom award is made shall, within ten (10) calendar days after the date of award, furnish a performance bond

(Standard Form 25) and a Payment Bond (Standard Form 25a), each with good and sufficient surety or sureties

acceptable to the Government.

(1) Performance Bond: The penal sum of the performance bond shall equal one hundred percent (100%) of

the contract price.

(2) Payment Bond:

(i) The penal sum shall be one hundred percent (100%) of the contract price.

(ii) If the contract price increases, and additional amount equal to 100 percent of the increase.

f. The contractor will not be issued a Notice to Proceed or be allowed to start work prior to furnishing the

requested bond, including any necessary insurance agreements.

H-5. PREPARATION OF PROGRESS SCHEDULE AND REPORTS

The reports contemplated by FAR Clause 52.236-15 titled "Schedules for Construction Contracts" in Section I shall

be accomplished on and in accordance with instructions pertaining to AF Form 3064, “Contract Progress Schedule,”

and AF Form 3065, “Contract Progress Report” unless a network schedule is specifically requested.

H-6. PREPARATION OF MATERIAL APPROVAL SUBMITTALS

The submittals contemplated by the clause herein entitled "Material and Workmanship" shall be accomplished on

and in accordance with instruction pertaining to AF Form 3000, Material Approval Submittal.

H-7. QUALITY CONTROL

The contractor will be required to institute a comprehensive Quality Control Program in order to assure himself and

the Government that all materials and workmanship are in strict accordance with the provisions of the

specifications. Within 20 calendar days of contract award, the contractor shall submit his Quality Control Program

Plan for Government review, approval, and incorporation into the contract.

H-8. SUBCONTRACTING RESPONSIBILITIES

The contractor shall be responsible for the management and performance of all subcontractors. The contractor shall

ensure the contract is completed within the stated requirements.

H-9. PERFORMANCE EVALUATIONS

At the conclusion of this contract, the Contracting Officer will complete a contractor’s performance evaluation in

the Construction Contractor Appraisal Support System (CCASS). The evaluation will take into account all aspects

of the contractor’s performance. Performance evaluations may be completed at any time the Contractor’s

performance is considered less than satisfactory. Contractors are required to obtain PKI certificates (See Section I,

PKI Certificate). Performance evaluations will be provided electronically through CCASS and contractor will be

Page 14: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 12 of 59

afforded an opportunity to review and respond to performance evaluations through CCASS. After considering input

from the contractor, the Contracting Officer makes the final determination on ratings for all performance evaluations.

The performance evaluations may have an impact on the award of future contracts. Contractor will be given an

opportunity to review this evaluation and provide comments prior to the evaluation being placed in the contract file.

H-10. SPECIAL UTILITY PROVISION

The contractor shall be responsible for any and all damages to accurately marked utilities resulting from its

operations. Further, the contractor shall be held liable for all costs associated with such damages. Such costs

include not only the costs to properly repair the damaged utility, but any direct costs incurred by the government to

provide emergency response to the site, as well as for any other monetary losses. Such loss may also include the

value of loss of productivity experienced by the government due to loss of power and /or facility evacuation arising

from the utility damage. Contractors are to field verify and mark location of utilities shown on construction permit.

H-11. DESIGNATION OF GOVERNMENT INSPECTOR

The Base Civil Engineer or his authorized representative is designated as the representative of the Contracting

Officer for the purpose of performing construction contract quality assurance for the Government, which includes

performing technical surveillance and monitoring workmanship and compliance with the plans and specification

under this contract. This provision in no way authorizes anyone other than the Contracting Officer to commit the

Government to changes in the terms of this contract.

H-12. BONA FIDE NEED

This contract is subject to the bona fide need rule pursuant to 31 U.S.C Section 1502 (a). As such, the contractor

must perform work or expend effort that is specified in the contract and for which payment will be made under the

terms of the contract. Planning, scheduling, obtaining of bonds and other efforts is not considered evidence of

performance. Ordering of materials cannot qualify if it is beyond moving of supplies or material, which are already

in inventory. To be considered, materials specifically for use on the contract, the contractor must have actually

incurred an obligation or made a payment to a supplier. Mobilization and on-site progress are evidence of

performance for the bona fide need purposes.

H-13. TRAFFIC ENFORCEMENT OF SEAT BELT USE AND PROHIBITION OF CELLULAR PHONES

Use of a cell phone or other hand-held electronic device without a hands-free capability or a failure to wear restraints

by any vehicle occupant will be reason for a “primary stop” on Grand Forks AFB. 319SFS personnel will issue the

operator/passenger a DD Form 1408, Armed Forces Traffic Ticket, for these infractions.

H-14. WORK BY THE GOVERNMENT

The Government reserves the right to undertake performance by Government forces or other contractors, the same

type or similar work as contractor for herein, as the Government deems necessary or desirable, and to do so will not

breach or otherwise violate this contract.

H-15. NOTICE OF CONSTRUCTIVE CHANGES

No order, statement or direction of the Contracting Officer, an authorized representative of the Contracting Officer

whether or not acting within the limits of his authority, or any other representatives of the Government, shall

constitute a change order under the “Changes” clause of this contract or entitle the contractor to an equitable

adjustment of the price or delivery schedule, unless such a change is issued in writing and signed by the Contracting

Officer.

H-16. BASE ENTRY PROCEDURES

Visitor Passes: The Commercial Visitor Control Center will issue a Visitor Pass to the contractor and his/her

employees upon completion of the screening process. Visiter Passes are for a maximum of one year and may be

renewed on a yearly basis. The screening process takes time, and the contractor shall submit a SFS Form 74 for each

employee no later than 5 days prior to the day base entry is needed. The SFS Form 74 may be obtained by contacting

the Contract Administrator.

Page 15: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 13 of 59

Employees that do not meet the minimum requirements will be denied base entry. The minimum requirements are

posted at the Commercial Visitor Control Center. The employer of the denied employee may appeal the denial by

contacting the Commercial Visitor Control Center.

Approved Visitor Passes must be picked up within 2 weeks of issuance. All Visitor Passes that are not picked up

within 2 weeks will be destroyed. Employees whose passes are destroyed must resubmit the paperwork to reobtain

base entry.

Although contractors will not be issued vehicles passes vehicles are subject to search while on the installation.

Employee privately owned vehicles will not be allowed access to restricted/controlled areas without a free zone

being established. Company vehicles will be allowed access to restricted/controlled areas.

All Contractor vehicles should have markings with the company name for quick identification of ownership and

notification if they are involved in an incident.

Conduct Requirements: The contractor shall ensure that his/her employees comply with all base traffic regulations

and properly conduct themselves while on the base.

Information Protection: The security manager for the Sponsoring unit (i.e LRS, CE ect.) will determine individual

requirements for contractor personnel to have a background check.

If a National NACI is determined to be required by the security manager, the security manager will coordinate the

check with the wing Information Security Office.

Anti-Terrorism: The anti-terrorism manager for the Sponsoring unit (i.e LRS, CE ect.) will determine individual

requirements for contractor personnel to have a Level 1 Anti-Terrorism Training.

The Level 1 Anti-Terrorism training is recommended for all key management personnel, crew supervisors, project

managers and site superintendents. Unit anti-terrorism managers will be responsible for organizing this Level 1

training.

H-17. SMALL BUSINESS SUBCONTRACTING PLAN

All Large Business Concerns must develop a Subcontracting Plan specific to this acquisition and submit it along with

the initial proposal. See FAR 52.219-9(DEV). In addition, all Subcontracting Plans submitted in response to this

solicitation shall state that at least fifteen percent (15%) of the total value of the contract shall be subcontracted to

small business concerns.

Page 16: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 14 of 59

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees APR 1984

52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006

52.203-7 Anti-Kickback Procedures OCT 2010

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

JAN 1997

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management JUL 2013

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract

Awards

JUL 2013

52.204-13 System for Award Management Maintenance JUL 2013

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

AUG 2013

52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters

JUL 2013

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

MAY 2012

52.215-2 Audit and Records--Negotiation OCT 2010

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997

52.215-21 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data--

Modifications

OCT 2010

52.219-4 Notice of Price Evaluation Preference for HUBZone Small

Business Concerns

JAN 2011

52.219-8 Utilization of Small Business Concerns JUL 2013

52.219-9 (Dev) Small Business Subcontracting Plan (Deviation 2013-O0014) SEP 2013

52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards Act - Overtime

Compensation

JUL 2005

52.222-6 Davis Bacon Act JUL 2005

52.222-7 Withholding of Funds FEB 1988

52.222-8 Payrolls and Basic Records JUN 2010

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) JUL 2005

52.222-12 Contract Termination-Debarment FEB 1988

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988

52.222-14 Disputes Concerning Labor Standards FEB 1988

Page 17: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 15 of 59

52.222-15 Certification of Eligibility FEB 1988

52.222-21 Prohibition Of Segregated Facilities FEB 1999

52.222-26 Equal Opportunity MAR 2007

52.222-27 Affirmative Action Compliance Requirements for

Construction

FEB 1999

52.222-35 Equal Opportunity for Veterans SEP 2010

52.222-36 Affirmative Action For Workers With Disabilities OCT 2010

52.222-37 Employment Reports on Veterans SEP 2010

52.222-38 Compliance With Veterans' Employment Reporting

Requirements

SEP 2010

52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons FEB 2009

52.222-54 Employment Eligibility Verification AUG 2013

52.223-2 Affirmative Procurement of Biobased Products Under Service

and Construction Contracts

SEP 2013

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-6 Drug-Free Workplace MAY 2001

52.223-17 Affirmative Procurement of EPA-Designated Items in Service

and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.227-1 Authorization and Consent DEC 2007

52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007

52.228-1 Bid Guarantee SEP 1996

52.228-2 Additional Bond Security OCT 1997

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.228-11 Pledges Of Assets JAN 2012

52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995

52.228-14 Irrevocable Letter of Credit DEC 1999

52.228-15 Performance and Payment Bonds--Construction OCT 2010

52.229-3 Federal, State And Local Taxes FEB 2013

52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002

52.232-17 Interest OCT 2010

52.232-23 Alt I Assignment of Claims (Jan 1986) - Alternate I APR 1984

52.232-27 Prompt Payment for Construction Contracts JUL 2013

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes JUL 2002

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-5 Material and Workmanship APR 1984

52.236-6 Superintendence by the Contractor APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984

Page 18: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 16 of 59

52.236-9 Protection of Existing Vegetation, Structures, Equipment,

Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-14 Availability and Use of Utility Services APR 1984

52.236-15 Schedules for Construction Contracts APR 1984

52.236-17 Layout of Work APR 1984

52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -

Alternate I

APR 1984

52.236-26 Preconstruction Conference FEB 1995

52.242-13 Bankruptcy JUL 1995

52.242-14 Suspension of Work APR 1984

52.243-4 Changes JUN 2007

52.246-21 Warranty of Construction MAR 1994

52.248-3 Value Engineering-Construction OCT 2010

52.249-1 Alt I Termination for Convenience of the Government (Fixed-

price) (Short Form) (Apr 1984) - Alternate I

APR 1984

52.249-10 Default (Fixed-Price Construction) APR 1984

52.253-1 Computer Generated Forms JAN 1991

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7004 Alt A System for Award Management Alternate A MAR 2014

252.204-7006 Billing Instructions OCT 2005

252.204-7012 Safeguarding of unclassified controlled technical information NOV 2013

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Terrorist Country

MAR 2014

252.223-7004 Drug Free Work Force SEP 1988

252.223-7006 Prohibition On Storage And Disposal Of Toxic And

Hazardous Materials

APR 2012

252.225-7012 Preference For Certain Domestic Commodities FEB 2013

252.225-7048 Export-Controlled Items JUN 2013

252.227-7033 Rights in Shop Drawings APR 1966

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

252.236-7000 Modification Proposals-Price Breakdown DEC 1991

252.236-7006 Cost Limitation JAN 1997

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.243-7002 Requests for Equitable Adjustment DEC 2012

252.247-7023 Transportation of Supplies by Sea APR 2014

252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

Page 19: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 17 of 59

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready

for use not later than 330 calendar days after receipt of the notice to proceed. The time stated for completion shall

include final cleanup of the premises.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay

liquidated damages to the Government in the amount of $404.29 for each calendar day of delay until the work is

completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until

the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination

clause.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JULY 2013)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does

not include contracts that exceed five years in duration because the period of performance has been extended for a

cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other

appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not

dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business

under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not

dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a

kind of business activity in which a number of business concerns are primarily engaged. In determining whether

dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of

employees, financial resources, competitive status or position, ownership or control of materials, processes, patents,

license agreements, facilities, sales territory, and nature of business activity.

Page 20: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 18 of 59

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor

shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause,

upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to

include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification

of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the

contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this

rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to

this contract. The small business size standard corresponding to this NAICS code can be found at

http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a

contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by

paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications

section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they

reflect the Contractor's current status. The

Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this

clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the

Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in

SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following

rerepresentation and submit it to the contracting office, along with the contract number and the date on which the

rerepresentation was completed:

The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 236220- assigned to

contract number TBD.

(Contractor to sign and date and insert authorized signer's name and title).

(End of clause)

52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-

DESIGNATED ITEMS (MAY 2008)

(a) Definitions. As used in this clause--

Page 21: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 19 of 59

Postconsumer material means a material or finished product that has served its intended use and has been discarded

for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader

category of “recovered material.”

Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does

not include those materials and by-products generated from, and commonly reused within, an original manufacturing

process.

(b) The Contractor, on completion of this contract, shall--

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used

in contract performance, including, if applicable, the percentage of post-consumer material content; and

(2) Submit this estimate to

Attn: Matt D. Sanders

319 Contracting Flight

575 Tuskegee Airmen Blvd, Bldg 418

Grand Forks AFB, ND 58205-6436

(End of clause)

52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (SEP 2010)

(a) Definitions. As used in this clause--

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in

which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as

agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a

subcontractor for incorporation into the building or work. The term also includes an item brought to the site

preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency

lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or

work and that are produced as complete systems, are evaluated as a single and distinct construction material

regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

Page 22: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 20 of 59

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of

incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any

applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component,

including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but

excluding profit. Cost of components does not include any costs associated with the

manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost

of all its components. Components of foreign origin of the same class or kind for which nonavailability

determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic

construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for

construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic

construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction

materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause

if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction

material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds

the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be

impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and

reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use

foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information

for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

Page 23: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 21 of 59

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph

(b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price

comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty

(whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor

could not reasonably foresee the need for such determination and could not have requested the determination before

contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a

determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the

Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the

contract to allow use of the foreign construction material. However, when the basis for the exception is the

unreasonable price of a domestic construction material, adequate consideration is not less than the differential

established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign

construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the

Contractor shall include the following information and any applicable supporting data based on the survey of

suppliers:

Foreign and Domestic Construction Materials Price Comparison

----------------------------------------------------------------------------------------------------------------

Construction material description Unit of measure Quantity Price (dollars) \1\

----------------------------------------------------------------------------------------------------------------

Item 1

Foreign construction material.... ....................... ....................... .......................

