CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section...

347
CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013-2014 - ENACTMENT Act of Nov. 1, 2013, P.L. 680, No. 85 Cl. 86 An Act Providing for the capital budget for the fiscal year 2013-2014; itemizing public improvement projects, furniture and equipment projects, transportation assistance projects, redevelopment assistance capital projects, flood control projects, Keystone Recreation, Park and Conservation Fund projects, State forestry bridge projects, State ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat Commission projects, Manufacturing Fund projects, Oil and Gas Lease Fund projects, Environmental Stewardship Fund projects, highway bridge projects and State Stores Fund current revenue projects to be constructed or acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection, the Department of Transportation or the Pennsylvania Fish and Boat Commission, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection, the Department of Transportation or the Pennsylvania Fish and Boat Commission; stating the estimated useful life of the projects; and making appropriations. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: Section 1. Short title. This act shall be known and may be cited as the Capital Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns and to be financed by the incurring of debt shall be $4,664,749,000. (b) Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original

Transcript of CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section...

Page 1: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013-2014 - ENACTMENT Act of Nov. 1, 2013, P.L. 680, No. 85 Cl. 86

An Act Providing for the capital budget for the fiscal year 2013-2014;

itemizing public improvement projects, furniture and equipment projects, transportation assistance projects, redevelopment assistance capital projects, flood control projects, Keystone Recreation, Park and Conservation Fund projects, State forestry bridge projects, State ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat Commission projects, Manufacturing Fund projects, Oil and Gas Lease Fund projects, Environmental Stewardship Fund projects, highway bridge projects and State Stores Fund current revenue projects to be constructed or acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection, the Department of Transportation or the Pennsylvania Fish and Boat Commission, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection, the Department of Transportation or the Pennsylvania Fish and Boat Commission; stating the estimated useful life of the projects; and making appropriations.

The General Assembly of the Commonwealth of Pennsylvania

hereby enacts as follows: Section 1. Short title.

This act shall be known and may be cited as the Capital Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations.

(a) Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns and to be financed by the incurring of debt shall be $4,664,749,000.

(b) Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original

Page 2: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

movable furniture and equipment to complete public improvement projects itemized in section 4 and to be acquired by the Department of General Services, its successors or assigns and to be financed by the incurring of debt shall be $165,120,000.

(c) Transportation assistance.--The total authorization for the capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt shall be $1,931,709,000.

(d) Redevelopment assistance.--The total authorization for the capital projects in the category of redevelopment assistance capital projects itemized in section 6 for capital grants by the Department of Community and Economic Development, its successors or assigns and to be financed by the incurring of debt shall be $6,744,668,000.

(e) Flood control.--The total authorization for the capital projects in the category of flood control projects itemized in section 7 and to be constructed by the Department of Environmental Protection, its successors or assigns and to be financed by the incurring of debt shall be $137,852,000.

(f) Keystone Recreation, Park and Conservation Fund.--The total authorization for the capital projects in the category of public improvement projects itemized in section 8 and to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from current revenues in the Keystone Recreation, Park and Conservation Fund shall be $59,202,000.

(g) State forestry bridge projects.--The total authorization for the capital projects itemized in section 9 to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by oil company franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv) (relating to imposition of tax) shall be $25,155,000.

(h) State ATV/snowmobile projects.--The total authorization for the capital projects itemized in section 10 to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from current revenues in the Snowmobile/ATV Program Restricted Revenue Account shall be $250,000.

(i) Fish Fund and Boat Fund projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 11 to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by current revenues of the Fish Fund and the Boat Fund pursuant to executive authorization shall be $136,241,000.

Page 3: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(j) Manufacturing Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 12 and to be constructed by the Department of General Services, its successors or assigns and to be financed from current revenues in the Manufacturing Fund shall be $7,500,000.

(k) Oil and Gas Lease Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 13 to be acquired or developed by the Department of Conservation and Natural Resources and to be financed by current revenues of the Oil and Gas Lease Fund pursuant to executive authorization shall be $698,000.

(l) Environmental Stewardship Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 14 to be acquired or developed by the Department of Conservation and Natural Resources and to be financed by current revenues of the Environmental Stewardship Fund pursuant to executive authorization shall be $900,000.

(m) Highway bridge projects.--The total authorization for capital projects in the category of highway bridge projects itemized in section 15 to be constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt or from current revenue shall be $190,000. As used in this subsection, the term "capital project" shall mean a capital project as defined in section 302 of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, and shall include a county or municipal bridge rehabilitation, replacement or improvement project as set forth in section 15.

(n) State Stores Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 15.1 and to be developed by the Department of General Services, its successors or assigns, for the Pennsylvania Liquor Control Board, and to be financed from current revenues of The State Stores Fund shall be $4,000,000. Section 3. Itemization of public improvement capital projects.

(a) General rule.--Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Project Total Project Allocation

Page 4: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(1) Department of Agriculture (i) Farm Show Complex

(A) Upgrade Farm Show Complex, including new entrance to Expo Hall with meeting rooms and covered walkway Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Upgrade and improvements to parking areas Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(C) Land acquisition, demolition, construction, infrastructure and other related costs for development and expansion of Farm Show Complex parking facilities. Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) Health Diagnostic Laboratory

(A) Construct new plant industry laboratory in Harrisburg to satisfy modern testing procedures Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Construct new Pennsylvania Equine

Toxicology and Research Laboratory on New Bolton Campus of The University of Pennsylvania Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(2) Department of Conservation and Natural Resources (i) Bald Eagle State Forest

(A) Repair roadways, including drainage along Poe Valley Road Project Allocation 960,000(Base Project Allocation - $800,000) (Design & Contingencies - $160,000)

(i.1) Bald Eagle State Park (A) Construct an addition to the park

office and maintenance building Project Allocation 4,080,000(Base Project Allocation - $3,400,000) (Design & Contingencies - $680,000)

(i.2) Black Moshannon State Park

Page 5: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Develop ten additional family cabins with vehicle access and connection of utilities Project Allocation 3,000,000(Base Project Allocation - $2,400,000) (Design & Contingencies - $600,000)

(ii) Blue Knob State Park (A) Replace two office buildings and

combine into one modern office building Project Allocation 2,400,000(Base Project Allocation - $2,400,000)

(ii.1) Buchanan State Forest (A) Construction of a new maintenance

headquarters Project Allocation 3,000,000(Base Project Allocation - $2,500,000) (Design & Contingencies - $500,000)

(iii) Caledonia State Park (A) Rehabilitate campground restrooms and

shower houses with modern facilities Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Replace water lines throughout park Project Allocation 900,000(Base Project Allocation - $900,000)

(iv) Cherry Springs State Park (A) Construct visitors and administrative

center to accommodate increased park usage Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(v) Codorus State Park (A) Rehabilitate and pave roads and

parking lots for visitor safety Project Allocation 4,800,000(Base Project Allocation - $4,800,000)

(vi) Colonel Denning State Park (A) Replace pit restroom, add sewer lines

and replace campground restrooms and shower houses with modern facilities Project Allocation 1,800,000(Base Project Allocation - $1,800,000)

(vii) Cowans Gap State Park (A) Construct park office addition and

maintenance building addition Project Allocation 1,200,000

Page 6: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $1,200,000) (viii) Delaware Canal State Park

(A) Provide for repair and ongoing maintenance of Delaware Canal Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Replacement of 12 adjacent box beam

bridges along Delaware Canal Project Allocation 16,200,000(Base Project Allocation -

$13,500,000) (Design & Contingencies - $2,700,000)

(C) Construct a new resource center with storage building to meet current needs Project Allocation 3,300,000(Base Project Allocation - $2,750,000) (Design & Contingencies - $550,000)

(D) Rehabilitate Pecks Pond Dam Project Allocation 7,200,000(Base Project Allocation - $6,000,000) (Design & Contingencies - $1,200,000)

(E) Construction, infrastructure, redevelopment and other related costs for rehabilitation of THE Delaware Canal State Park in Riegelsville to Bristol Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(viii.1) Delaware State Forest (A) Construct a new resource center with

storage building Project Allocation 8,400,000(Base Project Allocation - $7,000,000) (Design & Contingencies - $1,400,000)

(ix) Denton Hill State Park (A) Rehabilitate park, including ski

lodge, ski lifts, snowmaking equipment, roads, parking lots, modern cabins and maintenance facilities for a four-season operation Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (ix.1) Forbes State Forest

(A) Remediate three acid mines originating on State forest lands

Page 7: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 1,800,000(Base Project Allocation - $1,500,000) (Design & Contingencies - $300,000)

(x) Forest District 10 (A) Replace failed acid mine drainage

treatment system to reduce pollutants in Kettle Creek watershed Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xi) Forest District 11 (A) Construct bridge over Lehigh River to

provide public and administrative access to Blue Ridge Tract of Lackawanna State Forest with public parking Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(xii) Forest District 12 (A) Construct bridge over Slate Run

Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Demolish old building and build public restrooms and contact station on Pine Creek Rail Trail Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(xiii) Forest District 13 (A) Remediate and reclaim acid mine

drainage pollution source on Commonwealth's land into Little Dents Run watershed Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(xiv) Forest District 14 (A) Locate, plug and retire abandoned oil

and gas wells on State forest land Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xv) Gifford Pinchot State Park (A) Replace water lines which are in

continual need of repair Project Allocation 1,560,000(Base Project Allocation - $1,560,000)

(B) Repave main road, including drainage Project Allocation 780,000

(xvi) Greenwood Furnace State Park (A) Construct new maintenance building to

Page 8: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

meet modern codes Project Allocation 1,800,000(Base Project Allocation - $1,800,000)

(xvii) Hickory Run State Park (A) Construct new visitors center with

administration facilities and comfort station and demolish old center Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(B) Develop and construct family cabin colony within park Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Rehabilitate and upgrade office to accommodate personnel Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(xviii) Kettle Creek State Park (A) Dredge lake and provide for improved

quality recreational opportunities in and around Kettle Creek Reservoir Project Allocation 2,000,000(Base Project Allocation - $1,600,000) (Design & Contingencies - $400,000)

(xviii.1) Kinzua Bridge State Park (A) Additional funds for DGS project 130-

1, Phase 2, construction of new office/visitor center, maintenance center, roads, trails, parking lots, water and sewage systems, clearing and grubbing of debris field, fencing of debris field, rehabilitation of remaining bridge towers and related site work Project Allocation 3,000,000(Base Project Allocation - $2,400,000) (Design & Contingencies - $600,000)

(B) Construction of site improvements, including infrastructure and land acquisition Project Allocation 2,000,000(Base Project Allocation - $1,600,000) (Design & Contingencies - $400,000)

(xviii.2) Kittanning State Forest (A) Restore iron furnace

Project Allocation 1,600,000(Base Project Allocation - $1,500,000)

Page 9: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $100,000) (xviii.3) Lackawanna State Forest

(A) Breach and remove Olyphant #1 Dam Project Allocation 900,000(Base Project Allocation - $750,000) (Design & Contingencies - $150,000)

(xix) Lackawanna State Park (A) Replace pool

Project Allocation 6,000,000(Base Project Allocation - $4,800,000) (Design & Contingencies - $1,200,000)

(xx) Laurel Mountain State Park (A) Develop Phase II of ski area, adding

ski and visitor service, including support facilities, lifts and tubing park Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xx.1) Lehigh Gorge State Park (A) Rehabilitate White Haven public

access area to include trail improvement, parking facilities, modern comfort station and boat launch Project Allocation 4,122,000(Base Project Allocation - $3,435,000) (Design & Contingencies - $687,000)

(xx.2) Little Buffalo State Park (A) Replacement of old cottages

Project Allocation 500,000(Base Project Allocation - $400,000) (Design & Contingencies - $100,000)

(xxi) Maurice K. Goddard State Park (A) Replace existing marina facility with

new structure for boat concession operations, public restrooms and meeting room space Project Allocation 2,400,000(Base Project Allocation - $2,400,000)

(xxi.1) Michaux State Forest (A) Rehabilitate Old Forge Picnic area

and pump house and dredge pond to meet modern codes Project Allocation 450,000(Base Project Allocation - $350,000) (Design & Contingencies - $100,000)

(xxii) Moraine State Park (A) Upgrade sewage treatment facilities

Page 10: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(xxiii) Ohiopyle State Park (A) Develop family cabin colony with

vehicle access and connection of utilities Project Allocation 3,000,000(Base Project Allocation - $2,400,000) (Design & Contingencies - $600,000)

(B) Improvements to Ferncliff parking lot and provide additional parking facilities adjacent to the falls area Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(xxiii.1) Park Region #2 (A) Removal of ten underground fuel tanks

and remediation of the land in seven State parks and replacement of aboveground tanks Project Allocation 3,300,000(Base Project Allocation - $2,750,000) (Design & Contingencies - $550,000)

(xxiv) Penn Nursery and Woodshop (A) Replace outdated maintenance shop to

meet current code requirements Project Allocation 5,500,000(Base Project Allocation - $5,500,000)

(xxiv.1) Pine Grove Furnace State Park (A) Replacement of water lines throughout

park Project Allocation 2,040,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $340,000)

(xxv) Point State Park (A) Connect Great Allegheny Passage Trail

to Point State Park and rehabilitate flag bastion, pedestrian access and parking lots Project Allocation 9,000,000(Base Project Allocation - $9,000,000)

(xxvi) Presque Isle State Park (A) Replenish sand to maintain beach

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Replace three beach/shower houses,

Page 11: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

including design, site location and construction Project Allocation 3,600,000(Base Project Allocation - $3,600,000)

(xxvii) Prince Gallitzin State Park (A) Replace two pit restrooms with modern

facilities at Wyerough and sailboat mooring areas Project Allocation 960,000(Base Project Allocation - $960,000)

(B) Replace water lines throughout park Project Allocation 3,240,000(Base Project Allocation - $3,240,000)

(C) Repave main road, including drainage to beach Project Allocation 2,400,000(Base Project Allocation - $2,400,000)

(D) Replacement of six miles of water lines within the park Project Allocation 5,000,000(Base Project Allocation - $4,000,000) (Design & Contingencies - $1,000,000)

(xxviii) Pymatuning State Park (A) Rehabilitate campground facilities

for full-service hook-ups, including new water well, water storage tanks and sewage collection system Project Allocation 2,400,000(Base Project Allocation - $2,400,000)

(B) Replacement of existing livery docks throughout the park Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(xxix) Ryerson Station State Park (A) Rehabilitate dam

Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (B) Dredging of sediment in Duke Lake

Project Allocation 7,800,000(Base Project Allocation - $6,500,000) (Design & Contingencies - $1,300,000)

(xxx) Samuel S. Lewis State Park (A) Replace pit restroom with modern

facilities, including onsite septic system

Page 12: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 1,200,000(Base Project Allocation - $1,200,000)

(xxxi) Shawnee State Park (A) Replace regional office to meet

modern code requirements and increase efficiency Project Allocation 3,600,000(Base Project Allocation - $3,600,000)

(xxxii) Shikellamy State Park (A) Replace dam bags that have reached

their life expectancy Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(xxxii.1) Susquehannock State Park (A) Rehabilitate entryway from township

road to park overlook Project Allocation 360,000(Base Project Allocation - $300,000) (Design & Contingencies - $60,000)

(xxxii.2) Tioga State Forest (A) Construction of new maintenance

headquarters Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(xxxii.3) Tuscarora State Forest (A) Additional funds for DGS 196-11,

Gunter Valley Dam, including construction of new dam control tower, dam embankment and foundation rehabilitation and repair and improvements to site access roadway and appurtenances Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (xxxii.4) Various lakes

(A) Dredging of various lakes throughout this Commonwealth and removing sediment Project Allocation 3,295,000(Base Project Allocation - $2,746,000) (Design & Contingencies - $549,000)

(xxxiii) Tobyhanna State Park (A) Rehabilitate Tobyhanna No. 2 dam

Project Allocation 8,500,000(Base Project Allocation - $7,000,000)

Page 13: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $1,500,000) (xxxiv) Whipple Dam State Park

(A) Replace bathhouse with modern facility and add onsite septic system Project Allocation 1,800,000(Base Project Allocation - $1,800,000)

(xxxv) Various Parks and Forest Districts (A) Rehabilitate or replace lookout fire

towers throughout park system Project Allocation 6,000,000(Base Project Allocation - $4,800,000) (Design & Contingencies - $1,200,000)

(3) Department of Corrections (i) Elizabethtown Training Academy

(A) Replace domestic and fire water lines and add fire hydrants Project Allocation 500,000(Base Project Allocation - $400,000) (Design & Contingencies - $100,000)

(B) Renovate boiler plant, including boilers and associated equipment Project Allocation 3,125,000(Base Project Allocation - $2,500,000) (Design & Contingencies - $625,000)

(C) Replace current fire alarm system Project Allocation 450,000(Base Project Allocation - $360,000) (Design & Contingencies - $90,000)

(i.1) State Correctional Institution at Albion (A) Replace various roofs throughout

institution Project Allocation 1,200,000(Base Project Allocation - $960,000) (Design & Contingencies - $240,000)

(B) Replace fire alarm system throughout institution Project Allocation 900,000(Base Project Allocation - $720,000) (Design & Contingencies - $180,000)

(ii) State Correctional Institution at Cambridge Springs (A) Replace 5,260 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturer Project Allocation 1,200,000

Page 14: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $960,000) (Design & Contingencies - $240,000)

(B) Install perimeter lights around circumference of institution Project Allocation 1,565,000(Base Project Allocation - $1,252,000) (Design & Contingencies - $313,000)

(iii) State Correctional Institution at Camp Hill (A) Renovate boiler plant to repair or

replace worn-out equipment and modify pollution controls system Project Allocation 4,000,000(Base Project Allocation - $3,200,000) (Design & Contingencies - $800,000)

(B) Renovate kitchen No. 2 Project Allocation 12,500,000(Base Project Allocation -

$10,000,000) (Design & Contingencies - $2,500,000)

(C) Demolish housing units A, B, C and D and construct four new housing units Project Allocation 81,000,000(Base Project Allocation -

$64,800,000) (Design & Contingencies - $16,200,000)

(iv) State Correctional Institution at Chester (A) Replace various roofs throughout

institution Project Allocation 7,000,000(Base Project Allocation - $5,600,000) (Design & Contingencies - $1,400,000)

(v) State Correctional Institution at Coal Township (A) Replace rubber roofing on all inmate

housing units Project Allocation 3,500,000(Base Project Allocation - $2,800,000) (Design & Contingencies - $700,000)

(vi) State Correctional Institution at Dallas (A) Expand existing visiting room with

approximately 2,000-square-foot addition to handle increased visitation demands Project Allocation 400,000(Base Project Allocation - $320,000)

Page 15: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $80,000) (B) Additional funding to upgrade storm

and sewage plant project 578-24 Project Allocation 4,000,000(Base Project Allocation - $3,200,000) (Design & Contingencies - $800,000)

(vii) State Correctional Institution at Fayette (A) Upgrade security system, including

door control, intercom, public address and perimeter security head unit for the institution Project Allocation 1,300,000(Base Project Allocation - $1,040,000) (Design & Contingencies - $260,000)

(viii) State Correctional Institution at Forest (A) Replace 5,300 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturer Project Allocation 1,430,000(Base Project Allocation - $1,144,000) (Design & Contingencies - $286,000)

(B) Repair or replace the HTHW (High Temperature Hot Water) piping distribution system Project Allocation 4,000,000(Base Project Allocation - $3,200,000) (Design & Contingencies - $800,000)

(C) Upgrade or replace institution's intercom system Project Allocation 700,000(Base Project Allocation - $560,000) (Design & Contingencies - $140,000)

(ix) State Correctional Institution at Graterford (A) Replace 5,300 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturer Project Allocation 1,200,000(Base Project Allocation - $960,000) (Design & Contingencies - $240,000)

(B) Remove and replace EPDM roofing and drain system on Correctional Industries and maintenance buildings

Page 16: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 1,375,000(Base Project Allocation - $1,100,000) (Design & Contingencies - $275,000)

(x) State Correctional Institution at Greensburg (A) Replace 4,224 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturer Project Allocation 750,000(Base Project Allocation - $600,000) (Design & Contingencies - $150,000)

(xi) State Correctional Institution at Houtzdale (A) Replace current microwave security

system with a buried coaxial system Project Allocation 1,020,000(Base Project Allocation - $816,000) (Design & Contingencies - $204,000)

(B) Renovate boiler plant equipment, modify pollution controls systems and utilize most cost-effective fuel source available Project Allocation 2,250,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $450,000)

(xii) State Correctional Institution at Huntingdon (A) Replace electrical services to blocks

and cells to meet current power demand requirements Project Allocation 8,500,000(Base Project Allocation - $6,800,000) (Design & Contingencies - $1,700,000)

(xiii) State Correctional Institution at Laurel Highlands (A) Replace perimeter security detection

system, including taut wire system on perimeter fence, and add new razor wire Project Allocation 2,500,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $500,000)

(xiv) State Correctional Institution at Mahanoy (A) Repair deteriorated face block on

inmate housing units and repair

Page 17: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure Project Allocation 15,000,000(Base Project Allocation -

$12,000,000) (Design & Contingencies - $3,000,000)

(B) Replace rubber roofing and metal roofing on all inmate housing units Project Allocation 3,800,000(Base Project Allocation - $3,040,000) (Design & Contingencies - $760,000)

(C) Replace personal alarm system throughout institution Project Allocation 425,000(Base Project Allocation - $340,000) (Design & Contingencies - $85,000)

(D) Replace block walls surrounding Level 5 housing unit exercise yard pens which have deteriorated from normal settling of structures Project Allocation 500,000(Base Project Allocation - $400,000) (Design & Contingencies - $100,000)

(E) Expand parking and repave access roads and parking lots Project Allocation 800,000(Base Project Allocation - $640,000) (Design & Contingencies - $160,000)

(xv) State Correctional Institution at Mercer (A) Replace rubber roofing on all inmate

housing units Project Allocation 750,000(Base Project Allocation - $600,000) (Design & Contingencies - $150,000)

(B) Repave existing perimeter road and install new perimeter road along new perimeter fence path Project Allocation 458,000(Base Project Allocation - $366,000) (Design & Contingencies - $92,000)

(C) Replace cell doors on A, F and M blocks Project Allocation 1,600,000(Base Project Allocation - $1,280,000) (Design & Contingencies - $320,000)

(D) Upgrade electrical panels, switches and breakers throughout facility Project Allocation 600,000

Page 18: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $480,000) (Design & Contingencies - $120,000)

(xvi) State Correctional Institution at Muncy (A) Install new 1,000,000-gallon water

tower and install new water line for municipal water service tie-in Project Allocation 3,000,000(Base Project Allocation - $2,400,000) (Design & Contingencies - $600,000)

(B) Expand existing visiting room with approximately 15,000-square-foot addition to handle increased visitation demands Project Allocation 5,300,000(Base Project Allocation - $4,240,000) (Design & Contingencies - $1,060,000)

(C) Replace 6,340 feet of current perimeter security system which is obsolete and no longer supported by the manufacturer Project Allocation 1,430,000(Base Project Allocation - $1,144,000) (Design & Contingencies - $286,000)

(D) Replace existing sewer lines which are obsolete and causing groundwater infiltration Project Allocation 1,875,000(Base Project Allocation - $1,500,000) (Design & Contingencies - $375,000)

(E) Construct new admissions building and demolish current building Project Allocation 625,000(Base Project Allocation - $500,000) (Design & Contingencies - $125,000)

(F) Expand parking lot and repave access roads and parking lots Project Allocation 1,800,000(Base Project Allocation - $1,440,000) (Design & Contingencies - $360,000)

(G) Replace existing modular housing unit to make ADA compliant Project Allocation 1,250,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $250,000)

(H) Construct new treatment center Project Allocation 3,125,000(Base Project Allocation - $2,500,000)

Page 19: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $625,000) (I) Renovate housing units, including ADA

improvements, electrical upgrades and HVAC systems, and replace windows and doors Project Allocation 12,500,000(Base Project Allocation -

$10,000,000) (Design & Contingencies - $2,500,000)

(xvii) State Correctional Institution at Pine Grove (A) Replace 5,310 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturer Project Allocation 2,000,000(Base Project Allocation - $1,600,000) (Design & Contingencies - $400,000)

(B) Expand and renovate main control room Project Allocation 680,000(Base Project Allocation - $544,000) (Design & Contingencies - $136,000)

(xviii) State Correctional Institution at Pittsburgh (A) Replace 5,520 feet of current

perimeter security system which is obsolete and no longer supported by the manufacturer Project Allocation 1,200,000(Base Project Allocation - $960,000) (Design & Contingencies - $240,000)

(B) Replace leaking steam and condensate piping from power plant to A & B housing units Project Allocation 565,000(Base Project Allocation - $452,000) (Design & Contingencies - $113,000)

(xix) State Correctional Institution at Rockview (A) Replace and add fencing to front of

institution Project Allocation 2,400,000(Base Project Allocation - $1,920,000) (Design & Contingencies - $480,000)

(B) Replace existing water tank at institution Project Allocation 1,440,000

Page 20: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $1,152,000) (Design & Contingencies - $288,000)

(C) Replace windows in treatment building Project Allocation 2,400,000(Base Project Allocation - $1,920,000) (Design & Contingencies - $480,000)

(D) Additional funds for DGS Project 571-30, upgrade reservoir to meet dam safety regulations Project Allocation 3,518,000(Base Project Allocation - $2,814,000) (Design & Contingencies - $704,000)

(E) Renovate boiler plant ash handling system to meet current regulations Project Allocation 625,000(Base Project Allocation - $500,000) (Design & Contingencies - $125,000)

(F) Renovate exterior of main dining hall and auditorium building, including refacing and repairing of concrete and sealing building Project Allocation 2,000,000(Base Project Allocation - $1,600,000) (Design & Contingencies - $400,000)

(G) Renovate exterior of deputy warden's building, including refacing and repairing of concrete and sealing building Project Allocation 1,000,000(Base Project Allocation - $800,000) (Design & Contingencies - $200,000)

(H) Expand parking and repave access roads and parking lots Project Allocation 800,000(Base Project Allocation - $640,000) (Design & Contingencies - $160,000)

(xx) State Correctional Institution at Smithfield (A) Renovate boilers and equipment,

modify pollution controls and provide effective fuel source Project Allocation 3,500,000(Base Project Allocation - $2,800,000) (Design & Contingencies - $700,000)

(xxi) State Correctional Institution at Somerset (A) Renovate 480-volt distribution

Page 21: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

switchgear and replace obsolete circuit breakers Project Allocation 432,000(Base Project Allocation - $346,000) (Design & Contingencies - $86,000)

(B) Replace existing digital management system panels throughout institution Project Allocation 420,000(Base Project Allocation - $336,000) (Design & Contingencies - $84,000)

(C) Replace roof on Correctional Industries Laundry Building Project Allocation 910,000(Base Project Allocation - $728,000) (Design & Contingencies - $182,000)

(D) Replace proximity card access system throughout institution for door control Project Allocation 625,000(Base Project Allocation - $500,000) (Design & Contingencies - $125,000)

(E) Replace rooftop heating and cooling units on inmate housing Project Allocation 775,000(Base Project Allocation - $620,000) (Design & Contingencies - $155,000)

(F) Install new water pump within facility Project Allocation 500,000(Base Project Allocation - $500,000)

(xxii) State Correctional Institution at Waymart (A) Repoint exterior building masonry and

repair parapets and brick work throughout institution Project Allocation 3,420,000(Base Project Allocation - $2,736,000) (Design & Contingencies - $684,000)

(B) Demolish J-Ward and repair corridor and roof structure at current building tie-in point Project Allocation 840,000(Base Project Allocation - $672,000) (Design & Contingencies - $168,000)

(C) Renovate and expand existing dining room to satisfy current needs Project Allocation 3,300,000

Page 22: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $2,640,000) (Design & Contingencies - $660,000)

(D) Construct a new education building Project Allocation 4,600,000(Base Project Allocation - $3,680,000) (Design & Contingencies - $920,000)

(E) Expand parking and repave access roads and parking lots Project Allocation 1,750,000(Base Project Allocation - $1,400,000) (Design & Contingencies - $350,000)

(F) Additional funding to renovate boiler plant project No. 1578-7 Project Allocation 4,260,000(Base Project Allocation - $3,408,000) (Design & Contingencies - $852,000)

(G) Renovate and expand A block housing unit Project Allocation 2,500,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $500,000)

(xxiii) State Correctional Institutions Statewide (A) Replace door control systems and

central control, housing units and other buildings Project Allocation 9,000,000(Base Project Allocation - $7,200,000) (Design & Contingencies - $1,800,000)

(4) Department of Education (i) Department of Education Headquarters

(A) Renovate two floors of Department of Education headquarters building at 333 Market Street, Harrisburg Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii) Delaware County Community College (A) Construction, infrastructure and

other related costs for renovation of the existing Technical High School Pickering Campus Project Allocation 2,400,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $400,000)

(iii) Lehigh Carbon Community College (A) Site development, infrastructure,

redevelopment, construction and other

Page 23: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

costs related to construction of an educational facility in Carbon County Project Allocation 4,800,000(Base Project Allocation - $4,000,000) (Design & Contingencies - $800,000)

(iv) Lincoln University (A) Additional funds for DGS Project No.

