    WorkInstruction CK84_99-JPN-MaterialItemization

    Purpose

    UsethisproceduretoruntheMaterialitemizationreport.

    Trigger

    Performthistransactionwhenyouneedtoanalyzematerialcostsbyitemcategories,suchas materialandlabor.

    MenuPath

    UsethefollowingSAPEasyAccessmenupath(s)tobeginthistransaction:

    Accounting>Controlling>ProductCostControlling>ProductCostPlanning> InformationSystem>DetailedReports>ForMaterial>CK84_99-Itemization

    TransactionCode

    CK84_99

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    1/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    2/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    ScreenFlow

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    2/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    3/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    Procedure

    1. InSAP,startthetransactionusingthemenupathortransactioncode.SAPEasyAccess

    2. Double-clicktheAccountingnode .

    3. Double-clicktheControllingnode .

    4. Double-clicktheProductCostControllingnode

    .

    5. Double-clicktheProductCostPlanningnode .

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    3/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    4/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    6. Double-clicktheInformationSystemnode .

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    4/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    5/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    7.Double-clicktheDetailedReportsnode .

    8. Double-clicktheForMaterialnode .

    9. Double-clicktheCK84_99-Itemizationnode .

    AnalyzeItemization:ItemCategories(Grouped)

    10.

    Asrequired,complete/reviewthefollowingfields:

    The goodsthat are

    R/O/C Description

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    5/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    6/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    thesubject ofbusinessactivity.Thematerialcan betraded,used inmanufacture,consumed

    , orproduced.Field

    Example:66810950

    R

    Material

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    6/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    7/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    R Methodofdistinguishing twoor morecostestimatesfor thesamematerial.R

    Containsall controlparameters forcosting,includingparameters thatcontrolhow costestimates

    areexecutedand whichmaterialprices oractivityprices areused tovaluatethecosting

    items. Aplant is

    R/O/C Description

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    7/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    8/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    anorganizational unitfordividinganenterpriseaccordingtoproduction,procurem

    ent,maintenance, andmaterialsplanning.It is aplacewherematerialsareproduced,

    or goodsandservicesareprovided.Field

    Example:1

    Costingversion

    Example:PPC1

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    8/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    9/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    CostingvariantExample:7U11

    RPlant

    11.

    ClicktheCostComp.Viewdrop-downlist .

    12.

    ClicktheCostofGoodsManufacturedlistitem.

    13.

    ClicktheExecutebutton .

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    9/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    10/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    ItemCategories(Grouped)

    14.

    ClicktheExitbutton .

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    10/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    11/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    AnalyzeItemization:ItemCategories(Grouped)

    15.

    ClicktheExitbutton .

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    11/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    12/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    Result

    YouhavesuccessfullyruntheMaterialitemizationreport.

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc

    12/13

  • 7/28/2019 CO CK84 99 JPN Material Itemization

    13/13

    WorkInstruction CK84_99-JPN-MaterialItemization

    Scenario

    Instructions Inthissimulationyouarerequiredto: RuntheMaterialItemizationReportinSAPECC6.0.

    RequiredData

    Thissectionprovidesthefielddatarequiredtocompletethisexercise.Refertothisdatasheetas necessarywhileperformingtheexercise.

    1 PPC1 7U11 Field

    Costingversion

    Costing variant

    Plant

    Value

    66810950

    Material

    Wednesday,July15,2009 CO_CK84_99_JPN_MaterialItemization.udc