Domestic construction material... ....................... ....................... ............ ...........

Item 2

Foreign construction material.... ....................... ....................... .......................

Domestic construction material... ....................... ....................... .......................

----------------------------------------------------------------------------------------------------------------

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate

is issued).

Page 24: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 22 of 59

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach

summary.

Include other applicable supporting information.

(End of clause)

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least Fifteen (15)

percent of the total amount of work to be performed under the contract. This percentage may be reduced by a

supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the

Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not

be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site

investigations by . . . . . . . . . None.

(b) Weather conditions . . . . . . . . . See Section J External Attachment 4: Climatological Survey.

(c) Transportation facilities . . . . . . . . None.

(d) . . . . . . . . . . None.

(End of clause)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in

full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may

be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

https://acquisition.gov/far/

(End of clause)

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an

authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

Page 25: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 23 of 59

(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation (DFARS) (48 CFR

Chapter two (2)) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name

of the regulation.

(End of clause)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications,

except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by

the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly

necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not

relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall

perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of

drawings:

See Section J

(End of clause)

SUBPART 5352.2 — TEXT OF PROVISIONS AND CLAUSES

5352.201-9101 Ombudsman

As prescribed in 5301.9103, insert the following clause:

Page 26: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 24 of 59

OMBUDSMAN (APR 2014)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential

offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the

source of the concern. The existence of the ombudsman does not affect the authority of the program manager,

contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of

proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman

may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements,

and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or

postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for

debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Mr.

Gregory S. Oneal, AFICA/KM, 507 Symington Drive, Scott AFB IL 62225-5022, (618) 229-0267, fax (618)256-

6668, email: [email protected]. Concerns, issues, disagreements, and recommendations that cannot be

resolved at the Center/MAJCOM/DRU/HQ AFICA/AFISRA/SMC ombudsman level, may be brought by the

interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary

(ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571)

256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical

requirements. Such inquiries shall be directed to the Contracting Officer.

(End of clause)

5352.242-9000 Contractor Access to Air Force Installations

As prescribed in 5342.490-1, insert a clause substantially the same as the following clause in solicitations and

contracts:

CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (NOV 2012)

(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who

make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel

are required to wear or prominently display installation identification badges or contractor-furnished, contractor

identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the

following: contract number, location of work site, start and stop dates, and names of employees and subcontractor

employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request

for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to

the issuing base pass and registration office or Security Forces for processing. When reporting to the registration

Page 27: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 25 of 59

office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration,

valid vehicle insurance certificate, and SFS 74 to obtain a vehicle pass.

(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for

newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer

requires access to the work site.

(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall

comply with AFI 31-101, Volume 1,The Air Force Installation Security Program, and AFI 31-501, Personnel

Security Program Management, as applicable.

(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor

shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the

issuing office.

(f) Failure to comply with these requirements may result in withholding of final payment.

(End of clause)

PKI CERTIFICATE

NOTICE TO OFFERORS

Public Key Infrastructure (PKI) Information

A Department Of Defense (DoD) PKI Certificate is required for all DoD

employees accessing CPARS, ACASS, and CCASS. Contractors are also encouraged

to obtain and use a certificate. Non-DoD Government users may continue to

access CPARS, ACASS, and CCASS without a certificate.

*********************************************

To determine if you have a valid DoD PKI Certificate.

<https://infosec.navy.mil/certtest>

Frequently Asked Questions about PKI

<http://www.cpars.csd.disa.mil/pkifaqs.htm>

PKI Information:

All DoD employees (military and Civilian), including DoD Contractors that

are working on site (military/government facilities) or contractors working

offsite using Government Furnished Equipment (GFE) are eligible to obtain

certificates from DoD PKI. If the contactor doesn't work on site or with GFE

they are encouraged to obtain and use a certificate from an External

Page 28: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 26 of 59

Certificate Authority (ECA).

External Certificate Authority

External Certificate Authorities (ECAs) provide digital certificates to the

DoD's private industry partners, contractors using their own equipment or

working in non-government facilities, allied partners, and other agencies.

Approved ECA vendors:

* Operational Research Consultants, Inc. (ORC) http://www.eca.orc.com

* VeriSign, Inc.

http://www.verisign.com/verisign-business-solutions/public-sector-solutions/

ieca-eca-certificates/index.html

* IdenTrust http://www.identrust.com/certificates/eca/index.html

Page 29: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 27 of 59

Section J - List of Documents, Exhibits and Other Attachments

ATTACHMENTS

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

ITEM # of Pages

1. Schedule of Drawings 4

2. Technical Specification Table of Contents 3

3. Building Wage Decision ND140003, Dated 01/03/2014 4

4. Highway Wage Decision ND140002, Dated 01/10/2014 7

LIST OF EXTERNAL ATTACHMENTS

1. JFSD200143 A/B & JFSD949951 A/B/C 1198

Technical Specifications

2. JFSD200143 A/B & JFSD949951 A/B/C 145

Drawings

3. JFSD200143 A/B & JFSD949951 A/B/C 53

Material Submittal Schedule

4. Climatological Summary for Grand Forks AFB, ND 5

5. Waiver Green Procurement Form 1

6. Past Performance Questionnaire 5

7. Financial Institution Reference Sheet 1

Page 30: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 28 of 59

SCHEDULE OF DRAWINGS

Reference Number Drawing Name Sheet # Date

G-001 Title Page and Drawing Index 1 5/15/13

G-002 Project Phasing and Staging 2 5/15/13

C-001 Location Plan and Vicinity Map 3 5/15/13

C-002 Legend and General Notes 4 5/15/13

C-100 Existing Site Plan 5 5/15/13

C-101 Demolition Site Plan 6 5/15/13

C-102 Site Plan 7 5/15/13

C-103 Site Layout Plan 8 5/15/13

C-104 Grading and Drainage Plan 9 5/15/13

C-105 Erosion and Sediment Control Plan 10 5/15/13

C-106 Utility Plan 11 5/15/13

C-300 Profiles and Schedule 12 5/15/13

C-400 Enlarged Plan – Sidewalks and Entry 13 5/15/13

C-500 Standard Civil Details Sheet 1 14 5/15/13

C-501 Standard Civil Details Sheet 2 15 5/15/13

C-502 Standard Civil Details Sheet 3 16 5/15/13

C-503 Standard Civil Details Sheet 4 17 5/15/13

L-100 Overall Landscape Site Plan 18 5/15/13

L-101 Landscape Plan 19 5/15/13

L-102 Landscape Plan 20 5/15/13

L-500 Landscape Notes, Details & Plant Schedule 21 5/15/13

S-001 Structural Legends and Notes 22 5/15/13

S-110 Foundation Plan Demolition 23 5/15/13

S-111 Foundation Plan 24 5/15/13

S-112 Slab Plan - Demolition 25 5/15/13

S-113 Slab Plan 26 5/15/13

S-114 Roof Framing Plan Demolition 27 5/15/13

S-115 Roof Framing Plan 28 5/15/13

S-500 Structural Details Sheet 1 29 5/15/13

S-501 Structural Details Sheet 2 30 5/15/13

S-502 Structural Details Sheet 3 31 5/15/13

S-503 Structural Details Sheet 4 32 5/15/13

A-100 Orentation Plan 33 5/15/13

A-110 Floor Plan – Area A - Demolition 34 5/15/13

A-111 Floor Plan – Area A 35 5/15/13

A-112 Reflected Ceiling Plan – Area A 36 5/15/13

A-113 Roof Plan – Area A - Demolition 37 5/15/13

A-114 Roof Plan – Area A 38 5/15/13

A-120 Floor Plan – Area B - Demolition 39 5/15/13

Page 31: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 29 of 59

A-121 Floor Plan – Area B 40 5/15/13

A-122 Reflected Ceiling Plan – Area B 41 5/15/13

A-123 Roof Plan – Area B - Demolition 42 5/15/13

A-124 Roof Plan – Area B 43 5/15/13

A-130 Floor Plan – Area C – Demolition 44 5/15/13

A-131 Floor Plan – Area C 45 5/15/13

A-132 Reflected Ceiling Plan – Area C 46 5/15/13

A-133 Roof Plan – Area C - Demolition 47 5/15/13

A-134 Roof Plan – Area C 48 5/15/13

A-200 Exterior Elevations Sheet 1 49 5/15/13

A-201 Exterior Elevations Sheet 2 50 5/15/13

A-300 Wall Sections Sheet 1 51 5/15/13

A-301 Wall Sections Sheet 2 52 5/15/13

A-302 Wall Sections Sheet 3 53 5/15/13

A-303 Wall Sections Sheet 4 54 5/15/13

A-400 Enlarged Plans and Details Sheet 1 55 5/15/13

A-401 Enlarged Plans and Details Sheet 2 56 5/15/13

A-402 Enlarged Plans and Details Sheet 3 57 5/15/13

A-403 Enlarged Plans and Details Sheet 4 58 5/15/13

A-404 Enlarged Plans and Details Sheet 5 59 5/15/13

A-405 Enlarged Plans and Details Sheet 6 60 5/15/13

A-406 Enlarged Plans and Details Sheet 7 61 5/15/13

A-407 Enlarged Plans and Details – Exterior 62 5/15/13

Dumpster Enclosure

A-500 Wall Types 63 5/15/13

A-501 Door and Frame Details 64 5/15/13

A-502 Window Frame Details 65 5/15/13

A-600 Room and Door Schedules 66 5/15/13

A-601 Room Sign Schedules 67 5/15/13

M-001 Mechanical Legends 68 5/15/13

M-110 HVAC Plan – Area A – Demolition 69 5/15/13

M-111 HVAC Plan – Area A 70 5/15/13

M-112 Piping Plan – Area A – Demolition 71 5/15/13

M-113 Piping Plan – Area A 72 5/15/13

M-114 Plumbing Plan – Area A – Demolition 73 5/15/13

M-115 Plumbing Plan – Area A 74 5/15/13

M-116 Mechanical Roof Plan – Area A 75 5/15/13

M-120 HVAC Plan – Area B – Demolition 76 5/15/13

M-121 HVAC Plan – Area B 77 5/15/13

M-122 Piping Plan – Area B – Demolition 78 5/15/13

M-123 Piping Plan – Area B 79 5/15/13

M-124 Plumbing Plan – Area B – Demolition 80 5/15/13

M-125 Plumbing Plan – Area B 81 5/15/13

M-126 Mechanical Roof Plan – Area B 82 5/15/13

Page 32: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 30 of 59

M-130 HVAC Plan – Area C – Demolition 83 5/15/13

M-131 HVAC Plan – Area C 84 5/15/13

M-132 Piping Plan – Area C – Demolition 85 5/15/13

M-133 Piping Plan – Area C 86 5/15/13

M-500 Mechanical Details 87 5/15/13

M-501 Mechanical Enlarged Plan, Sections and 88 5/15/13

Details

M-600 Piping Riser Diagram – Area A 89 5/15/13

M-601 Piping Riser Diagram – Area B Demolition 90 5/15/13

M-602 Piping Riser Diagram – Area B 91 5/15/13

M-610 HVAC Air Flow and Controls Diagram 92 5/15/13

Sheet 1

M-611 HVAC Air Flow and Controls Diagram 93 5/15/13

Sheet 2

M-612 HVAC Piping Diagram 94 5/15/13

M-613 HVAC Sequence of Operations 95 5/15/13

M-620 Mechanical Schedules – Sheet 1 96 5/15/13

M-621 Mechanical Schedules – Sheet 2 97 5/15/13

F-001 Line Safety Narrative and Legend 98 5/15/13

F-002 Fire Alarm/Mass Notification General 99 5/15/13

Notes, Legend, and Matrix

F-003 Sprinkler General Notes, Legends and 100 5/15/13

Details

F-100 Fire Safety – Overall Plan 101 5/15/13

F-110 Fire Alarm/Mass Notification Plan Area A 102 5/15/13

F-111 Fire Suppression Plan – Area A 103 5/15/13

F-120 Fire Alarm/Mass Notification Plan Area B 104 5/15/13

F-121 Fire Suppression Plan – Area B 105 5/15/13

F-130 Fire Alarm/Mass Notification Plan Area C 106 5/15/13

F-131 Fire Suppression Plan – Area C 107 5/15/13

E-100 Electrical Legends 108 5/15/13

E-100 Electrical Site Plan – Demolition 109 5/15/13

E-101 Electrcial Utility Plan 110 5/15/13

E-102 Electrcial Sight Lighting Plan 111 5/15/13

E-103 Building 314 Existing Grounding Plan 112 5/15/13

E-110 Lighting Plan – Area A – Demolition 113 5/15/13

E-111 Lighting Plan – Area A 114 5/15/13

E-112 Power Plan – Area A – Demolition 115 5/15/13

E-113 Power Plan – Area A 116 5/15/13

E-114 Systems Plan – Area A – Demolition 117 5/15/13

E-115 Systems Plan – Area A 118 5/15/13

E-116 Lighting Protection Plan – Area A – 119 5/15/13

Demolition

E-117 Lighting Protection Plan – Area A 120 5/15/13

Page 33: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 31 of 59

E-118 Electrcial Roof Plan – Area A 121 5/15/13

E-120 Lighting Plan – Area B – Demolition 122 5/15/13

E-121 Lighting Plan – Area B 123 5/15/13

E-122 Power Plan – Area B – Demolition 124 5/15/13

E-123 Power Plan – Area B 125 5/15/13

E-124 Systems Plan – Area B – Demolition 126 5/15/13

E-125 Systems Plan – Area B 127 5/15/13

E-126 Lighting Protection Plan – Area A 128 5/15/13

E-130 Lighting Plan – Area C – Demolition 129 5/15/13

E-131 Lighting Plan – Area C 130 5/15/13

E-132 Power Plan – Area C – Demolition 131 5/15/13

E-133 Power Plan – Area C 132 5/15/13

E-134 Systems Plan – Area C – Demolition 133 5/15/13

E-135 Systems Plan – Area C 134 5/15/13

E-136 Existing Lighting Protection Plan – Area C 135 5/15/13

E-400 Enlarged Plans Skylight Lighting 136 5/15/13

E-401 Enlarged Plans Communications Closet RM 137 5/15/13

E-500 Electrical Details 138 5/15/13

E-501 Electrical Detail 139 5/15/13

E-600 Electrical Riser Diagram 140 5/15/13

E-601 Panelboard Schedules – Area A 141 5/15/13

E-602 Panelboard Schedules – Area A 142 5/15/13

E-603 Panelboard Schedules – Area B 143 5/15/13

E-604 Panelboard and MCC Switchboard 144 5/15/13

Schedules – Area C

E-605 Light Fixture Schedule 145 5/15/13

Page 34: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 32 of 59

TECHNICAL SPECIFICATION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01000 TECHNICAL PROVISIONS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 42 19 COMPOSITE PANELS