1101-46, construction of additional tennis courts, softball field, soccer field and bleachers to support track and soccer fields Project Allocation 20,000,000(Base Project Allocation -

$16,000,000) (Design & Contingencies - $4,000,000)

(B) Provide for new construction and renovation of three existing facilities to create the Center for the Study of Black Culture at the university Project Allocation 25,000,000(Base Project Allocation -

$20,000,000) (Design & Contingencies - $5,000,000)

(C) Renovate and expand Alumni House Project Allocation 20,000,000(Base Project Allocation -

$16,000,000) (Design & Contingencies - $4,000,000)

(v) Pennsylvania Highlands Community College (A) Acquisition, construction,

rehabilitation and other costs related to the design and construction of facilities to be utilized as a branch campus to be located in Mifflin County Project Allocation 600,000(Base Project Allocation - $500,000) (Design & Contingencies - $100,000)

(vi) Community College of Philadelphia (A) Renovation of biology labs and

associated prep rooms at main campus and West Regional Center Project Allocation 4,800,000(Base Project Allocation - $4,000,000) (Design & Contingencies - $800,000)

(vi.1) Reading Area Community College (A) Construction, infrastructure

Page 24: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

improvements and related costs for the Reading Area Community College Berks Hall renovation and conservation project Project Allocation 1,167,000(Base Project Allocation - $1,167,000)

(B) Construction, infrastructure improvements and related costs for the Reading Area Community College pedestrian safety, gateway and traffic improvement project Project Allocation 2,356,000(Base Project Allocation - $2,356,000)

(vii) Temple University (A) (Reserved) (B) (Reserved) (C) Renovate Paley Library

Project Allocation 90,000,000(Base Project Allocation -

$90,000,000) (D) Renovate Old Dental School

Project Allocation 75,000,000(Base Project Allocation -

$75,000,000) (E) Renovate and expand law school

Project Allocation 60,000,000(Base Project Allocation -

$60,000,000) (F) Renovate and construct addition to

College of Engineering Project Allocation 100,000,000(Base Project Allocation -

$100,000,000) (G) Demolition of Barton Hall and

construct campus quad, Main Campus Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (H) Reface and renovate Health Sciences

Campus Project Allocation 35,000,000(Base Project Allocation -

$35,000,000) (I) Acquisition, infrastructure,

renovations, construction and other related costs to support a dental, medical, health sciences and patient

Page 25: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

care facilities project in Lackawanna County Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (J) Construction, infrastructure and

other related costs for development of a multiuse facility for athletics, academics and research and local community athletic events Project Allocation 130,000,000(Base Project Allocation -

$130,000,000) (viii) Thaddeus Stevens College of Technology

(A) Upgrade and rehabilitate college's main electrical system, including infrastructure Project Allocation 3,000,000(Base Project Allocation - $2,400,000) (Design & Contingencies - $600,000)

(B) Expand dining hall by adding second story which will connect into Hartzell Instructional Center Project Allocation 5,750,000(Base Project Allocation - $5,060,000) (Design & Contingencies - $690,000)

(C) Infrastructure, development, design and other costs related to demolition of Leonard Building and construction of technology center Project Allocation 16,800,000(Base Project Allocation -

$14,000,000) (Design & Contingencies - $2,800,000)

(D) Renovate Mellor Classroom and Administrative Building Project Allocation 1,017,000(Base Project Allocation - $895,000) (Design & Contingencies - $122,000)

(E) Upgrade electrical system campuswide Project Allocation 2,875,000(Base Project Allocation - $2,530,000) (Design & Contingencies - $345,000)

(F) Renovate Learning Resource Center to meet modern codes, including ADA and HVAC Project Allocation 2,300,000

Page 26: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $2,018,000) (Design & Contingencies - $282,000)

(G) Upgrade HVAC, including controls in three main buildings and two auxiliary buildings Project Allocation 400,000(Base Project Allocation - $352,000) (Design & Contingencies - $48,000)

(H) Renovate metal fabrication and welding shop, including new exhaust system and welding stations Project Allocation 250,000(Base Project Allocation - $220,000) (Design & Contingencies - $30,000)

(I) Abatement of lead paint and painting of two campus buildings Project Allocation 230,000(Base Project Allocation - $202,000) (Design & Contingencies - $28,000)

(J) Renovate Hartzell Hall to include a second floor with additional classroom and office space Project Allocation 5,000,000(Base Project Allocation - $4,400,000) (Design & Contingencies - $600,000)

(K) Upgrade IT distribution, including electrical wiring throughout campus Project Allocation 5,000,000(Base Project Allocation - $4,400,000) (Design & Contingencies - $600,000)

(ix) The Pennsylvania State University (A) Convert existing coal-fired boilers

to natural gas to comply with new EPA/DEP clean air regulations Project Allocation 25,000,000(Base Project Allocation -

$20,000,000) (Design & Contingencies - $5,000,000)

(B) Provide for continuation of capital to renovate campuses located in university's eastern region Project Allocation 28,000,000(Base Project Allocation -

$28,000,000) (C) Design, infrastructure, construction,

renovations, abatement of hazardous materials, utility upgrades and

Page 27: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

extensions and other related costs for state-of-the-art research and teaching space for College of Liberal Arts Project Allocation 54,000,000(Base Project Allocation -

$43,200,000) (Design & Contingencies - $10,800,000)

(D) Design, infrastructure, renovations, abatement of hazardous materials and other related costs for building access modifications, including installation of key access boxes and video surveillance cameras and infrastructure and any building modifications needed Project Allocation 10,000,000(Base Project Allocation - $8,000,000) (Design & Contingencies - $2,000,000)

(E) Design, infrastructure, construction, renovations, abatement of hazardous materials, underground piping upgrades and additions and other related costs for a chilled water capacity and distribution expansion project at University Park campus Project Allocation 25,000,000(Base Project Allocation -

$20,000,000) (Design & Contingencies - $5,000,000)

(F) Design, infrastructure, construction, abatement of hazardous materials, utility upgrades and extensions and other related costs for new classroom/class lab building at University Park campus Project Allocation 51,300,000(Base Project Allocation -

$41,040,000) (Design & Contingencies - $10,260,000)

(G) Additional funding for renovations, rehabilitation, construction and other costs related to an addition to existing computer building or construction of new facility Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)

Page 28: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(H) Design, acquisition, infrastructure, demolition, construction, abatement of hazardous materials, utility upgrades and extensions and other related costs for a general computing data center Project Allocation 50,000,000(Base Project Allocation -

$40,000,000) (Design & Contingencies - $10,000,000)

(I) Additional funding for renovations to Henning Building, including upgrades to systems to bring them to current facility standards Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (J) Infrastructure, renovations,

construction, abatement of hazardous materials, utility upgrades and extensions and other related costs for the rehabilitation of Kostos Building Project Allocation 12,000,000(Base Project Allocation - $9,600,000) (Design & Contingencies - $2,400,000)

(K) Design, infrastructure, construction, abatement of hazardous materials, utility upgrades and extensions and other related costs for a capital renewal project to Baker Engineering and Science Building Project Allocation 8,000,000(Base Project Allocation - $6,400,000) (Design & Contingencies - $1,600,000)

(L) Design, infrastructure, construction, abatement of hazardous materials, utility upgrades and extensions and other related costs for new Recital Hall addition and Music I renovations Project Allocation 25,000,000(Base Project Allocation -

$20,000,000) (Design & Contingencies - $5,000,000)

(M) Design, infrastructure, construction, abatement of hazardous materials, utility upgrades and extensions and other related costs for a capital renewal project to Ruhl

Page 29: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Student/Community Center and the attached multipurpose building Project Allocation 10,500,000(Base Project Allocation - $8,400,000) (Design & Contingencies - $2,100,000)

(N) Design, infrastructure, construction, abatement of hazardous materials, utility extensions and other related costs for Student Union building at Brandywine Project Allocation 16,000,000(Base Project Allocation -

$12,800,000) (Design & Contingencies - $3,200,000)

(O) Design, infrastructure, construction, abatement of hazardous materials and other related costs for capital renewal project to wastewater treatment plant at University Park campus Project Allocation 45,000,000(Base Project Allocation -

$36,000,000) (Design & Contingencies - $9,000,000)

(P) Additional funding for infrastructure, construction and other related costs for construction of water treatment facility and distribution system at University Park campus Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (Q) Design, infrastructure, construction,

abatement of hazardous materials and other related costs for athletic field conversion and expansion project at Pennsylvania College of Technology Project Allocation 1,200,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $200,000)

(R) Design, infrastructure, construction and other related costs for career and alumni center at Pennsylvania College of Technology Project Allocation 13,200,000(Base Project Allocation -

Page 30: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

$11,000,000) (Design & Contingencies - $2,200,000)

(S) Design, infrastructure, construction and other related costs for athletic, fitness and wellness center at Pennsylvania College of Technology Project Allocation 30,000,000(Base Project Allocation -

$25,000,000) (Design & Contingencies - $5,000,000)

(T) Design, infrastructure, construction, abatement of hazardous materials and other related costs, including utility upgrades and extensions, site improvements and code-related upgrades for multiphased development of Pattee Library Knowledge Commons at University Park campus Project Allocation 11,000,000(Base Project Allocation - $8,800,000) (Design & Contingencies - $2,200,000)

(U) Construct new data center at Milton S. Hershey Medical Center Project Allocation 24,000,000(Base Project Allocation -

$24,000,000) (V) Design, infrastructure, construction,

demolition, renovations, abatement of hazardous materials, utility upgrades and extensions and other related costs for state-of-the-art research and teaching space for College of Engineering Project Allocation 100,000,000(Base Project Allocation -

$80,000,000) (Design & Contingencies - $20,000,000)

(W) (Reserved) (X) Construction, infrastructure and

other related costs for medical and educational facilities for Penn State Hershey Medical Center Project Allocation 50,000,000(Base Project Allocation -

$50,000,000) (Y) Design, infrastructure, construction,

demolition, renovations, abatement of

Page 31: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

hazardous materials, utility upgrades and extensions and other related costs for College of Agricultural Sciences Project Allocation 80,000,000(Base Project Allocation -

$64,000,000) (Design & Contingencies - $16,000,000)

(Z) Design, infrastructure, construction, demolition, renovations, abatement of hazardous materials, utility upgrades and extensions and other related costs for state-of-the-art research and teaching space for College of Engineering Project Allocation 100,000,000(Base Project Allocation -

$80,000,000) (Design & Contingencies - $20,000,000)

(x) University of Pittsburgh (A) Renovate exterior of Hillman Library,

including plaza, planters, windows, masonry and waterproofing membrane Project Allocation 10,000,000(Base Project Allocation - $8,000,000) (Design & Contingencies - $2,000,000)

(B) Renovate Fitzgerald Fieldhouse to meet modern codes, including ADA, and expand building to meet demands Project Allocation 10,000,000(Base Project Allocation - $8,000,000) (Design & Contingencies - $2,000,000)

(C) Renovate and construct addition to Trees Hall Project Allocation 40,000,000(Base Project Allocation -

$40,000,000) (D) Renovate and construct addition to

Fitzgerald Fieldhouse Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (E) Renovate Bellefield Hall

Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (F) Renovate, construct addition and fit-

out to Posvar Hall

Page 32: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (G) Renovation and addition to David

Lawrence Hall Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (H) Upgrade to Trees Field

Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (I) Upgrade and deferred maintenance -

Phase VII Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (J) Programmatic renovations - Phase III

Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (5) Department of Environmental Protection

(i) Allegheny County (A) Acquisition, construction,

infrastructure and other related costs for aviation, industrial and commercial site development and improvements, including flood mitigation and structural improvements, at or surrounding Allegheny County Airport Project Allocation 40,000,000(Base Project Allocation -

$40,000,000) (B) Construction, infrastructure

improvements and other costs related to the development of de-icing fluid treatment facility at Pittsburgh International Airport, including flood mitigation structural improvements Project Allocation 25,000,000(Base Project Allocation -

$25,000,000) (C) Acquisition, construction,

infrastructure and other related costs for the development of industrial and commercial sites at or surrounding

Page 33: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Pittsburgh International Airport Project Allocation 50,000,000(Base Project Allocation -

$50,000,000) (D) Acquisition, construction,

infrastructure and other related costs for Pitcairn Borough Dirty Camp Run flood protection project Project Allocation 1,360,000(Base Project Allocation - $1,360,000)

(ii) Cambria County (A) Additional funding for DGS Project

183-19, flood protection project in Adams and Croyle Townships for south fork of Little Conemaugh River, including earthen levee repair and concrete channel rehabilitation Project Allocation 1,800,000(Base Project Allocation - $1,620,000) (Design & Contingencies - $180,000)

(B) Rehabilitate existing flood protection in Northern Cambria Borough, including replacement of drainage structures, pedestrian ramp and mitigation Project Allocation 1,350,000(Base Project Allocation - $1,215,000) (Design & Contingencies - $135,000)

(iii) Carbon County (A) Provide for complete rehabilitation

of flood protection to bring existing flood protection to current standards in Weissport Borough Project Allocation 3,750,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $750,000)

(iv) Clearfield County (A) Rehabilitate existing flood

protection in Irvona Borough, including replacement of drainage structures, elimination of two closure structures and mitigation Project Allocation 1,800,000(Base Project Allocation - $1,620,000) (Design & Contingencies - $180,000)

(v) Columbia County (A) Provide additional funds for flood

Page 34: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

protection project in Town of Bloomsburg currently being designed by Baltimore District to satisfy post- Hurricane Katrina Federal guidelines Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Provide for flood protection for the

Town of Bloomsburg, including watershed and channel improvements Project Allocation 70,000,000(Base Project Allocation -

$59,500,000) (Design & Contingencies - $10,500,000)

(vi) Dauphin County (A) Acquire and rehabilitate or construct

south central regional office Project Allocation 22,750,000(Base Project Allocation -

$20,475,000) (Design & Contingencies - $2,275,000)

(vii) Lancaster County (A) Additional funding for DGS Project

182-21, Marietta Borough flood protection project, including embankment, earthen levee, concrete wall closure and gates Project Allocation 20,700,000(Base Project Allocation -

$18,630,000) (Design & Contingencies - $2,070,000)

(viii) Lehigh County (A) Construction of a storm water

retention system for flooding mitigation in Borough of Fountain Hill Mill 2 complex Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ix) Luzerne County (A) Repair or replace debris dam

embankment and its inlet works on Brown Creek and replace damaged storm drains within Plymouth Borough Project Allocation 1,800,000(Base Project Allocation - $1,620,000) (Design & Contingencies - $180,000)

(B) Additional funding for DGS Project

Page 35: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

183-3, stream bank stabilization in Pittston Township, including mitigation and maintenance on access ramps Project Allocation 1,350,000(Base Project Allocation - $1,215,000) (Design & Contingencies - $135,000)

(x) Monroe County (A) Construction, infrastructure

improvements and other costs related to Skytop Dam restoration Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xi) Montgomery County (A) Additional funding for DGS Project

181-08, raising level of levees along Tacony Creek, construction of concrete channel, extension of culvert box and construction of new SEPTA railroad bridge for stream flow improvement in Cheltenham and Abington Townships Project Allocation 4,000,000(Base Project Allocation - $3,200,000) (Design & Contingencies - $800,000)

(B) Additional funding for DGS Project 181-17, Sandy Run flood protection project, in Abington and Upper Dublin Townships, including channel realignment and improvements, including mitigation Project Allocation 360,000(Base Project Allocation - $324,000) (Design & Contingencies - $36,000)

(C) Additional funding for DGS Project 181-8, raising level of levees along Tacony Creek, construction of concrete channel, extension of culvert box and construction of new SEPTA railroad bridge for stream flow improvement in Glenside area of Cheltenham Township, including raising of concrete channel wall and earthen levee and constructing concrete channel with culvert Project Allocation 1,800,000(Base Project Allocation - $1,620,000) (Design & Contingencies - $180,000)

Page 36: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(D) Construction, infrastructure improvements and other costs related to Abington stream bank stabilization flood control project Project Allocation 200,000(Base Project Allocation - $200,000)

(xii) Philadelphia County (A) Construction, infrastructure, storm

water management and restoration of tidal wetland for Penn Treaty Park Phase I project Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (B) Lake renovations and other costs

related to Franklin Delano Roosevelt Park Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (6) Department of General Services

(i) Berks County (A) Upgrade and renovate two elevators in

Reading State Office Building, including replacement of controller, car fixtures, corridor fixtures door operator, tracks/hangars and power unit Project Allocation 250,000(Base Project Allocation - $150,000) (Design & Contingencies - $100,000)

(B) Completely renovate two elevators, including motors and remodeling, in Reading State Office Building Project Allocation 250,000(Base Project Allocation - $150,000) (Design & Contingencies - $100,000)

(C) Replace coal boilers with more efficient system in Reading State Office Building Project Allocation 1,000,000(Base Project Allocation - $800,000) (Design & Contingencies - $200,000)

(D) Upgrade security at Reading State Office Building Project Allocation 100,000(Base Project Allocation - $100,000)

Page 37: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(i.1) Cambria County (A) Demolition, construction,

infrastructure, abatement of hazardous materials and other costs related to the State Corrections Facility at SCI Cresson property reuse project Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (ii) Dauphin County

(A) Replace wiring in all lighting fixtures in Main Capitol Building Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Upgrade and renovate all existing elevators, including upgrading motors and remodeling cabs, in Finance Building Project Allocation 1,820,000(Base Project Allocation - $1,638,000) (Design & Contingencies - $182,000)

(C) Upgrade and renovate all existing elevators, including upgrading motors and remodeling cabs, in Forum Building Project Allocation 1,820,000(Base Project Allocation - $1,638,000) (Design & Contingencies - $182,000)

(D) Replace roof, including paver supports, roof membrane and roof and parapet material of Keystone Building Project Allocation 2,500,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $500,000)

(E) Replace parapet roof, including full removal of old roof and repair spalling, in Finance Building Project Allocation 700,000(Base Project Allocation - $600,000) (Design & Contingencies - $100,000)

(F) Repair roof interstice space between roof and ceiling and tie into control system in Main Capitol Building Project Allocation 1,000,000(Base Project Allocation - $900,000) (Design & Contingencies - $100,000)

(G) Replace roof and windows in Matthew J. Ryan Office Building

Page 38: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 550,000(Base Project Allocation - $500,000) (Design & Contingencies - $50,000)

(H) Remove and replace architectural grade shingles, remove and replace BUR roofs with R-30 insulation and EPDM roofing and replace EPDM roof on windows, including insulation, in DGS Annex Complex, Administration Building Project Allocation 113,000(Base Project Allocation - $110,000) (Design & Contingencies - $3,000)

(I) Install central air conditioning in Chapel Building of DGS Annex Complex Project Allocation 116,000(Base Project Allocation - $113,000) (Design & Contingencies - $3,000)

(J) Repair or replace damaged sandstone headers along entryway of Archives Building Project Allocation 310,000(Base Project Allocation - $300,000) (Design & Contingencies - $10,000)

(K) Reline cooling towers, including membrane for chillers, at Central Plant Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(L) Construct ADA entrance in North Office Building Project Allocation 750,000(Base Project Allocation - $700,000) (Design & Contingencies - $50,000)

(M) Repave or rebuild various annex cartways at DGS Annex Complex Project Allocation 681,000(Base Project Allocation - $681,000)

(N) Replace moduline diffuser in East Wing Building Project Allocation 381,000(Base Project Allocation - $381,000)

(O) Completely renovate elevators, including motors and remodeling, in Finance Building Project Allocation 910,000(Base Project Allocation - $700,000) (Design & Contingencies - $210,000)

Page 39: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(P) Completely renovate elevators, including motors and remodeling, in Forum Building Project Allocation 910,000(Base Project Allocation - $700,000) (Design & Contingencies - $210,000)

(Q) Repair or replace pavers within Keystone Building Plaza Project Allocation 2,000,000(Base Project Allocation - $1,500,000) (Design & Contingencies - $500,000)

(R) Completely replace roof of Arsenal Building, including flashing and roof drains Project Allocation 700,000(Base Project Allocation - $600,000) (Design & Contingencies - $100,000)

(S) Replace chiller that controls cooling system in 22nd and Forster Building Project Allocation 600,000(Base Project Allocation - $480,000) (Design & Contingencies - $120,000)

(T) Replace moduline diffusers in Rachel Carson Building Project Allocation 1,000,000(Base Project Allocation - $800,000) (Design & Contingencies - $200,000)

(U) Completely renovate all building restrooms in Health and Welfare Building Project Allocation 4,000,000(Base Project Allocation - $3,200,000) (Design & Contingencies - $800,000)

(V) Completely renovate all building restrooms in Labor and Industry Building Project Allocation 8,000,000(Base Project Allocation - $6,400,000) (Design & Contingencies - $1,600,000)

(W) Replace secondary switchgear in State Museum Building, including under floor feeders Project Allocation 2,500,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $500,000)

(X) Replace generator in Petry Building Project Allocation 500,000

Page 40: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $400,000) (Design & Contingencies - $100,000)

(Y) Upgrade security in State buildings and facilities within the City of Harrisburg and Susquehanna Township Project Allocation 5,800,000(Base Project Allocation - $5,800,000)

(iii) Lackawanna County (A) Upgrade security at the Scranton

State Office Building Project Allocation 100,000(Base Project Allocation - $100,000)

(iv) Philadelphia County (A) Renovations and rehabilitation of

Pennsylvania Convention Center Facilities Project Allocation 38,000,000(Base Project Allocation -

$38,000,000) (6.1) Pennsylvania Emergency Management Agency

(i) Eastern Area Office Building (A) Demolish and remediate old Eastern

Area Office on grounds of Hamburg Center Project Allocation 1,000,000(Base Project Allocation - $900,000) (Design & Contingencies - $100,000)

(7) Pennsylvania Historical and Museum Commission (i) Bowman's Hill Wildflower Preserve

(A) Construction and other related costs for Bowman's Hill Wildflower Preserve visitor center Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ii) Brandywine Battlefield Park (A) Acquisition, infrastructure,

renovation, construction and other related costs for redevelopment and preservation of Welcome Center and other historic buildings and access improvements Project Allocation 7,200,000(Base Project Allocation - $6,000,000) (Design & Contingencies - $1,200,000)

(iii) Daniel Boone Homestead (A) Restore Daniel Boone Homestead and

Page 41: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other structures at site Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(iv) Eckley Miners' Village (A) Install fire protection system,

including construction of water main to provide sufficient fire suppression to buildings Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(B) Provide for Phase IV of preservation and restoration of miners' houses, including structural and interior restoration, infrastructure and restoration of outbuildings Project Allocation 4,800,000(Base Project Allocation - $4,000,000) (Design & Contingencies - $800,000)

(v) Erie Maritime Museum (A) Provide for replacement of portions

of existing exhibits, selective exhibit component improvements, new energy-efficient exhibit lighting and installation of new exhibits Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(vi) Landis Valley Village and Farm Museum (A) Replace underground sewage, water,

electrical, telephone, data and fire and security lines throughout site and upgrade HVAC system with new geothermal systems and other energy-saving equipment and features Project Allocation 9,000,000(Base Project Allocation - $7,500,000) (Design & Contingencies - $1,500,000)

(B) Install fire protection system, including construction of water main to provide sufficient fire suppression to buildings Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(C) Provide site improvements, including

Page 42: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

preservation and restoration of interior and exterior of buildings Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(D) Design, fabricate and install new permanent exhibits for new visitor center Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(vii) Old Economy Village (A) Rehabilitate exterior and structure

of up to 18 buildings, including painting, roofing, moisture barriers, repair of structural members, masonry, gutters and drainage chimneys, electrical, wastewater systems, HVAC and water supply lines with archaeological investigations at site Project Allocation 3,000,000(Base Project Allocation - $2,500,000) (Design & Contingencies - $500,000)

(viii) Pennsbury Manor (A) Install fire protection system,

including construction of water main to provide sufficient fire suppression to buildings Project Allocation 2,400,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $400,000)

(ix) Pennsylvania Anthracite Heritage Museum (A) Install fire protection system,

including bringing sufficient water to building and installation of new sprinklers and gas/chemical suppression system in collection area Project Allocation 960,000(Base Project Allocation - $800,000) (Design & Contingencies - $160,000)

(x) Pennsylvania Lumber Museum (A) Provide for second phase of exhibits

in main gallery, as well as outdoor site interpretive signage and exhibits Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(xi) Railroad Museum of Pennsylvania

Page 43: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Install fire protection system, including construction of water main to provide sufficient fire suppression to buildings Project Allocation 1,200,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $200,000)

(xii) Scranton Iron Furnaces (A) Restore and stabilize furnaces,

including masonry, drainage, lighting, security, fencing and infrastructure Project Allocation 6,000,000(Base Project Allocation - $5,000,000) (Design & Contingencies - $1,000,000)

(xiii) Washington Crossing Historic Park (A) Provide restoration and improvements

to Bowman's Hill Tower and ancillary facilities Project Allocation 6,000,000(Base Project Allocation - $5,000,000) (Design & Contingencies - $1,000,000)

(B) Install fire protection system, including construction of water main to provide sufficient fire suppression to buildings Project Allocation 2,400,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $400,000)

(8) Department of Labor and Industry (i) Labor and Industry Building, Harrisburg,

Dauphin County (A) Replace two high-voltage

transformers, including infrastructure Project Allocation 5,000,000(Base Project Allocation - $4,500,000) (Design & Contingencies - $500,000)

(9) Department of Military and Veterans Affairs (i) (Reserved) (ii) Coraopolis Readiness Center, Allegheny

County (A) Rehabilitate Coraopolis Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); and repair facade and parking facility

Page 44: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 1,500,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $250,000)

(iii) (Reserved) (iv) Pittsburgh Support Maintenance Shop,

Allegheny County (A) Combine three field maintenance shops

with 11,300 square feet of usable space and 2,250 square feet of unheated storage Project Allocation 1,440,000(Base Project Allocation - $1,200,000) (Design & Contingencies - $240,000)

(v) Southwestern Veterans Center, Allegheny County (A) Renovate and repair Southwestern

Veterans Center, including replacement of facility roof Project Allocation 3,125,000(Base Project Allocation - $2,500,000) (Design & Contingencies - $625,000)

(B) Provide for renovation and general repairs of Southwestern Veterans Center, including life safety and regulatory deficiencies Project Allocation 8,125,000(Base Project Allocation - $7,313,000) (Design & Contingencies - $812,000)

(vi) Ford City Readiness Center, Armstrong County (A) Rehabilitate Ford City Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 3,000,000(Base Project Allocation - $2,500,000) (Design & Contingencies - $500,000)

(vii) Hollidaysburg Readiness Center, Blair County (A) Rehabilitate Hollidaysburg Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms

Page 45: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); and repair facade and parking facilityProject Allocation 2,800,000(Base Project Allocation - $2,400,000) (Design & Contingencies - $400,000)

(viii) Hollidaysburg Veterans Home, Blair County (A) Provide for renovation and general

repairs of Hollidaysburg Veterans Home, including upgrading community living center at Eisenhower Hall and constructing meal delivery systems at Arnold and Eisenhower Halls Project Allocation 1,325,000(Base Project Allocation - $1,060,000) (Design & Contingencies - $265,000)

(B) Provide for renovation and general repairs of Hollidaysburg Veterans Home Project Allocation 6,325,000(Base Project Allocation - $5,693,000) (Design & Contingencies - $632,000)

(ix) Butler Readiness Center, Butler County (A) Rehabilitate Butler Readiness Center,

including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 3,800,000(Base Project Allocation - $3,300,000) (Design & Contingencies - $500,000)

(x) Southeastern Veterans Center, Chester County (A) Provide for renovation and general

repairs of Southeastern Veterans Center, including upgrades and renovations at Coates Hall and construction of new maintenance building Project Allocation 1,925,000(Base Project Allocation - $1,540,000) (Design & Contingencies - $385,000)

(B) Provide for renovation and general repairs of Southeastern Veterans

Page 46: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Center, including replacement of facility roof Project Allocation 9,925,000(Base Project Allocation - $8,933,000) (Design & Contingencies - $992,000)

(xi) Spring City Armory, Chester County (A) Rehabilitate Spring City Armory to

current standards, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(xii) Spring City Readiness Center, Chester County (A) Rehabilitate Spring City Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker roomsand mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 3,600,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $600,000)

(xiii) Lock Haven Readiness Center, Clinton County (A) Rehabilitate Lock Haven Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 3,000,000(Base Project Allocation - $2,500,000) (Design & Contingencies - $500,000)

(xiv) Harrisburg Readiness Center, Dauphin County (A) Rehabilitate Harrisburg Readiness

Page 47: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 4,600,000(Base Project Allocation - $4,000,000) (Design & Contingencies - $600,000)

(xiv.1) Harrisburg Maintenance Shop (A) Rehabilitate Harrisburg Field

Maintenance Shop, including maintenance bays, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms, and upgrade building systems, including HVAC, roofs, windows and doors, repairs to the facade, expansion of parking and construction of unheated storage facility Project Allocation 3,500,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $500,000)

(xv) Pennsylvania Soldiers' and Sailors' Home, Erie County (A) Provide for renovation and general

repairs of Pennsylvania Soldiers' and Sailors' Home, including life safety and regulatory deficiencies Project Allocation 13,400,000(Base Project Allocation -

$12,060,000) (Design & Contingencies - $1,340,000)

(xvi) Indiana Readiness Center, Indiana County (A) Rehabilitate Indiana Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 3,200,000(Base Project Allocation - $2,700,000)

Page 48: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $500,000) (xvii) Gino J. Merli Veterans Center,

Lackawanna County (A) Provide for renovation and general

repairs of Gino J. Merli Veterans Center, including life safety and regulatory deficiencies Project Allocation 9,895,000(Base Project Allocation - $8,906,000) (Design & Contingencies - $989,000)

(xvii.1) Scranton Maintenance Shop, Lackawanna County (A) Rehabilitate maintenance shop,

administrative offices, classrooms, storage rooms, mechanical rooms and parking Project Allocation 4,500,000(Base Project Allocation - $4,000,000) (Design & Contingencies - $500,000)

