• INTRODUCTIONS• PROJECT SCOPE REVIEW• PROJECT TIMELINE• ANTICIPATED WORK CATEGORIES• BIDDING PROCEDURES• PROJECT CONTACTS
PROJECT SCOPE REVIEW
COLUMBIA CENTRAL HIGH SCHOOL (BP 02)- RENOVATE NEW 7TH/8TH GRADE WING- NEW ADDITION - LOCKER ROOMS- ADMINISTRATION RENOVATION / SECURE ENTRANCE- UPGRADE FINISHES AND REPLACE DOORS / WINDOWS
THROUGHOUT H.S.- NEW ARCHITECTURAL AND SCIENCE LAB CASEWORK- UPGRADE BUILDING HVAC AND CONTROLS- UPGRADE BUILDING LIGHTING, FIRE ALARM, ELECTRICAL- UPGRADE TECHNOLOGY- SITEWORK – ATHLETICS, PARKING, BUS AND PARENT
DROP OFF AREAS
PROJECT SCOPE REVIEW
ELEMENTARY, INTERMEDIATE, AND OPTIONS SCHOOL (BP 03)
- RENOVATIONS TO ACCOMMODATE GRADE LEVEL RECONFIGURATION
- ADMINISTRATION RENOVATION / SECURE ENTRANCE- UPGRADE FINISHES AND REPLACE DOORS / WINDOWS
THROUGHOUT- RENOVATE TOILET ROOMS- NEW CASEWORK- UPGRADE BUILDING HVAC AND CONTROLS- UPGRADE BUILDING LIGHTING, FIRE ALARM,
ELECTRICAL- UPGRADE TECHNOLOGY
TIMELINE • BID PACK 02 – (HIGH SCHOOL)
– BID DOCUMENTS AVAILABLE WEEK OF OCTOBER 20, 2014– BIDS DUE WEEK OF NOVEMBER 17, 2014– BID REVIEW / POST BID INTERVIEWS TO SUPPORT 12/1/14
AWARDS
• CONSTRUCTION– 7TH/8TH GRADE WING 12/1/14 – 4/6/15 (SPRING BREAK)– LOCKER ROOM ADDITION START 3/30/15– REMAINING BUILDING START AFTER SCHOOL– ALL WORK SUBSTANTIALLY COMPLETE FIRST WEEK
SEPTEMBER 2015 FOR SCHOOL
• BID PACK 03 (ELEMENTARY AND MIDDLE SCHOOL)– START IN SOME AREAS AT SPRING BREAK (APRIL 2015)– BALANCE OF WORK IN SUMMER 2015
TIMELINE
ANTICIPATED WORK CATEGORIES
• DEMOLITION• STRUCTURAL CONCRETE• MASONRY• STRUCTURAL /
MISCELLANEOUS STEEL• GENERAL TRADES• ROOFING• ALUMINUM / GLASS & GLAZING• DRYWALL / ACOUSTICAL /
PLASTER• RESILIENT FLOORING AND
CARPET• HARD TILE• PAINTING AND COATINGS
• LOCKERS• INTERIOR & EXTERIOR
SIGNAGE / BANNERS• PLUMBING• HVAC• ELECTRICAL / FIRE ALARM• EARTHWORK AND UTILITIES• ASPHALT PAVING / STRIPING• ATHLETIC SURFACES /
EQUIPMENT• SITE CONCRETE• FENCING• LANDSCAPE / TURF & GRASS /
PLANTINGS
QUESTIONS & ANSWERS• Question: Will there be a local preference for the bids?
Answer: No, however the owner has the right to accept or reject any or all offers.
• Question: Will plans and specifications be available at ABC Reproduction? Answer: Yes. Bid Docs can be reviewed on Granger FTP site.
• Question: Will the mechanical package be one package (Plumbing/HVAC) or separate packages?
Answer: Separate packages
• Will this be a prevailing rate job? Answer: Yes
• Will certified payroll be required? Answer: Yes
• Will a bid bond be required in the amount of 5% be required? Answer: Yes
• Will a performance bond be required? Answer: Yes
CONTACT INFORMATION
GRANGER CONSTRUCTION CO.MATT LERG
[email protected] STYX