07 51 13 BUILT-UP ASPHALT ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 13 METAL ROLLING COUNTER DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 62 26 TUBULAR DAYLIGHTING DEVICES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DIVISION 09 – FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

mn142 PROJECT TABLE OF CONTENTS - 1

Repair Communications Squadron Building 314 and Parking Lot

Grand Forks Air Force Base

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE AND PORCELAIN TILE

09 51 00 ACOUSTICAL CEILINGS

Page 35: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 33 of 59

09 65 00 RESILIENT FLOORING

09 68 00 CARPET

09 72 00 WALL COVERINGS

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 10 00 VISUAL COMMUNICATIONS SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 14 01 EXTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 93 00 SITE FURNISHINGS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 07 19.00 40 PLUMBING PIPING INSULATION

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING

SYSTEMS

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 31 13 METAL DUCTS

23 34 23.00 40 HVAC POWER VENTILATORS

23 36 00 AIR TERMINAL UNITS

23 37 13 DIFFUSERS, REGISTERS, AND GRILLS

23 54 19 BUILDING HEATING SYSTEMS, WARM AIR

23 81 47 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS

DIVISION 26 - ELECTRICAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

26 60 13.00 40 LOW-VOLTAGE MOTORS

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

mn142 PROJECT TABLE OF CONTENTS - 2

Repair Communications Squadron Building 314 and Parking Lot

Grand Forks Air Force Base

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

Page 36: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 34 of 59

31 23 00.00 20 EXCAVATION AND FILL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 14 CONCRETE PAVEMENTS FOR SMALL PROJECTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 32 23 SEGMENTAL RETAINING WALLS

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

32 96 00 TRANSPLANTING EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 40 00 STORM DRAINAGE UTILITIES

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

SCHEDULE OF MATERIAL SUBMITTALS

-- End of Project Table of Contents --

Page 37: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 35 of 59

General Decision Number: ND140003 01/03/2014 ND3

Superseded General Decision Number: ND20130003

State: North Dakota

Construction Type: Building

County: Grand Forks County in North Dakota.

BUILDING CONSTRUCTION PROJECTS (does not include single family

homes and apartments up to and including four stories)

Modification Number Publication Date

0 01/03/2014

* BRND0003-001 05/01/2013

Rates Fringes

BRICKLAYER.......................$ 30.58 11.69

----------------------------------------------------------------

* IRON0512-003 06/09/2013

Rates Fringes

IRONWORKER.......................$ 27.30 22.05

----------------------------------------------------------------

* SHEE0010-037 06/17/2013

Rates Fringes

Sheet Metal Worker

SHEET METAL WORKERS

(including setting the

HVAC unit, installing the

ductwork and performing

the testing & balancing)...$ 28.33 8.96

----------------------------------------------------------------

SUND1999-002 12/21/1999

Rates Fringes

CARPENTER

CARPENTERS (including form

setting, Cabinet

installation, & drywall

hanging, excluding

acoustical ceiling

installation)...............$ 11.33

DRYWALL FINISHER/TAPER...........$ 13.92

ELECTRICIAN

ELECTRICIAN (including low

voltage of computer &

telephone lines, doorbells

Page 38: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 36 of 59

& system controls)..........$ 14.68 2.97

Fire Sprinkler Fitter............$ 14.05 1.51

INSULATOR - MECHANICAL

(Duct, Pipe & Mechanical

System Insulation)...............$ 15.43 1.93

Laborers:

Common......................$ 8.44

Mason Tender................$ 9.00

PAINTER

PAINTER (including

wallpaper hanging,

excluding Drywall

Finishing)..................$ 10.88 1.34

PIPEFITTER

PIPEFITTER (including HVAC

piping).....................$ 15.26 2.37

PLUMBER..........................$ 14.56 1.94

----------------------------------------------------------------

WELDERS - Receive rate prescribed for craft performing

operation to which welding is incidental.

================================================================

Unlisted classifications needed for work not included within

the scope of the classifications listed may be added after

award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

----------------------------------------------------------------

The body of each wage determination lists the classification

and wage rates that have been found to be prevailing for the

cited type(s) of construction in the area covered by the wage

determination. The classifications are listed in alphabetical

order of "identifiers" that indicate whether the particular

rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with

characters other than "SU" denotes that the union

classification and rate have found to be prevailing for that

classification. Example: PLUM0198-005 07/01/2011. The first

four letters , PLUM, indicate the international union and the

four-digit number, 0198, that follows indicates the local union

number or district council number where applicable , i.e.,

Plumbers Local 0198. The next number, 005 in the example, is

an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the

Page 39: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 37 of 59

effective date of the most current negotiated rate/collective

bargaining agreement which would be July 1, 2011 in the above

example.

Union prevailing wage rates will be updated to reflect any

changes in the collective bargaining agreements governing the

rates.

0000/9999: weighted union wage rates will be published annually

each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived

from survey data by computing average rates and are not union

rates; however, the data used in computing these rates may

include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union majority rates,

LA indicates the State of Louisiana; 2004 is the year of the

survey; and 007 is an internal number used in producing the

wage determination. A 1993 or later date, 5/13/2010, indicates

the classifications and rates under that identifier were issued

as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change

until a new survey is conducted.

----------------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can

be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on

a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests

for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted

because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal

process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

Page 40: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 38 of 59

2.) If the answer to the question in 1.) is yes, then an

interested party (those affected by the action) can request

review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the

interested party's position and by any information (wage

payment data, project description, area practice material,

etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

================================================================

END OF GENERAL DECISION

General Decision Number: ND140002 01/10/2014 ND2

Superseded General Decision Number: ND20130002

State: North Dakota

Construction Type: Highway

Counties: North Dakota Statewide.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 01/03/2014

1 01/10/2014

ELEC0714-002 09/29/2013

ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, BURLIEGH, DIVIDE,

DUNN, EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY,

MCKENZIE, MCLEAN, MERCER, MORTON, MOUNTRIAL, OLIVER, PIERCE,

RENVILLE, ROLLETTE, SHERIDAN, SOIUX, SLOPE, STARK, WARD, &

WILLIAMS COUNTIES:

Rates Fringes

ELECTRICIAN

Page 41: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 39 of 59

CABLE SPLICER...............$ 34.46 29.5%+5.00

ELECTRICIAN.................$ 34.06 29.5%+5.00

----------------------------------------------------------------

* ELEC0714-003 09/29/2013

LINE CONSTRUCTION:

Rates Fringes

Line Construction

CABLE SPLICER...............$ 34.15 29.5%+5.00

GROUNDMAN...................$ 20.49 29.5%+5.00

LINE EQUIPMENT OPERATOR.....$ 30.74 29.5%+5.00

LINEMAN.....................$ 34.15 29.5%+5.00

----------------------------------------------------------------

ELEC1426-002 06/01/2013

BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRAND FORKS,

GRIGGS, KIDDER, LAMOURE, LOGAN, MCINTOSH, NELSON, PEMBINA,

RAMSEY, RANSOM, RICHLAND, SARGENT, STEELE, STUTSMAN, TOWNER,

TRAILL, WALSH, & WELLS COUNTIES:

Rates Fringes

ELECTRICIAN

CABLE SPLICER...............$ 28.30 11.26

ELECTRICIAN.................$ 26.95 11.10

----------------------------------------------------------------

ENGI0049-001 10/01/2013

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 25.55 13.75

GROUP 2.....................$ 24.65 13.75

GROUP 3.....................$ 24.40 13.75

GROUP 4.....................$ 24.25 13.75

GROUP 5.....................$ 23.40 13.75

GROUP 6.....................$ 22.10 13.75

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: All Cranes 60 tons and over, Cranes doing piling,

sheeting, dragline/clam work, Derrick(Guy & Stiff), Gentry

Crane Operator, Helicopter Operator, Mole Operator or

Tunnel Mucking Machine, Power Shovel 3-1/2 CY. and over and

Traveling Tower Crane.

GROUP 2: All Cranes 21 tons and up to 59 tons, Backhoe

Operator 3 CY. and over, Creter Crane, Dredge Operator 12'

and Over, Equipment Dispatcher, Finish Motor Grader, Front

End Loader Operator 8 CY. and over, Master Mechanic (When

supervising 5 or more Mechanics), Mon-o-rail Hoist

Operator, Power Shovel up to and including 3-1/2 CY. and

Tugboat.

GROUP 3: Cranes 20 tons and under, Asphalt Paving Machine

Operator, Asphalt Plant Operator, Automated Grade Trimmer,

Backhoe Operator 1 CY. up to and including 2-1/2 CY., Boom

Page 42: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 40 of 59

Truck Hydraulic (8 Tons & over), Cableway Operator,

Concrete Batch Plant Operator(electronic or manual),

Concrete Mixer Paving Machine Operator, Concrete Paver-

Bridge Decks, Concrete Pump, Concrete Spreader Operator &

Belt Placer, Crushing Plant Operator, Dozer Operator,

Dredge Operator or Engineer 11'' and under, Drill Rigs,

Heavy Duty Rotary or Chum or Cable Drill, Front End Loader

(3-1/2 CY. up to and including 7-1/2 CY.), Gravel Washing &

Screening Plant Operator, Locomotive, all types, Mechanic

or Welder(heavy duty), Motor Grade Operator, Pavement

Breaker (Non-Hydro Hammer type, Pipeline Wrapping, Cleaning

& Bending Machine Operator, Power Actuated Auger and

Horizontal Boring Machine Operator 6'' and over,

Refrigeration Plant Engineer, Roto Milling Machine (Surface

Planer) 43'' & over, Scraper Operator, Slip Form Concrete

Paving Operator, Tandem Pushed Quad 9 or similar, Tractor

with Boom Attachment, Trenching Machine- 100 HP. and over.

GROUP 4: Articulated/Off Road Hauler, Asphalt Dump Person,

Asphalt Paving Screed Operator, Backhoe - up to and

including 1/2 CY., Boring Machine locator, Console Board

Operator, Distributor Operator (Bituminous), Forklift

Operator, Front End Loader- 1-1/2 CY. up to and including 3

CY., Grade Person, Gravel Screening Plant Operator (not

Crushing or Washing), Greaser, Lazer-Screed Operator,

Longitudinal Float and Spray Operator, Micro surfacer

Machine, Motor Grade Operator-Hual Roads, Paving Breaker-

Hydro Hammer Type, Pugmill Operator, Push Tractor, Roller,

Steel & Rubber on Hot Mix Asphalt Paving, Rotomill Machine

(Surface Planer), up to and including 42'', Rumble Strip

Machine, Sand and Chip Spreader, Self-propelled Sheepsfoot

Packer with or without Blade attachment, Self-propelled

Traveling Soil Stabilizer, Sheepsfoot Packer with Dozer

attatchment- 100 HP and over, Shouldering Machine, Slip

Form, Curb & Gutter Operator, Slurry Seal Machine, Tamping

Machine Operator, Tie Tamper and Ballast Machine, Trenching

Machine Operator- 46 HP up to and including 99 HP, Truck

Mechanic, Well Points, Tub Grinder, Fuel/Lube Operator.

GROUP 5: Boom Truck- A- Frame or Hydraulic 2 tons up to and

including 7 tons, Broom-Self propelled, Concrete Saw (Power

Operated), Cure Bridge Operator, Front End Loader Operator,

less than 1-1/2 CY., Mobile Cement Mixer, Power Actuated

Auger & Horizontal Boring Machine Operator up to and

including 5", Roller, on other than Hot Mix Asphalt Paving,

Oilers, Vibrating Packer Operator (Pad Type)

Self-propelled, Water Spraying Equipment-Self Propelled,

Skidsteer Operator with Attachments.

GROUP 6: Brakeman or Switchman, Curb Machine Operator

(Manuel), Dredge or Tugboat Deckhand, Drill Truck

Gravel/Testing Operator, Form Trench Digger (Power), Gunite

Operator Gunall, Paint Machine Striping Operator, Pick-up

Sweeper, 1CY. & over Hopper Capacity, Scissor Jack-Self

Propelled Platform Lift, Straw Mulcher and Blower, Stump

Chipper Operator, Tractor Pulling Compaction or Aerating

Equipment, Trenching Machine Operator- up to and including

45 HP., Assistant/Apprentice Operator.

----------------------------------------------------------------

Page 43: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 41 of 59

TEAM0638-002 10/01/2013

Rates Fringes

TRUCK DRIVER

Euclid over 20 yds..........$ 26.62 10.80

Single Axle Trucks..........$ 24.67 10.80

Tandem Tri Axle Semi, Low

Boy and Off Road Heavy

Duty End Dumps 20 yds &

under.......................$ 25.10 10.80

Tandem Tri/ Axle Truck......$ 24.79 10.80

----------------------------------------------------------------

SUND2002-001 09/06/2013

Rates Fringes

Electrician

Cass County.................$ 14.72 3.40

CARPENTER........................$ 26.00 3.90

Cement Mason/Finisher............$ 26.00 3.90

Laborers:

GROUP 1:....................$ 18.40

GROUP 2.....................$ 18.65

GROUP 3.....................$ 18.80

GROUP 4.....................$ 19.55

LABORERS CLASSIFICATIONS

GROUP 1: General Construction Laborers: Sack Shaker (cement

and mineral filler): Pipe Handler: Drill Runner Tender:

Salamander Heater and Blower Tender, Light truck, Pickup

Driver, Flaggers and Pilot Car Drivers.

GROUP 2: Semi Skilled Laborer: Bulk Cement Handler: Conduit

Layer, Telephone or Electrical: Form Setter (pavement): Gas

Electric or pneumatic tool operator: Chipping Hammer,

Grinders and Paving Brakers (tamper-drit) Concrete Vibrator

Operator: Chain Saw Operator: Concrete Saw Operator:

Concrete Curing Man (not water): Bituminous worker

(Shoveler, Dumper, Raker and Floated): Kettleman

(bituminous or lead): Concrete Bucket Signlman: Power Buggy

Operator: Brick and Mason Tender: Multiplate Pipelayer:

Culvert Pipe Layers: Concrete Finishers Tender. Carpenters

Tenders.

GROUP 3: Caisson Worker: Bottom Man (sanitary sewer, storm

sewer water and gas liners): Concrete Mixer Operator (one

bag capacity): Mortar Mixer.