(xvii.2) New Castle Maintenance Shop, Lawrence County (A) Rehabilitate maintenance shop,

administrative offices, classrooms, storage rooms, mechanical rooms and parking Project Allocation 2,500,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $500,000)

(xvii.3) Combat Aviation Brigade Readiness Center, Lebanon County (A) Rehabilitate 28th Aviation Brigade at

Fort Indiantown Gap, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, lockers, mechanical rooms, HVAC, infrastructure and parking Project Allocation 4,500,000(Base Project Allocation - $4,000,000) (Design & Contingencies - $500,000)

(xvii.4) Recruiting and Retention Battalion, Lebanon County (A) Rehabilitate Recruiting and Retention

Battalion at Fort Indiantown Gap to include assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and

Page 49: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

mechanical rooms and upgrade the building systems, including HVAC, roofs, windows and doors and repairs to facade Project Allocation 2,500,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $500,000)

(xviii) Wilkes-Barre Readiness Center, Luzerne County (A) Rehabilitate Wilkes-Barre Readiness

Center, including assembly hall, dining facility, classrooms, administrative offices, storage space, restrooms, locker rooms, parking for privately owned and military vehicles and renovation of existing facility Project Allocation 3,000,000(Base Project Allocation - $2,500,000) (Design & Contingencies - $500,000)

(xviii.1) Williamsport Maintenance Shop, Lycoming County (A) Rehabilitate maintenance shop,

administrative offices, classrooms, storage rooms, mechanical rooms and parking Project Allocation 2,500,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $500,000)

(xix) Bradford Readiness Center, McKean County (A) Expand Bradford Readiness Center,

including additional classroom, administrative offices, storage space, restrooms, locker rooms, mechanical rooms and parking facilities Project Allocation 1,200,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $200,000)

(B) Expand Bradford Readiness Center, including infrastructure at airport Project Allocation 1,200,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $200,000)

(xx) Kane Readiness Center, McKean County (A) Rehabilitate Kane Readiness Center,

including assembly hall, classrooms, administrative offices, storage space,

Page 50: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 3,300,000(Base Project Allocation - $2,800,000) (Design & Contingencies - $500,000)

(xxi) Hermitage Readiness Center, Mercer County (A) Rehabilitate Hermitage Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 4,700,000(Base Project Allocation - $4,000,000) (Design & Contingencies - $700,000)

(xxii) East Stroudsburg Readiness Center, Monroe County (A) Rehabilitate East Stroudsburg

Readiness Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 3,000,000(Base Project Allocation - $2,400,000) (Design & Contingencies - $600,000)

(xxiii) Tobyhanna Armed Forces Reserve Center, Monroe County (A) Rehabilitation and building expansion

of Tobyhanna Armed Forces Center, including assembly hall, kitchen, supply, locker room, administration and classroom with parking, including maintenance facility Project Allocation 600,000(Base Project Allocation - $500,000) (Design & Contingencies - $100,000)

(xxiv) Plymouth Meeting Readiness Center,

Page 51: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Montgomery County (A) Rehabilitate Plymouth Meeting

Readiness Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 4,500,000(Base Project Allocation - $3,900,000) (Design & Contingencies - $600,000)

(xxv) Delaware Valley Veterans Home, Philadelphia County (A) Provide for renovation and general

repairs of Delaware Valley Veterans Home, including life safety and regulatory deficiencies Project Allocation 10,250,000(Base Project Allocation - $9,225,000) (Design & Contingencies - $1,025,000)

(B) Provide for renovation and general repairs of Delaware Valley Veterans Home, including life safety and regulatory deficiencies Project Allocation 5,625,000(Base Project Allocation - $4,500,000) (Design & Contingencies - $1,125,000)

(xxv.1) Southampton Road Readiness Center, Philadelphia County (A) Rehabilitate assembly hall,

classrooms, administrative offices, storage space, restrooms, lockers, mechanical rooms, HVAC, infrastructure and parking Project Allocation 4,500,000(Base Project Allocation - $4,000,000) (Design & Contingencies - $500,000)

(xxv.2) 23rd Street Readiness Center, Philadelphia County (A) Rehabilitate assembly hall,

classrooms, administrative offices, storage spaces, restrooms, lockers, mechanical rooms, HVAC, infrastructure and parking Project Allocation 3,500,000

Page 52: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $3,000,000) (Design & Contingencies - $500,000)

(xxv.3) Lancaster Avenue Readiness Center, Philadelphia County (A) Additional funding for DGS Project

961-26, rehabilitate Philadelphia Lancaster Avenue Readiness Center, to support construction management services, commissioning and additional contingency funds Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(xxvi) Schuylkill County Readiness Center, Schuylkill County (A) Purchase 10 to 20 acres of land for

future construction of new Schuylkill County Readiness Center to replace current facilities to meet new requirements Project Allocation 1,600,000(Land Allocation - $1,600,000)

(xxvi.1) Oil City Readiness Center, Venango County (A) Rehabilitate assembly hall,

classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms and upgrade building systems, including HVAC, roofs, windows, doors and repairs to facade Project Allocation 3,500,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $500,000)

(xxvii) Mount Pleasant Readiness Center, Westmoreland County (A) Rehabilitate Mount Pleasant Readiness

Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage facility Project Allocation 3,000,000(Base Project Allocation - $2,500,000) (Design & Contingencies - $500,000)

(xxviii) York Readiness Center, York County

Page 53: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Rehabilitate York Readiness Center, including assembly hall, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical rooms; upgrade building systems (HVAC, roofs, windows, doors); repair facade; expand parking; and construct unheated storage space Project Allocation 2,400,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $400,000)

(10) Department of Public Welfare (i) Clarks Summit State Hospital

(A) Replace all G & W oil switches and high-voltage lines throughout facility and install new generators at Buildings 2 and 7, including new 200-amp service Project Allocation 5,000,000(Base Project Allocation - $4,300,000) (Design & Contingencies - $700,000)

(B) Upgrade fire alarm and fire suppression system throughout facility Project Allocation 2,800,000(Base Project Allocation - $2,520,000) (Design & Contingencies - $280,000)

(C) Replace boilers Project Allocation 4,200,000(Base Project Allocation - $3,780,000) (Design & Contingencies - $420,000)

(ii) Cresson Secure Treatment Unit (A) Construct multipurpose modular

building for classroom and gym use Project Allocation 3,000,000(Base Project Allocation - $2,500,000) (Design & Contingencies - $500,000)

(iii) Danville State Hospital (A) Replace tower roof and flat roof of

Building I Project Allocation 750,000(Base Project Allocation - $650,000) (Design & Contingencies - $100,000)

(B) Replace roofs on various buildings Project Allocation 1,800,000(Base Project Allocation - $1,620,000) (Design & Contingencies - $180,000)

(iv) Ebensburg Center

Page 54: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Replace, install and upgrade air conditioning to various hallways, corridors, day activity rooms and dining areas in five residential units Project Allocation 500,000(Base Project Allocation - $388,000) (Design & Contingencies - $112,000)

(B) Upgrade fire alarm and fire suppression system throughout facility Project Allocation 2,200,000(Base Project Allocation - $1,980,000) (Design & Contingencies - $220,000)

(C) Replace current HVAC Project Allocation 3,500,000(Base Project Allocation - $3,150,000) (Design & Contingencies - $350,000)

(iv.1) Hamburg Center (A) Demolish and remediate obsolete

boiler plant building Project Allocation 1,000,000(Base Project Allocation - $900,000) (Design & Contingencies - $100,000)

(v) Loysville Youth Development Center (A) Replace fire lines and pumps and

install new fire sprinklers in Building 10 Project Allocation 1,800,000(Base Project Allocation - $1,500,000) (Design & Contingencies - $300,000)

(B) Upgrade and replace HVAC equipment throughout facility to meet current ventilation codes Project Allocation 3,000,000(Base Project Allocation - $2,700,000) (Design & Contingencies - $300,000)

(vi) (Reserved) (vii) Norristown State Hospital

(A) Demolish vacant and deteriorated buildings considered a nuisance and hazard Project Allocation 1,000,000(Base Project Allocation - $900,000) (Design & Contingencies - $100,000)

(B) Upgrade and replace HVAC equipment throughout facility to meet current ventilation codes Project Allocation 5,000,000

Page 55: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $4,500,000) (Design & Contingencies - $500,000)

(viii) North Central Secure Treatment Unit (A) Construct multipurpose modular

building for classroom and gym use Project Allocation 5,400,000(Base Project Allocation - $4,500,000) (Design & Contingencies - $900,000)

(B) Replace existing standard glass windows with new security-type shatterproof glass windows for health and safety issues Project Allocation 600,000(Base Project Allocation - $540,000) (Design & Contingencies - $60,000)

(C) Replace current HVAC to meet code requirements Project Allocation 9,000,000(Base Project Allocation - $8,100,000) (Design & Contingencies - $900,000)

(viii.1) Philipsburg State Hospital (A) Demolish and remediate all campus

buildings Project Allocation 6,000,000(Base Project Allocation - $5,400,000) (Design & Contingencies - $600,000)

(ix) Polk Center (A) Remove and replace water plant

Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Repair all mortar joints between brick and seal all brick and mortar joints Project Allocation 2,500,000(Base Project Allocation - $2,250,000) (Design & Contingencies - $250,000)

(C) Upgrade fire alarm and fire suppression system throughout facility Project Allocation 1,800,000(Base Project Allocation - $1,620,000) (Design & Contingencies - $180,000)

(x) Selinsgrove Center (A) Reseal joints and renovate lighting

and drainage systems in steam tunnels between power plant and central building complex Project Allocation 550,000

Page 56: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $475,000) (Design & Contingencies - $75,000)

(B) Upgrade fire alarm and fire suppression system throughout facility Project Allocation 2,700,000(Base Project Allocation - $2,430,000) (Design & Contingencies - $270,000)

(C) Funding for DGS Project 553-34 relating to portable water Project Allocation 3,500,000(Base Project Allocation - $3,150,000) (Design & Contingencies - $350,000)

(xi) South Mountain Restoration Center (A) Provide for breech of Carbarough Dam

and land restoration to protect property and life as mandated by Department of Environmental Protection Project Allocation 3,500,000(Base Project Allocation - $3,150,000) (Design & Contingencies - $350,000)

(xii) Torrance State Hospital (A) Replace existing wastewater treatment

plant to comply with current regulations and codes Project Allocation 4,500,000(Base Project Allocation - $4,200,000) (Design & Contingencies - $300,000)

(B) Additional funds for construction and replacement of existing wastewater treatment plant Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xiii) Warren State Hospital (A) Upgrade medium-voltage and low-

voltage electrical gear throughout facility Project Allocation 4,000,000(Base Project Allocation - $3,600,000) (Design & Contingencies - $400,000)

(xiii.1) Wernersville State Hospital (A) Replace boiler

Project Allocation 1,500,000(Base Project Allocation - $1,350,000) (Design & Contingencies - $150,000)

(xiv) White Haven Center (A) Upgrade fire alarm and fire

suppression system throughout facility

Page 57: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 2,100,000(Base Project Allocation - $1,890,000) (Design & Contingencies - $210,000)

(B) Upgrade existing facility to comply with current emission requirements Project Allocation 5,500,000(Base Project Allocation - $4,950,000) (Design & Contingencies - $550,000)

(C) Upgrade existing medium-voltage distribution system Project Allocation 5,000,000(Base Project Allocation - $4,500,000) (Design & Contingencies - $500,000)

(xv) Youth Forestry Camp No. 2 (A) Demolish existing building and

construct new medical building Project Allocation 750,000(Base Project Allocation - $675,000) (Design & Contingencies - $75,000)

(xvi) Youth Forestry Camp No. 3 (A) Install HVAC

Project Allocation 700,000(Base Project Allocation - $630,000) (Design & Contingencies - $70,000)

(11) Pennsylvania State Police (i) DNA Laboratory, Westmoreland County

(A) Construct new DNA laboratory in Greensburg to meet requirements and codes Project Allocation 29,000,000(Base Project Allocation -

$22,500,000) (Land Allocation - $1,500,000) (Design & Contingencies - $5,000,000)

(ii) Greensburg Headquarters, Westmoreland County (A) Design and construction of new

headquarters facility Project Allocation 9,264,000(Base Project Allocation - $7,720,000) (Design & Contingencies - $1,544,000)

(iii) Academy Complex, Derry Township, Dauphin County (A) Construction and other related costs

for renovations to Pennsylvania State Police Academy Complex Project Allocation 8,164,000

Page 58: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $7,220,000) (Design & Contingencies - $944,000)

(iv) Erie Headquarters, Erie County (A) Additional funding for construction

of new headquarters facility, garage, crime lab and aviation hangar to replace existing owned and leased facilities Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(12) State System of Higher Education (i) Bloomsburg University

(A) Construct facilities complex to centralize facilities management functions into single complex of buildings Project Allocation 19,000,000(Base Project Allocation -

$15,200,000) (Design & Contingencies - $3,800,000)

(ii) Cheyney University (A) Completely renovate Coppin Hall

Building Project Allocation 9,000,000(Base Project Allocation - $7,200,000) (Design & Contingencies - $1,800,000)

(B) Construction, infrastructure and other related costs for the design and construction of dormitory Project Allocation 12,000,000(Base Project Allocation -

$10,000,000) (Design & Contingencies - $2,000,000)

(C) Renovate Cope Athletic Complex and supporting academic spaces Project Allocation 10,000,000(Base Project Allocation - $8,000,000) (Design & Contingencies - $2,000,000)

(D) Additional funding to construct new student housing Project Allocation 500,000(Base Project Allocation - $500,000)

(iii) East Stroudsburg University (A) Completely renovate Kemp Library

Building Project Allocation 45,000,000(Base Project Allocation -

Page 59: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

$36,000,000) (Design & Contingencies - $9,000,000)

(iii.1) Edinboro University (A) Rehabilitate and renovate Porreco

Center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iv) Indiana University of Pennsylvania (A) Additional funding for renovation of

Stapleton/Stabley Library, including space reconfiguration Project Allocation 14,500,000(Base Project Allocation -

$11,600,000) (Design & Contingencies - $2,900,000)

(v) Kutztown University (A) Additional funding for renovation of

Beekey Education Building, including infrastructure Project Allocation 9,000,000(Base Project Allocation - $7,200,000) (Design & Contingencies - $1,800,000)

(B) Renovate DeFrancesco Building interior Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(vi) Lock Haven University (A) Renovate and upgrade campus

electrical infrastructure to meet modern demands and efficiencies Project Allocation 16,000,000(Base Project Allocation -

$12,800,000) (Design & Contingencies - $3,200,000)

(B) Additional funding for renovation of South Ulmer Hall, including infrastructure converting from science to general classroom Project Allocation 23,000,000(Base Project Allocation -

$18,400,000) (Design & Contingencies - $4,600,000)

(C) Renovate Russell Hall, including infrastructure Project Allocation 15,000,000(Base Project Allocation -

$12,000,000)

Page 60: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $3,000,000) (D) Construction and other related costs

for renovation of office building Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (vii) Mansfield University

(A) Renovate Belknap and Retan Halls to provide better functionality and space usage Project Allocation 10,000,000(Base Project Allocation - $8,000,000) (Design & Contingencies - $2,000,000)

(B) Expand Butler Music Center, including infrastructure Project Allocation 8,000,000(Base Project Allocation - $6,400,000) (Design & Contingencies - $1,600,000)

(C) Reroute Morris Drive Project Allocation 6,000,000(Base Project Allocation - $4,800,000) (Design & Contingencies - $1,200,000)

(D) Demolish Maple Hall and construct new parking lot Project Allocation 6,000,000(Base Project Allocation - $4,800,000) (Design & Contingencies - $1,200,000)

(E) Upgrade utilities and infrastructure campuswide and replace outdated systems Project Allocation 10,000,000(Base Project Allocation - $8,000,000) (Design & Contingencies - $2,000,000)

(viii) Millersville University (A) Completely renovate Pucillo Hall,

including infrastructure Project Allocation 7,000,000(Base Project Allocation - $5,600,000) (Design & Contingencies - $1,400,000)

(B) Completely renovate Brooks Hall into health and wellness center Project Allocation 15,000,000(Base Project Allocation -

$12,000,000) (Design & Contingencies - $3,000,000)

(ix) Shippensburg University (A) Additional funding for renovation of

Page 61: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Franklin Science Center Project Allocation 25,000,000(Base Project Allocation -

$20,000,000) (Design & Contingencies - $5,000,000)

(B) Additional funding for replacement of Henderson Hall Project Allocation 11,000,000(Base Project Allocation - $8,800,000) (Design & Contingencies - $2,200,000)

(ix.1) Slippery Rock University (A) Additional funding for renovation and

addition to McKay Building Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(x) West Chester University (A) Additional funding for renovation of

Sturzebecker Health Science Center, including new addition Project Allocation 13,000,000(Base Project Allocation -

$10,400,000) (Design & Contingencies - $2,600,000)

(B) Construct new athletics facility, approximately 85,000 square feet Project Allocation 15,000,000(Base Project Allocation -

$12,000,000) (Design & Contingencies - $3,000,000)

(C) Renovate the Sturzebecker Health Science Center Project Allocation 20,000,000(Base Project Allocation -

$16,000,000) (Design & Contingencies - $4,000,000)

(13) Department of Transportation (i) Adams County

(A) Construct new vehicle wash building at Adams County Maintenance Garage Project Allocation 690,000(Base Project Allocation - $600,000) (Design & Contingencies - $90,000)

(B) Develop new stockpile facility in Adams County, including site purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000)

Page 62: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Land Allocation - $20,000) (Design & Contingencies - $200,000)

(C) Renovate and expand current Adams County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(D) Develop new stockpile, including site purchase, design and construction Project Allocation 3,000,000(Base Project Allocation - $1,750,000) (Land Allocation - $750,000) (Design & Contingencies - $500,000)

(E) Construct four new storage buildings and site work at various stockpiles Project Allocation 1,400,000(Base Project Allocation - $1,190,000) (Design & Contingencies - $210,000)

(F) Demolish and construct two new salt storage buildings and site work at Adams County Maintenance Stockpile Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(ii) Allegheny County (A) Renovate Allegheny County District

11-0 Office, including roof, infrastructure, energy efficiencies and program requirements Project Allocation 2,200,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $200,000)

(B) Renovate Allegheny County Maintenance Garage, including roof, infrastructure, energy efficiencies and program requirements Project Allocation 825,000(Base Project Allocation - $750,000) (Design & Contingencies - $75,000)

(C) Construct new PM/service/line paint building at the Neville Island Stockpile Facility Project Allocation 775,000(Base Project Allocation - $700,000) (Design & Contingencies - $75,000)

Page 63: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(D) Construct new service/PM building at Fort Pitt Tunnel Facility to meet program requirements Project Allocation 3,850,000(Base Project Allocation - $3,500,000) (Design & Contingencies - $350,000)

(E) Replace electric generators and remove existing roof systems at Fort Pitt, Liberty and Squirrel Hill Tunnel Facilities Project Allocation 3,350,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $350,000)

(F) Demolish and construct new salt storage buildings and site work at Allegheny County Maintenance Stockpile Project Allocation 2,400,000(Base Project Allocation - $2,100,000) (Design & Contingencies - $300,000)

(G) Renovate and expand Rest Site 11, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(H) Renovate and expand Rest Site 12, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(I) Renovate and expand Allegheny County Driver Licensing Center, including roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(J) Renovate and expand Allegheny County Maintenance Garage, including roof replacement, building systems upgrade

Page 64: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

and energy efficiency improvement Project Allocation 3,500,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $500,000)

(K) Construct new maintenance garage at Liberty Tunnels Facility Project Allocation 3,750,000(Base Project Allocation - $3,250,000) (Design & Contingencies - $500,000)

(ii.1) Armstrong County (A) Demolish and construct new salt

storage buildings and site work at Armstrong County Maintenance Stockpile Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(iii) Beaver County (A) Construct new PM/service/line paint

building at Beaver County Maintenance Facility Project Allocation 775,000(Base Project Allocation - $700,000) (Design & Contingencies - $75,000)

(B) Remove and replace roof system at Beaver County Maintenance Facility Project Allocation 525,000(Base Project Allocation - $450,000) (Design & Contingencies - $75,000)

(C) Construct new PM building at Beaver County Maintenance Facility Project Allocation 1,100,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $100,000)

(D) Remove and replace HVAC system and wall installation at Beaver County Maintenance Office Project Allocation 1,150,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $150,000)

(E) Demolish and construct two new salt storage buildings and site work at Beaver County Maintenance Stockpile Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(F) Renovate and expand Beaver County Driver Licensing Center, including

Page 65: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

roof replacement, upgrade building systems, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(G) Renovate and expand Beaver County Maintenance Garage, including roof replacement, upgrade building systems and improve energy efficiency Project Allocation 3,600,000(Base Project Allocation - $3,250,000) (Design & Contingencies - $350,000)

(H) Construction and other related costs for Hereford Manor dams Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(iii.1) Bedford County (A) Develop new stockpile, including site

purchase, design and construction Project Allocation 3,000,000(Base Project Allocation - $1,750,000) (Land Allocation - $750,000) (Design & Contingencies - $500,000)

(B) Demolish and construct new salt storage buildings and site work at Bedford County Maintenance Stockpile Project Allocation 1,200,000(Base Project Allocation - $1,050,000) (Design & Contingencies - $150,000)

(C) Construct new maintenance garage, including salt storage buildings, auxiliary buildings, site work and land acquisition Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(D) Renovate and expand current county maintenance garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

Page 66: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(iv) Berks County (A) Construct new vehicle wash building

at Berks County Maintenance Garage Project Allocation 690,000(Base Project Allocation - $600,000) (Design & Contingencies - $90,000)

(B) Reskin metal building at Berks County Maintenance Facility Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

(C) Renovate and expand Berks County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(iv.1) Blair County (A) Renovate and expand District Office

9-0, including roof replacement and building systems upgrade Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(B) Renovate and expand Blair County Maintenance Facility, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(C) Design and construction of new district bridge slab building and site work at Blair County Maintenance Facility Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

(D) Demolish and construct new salt storage building, including site work at Blair County Maintenance Facility Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(iv.2) Bradford County (A) Develop new stockpile facility,

Page 67: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

including site purchase, design and construction Project Allocation 3,000,000(Base Project Allocation - $1,750,000) (Land Allocation - $750,000) (Design & Contingencies - $500,000)

(B) Demolish and construct new storage buildings and site work at various stockpiles at Bradford County Stockpile Facility Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(C) Demolish and construct new salt storage building and site work Project Allocation 5,000,000(Base Project Allocation - $4,500,000) (Design & Contingencies - $500,000)

(D) Renovate and expand Bradford County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(iv.3) Bucks County (A) Construct new salt storage buildings

and site work at Bucks County Maintenance Facility Project Allocation 1,600,000(Base Project Allocation - $1,400,000) (Design & Contingencies - $200,000)

(B) Renovate and expand Welcome Center Site P, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,050,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $50,000)

(iv.4) Cambria County (A) Develop new stockpile, including site

purchase, design and construction Project Allocation 3,000,000(Base Project Allocation - $1,750,000) (Land Allocation - $750,000) (Design & Contingencies - $500,000)

Page 68: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(B) Develop new stockpile, including site purchase, design and construction Project Allocation 3,000,000(Base Project Allocation - $1,750,000) (Land Allocation - $750,000) (Design & Contingencies - $500,000)

(C) Demolish and construct new salt storage buildings and site work at Cambria County Maintenance Stockpile Project Allocation 800,000(Base Project Allocation - $720,000) (Design & Contingencies - $80,000)

(D) Renovate and expand Cambria County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(E) Renovate and expand Cambria County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(iv.5) Cameron County (A) Construct new county maintenance

garage, including salt storage buildings, auxiliary buildings, site work and acquisition of land at Cameron County Maintenance Garage Project Allocation 15,000,000(Base Project Allocation -

$11,775,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,225,000)

(B) Renovate and expand current Cameron County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(iv.6) Carbon County

Page 69: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Construct new salt storage building and site work at Carbon County Maintenance Facility Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(B) Demolish and construct satellite office and garage at Hudsondale Stockpile Project Allocation 2,300,000(Base Project Allocation - $1,970,000) (Design & Contingencies - $30,000)

(C) Renovate and expand Carbon County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(iv.7) Centre County (A) Renovate and expand current Centre

County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(B) Renovate and expand County Rest Site 29, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(C) Renovate and expand County Rest Site 30, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(D) Renovate and expand Centre County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step

Page 70: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(iv.8) Chester County (A) Construct new salt storage building

and site work at Chester County Maintenance Facility Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

(B) Construct new salt storage buildings and site work at Chester County Maintenance Facility Project Allocation 1,600,000(Base Project Allocation - $1,400,000) (Design & Contingencies - $200,000)

(iv.9) Clarion County (A) Renovate and expand Clarion County

Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 1,900,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $200,000)

(iv.10) Clearfield County (A) Renovate and expand current

Clearfield County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(B) Construct new salt storage buildings at Clearfield County Stockpile Facility Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(iv.11) Clinton County (A) Construct new salt storage buildings

at Clinton County Stockpile Facility Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(B) Renovate and expand Rest Site 33,

Page 71: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(C) Renovate and expand Rest Site 34, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(iv.12) Columbia County (A) Renovate and expand Rest Site 37,

including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(B) Renovate and expand Rest Site 38, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(C) Renovate and expand current Columbia County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(D) Construction of new Columbia County Maintenance Garage, including salt storage buildings, auxiliary buildings, site work and land acquisition Project Allocation 15,000,000(Base Project Allocation -

$11,750,000)

Page 72: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(E) Construct new salt storage buildings at Columbia County Stockpile Facility Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(iv.13) Crawford County (A) Demolish and construct new storage

buildings and site work at various stockpiles at Crawford County Maintenance Facility Project Allocation 350,000(Base Project Allocation - $298,000) (Design & Contingencies - $52,000)

(B) Renovate and expand County Rest Site 19, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(C) Renovate and expand County Rest Site 20, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(D) Renovate and expand Crawford County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(E) Renovate and expand Crawford County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

Page 73: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(iv.14) Cumberland County (A) Demolish and construct two new salt

storage buildings and site work at Cumberland County Maintenance Stockpile Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(B) Renovate and expand Rest Site 45, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(C) Renovate and expand Rest Site 46, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(v) Dauphin County (A) Construct new vehicle wash building

at Dauphin County Maintenance Garage Project Allocation 690,000(Base Project Allocation - $600,000) (Design & Contingencies - $90,000)

(B) Develop new stockpile facility in Dauphin County, including site purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000) (Land Allocation - $20,000) (Design & Contingencies - $200,000)

(C) Construct new vehicle wash building at Dauphin County Maintenance Garage Stockpile 02 in Elizabethville Project Allocation 690,000(Base Project Allocation - $600,000) (Design & Contingencies - $90,000)

(D) Renovate and expand District Office 8-0, including roof replacement and building systems upgrade Project Allocation 2,000,000

Page 74: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(E) Renovate and expand current Dauphin County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(F) Demolish and construct two new salt storage buildings and site work at Dauphin County Maintenance Stockpile Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(G) Renovation and expansion of Dauphin County Sign Shop, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(H) Renovate and expand Dauphin County Fleet Management Facility, including roof replacement and building systems upgrade Project Allocation 3,500,000(Base Project Allocation - $3,100,000) (Design & Contingencies - $400,000)

(vi) Delaware County (A) Develop new stockpile facility in

Delaware County, including site purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000) (Land Allocation - $20,000) (Design & Contingencies - $200,000)

(B) Construct new salt storage buildings and site work at Delaware County Maintenance Facility Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(C) Renovate and expand Welcome Center Site P, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot

Page 75: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

upgrades and sewage plant upgrades Project Allocation 1,050,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $50,000)

(D) Renovate and expand Delaware County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 1,500,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $500,000)

(vi.1) Elk County (A) Construct new salt storage building

at Elk County Stockpile Facility Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

(vi.2) Erie County (A) Develop new stockpile facilities,

including site purchase, design and construction at Erie County Stockpile Facility Project Allocation 9,000,000(Base Project Allocation - $5,250,000) (Land Allocation - $2,250,000) (Design & Contingencies - $1,500,000)

(B) Renovate and expand Welcome Center Site L, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(C) Renovate and expand Welcome Center Site M, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(D) Renovate and expand Erie County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,500,000

Page 76: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(vi.3) Fayette County (A) Construct new maintenance garage,

including salt storage buildings, auxiliary buildings, site work and land acquisition Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(B) Demolish and construct three new salt storage buildings and site work at Fayette County Maintenance Facility Project Allocation 1,200,000(Base Project Allocation - $1,050,000) (Design & Contingencies - $150,000)

(C) Renovate and expand District Office 12-0, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,150,000) (Design & Contingencies - $350,000)

(D) Renovate and expand current driver licensing center, including roof replacement, building systems upgrade, sidewalks, curbing and parking lot upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(vi.4) Forest County (A) Construct new Forest County

Maintenance Garage, including salt storage buildings, auxiliary buildings, site work and land acquisition Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(B) Construct new salt storage facility at Forest County Stockpile Facility Project Allocation 350,000(Base Project Allocation - $298,000)

Page 77: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $52,000) (vii) Franklin County

(A) Develop new stockpile facility in Franklin County, including site purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000) (Land Allocation - $20,000) (Design & Contingencies - $200,000)

(B) Develop new stockpile facility to replace SP 17 in Franklin County, including site purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000) (Land Allocation - $20,000) (Design & Contingencies - $200,000)

(C) Construct new storage buildings and site work at various stockpiles Project Allocation 1,800,000(Base Project Allocation - $1,530,000) (Design & Contingencies - $270,000)

(D) Renovate and expand current Franklin County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(E) Construct new salt storage buildings and site work at Franklin County Maintenance Stockpile Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(F) Renovate and expand Welcome Center Site G, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(G) Renovate and expand current driver licensing center, including roof replacement, building systems upgrade, sidewalks, curbing and parking lot

Page 78: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(vii.1) Fulton County (A) Renovate and expand current

maintenance facility, including roof replacement, building systems upgrade and construction of two bays with overhead cranes Project Allocation 2,700,000(Base Project Allocation - $2,350,000) (Design & Contingencies - $350,000)

(B) Demolish and construct new salt storage buildings and site work at Fulton County Maintenance Stockpile Project Allocation 1,200,000(Base Project Allocation - $1,050,000) (Design & Contingencies - $150,000)

(C) Renovate and expand Welcome Center Site B, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(D) Renovate and expand Rest Site 3, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(vii.2) Greene County (A) Rehabilitate and expand Greene County

Welcome Center Project Allocation 1,800,000(Base Project Allocation - $1,530,000) (Design & Contingencies - $270,000)

(B) Demolish and construct new salt storage buildings and site work at Greene County Maintenance Stockpile Project Allocation 800,000(Base Project Allocation - $720,000) (Design & Contingencies - $80,000)

Page 79: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(C) Renovate and expand Greene County Maintenance Facility, including roof replacement and building systems upgrade Project Allocation 3,000,000(Base Project Allocation - $2,650,000) (Design & Contingencies - $350,000)

(D) Renovate and expand Welcome Center Site D, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(E) Renovate and expand Greene County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(vii.3) Huntingdon County (A) Renovate and expand Huntingdon County

Maintenance Facility, including roof replacement and building systems upgrade Project Allocation 2,700,000(Base Project Allocation - $2,350,000) (Design & Contingencies - $350,000)

(B) Demolish and construct new salt storage buildings and site work at Huntingdon County Maintenance Stockpile Project Allocation 1,200,000(Base Project Allocation - $1,050,000) (Design & Contingencies - $150,000)

(vii.4) Indiana County (A) Develop new stockpile, including site

purchase, design and construction Project Allocation 3,050,000(Base Project Allocation - $1,750,000) (Land Allocation - $750,000) (Design & Contingencies - $550,000)

(B) Renovate and expand Indiana County

Page 80: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,520,000(Base Project Allocation - $2,220,000) (Design & Contingencies - $300,000)

(vii.5) Jefferson County (A) Renovate and expand Rest Site 25,

including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(B) Renovate and expand Rest Site 26, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(C) Renovate and expand Jefferson County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 1,500,000(Base Project Allocation - $1,350,000) (Design & Contingencies - $150,000)

(vii.6) Juniata County (A) Renovate and expand Juniata County

Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(viii) Lackawanna County (A) Renovate and expand District Office

4-0 to bring building into code compliance, upgrade building systems and improve program requirements and energy efficiency Project Allocation 2,750,000(Base Project Allocation - $2,500,000) (Design & Contingencies - $250,000)

Page 81: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(B) Construct new county metal storage building at Lackawanna County Maintenance Facility Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

(C) Construct new Lackawanna County Maintenance Garage Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(D) Renovate and expand current Lackawanna County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,520,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(E) Demolish and construct four new storage buildings and site work at various stockpiles at Lackawanna County Stockpile Facility Project Allocation 1,600,000(Base Project Allocation - $1,400,000) (Design & Contingencies - $200,000)

(F) Construct addition to District Office 4-0 for expansion of work units, conference rooms and cafeteria Project Allocation 4,000,000(Base Project Allocation - $3,400,000) (Design & Contingencies - $600,000)

(G) Renovate and expand Lackawanna County Roadside Rest Site 36, including roof replacement, building systems upgrade, energy efficiency improvement, sidewalks, curbing and step replacement, parking lot upgrades and water and sewer treatment plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(ix) Lancaster County (A) Develop new stockpile facility in

Lancaster County, including site

Page 82: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000) (Land Allocation - $20,000) (Design & Contingencies - $200,000)

(B) Renovate and expand current Lancaster County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(C) Demolish and construct new salt storage buildings and site work at various stockpiles Project Allocation 2,000,000(Base Project Allocation - $1,750,000) (Design & Contingencies - $250,000)

(x) Lawrence County (A) Construct new PM building at Lawrence

County Maintenance Facility Project Allocation 825,000(Base Project Allocation - $750,000) (Design & Contingencies - $75,000)

(B) Develop new stock pile facility, including site purchase, design and construction Project Allocation 3,000,000(Base Project Allocation - $1,750,000) (Land Allocation - $750,000) (Design & Contingencies - $500,000)

(C) Construct new salt storage building at Lawrence County Maintenance Facility Project Allocation 800,000(Base Project Allocation - $720,000) (Design & Contingencies - $80,000)

(D) Construct new maintenance garage, including salt storage buildings, auxiliary buildings, site work and land acquisition Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(E) Demolish and construct two new salt

Page 83: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

storage buildings and site work at Lawrence County Maintenance Stockpile Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(F) Renovate and expand Lawrence County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(G) Renovate and expand Lawrence County Roadside Rest Site 15, including roof replacement, building systems upgrade, energy efficiency improvement, sidewalks, curbing, step replacement and parking lot upgrades Project Allocation 1,250,000(Base Project Allocation - $1,200,000) (Design & Contingencies - $50,000)

(H) Renovate and expand Lawrence County Roadside Rest Site 16, including roof replacement, building systems upgrade, energy efficiency improvement, sidewalks, curbing, step replacement and parking lot upgrades Project Allocation 1,250,000(Base Project Allocation - $1,200,000) (Design & Contingencies - $50,000)

(x.1) Lebanon County (A) Construct new maintenance garage,

including salt storage buildings, auxiliary buildings, site work and land acquisition Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(B) Demolish and construct new salt storage buildings and site work at various stockpiles Project Allocation 1,600,000(Base Project Allocation - $1,400,000)

Page 84: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $200,000) (C) Renovate and expand Lebanon County

Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(D) Renovate and expand Lebanon County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(xi) Lehigh County (A) Construct new vehicle wash building

at Lehigh County Maintenance Garage Project Allocation 690,000(Base Project Allocation - $600,000) (Design & Contingencies - $90,000)

(B) Renovate and expand Lehigh County Maintenance Garage to upgrade building systems and improve program requirements and energy efficiency Project Allocation 1,150,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $150,000)

(C) Construction of new salt storage building at Lehigh County Maintenance Facility Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

(D) Renovate and expand District Office 5-0, including roof replacement and building systems upgrade Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(E) Renovate and expand Lehigh County Maintenance Facility, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 1,500,000

Page 85: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $1,275,000) (Design & Contingencies - $225,000)

(xii) Luzerne County (A) Develop new stockpile facility,

including site purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000) (Land Allocation - $20,000) (Design & Contingencies - $200,000)

(B) Construct new salt storage buildings at Luzerne County Maintenance Facility Project Allocation 850,000(Base Project Allocation - $730,000) (Design & Contingencies - $120,000)

(C) Construct new bay storage buildings with overhead doors at Luzerne County Maintenance Facility Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

(D) Construct new county metal storage building at Luzerne County Maintenance Facility Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

(E) Construct seven new salt storage buildings and site work at various stockpiles at Luzerne County Stockpile Facility Project Allocation 2,800,000(Base Project Allocation - $2,450,000) (Design & Contingencies - $350,000)

(F) Renovate and expand Rest Site 39, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(G) Renovate and expand Rest Site 53, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades

Page 86: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 1,050,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $50,000)

(H) Renovate and expand Rest Site 54, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,050,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $50,000)

(xii.1) Lycoming County (A) Demolish and construct new storage

buildings and site work at various stockpiles at Lycoming County Stockpile Facility Project Allocation 1,200,000(Base Project Allocation - $1,050,000) (Design & Contingencies - $150,000)

(B) Renovate and expand current District Office 3-0, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(C) Renovate and expand Lycoming County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(xii.2) McKean County (A) Construct new salt storage buildings

at McKean County Stockpile Facility Project Allocation 700,000(Base Project Allocation - $650,000) (Design & Contingencies - $50,000)

(B) Renovate and expand McKean County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(xii.3) Mercer County (A) Develop new maintenance garage,

Page 87: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

including site purchase, design and construction at Mercer County Maintenance Garage Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(B) Renovate and expand Rest Site 17, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(C) Renovate and expand Rest Site 18, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(D) Construct new county maintenance garage, including salt storage buildings, auxiliary buildings, site work and acquisition of site at Mercer County Maintenance Garage Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(E) Demolish and construct new storage buildings and site work at various stock piles at Mercer County Stockpile Facility Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(F) Renovate and expand Mercer County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000)

Page 88: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $150,000) (xii.4) Mifflin County

(A) Renovate and expand Mifflin County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(xii.5) Monroe County (A) Construct new salt storage building,

auxiliary buildings, site work and land acquisition at Monroe County Maintenance Facility Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(B) Renovate and expand current Monroe County Welcome Center, including roof replacement and building systems upgrade Project Allocation 3,000,000(Base Project Allocation - $2,550,000) (Design & Contingencies - $450,000)

(C) Renovate and expand Rest Site 41, including roof replacement, building systems upgrade, program requirements improvement, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(D) Renovate and expand Monroe County Maintenance Facility, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(xiii) Montgomery County (A) Renovate Montgomery County District

Office by designing and constructing

Page 89: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

dry chemical fire protection system for TCC and all server rooms Project Allocation 440,000(Base Project Allocation - $400,000) (Design & Contingencies - $40,000)

(B) Construct new garage parking deck at Montgomery County District Office Project Allocation 3,300,000(Base Project Allocation - $3,000,000) (Design & Contingencies - $300,000)

(C) Renovate and expand Montgomery County Maintenance Garage to upgrade building systems and improve program requirements and energy efficiency Project Allocation 825,000(Base Project Allocation - $750,000) (Design & Contingencies - $75,000)

(D) Renovate and expand District Office 6-0 to bring building into code compliance, upgrade building systems and improve program requirements and energy efficiency Project Allocation 2,200,000(Base Project Allocation - $2,000,000) (Design & Contingencies - $200,000)

(E) Construction of new salt storage buildings and site work at Montgomery County Maintenance Facility Project Allocation 2,000,000(Base Project Allocation - $1,750,000) (Design & Contingencies - $250,000)

(F) Renovate and expand Montgomery County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(G) Renovate and expand Montgomery County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 1,500,000(Base Project Allocation - $1,275,000) (Design & Contingencies - $225,000)

Page 90: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(xiii.1) Montour County (A) Demolish and construct new storage

buildings and site work at various stockpiles at Montour County Stockpile Facility Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(B) Renovate and expand Rest Site 35, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(C) Renovate and expand Rest Site 36, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(xiii.2) Northampton County (A) Construct new salt storage buildings,

auxiliary buildings, site work and land acquisition at Northampton County Maintenance Facility Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(B) Renovate and expand current Northampton County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(C) Construct new salt storage building and site work at Northampton County Maintenance Garage Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

Page 91: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(xiii.3) Northumberland County (A) Demolish and construct new storage

buildings and site work at various stockpiles at Northumberland County Stockpile Facility Project Allocation 1,600,000(Base Project Allocation - $1,400,000) (Design & Contingencies - $200,000)

(B) Construct new maintenance garage, including salt storage buildings, auxiliary buildings, site work and land acquisition Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(C) Renovate and expand Northumberland County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(xiv) Perry County (A) Develop new stockpile facility in

Perry County, including site purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000) (Land Allocation - $20,000) (Design & Contingencies - $200,000)

(B) Demolish and construct new salt storage buildings and site work at various stockpiles Project Allocation 1,200,000(Base Project Allocation - $1,050,000) (Design & Contingencies - $150,000)

(C) Develop new stockpile, including site purchase, design and construction Project Allocation 3,000,000(Base Project Allocation - $1,750,000) (Land Allocation - $750,000) (Design & Contingencies - $500,000)

(xiv.1) Philadelphia County (A) Construction of new salt storage

Page 92: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

building at Philadelphia County Maintenance Facility Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(B) Renovate and expand Philadelphia County Maintenance Facility, including roof replacement and building systems upgrade Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(C) Demolish and construct new salt storage building and site work at Philadelphia County Maintenance Facility Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(D) Renovate and expand Philadelphia County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(xiv.2) Pike County (A) Construct new salt storage building

and site work at Pike County Maintenance Facility Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(B) Renovate and expand Welcome Center Site K, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(C) Renovate and expand Rest Site 61, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades

Page 93: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(D) Renovate and expand Rest Site 62, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(E) Removal and roof replacement system at maintenance facility at Pike County Welcome Center Project Allocation 650,000(Base Project Allocation - $600,000) (Design & Contingencies - $50,000)

(xiv.3) Potter County (A) Renovate and expand current Potter

County Maintenance Garage Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(B) Demolish and construct two new storage buildings and site work at Potter County Stockpile Facility Project Allocation 1,050,000(Base Project Allocation - $900,000) (Design & Contingencies - $150,000)

(xv) Schuylkill County (A) Renovate and expand Schuylkill County

Maintenance Garage to upgrade building systems and improve program requirements and energy efficiency Project Allocation 1,150,000(Base Project Allocation - $1,000,000) (Design & Contingencies - $150,000)

(B) Renovate and expand current Schuylkill County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 1,500,000(Base Project Allocation - $1,275,000) (Design & Contingencies - $225,000)

(C) Construct new salt storage building and site work at Schuylkill County

Page 94: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Maintenance Facility Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(D) Renovate and expand Schuylkill County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(xv.1) Snyder County (A) Demolish and construct new storage

buildings and site work at various stockpiles at Snyder County Stockpile Facility Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(B) Renovate and expand Snyder County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(xv.2) Somerset County (A) Demolish and construct new salt

storage buildings and site work at Somerset County Maintenance Stockpile Project Allocation 1,200,000(Base Project Allocation - $1,050,000) (Design & Contingencies - $150,000)

(B) Develop new stockpile, including site purchase, design and construction Project Allocation 3,000,000(Base Project Allocation - $1,750,000) (Land Allocation - $750,000) (Design & Contingencies - $500,000)

(C) Renovate and expand Somerset County Maintenance Garage, including roof replacement and building systems upgrade

Page 95: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(D) Renovate and expand current driver licensing center, including roof replacement, building systems upgrade, program requirements improvement, sidewalks, curbing, step replacement and parking lot upgrade Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(xv.3) Sullivan County (A) Renovate and expand current Sullivan

County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 1,500,000(Base Project Allocation - $1,275,000) (Design & Contingencies - $225,000)

(B) Demolish and construct two new storage buildings and site work at various stockpiles at Sullivan County Stockpile Facility Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(xv.4) Susquehanna County (A) Renovate and expand current

Susquehanna County Maintenance Facility, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,100,000) (Design & Contingencies - $400,000)

(B) Reskin metal building at Susquehanna County Maintenance Facility Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

(C) Construct new salt storage buildings and site work at various stockpiles at Susquehanna County Maintenance Facility Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

Page 96: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(D) Renovate and expand Rest Site 56, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(E) Renovate and expand Welcome Center Site H, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(xv.5) Tioga County (A) Renovate and expand current Tioga

County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(B) Construct new Tioga County Maintenance Garage, including salt storage buildings, auxiliary buildings, site work and land acquisition Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(C) Demolish and construct new storage buildings and site work at various stockpiles at Tioga County Stockpile Facility Project Allocation 1,200,000(Base Project Allocation - $1,050,000) (Design & Contingencies - $150,000)

(D) Renovate and expand Welcome Center Site T, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000

Page 97: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $1,800,000) (Design & Contingencies - $200,000)

(xv.6) Union County (A) Renovate and expand current Union

County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(B) Demolish and construct new storage buildings and site work at various stockpiles at Union County Stockpile Facility Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(xv.7) Venango County (A) Construct new county maintenance

garage, including salt storage buildings, auxiliary buildings, site work and acquisition of land at Venango County Maintenance Garage Project Allocation 15,000,000(Base Project Allocation -

$11,750,000) (Land Allocation - $1,000,000) (Design & Contingencies - $2,250,000)

(B) Construct parking lot at District Office 1-0 Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(C) Demolish and construct new storage building and site work at Venango County Stockpile Facility Project Allocation 400,000(Base Project Allocation - $350,000) (Design & Contingencies - $50,000)

(D) Renovate and expand Rest Site 21, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

Page 98: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(E) Renovate and expand Rest Site 22, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(F) Renovate and expand current Venango County District Office, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,125,000) (Design & Contingencies - $375,000)

(G) Renovate and expand Venango County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(xv.8) Warren County (A) Demolish and construct new storage

buildings and site work at various stock piles at Warren County Stockpile Facility Project Allocation 1,800,000(Base Project Allocation - $1,550,000) (Design & Contingencies - $250,000)

(B) Renovate and expand Warren County Driver Licensing Center, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 1,400,000(Base Project Allocation - $1,250,000) (Design & Contingencies - $150,000)

(C) Renovate and expand Warren County Maintenance Garage, including roof replacement, building systems upgrade and energy efficiency improvement Project Allocation 2,500,000(Base Project Allocation - $2,125,000)

Page 99: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $375,000) (xvi) Washington County

(A) Develop new stockpile facility, including site purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000) (Land Allocation - $20,000) (Design & Contingencies - $200,000)

(B) Develop new stockpile facility at Atlasburg, including site purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000) (Land Allocation - $20,000) (Design & Contingencies - $200,000)

(C) Demolish and construct new salt storage buildings and site work at Washington County Maintenance Stockpile Project Allocation 1,200,000(Base Project Allocation - $1,050,000) (Design & Contingencies - $150,000)

(D) Renovate and expand Welcome Center Site A, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,500,000(Base Project Allocation - $2,200,000) (Design & Contingencies - $300,000)

(xvi.1) Wayne County (A) Renovate and expand current Wayne

County Maintenance Facility, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,100,000) (Design & Contingencies - $400,000)

(B) Reskin metal building at Wayne County Maintenance Facility Project Allocation 350,000(Base Project Allocation - $300,000) (Design & Contingencies - $50,000)

(C) Construct new salt storage buildings and site work at various stockpiles at Wayne County Maintenance Facility

Page 100: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 800,000(Base Project Allocation - $700,000) (Design & Contingencies - $100,000)

(xvi.2) Westmoreland County (A) Construct new salt storage building

at Westmoreland County Maintenance Facility Project Allocation 400,000(Base Project Allocation - $380,000) (Design & Contingencies - $20,000)

(B) Construct retaining wall at Latrobe Stockpile Project Allocation 325,000(Base Project Allocation - $300,000) (Design & Contingencies - $25,000)

(C) Purchase additional property for expansion of Westmoreland County Maintenance Garage Project Allocation 1,000,000(Land Allocation - $1,000,000)

(D) Rehabilitate and expand 12-5 Maintenance Facility, including infrastructure Project Allocation 3,000,000(Base Project Allocation - $2,650,000) (Design & Contingencies - $350,000)

(E) Demolish and construct new salt storage buildings and site work at Westmoreland County Maintenance Stockpile Project Allocation 2,400,000(Base Project Allocation - $2,100,000) (Design & Contingencies - $300,000)

(xvi.3) Wyoming County (A) Renovate and expand current Wyoming

County Maintenance Facility, including roof replacement and building systems upgrade Project Allocation 2,500,000(Base Project Allocation - $2,100,000) (Design & Contingencies - $400,000)

(xvii) York County (A) Develop a new stockpile facility,

including site purchase, design and construction Project Allocation 2,220,000(Base Project Allocation - $2,000,000)

Page 101: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Land Allocation - $20,000) (Design & Contingencies - $200,000)

(B) Construct new vehicle wash building at York County Maintenance Garage Project Allocation 690,000(Base Project Allocation - $600,000) (Design & Contingencies - $90,000)

(C) Develop new maintenance garage, including site purchase, design and construction Project Allocation 5,000,000(Base Project Allocation - $3,000,000) (Land Allocation - $1,500,000) (Design & Contingencies - $500,000)

(D) Renovate and expand current York County Maintenance Garage, including roof replacement and building systems upgrade Project Allocation 2,000,000(Base Project Allocation - $1,700,000) (Design & Contingencies - $300,000)

(E) Demolish and construct new salt storage buildings and site work at York County Maintenance Stockpile Project Allocation 3,200,000(Base Project Allocation - $2,800,000) (Design & Contingencies - $400,000)

(F) Develop new stockpile, including site purchase, design and construction Project Allocation 3,000,000(Base Project Allocation - $1,750,000) (Land Allocation - $750,000) (Design & Contingencies - $500,000)

(G) Construct new welcome center, including auxiliary buildings, site work and site acquisition Project Allocation 10,000,000(Base Project Allocation - $7,500,000) (Land Allocation - $1,000,000) (Design & Contingencies - $1,500,000)

(H) Renovate and expand Welcome Center Site J, including roof replacement, building systems upgrade, sidewalks, curbing, step replacement, parking lot upgrades and sewage plant upgrades Project Allocation 2,000,000(Base Project Allocation - $1,800,000)

Page 102: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $200,000) (xviii) Montgomery and Philadelphia Counties

(A) City Avenue Special Services District. Construction, infrastructure improvements and other related costs on City Avenue for pedestrian and vehicular hazard mitigation and storm water management in Lower Merion Township and the City of Philadelphia Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (b) Port projects.--Additional capital projects in the

category of improvement projects for ports to be constructed or acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Project Total Project Allocation

(1) Erie County (i) Erie Inland Port

(A) Construct rail improvements and ship-loading infrastructure at the Port of Erie Project Allocation 9,000,000(Base Project Allocation - $9,000,000)

(B) Construct rail improvements and replace rail bridge at Erie Inland Port-Albion site Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (2) Philadelphia County

(i) Philadelphia Regional Port Authority (A) Land acquisition, expansion, design,

construction and general improvements to port facilities Project Allocation 493,200,000(Base Project Allocation -

$493,200,000) (B) Main channel deepening project

Project Allocation 97,800,000(Base Project Allocation -

$97,800,000) Section 4. Itemization of furniture and equipment projects.

Page 103: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successor or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Project Total Project Allocation

(1) Department of Conservation and Natural Resources (i) Kinzua Bridge State Park

(A) Original furniture and equipment for new office/visitor center for public and staff use Project Allocation 3,000,000(Base Project Allocation - $2,400,000) (Design & Contingencies - $600,000)

(ii) Ohiopyle State Park (A) Original furniture and equipment for

Project DGS 166-9, Ohiopyle State Park Visitors' Center Project Allocation 220,000(Base Project Allocation - $220,000)

(iii) S. B. Elliott State Park (A) Additional funding for purchase of

exhibits, furnishings and equipment for visitor center and overnight facilities Project Allocation 3,500,000(Base Project Allocation - $2,800,000) (Design & Contingencies - $700,000)

(iv) Sinnemahoning State Park (A) Purchase of exhibits, furnishings and

equipment for visitor center and office Project Allocation 2,000,000(Base Project Allocation - $1,600,000) (Design & Contingencies - $400,000)

(2) Department of Education (i) Lincoln University

(A) Original furniture and equipment associated with renovation of Center for the Study of Black Culture Project Allocation 4,000,000(Base Project Allocation - $3,200,000) (Design & Contingencies - $800,000)

Page 104: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(B) Provide necessary furniture and equipment associated with renovation of Alumni House Project Allocation 5,000,000(Base Project Allocation - $4,000,000) (Design & Contingencies - $1,000,000)

(ii) Temple University (A) Original furniture and equipment

associated with renovation of Tomlinson Hall Project Allocation 450,000(Base Project Allocation - $360,000) (Design & Contingencies - $90,000)

(B) Original furniture and equipment associated with design and construction of Center for Scholars Project Allocation 300,000(Base Project Allocation - $300,000)

(iii) Thaddeus Stevens College of Technology (A) Original furniture and equipment

associated with design and construction of technology center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iv) The Pennsylvania State University (A) Original furniture and equipment for

state-of-the-art research and teaching space for College of Liberal Arts Project Allocation 8,100,000(Base Project Allocation - $8,100,000)

(B) Original furniture and equipment for building entrance and security systems project, including key access boxes and video surveillance cameras Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(C) Original furniture and equipment for chilled water expansion project for University Park campus Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(D) Original furniture and equipment for new classroom/class laboratory building at University Park campus Project Allocation 7,700,000(Base Project Allocation - $7,700,000)

(E) Additional funding for furniture and

Page 105: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

equipment for computer building at University Park campus Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(F) Original furniture and equipment for general computing data center Project Allocation 13,000,000(Base Project Allocation -

$13,000,000) (G) Additional funding for furniture and

equipment for Henning Building Project Allocation 2,250,000(Base Project Allocation - $2,250,000)

(H) Capital renewal for Kostos Building Project Allocation 1,800,000(Base Project Allocation - $1,800,000)

(I) Capital renewal for Baker Engineering & Science Building Project Allocation 1,400,000(Base Project Allocation - $1,400,000)

(J) Original furniture and equipment for new Recital Hall addition and Music Building I Project Allocation 3,300,000(Base Project Allocation - $3,300,000)

(K) Original furniture and equipment for Ruhl Student Community Center and multipurpose building upgrades Project Allocation 1,600,000(Base Project Allocation - $1,600,000)

(L) Original furniture and equipment for Student Union Building at Brandywine Project Allocation 2,400,000(Base Project Allocation - $2,400,000)

(M) Capital renewal for waste water treatment plant located at University Park campus Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(N) Additional funding for furniture and equipment for water treatment plant located at University Park campus Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(O) Original furniture and equipment for Pattee Library Knowledge Commons at University Park

Page 106: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(P) Provide for necessary furniture and equipment associated with design and construction of Milton S. Hershey Data Center Project Allocation 2,400,000(Base Project Allocation - $2,400,000)

(Q) Original furniture and equipment for state-of-the-art research and teaching space for College of Agricultural Sciences Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (R) Original furniture and equipment for

state-of-the-art research and teaching space for College of Engineering Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (2.1) Department of General Services

(i) Family Court Complex, Philadelphia (A) Provide the necessary furniture and

equipment associated with construction of Family Court Complex in Philadelphia Project Allocation 22,000,000(Base Project Allocation -

$22,000,000) (3) Pennsylvania Historical and Museum

Commission (i) Landis Valley Village and Museum

(A) Original furniture and equipment for new visitor center Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(ii) Railroad Museum of Pennsylvania (A) Original equipment for new rolling

stock storage facility Project Allocation 1,200,000(Base Project Allocation - $1,200,000)

(iii) Southeastern Veterans Center, Chester County (A) Provide original furniture and

equipment to fully equip new maintenance building

Page 107: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 200,000(Base Project Allocation - $200,000)

(4) State System of Higher Education (i) Bloomsburg University

(A) Original furniture and equipment associated with renovation of McCormick Center Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ii) California University of Pennsylvania (A) Original furniture and equipment

associated with renovation of Coover Hall Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Original furniture and equipment associated with renovation of South Hall and Old Main Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(iii) Cheyney University (A) Original furniture and equipment

associated with renovation of Cope Hall Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iv) Clarion University (A) Original furniture and equipment

associated with renovation of Marwick-Boyd Fine Arts Center Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(v) East Stroudsburg University (A) Original furniture and equipment

associated with construction of Information Commons Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(vi) Edinboro University (A) Original furniture and equipment

associated with renovation and addition of Porreco Center Project Allocation 500,000(Base Project Allocation - $500,000)

(vii) Indiana University of Pennsylvania (A) Original furniture and equipment

associated with renovation of

Page 108: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Stapleton/Stabley Libraries Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Provide for necessary furniture and equipment associated with renovation of Weyant and Walsh Halls Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(viii) Kutztown University (A) Original furniture and equipment

associated with renovation of Lytle Hall Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Original furniture and equipment associated with renovation of Poplar House Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ix) Mansfield University (A) Original furniture and equipment

associated with construction of new student housing Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(x) Slippery Rock University (A) Original furniture and equipment

associated with renovation of Student Success Center Project Allocation 2,800,000(Base Project Allocation - $2,800,000)

Section 5. Itemization of transportation assistance projects. (a) Mass transit.--Additional capital projects in the

category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:

Project Total Project Allocation

(1) Adams County Transit Authority (ACTA) (i) Design, construction and other related

costs for multimodal transportation facility for Freedom Transit, ACTA Paratransit, intercity buses, automobiles and bicycles to provide off-street parking for both public and private users, as well

Page 109: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

as to accommodate overflow parking from the Gettysburg National Military Park, Borough of Gettysburg

Project Allocation 3,000,000 (Base Project Allocation - $3,000,000)

(1.1) Allegheny County (i) High-density redevelopment at new and

existing transit stops along proposed Bus Rapid Transit Route and Lightrail and Busway stops in City of Pittsburgh

Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (ii) Acquisition, construction,

infrastructure, redevelopment and other related costs for multimodal public transportation facility

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(2) Armstrong Area Transportation Authority (i) Provide for facility and facility

upgrades, including mobility management center, terminals, fuel storage, parking lots, fueling depots, roof replacement and miscellaneous equipment

Project Allocation 2,253,000(Base Project Allocation - $2,028,000) (Design & Contingencies - $225,000)

(ii) Upgrade and renovate DuBois facility to bring to state of good repair

Project Allocation 959,000(Base Project Allocation - $863,000) (Design & Contingencies - $96,000)

(iii) Construct terminals Project Allocation 1,162,000(Base Project Allocation - $1,162,000)

(iv) Mobility Management Center, to match discretionary Federal capital funding to rehabilitate infrastructure throughout system

Project Allocation 1,066,000(Base Project Allocation - $959,000) (Design & Contingencies - $107,000)

(v) Bus Purchase Program, provide for replacement of buses that have exceeded their useful life