GROUP 4: Pipe Layers (sanitary sewer, storm sewer, water and

gas lines): Drill runner (includes Wagon Churn or Air

Track) Powderman, Gunite and Sandblast, Nozzleman,

Reinforcing Steel Setters/Tiers.

----------------------------------------------------------------

Page 44: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 42 of 59

WELDERS - Receive rate prescribed for craft performing

operation to which welding is incidental.

================================================================

Unlisted classifications needed for work not included within

the scope of the classifications listed may be added after

award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

----------------------------------------------------------------

The body of each wage determination lists the classification

and wage rates that have been found to be prevailing for the

cited type(s) of construction in the area covered by the wage

determination. The classifications are listed in alphabetical

order of "identifiers" that indicate whether the particular

rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with

characters other than "SU" denotes that the union

classification and rate have found to be prevailing for that

classification. Example: PLUM0198-005 07/01/2011. The first

four letters , PLUM, indicate the international union and the

four-digit number, 0198, that follows indicates the local union

number or district council number where applicable , i.e.,

Plumbers Local 0198. The next number, 005 in the example, is

an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the

effective date of the most current negotiated rate/collective

bargaining agreement which would be July 1, 2011 in the above

example.

Union prevailing wage rates will be updated to reflect any

changes in the collective bargaining agreements governing the

rates.

0000/9999: weighted union wage rates will be published annually

each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived

from survey data by computing average rates and are not union

rates; however, the data used in computing these rates may

include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union majority rates,

LA indicates the State of Louisiana; 2004 is the year of the

survey; and 007 is an internal number used in producing the

wage determination. A 1993 or later date, 5/13/2010, indicates

the classifications and rates under that identifier were issued

as a General Wage Determination on that date.

Page 45: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 43 of 59

Survey wage rates will remain in effect and will not change

until a new survey is conducted.

----------------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can

be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on

a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests

for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted

because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal

process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an

interested party (those affected by the action) can request

review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the

interested party's position and by any information (wage

payment data, project description, area practice material,

etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an

interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

Page 46: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 44 of 59

4.) All decisions by the Administrative Review Board are final.

================================================================

END OF GENERAL DECISION

Page 47: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 45 of 59

Section K - Representations, Certifications and Other Statements of Offerors

CLAUSES INCORPORATED BY REFERENCE

52.236-28 Preparation of Proposals--Construction OCT 1997

252.209-7001 Disclosure of Ownership or Control by the Government of a

Terrorist Country

JAN 2009

CLAUSES INCORPORATED BY FULL TEXT

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2014)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) The small business size standard is $33,500,000.00.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a

construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500

employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of

this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System

for Award Management (SAM), and has completed the Representations and Certifications section of SAM

electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding

individual representations and certifications in the solicitation. The offeror shall indicate which option applies by

checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications

in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-

fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This

provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at

52.204-7, System for Award Management.

Page 48: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 46 of 59

(iv) 52.204-5, Women-Owned Business (Other Than Small Business).This provision applies to solicitations that--

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation. This provision

applies to solicitations using funds appropriated in fiscal years 2008, 2009, 2010, or 2012.

(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the

contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.214-14, Place of Performance – Sealed Bidding. This provision applies to invitations for bids except those

in which the place of performance is specified by the Government.

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is

specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations

when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the

contract will be performed in the United States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the

clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for

construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to

solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the

contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or

specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased

Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use

of, EPA-designated items.

(xvi) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-

1.

(xvii) 52.225-4, Buy American Act--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II,

and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

Page 49: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 47 of 59

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $79,507, the provision with its Alternate II applies.

(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.

(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at

52.225-5.

(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision

applies to all solicitations.

(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to

Iran--Representation and Certifications. This provision applies to all solicitations.

(xxi) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision

applies to--

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational

institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of

Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following certifications are applicable as indicated by the Contracting Officer:

(Contracting Officer check as appropriate.)

(i) 52.219-22, Small Disadvantaged Business Status.

(A) Basic.

(B) Alternate I.

(ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iii) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance,

Calibration, or Repair of Certain Equipment Certification.

(iv) 52.222-52, Exemption from Application of the Service Contract Act to Contracts for Certain

Services–Certification.

(v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA–Designated

Products (Alternate I only).

(vi) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

Page 50: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 48 of 59

(d) The offeror has completed the annual representations and certifications electronically via the SAM website

accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by

submission of the offer that the representations and certifications currently posted electronically that apply to this

solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are

current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the

NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by

reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by

clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer

and are current, accurate, and complete as of the date of this offer.

------------------------------------------------------------------------

FAR Clause Title Date Change

------------------------------------------------------------------------

------ ---------- ------ ------

------------------------------------------------------------------------

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the

representations and certifications posted on SAM.

(End of provision)

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

(a) Definitions. As used in this provision--

Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a

determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian

Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes

administrative proceedings at the Federal and State level but only in connection with performance of a Federal

contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection

of deliverables.

Federal contracts and grants with total value greater than $10,000,000 means--

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-

quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

Principal means an officer, director, owner, partner, or a person having primary management or supervisory

responsibilities within a business entity (e.g., general manager; plant manager; head of a

division or business segment; and similar positions).

(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than

$10,000,000.

(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer,

that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is

current, accurate, and complete as of the date of submission of this offer with regard to the following information:

Page 51: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 49 of 59

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the

award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal

or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty,

reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in--

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an

acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in

paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision,

whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as

required through maintaining an active registration in the System for Award Management database via

https://www.acquisition.gov (see 52.204-7).

(End of provision)

252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2014)

Substitute the following paragraphs (d) and (e) for paragraph (d) of the provision at FAR 52.204-8:

(d)(1) The following representations or certifications in the System for Award Management (SAM) database are

applicable to this solicitation as indicated:

(i) 252.209-7001, Disclosure of Ownership or Control by the Government of a Terrorist Country. Applies to all

solicitations expected to result in contracts of $150,000 or more.

(ii) 252.209-7003, Reserve Officer Training Corps and Military Recruiting on Campus--Representation. Applies to

all solicitations with institutions of higher education.

(iii) 252.216-7008, Economic Price Adjustment--Wage Rates or Material Prices Controlled by a Foreign

Government. Applies to solicitations for fixed-price supply and service contracts when the contract is to be

performed wholly or in part in a foreign country, and a foreign government controls wage rates or material prices and

may during contract performance impose a mandatory change in wages or prices of materials.

(iv) 252.225-7042, Authorization to Perform. Applies to all solicitations when performance will be wholly or in part

in a foreign country.

Page 52: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 50 of 59

(v) 252.229-7012, Tax Exemptions (Italy)--Representation. Applies to solicitations when contract performance will

be in Italy.

(vi) 252.229-7013, Tax Exemptions (Spain)--Representation. Applies to solicitations when contract performance will

be in Spain.

(2) The following representations or certifications in SAM are applicable to this solicitation as indicated by the

Contracting Officer: [Contracting Officer check as appropriate.]

____ (i) 252.209-7002, Disclosure of Ownership or Control by a Foreign Government.

____ (ii) 252.225-7000, Buy American--Balance of Payments Program Certificate.

____ (iii) 252.225-7020, Trade Agreements Certificate.

____ Use with Alternate I.

____ (iv) 252.225-7031, Secondary Arab Boycott of Israel.

____ (v) 252.225-7035, Buy American--Free Trade Agreements--Balance of Payments Program Certificate.

____ Use with Alternate I.

____ Use with Alternate II.

____ Use with Alternate III.

____ Use with Alternate IV.

____ Use with Alternate V.

(e) The offeror has completed the annual representations and certifications electronically via the SAM Web site at

https://www.acquisition.gov/. After reviewing the SAM database information, the offeror verifies by submission of

the offer that the representations and certifications currently posted electronically that apply to this solicitation as

indicated in FAR 52.204-8(c) and paragraph (d) of this provision have been entered or updated within the last 12

months, are current, accurate, complete, and applicable to this solicitation (including the business size standard

applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this

offer by reference (see FAR 4.1201); except for the changes identified below ____ [offeror to insert changes,

identifying change by provision number, title, date]. These amended representation(s) and/or certification(s) are also

incorporated in this offer and are current, accurate, and complete

as of the date of this offer.

FAR/DFARS Clause # Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the

representations and certifications located in the SAM database.

(End of provision)

Page 53: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 51 of 59

Section L - Instructions, Conditions and Notices to Bidders

CLAUSES INCORPORATED BY REFERENCE

52.214-34 Submission Of Offers In The English Language APR 1991

52.214-35 Submission Of Offers In U.S. Currency APR 1991

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004

52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

52.225-10 Notice of Buy American Act Requirement--Construction

Materials

FEB 2009

52.232-13 Notice Of Progress Payments APR 1984

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-5 DAVIS-BACON ACT--SECONDARY SITE OF THE WORK (JUL 2005)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the

work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror

shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not

applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting

Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination

for a secondary site of the work.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance

Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate

workforce in each trade on all construction work in the covered area, are as follows:

Page 54: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 52 of 59

Goals for minority

participation for each trade

Goals for female

participation for each trade

1.2% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor

performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the

goals established for the geographical area where the work is actually performed. Goals are published periodically in

the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract

Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall

be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations

required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to

meet the goals. The hours of minority and female employment and training must be substantially uniform throughout

the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and

women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to

Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of

the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals

will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract

Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in

excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The

notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is North Dakota,

Grand Forks County, Grand Forks.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an

agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served

on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

319th Contracting Flight

Attn: Matt D. Sanders

575 Tuskegee Airmen Blvd., Bldg 418

Page 55: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 53 of 59

Grand Forks AFB, ND 58205-6436

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the

GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting

the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters

are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for:

17 June 2014, Tuesday at 1:00 PM CDT

(c) Participants will meet at:

575 Tuskegee Airmen Blvd., Bldg 418

Grand Forks AFB, ND 58205-6436

(d) Contractors are required to enter through the South Gate Entrance off Highway 2 to pick up visitor passes. All

parties will meet at the 319 Contracting Flight no later than 12:55 PM CDT. This will be the only site visit offered

for this RFP.

(e) To obtain visitor passes, email the following information of those individuals attending to the attention of SSgt

Justin Baker ([email protected]) and to Mr. Mattison Sanders ([email protected]) no later than 16 June

2014. The following information will need to be provided.

Full Name

Company Representing

Driver’s License Number and State Issued

(f) Vehicles will need current proof of registration and insurance to be driven on Grand Forks AFB, ND

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if

they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is

cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its

quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by

paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a

solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

https://www.acquisition.gov/far

(End of provision

Page 56: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 54 of 59

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an

authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation (DFARS) (48 CFR Chapter two (2))

provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the

regulation.

(End of provision)

SECTION L

L-01. PROPOSAL PREPARATION INSTRUCTIONS

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and

certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Offerors

must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying

rationale. The response shall consist of two (2) separate parts; Part I - Price Proposal, and Part II - Past

Performance Information.

B. The contracting officer has determined there is a high probability of adequate price competition in this

acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in

the contracting officer's opinion, adequate price competition exists no additional data will be requested and

certification under FAR 15.406-2 will not be required. However, if at any time during this competition the

contracting officer determines that adequate price competition no longer exists; offerors may be required to submit

cost data to the extent necessary for the contracting officer to determine the reasonableness and affordability of the

price.

C. Specific Instructions:

1. PART I – PRICE PROPOSAL - Submit original and one (1) copy

(a) Complete blocks 14, 15, 16, 17 and 18 of the SF1442. In doing so, the offeror accedes to the contract

terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN).

The extended amount must equal the whole dollar unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned

in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

(d) If applicable, provide a copy of the letter from the Small Business Administration (SBA) showing proof

of Section 8(a) status.

(e) All Large Business Concerns that submit a proposal must also develop and submit a Subcontracting

Plan in accordance with FAR 52.219-9 (DEV) with the initial proposal. The Subcontracting Plan shall be a

negotiable item during any discussions that the government may hold and shall become part of the resultant contract

if awarded to a Large Business Concern.

2. PART II – PAST PERFORMANCE INFORMATION - Limited to no more than 2 pages per contract

listed. Only references for relevant past efforts/contracts are desired. Submit original plus three (3) copies.

(a) Quality and Satisfaction Rating for Contracts Completed in the Past Three Years: Provide any

information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates

Page 57: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 55 of 59

customer satisfaction with overall job performance and quality of completed product for relevant past

efforts/contracts (similar in scope and magnitude of effort and complexities this solicitation requires). In addition,

explain corrective actions taken in the past, if any, for substandard performance and any current performance

problems such as cost overruns, extended performance periods, numerous warranty calls, etc.

(b) Performance Surveys: The government will evaluate the quality and extent of offeror's performance

deemed relevant to the requirements of this RFP. The government will use information submitted by the offeror and

any other sources of information available to the Government to assess past performance. Provide a list of three (3)

to five (5), of the most relevant contracts performed for Federal agencies and commercial customers within the last

three (3) years. Relevant contracts include but are not limited to: Construction of new building areas to include

entryways, constructions of standing seam metal roofs, construction and/or repair of parking lots, sidewalks, and

associated lighting, construction of generator screen walls and façade treatments, exterior envolope repairs, interior

demolitions, and interior repair/alteration to include partitions, finishes, electrical, and mechanical systems. The

evaluation of past performance information will take into account past performance information regarding

predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or

critical aspects of the requirement when such information is relevant to the instant acquisition. Past performance

regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform

major or critical aspects of the requirement will not be rated as highly as past performance information for the

principal offeror. Furnish the following information for each contract listed:

(i) Company/Division name

(ii) Product/Service

(iii) Contracting Agency/Customer

(iv) Contract Number

(v) Contract Dollar Value

(vi) Period of Performance

(vii) Verified, up-to-date name, address, FAX & telephone number of the contracting officer

(viii) Comments regarding compliance with contract terms and conditions

(ix) Comments regarding any known performance deemed unacceptable to the customer, or not in

accordance with the contract terms and conditions.

If a teaming arrangement is contemplated, provide complete information as to the arrangement, including

any relevant and recent past performance information on previous teaming arrangements with same partner. If this is

a first time joint effort, each party to the arrangement must provide a list of past relevant contracts.

(c) Subcontractor Consent: Past performance information pertaining to a subcontractor cannot be

disclosed to the prime offeror without the subcontractor’s consent. Provide with the proposal a letter from all

subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past

performance information to the prime contractor.

(d) Financial Data Information: Complete the attached Financial Institution Reference Sheet and return

with the proposal.

D. Documents submitted in response to this RFP must be fully responsive to and consistent with the following:

1. Requirements of the RFP (CLINs & technical specifications) and government standards and regulations

pertaining to the PWS.

2. Evaluation Factors for Award in Section M of this RFP.

3. Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this

Section L will not be read or evaluated, and will be removed from the proposal.

4. Format for proposal Part II shall be as follows:

(a) The proposal will be 8 1/2” x 11” paper except for fold-outs used for charts, tables, or diagrams, which

may not exceed 11” x 17”.

(b) A page is defined as one face of a sheet of paper containing information.

(c) Typing shall not be less than 12 pitch.

(d) Elaborate formats, bindings or color presentations are not desired or required.

Page 58: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 56 of 59

E. INFORMATION REGARDING SUBMISSION OF PROPOSAL

(a) All proposals must be either hand carried or mailed directly to:

319th Contracting Flight

575 Tuskegee Airmen Blvd, Bldg 418

Grand Forks AFB, ND 58205

The sealed envelope or package used to submit your proposal must show the time and date specified for

receipt, the solicitation number, and the name and address of the offeror. Faxed or emailed proposals will NOT be

accepted.

(b) Offerors are cautioned that Grand Forks AFB, ND has visitor control procedures requiring individuals

not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE

ANTICIPATED WHEN HANDCARRYING PROPOSALS. Offerors should allow sufficient time to obtain a visitor

pass and arrive at the 319th Contracting Flight PRIOR to the time specified for receipt. Late proposals will be

processed in accordance with FAR 15.208(b) “Submission, Modification, Revision, and Withdrawal of Proposals.”

Page 59: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 57 of 59

Section M - Evaluation Factors for Award

SECTION M

M-01 BASIS FOR CONTRACT AWARD: This is a competitive best value source selection in which

competing offerors' past performance history will be evaluated on a basis significantly more important than cost or

price considerations. By submission of its offer, the offeror accedes to all solicitation requirements, including terms

and conditions, representations and certifications, and technical requirements, in addition to those identified as

evaluation factors or subfactors. All acceptable offers shall be treated equally except for their prices and

performance records. Failure to meet a requirement may result in an offer being determined unacceptable. Offerors

must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying

rationale. The evaluation process shall proceed as follows:

A. Price Evaluation. Initially, offers shall be ranked according to price. An offeror’s proposed prices will be

determined by multiplying the quantities identified in Section B by the proposed unit price for each Contract Line

Item Number to confirm the extended amount for each. When applicable, the price evaluation adjustment for

HUBZone small business concerns will be applied in accordance with FAR 52.219-4, Notice of Price Evaluation

Preference for HUBZone Small Business Concerns, to arrive at an evaluated price. The price evaluation will

document for the offers evaluated under the following subparagraph B, the reasonableness and affordability of the

proposed total evaluated price.

B. Performance Confidence Assessment. The contracting officer shall seek recent and relevant performance

information on the lowest priced offerors based on (1) the past efforts provided by the offeror and (2) data

independently obtained from other government and commercial sources. The government reserves the right to seek

information on higher priced offerors if none of the lower priced offerors receive a “Substantial Confidence”

performance confidence assessment.

C. Relevant contracts include but are not limited to: Construction of new building areas to include entryways,

constructions of standing seam metal roofs, construction and/or repair of parking lots, sidewalks, and associated

lighting, construction of generator screen walls and façade treatments, exterior envolope repairs, interior demolitions,

and interior repair/alteration to include partitions, finishes, electrical, and mechanical systems. The purpose of the

past performance evaluation is to allow the government to assess the offeror’s probability of meeting the solicitation

requirements based on the offeror’s demonstrated past performance. The assessment process will result in an overall

performance confidence assessment of Substantial Confidence, Satisfactory Confidence, Limited Confidence, No

Confidence, or Unknown Confidence as defined in DoD Source Selection Procedures. Past performance regarding

predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or

critical aspects of the requirement will not be rated as highly as past performance information for the principal

offeror. Offerors with no recent/relevant performance history or if the offeror’s performance record is so sparse that

no meaningful confidence assessment rating can be reasonably assigned shall receive the rating "Unknown

Confidence," meaning the rating is treated neither favorably nor unfavorably (neutral). Confident assessment ratings

are defined as the following:

Page 60: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 58 of 59

D. In evaluating past performance, the government reserves the right to give greater consideration to information on

those contracts deemed most relevant to the effort described in this RFP.

E. If the lowest priced evaluated offer is judged to have a Substantial Confidence performance assessment, that offer

represents the best value for the government and the evaluation process stops at this point. Award shall be made to

that offeror without further consideration of any other offers.

F. If the lowest priced offeror is not judged to have a Substantial Confidence performance confidence assessment,

the next lowest priced offeror will be evaluated and the process will continue (in order by price) until an offeror is

judged to have a Substantial Confidence performance confidence assessment or until all offerors are evaluated. The

Source Selection Authority shall then make an integrated assessment best value decision.

G. Offerors are cautioned to submit sufficient information and in the format specified in section L. Offerors may be

asked to clarify certain aspects of their proposal (for example, the relevance of past performance information) or

respond to adverse past performance information to which the offeror has not previously had an opportunity to

respond. Adverse past performance is defined as past performance information that supports a less than satisfactory

rating on any evaluation element or any unfavorable comments received from sources without a formal rating system.

Communication conducted to resolve minor or clerical errors will not constitute discussions and the contracting

officer reserves the right to award a contract without the opportunity for proposal revision.

H. The government intends to award a contract without discussions with respective offerors. The government,

however, reserves the right to conduct discussions if deemed in its best interest.

TABLE - PERFORMANCE CONFIDENCE ASSESSMENTS

Rating Description

SUBSTANTIAL CONFIDENCE Based on the offeror’s performance record, the government has a high

expectation that the offeror will successfully perform the required effort.

SATISFACTORY CONFIDENCE Based on the offeror’s performance record, the government has an expectation

that the offeror will successfully perform the required effort.

LIMITED CONFIDENCE Based on the offeror’s performance record, the government has a low

expectation that the offeror will successfully perform the required effort.

NO CONFIDENCE Based on the offeror’s performance record, the government has no expectation

that the offeror will be able to successfully perform the required effort.

UNKNOWN CONFIDENCE No performance record is identifiable or the offeror’s performance record is so

sparse that no confidence assessment rating can be reasonably assigned.

Page 61: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

FA4659-14-R-0011

Page 59 of 59

Page 62: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

1. 02 41 00, 1.2.1, Demolition Plan X

2. 02 41 00, 1.6, Notification X

3. 03 30 00, 1.6.1.1, Reinforcing steel

X

4. 03 30 00, 2.4.6, Materials for Curing Concrete

X

5. 03 30 00, 2.4.1, Cement X

6. 03 30 00, 2.4.1.2, Portland Cement

X

7. 03 30 00, 2.3.2, Ready-Mix Concrete

X

8. 03 30 00, 2.3.3, Concrete Curing Materials

X

9. 03 30 00, 2.5, Reinforcement X

10. 03 30 00, 2.3.1, mix design X

11. 03 30 00, 1.6.3.1, Concrete mix design

X

12. 03 30 00, 3.11.2.3, Compressive strength tests

X

13. 03 30 00, 3.11.2.4, Air Content X

14. 03 30 00, 2.3.1, Slump X

15. 03 30 00, 2.3.1, Air Entrainment X

Page 63: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

16. 03 30 00, 1.6.2.1, Curing concrete elements

X

17. 03 30 00, 2.5.4, Steel Bar X

18. 04 20 00, 1.6.2, Cold Weather Installation

X

19. 04 20 00, 2.6, Water-Repellant Admixture

X

20. 04 20 00, 2.2, Clay or Shale Brick

X

21. 04 20 00, 2.8, Anchors, Ties, and Bar Positioners

X

22. 04 20 00, 2.9, Joint Reinforcement

X

23. 04 20 00, 1.2.1.1, Unit Strength Method

X

24. 04 20 00, 3.21.1, Efflorescence Test

X

25. 04 20 00, 2.3.3, Fire-rated CMU X

26. 04 20 00, 1.4.3, Masonry Inspector Qualifications

X

27. 05 12 00, 1.5.1, Fabrication drawings

X

28. 05 12 00, 2.3.2, Non-Shrink Grout

X

29. 05 12 00, 2.1, Steel X

30. 05 12 00, 1.5.2.1, Welding procedures and qualifications

X

Page 64: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

31. 05 40 00, 1.6.1, Framing Components

X

32. 05 40 00, 2.1, studs, joists X

33. 05 40 00, 1.6.2, Metal framing calculations

X

34. 05 40 00, 1.4, Load-bearing cold-formed metal framing

X

35. 05 40 00, 3.1.1, Welds X

36. 05 50 13, 3.1, metal X

37. 05 50 13, 2.3, angles and plates X

38. 06 20 00, 3.1, Moldings X

39. 06 20 00, 2.1.5, Base Trim X

40. 06 20 00, 2.1.6, Chair Rail X

41. 06 20 00, 2.2, Trim X

42. 06 41 16.00 10, 2.8, Shop Drawings

X

43. 06 41 16.00 10, 2.2, Plastic Laminates

X

44. 06 41 16.00 10, 2.4, Cabinet Hardware

X

45. 06 61 16, 2.1, Solid polymer material

X

Page 65: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

46. 06 61 16, 2.3, Fabrications X

47. 06 61 16, 2.1, Material X

48. 06 61 16, 2.3, Fabrications X

49. 06 61 16, 1.4.1, Qualifications X

50. 07 21 13, 2.1, Block or board insulation

X

51. 07 21 16, 2.1, Blanket insulation X

52. 07 21 16, 2.3, Vapor retarder X

53. 07 21 16, 2.4, Pressure sensitive tape

X

54. 07 22 00, 2.4, Wood nailers X

55. 07 22 00, 2.1.4, Tapered roof insulation

X

56. 07 22 00, 2.3, Fasteners X

57. 07 22 00, 2.1, Insulation X

58. 07 22 00, 2.3, fasteners X

59. 07 22 00, 2.1, insulation X

60. 07 42 13, 1.5.2, Qualification of Manufacturer

X

Page 66: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

61. 07 42 13, 1.5.3, Qualification of Installation Contractor

X

62. 07 42 13, 1.5.1, Installation Drawings

X

63. 07 42 13, 2.3.1, Wall Panels X

64. 07 42 13, 2.3.2, Factory Color Finish

X

65. 07 42 13, 1.5.4, Closure Materials

X

66. 07 42 13, 2.6.4.4, Pressure Sensitive Tape

X

67. 07 42 13, 2.6.4.1, Sealants and Caulking

X

68. 07 42 13, 1.5.4, Accessories X

69. 07 42 13, 2.6, Accessories X

70. 07 42 13, 2.3.1, Wall Panels X

71. 07 42 13, 2.5, Fasteners X

72. 07 42 13, 2.6.3, Metal Closure Strips

X

73. 07 42 13, 2.3.2.5, Color chart X

74. 07 42 13, 3.7.2, Leakage Tests X

75. 07 42 13, 2.3.2.6, Coating X

Page 67: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

76. 07 42 13, 2.3.2.6, Chalking X

77. 07 42 13, 3.3, Installation X

78. 07 42 13, 1.8, Warranty X

79. 07 42 13, 1.5.5, Maintenance Instructions

X

80. 07 42 13, 1.8.1, 20 year 'No Dollar Limit' warranty for labor and material

X

81. 07 42 19, 2.4, Composite wall panels

X

82. 07 42 19, 2.4, Composite Wall Panels

X

83. 07 42 19, 2.4, Composite Wall Panels

X

84. 07 51 13, 2.4, Asphalt X

85. 07 51 13, 3.3.3, Felts X

86. 07 51 13, 3.3.3, Felts X

87. 07 51 13, 2.3, Flashing Membrane

X

88. 07 51 13, 2.9, Fasteners X

89. 07 51 13, 2.6, Primer X

90. 07 51 13, 2.7, Asphalt Roof Cement

X

Page 68: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

91. 07 51 13, 2.8, Cant Strips X

92. 07 51 13, 2.10, Pre-Manufactured Accessories

X

93. 07 51 13, 2.11, Roof Walkways X

94. 07 51 13, 1.8.1, Warranties X

95. 07 51 13, 1.2, Pre-construction Roof Evaluation Report

X

96. 07 51 13, 3.5.3, Samples of Built-Up Roofing

X

97. 07 51 13, 3.1, Verification Of Conditions

X

98. 07 51 13, 1.5.1, Bill of Lading X

99. 07 51 13, 1.4.1, Qualifications of Applicator

X

100. 07 51 13, 3.3.3, Felts X

101. 07 51 13, 3.3.3, Felts X

102. 07 51 13, 3.5.2, Flashings X

103. 07 51 13, 2.4, Asphalt X

104. 07 51 13, 1.8, WARRANTY X

105. 07 51 13, 3.6, INFORMATION CARD

X

Page 69: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

106. 07 60 00, 3.1.14, Gutters X

107. 07 60 00, 3.1.15, Downspouts X

108. 07 60 00, 3.1.11, Gravel stops and fascias

X

109. 07 60 00, 3.1.10, Counterflashing

X

110. 07 60 00, 3.1.16, Flashing at roof penetrations

X

111. 07 60 00, 3.1.12, Reglets X

112. 07 60 00, 3.1.17, Conductor heads

X

113. 07 60 00, 3.1.13, Drip edge X

114. 07 60 00, 3.1.18, Eave flashing X

115. 07 61 14.00 20, 1.2.5, Roofing X

116. 07 61 14.00 20, 2.1, Roofing panels

X

117. 07 61 14.00 20, 2.2, Attachment clips

X

118. 07 61 14.00 20, 2.3.1, Closures X

119. 07 61 14.00 20, 2.3, Accessories X

120. 07 61 14.00 20, 2.3.2, Fasteners X

Page 70: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

121. 07 61 14.00 20, 2.3.3, Sealants X

122. 07 61 14.00 20, 2.4, Insulation X

123. 07 61 14.00 20, 1.7, warranty X

124. 07 61 14.00 20, 2.1, panel X

125. 07 61 14.00 20, 2.3, Accessories X

126. 07 61 14.00 20, 2.3.3, Sealants X

127. 07 61 14.00 20, 1.5, Design calculations

X

128. 07 61 14.00 20, 1.3.3, Structural performance

X

129. 07 61 14.00 20, 1.6.5, Finish X

130. 07 61 14.00 20, 1.6.3, Installer's Qualifications

X

131. 07 61 14.00 20, 3.3, Installation X

132. 07 61 14.00 20, 3.7, Information card

X

133. 07 84 00, 2.1, Firestopping Materials

X

134. 07 84 00, 2.1, Firestopping Materials

X

135. 07 84 00, 1.4, Installer Qualifications

X

Page 71: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

136. 07 92 00, 2.1, Sealants X

137. 07 92 00, 2.2, Primers X

138. 07 92 00, 2.3, Bond breakers X

139. 07 92 00, 2.4, Backstops X

140. 07 92 00, 2.1, Sealants X

141. 08 11 13, 2.1, Doors X

142. 08 11 13, 2.1, Doors X

143. 08 11 13, 2.5, Frames X

144. 08 11 13, 2.5, Frames X

145. 08 11 13, 2.7, Weatherstripping X

146. 08 11 13, 2.1, Doors X

147. 08 11 13, 2.5, Frames X

148. 08 11 13, 2.7, Weatherstripping X

149. 08 11 16, 1.5.1, Doors and frames

X

150. 08 11 16, 2.1, Doors and frames X

Page 72: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

151. 08 11 16, 1.5.2.1, Finish sample X

152. 08 11 16, 1.2.1, calculations X

153. 08 11 16, 1.2.2, calculations X

154. 08 11 16, 1.5.1, Doors and frames

X

155. 08 11 16, 2.1, Doors and frames X

156. 08 14 00, 2.1, Doors X

157. 08 14 00, 2.1, Doors X

158. 08 14 00, 2.2, Accessories X

159. 08 14 00, 2.3.6, Water-resistant sealer

X

160. 08 14 00, 1.5, warranty X

161. 08 14 00, 2.1.2, Sound transmission class rating

X

162. 08 14 00, 1.3, Certification X

163. 08 14 00, 2.3.5.2, Door finish colors

X

164. 08 33 13, 1.2, Rolling Counter Doors

X

165. 08 33 13, 3.1, Installation X

Page 73: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

166. 08 33 13, 3.3, Cleaning X

167. 08 33 13, 2.2, Rolling Counter Door (Non-Rated)