Project Allocation 2,464,000(Base Project Allocation - $2,218,000)

Page 110: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $246,000) (2.1) Beaver County Transit Authority

(i) Construction, infrastructure and other related costs for natural gas fueling station in Center Township

Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(3) Butler Transit Authority (i) Expand Cranberry Area Park and Ride

Facility on Route 528 near I-79, Butler County, including property acquisition and construction

Project Allocation 450,000(Base Project Allocation - $405,000) (Design & Contingencies - $45,000)

(ii) Provide for infrastructure improvements, facility upgrades for bus storage and maintenance areas, construction of public waiting area, training room, park and ride facility and compressed natural gas (CNG) refueling station and purchase of four 45-foot Coach CNG buses

Project Allocation 1,700,000(Base Project Allocation - $1,700,000)

(4) Cambria County Transit Authority (i) Replace transit facility in Johnstown to

meet current standards and requirements Project Allocation 2,419,000(Base Project Allocation - $2,177,000) (Design & Contingencies - $242,000)

(ii) Construct transit facility Project Allocation 3,871,000(Base Project Allocation - $3,871,000)

(iii) Construction and infrastructure improvements for new facility and bus replacement projects for Camtran

Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(iv) Replace track ties and other improvements

Project Allocation 271,000(Base Project Allocation - $244,000) (Design & Contingencies - $27,000)

(v) Replace fare collection system Project Allocation 78,000(Base Project Allocation - $70,000) (Design & Contingencies - $8,000)

Page 111: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(5) Capital Area Transit (CAT) Authority (i) Replace CAT's transit facility to meet

modern requirements Project Allocation 47,742,000(Base Project Allocation -

$42,968,000) (Design & Contingencies - $4,774,000)

(ii) Upgrade transportation technology for vehicle monitoring and real-time information for CAT's transit operations

Project Allocation 1,935,000(Base Project Allocation - $1,742,000) (Design & Contingencies - $193,000)

(6) Centre Area Transportation Authority (CATA) (i) Expand CATA's maintenance and bus storage

areas Project Allocation 968,000(Base Project Allocation - $871,000) (Design & Contingencies - $97,000)

(ii) Acquisition of replacement buses Project Allocation 1,600,000(Base Project Allocation - $1,600,000)

(iii) Rehabilitate or replace various facilities and infrastructure

Project Allocation 30,000,000(Base Project Allocation -

$24,000,000) (Design & Contingencies - $6,000,000)

(iv) Acquisition of compressed natural gas (CNG) buses

Project Allocation 5,700,000(Base Project Allocation - $5,700,000)

(6.1) Chester County (i) Acquisition, construction and related

costs of Darby Road extension and Paoli Transit Center projects in Tredyffrin Township

Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (7) County of Lackawanna Transit System

(i) Acquisition, construction, infrastructure and other costs related to compressed natural gas fueling station and maintenance facility

Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

Page 112: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(ii) Acquisition, construction, infrastructure and other costs related to intermodal transportation center

Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(8) Crawford Area Transportation Authority (i) Construct steel structure sheltered bus

storage facility and wash bay for bus fleet

Project Allocation 387,000(Base Project Allocation - $348,000) (Design & Contingencies - $39,000)

(9) Erie Metropolitan Transit Authority (i) Construct new operations facility,

including infrastructure Project Allocation 1,796,000(Base Project Allocation - $1,616,000) (Design & Contingencies - $180,000)

(9.1) Lebanon Transit (i) Rehabilitate building and grounds,

including maintenance garage roof Project Allocation 406,000(Base Project Allocation - $365,000) (Design & Contingencies - $41,000)

(10) Lehigh and Northampton Transportation Authority (i) Construct new operations facility,

including infrastructure at Allentown operating facility

Project Allocation 2,517,000(Base Project Allocation - $2,265,000) (Design & Contingencies - $252,000)

(ii) Transit vehicle purchase, provide funding for purchase of transit buses

Project Allocation 1,646,000(Base Project Allocation - $1,481,000) (Design & Contingencies - $165,000)

(10.1) Lycoming County (i) Construction, infrastructure and other

related costs for replacing existing cast in place culvert which carries Lawshee Run under several borough streets and sidewalks, including repairs to streets and replacement of sidewalks in Jersey Shore Borough

Project Allocation 2,800,000(Base Project Allocation - $2,800,000)

Page 113: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(11) Mid-County Transit Authority (i) Construct bus storage facility

Project Allocation 215,000(Base Project Allocation - $215,000)

(12) Mid Mon Valley Transit Authority (i) Rehabilitate bus storage, Phase II,

including construction to rehabilitate existing bus storage, administration and passenger areas at Donora transit facility

Project Allocation 1,160,000(Base Project Allocation - $1,044,000) (Design & Contingencies - $116,000)

(ii) Construct Donora Phase II project Project Allocation 965,000(Base Project Allocation - $965,000)

(iii) Replace revenue rolling stock that has outlived its useful life as part of Phase II of rehabilitation of Donora transit facility

Project Allocation 364,000(Base Project Allocation - $328,000) (Design & Contingencies - $36,000)

(13) Monroe County Transit Authority (i) Construct new bus storage facility and

staging area Project Allocation 968,000(Base Project Allocation - $871,000) (Design & Contingencies - $97,000)

(14) Montgomery County (i) Construction, infrastructure improvements

and other costs related to expansion of Ardmore Train Station transit and parking improvements project

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (14.1) Northampton County

(i) Installation of traffic light at intersection of Polk Valley Road and Route 412 in Lower Saucon Township

Project Allocation 450,000(Base Project Allocation - $450,000)

(15) Philadelphia County (i) Infrastructure improvements, including

equipment upgrades for Phlash Trolley fleet

Project Allocation 235,000

Page 114: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $235,000) (16) Port Authority of Allegheny County (PAAC)

(i) FY 2011-2012 Section 5307 Program, replacement and rehabilitation of major components of bus and fixed guideway system

Project Allocation 7,341,000(Base Project Allocation - $6,607,000) (Design & Contingencies - $734,000)

(ii) FY 2011-2012 Section 5309 Program, replacement and rehabilitation of major components within Port Authority's rail and busway system, including North Shore Connector project

Project Allocation 6,000,000(Base Project Allocation - $5,400,000) (Design & Contingencies - $600,000)

(iii) FY 2011-2012 Section 5307 Flex Program, to provide funding of replacement buses and standardize bus procurement program

Project Allocation 1,493,000(Base Project Allocation - $1,344,000) (Design & Contingencies - $149,000)

(iv) FY 2011-2012 Section 5309 Bus and Bus Facilities Program, utilization of bus and bus facilities earmarks to perform various bus upgrades and facility improvements

Project Allocation 1,161,000(Base Project Allocation - $1,045,000) (Design & Contingencies - $116,000)

(v) Infrastructure Safety Renewal Program, to restore PAAC's transit and railroad infrastructure, including maintenance support facilities

Project Allocation 16,000,000(Base Project Allocation -

$14,400,000) (Design & Contingencies - $1,600,000)

(vi) Vehicle Overhaul Program Project Allocation 7,419,000(Base Project Allocation - $6,678,000) (Design & Contingencies - $741,000)

(vii) FY 2011-2012 Section 5307 Program, for replacement and rehabilitation of major components of bus and fixed guideway system

Project Allocation 13,706,000

Page 115: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $12,335,000)

(Design & Contingencies - $1,371,000) (viii) FY 2011-2012 Section 5309 Program, for

replacement and rehabilitation of major components within Port Authority's rail and busway system to ensure safety and reliability, including North Shore Connector project

Project Allocation 11,756,000(Base Project Allocation -

$10,580,000) (Design & Contingencies - $1,176,000)

(ix) FY 2011-2012 Section 5307 Flex Program, to provide funding for match of Federal and local funding

Project Allocation 1,493,000(Base Project Allocation - $1,344,000) (Design & Contingencies - $149,000)

(x) FY 2011-2012 Section 5309 Bus and Bus Facilities Program, to provide for utilization of bus and bus facilities earmarks to perform various bus upgrades and facility improvements

Project Allocation 1,403,000(Base Project Allocation - $1,263,000) (Design & Contingencies - $140,000)

(xi) Infrastructure Safety Renewal Program, to provide funding to restore PAAC's transit and railroad infrastructure, including maintenance support facilities

Project Allocation 45,484,000(Base Project Allocation -

$41,000,000) (Design & Contingencies - $4,484,000)

(xii) Vehicle Overhaul Program, to provide for PAAC's major overhaul of rolling stock

Project Allocation 5,000,000(Base Project Allocation - $4,500,000) (Design & Contingencies - $500,000)

(xiii) Section 5307 Program, to match discretionary Federal capital and local funding for replacement of major components of bus and fixed guideway systems

Project Allocation 4,723,000(Base Project Allocation - $4,251,000)

Page 116: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $472,000) (xiv) Section 5309 Program, to match Federal

capital funds to replace buses and rehabilitate various facilities and infrastructure

Project Allocation 678,000(Base Project Allocation - $610,000) (Design & Contingencies - $68,000)

(xv) Section 5307 Program, to match discretionary Federal capital funding to purchase 70 replacement buses annually

Project Allocation 1,493,000(Base Project Allocation - $1,344,000) (Design & Contingencies - $149,000)

(xvi) Federal Grant Program, to match discretionary Federal capital and local funding to rehabilitate or replace existing facilities and infrastructure

Project Allocation 5,601,000(Base Project Allocation - $5,041,000) (Design & Contingencies - $560,000)

(16.1) Red Rose Transit Authority (i) Purchase buses, to provide for

replacement of buses Project Allocation 1,887,000(Base Project Allocation - $1,698,000) (Design & Contingencies - $189,000)

(17) River Valley Transit (i) Expand Trade and Transit Center and

Church Street Transportation Intermodal Center

Project Allocation 1,161,000(Base Project Allocation - $1,045,000) (Design & Contingencies - $116,000)

(ii) Expand Trade and Transit Center Project Allocation 1,459,000(Base Project Allocation - $1,313,000) (Design & Contingencies - $146,000)

(iii) Construct compressed natural gas fueling station and purchase four CNG transit vehicles

Project Allocation 1,042,000(Base Project Allocation - $937,800) (Design & Contingencies - $104,200)

(18) Southeastern Pennsylvania Transportation Authority (SEPTA) (i) FFY 2012 Section 5307 Formula Program of

Page 117: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Prospects, including state of good repair, vehicle overhaul, regional rail signal mechanization, system improvements, bus purchase and paratransit vehicle purchase programs

Project Allocation 23,831,000(Base Project Allocation -

$21,448,000) (Design & Contingencies - $2,383,000)

(ii) FFY 2012 Section 5309 Rail Modernization Program, including state of good repair, vehicle overhaul, regional rail signal mechanization, system improvements, transit and regional rail station and station accessibility programs

Project Allocation 24,170,000(Base Project Allocation -

$21,753,000) (Design & Contingencies - $2,417,000)

(iii) FFY 2012 Bus Purchase Program, including acquisition and replacement of buses

Project Allocation 4,133,000(Base Project Allocation - $3,720,000) (Design & Contingencies - $413,000)

(iv) FFY 2012 Federal Highway Flex Program, including funds for SEPTA's railroad/highway grade crossings and for CMAQ projects that help meet requirements of the Clean Air Act

Project Allocation 774,000(Base Project Allocation - $697,000) (Design & Contingencies - $77,000)

(v) Federal Competitive Grant Program, to provide for State funds to match Federal capital funding awarded through competitive grant programs

Project Allocation 15,839,000(Base Project Allocation -

$14,255,000) (Design & Contingencies - $1,584,000)

(vi) FY 2012-2013 State of Good Repair Program, to bring transit and railroad facilities to a state of good repair, including communications, track right-of-way, station facilities, environmental concerns and bridges

Page 118: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 24,174,000(Base Project Allocation -

$21,755,000) (Design & Contingencies - $2,419,000)

(vii) Infrastructure Safety Renewal Program, to restore SEPTA's transit and railroad infrastructure, including maintenance support facilities

Project Allocation 31,936,000(Base Project Allocation -

$28,742,000) (Design & Contingencies - $3,194,000)

(viii) FY 2011-2012 Vehicle Overhaul Program Project Allocation 53,226,000(Base Project Allocation -

$47,903,000) (Design & Contingencies - $5,323,000)

(ix) FFY 2013 Formula Program of Projects, to provide for SEPTA's State funds to match Federal capital funding to replace buses and rehabilitate various facilities and infrastructure to bring to state of good repair

Project Allocation 23,226,000(Base Project Allocation -

$20,903,000) (Design & Contingencies - $2,323,000)

(x) FFY 2013 Rail Modernization Program, to provide for SEPTA's state of good repair program, vehicle overhaul program, regional rail signal mechanization, system improvements program, transit and regional rail station program and station accessibility program

Project Allocation 23,226,000(Base Project Allocation -

$20,903,000) (Design & Contingencies - $2,323,000)

(xi) FFY 2013 Bus Purchase Program, to provide for acquisition and replacement of buses for SEPTA services

Project Allocation 4,133,000(Base Project Allocation - $3,720,000) (Design & Contingencies - $413,000)

(xii) Federal Competitive Grant Program, to provide for State funds to match Federal capital funding awarded through

Page 119: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

competitive grant programs by improving air quality and removing congestion

Project Allocation 17,420,000(Base Project Allocation -

$15,678,000) (Design & Contingencies - $1,742,000)

(xiii) Federal Competitive Clean Fuel Program, to provide for State funds to match discretionary Federal capital funding to replace existing vehicles with clean fuel vehicles to bring to state of good repair

Project Allocation 1,452,000(Base Project Allocation - $1,307,000) (Design & Contingencies - $145,000)

(xiv) FY 2013-2014 Safety Renewal Program, to provide funds to rehabilitate or replace existing facilities and infrastructure to bring to state of good repair

Project Allocation 33,872,000(Base Project Allocation -

$30,485,000) (Design & Contingencies - $3,387,000)

(xv) FY 2013-2014 State of Good Repair Program, to provide funds to rehabilitate or replace existing facilities and infrastructure to bring to state of good repair

Project Allocation 19,356,000(Base Project Allocation -

$17,420,000) (Design & Contingencies - $1,936,000)

(xvi) Vehicle Overhaul Program, to provide for SEPTA's 2013-2014 Vehicle Overhaul Program which provides for major overhaul of rolling stock

Project Allocation 53,227,000(Base Project Allocation -

$47,904,000) (Design & Contingencies - $5,323,000)

(xvii) FY 2012-2013 State of Good Repair Program, to provide funds to rehabilitate or replace existing facilities and infrastructure to bring to state of good repair

Project Allocation 24,194,000(Base Project Allocation -

Page 120: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

$21,775,000) (Design & Contingencies - $2,419,000)

(xviii) Infrastructure Safety Renewal Program, to provide for restoration of SEPTA's transit and railroad infrastructure, including maintenance support facilities

Project Allocation 31,936,000(Base Project Allocation -

$28,742,000) (Design & Contingencies - $3,194,000)

(xix) Vehicle Overhaul Program, to provide for SEPTA's 2012-2013 Vehicle Overhaul Program which provides for major overhaul of rolling stock

Project Allocation 53,227,000(Base Project Allocation -

$47,904,000) (Design & Contingencies - $5,323,000)

(xx) FY 2012-2013 Infrastructure Safety Renewal Program, to provide for restoration of SEPTA's transit and railroad infrastructure, including maintenance support facilities

Project Allocation 31,936,000(Base Project Allocation -

$28,742,000) (Design & Contingencies - $3,194,000)

(xxi) Commuter rail expansion project, Phase 1 -- Elwyn to Wawa

Project Allocation 16,500,000(Base Project Allocation -

$15,000,000) (Design & Contingencies - $1,500,000)

(xxii) Commuter rail expansion project, Phase 2 -- Wawa to West Chester

Project Allocation 16,500,000(Base Project Allocation -

$15,000,000) (Design & Contingencies - $1,500,000)

(xxiii) Urbanized Area of Formula Program, to match Federal capital funding and to replace buses and rehabilitate various facilities and infrastructure

Project Allocation 47,614,000(Base Project Allocation -

$42,853,000)

Page 121: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $4,761,000) (xxiv) State of Good Repair Program, to

provide for the State of Good Repair Program and Facilities Overhaul Program and to rehabilitate or replace various facilities and infrastructure

Project Allocation 51,098,000(Base Project Allocation -

$45,988,000) (Design & Contingencies - $5,110,000)

(xxv) Bus and Bus Facilities Program, to match Federal capital funding and replace buses and rehabilitate various facilities and infrastructure

Project Allocation 3,484,000(Base Project Allocation - $3,136,000) (Design & Contingencies - $348,000)

(xxvi) Bus Purchase Flex Program, to match Federal funds to replace buses and rehabilitate various facilities and infrastructure

Project Allocation 8,267,000(Base Project Allocation - $7,440,000) (Design & Contingencies - $827,000)

(xxvii) Federal Grant Program, to match discretionary Federal capital funding to rehabilitate or replace existing facilities and infrastructure

Project Allocation 1,452,000(Base Project Allocation - $1,307,000) (Design & Contingencies - $145,000)

(xxviii) Infrastructure Safety Renewal Program, to provide for transit and railroad infrastructure, including maintenance support facilities

Project Allocation 67,744,000(Base Project Allocation -

$60,970,000) (Design & Contingencies - $6,774,000)

(xxix) Fiscal year 2014-2015 State of Good Repair Program, to provide for the State of Good Repair Program and Facilities Overhaul Program and to rehabilitate or replace various facilities and infrastructure

Project Allocation 19,356,000(Base Project Allocation -

Page 122: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

$17,420,000) (Design & Contingencies - $1,936,000)

(xxx) Vehicle Overhaul Program, to provide for fiscal year 2013-2014 Vehicle Overhaul Program

Project Allocation 53,266,000(Base Project Allocation -

$47,903,000) (Design & Contingencies - $5,323,000)

(xxxi) Federal Grant Program, provide State funds to match discretionary Federal capital funding to rehabilitate or replace existing assets

Project Allocation 4,839,000(Base Project Allocation - $4,355,000) (Design & Contingencies - $484,000)

(19) Department of Transportation (i) Vehicle and Capital Equipment Program, to

provide funding match for non-Federal projects for purchase of transit vehicles and other capital equipment and infrastructure

Project Allocation 50,000,000(Base Project Allocation -

$45,000,000) (Design & Contingencies - $5,000,000)

(ii) Provide funding for capital improvements and capital maintenance to Keystone Corridor, including interlockings and stations

Project Allocation 15,000,000(Base Project Allocation -

$13,500,000) (Design & Contingencies - $1,500,000)

(iii) Vehicle and Capital Equipment Program, to provide funding match for Federal projects for purchase of transit vehicles and other capital equipment and infrastructure

Project Allocation 50,000,000(Base Project Allocation -

$45,000,000) (Design & Contingencies - $5,000,000)

(iv) Alternative Fuel Vehicles Program, provide for CNG, equipment and infrastructure to support alternate fuel vehicles for various transit authorities

Page 123: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

across this Commonwealth Project Allocation 50,000,000(Base Project Allocation -

$50,000,000) (19.1) Washington City Transit

(i) Improve transit facilities, to provide for purchase of passenger amenities

Project Allocation 58,000(Base Project Allocation - $52,000) (Design & Contingencies - $6,000)

(ii) Purchase equipment, to provide for purchase of new equipment for additional transit staff

Project Allocation 24,000(Base Project Allocation - $22,000) (Design & Contingencies - $2,000)

(20) York County Transportation Authority (i) Renovate transit operations

center/maintenance facility Project Allocation 8,710,000(Base Project Allocation - $7,839,000) (Design & Contingencies - $871,000)

(ii) Purchase buses, to provide for replacement of fixed-route vehicles

Project Allocation 1,348,000(Base Project Allocation - $1,213,000) (Design & Contingencies - $135,000)

(b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Project Total Project Allocation

(1) Allegheny County (i) City of Pittsburgh

(A) High-density redevelopment at new and existing transit stops along proposed Bus Rapid Transit Route and Lightrail and Busway stops in City of Pittsburgh Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (ii) Three Rivers Marine & Rail Terminals

(A) Rail rehabilitation, including track

Page 124: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure improvements, upgrade ballast, ties and surface and align tracks for Glassport Terminal rail expansion project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(2) Allegheny, Fayette, Washington and Westmoreland Counties (i) Wheeling & Lake Erie Railroad

(A) Upgrade existing infrastructure and construct new capacity for projected increases in car loadings and new customer development, including engineering, site preparation, grading, rail, ties, ballast, switches, signals, crossings, bridges, tunnels, slope stabilization and other related materials Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (3) Allegheny, Butler and Washington Counties

(i) Allegheny Valley Railroad (A) Rehabilitate and build railroad

infrastructure to enhance operational capacity, including acquisition of land, planning and engineering, rail, crossties, roadbed, drainage, interchanges, lubricators, sidings, public delivery tracks, bridges, tunnels, crossings, freight yard modification and expansion Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(3.1) Allegheny and Washington Counties (i) Pittsburgh and Ohio Central Railroad

(A) Rehabilitation, including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings, signal and communication and related work Project Allocation 4,900,000(Base Project Allocation - $4,900,000)

(B) Rail construction or rehabilitation, including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings, signal

Page 125: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

and communication and related work Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(4) Beaver County (i) Aliquippa and Ohio River Railroad

(A) Rehabilitation, including ties, rail, surface, bridge, switches, ditching, undercutting, brush cutting, road crossings, signal and communication and related work Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(B) Rail construction or rail rehabilitation for support of new or existing customers in Beaver County Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(5) Berks County (i) City of Reading

(A) Rehabilitation, construction and renovation of rail infrastructure to service Evergreen Community Power site, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail service and any other related costs Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Colebrookdale Railroad (A) Rehabilitation of railroad, including

track improvements, siding extensions, visitor center, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and enhance corridor for freight traffic in Berks and Montgomery Counties Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iii) Richmond Township

Page 126: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Construction of an approximately 3,000 feet, three-track rail spur from Norfolk Southern eastbound mainline between Reading and Allentown to East Penn Manufacturing facility, including track, ties, rail, switches, surface, bridges, road crossing, drainage, grading and other associated improvements and costs Project Allocation 921,000(Base Project Allocation - $921,000)

(6) Bucks County (i) Fairless Hills

(A) Acquisition, infrastructure, redevelopment, construction and other related costs for Fairless Hills rail expansion project at the Keystone Industrial Port complex Project Allocation 5,750,000(Base Project Allocation - $5,750,000)

(ii) Falls Township (A) Acquisition, infrastructure, rail

improvements and other related costs for development of industrial facility located at Keystone Industrial Port Complex Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (iii) Bucks County Industrial Development

Authority (A) Acquisition, infrastructure,

redevelopment, construction and other related costs to extend rail service to Riverside Industrial Park Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iv) SMS Rail Lines (A) Expand service to current and future

customers and upgrade rail infrastructure, including land acquisition, engineering, site preparation, rail, ties, undercutting, ballast, sidings, crossings, equipment and other related materials Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

Page 127: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(7) Cambria County (i) City of Johnstown

(A) Rehabilitation, construction and renovation of rail infrastructure to service an economic development project related to or impacted by Marcellus Shale natural gas production located in the greater Johnstown area, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail station and any other related costs Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) County projects

(A) Rehabilitation, construction and renovation of rail infrastructure to service an economic development project related to or impacted by Marcellus Shale natural gas production, located in the greater Johnstown area, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail station and any other related costs Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Rehabilitation, construction and

renovation of rail infrastructure to serve economic development project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (7.1) Carbon County

(i) Graymont, Inc., Pleasant Gap

Page 128: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Rail construction and rehabilitation, including grading and filling, ballasts, switches, derailers and related work for a Graymont, Inc., Pleasant Gap plant rail expansion project Project Allocation 2,100,000(Base Project Allocation - $2,100,000)

(ii) Reading Blue Mountain and Northern Railroad (A) Nesquehoning bridge project, Phase 2,

construction of second span over Lehigh River adjacent to existing bridge Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (7.2) Centre County

(i) Titan Energy Park (A) Rail construction, rail sidings,

switches, bridge replacement, site upgrades, connector road, loading equipment, building upgrades, access systems and other related costs for development of centralized transloading site Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(7.3) Chester County (i) City of Coatesville

(A) Rehabilitation of rail infrastructure pertaining to Modena Railroad Bridge to facilitate efficient and safe movement of raw materials and finished steel products, including, but not limited to, engineering, site preparation, drainage, grading, rails, ties, ballast, switches, crossings, sidings, bridge and paving Project Allocation 2,800,000(Base Project Allocation - $2,800,000)

(7.4) Clearfield County (i) Bloom Township

(A) Construction, infrastructure and other related costs for the development of a regional transloading facility at the Falls Creek location

Page 129: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

of Russell Stone Products Project Allocation 1,400,000(Base Project Allocation - $1,400,000)

(7.5) Clinton County (i) Clinton County Solid Waste Authority

(A) Construction and related infrastructure for railroad siding and transloading facility in Wayne Township Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii) Clinton County Economic Partnership (A) Construct siding and loading

facilities for the Henry Street Rail project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(7.6) Crawford County (i) Economic Progress Alliance of Crawford

County (A) Infrastructure, construction and

other related costs for development of Keystone Regional Industrial Park rail line, including improvements to existing rail line and construction of new track and turnouts Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(7.7) Dauphin County (i) Steelton and Highspire Railroad

(A) Rehabilitation of rail infrastructure to facilitate the efficient and safe movement of raw materials and finished steel products in Dauphin County, including engineering, site preparation, drainage, grading, rails, ties, ballast, switches, crossings, sidings, bridge and paving Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(7.8) Delaware County (i) Delaware County Redevelopment Authority

(A) Construction, acquisition, railroad infrastructure, including support facilities, and related costs for economic development project in Delaware County

Page 130: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) SEPTA Media/Elwyn Regional Rail

(A) Construction, infrastructure, redevelopment and other related costs for modernization of Secane Regional Rail Station Project Allocation 13,000,000(Base Project Allocation -

$13,000,000) (8) Erie County

(i) City of Erie (A) Construct rail improvements and ship

loading infrastructure at the Port of Erie Project Allocation 9,000,000(Base Project Allocation - $9,000,000)

(B) Construct rail improvements and replace rail bridge at Erie Inland Port-Albion site Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (9) Fayette and Westmoreland Counties

(i) Southwest Pennsylvania Railroad Company (A) Rehabilitate and build railroad

infrastructure to enhance operational capacity, including acquisition of land, planning and engineering, rail, crossties, roadbed, drainage, interchanges, lubricators, sidings, public delivery tracks, bridges, crossings, freight yard modification and expansion Project Allocation 11,500,000(Base Project Allocation -

$11,500,000) (10) Lackawanna County

(i) Pocono Northeast Regional Railroad Authority (A) Purchase and install ties, ballast,

raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Laurel Line Mainline project Project Allocation 1,500,000

Page 131: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $1,500,000) (ii) Pennsylvania Northeast Regional Railroad

Authority (A) Purchase and install ties, ballast,

raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Carbondale Mainline Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Purchase and install ties, ballast, raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Pocono Mainline Project Allocation 1,250,000(Base Project Allocation - $1,250,000)

(iii) County of Lackawanna Transit System (A) Acquisition, construction,

infrastructure and other costs related to an intermodal transportation center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(11) Lancaster County (i) Columbia Economic Development Corporation

(A) Construction, infrastructure, redevelopment and other related costs for railroad tracks, turnouts to serve as a rail yard, a runaround track, track repair and rehabilitation in Columbia Borough Project Allocation 733,000(Base Project Allocation - $733,000)

(ii) Lancaster County Redevelopment Authority (A) Acquisition, construction,

infrastructure and other related costs for rail relocation, including removal of old tracks, construction of new switching track and redevelopment of old track site in Lititz Borough Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(iii) Strasburg Rail Road (A) Land acquisition, engineering, rail,

ties, ballast, crossings, transload equipment and other related costs for expansion of existing transload

Page 132: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

terminal and rail infrastructure Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(iv) Urban Outfitters, Inc. (A) Rehabilitation, construction and

renovation of rail infrastructure to service a direct-to-consumer distribution center located in the Gap area of Lancaster County, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballasts, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail station and any other related costs in Salisbury Township Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (11.1) Luzerne County

(i) County projects (A) Rehabilitate existing rail

infrastructure and construct transload facility, including site preparation, engineering, grading, rail, ties, ballast, switch relocation, paving, gravel, fabrication of concrete pad, acquiring and installing truck scale and other materials necessary in the operation of the new facility Project Allocation 1,400,000(Base Project Allocation - $1,400,000)

(B) Construction, site preparation, engineering, grading, rail ties, ballast, acquiring and installing rail scale and other related materials to extend siding to provide direct rail access to Northeast Recycling Solutions Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(12) Lycoming County (i) Jersey Shore Railroad

(A) Rehabilitation of existing yard rail infrastructure and construction of

Page 133: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

additional track to increase capacity within the yard, including engineering, site preparation, rail, ties, ballast and grade crossings Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(ii) City of Williamsport (A) Track rehabilitation, new

construction and other related costs to provide rail service to NuWeld Corporation facility Project Allocation 350,000(Base Project Allocation - $350,000)

(13) McKean County (i) American Refining Group

(A) Reconstruct loading areas and rehabilitate existing infrastructure in McKean County to facilitate safe and efficient transfer of products critical to oil refining and petroleum distribution supply chain, including engineering, site preparation, rail, ties, ballast, switches, sidings, crossings, drainage, pipe and related loading equipment Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(ii) McKean County Economic Development (A) Acquisition, construction,

rehabilitation, restoration, remediation, maintenance and infrastructure development and improvements for railroad development project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (13.1) Mercer County