X

168. 08 41 13, 1.3, Installation Drawings

X

169. 08 41 13, 1.3, Fabrication Drawings

X

170. 08 41 13, 1.3, Manufacturer's Catalog Data

X

171. 08 41 13, 1.3, Finish and Color Samples

X

172. 08 41 13, 3.4, Manufacturer's Product Warranty

X

173. 08 51 13, 2.1, Windows X

174. 08 51 13, Fabrication Drawings X

175. 08 51 13, 2.1, Windows X

176. 08 51 13, 2.2.5.1, Hardware X

177. 08 51 13, 2.2.5, Accessories X

178. 08 51 13, 1.9.1.6, Thermal performance

X

179. 08 51 13, 1.4.2.1, Finish Sample X

180. 08 51 13, 1.4.2.2, Window Sample

X

Page 74: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

181. 08 51 13, 1.4.3, Design Analysis X

182. 08 51 13, 1.4.4, Minimum condensation resistance factor

X

183. 08 51 13, 1.4.4, Resistance to forced entry

X

184. 08 51 13, 1.9.3.3, Standard Airblast Test

X

185. 08 51 13, 2.1, Windows X

186. 08 62 26, 3.2, Shop Drawings X

187. 08 62 26, 2.3.1, Tubular Daylighting Devices

X

188. 08 62 26, 2.3, System X

189. 08 62 26, 1.6, Warranty X

190. 08 71 00, 1.4, Hardware schedule

X

191. 08 71 00, 2.3.7, Keying system X

192. 08 71 00, 2.3, Hardware items X

193. 08 71 00, 3.1, Installation X

194. 08 71 00, 1.4, Hardware Schedule

X

195. 08 81 00, 3.1, Installation X

Page 75: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

196. 08 81 00, 1.6.1, Insulating Glass X

197. 08 81 00, 1.6.1, Insulating Glass X

198. 08 81 00, 2.3, Setting and sealing materials

X

199. 08 81 00, 3.2, Glass setting X

200. 09 06 90, 2.2, Color Schedule X

201. 09 22 00, 2.1, Metal support systems

X

202. 09 29 00, 2.1.5, Cementitious backer units

X

203. 09 29 00, 2.1.2, Glass Mat Water-Resistant Gypsum Tile Backing Board

X

204. 09 29 00, 2.1.3, Glass Mat Covered or Reinforced Gypsum Sheathing

X

205. 09 29 00, 2.1.4, Impact Resistant Gypsum Board

X

206. 09 29 00, 2.1.1, Gypsum Board X

207. 09 30 00, 1.4, Detail Drawings X

208. 09 30 00, 2.1, Tile X

209. 09 30 00, 2.3, Mortar and Grout X

210. 09 30 00, 2.1, Tile X

Page 76: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

211. 09 30 00, 2.4, Solid Surfacing Thresholds

X

212. 09 30 00, 2.3, Grout X

213. 09 51 00, 1.2, Approved Detail Drawings

X

214. 09 51 00, 1.2, Acoustical Ceiling System

X

215. 09 51 00, 2.1, Acoustical Units X

216. 09 65 00, 2.8, Resilient Flooring and Accessories

X

217. 09 65 00, 2.8, Resilient Flooring and Accessories

X

218. 09 65 00, 2.5, Adhesives X

219. 09 65 00, 2.9, Resilient Flooring and Accessories

X

220. 09 65 00, 3.2, Surface Preparation

X

221. 09 65 00, 3.1, Installation X

222. 09 65 00, 2.8, Resilient Flooring and Accessories

X

223. 09 65 00, 2.8, Resilient Flooring and Accessories

X

224. 09 65 00, 2.4, Adhesives X

225. 09 68 00, 3.4, Installation X

Page 77: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

226. 09 68 00, 2.1, Carpet X

227. 09 68 00, 3.1, Surface Preparation

X

228. 09 68 00, 3.4, Installation X

229. 09 68 00, 1.4, Regulatory Requirements

X

230. 09 68 00, 2.1.1, Physical Characteristics

X

231. 09 68 00, 2.1, Carpet X

232. 09 68 00, 1.4, Regulatory Requirements

X

233. 09 68 00, 2.1, Carpet X

234. 09 68 00, 3.5, Cleaning and Protection

X

235. 09 72 00, Wallcoverings X

236. 09 72 00, 2.4, Primer and Adhesive

X

237. 09 72 00, Wallcoverings X

238. 09 72 00, Wallcoverings X

239. 09 72 00, Wallcoverings X

240. 09 72 00, Wallcoverings X

Page 78: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

241. 09 90 00, 2.1, Manufacturer's Technical Data Sheets

X

242. 09 90 00, 1.9, Color X

243. 09 90 00, 3.5.2, Mixing X

244. 09 90 00, 1.7.2, Manufacturer's Material Safety Data Sheets

X

245. 09 90 00, 2.1, Coatings X

246. 10 10 00, 2.1, Ceiling Projector Mount

X

247. 10 14 00.20, 1.4.2, Detail Drawings

X

248. 10 14 00.20, 1.4.1, Interior Signage

X

249. 10 14 00.20, 1.4.1, Interior Signage

X

250. 10 14 00.20, 3.1, Approved Manufacturer's Instructions

X

251. 10 14 00.20, 3.1.2, Protection and Cleaning

X

252. 10 14 01, 3.1, Approved Detail Drawings

X

253. 10 14 01, 3.1, Installation X

254. 10 14 01, 1.2, Exterior Signage X

255. 10 14 01, 3.1.2, Protection and Cleaning

X

Page 79: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

256. 10 21 13, 1.2, Fabrication Drawings

X

257. 10 21 13, 3.2, Installation Drawings

X

258. 10 21 13, 1.2, Toilet Partition System

X

259. 10 21 13, 1.2, Cleaning and Maintenance Instructions

X

260. 10 21 13, 2.5, Colors And Finishes

X

261. 10 21 13, 2.2, Partition Panels and Doors

X

262. 10 21 13, 2.1.1, Anchoring Devices and Fasteners

X

263. 10 21 13, 2.1.3, Hardware and Fittings

X

264. 10 21 13, 2.1.2, Brackets X

265. 10 21 13, 2.5, Colors and Finishes

X

266. 10 21 13, 1.6, Warranty X

267. 10 26 13, 2.3, Chair Rail X

268. 10 26 13, 2.2, Corner Guards X

269. 10 26 13, 2.5, Finish X

270. 10 28 13, 2.1.2, Finishes X

Page 80: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

271. 10 28 13, 2.2, Accessory Items X

272. 10 28 13, 2.1.2, Finishes X

273. 10 28 13, 2.2, Accessory Items X

274. 10 44 16, 2.1, Manufacturer's Data

X

275. 10 44 16, 2.1, Fire Extinguishers X

276. 10 44 16, 2.4, Accessories X

277. 10 44 16, 2.5, Cabinets X

278. 10 44 16, 2.6, Wall Brackets X

279. 10 44 16, 2.1, Fire Extinguishers X

280. 10 44 16, 2.4, Accessories X

281. 10 44 16, 2.5, Cabinets X

282. 10 44 16, 2.6, Wall Brackets X

283. 10 44 16, 3.2.1, Replacement Parts

X

284. 10 44 16, 2.1, Fire Extinguishers X

285. 10 44 16, 2.1, Manufacturer's Warranty with Inspection Tag

X

Page 81: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

286. 12 93 00, 2.1, Bicycle Racks X

287. 12 93 00, 2.2, Bollards X

288. 12 93 00, 1.3.3, Assembly Instruction Drawings

X

289. 12 93 00, 2.1, Bicycle Racks X

290. 12 93 00, 2.2, Collapsible Bollards

X

291. 12 93 00, 2.3, Finish X

292. 12 93 00, 3.2, Testing X

293. 12 93 00, 3.4, Installation X

294. 21 13 13.00 20, 1.5.2, Shop Drawings

X

295. 21 13 13.00 20, 2.1.1, Pipe X

296. 21 13 13.00 20, 2.1.1, Fittings X

297. 21 13 13.00 20, 2.1.3, Sprinklers X

298. 21 13 13.00 20, 2.1.4, Pipe hangers and supports

X

299. 21 13 13.00 20, 2.1.1, Mechanical couplings

X

300. 21 13 13.00 20, 1.3, Hydraulic Calculations

X

Page 82: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

301. 21 13 13.00 20, 3.5, request to schedule Preliminary Tests

X

302. 21 13 13.00 20, 3.5, Preliminary Test Report

X

303. 21 13 13.00 20, 3.6, request to schedule Final Acceptance Test

X

304. 21 13 13.00 20, 3.6, Final Acceptance Test Report

X

305. 21 13 13.00 20, 3.1, Inspection by Fire Protection Engineer

X

306. 21 13 13.00 20, 1.5.1, Fire Protection Engineer

X

307. 21 13 13.00 20, 1.5.2, Sprinkler System Installer

X

308. 21 13 13.00 20, 3.6, Operating and Maintenance Instructions

X

309. 21 13 13.00 20, 3.6, As-built drawings

X

310. 22 00 00, 3.7.1, Plumbing System

X

311. 22 00 00, 2.4, Fixtures X

312. 22 00 00, 2.4.2, Flush valve water closets

X

313. 22 00 00, 2.4.3, Flush valve urinals

X

314. 22 00 00, 2.4.4, Wall-hung urinals

X

315. 22 00 00, 2.4.5, Countertop lavatories

X

Page 83: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

316. 22 00 00, 2.4.6, Countertop sinks

X

317. 22 00 00, 2.4.7, Drinking-water coolers

X

318. 22 00 00, 2.4.8, Plastic shower stalls

X

319. 22 00 00, 2.6, Water heaters X

320. 22 00 00, 2.5.2, Shower Faucets X

321. 22 00 00, 1.5.1, Welding X

322. 22 00 00, 3.7.1, Plumbing System

X

323. 22 00 00, 3.7, Tests, Flushing and Disinfection

X

324. 22 00 00, 1.3, Materials and Equipment

X

325. 22 00 00, 2.1.1, Bolts X

326. 22 00 00, 3.7.1, Plumbing System

X

327. 22 07 19.00 40, 1.5, Installation Drawings

X

328. 22 07 19.00 40, 3.1, Installation Drawings

X

329. 22 07 19.00 40, Part 2, Adhesives

X

330. 22 07 19.00 40, Part 2, Coatings X

Page 84: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

331. 22 07 19.00 40, Part 2, Insulation Materials

X

332. 22 07 19.00 40, Part 2, Tape X

333. 22 07 19.00 40, 1.5, Installation Manual

X

334. 22 07 19.00 40, 3.1, Installation Manual

X

335. 23 00 00, 1.4.5, Detail Drawings X

336. 23 00 00, 2.8.1.1, Insulated Nonmetallic Flexible Duct Runouts

X

337. 23 00 00, 2.8.1.1, Duct Connectors

X

338. 23 00 00, 2.8.2, Duct Access Doors

X

339. 23 00 00, 2.8.3, Fire Dampers X

340. 23 00 00, 2.8.4, Manual Balancing Dampers

X

341. 23 00 00, 2.8.8.1, Diffusers X

342. 23 00 00, 2.8.9, Air Vents, Penthouses, and Goosenecks

X

343. 23 00 00, 2.9.1.1, Centrifugal Fans

X

344. 23 00 00, 2.10, Air Handling Units

X

345. 23 00 00, 2.11.1.1, Variable Volume, Single Duct Terminal Units

X

Page 85: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

346. 23 00 00, 2.11.1.2, Reheat Units X

347. 23 00 00, 2.9.4, Humidifiers X

348. 23 00 00, 3.9, Test Procedures X

349. 23 00 00, 1.2.1, Diagrams X

350. 23 00 00, 3.14, Operation and Maintenance Training

X

351. 23 00 00, 3.12, Performance Tests

X

352. 23 00 00, 3.14, Performance Tests

X

353. 23 00 00, 3.10, Damper Acceptance Test

X

354. 23 00 00, 1.4.1, Bolts X

355. 23 00 00, 3.2, Manufacturer's Installation Instructions

X

356. 23 00 00, 3.14, Operation and Maintenance Training

X

357. 23 00 00, 3.14, Operation and Maintenance Manuals

X

358. 23 00 00, 2.8.3, Fire Dampers X

359. 23 00 00, 2.8.4, Manual Balancing Dampers

X

360. 23 00 00, 2.9.1.1, Centrifugal Fans

X

Page 86: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

361. 23 00 00, 2.10, Air Handling Units

X

362. 23 00 00, 2.11.1.1, Variable Volume, Single Duct Terminal Units

X

363. 23 00 00, 2.11.1.2, Reheat Units X

364. 23 00 00, 2.9.4, Humidifiers X

365. 23 05 15, 1.2, Material, Equipment, and Fixture Lists

X

366. 23 05 15, 1.2, Record Drawings X

367. 23 05 15, 1.2, Connection Diagrams

X

368. 23 05 15, 1.2, Coordination Drawings

X

369. 23 05 15, 1.2, Fabrication Drawings

X

370. 23 05 15, 3.1, Installation Drawings

X

371. 23 05 15, 2.1, Pipe and Fittings X

372. 23 05 15, 2.2, Piping Specialties X

373. 23 05 15, 2.3, Valves X

374. 23 05 15, 2.4, Miscellaneous Materials

X

375. 23 05 15, 2.5, Supporting Elements

X

Page 87: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

376. 23 05 15, 2.2.3.1, Expansion Tanks

X

377. 23 05 15, 2.2.3.2, Air Separator Tanks

X

378. 23 05 15, 1.2, Equipment Foundation Data

X

379. 23 05 15, 1.2, Manufacturer's Standard Color Charts

X

380. 23 05 15, 2.1, Pipe and Fittings X

381. 23 05 15, 2.2, Piping Specialties X

382. 23 05 15, 2.3, Valves X

383. 23 05 15, 3.1, Hydrostatic Tests X

384. 23 05 15, 3.1, Air Tests X

385. 23 05 15, 3.1, Valve-Operating Tests

X

386. 23 05 15, 3.1, Drainage Tests X

387. 23 05 15, 3.1, Pneumatic Tests X

388. 23 05 15, 3.1, Non-Destructive Electric Tests

X

389. 23 05 15, 3.1, System Operation Tests

X

390. 23 05 15, 1.2, Listing of Product Installations

X

Page 88: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

391. 23 05 15, 1.2, Records of Existing Conditions

X

392. 23 05 15, 3.1, Surface Resistance

X

393. 23 05 15, 3.1, Shear and Tensile Strengths

X

394. 23 05 15, 3.1, Temperature Ratings

X

395. 23 05 15, 3.1, Bending Tests X

396. 23 05 15, 3.1, Flattening Tests X

397. 23 05 15, 3.1, Transverse Guided Weld Bend Tests

X

398. 23 05 15, 3.9, Operation and Maintenance Manuals

X

399. 23 05 93, 1.3, Records of Existing Conditions

X

400. 23 05 93, 1.3.3, Records of Existing Conditions

X

401. 23 05 93, 1.5.3.1, TAB Firm X

402. 23 05 93, 1.2, TAB team assistants

X

403. 23 05 93, 1.2, TAB team engineer

X

404. 23 05 93, 1.5.3.2, TAB Specialist

X

405. 23 05 93, 1.2, TAB team field leader

X

Page 89: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

406. 23 05 93, 1.3.3, TAB Schematic Drawings and Report Forms

X

407. 23 05 93, 1.3, Equipment and Performance Data

X

408. 23 05 93, 1.5.3.4, TAB Related HVAC Submittals

X

409. 23 05 93, 1.5.2, TAB Procedures X

410. 23 05 93, 1.5.2, Calibration X

411. 23 05 93, 1.3.3, Systems Readiness Check

X

412. 23 05 93, 1.5.4, TAB Execution X

413. 23 05 93, 1.5.4.3, TAB Verification

X

414. 23 05 93, 1.3.3, Design review report

X

415. 23 05 93, 1.7.1.1, Design review report

X

416. 23 05 93, 1.7.1, Pre-Final DALT report

X

417. 23 05 93, 3.3.5, Pre-Final DALT report

X

418. 23 05 93, 1.7.1, Final DALT report

X

419. 23 05 93, 3.3.8, Final DALT report

X

420. 23 05 93, 1.5.5.2, TAB report for Season 1

X

Page 90: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

421. 23 05 93, 1.5.5.2, TAB report for Season 2

X

422. 23 05 93, 1.5.3.1, TAB Firm X

423. 23 05 93, 1.5.1, Independent TAB Agency and Personnel Qualifications

X

424. 23 05 93, 1.7.1, DALT and TAB Submittal and Work Schedule

X

425. 23 05 93, 1.3.3, Design review report

X

426. 23 05 93, 1.7.1.1, Design review report

X

427. 23 05 93, 1.7.1.2, Pre-field DALT preliminary notification

X

428. 23 05 93, 1.7.1.3, Pre-field TAB engineering report

X

429. 23 05 93, 1.7.1, Advanced notice for TAB field work

X

430. 23 05 93, 3.3.2, Advance Notice of Pre-Final DALT Field Work

X

431. 23 05 93, 1.7.1, Prerequisite HVAC Work Check Out List

X

432. 23 05 93, 1.7.1, Advanced notice for Season 2 TAB field work

X

433. 23 05 93, 1.7.1, Prerequisite HVAC Work Check Out List For Season 2

X

434. 23 07 00, 3.2.2.4, MICA Plates X

435. 23 07 00, 2.3, Pipe Insulation Systems

X

Page 91: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

436. 23 07 00, 3.2, Pipe Insulation Systems

X

437. 23 07 00, 3.3, Duct Insulation Systems

X

438. 23 07 00, 3.4, Equipment Insulation Systems

X

439. 23 07 00, 2.3, Pipe Insulation Systems

X

440. 23 07 00, 3.2, Pipe Insulation Systems

X

441. 23 07 00, 3.3, Duct Insulation Systems

X

442. 23 07 00, 3.4, Equipment Insulation Systems

X

443. 23 07 00, 2.2.1.3, Thermal Insulation

X

444. 23 07 00, 2.3, Pipe Insulation Systems

X

445. 23 07 00, 3.2, Pipe Insulation Systems

X

446. 23 07 00, 3.3, Duct Insulation Systems

X

447. 23 07 00, 3.4, Equipment Insulation Systems

X

448. 23 08 00.00 10, 1.5.2.2, Commissioning Plan

X

449. 23 08 00.00 10, 3.2.1, Pre-Functional Performance Test Checklists

X

450. 23 08 00.00 10, 3.2.2, Functional Performance Tests

X

Page 92: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

451. 23 08 00.00 10, 3.3, Commissioning Report

X

452. 23 08 00.00 10, 1.5.1, Commissioning Firm

X

453. 23 08 00.00 10, 1.5.2, Commissioning Specialist

X

454. 23 09 23, 1.5.5, DDC Contractor Design Drawings

X

455. 23 09 23, 1.5.6, Draft As-Built Drawings

X

456. 23 09 23, 1.5.7, Final As-Built Drawings

X

457. 23 09 23, 2.1, Manufacturer's Catalog Data

X

458. 23 09 23, 2.13.4, Programming Software

X

459. 23 09 23, 2.13.4, GPPC Application Programs

X

460. 23 09 23, 2.13.1, XIF files X

461. 23 09 23, 1.3.1, LNS Database X

462. 23 09 23, 2.13.3, LNS Plug-in X

463. 23 09 23, 1.3.3, Network Bandwidth Usage Calculations

X

464. 23 09 23, 3.2, Existing Conditions Report

X

465. 23 09 23, 3.6, Start-Up and Start-Up Testing Report

X

Page 93: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

466. 23 09 23, 3.8.1, PVT Procedures X

467. 23 09 23, 3.8.3, PVT Report X

468. 23 09 23, 1.5.1, Pre-Construction QC Checklist

X

469. 23 09 23, 1.5.1, Post-Construction QC Checklist

X

470. 23 09 23, 1.10.1, Operation and Maintenance (O&M) Instructions

X

471. 23 09 23, 3.7.1, Training Documentation

X

472. 23 09 23, 1.5.1, Closeout QC Checklist

X

473. 23 21 13.00 20, 1.2.1, Hot water heating system

X

474. 23 21 13.00 20, 2.2.1, Finned tube radiators

X

475. 23 21 13.00 20, 1.4.4, Backflow preventer certification

X

476. 23 21 13.00 20, 1.4.2.1, Report of prior installations

X

477. 23 21 13.00 20, 1.4.2.2, Welding procedures

X

478. 23 21 13.00 20, 1.4.2.3, Welder's qualifications

X

479. 23 21 13.00 20, 2.2.1, Finned tube radiators

X

480. 23 31 13, 1.5, Material, Equipment, and Fixture Lists

X

Page 94: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

481. 23 31 13, 1.5, Records of Existing Conditions

X

482. 23 31 13, 1.3, Connection Diagrams

X

483. 23 31 13, 1.6, Connection Diagrams

X

484. 23 31 13, 1.6, Record Drawings X

485. 23 31 13, Equipment and Performance Data

X

486. 23 31 13, 2.1.1, Galvanized Steel Ductwork Materials

X

487. 23 31 13, 2.1.2, Brazing Materials

X

488. 23 31 13, 2.1.3, Mill-Rolled Reinforcing and Supporting Materials

X

489. 23 31 13, 2.2.1, Round Sheet Metal Duct Fittings

X

490. 23 31 13, 2.2.4, Turning Vanes X

491. 23 31 13, 2.2.6, Flexible Connectors

X

492. 23 31 13, 2.2.9, Flexible Duct Materials

X

493. 23 31 13, 2.2.12, Power-Operated Dampers

X

494. 23 31 13, 2.2.13, Fire Dampers and Wall Collars

X

495. 23 31 13, 2.2.11, Gravity Backdraft and Relief Dampers

X

Page 95: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

496. 23 31 13, 2.2.10, Manual Volume Dampers

X

497. 23 31 13, 1.3, Design Analysis and Calculations

X

498. 23 31 13, 3.4.2, Ductwork Leakage Tests

X

499. 23 31 13, 3.4.1, Operational Tests

X

500. 23 31 13, 3.2, Listing of Product Installations

X

501. 23 31 13, 2.1.1, Galvanized Steel Ductwork Materials

X

502. 23 31 13, 2.1.2, Brazing Materials

X

503. 23 31 13, 2.1.3, Mill-Rolled Reinforcing and Supporting Materials

X

504. 23 31 13, 2.2.1, Round Sheet Metal Duct Fittings

X

505. 23 31 13, 2.2.4, Turning Vanes X

506. 23 31 13, 2.2.5, Dampers X

507. 23 31 13, 2.2.6, Flexible Connectors

X

508. 23 31 13, 3.6, Operation and Maintenance Manuals

X

509. 23 31 13, 2.2.12, Power-Operated Dampers

X

510. 23 31 13, 2.2.13, Fire Dampers and Wall Collars

X

Page 96: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

511. 23 34 23.00 40, 1.4, Shop Drawings

X

512. 23 34 23.00 40, 3.1, Installation Drawings

X

513. 23 34 23.00 40, 1.4, Record Drawings

X

514. 23 34 23.00 40, 1.1, Equipment and Performance Data

X

515. 23 34 23.00 40, 1.4, Equipment and Performance Data

X

516. 23 34 23.00 40, 1.1, Manufacturer's Catalog Data

X

517. 23 34 23.00 40, 1.4, Manufacturer's Catalog Data

X

518. 23 34 23.00 40, 2.2, Housing X

519. 23 34 23.00 40, 2.3, Fan X

520. 23 34 23.00 40, 2.5, Motor X

521. 23 34 23.00 40, 2.6, Bases X

522. 23 34 23.00 40, 2.7, Roof Curbs X

523. 23 34 23.00 40, 2.8, Dampers X

524. 23 34 23.00 40, 2.9, Screens X

525. 23 34 23.00 40, 3.2, Tests X

Page 97: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

526. 23 36 00, 1.3, Records of Existing Conditions

X

527. 23 36 00, 2.1, Shutoff Single-Duct Air Terminal Units

X

528. 23 36 00, 1.3, Record Drawings X

529. 23 36 00, 1.3, Spare Parts X

530. 23 36 00, 2.1, Shutoff Single-Duct Air Terminal Units

X

531. 23 36 00, 3.3, Operation and Maintenance Manuals

X

532. 23 37 13, 2.1, Material, Equipment, and Fixture Lists

X

533. 23 37 13, 2.1, Records of Existing Conditions

X

534. 23 37 13, 2.1, Fabrication Drawings

X

535. 23 37 13, 3.1, Installation Drawings

X

536. 23 37 13, 1.3, Equipment and Performance Data

X

537. 23 54 19, 2.1, Humidifiers X

538. 23 54 19, 1.4.6, System Diagrams

X

539. 23 54 19, 1.4.3, Similar Services X

540. 23 54 19, 3.1, Humidifiers - installation instructions

X

Page 98: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

541. 23 54 19, 2.1, Humidifiers X

542. 23 54 19, 3.4.1, Tests X

543. 23 54 19, 3.8, Field Training X

544. 23 81 47, 1.6.6, System Diagrams

X

545. 23 81 47, 1.3, Ground Source Heat Pump Installer

X

546. 23 81 47, 2.1.1, Water-source water-to-air heat pumps

X

547. 23 81 47, 2.5, Antifreeze X

548. 23 81 47, 3.6.3.2, Water-source water-to-air heat pumps - field acceptance test plan

X

549. 23 81 47, 3.6.3.3, Water-source water-to-air heat pumps - field acceptance test report

X

550. 23 81 47, 2.1.1, ARI/ISO Performance Data For Water Source Heat Pumps

X

551. 23 81 47, 1.10, Ground Source heat Pump Installation Certificate

X

552. 23 81 47, 3.1.1, Water-source water-to-air heat pumps - installation instructions