(i) Hempfield Township (A) Design, infrastructure, construction

and other related costs for installation of new rail spur and rail siding at Hodge Foundry Project Allocation 700,000(Base Project Allocation - $700,000)

(14) Mifflin County (i) Mifflin County Industrial Development

Page 134: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Authority (A) Infrastructure, rehabilitation,

abatement of hazardous materials and other related costs for remediation of abandoned brownfield site and construction of new railroad infrastructure Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(15) Monroe County (i) Pennsylvania Northeast Regional Railroad

Authority (A) Purchase and install ties, ballast,

raise, line and surface, bridge repairs, tunnel repairs, crossing rehabilitation and other related costs for Pocono Mainline Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(16) Montgomery County (i) Montgomery County

(A) Construction, infrastructure improvements and other costs related to expansion of Ardmore Train Station transit and parking improvements project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) Colebrookdale Railroad

(A) Rehabilitation of railroad, including track improvements, siding extensions, visitors centers, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and enhance corridor for freight traffic in Berks and Montgomery Counties Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iii) Pennsylvania Northeastern Railroad

(A) Rehabilitation of railroad, including track improvements, resurfacing road crossings and related remedial work to enhance economic development

Page 135: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

opportunities and enhance corridor for freight traffic in Lansdale, Hatfield and Souderton Project Allocation 770,000(Base Project Allocation - $770,000)

(16.1) Philadelphia County (i) Philadelphia Regional Port Authority and

PennDOT (A) General access and on-terminal rail

improvements for port facilities Project Allocation 18,000,000(Base Project Allocation -

$18,000,000) (ii) Philadelphia County

(A) Port of Philadelphia Pier 122 bulk cargo terminal facility, new rail line and rail turnout construction, pier crane, materials and equipment Project Allocation 3,700,000(Base Project Allocation - $3,700,000)

(17) Schuylkill County (i) Greater Tamaqua Industrial Development

Enterprises (A) Infrastructure, rehabilitation and

other related costs for Gordon Building rail spur project, including new rail and switches Project Allocation 140,000(Base Project Allocation - $140,000)

(17.1) Somerset County (i) Somerset County

(A) Construction, infrastructure and other related costs for rail projects relating to economic development projects in Quemahoning Township Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Acquisition, construction, infrastructure and other related costs for rail siding and transloading facility in Shade Township Project Allocation 2,100,000(Base Project Allocation - $2,100,000)

(18) Washington County (i) Washington County

(A) Acquisition, construction, infrastructure, redevelopment and

Page 136: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other costs related to site improvement project at Mon River Industrial Park in Allenport Borough Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Acquisition, construction,

infrastructure, redevelopment and other costs related to Zediker Station Business Park improvement project in South Strabane Township Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (C) Acquisition, construction,

infrastructure, redevelopment and other costs related to mixed-use business park Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Acquisition, construction, infrastructure, redevelopment and other costs related to development of pad-ready sites along the I-79 and Route 19 corridor Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(E) Acquisition, construction, infrastructure, redevelopment and other costs related to locating sites for support companies for natural gas industry Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(F) Acquisition, construction, infrastructure, redevelopment and other costs related to redevelopment of former industrial sites for new and expanding businesses Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Acquisition, construction, infrastructure, redevelopment and other costs related to Mon Valley receiving and loading facility development project Project Allocation 5,000,000

Page 137: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $5,000,000) (H) Acquisition, construction,

infrastructure, redevelopment and other costs related to development of sites adjacent to Washington County Airport for aviation-related business park Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (I) Acquisition, construction,

infrastructure, redevelopment and other costs related to Skypointe business park Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(J) Acquisition, construction, infrastructure and other related costs for loadout facility in Carroll Township Project Allocation 4,750,000(Base Project Allocation - $4,750,000)

(19) Westmoreland County (i) Three Rivers Marine and Rail Terminals LP

(A) Infrastructure, rehabilitation, construction and other related costs for rail track expansion, including addition of rail switches Project Allocation 750,000(Base Project Allocation - $750,000)

(ii) Westmoreland County Industrial Development Corporation (A) Infrastructure, construction and

other related costs for Southwest Pennsylvania Railroad rail rehabilitation project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Infrastructure, construction and other related costs for Derry Porcelain Park Redevelopment Project, including extension of rail spur service for industrial use Project Allocation 350,000(Base Project Allocation - $350,000)

(iii) Westmoreland County (A) Construction, infrastructure and

Page 138: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other related costs for rail expansion project in City of Monessen Project Allocation 750,000(Base Project Allocation - $750,000)

(20) Wyoming County (i) Procter and Gamble Paper Products Co.,

Mehoopany Plant (A) Rehabilitate rail and existing

infrastructure, including switches, signals, ties, ballast, rail, timbers, surfacing and other related materials Project Allocation 250,000(Base Project Allocation - $250,000)

(21) Multiple Counties (i) D & I Silica, LLC

(A) Improve and expand existing transload sites in Armstrong, Cameron, Elk, Fayette, Luzerne, McKean, Tioga and Warren Counties, including land acquisition, drainage, ditching, rail, ties, ballast, switches, grading, surfacing, gaging, unloading pits, transload equipment, truck staging and road access Project Allocation 5,500,000(Base Project Allocation - $5,500,000)

(B) Establish new intermodal facilities to transload materials required by natural gas industry in Blair, Bradford, Butler, Centre, Clearfield, Clinton, Crawford, Erie, Indiana, Lawrence, Mercer, Venango, Westmoreland and Wyoming Counties, including land acquisition, site preparation, brush cutting, drainage, ditching, rail, ties, ballast, switches, grading, surfacing, unloading pits, transload equipment, truck staging and road access Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) SEDA-COG Joint Rail Authority

(A) Railroad bridge upgrades, including load capacity increases in Columbia, Montour, Northumberland, Union, Lycoming, Clinton, Centre, Blair and

Page 139: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Mifflin Counties Project Allocation 2,100,000(Base Project Allocation - $2,100,000)

(B) Nittany & Bald Eagle Railroad yard upgrades and expansion, including construction of railroad tracks in Blair, Centre and Clinton Counties Project Allocation 2,800,000(Base Project Allocation - $2,800,000)

(C) Shamokin City and yard rehabilitation, including roadbed, crossing surfaces, turnouts and related track work Project Allocation 3,150,000(Base Project Allocation - $3,150,000)

(D) Lycoming Valley Railroad track upgrades and expansion, including construction of new storage tracks between Williamsport, Lycoming County, and South Avis, Clinton County Project Allocation 1,260,000(Base Project Allocation - $1,260,000)

(E) Capital upgrades and other safety upgrades to eight railroad bridges in Blair, Centre, Columbia, Lycoming, Mifflin and Northumberland Counties for critical rail service on the Nittany & Bald Eagle, Juniata Valley, Lycoming Valley, North Shore and Shamokin Valley Railroads Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(iii) North Shore Railroad (A) Retrofitting of diesel locomotives

and other equipment to operate on alternative fuel sources or natural gas, or both, in Lycoming and Northumberland Counties Project Allocation 750,000(Base Project Allocation - $750,000)

(B) Rehabilitation, infrastructure, construction and other related costs for equipment upgrades, installation of new technology and other upgrades to ensure Federal regulation compliance in Blair, Centre, Clinton, Columbia, Lycoming, Mifflin, Montour

Page 140: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

and Northumberland Counties Project Allocation 1,250,000(Base Project Allocation - $1,250,000)

(iv) R. J. Corman Railroad Company (A) Rehabilitation of the rail line known

as the Clearfield Cluster, located in Cambria, Centre, Clearfield, Clinton, Indiana and Jefferson Counties, including rail bed, ties, rail and other materials to support continued growth of business in these areas and reduction of truck traffic Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (v) Southwest Pennsylvania Railroad

(A) Rehabilitate and build railroad infrastructure to enhance operational capacity in Fayette and Westmoreland Counties, including acquisition of land, planning and engineering, rail, crossties, roadbed, drainage, interchanges, lubricators, sidings, public delivery tracks, bridges, crossings, freight yard modification and expansion Project Allocation 11,500,000(Base Project Allocation -

$11,500,000) (vi) Lycoming and Union Counties

(A) Construction, rehabilitation, development of rail infrastructure and other costs relating to extending service through Gregg Township, Union County, to Timber Run Industrial Park in Brady Township, Lycoming County Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(c) Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Project Total Project Allocation

Page 141: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(1) Allegheny County (i) Allegheny County Airport Authority

(A) Acquisition, construction, infrastructure and other related costs for aviation, industrial and commercial site development and improvements at or surrounding Allegheny County Airport Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (B) Construction, infrastructure

improvements and other costs related to development of de-icing fluid treatment facility at Pittsburgh International Airport Project Allocation 12,500,000(Base Project Allocation -

$12,500,000) (C) Construction, infrastructure

improvements and other costs related to development of Phase III of Clinton Commerce Center

Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (D) Construction, infrastructure

improvements and other costs related to development of business park on site 7 at Pittsburgh International Airport Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(E) Construction, infrastructure improvements and other costs related to development of Cherrington Commerce Center Phase II Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (F) Acquisition, construction,

infrastructure and other related costs for development of industrial and commercial sites at or surrounding Pittsburgh International Airport Project Allocation 50,000,000(Base Project Allocation -

Page 142: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

$50,000,000) (2) Armstrong County

(i) McVille Airport (A) Acquisition, infrastructure,

construction and other related costs for expansion of existing facilities and construction of access road, new hangars and helipad Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(2.1) Beaver County (i) Beaver County Airport Authority

(A) Construction and other related costs for hangars and an extension of runway in Chippewa Township Project Allocation 300,000(Base Project Allocation - $300,000)

(2.2) Bedford County (i) Bedford County Airport Authority

(A) Acquisition, construction and other related costs for airport expansion of hangars, required taxi lane, removal of landing approach obstructions, operation and maintenance buildings, required infrastructure, including roads and parking, for both aircraft and automobiles Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (2.3) Bradford County

(i) Bradford County Airport Authority (A) Construction and other related costs

to extend runway and parallel taxiway in Towanda Project Allocation 4,227,000(Base Project Allocation - $4,227,000)

(3) Bucks County (i) Bucks County Airport Authority

(A) Infrastructure, construction and other related costs for airport improvements and upgrades at Quakertown Airport, including renovations to existing facilities and paving of parking lot and access roads Project Allocation 150,000(Base Project Allocation - $150,000)

Page 143: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(B) Infrastructure, construction and other related costs for airport improvements and upgrades at Doylestown Airport, including demolition, infrastructure development and construction of administration building, aircraft storage hangar and aircraft maintenance hangar Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(4) Carbon County (i) Carbon County Airport Authority

(A) Construction of airport buildings, including general aviation terminal and snow removal equipment storage and aircraft storage hangars Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(5) Chester County (i) Chester County Area Airport Authority

(A) Infrastructure, construction and other related costs for Phase I of a hangar development expansion project Project Allocation 337,000(Base Project Allocation - $337,000)

(6) Crawford County (i) Crawford County Regional Airport

Authority (A) Design, engineer and other related

costs for the construction of field hangar Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Design, engineer and other related costs for construction of aircraft T-hangars Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii) Titusville Airport Authority (A) Runway expansion

Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(7) Lancaster County (i) Lancaster Airport Authority

(A) Site development to include sewer pumping station and extended sewer lines

Page 144: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 750,000(Base Project Allocation - $750,000)

(8) Luzerne County (i) Hazleton Airport

(A) Acquisition, construction, rehabilitation and other related costs for hangars and expansion of runway at Hazleton Airport Project Allocation 300,000(Base Project Allocation - $300,000)

(9) Lycoming County (i) Williamsport Regional Airport

(A) Design and construction of facility improvements, including directional signage, terminal building, renovations and parking Project Allocation 3,676,000(Base Project Allocation - $3,676,000)

(B) Demolition of existing terminal building and other associated buildings, construction of new terminal building and other airport improvements Project Allocation 11,500,000(Base Project Allocation -

$11,500,000) (10) Somerset County

(i) Somerset County Airport (A) Replacement of existing underground

aviation fuel storage tanks and dispensing units Project Allocation 400,000(Base Project Allocation - $400,000)

(B) Construction of permanent location for medical helicopter base Project Allocation 400,000(Base Project Allocation - $400,000)

(C) Construction of new hangars, improvements to existing hangars and acquisition of existing hangars Project Allocation 500,000(Base Project Allocation - $500,000)

(11) Snyder County (i) Penn Valley Airport Authority

(A) Acquisition, infrastructure and other related costs for development of aviation industrial park

Page 145: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 750,000(Base Project Allocation - $750,000)

(B) Infrastructure, construction and other related costs for construction of energy-efficient maintenance facility Project Allocation 850,000(Base Project Allocation - $850,000)

(12) Washington County (i) Washington County Airport

(A) Acquisition, construction, infrastructure, redevelopment and other costs related to development of sites adjacent to Washington County Airport for aviation-related business park Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) Skypointe Business Park

(A) Acquisition, construction, infrastructure, redevelopment and other costs related to Skypointe Business Park Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

Section 6. Itemization of redevelopment assistance projects. (a) Additional capital projects in the category of

redevelopment assistance projects for capital grants by the Department of Community and Economic Development, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment assistance capital projects and to be financed by the incurring of debt, are hereby itemized, together with their estimated financial costs, as follows:

Project Total Project Allocation

(1) Adams County (i) County projects

(A) Design, infrastructure, construction and other related costs for the development of countywide broadband infrastructure Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Adams County Industrial Development

Page 146: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Authority (A) Costs related to site preparations

for lots within business park, including the blasting of diabase Project Allocation 500,000(Base Project Allocation - $500,000)

(iii) Adams County Economic Development Corporation (A) Acquisition, construction and other

related costs for new Head Start facility to provide educational and dental services to the community Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Rehabilitation, construction and other related costs for facilities expansion within professional center located in Cumberland Township

Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction, infrastructure, acquisition and related development costs for commercial economic development project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(2) Allegheny County (i) County projects

(A) Design, acquisition, infrastructure, construction and other related costs for redevelopment of Kelman Bottles plant, including equipment and system upgrades Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Acquisition, construction, infrastructure and other related costs for development of industrial and commercial sites at or surrounding Pittsburgh International Airport Project Allocation 50,000,000(Base Project Allocation -

$50,000,000) (C) Infrastructure, site development and

construction of The Odeon Building mixed-use facility Project Allocation 2,000,000

Page 147: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $2,000,000) (D) Acquisition, construction,

infrastructure improvements and related costs for the development of an educational complex for Junior Achievement of Western Pennsylvania Project Allocation 5,500,000(Base Project Allocation - $5,500,000)

(E) Site development, infrastructure, remediation and construction for Keystone Commons expansion project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) City of Clairton

(A) Acquisition, construction, infrastructure and other related costs for Clairton revitalization project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for a citywide redevelopment project in City of Clairton Project Allocation 750,000(Base Project Allocation - $750,000)

(ii.1) City of McKeesport (A) Acquisition, construction,

infrastructure, redevelopment, abatement of hazardous materials and other related costs for citywide redevelopment project in City of McKeesport Project Allocation 500,000(Base Project Allocation - $500,000)

(iii) City of Pittsburgh (A) Construction, infrastructure

improvements and other costs related to expansion of Women's Center and Shelter of Greater Pittsburgh Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Construction, infrastructure improvements and other costs related to mixed-use development of Eastside

Page 148: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Campus of Chatham University Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (C) Construction, infrastructure

improvements and other costs related to office expansion building for The Andy Warhol Museum and Carnegie Museums of Pittsburgh Project Allocation 3,450,000(Base Project Allocation - $3,450,000)

(D) Construction, infrastructure improvements and other costs related to Carnegie Science Center expansion project Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (E) Acquisition, construction,

infrastructure and other related costs for public park expansion project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F) Acquisition, construction, infrastructure and other related costs for Pittsburgh Riverfront redevelopment projects Project Allocation 14,000,000(Base Project Allocation -

$14,000,000) (G) Acquisition, construction,

infrastructure and other related costs for Pittsburgh Advanced Technology Incubator development projects Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (H) Acquisition, construction,

infrastructure and other related costs for North Point Breeze redevelopment Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(I) Acquisition, construction, infrastructure and other related costs for Larimer redevelopment neighborhood improvement project Project Allocation 5,000,000

Page 149: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $5,000,000) (J) Acquisition, construction,

infrastructure and other related costs for Homewood redevelopment mixed-use rehabilitation project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(K) Construction, infrastructure improvements and other related costs for Garfield redevelopment project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(L) Acquisition, construction, infrastructure and other related costs for Entrepreneur Resource Center project Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(M) Acquisition, construction, infrastructure and other related costs for East Liberty redevelopment project Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (N) Acquisition, construction,

infrastructure and other related costs for Construction Junction project Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(O) Acquisition, construction, infrastructure and other related costs for redevelopment of closed schools and historic churches into housing, office or commercial uses Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(P) Demolition, acquisition, construction, infrastructure and other related costs for redevelopment of areas in Central Lawrenceville Project Allocation 5,500,000(Base Project Allocation - $5,500,000)

(Q) Acquisition, construction, infrastructure and other related costs for Allegheny Riverfront redevelopment project Project Allocation 14,000,000

Page 150: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $14,000,000)

(R) Acquisition, construction, infrastructure and other related costs for Hill District Uptown redevelopment project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(S) Acquisition, construction, infrastructure and other related costs for Pittsburgh neighborhood connectivity project Project Allocation 200,000,000(Base Project Allocation -

$200,000,000) (T) Acquisition, construction,

infrastructure and other related costs for transit-oriented development projects Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (U) Acquisition, construction,

infrastructure and other related costs for Flashlight Factory Lofts project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(V) Acquisition, construction, infrastructure and other related costs for Duquesne University renovation project Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (W) Acquisition, construction,

infrastructure and other related costs for University of Pittsburgh Medical Center Mercy projects Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(X) Acquisition, construction, infrastructure and other related costs for University of Pittsburgh Medical Center Magee-Womens Hospital service line expansion project Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

Page 151: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Y) Construction, infrastructure and other related costs for Pittsburgh Symphony Orchestra Heinz Hall renovation project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (Z) Construction, infrastructure and

other related costs for Gardens at Market Square mixed-use development project Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(AA) Acquisition, construction, infrastructure and other related costs for redevelopment of West Neighborhoods and Sheraden Market Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(BB) Acquisition, construction, infrastructure and other related costs for Pittsburgh Civic Building Office relocation reinvestment project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (CC) Construction, infrastructure and

other related costs for Pittsburgh Central Business District parking project Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (DD) Acquisition, construction,

infrastructure and other related costs for Parkway Center Mall redevelopment project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (EE) Demolition, acquisition,

construction, infrastructure and related costs for the redevelopment of mixed-use development site in the neighborhood of Mount Washington Project Allocation 10,000,000(Base Project Allocation -

Page 152: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

$10,000,000) (FF) Construction, infrastructure and

other related costs for Federal and North Phase 2 project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(GG) Construction, infrastructure and other related costs for Downtown Pittsburgh revitalization project Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (HH) Construction, infrastructure and

other related costs for Downtown Preservation project Phase 2 Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(II) Acquisition, construction, infrastructure and other related costs for redevelopment of former J. Allan Steel site in the Chateau neighborhood and in the adjacent Manchester neighborhood Project Allocation 18,000,000(Base Project Allocation -

$18,000,000) (JJ) Construction, infrastructure and

other related costs for Broadhead Industrial Park redevelopment project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (KK) Demolition, construction,

restoration and related costs for commercial corridor in Beechview neighborhood Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(LL) Construction, infrastructure and other related costs for Robert Morris University Student Recreation Center redevelopment project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(MM) Renovations, infrastructure, rehabilitation and other related costs for Robert Morris University Yorktown

Page 153: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Hall Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(NN) Acquisition, remediation, infrastructure development and related site preparation costs for redevelopment of former brownfield site in Squirrel Hill and Swisshelm Park neighborhoods Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(OO) Acquisition, site preparation of parking garages and related infrastructure within the redevelopment sites of SouthSide Works and Pittsburgh Technology Center Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (PP) Acquisition, remediation,

construction, infrastructure and related site preparation costs in Hazelwood neighborhood Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (QQ) Acquisition, construction,

renovation, infrastructure and related activities in redevelopment of neighborhood of Carrick Project Allocation 5,500,000(Base Project Allocation - $5,500,000)

(RR) Acquisition, remediation, construction, infrastructure and related activities for redevelopment of strategic brownfield sites Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (SS) Construction, infrastructure and

other related costs for Gateway Center Islands refurbishment redevelopment project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(TT) Acquisition, infrastructure improvements, construction and other

Page 154: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

related costs for the University of Pittsburgh Medical Center's development of a Center for Innovative Science's Center for Personalized Medicine Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (UU) Construction, renovations,

infrastructure improvements and other related costs for the Northside Leadership Conference, Inc., Penn Brewery expansion project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(VV) Construction, renovations, infrastructure improvements and other related costs for the Northside Leadership Conference, Inc., East Deutschtown Historic Gateway mixed-use project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(WW) Acquisition, construction, renovation, site work and infrastructure improvements for an office building and new hotel within the Oliver Building Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (XX) Acquisition, construction and

rehabilitation costs associated with converting the Wholey Building into residential units Project Allocation 17,000,000(Base Project Allocation -

$17,000,000) (YY) Construction, infrastructure site

development, remediation and other costs related to the Lawrenceville Technology Center project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ZZ) Construction and other related costs for Innovation and Entrepreneurship Center

Page 155: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 50,000,000(Base Project Allocation -

$50,000,000) (AAA) Acquisition, construction,

redevelopment and other related costs for The Odeon Building Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(BBB) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for animal resource center Project Allocation 6,500,000(Base Project Allocation - $6,500,000)

(CCC) Construction, infrastructure, redevelopment and other related costs for 31st Street Studios project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(DDD) Construction, redevelopment, abatement of hazardous materials and other related costs for advanced digital media design, fabrication and simulation center at Carnegie Mellon University Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(EEE) Acquisition, construction, infrastructure, redevelopment and other related costs for animal resource center project Project Allocation 6,500,000(Base Project Allocation - $6,500,000)

(FFF) Construction, redevelopment and other related costs for projects at site of former Carnegie Library Allegheny Project Allocation 1,625,000(Base Project Allocation - $1,625,000)

(GGG) Construction, infrastructure, redevelopment and other related costs for projects at Frick Art and Historical Center Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(HHH) Construction, infrastructure,

Page 156: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

redevelopment, rehabilitation and other related costs for Frick Art and Historical Center projects Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(III) Acquisition, construction and other related costs for workforce development centers in City of Pittsburgh Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(JJJ) Acquisition, construction, infrastructure and other related costs for National Museum of Broadcasting Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(KKK) Acquisition, construction, infrastructure, redevelopment and other related costs for Parkway Center Mall Project Allocation 50,000,000(Base Project Allocation -

$50,000,000) (LLL) Construction, redevelopment and

other related costs for Pittsburgh Ballet Theatre expansion project Project Allocation 1,750,000(Base Project Allocation - $1,750,000)

(MMM) Acquisition, construction, redevelopment and other related costs for project at Senator John Heinz History Center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(NNN) Acquisition, construction, infrastructure, redevelopment and other related costs for mixed-use development project Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(OOO) Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs for development project near intersection of Murray Avenue and Forward Avenue Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

Page 157: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(PPP) Acquisition, construction, infrastructure, redevelopment and other related costs for multimodal public transportation facility Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(QQQ) Acquisition, construction, infrastructure, redevelopment and other related costs for development of Schenley Technology Park Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (RRR) Acquisition, construction,

infrastructure, redevelopment and other related costs for expansion and redevelopment of commercial and office space, including, but not limited to, PPG Place Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (SSS) Acquisition, construction,

infrastructure, redevelopment, abatement of hazardous materials and other related costs for projects relating to Town Place, including expansion of parking structure Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (TTT) Acquisition, clearing, demolition,

renovation, expansion, environmental remediation, construction, infrastructure, streets, utilities and other costs associated with the Addison development project located near Centre Avenue, Kirkpatrick Street, Bentley Drive and Devilliers Street Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(UUU) Acquisition, clearing, demolition, renovation, expansion, environmental remediation, construction, infrastructure, streets, utilities, storm water mitigation and other costs

Page 158: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

associated with Larimer development project located near Negley Run, Washington and East Liberty Boulevards, Larimer and Lincoln Avenues and Broad Street Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(VVV) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous waste and other related costs for Forbes Hotel project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (WWW) Construction, infrastructure,

redevelopment and other related costs for renovation of City Theatre Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(iii.1) Redevelopment Authority of Allegheny County (A) Acquisition, construction,

infrastructure, redevelopment and other related costs for Chevron Appalachian Michigan Business Unit to locate its regional headquarters in Moon Township Project Allocation 8,533,000(Base Project Allocation - $8,533,000)

(B) Construction, infrastructure, redevelopment and other related costs for Innovation Ridge technology and office park in Marshall Township Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iii.2) Allegheny County Housing Authority

(A) Acquisition, infrastructure, construction and other related costs for development of Orchard Park - Phase I Project Allocation 750,000(Base Project Allocation - $750,000)

(iv) Urban Redevelopment Authority of Pittsburgh (A) Acquisition, redevelopment and

construction of property to support

Page 159: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

mixed-use development, parking garage and other infrastructure in Strip District Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iv.1) Aspinwall Borough

(A) Construction, infrastructure, redevelopment and other related costs for Aspinwall Riverfront Park project Project Allocation 1,543,000(Base Project Allocation - $1,543,000)

(iv.2) Bethel Park Municipality (A) Construction, infrastructure,

redevelopment, renovation and other related costs for upgrades to Village Green Park Project Allocation 500,000(Base Project Allocation - $500,000)

(B) Construction, acquisition, abatement of hazardous materials, redevelopment, renovation and other related costs for upgrades to Bethel Park VFC stations Project Allocation 500,000(Base Project Allocation - $500,000)

(iv.3) Brentwood Borough (A) Construction, redevelopment and other

related costs for Brentwood Municipal Public Safety Center Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Construction, redevelopment and other related costs for Brentwood Municipal Stadium Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(v) Bridgeville Borough (A) Construction, infrastructure and

other related costs for ACHIEVA's manufacturing facility expansion project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(v.1) Castle Shannon Borough (A) Construction, acquisition,

infrastructure, redevelopment and other related costs for Waverly

Page 160: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Terrace housing project Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (v.2) Crafton Borough

(A) Construction, infrastructure, redevelopment and other related costs for Crafton Park rehabilitation project Project Allocation 1,205,000(Base Project Allocation - $1,205,000)

(v.3) Edgewood Borough (A) Construction, infrastructure

improvements and related costs for a new residence hall at the Western Pennsylvania School for the Deaf Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(v.4) Etna Borough (A) Construction and other related costs

for municipal complex improvements Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(vi) Findlay Township (A) Construction, infrastructure

improvements and other costs related to development of de-icing fluid treatment facility at Pittsburgh International Airport Project Allocation 12,500,000(Base Project Allocation -

$12,500,000) (B) Construction, infrastructure

improvements and other costs related to development of Phase III of Clinton Commerce Center Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (C) Construction, acquisition,

infrastructure and other related costs for development project Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (vi.1) Glenshaw

(A) Construction, acquisition,

Page 161: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure and related costs for the TAKTL facility Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (vi.2) Greentree Borough

(A) Acquisition, construction, infrastructure, redevelopment and other related costs for Parkway Center Mall Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (vi.3) Harmar Township

(A) Construction, infrastructure, redevelopment and other related costs for improvements to and expansion of PPG facility Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (vii) McKees Rocks Borough

(A) Construction, infrastructure and other related costs for Ohio Valley General Hospital Data and Information Technology Center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Construction, acquisition, infrastructure and related costs for the Island Studios Expansion Project to include, but not be limited to, a film studio, hotel, museum, office and other development Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (vii.1) Millvale Borough

(A) Acquisition, infrastructure, redevelopment, abatement of hazardous materials and other related costs, for improvements in central business district Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(viii) Moon Township (A) Construction, infrastructure

Page 162: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

improvements and other costs related to development of business park on site 7 at Pittsburgh International Airport Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(B) Construction, infrastructure improvements and other costs related to development of Cherrington Commerce Center Phase II Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (C) Acquisition, construction, site work

and infrastructure improvements for a development project in Moon Township Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (D) Acquisition, construction,

infrastructure improvements and related costs for the development of an athletic and multipurpose arena at Robert Morris University Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (E) Construction, acquisition,

infrastructure and related costs for development of Omega Corporate Center project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F) Construction, acquisition, infrastructure and related costs for development of Alpha Corporate Center project Project Allocation 25,000,000(Base Project Allocation -

$25,000,000) (ix) Mt. Oliver Borough

(A) Acquisition, construction, infrastructure and other related costs for Brownsville Road Corridor redevelopment projects Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

Page 163: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(ix.1) North Versailles Township (A) Acquisition, construction,

infrastructure, redevelopment and other related costs for Pittsburgh Plaza East Shopping Center Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (ix.2) Oakmont Borough

(A) Construction, rehabilitation and other related costs for senior living project Project Allocation 2,950,000(Base Project Allocation - $2,950,000)

(B) Construction, redevelopment, infrastructure, renovation, abatement of hazardous materials and other related costs for projects for Presbyterian SeniorCare Center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ix.3) Penn Hills Township (A) Acquisition, construction and other

related costs for emergency medical services building in Penn Hills Project Allocation 600,000(Base Project Allocation - $600,000)

(x) Plum Borough (A) Construction, infrastructure

improvements and other costs related to Plum Municipal Center Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(xi) Robinson Township (A) Construction, infrastructure and

other related costs for Bradley Center expansion project Project Allocation 500,000(Base Project Allocation - $500,000)