X

553. 23 81 47, 3.6.5, On-Site Training

X

Page 99: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

554. 23 81 47, 2.1.1, Water-source water-to-air heat pumps

X

555. 26 20 00, 2.11, Panelboards X

556. 26 20 00, 2.14, Transformers X

557. 26 20 00, 2.18, Motor control centers

X

558. 26 20 00, 3.1.6.1, Marking strips X

559. 26 20 00, 2.10, Receptacles X

560. 26 20 00, 2.11.3, Circuit breakers

X

561. 26 20 00, 2.8, Switches X

562. 26 20 00, 2.14, Transformers X

563. 26 20 00, 2.12, Enclosed circuit breakers

X

564. 26 20 00, 2.16, Motor controllers

X

565. 26 20 00, 2.18.2, Combination motor controllers

X

566. 26 20 00, 2.17, Manual motor starters

X

567. 26 20 00, 3.5.2, 600-volt wiring test

X

568. 26 20 00, 3.5.3, Transformer tests

X

Page 100: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

569. 26 20 00, 3.5.4, Ground-fault receptacle test

X

570. 26 20 00, 2.9, Fuses X

571. 26 20 00, 2.24.1, Transformer factory tests

X

572. 26 29 23, 1.4.1, Schematic diagrams

X

573. 26 29 23, 1.4.2, Interconnecting diagrams

X

574. 26 29 23, 1.4.3, Installation drawings

X

575. 26 29 23, 2.1, Variable frequency drives

X

576. 26 29 23, 2.3, Wires and cables X

577. 26 29 23, 1.4.4, Equipment schedule

X

578. 26 29 23, 3.2.1, VFD Test X

579. 26 29 23, 3.2.2, Performance Verification Tests

X

580. 26 29 23, 3.2.3, Endurance Test X

581. 26 29 23, 1.4.5, Installation instructions

X

582. 26 29 23, 2.5.1, VFD Factory Test Plan

X

583. 26 29 23, 1.4.6, Factory test results

X

Page 101: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

584. 26 29 23, 2.1, Variable frequency drives

X

585. 26 51 00, 2.1, Fluorescent lighting fixtures

X

586. 26 51 00, 1.5.1, Fluorescent electronic ballasts

X

587. 26 51 00, 2.1.2, Fluorescent lamps

X

588. 26 51 00, 2.2, LED Lighting Fixtures

X

589. 26 51 00, 2.6, Lighting Contactor

X

590. 26 51 00, 2.7, Photocell Switch X

591. 26 51 00, 2.8, Light Level Sensor

X

592. 26 51 00, 2.9, Exit signs X

593. 26 51 00, 2.10, Emergency lighting equipment

X

594. 26 51 00, 2.11, Occupancy sensors

X

595. 26 51 00, 1.5.3.3, Energy Efficiency

X

596. 26 51 00, 3.3, Operating test X

597. 26 51 00, Lighting Control System

X

598. 26 56 00, 1.4.1.1, Luminaire drawings

X

Page 102: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

599. 26 56 00, 1.4.1.2, Poles X

600. 26 56 00, 1.6.2, Energy Efficiency

X

601. 26 56 00, 2.2, Luminaires X

602. 26 56 00, 2.2.1, Lamps X

603. 26 56 00, 2.2.2, Ballasts X

604. 26 56 00, 2.3, Lighting contactor X

605. 26 56 00, 2.4, Time switch X

606. 26 56 00, 2.5, Photocell switch X

607. 26 56 00, 2.6.1, Steel poles X

608. 26 56 00, 2.7, Brackets X

609. 26 56 00, 1.4.2, Design Data for luminaires

X

610. 26 56 00, 3.2, Operating test X

611. 26 56 00, 1.8, Operational Service

X

612. 26 60 13.00 40, 2.1, Motors X

613. 26 60 13.00 40, 2.1, Motors X

Page 103: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

614. 26 60 13.00 40, 2.1, Catalog Data

X

615. 26 60 13.00 40, 1.3, Rotor Bars X

616. 26 60 13.00 40, 1.3, Stator Slots X

617. 26 60 13.00 40, 1.3, Rotational Speed

X

618. 26 60 13.00 40, 1.3, Cooling Fan Blades

X

619. 26 60 13.00 40, 1.3, Bearing Manufacturer

X

620. 26 60 13.00 40, 1.3, Bearing Style

X

621. 26 60 13.00 40, 1.3, Bearing Type

X

622. 26 60 13.00 40, 1.3, Balls/Elements

X

623. 26 60 13.00 40, 1.3, Commutator Bars

X

624. 26 60 13.00 40, 1.3, Commutator Brushes

X

625. 26 60 13.00 40, 1.3, SCR Firing Frequencies

X

626. 26 60 13.00 40, 2.9, Factory Test Results

X

627. 26 60 13.00 40, 2.1, Efficiency X

628. 26 60 13.00 40, 2.1.1, Efficiency X

Page 104: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

629. 26 60 13.00 40, 2.9, Power-Factor

X

630. 26 60 13.00 40, 2.8, Service Factor

X

631. 26 60 13.00 40, 2.5, Temperature Rating

X

632. 26 60 13.00 40, 2.9, Noise X

633. 26 60 13.00 40, 2.3.1, Full-Load X

634. 26 60 13.00 40, 2.9, Locked-Rotor

X

635. 26 60 13.00 40, 2.9, Insulation Resistance

X

636. 26 60 13.00 40, 2.9, Winding Resistance

X

637. 26 60 13.00 40, 2.9, High-Potential Tests

X

638. 26 60 13.00 40, 2.1, Motors X

639. 27 10 00, 1.6.1.1, Telecommunications drawings

X

640. 27 10 00, 1.6.1.2, Telecommunications Space Drawings

X

641. 27 10 00, 2.3, Telecommunications cabling

X

642. 27 10 00, 2.4.5, Patch panels X

643. 27 10 00, 2.5, Telecommunications outlet/connector assemblies

X

Page 105: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

644. 27 10 00, 2.4.2, Equipment support frame

X

645. 27 10 00, 2.4.3, Connector blocks

X

646. 27 10 00, 1.10.3, Spare Parts X

647. 27 10 00, 3.4.1, Telecommunications cabling testing

X

648. 27 10 00, 1.6.2.1, Telecommunications Contractor

X

649. 27 10 00, 1.6.2.2, Key Personnel X

650. 27 10 00, 1.6.2.3, Manufacturer Qualifications

X

651. 27 10 00, 1.6.3, Test plan X

652. 27 10 00, 2.12.1, Factory reel tests

X

653. 27 10 00, 1.10.1, Telecommunications cabling and pathway system

X

654. 27 10 00, 1.10.2, Record Documentation

X

655. 28 31 76, 2.1.2, Nameplates X

656. 28 31 76, 2.13.10, Instructions X

657. 28 31 76, 3.2.1, Wiring Diagrams

X

658. 28 31 76, 1.4.1, System Layout X

Page 106: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

659. 28 31 76, 2.3, System Operation X

660. 28 31 76, 2.17, Notification Appliances

X

661. 28 31 76, 2.14, Amplifiers X

662. 28 31 76, 1.4.2, Technical Data And Computer Software

X

663. 28 31 76, 2.13, Fire Alarm and Mass Notification Control Panel (FACP/MNS)

X

664. 28 31 76, 3.2.2, Terminal cabinets

X

665. 28 31 76, 2.16, Manual stations X

666. 28 31 76, 2.20, Transmitters X

667. 28 31 76, 2.12.1, Fire Alarm and Mass Notification Batteries

X

668. 28 31 76, 2.12.2, Battery chargers

X

669. 28 31 76, 2.10, Smoke sensors X

670. 28 31 76, 2.17, Notification appliances

X

671. 28 31 76, 2.7, Addressable interface devices

X

672. 28 31 76, 2.14, Amplifiers X

673. 28 31 76, 2.14, Tone generators X

Page 107: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

674. 28 31 76, 2.14, Digitalized voice generators

X

675. 28 31 76, 2.20.1, Radio transmitter and Interface Panels

X

676. 28 31 76, 1.3, Local Operating Console (LOC)

X

677. 28 31 76, 2.12.1.2, Battery power

X

678. 28 31 76, 2.12.2, Battery chargers

X

679. 28 31 76, 2.12.1.2, Voltage drop calculation

X

680. 28 31 76, 3.7, Field Quality Control

X

681. 28 31 76, 3.7.1, Testing Procedures

X

682. 28 31 76, 2.10.3, Smoke sensor testing

X

683. 28 31 76, 1.6.1.4, Installer X

684. 28 31 76, 3.7.2.2, Formal Inspection and Tests

X

685. 28 31 76, 3.7.2.3, Final Testing X

686. 28 31 76, 2.3, System Operation X

687. 28 31 76, 1.6.2.2, Fire Alarm and Mass Notification System

X

688. 28 31 76, 1.8, Operation and Maintenance (O&M) Instructions

X

Page 108: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

689. 28 31 76, 3.8, Instruction of Government Employees

X

690. 28 31 76, 3.7.2.4, As-Built Drawings

X

691. 31 05 19, 2.1.2, Thread X

692. 31 05 19, 2.2, Manufacturing Quality Control Sampling and Testing

X

693. 31 05 19, 2.1.1, Geotextile X

694. 31 23 00.00 20, 1.6.1, Shoring and Sheeting Plan

X

695. 31 23 00.00 20, 1.6.2, Dewatering work plan

X

696. 31 23 00.00 20, 3.12.2.1, Fill and backfill

X

697. 31 23 00.00 20, 3.12.2.2, Density tests

X

698. 32 01 19, Manufacturer's Recommendations

X

699. 32 01 19, 1.2, Equipment X

700. 32 01 19, 1.4.2, Materials X

701. 32 01 19, 1.4.2, Certified copies of the test reports

X

702. 32 05 33, 2.4, Integrated Pest Management Plan

X

703. 32 05 33, 3.5.1, Maintenance inspection report

X

Page 109: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

704. 32 05 33, Operations and Maintenance Manual

X

705. 32 05 33, 3.5.2, Tree, staking and guying removal

X

706. 32 11 23, 1.3, Plant, Equipment, and Tools

X

707. 32 12 16, 2.4, Mix Design X

708. 32 12 16, 3.9, Contractor Quality Control

X

709. 32 12 16, 3.10, Material Acceptance

X

710. 32 12 16, 2.2, Bitumen X

711. 32 12 16, 2.4, Aggregate X

712. 32 12 16, 2.4, Mixture X

713. 32 12 16, 2.1, Aggregates X

714. 32 12 16, 3.9.2.10, QC Monitoring

X

715. 32 12 16, 2.2, Bitumen X

716. 32 12 16, 3.5, Testing Laboratory

X

717. 32 13 14, Mixture Proportions X

718. 32 13 14, 3.2, Testing X

Page 110: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

719. 32 16 13, 2.1, Concrete X

720. 32 16 13, 3.8, Field Quality Control

X

721. 32 17 24.00 10, 1.2, Equipment X

722. 32 17 24.00 10, 1.4.1, Qualifications

X

723. 32 17 24.00 10, 2.3, Sampling and Testing

X

724. 32 32 23, 2.1, Segmental Retaining Wall Units

X

725. 32 32 23, 2.1, Segmental Retaining Wall Units

X

726. 32 32 23, 2.1, Segmental Retaining Wall Units

X

727. 32 32 23, 2.1, Segmental Retaining Wall Units

X

728. 32 92 19, 2.5.3, Wood cellulose fiber mulch

X

729. 32 92 19, 2.4, Fertilizer X

730. 32 92 19, 2.2.3, Topsoil composition tests

X

731. 32 92 19, 2.1, seed X

732. 32 92 19, 2.7, Erosion Control Materials

X

733. 32 92 23, 2.4, Fertilizer X

Page 111: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

734. 32 92 23, 2.2.3, Topsoil Composition Tests

X

735. 32 92 23, 2.1, Sods X

736. 32 93 00, 1.4.3, State Landscape Contractor's License

X

737. 32 93 00, 1.6, Time Restrictions and Planting Conditions

X

738. 32 93 00, 2.3.5, Peat X

739. 32 93 00, 2.3.8, Composted Derivatives

X

740. 32 93 00, Rotted Manure X

741. 32 93 00, 2.7.2, Organic Mulch Materials

X

742. 32 93 00, 2.3.9, Gypsum X

743. 32 93 00, Drainage Pipe X

744. 32 93 00, 2.7, Mulch X

745. 32 93 00, Ground Stakes X

746. 32 93 00, 2.5, Fertilizer X

747. 32 93 00, 1.5.2.4, Weed control fabric

X

748. 32 93 00, 2.8.1, Staking Material X

Page 112: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

749. 32 93 00, Metal anchors X

750. 32 93 00, 2.10, Antidesiccants X

751. 32 93 00, 2.11, Erosion control materials

X

752. 32 93 00, 2.7, Mulch X

753. 32 93 00, 1.4.1, Topsoil composition tests

X

754. 32 93 00, 1.4.4, Percolation Test X

755. 32 93 00, Forest Stewardship Council (FSC) Certification

X

756. 32 93 00, 1.4.2, Nursery certifications

X

757. 32 93 00, Plastic Identification X

758. 32 96 00, 1.4.1, State Landscape Contractor's License & Tree Relocation References

X

759. 32 96 00, 1.4.2, Photographs X

760. 32 96 00, 1.4.3, Transplanting Plan

X

761. 32 96 00, 1.4.3, Equipment X

762. 32 96 00, 1.4.5, Soil Test X

763. 33 11 00, 2.1.1, Piping Materials X

Page 113: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

764. 33 11 00, 2.1, Water distribution main

X

765. 33 11 00, 2.1.2.3, Valve boxes X

766. 33 11 00, 3.1.3, Disinfection X

767. 33 11 00, 2.1, Water distribution main

X

768. 33 11 00, 2.1.1.1, Lining X

769. 33 11 00, 2.1.1.2, Lining X

770. 33 11 00, 2.1.2.2, hydrants X

771. 33 11 00, 3.1.1, Installation X

772. 33 40 00, 3.3, Placing Pipe X

773. 33 40 00, 2.1, Pipe for Culverts and Storm Drains

X

774. 33 40 00, 2.1.2, Resin Certification

X

775. 33 40 00, 2.1.3, Resin Certification

X

776. 33 40 00, 3.9, Pipeline Testing X

777. 33 40 00, 3.8.5, Determination of Density

X

778. 33 40 00, 2.3.4, Frame and Cover for Gratings

X

Page 114: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER JFSD200143A JFSD200143B JFSD949951A JFSD949951B JFSD949951C

PROJECT TITLE Construct Main Entry For B314 Repair Communications Squadron B314 Add Parking Lot/Lights Repair Parking Lot/Lights Landscape Parking Lot

CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LIN

E N

UM

BE

R

ITEM DESCRIPTION, CONTRACT REFERENCE, TYPE OF SUBMITTAL

PR

OO

F O

F

CO

MP

LIA

NC

E

PR

OC

ED

UR

ES

SHO

P D

RA

WIN

GS

MF

G D

AT

A

CE

RT

IFIC

AT

ES

TE

ST D

AT

A

GU

AR

AN

TE

ES

SAM

PL

ES

RE

QU

IRE

D D

AT

E

OF

SU

BM

ISSI

ON

DA

TE

RE

CE

IVE

D

CO

NT

RA

CT

ING

DA

TE

TO

CIV

IL

EN

GIN

EE

RIN

G

RE

TU

RN

SU

SPE

NSE

D

AT

E

SUB

MIT

TA

L

NU

MB

ER

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ESU

BM

ITT

IAL

FIA

NL

AP

PR

OV

AL

REMARKS

APPROVED

DISAPPROVED

779. 33 70 02.00 10, 1.4.2, As-Built Drawings

X

780. 33 70 02.00 10, 2.1, Material and Equipment

X

781. 33 70 02.00 10, 3.2, Installation Requirements

X

782. 33 70 02.00 10, 2.15,Factory Tests

X

783. 33 70 02.00 10, 3.9, Field Testing

X

784. 33 70 02.00 10, 3.9.7, Operating Tests

X

785. 33 70 02.00 10, 3.3.1.4, Cable Installation

X

786. 33 70 02.00 10, 2.1, Material and Equipment

X

787. 33 70 02.00 10, 3.4, Cable Joints X

788. 33 70 02.00 10, 3.10.2, Installation Engineer

X

789. 33 70 02.00 10, Operation and Maintenance Manuals

X

Page 115: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 116: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 117: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 118: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 119: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 120: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 121: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 122: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 123: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 124: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 125: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 126: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...
Page 127: Communication Bldg 314, Grand Forks AFB, ND in strict ...petersonconstruction.com/MiscDocuments.pdf · Communication Bldg 314, Grand Forks AFB, ND in strict ... NSN 7540-01-155 ...