(B) Acquisition, construction, infrastructure and other related costs for expansion of Industrial Scientific Global Headquarters Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (C) Acquisition, construction,

Page 164: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure, redevelopment and other related costs for development of business park Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Construction, acquisition, infrastructure and related costs for redevelopment of Marquis Office Plaza, including, but not limited to, a new parking garage Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xii) Ross Township (A) Acquisition, demolition,

infrastructure and construction of public facilities in McKnight Road business corridor Project Allocation 2,250,000(Base Project Allocation - $2,250,000)

(B) Acquisition, demolition, infrastructure and construction of public facilities for purposes of redevelopment of Northway Mall on McKnight Road Project Allocation 2,250,000(Base Project Allocation - $2,250,000)

(C) Acquisition, demolition, infrastructure and construction of public facilities for parks, recreation and open space Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(D) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for The Perry Shops located on Perry Highway Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (xiii) Sewickley Borough

(A) Construction, infrastructure and other related costs for renovation of 5 South Patient Unit at Heritage Valley Sewickley Hospital facility Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

Page 165: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(B) Construction, infrastructure and other related costs for renovation and reconstruction of School of Nursing building at Heritage Valley Sewickley campus Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction, infrastructure and other related costs for the design, expansion and renovation of surgical services department at Heritage Valley Sewickley Hospital facility Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(xiii.1) Sharpsburg Borough (A) Infrastructure and other related

costs for water and sewer system improvements Project Allocation 1,850,000(Base Project Allocation - $1,850,000)

(xiii.2) South Fayette Township (A) Acquisition, construction,

infrastructure and other related costs for park improvements Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, infrastructure and other related costs for civic center Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(xiv) West Deer Township (A) Infrastructure, rehabilitation,

construction and other related costs, including the abatement of hazardous materials, for development of senior citizen center Project Allocation 800,000(Base Project Allocation - $800,000)

(xv) West Mifflin Borough (A) Acquisition, construction,

infrastructure and other related costs for aviation, industrial and commercial site development and improvements at or surrounding Allegheny County Airport Project Allocation 20,000,000(Base Project Allocation -

Page 166: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

$20,000,000) (B) Acquisition, construction,

infrastructure, redevelopment and other related costs for the development of a mixed-use facility Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (C) Acquisition, construction,

infrastructure and other costs related to development of aviation, industrial and commercial sites at or surrounding Allegheny County Airport Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (xvi) White Oak Borough

(A) Construction, infrastructure and other related costs for projects in White Oak Business District Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(3) Armstrong County (i) County projects

(A) Infrastructure, construction and other related costs for renovations to Belmont Complex indoor multiuse facility Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Acquisition, infrastructure, construction and other related costs, including abatement of hazardous materials, for public school buildings adaptive reuse project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, infrastructure, construction and other related costs for downtown revitalization projects, including facade improvements, landscaping, lighting, parking lots and streetscape improvements Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(ii) Armstrong County Industrial Development Authority

Page 167: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Acquisition, infrastructure and construction for development of new industrial park Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(4) Beaver County (i) County projects

(A) Redevelopment, restoration and other related costs for the former Pittsburgh and Lake Erie Railroad passenger station to be used as a multipurpose meeting/event space Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, infrastructure and other related costs for public works building and fire station in Big Beaver Borough Project Allocation 500,000(Base Project Allocation - $500,000)

(ii) City of Aliquippa (A) Acquisition, construction,

infrastructure and other related costs for business or manufacturing facility associated with the petrochemical industry Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iii) Beaver County Corporation for Economic

Development (A) Infrastructure, site improvements and

other related costs for construction of compressed natural gas fueling facility Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment of industrial properties located within Ellwood City Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (C) Acquisition, infrastructure,

abatement of hazardous materials,

Page 168: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

construction and other related costs for redevelopment and improvement of industrial sites located within Potter Township Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (iv) Redevelopment Authority of Beaver County

(A) Renovation and rehabilitation of patient rooms and corridors at Heritage Valley Beaver Hospital facility Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Rehabilitation, construction and other related costs for renovations to radiology department at Heritage Valley Beaver Hospital facility Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Infrastructure, construction and other related costs for rehabilitation and restoration of historic former Pittsburgh & Lake Erie Railroad passenger station Project Allocation 975,000(Base Project Allocation - $975,000)

(v) Baden Borough (A) Acquisition, construction,

infrastructure, redevelopment and other related costs for Baden Academy Charter School expansion project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(vi) Ellwood City Borough (A) Acquisition, construction,

infrastructure, redevelopment, abatement of hazardous materials and other related costs for redevelopment projects Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (vii) Franklin Township

(A) Construction and other related costs for Hereford Manor dams Project Allocation 7,500,000

Page 169: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $7,500,000) (viii) Harmony Township

(A) Construction, infrastructure and other related costs for CNG conversion project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, construction, infrastructure, redevelopment and other related costs for an industrial park Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (5) Bedford County

(i) County projects (A) Acquisition, construction,

infrastructure and other related costs for rehabilitation of 8.5 miles of abandoned Pennsylvania Turnpike as multiuse trail Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(ii) Bedford County Development Association (A) Preparation of 90 acres of Bedford

County Business Park II as shovel-ready sites to attract new businesses to the area Project Allocation 2,375,000(Base Project Allocation - $2,375,000)

(6) Berks County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for development of 104 acres for expansion of Reading Health System Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(B) Acquisition, construction, infrastructure, redevelopment and other related costs for projects for Berks Community Health Center Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (C) Rehabilitation of railroad, including

track improvements, siding extensions,

Page 170: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

visitors center, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and preserve corridor for future freight traffic in Berks and Montgomery Counties Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) Amity Township

(A) Acquisition, infrastructure, construction and other related costs for development of retail and business park Project Allocation 1,300,000(Base Project Allocation - $1,300,000)

(iii) Boyertown Borough (A) Construction, infrastructure and

other related costs for rehabilitation of historic Civil War era railroad project Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(iv) City of Reading (A) Construction, infrastructure and

other related costs for early learning center at Albright College Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Construction, infrastructure and other related costs for Albright College Cogeneration Plant expansion project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(C) Construction, infrastructure and other related costs for Albright College Track and Field Facility project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(D) Construction, infrastructure and other related costs for Albright College Library Holocaust Resource Center project Project Allocation 500,000

Page 171: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $500,000) (E) Renovation, restoration,

reconstruction, infrastructure improvements and related costs for Reading Public Museum Project Allocation 1,112,000(Base Project Allocation - $1,112,000)

(F) Construction, infrastructure improvements and other related costs for installation of natural gas refueling station at Evergreen Community Power site Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Construction, reconstruction, rehabilitation, remediation, infrastructure improvements and other related costs for redevelopment of existing building at Evergreen Community Power site Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(H) Rehabilitation, construction and renovation of rail infrastructure to service Evergreen Community Power site, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail service and any other related costs Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(I) Construction, infrastructure improvements and related costs for the Reading Area Community College Berks Hall renovation and conservation project Project Allocation 600,000(Base Project Allocation - $600,000)

(J) Construction, infrastructure improvements and related costs for the Reading Area Community College pedestrian safety, gateway and traffic

Page 172: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

improvement project Project Allocation 1,178,000(Base Project Allocation - $1,178,000)

(iv.1) Cumru Township (A) Acquisition, construction,

infrastructure, development and other costs related to development of industrial site for new and expanding businesses Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (v) Exeter Township

(A) Construction, infrastructure and other related costs for Lincoln Business Park redevelopment project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Construction, site preparation, infrastructure improvements and related costs for new Emergency Services Building Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(vi) Fleetwood Borough (A) Acquisition, infrastructure,

renovations and other related costs for Fleetwood Tannery/Fleetwood Auto Body Complex project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, infrastructure, renovations and other related costs for revitalization of Fleetwood Borough Central Business District Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(vi.1) Kutztown Borough (A) Revitalization of

industrial/commercial sites, including acquisition, rehabilitation, construction, infrastructure development and related costs Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, demolition, construction, rehabilitation and

Page 173: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

redevelopment of multiple properties to create a municipal government center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(vi.2) Leesport Borough (A) Construction, renovation and other

related costs for fire station Project Allocation 1,250,000(Base Project Allocation - $1,250,000)

(vi.3) Lyons Borough (A) Construction, infrastructure,

abatement of hazardous materials and other related costs for the redevelopment and rehabilitation of manufacturing facility Project Allocation 17,000,000(Base Project Allocation -

$17,000,000) (vii) Muhlenberg Township

(A) Acquisition, infrastructure, renovations and other related costs for NGK Metals facility redevelopment and reuse project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, infrastructure, renovations and other related costs for Fifth Street Highway Corridor revitalization project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (viii) Snyder Township

(A) Renovation and other related costs to replace and upgrade facility infrastructure of Tyrone Hospital Project Allocation 1,650,000(Base Project Allocation - $1,650,000)

(ix) Borough of Topton (A) Construction, infrastructure and

other related costs for renovations to historic Old Main building of Diakon Lutheran Home at Topton Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(x) West Reading Borough

Page 174: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Acquisition, infrastructure, renovations and other related costs for Reading Health System surgical tower and related facilities Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(7) Blair County (i) City of Altoona

(A) Construction, infrastructure and other related costs for the expansion of Altoona Regional Health System, including new operating rooms, additional laboratory space and vision center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii) Altoona-Blair County Development Corporation (A) Acquisition, abatement of hazardous

materials, renovations and rehabilitation of regional arts center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(8) Bradford County (i) (Reserved) (ii) Borough of Towanda

(A) Acquisition, construction, infrastructure and other related costs for expansion of Memorial Hospital Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii) Wyalusing Township (A) Acquisition, site preparation,

remediation, infrastructure improvements and construction of Wyalusing Professional Park Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(9) Bucks County (i) County projects

(A) Acquisition, construction, infrastructure, redevelopment and other related costs for ARIA Health System urgent care facilities Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, construction,

Page 175: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure, redevelopment and other related costs for ARIA Health System facilities to provide medical services, conduct research and other related activities Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (C) Acquisition, infrastructure,

redevelopment, construction and other related costs for Fairless Hills rail expansion project at Keystone Industrial Port Complex Project Allocation 5,750,000(Base Project Allocation - $5,750,000)

(D) Acquisition, rehabilitation, construction and other related costs for renovation of former warehouse space and development of entrepreneurial scientists research clusters Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(ii) Bucks County Industrial Development Authority (A) Acquisition, infrastructure,

redevelopment and other related costs for construction of rail service to Riverside Industrial Park Project Allocation 2,100,000(Base Project Allocation - $2,100,000)

(iii) Redevelopment Authority of Bucks County (A) Acquisition, infrastructure,

construction and other related costs for rehabilitation of Grundy Powerhouse Project Allocation 525,000(Base Project Allocation - $525,000)

(B) Acquisition, infrastructure, construction and other related costs for rehabilitation and development of PECO building in Penndel Borough Project Allocation 600,000(Base Project Allocation - $600,000)

(C) Acquisition, infrastructure, construction and other related costs for redevelopment of Stocks Waterfront

Page 176: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

into mixed-use facility Project Allocation 780,000(Base Project Allocation - $780,000)

(D) Acquisition, infrastructure, redevelopment, construction and other related costs for infrastructure improvements to Route 13 Industrial Corridor Project Allocation 1,100,000(Base Project Allocation - $1,100,000)

(E) Acquisition, infrastructure, construction and other related costs for redevelopment of USI Lighting manufacturing site Project Allocation 1,200,000(Base Project Allocation - $1,200,000)

(F) Infrastructure, construction and other related costs for improvements to Edgely Industrial Park, including roadways, storm water management, lighting and other infrastructure Project Allocation 1,200,000(Base Project Allocation - $1,200,000)

(G) Acquisition, infrastructure, construction and other related costs for demolition of Mill Run Retirement Community and redevelopment of property Project Allocation 1,200,000(Base Project Allocation - $1,200,000)

(H) Acquisition, demolition, infrastructure improvements, construction, renovation and other related costs for development of public/private academic university Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(I) Infrastructure, construction, redevelopment and other related costs for senior housing project in Telford Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iv) Bensalem Township

(A) Acquisition, infrastructure and other costs related to construction of new Newport fire house

Page 177: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Renovation, rehabilitation and other related costs for historic Growden Mansion Project Allocation 500,000(Base Project Allocation - $500,000)

(C) Construction and other related costs for affordable housing for disabled veterans Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Construction and other related costs for transitional housing for women who have completed their treatment program but still struggle with homelessness Project Allocation 600,000(Base Project Allocation - $600,000)

(E) Construction, infrastructure, redevelopment and other related costs for family and community outreach center that offers recovery services to individuals with addictions Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(F) Acquisition, construction, infrastructure, redevelopment and other related costs for a cultural and community center with business district improvements Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(G) Construction and other related costs for new access road to assist in redevelopment of industrial zone Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(H) Construction, infrastructure, redevelopment and other related costs for residential drug and alcohol addiction treatment facility for first responders, corrections officers and combat veterans who are seeking inpatient treatment Project Allocation 500,000(Base Project Allocation - $500,000)

(iv.1) Bristol Township

Page 178: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Construction, acquisition and other related costs to redevelop and revitalize vacant portion of Lower Bucks Hospital for treatment and rehabilitation facility Project Allocation 1,100,000(Base Project Allocation - $1,100,000)

(B) Acquisition, construction, infrastructure, redevelopment and other related costs for public health and safety projects in Bristol Borough and Bristol Township Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(iv.2) Bristol Borough (A) Construction, infrastructure and

other related costs for projects along Otter Creek and Adams Hollow Creek Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(v) Chalfont Borough (A) Acquisition, construction,

infrastructure, pedestrian enhancements and other costs related to transit-oriented development and downtown revitalization Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (v.1) Doylestown Borough

(A) Acquisition, construction, infrastructure, renovation and other related costs for redevelopment of PennDOT maintenance site facility for urban park and office space Project Allocation 1,415,000(Base Project Allocation - $1,415,000)

(B) Construction, reconstruction and other related costs for Doylestown Hospital maternity center Project Allocation 1,100,000(Base Project Allocation - $1,100,000)

(v.2) Falls Township (A) Acquisition, infrastructure, rail

improvements and other related costs for development of industrial facility at Keystone Industrial Port Complex

Page 179: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (vi) Lower Southampton Township

(A) Infrastructure, construction, renovations and other related costs for new public works building Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure, construction and other related costs for new police department headquarters Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(C) Construction, redevelopment, renovation and other related costs for Lower Southampton Firehouse Project Allocation 500,000(Base Project Allocation - $500,000)

(D) Construction, infrastructure, redevelopment, acquisition and other related costs for new police station Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(E) Construction, infrastructure, redevelopment and other related costs for new public works building Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(vii) Middletown Township (A) Infrastructure, construction,

rehabilitation and other related costs for roadway improvements to Big Oak Road, located within industrial park Project Allocation 800,000(Base Project Allocation - $800,000)

(B) Infrastructure, construction and other related costs for rehabilitation of municipal building Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, infrastructure, construction and other related costs for redevelopment of school buildings for future public use Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

Page 180: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(D) Construction, renovation, infrastructure and other related costs for expansion of St. Mary Medical Center Project Allocation 25,000,000(Base Project Allocation -

$25,000,000) (E) Construction, acquisition,

infrastructure and other related costs for redevelopment of former school building for public use Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(F) Construction, renovation, infrastructure and other related costs for municipal building in disrepair Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(vii.1) Milford Township (A) Land acquisition, construction,

infrastructure and other related costs for development and expansion of hospital Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (viii) Northampton Township

(A) Acquisition, infrastructure, construction and other related costs for a new police department headquarters and renovations to existing facilities Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ix) Quakertown Borough (A) Acquisition, infrastructure,

construction and other related costs for new downtown infill project consisting of office and retail complex Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(ix.1) Upper Southampton Township (A) Construction and other related costs

for new public works building and renovation of existing public works building for general government use

Page 181: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 1,250,000(Base Project Allocation - $1,250,000)

(B) Land acquisition for recreation and open space Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(x) Warwick Township (A) Acquisition, infrastructure,

construction and other related costs for township building renovations and upgrades Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Infrastructure, construction, rehabilitation and other related costs for roadway improvements to Stout Drive, which provides ingress and egress to industrial park Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(10) Butler County (i) Butler County Redevelopment Authority

(A) Site preparation activity, including onsite utility construction, on property along SR 0019 in Jackson Township to support mixed-use development Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Construction of infrastructure,

capital facilities and site development activities for construction of a mixed-use development in Route 228 corridor Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) Cranberry Township

(A) Acquisition, infrastructure, rehabilitation and other related costs for construction of public plaza and other amenities in Route 228 corridor Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure, construction and other related costs

Page 182: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

for expansion of North Boundary Park Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, infrastructure, construction and other related costs, including abatement of hazardous materials, for Fernway redevelopment project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(D) Acquisition, construction, site development and infrastructure costs related to economic development project in Commonwealth and Executive Drive corridor Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(E) Acquisition, infrastructure, rehabilitation and other related costs for construction of new public library Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(F) Acquisition, rehabilitation, site development and infrastructure costs related to economic development project in Route 228 corridor Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(G) Acquisition, rehabilitation, site development and infrastructure costs related to economic development project in Route 19 corridor Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(H) Acquisition, infrastructure, construction and other costs for redevelopment and implementation of Route 19 Main Street program Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii) Zelienople Borough (A) Acquisition, infrastructure,

construction and renovations of Main Street corridor as part of Central Business District revitalization project Project Allocation 3,900,000

Page 183: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $3,900,000) (B) Construction, infrastructure,

redevelopment and other related costs for development of Sensory House Museum on Glade Run's Zelienople campus for individuals with autism and other developmental disabilities Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction, redevelopment and other related costs for development of Jeremiah Village, a residential community for individuals with autism Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Construction, infrastructure, redevelopment and other related costs for learning center and chapel on Zelienople campus of Glade Run Lutheran Services Project Allocation 750,000(Base Project Allocation - $750,000)

(11) Cambria County (i) County projects

(A) Acquisition, construction, site development, infrastructure and transportation improvements and other related costs for Conemaugh Health System for an ambulatory care center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for acid mine drainage cleanup infrastructure Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (C) Acquisition, construction,

infrastructure and other related costs for ambulatory care center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for

Page 184: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

economic development project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(E) Acquisition, construction, infrastructure and other related costs for natural gas refueling station Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(F) Acquisition, construction, infrastructure and other related costs for natural gas refueling station in Cambria County Industrial Park Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Acquisition, construction, infrastructure and other related costs for outdoor recreational tourism facility and related projects Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(H) Rehabilitation, construction and renovation of rail infrastructure to serve an economic development project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) Cambria Township

(A) Construction, infrastructure and other related costs for Cambria County Prison improvement project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Acquisition, construction, infrastructure improvements and other related costs for the installation of a natural gas refueling station in Cambria County Industrial Park Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Construction, infrastructure and other related costs for natural gas-powered data center expansion Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii) City of Johnstown (A) Construction, infrastructure and

other related costs for Cambria County

Page 185: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

War Memorial improvement project Project Allocation 1,250,000(Base Project Allocation - $1,250,000)

(B) Construction, reconstruction, rehabilitation, remediation, infrastructure improvements and other related costs for the redevelopment and reuse of historic Conrad Building Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Acquisition, construction, reconstruction, rehabilitation, upgrades, related infrastructure improvements, including streetscape and pedestrian improvements, and other related costs for Conemaugh Medical Park Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Demolition and construction of various properties to revitalize the commercial, retail and housing districts within the city and related infrastructure Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (E) Acquisition, construction,

infrastructure, redevelopment, abatement of hazardous materials and other related costs for acid mine drainage and alternative energy projects Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (F) Acquisition, construction,

infrastructure, redevelopment, abatement of hazardous materials and other related costs for a new education facility Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for emergency

Page 186: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

department project Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(H) Acquisition, construction, infrastructure and other related costs for projects related to Conemaugh Medical Park Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(I) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for redevelopment project at site of former Conrad building Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(J) Construction, infrastructure and other related costs for projects relating to Johnstown Public Safety Building Project Allocation 500,000(Base Project Allocation - $500,000)

(K) Construction, infrastructure and other related costs for Point Stadium projects Project Allocation 500,000(Base Project Allocation - $500,000)

(iv) Cresson Township (A) Construction, demolition,

renovations, infrastructure and other costs related to expansion of the campus of Mount Aloysius College Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (v) Ebensburg Borough

(A) Construction, infrastructure and other related costs for Cambria County Courthouse renovation project Project Allocation 500,000(Base Project Allocation - $500,000)

(vi) Hastings Borough (A) Acquisition, construction,

reconstruction, rehabilitation, upgrades, infrastructure improvements and other related costs for the Conemaugh Miners Medical Center in

Page 187: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Hastings and surrounding municipalities Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, construction, infrastructure and other related costs for medical center projects in the borough and surrounding municipalities Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(vii) Loretto Borough (A) Construction, infrastructure and

other related costs for renovation and expansion of Saint Francis University School of Health Sciences complex Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (viii) Richland Township

(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for ambulatory care center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(12) Cameron County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project in the county Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (13) Carbon County

(i) County projects (A) Site development, infrastructure,

redevelopment, construction and other costs related to construction of educational facility in Carbon County Project Allocation 4,800,000(Base Project Allocation - $4,800,000)

(B) Construction, site development, infrastructure and other costs related to construction of educational facility for Lehigh Carbon Community College

Page 188: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(C) Construction, infrastructure and other related costs for Blue Mountain Health System renovation projects at Palmerton Hospital and Gnaden Huetten Memorial Hospital campuses Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(D) Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the county Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(ii) Nesquehoning Borough (A) Construction, renovation and other

related costs for expansion of Carbon County Correctional Facility Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(14) Centre County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for wildlife education center Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Acquisition, infrastructure, construction and other related costs for development of expanded natural gas services Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, infrastructure, construction and other related costs for rehabilitation and expansion of Memorial Field and Central Parklet, located in State College Borough

Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(D) Acquisition, infrastructure, construction and other related costs for centralized, all-inclusive YMCA multisports facility Project Allocation 10,000,000

Page 189: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $10,000,000)

(E) Construction, infrastructure, acquisition and other related costs for development of natural gas services Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F) Construction, rehabilitation, site upgrades, connector road to Penn Eagle Industrial Park, loading equipment, building upgrades, access system and other related costs for development of a centralized transloading site at Titan Energy Park Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Acquisition, construction, infrastructure and other related costs for development of natural gas services Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Moshannon Valley Economic Development Partnership (A) Acquisition, infrastructure,

construction and other related costs for medical building in medically underserved area Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iii) Geisinger Authority (A) Construction, infrastructure,

redevelopment, renovation and other related costs for expanded access to primary and specialty care project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(iii.1) Bellefonte Borough (A) Redevelopment of downtown area in

Bellefonte Borough, including construction and related infrastructure Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iv) Centre Hall Borough/Potter Township (A) Construction, infrastructure and

Page 190: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other related costs for new fire hall Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(v) College Township (A) Construction, infrastructure and

other related costs for development of compressed natural gas fueling station for Centre County Recycling and Refuse Authority operations Project Allocation 500,000(Base Project Allocation - $500,000)

(vi) State College Borough (A) Construction, infrastructure and

other related costs for mixed-use development, including retail, hotel, residential and parking Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(15) Chester County (i) County projects

(A) Acquisition, infrastructure, renovations and other related costs for improvement to park facilities Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, infrastructure, renovations, rehabilitation and other related costs for community revitalization projects Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, infrastructure, renovations, rehabilitation and other related costs for economic development projects Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Construction, infrastructure and other related costs for Valley Forge Christian College athletic facilities expansion project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(E) Construction, infrastructure and other related costs for renovation of existing Technical High School Pickering Campus

Page 191: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 2,400,000(Base Project Allocation - $2,400,000)

(ii) Chester County Economic Development Council (A) Acquisition, infrastructure,

construction, streetscape improvements, industrial and commercial site development and other capital revitalization in Borough of Kennett Square Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Acquisition, infrastructure,

construction, commercial development and other related costs for Route 1 corridor in southern Chester County Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (iii) Chester County Industrial Development

Authority (A) Acquisition, demolition,

infrastructure, construction and other related costs, including abatement of hazardous materials, for multisite, transit-oriented redevelopment project in City of Coatesville. Redevelopment to include reconstruction of infrastructure, renovation of historic facilities and new construction Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Acquisition, construction,

infrastructure and other related costs for renovation of historical cultural center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction, infrastructure, redevelopment, site preparation, demolition and other related costs to support redevelopment of Devault Quarry Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

Page 192: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(D) Acquisition, site preparation, infrastructure, demolition and construction costs to support redevelopment of two previously utilized sites for commercial development project in West Goshen Township Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(E) Acquisition, site preparation, infrastructure and construction costs to support construction of grocery-anchored, 65,000-square-foot commercial center and placement of significant new infrastructure in East Brandywine Township Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(iii.1) Downingtown Borough (A) Construction, infrastructure,

acquisition and related costs for development and expansion of Downingtown Transportation Center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii.2) Easttown Township (A) Construction, renovation, demolition,

abatement of hazardous materials and other related costs for fire company apparatus building Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(iv) East Whiteland Township (A) Construction, infrastructure

improvements and other costs related to People's Theatre Phase III expansion project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, infrastructure improvements and other costs related to Immaculata University building projects Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(v) Malvern Borough (A) Construction, infrastructure,

Page 193: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

acquisition and related costs associated with reuse and development projects Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(vi) Phoenixville Borough (A) Construction, infrastructure

improvements and other costs related to Colonial Theatre expansion project Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(B) Mixed-use development, including construction, infrastructure, acquisition and related costs at former Phoenix Steel site Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Construction, acquisition, infrastructure, redevelopment and other related costs for parking garage and reconstruction of transit service trestle bridge Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Construction, renovation and other related costs for upgrades to Reeves Park, including renovations to historic memorials and Civil War-era display Project Allocation 750,000(Base Project Allocation - $750,000)

(vi.1) Schuylkill Township (A) Construction and other related costs

for renovations to municipal complex, including police indoor shooting range, installation of geothermal and solar and new outbuilding Project Allocation 1,250,000(Base Project Allocation - $1,250,000)

(B) Construction, renovation, demolition, abatement of hazardous materials and other related costs for fire company apparatus Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(vii) Upper Uwchlan Township (A) Construction, infrastructure and

Page 194: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other related costs for roadway reconstruction, landscaping and streetscape improvements to Pennsylvania Drive and Stockton Drive, located within Hankin's Eagleview Project Allocation 700,000(Base Project Allocation - $700,000)

(B) Construction and other related costs for renovations and rehabilitation of barn located in Upland Farms Park, to be utilized as local community center Project Allocation 910,000(Base Project Allocation - $910,000)

(viii) Uwchlan Township (A) Construction, infrastructure and

other related costs for improvement and expansion of Eagleview complex Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Construction, infrastructure and

other related costs for improvement and expansion of Innovation Center at Eagleview Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(ix) Borough of West Chester (A) Acquisition, construction,

infrastructure and other related costs for Borough of West Chester multiuse theater project Project Allocation 500,000(Base Project Allocation - $500,000)

(B) Acquisition, construction, infrastructure and other related costs for Borough of West Chester redevelopment projects Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(C) Acquisition, construction, infrastructure and other related costs for former biopharma site redevelopment projects Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(16) Clarion County (i) (Reserved)

Page 195: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(ii) Monroe Township (A) Acquisition, infrastructure,

construction and other related costs for assisted living senior community Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, construction, infrastructure and other related costs for YMCA health and wellness center Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(17) Clearfield County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) Moshannon Valley Economic Development

Partnership (A) Acquisition, infrastructure,

construction and other related costs for medical building in medically underserved area Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iii) Bloom Township (A) Construction, infrastructure and

other related costs for the development of regional transloading facility at Falls Creek location of Russell Stone Products Project Allocation 1,400,000(Base Project Allocation - $1,400,000)

(iv) City of DuBois (A) Infrastructure, construction and

other related costs for expansion of existing medical arts building at DuBois Regional Medical Center Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(18) Clinton County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project

Page 196: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Acquisition, construction, facility

improvements, machinery and equipment costs related to renovation and expansion with Jersey Shore Steel Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ii) Lock Haven (A) Construction, infrastructure and

other related costs for broadband fiber and wireless communications project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Construction and other related costs for renovation of office building Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii) Wayne Township (A) Acquisition, construction and related

infrastructure for a mulch recycling facility Project Allocation 750,000(Base Project Allocation - $750,000)

(B) Demolition, construction and related infrastructure to relocate weight scale and to construct scale house and roadway related to overall project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction and infrastructure for a new administration building that will include educational facilities Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(D) Construction and related infrastructure for compressed natural gas filling station for solid waste authority vehicles and public filling Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(E) Acquisition, construction and related infrastructure for a vehicle maintenance shop for service of compressed natural gas vehicles

Page 197: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 750,000(Base Project Allocation - $750,000)

(F) Construction and related infrastructure for facilities to collect and process landfill gas into compressed natural gas Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(19) Columbia County (i) County projects

(A) Renovations and upgrades to Ber Vaughn Park swimming pool complex Project Allocation 2,750,000(Base Project Allocation - $2,750,000)

(20) Crawford County (i) County projects

(A) Acquisition, infrastructure and construction of trail segments advancing Erie-to-Pittsburgh trail corridor and closing existing gaps Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure, construction and renovations of existing or needed infrastructure promoting economic development Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(ii) Conneaut Valley Economic and Industrial Development Authority (A) Acquisition, rehabilitation,

construction and other related costs, including abatement of hazardous materials, for regional economic development project in downtown Conneautville Borough Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(iii) Economic Progress Alliance of Crawford County (A) Acquisition, infrastructure

improvements, site planning, renovation, remediation, construction and other related costs for continued development of Linesville Business Park Project Allocation 1,000,000

Page 198: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $1,000,000) (B) Acquisition, infrastructure

improvements, site planning, renovation, remediation, construction and other related costs for continued development of Bessemer Street in City of Meadville Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, infrastructure improvements, site planning, renovation, remediation, construction and other related costs for continued development of Crawford Woodlands in Vernon Township Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Acquisition, infrastructure, construction and other related costs for redevelopment and expansion of Meadville Medical Center Project Allocation 25,000,000(Base Project Allocation -

$25,000,000) (iv) Redevelopment Authority of the City of

Meadville (A) Acquisition, infrastructure,

construction and other related costs for renovations and redevelopment of various land parcels and commercial properties located within City of Meadville Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Construction, infrastructure and other related costs for renovation of Bentley Hall at Allegheny College Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (v) Titusville Redevelopment Authority

(A) Infrastructure, construction and redevelopment of properties along Titusville portion of Erie-to-Pittsburgh trail Project Allocation 500,000(Base Project Allocation - $500,000)

Page 199: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(B) Acquisition, rehabilitation, construction and other related costs, including abatement of hazardous materials, for redevelopment of blighted properties located within City of Titusville Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Infrastructure, renovation and redevelopment of several steel mill buildings for conversion into multitenant industrial building Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(D) Infrastructure and other related costs for construction of five light manufacturing incubators, including new buildings, loading docks, rail spur and rail sidings Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(vi) Conneaut Lake Borough (A) Construction, infrastructure,

redevelopment and other related costs for revitalization of downtown business district Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(21) Cumberland County (i) (Reserved) (ii) Camp Hill Borough

(A) Land acquisition, construction, infrastructure improvement, renovation and other related costs for expansion of Holy Spirit Health System facilities Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii) East Pennsboro Township (A) Land acquisition, infrastructure

improvements, demolition, site improvement, renovation, addition, utility expansion, construction, purchase of medically necessary fixtures and other related costs for hospital and other related facilities of Holy Spirit Health System

Page 200: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(iv) Hampden Township (A) Construction, acquisition,

infrastructure, redevelopment and other related costs for PinnacleHealth West Shore Campus Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (v) Hampden Township

(A) Purchase, renovation and other related costs for community homes by Keystone Human Services to support persons with intellectual disabilities Project Allocation 3,740,000(Base Project Allocation - $3,740,000)

(vi) Borough of Lemoyne (A) Construction, infrastructure and

other related costs for new fire station Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(vii) Borough of Shippensburg (A) Acquisition, infrastructure,

construction and other costs related to Dykeman Road extension project located within industrial park Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Renovations, redevelopment and other related costs for design, construction and development of community center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(viii) Silver Spring Township (A) Land acquisition, infrastructure

improvements, environmental remediation, construction and other related costs for community recreational facilities Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Purchase, renovation and other related costs for community homes by Keystone Human Services to support persons with intellectual disabilities

Page 201: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 3,740,000(Base Project Allocation - $3,740,000)

(ix) South Middleton Township (A) Construction and other related costs

for new dining facility and improvements to existing buildings that are part of Diakon Wilderness Center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(x) Wormleysburg Borough (A) Construction, infrastructure and

other costs related to the expansion of Early Childhood Center at Harrisburg Academy Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(22) Dauphin County (i) County projects

(A) Construction and other related costs for improvement of infrastructure in City of Harrisburg and other surrounding communities Project Allocation 24,000,000(Base Project Allocation -

$24,000,000) (B) Acquisition, construction,

infrastructure and other related costs for Union House Apartment adaptive reuse project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction and infrastructure improvements for Jewish Federation of Greater Harrisburg facility Project Allocation 1,100,000(Base Project Allocation - $1,100,000)

(D) Acquisition, construction and related infrastructure for facility to provide training for multidisciplinary investigative teams and other individuals in area of child protective services Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(E) Construction of firearm manufacturing facility to be located within ten

Page 202: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

miles of Harrisburg International Airport Project Allocation 38,000,000(Base Project Allocation -

$38,000,000) (ii) City of Harrisburg

(A) Acquisition, construction, infrastructure and other related costs for Greenwood Business Center incubator project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Construction, renovation, rehabilitation, redevelopment, infrastructure improvement and other related costs at Harrisburg Resource Recovery Facility Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(C) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for construction of art and athletic facility Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Acquisition, construction, infrastructure and other related costs for redevelopment projects Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (E) Acquisition, construction and other

related costs for PinnacleHealth campus improvements and expansion Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (F) Acquisition, renovation,

infrastructure and other related costs for site development and improvements, including structural improvements, for at-risk youth through renovation of Joshua Learning Center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(G) Acquisition, construction,

Page 203: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure, redevelopment and other related costs for a Salvation Army Corps Community Center on Paxton Street Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(iii) Derry Township (A) Acquisition, construction,

infrastructure and other related costs for Vista Foundation Autism Spectrum Disorder project Project Allocation 350,000(Base Project Allocation - $350,000)

(iii.1) East Hanover Township (A) Purchase, renovation and other

related costs for community homes by Keystone Human Services to support persons with intellectual disabilities Project Allocation 3,740,000(Base Project Allocation - $3,740,000)

(iv) Londonderry Township (A) Construction, infrastructure and

other related costs for water service infrastructure for commercial and industrial projects Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(iv.1) Lower Paxton Township (A) Construction, infrastructure and

other related costs for recreation facility on Bishop McDevitt High School campus on Spring Creek Road Project Allocation 725,000(Base Project Allocation - $725,000)

(B) Purchase, renovation and other related costs for community homes by Keystone Human Services to support persons with intellectual disabilities Project Allocation 3,740,000(Base Project Allocation - $3,740,000)

(C) Acquisition, infrastructure, construction, redevelopment and other related costs for PinnacleHealth Community Campus Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)

Page 204: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(iv.2) Middle Paxton Township (A) Construction, infrastructure,

redevelopment and other related costs for renovation and expansion of YWCA's Camp Reily Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(iv.3) South Hanover Township (A) Acquisition, construction,

infrastructure and other related costs for municipal complex and emergency services facility Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(v) Swatara Township (A) Acquisition, construction,

infrastructure and other related costs for Swatara Gardens senior housing project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(v.1) Susquehanna Township (A) Purchase, renovation and other

related costs for community homes by Keystone Human Services to support persons with intellectual disabilities Project Allocation 3,740,000(Base Project Allocation - $3,740,000)

(23) Delaware County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for commercial development of housing, retail and other mixed uses at Widener University Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Delaware County Housing Authority, acquisition, infrastructure, redevelopment, construction, abatement of hazardous materials and other related costs for development of properties in Ridley Township and Nether Providence Township Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(C) Construction, renovations and other

Page 205: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

costs related to conversion and upgrade of all patient rooms to private rooms at Delaware County Memorial Hospital Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(i.1) Chester Economic Development Authority (A) Construction, expansion,

infrastructure improvements, environmental remediation, rehabilitation, renovation and other related costs for the completion of Phase II for sports and entertainment complex on Chester waterfront Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (i.2) Delaware County Commerce Center

(A) Acquisition, infrastructure, rehabilitation, construction and other related costs for entertainment, hotel and special events facility Project Allocation 12,500,000(Base Project Allocation -

$12,500,000) (B) Construction, infrastructure,

renovation and other related costs for alternative energy facility utilizing plasma technologies Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(ii) Delaware County Industrial Development Authority (A) Infrastructure, construction and

other related costs for revitalization of former Sears site Project Allocation 4,200,000(Base Project Allocation - $4,200,000)

(B) Infrastructure, construction, public utility upgrades and other related costs for Chadds Ford redevelopment project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, site preparation, infrastructure and construction costs related to mixed-use redevelopment

Page 206: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

project to be located adjacent to Cardinal O'Hara High School Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (D) Acquisition, site preparation,

construction, infrastructure, abatement of hazardous materials and other related costs to support Pond's Edge redevelopment project in Middletown Township Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(E) Construction, infrastructure and other related costs for the redevelopment of former Lyondell building in Newtown Township Project Allocation 5,798,000(Base Project Allocation - $5,798,000)

(iii) Delaware County Redevelopment Authority (A) Site preparation, installation of

public utilities and related facilities, construction and installation of sidewalks and fencing and other related costs for multipurpose athletic facility at Cardinal O'Hara High School Project Allocation 300,000(Base Project Allocation - $300,000)

(B) Infrastructure, renovations, construction and other related costs for rehabilitation of former school building to accommodate day program services Project Allocation 500,000(Base Project Allocation - $500,000)

(C) Acquisition, infrastructure, construction and other related costs for development of integrated ambulatory center for Mercy Health System to provide expanded access to primary care, specialty care and diagnostic services Project Allocation 1,750,000(Base Project Allocation - $1,750,000)

(D) Infrastructure, construction, renovation and other related costs for

Page 207: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

expansion of Neumann University's Bruder Student Life Center Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(E) Acquisition, design, infrastructure, construction, renovation and other related costs for construction of safety cross-over bridge project, connecting Neumann University's main campus to student center and residence housing Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(F) Acquisition, infrastructure, construction and other related costs for rehabilitation and renovation of the historic Deshong Museum and mansion Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Acquisition, design, infrastructure, construction and other related costs for access ramp, within Crozer-Chester Medical Center, to allow for ingress and regress Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (H) Acquisition, infrastructure,

redevelopment, construction, abatement of hazardous materials and other related costs for redevelopment of properties in Penn Hills area of Ridley Township Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(I) Land acquisition, infrastructure improvements, demolition, site improvement, renovation, addition, utility expansion and other related costs for hospital and related facilities of main line health system Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (J) Redevelopment, construction,

demolition, infrastructure and other

Page 208: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

related costs for commercial and retail development of Upper Darby 69th Street corridor Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(K) Redevelopment, construction, infrastructure and other related costs for commercial development of Primos Film and Video Studios Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(L) Construction, infrastructure and other related costs for new on-campus student housing, limited university-operated and student-centric retail, performing arts center, pedestrian bridge over Route 30 and parking improvements, including a 1,230-acre parking structure for Villanova University in Radnor Township Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (M) Construction, acquisition, railroad

infrastructure, including support facilities, and related costs for economic development project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iv) City of Chester

(A) Acquisition, infrastructure, construction and other related costs for renovation and rehabilitation of historic 1724 Old Chester Courthouse and courtyard Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Acquisition, construction, infrastructure, redevelopment and other related costs for mixed-use redevelopment in downtown central business district and surrounding neighborhoods Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)

Page 209: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(C) Acquisition, construction, infrastructure, redevelopment and other related costs for parking projects in downtown central business area and surrounding areas Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (D) Acquisition, construction,

infrastructure, redevelopment and other related costs for waterfront redevelopment Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (E) Acquisition, construction,

infrastructure, redevelopment and other related costs for redevelopment of downtown central business district and surrounding neighborhoods Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (F) Acquisition, construction,

infrastructure, redevelopment and other related costs for redevelopment projects Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iv.1) Chester Township

(A) Construction and other related costs for fire station Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(v) Borough of Eddystone (A) Acquisition, infrastructure,

construction and other related costs for renovation and rehabilitation of Eddystone Fire House and Evacuation Center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(vi) Glenolden Borough (A) Acquisition, construction and other

related costs for recreational fields, maintenance facility and walking

Page 210: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

trails Project Allocation 500,000(Base Project Allocation - $500,000)

(vi.1) Haverford Township (A) Construction, redevelopment,

infrastructure and other related costs for a municipal services building Project Allocation 9,000,000(Base Project Allocation - $9,000,000)

(B) Construction, redevelopment, infrastructure and other related costs for a combined police, EMS, township administration and other municipal services facility Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(vii) Marple Township (A) Construction, infrastructure and

other related costs for new Municipal Police Station and Magisterial District Court Project Allocation 4,100,000(Base Project Allocation - $4,100,000)

(B) Construction, infrastructure, rehabilitation, renovation and other related costs for Marple Township Municipal and Library Building Project Allocation 654,000(Base Project Allocation - $654,000)

(C) Site preparation, infrastructure, construction and other related costs to support the development of new facility for Broomall Fire Company Project Allocation 3,250,000(Base Project Allocation - $3,250,000)

(viii) Borough of Media (A) Construction, infrastructure,

renovation, redevelopment and other related costs for Media-Upper Providence Free Library Project Allocation 750,000(Base Project Allocation - $750,000)

(viii.1) Millbourne Borough (A) Construction, infrastructure and

other related costs for redevelopment of former Sears site Project Allocation 4,200,000

Page 211: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $4,200,000) (ix) Morton Borough

(A) Construction, renovation and other related costs for improvements to municipal building, including police station, borough offices and community facilities Project Allocation 500,000(Base Project Allocation - $500,000)

(x) Newtown Township (A) Acquisition, construction,

infrastructure, redevelopment and other related costs for municipal and public safety facility Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(xi) Norwood Borough (A) Construction and other related costs

for new firehouse Project Allocation 500,000(Base Project Allocation - $500,000)

(xii) Prospect Park Borough (A) Construction, redevelopment,

rehabilitation and other related costs to revitalize a blighted business/civic district Project Allocation 800,000(Base Project Allocation - $800,000)

(xiii) Radnor Township (A) Construction, renovation and

rehabilitation of capital facilities, including infrastructure on campus of Cabrini College Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Construction, redevelopment and other

related costs for projects relating to Creutzberg Center Project Allocation 1,050,000(Base Project Allocation - $1,050,000)

(C) Construction, infrastructure and other related costs for projects in Fenimore Woods Park Project Allocation 700,000(Base Project Allocation - $700,000)

(D) Construction, infrastructure,

Page 212: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

redevelopment and other related costs for projects relating to Radnor Township Building Project Allocation 500,000(Base Project Allocation - $500,000)

(E) Upgrades and deferred maintenance, Phase VII, for north Wayne flood mitigation Project Allocation 550,000(Base Project Allocation - $550,000)

(xiii.1) Ridley Park Borough (A) Infrastructure improvements,

construction, relocation, renovation and other related costs for Taylor Hospital Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(xiv) Sharon Hill Borough (A) Renovations, construction, energy

efficiency upgrades and other related costs for Sharon Hill Borough fire department Project Allocation 500,000(Base Project Allocation - $500,000)

(xv) Springfield Township (A) Rehabilitation, renovation,

infrastructure and other related costs for improvements to two business districts Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Renovations and other related costs for ADA accessibility requirements and upgrade facilities used for township public safety and emergency operation activities Project Allocation 500,000(Base Project Allocation - $500,000)

(C) Renovation, infrastructure and other related costs for township parks and recreation projects Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(D) Construction, infrastructure and other related costs for development of full-service hotel facility Project Allocation 3,000,000

Page 213: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $3,000,000) (E) Renovation, infrastructure and other

related costs for township building/police station Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(xvi) Tinicum Township (A) Construction, redevelopment,

rehabilitation and other related costs for renovation of Lazaretto Quarantine Station for reuse as Tinicum Township Municipal Building Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xvii) Upland Borough (A) Upgrade central heat and cooling

systems for Crozer-Keystone Health System, including construction, infrastructure and other related costs Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(xviii) Upper Providence Township (A) Construction, infrastructure and

other related costs for new gymnasium/multipurpose building at Walden School and related site improvements Project Allocation 1,200,000(Base Project Allocation - $1,200,000)

(24) Elk County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) Elk County Redevelopment Authority

(A) Acquisition, renovation, environmental remediation, construction and other related costs for rehabilitation of commercial buildings in Historic District of Ridgway Borough Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(25) Erie County

Page 214: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(i) County Projects (A) Acquisition, construction,

infrastructure improvements and other costs related to the L2S-NMI-ERIE Medical Device Assembly Plant project Project Allocation 250,000(Base Project Allocation - $250,000)

(B) Acquisition, construction, infrastructure, redevelopment and other related costs for Erie Metropolitan Transit Authority projects Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(C) Acquisition, construction, infrastructure, redevelopment and other related costs for CNG fueling station projects of Erie Metropolitan Transit Authority Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ii) Boroughs of Albion and Cranesville; Conneaut and Elk Creek Townships (A) Construct rail improvements and

replace rail bridge at Erie Inland Port-Albion site Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (iii) Corry Area Industrial Development

Corporation (A) Acquisition, redevelopment and

rehabilitation of vacant industrial facility to be converted to multitenant manufacturing facilities Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(iv) Economic Development Corporation of Erie County (A) Infrastructure, construction,

redevelopment and other related costs for improvement of former potato chip factory Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(v) Erie City (A) Construction, infrastructure and

Page 215: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other related costs for Stairways Behavioral Health neighborhood revitalization project Project Allocation 5,100,000(Base Project Allocation - $5,100,000)

(B) Construct rail improvements and ship loading infrastructure at Port of Erie Project Allocation 9,000,000(Base Project Allocation - $9,000,000)

(C) Construction, infrastructure and other related costs for building joint operations facility Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(D) Construction, infrastructure and other related costs for a new academic building at Mercyhurst University Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(v.1) Conneaut Township (A) Acquisition, construction and other

related costs for development of multitenant industrial site as part of regional initiative called Erie Inland Port Project Allocation 8,075,000(Base Project Allocation - $8,075,000)

(26) Fayette County (i) Bullskin Township

(A) Construction, infrastructure and other costs related to Fay/West Soccer Complex indoor facility project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ii) City of Uniontown (A) Acquisition, infrastructure,

construction and other related costs for development of White Swan Apartments Project Allocation 750,000(Base Project Allocation - $750,000)

(iii) City of Connellsville (A) Construction, redevelopment,

infrastructure and other related costs for the renovation of Behavioral Health Unit of Highlands Hospital Project Allocation 1,150,000

Page 216: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $1,150,000) (27) Forest County

(i) (Reserved) (28) Franklin County

(i) Franklin County Redevelopment Authority (A) Acquisition, construction,

infrastructure and other related costs for economic development project in the county Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Infrastructure, construction and other related costs for renovation and rehabilitation of John Steward Memorial Library on Wilson College campus Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, infrastructure, construction and other related costs for redevelopment of former Scotland School for Veterans' Children campus, including construction of educational and other use facilities Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(D) Acquisition, infrastructure, construction and other costs related to renovations and improvements at hospital facilities and entities in the county Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (E) Infrastructure, construction,

abatement of hazardous materials and other related costs for renovation of Prentis Hall on Wilson College campus Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (i.1) Franklin County Industrial Development

Authority (A) Construction, acquisition, site

preparation, infrastructure and related development costs for a high-tech industry office park and related

Page 217: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

uses in Letterkenny Township Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(ii) Chambersburg Borough (A) Acquisition, infrastructure, design,

engineering, renovations, rehabilitation, construction, utility relocation, traffic improvements, traffic signal upgrades and other related costs for upgrading municipal electric systems throughout this Commonwealth Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(B) Acquisition, infrastructure, design, engineering, renovations, rehabilitation, construction, utility relocation, traffic improvements, traffic signal upgrades and other related costs for creating distributed natural gas generation facilities at municipal electric systems throughout this Commonwealth Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(C) Purchase, renovation and other related costs for community homes by Keystone Human Services to support persons with intellectual disabilities Project Allocation 3,740,000(Base Project Allocation - $3,740,000)

(iii) Borough of Shippensburg (A) Construction, rehabilitation and

other related costs for improvements to Memorial Park Stadium Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(iv) Borough of Waynesboro (A) Acquisition, construction,

infrastructure and other related costs for economic development project in Borough of Waynesboro Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(29) Fulton County (i) County projects

(A) Acquisition, construction,

Page 218: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure and other related costs for rehabilitation of 8.5 miles of abandoned Pennsylvania Turnpike as a multiuse trail Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(30) Greene County (i) Franklin Township

(A) Acquisition, construction, infrastructure and other related costs for Greene County Airport commercial development project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Acquisition, construction, infrastructure and other related costs for Waynesburg Crossings economic development project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(C) Acquisition, construction, infrastructure and other related costs for Franklin Township Business Park project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Acquisition, construction, facility improvements, machinery and equipment costs related to renovation of Kyowa facility Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(ii) Waynesburg Borough (A) Acquisition, construction,

infrastructure, redevelopment and other related costs for academic building at Waynesburg University Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(B) Acquisition, construction, infrastructure, redevelopment and other related costs for dormitory at Waynesburg University Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(31) Huntingdon County (i) County projects

Page 219: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Acquisition, construction, infrastructure and other related costs for a Federally Qualified Health Center-anchored multiservice facility Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(ii) Huntingdon County Business and Industry, Incorporated (A) Acquisition, renovation, expansion

and other improvements to Huntingdon County Career and Technology Center Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(32) Indiana County (i) County projects

(A) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of vacant lots at Corporate Campus business park Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of multitenant building at Windy Ridge Business and Technology Park Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of industrial multitenant building known as Dixonville Commons Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for rehabilitation of Indiana Community Center Building Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(E) Acquisition, engineering, infrastructure, construction and other

Page 220: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

related costs for development of countywide fiber optic network Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(F) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of multitenant building at 119 Business Park and Joseph Land development project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(G) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of multipurpose building in White Township Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(H) Acquisition, engineering, site preparation, infrastructure, construction and other related costs, including abatement of hazardous materials, for redevelopment of industrial building and conversion to multitenant building Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(I) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of vacant lots and acquisition of adjacent property at Windy Ridge Business and Technology Park Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(J) Acquisition, engineering, site preparation, infrastructure, construction and other related costs for development of high bay, multitenant, industrial building at Windy Ridge Business and Technology Park Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(K) Renovation, construction and other

Page 221: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

related costs for redevelopment of historic Rochester and Pittsburgh Coal Company building and conversion into a boutique hotel Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(ii) Clymer Borough (A) Acquisition, infrastructure,

redevelopment and other related costs to develop borough-owned property for senior residential development, ballfields, trails, veterans monument, green space and additional parking Project Allocation 1,650,000(Base Project Allocation - $1,650,000)

(iii) Green Township (A) Construction, excavation,

infrastructure and other related costs for new rail siding and transloading facility Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(33) Jefferson County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Development, construction,

maintenance and other related costs for a hotel in Jefferson County Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ii) Brockway Borough (A) Acquisition, infrastructure,

construction and other related costs for economic project to be located at intersection of Routes 219 and 28 Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Acquisition, infrastructure,

redevelopment, renovations and other related costs for educational and training facility

Page 222: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iii) Eldred Township

(A) Acquisition, infrastructure, construction and other related costs for economic development project in the county Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(34) Juniata County (i) (Reserved)

(35) Lackawanna County (i) County projects

(A) Acquisition, construction, infrastructure and other related costs for Valley View Business Park Industrial Facility Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, construction, renovations, infrastructure and other related costs for dental, medical, health sciences and patient care facilities project Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (C) Acquisition, construction,

renovations, infrastructure and other related costs for dental, medical, health sciences and patient care clinic Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(ii) Archbald Borough (A) Construction, infrastructure and

other costs related to Valley View Business Park redevelopment project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, infrastructure and other costs related to Archbald Business Park III redevelopment project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

Page 223: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(C) Construction, infrastructure and other costs related to Valley View Business Park new building project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Construction, infrastructure and other costs related to Archbald Route 6 Industrial Facility redevelopment project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(E) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for economic development project along Peggy Drive in Archbald Borough Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(F) Construction, infrastructure and other related costs for Tinklepaugh Creek flood mitigation projects in Archbald and Blakely Boroughs Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(ii.1) Archbald, Jessup and Blakely Boroughs (A) Acquisition, construction,

infrastructure, redevelopment, abatement of hazardous materials and other related costs for Valley Community Civic Center project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(iii) Blakely Borough (A) Construction, infrastructure and

other costs related to Blakely Borough Main Street Business District revitalization project Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(iv) Carbondale Township (A) Construction, infrastructure and

other costs related to Carbondale Technology Transfer Complex multitenant flex building project Project Allocation 361,000(Base Project Allocation - $361,000)

Page 224: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(v) City of Carbondale (A) Acquisition, construction,

infrastructure and other related costs for Carbondale Anchor Building redevelopment project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(vi) City of Scranton (A) Acquisition, construction,

infrastructure and other related costs for Radisson Lackawanna Station restoration project Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(B) Acquisition, construction, infrastructure and other related costs for Scranton Department of Public Works complex project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Acquisition, construction, infrastructure and other related costs for Central Business District improvement project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Acquisition, construction, infrastructure and other related costs for South Scranton Area Elm Street revitalization project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(E) Acquisition, construction, infrastructure and other related costs for Central Business District revitalization project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F) Acquisition, construction, infrastructure and other related costs for Neighborhood Commercial District revitalization project Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(G) Acquisition, construction, infrastructure and other related costs for new downtown office building

Page 225: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(H) Acquisition, construction, infrastructure and other related costs for Iron Arts District redevelopment project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(I) Acquisition, construction, infrastructure and other related costs for Iron Furnaces historic site project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (J) Acquisition, construction,

infrastructure and other related costs for renovation of buildings in Downtown Business District for Lackawanna County Efficiency in Government project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(K) Construction, infrastructure and other costs related to Lackawanna County Park redevelopment and improvement projects Project Allocation 500,000(Base Project Allocation - $500,000)

(L) Construction, infrastructure and other costs related to Lackawanna County Economic Development Initiative Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(M) Acquisition, construction, infrastructure and other related costs for Lackawanna College Continuing Education expansion project Project Allocation 1,750,000(Base Project Allocation - $1,750,000)

(N) Acquisition, construction, infrastructure and other related costs for Lackawanna College Learning Commons project Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(O) Construction, infrastructure and

Page 226: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other costs related to Lackawanna College street redevelopment project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(P) Construction, infrastructure and other costs related to The Commonwealth Medical College redevelopment project Project Allocation 500,000(Base Project Allocation - $500,000)

(Q) Construction, infrastructure, demolition and other costs related to Scranton Enterprise Center renovation project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(R) Construction, infrastructure and other costs related to former Murray Corporation Building redevelopment project Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(S) Acquisition, construction, renovation, infrastructure and other related costs for Mt. Pleasant Corporate Center Office Building redevelopment project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(T) Construction and other related costs to rebuild facilities at Scranton's Farmer's Market and Albright Avenue Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(U) Construction, infrastructure and other costs related to University of Scranton South Side Sports Complex project Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(V) Construction, infrastructure and other costs related to University of Scranton rehabilitation project Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (W) Construction, infrastructure and

Page 227: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other costs related to expansion of Sette LaVerghetta Center for Performing Arts at Marywood UniversityProject Allocation 3,000,000(Base Project Allocation - $3,000,000)

(X) Construction, infrastructure and other costs related to clinical and community services at Marywood University's South Campus renovation project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(Y) Construction, infrastructure and other costs related to The Knowledge (Learning) Commons at Marywood University redevelopment project Project Allocation 12,500,000(Base Project Allocation -

$12,500,000) (Z) Acquisition, construction,

infrastructure and other costs related to Wright Primary Care Center development project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(AA) Acquisition, construction, infrastructure and other costs related to redevelopment of Lackawanna Avenue Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (BB) Acquisition, construction,

infrastructure and other costs related to compressed natural gas fueling station and maintenance facility Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(CC) Acquisition, construction, infrastructure and other costs related to intermodal transportation center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(DD) Acquisition, construction, infrastructure and other costs related to Timmy's Town Center children's museum project Project Allocation 5,000,000

Page 228: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $5,000,000) (EE) Acquisition, renovations,

construction, infrastructure and other related costs for dental, medical, health sciences and patient care clinic Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(vi.1) Covington Township (A) Construction, infrastructure

improvements and other costs for the Moffat Estate redevelopment project Project Allocation 500,000(Base Project Allocation - $500,000)

(vii) Dickson City Borough (A) Acquisition, construction,

infrastructure and other costs related to Dickson City Senior/Civic Center expansion project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(viii) Jefferson Township (A) Construction, infrastructure and

other costs related to development of commercial site and to provide sanitary sewer infrastructure for project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ix) Jessup Borough (A) Construction, infrastructure and

other costs related to new building at Jessup Small Business Center Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Acquisition, construction, infrastructure and other costs related to Valley View Business Park Interchange project Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(x) La Plume Township (A) Construction, infrastructure and

other costs related to recreational facilities and housing projects for Keystone College Project Allocation 3,500,000

Page 229: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $3,500,000) (xi) Mayfield Borough

(A) Acquisition, construction, infrastructure and other costs related to Lackawanna Business Center redevelopment project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xii) Moosic Borough (A) Construction, infrastructure

improvements and other costs related to former JC Penney building expansion project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Acquisition, construction, infrastructure and other costs related to new building at Glenmaura Corporate Center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(C) Construction, infrastructure and other costs related to sanitary sewer infrastructure for industrial park Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(xii.1) Moscow Borough (A) Acquisition, construction,

infrastructure, redevelopment, abatement of hazardous materials and other related costs for senior housing development Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(xiii) Scott Township (A) Construction, infrastructure

improvements and other costs related to Scott Township Technology and Industrial Facility redevelopment project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xiii.1) South Abington Township (A) Acquisition, development,

construction, infrastructure, design and other costs associated with the Abington Township Maintenance Facility

Page 230: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Construction, design, infrastructure improvements and other costs for the Phelps Student Center renovation project at Baptist Bible College Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, development, construction, infrastructure, design and other costs associated with a development project at Baptist Bible College Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (D) Construction, design, infrastructure

improvements and other costs for the Jackson Hall renovations at Baptist Bible College Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xiv) Taylor Borough (A) Acquisition, construction,

infrastructure and other costs related to Taylor redevelopment -- Colliery/Feltsville project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, construction, infrastructure and other costs related to Taylor Borough industrial redevelopment project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(xv) (Reserved) (36) Lancaster County

(i) County projects (A) Infrastructure upgrades, construction

and other related costs for operating room expansion at Heart of Lancaster Regional Medical Center Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Acquisition, construction, infrastructure, redevelopment and other related costs for medical

Page 231: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

education building Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (ii) Redevelopment Authority of the County of

Lancaster (A) Acquisition, infrastructure,

construction and other related costs for development and construction of Rock Lititz, a campus-style commercial park Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(iii) City of Lancaster (A) Acquisition, design, infrastructure,

construction and other related costs for renovations to North Museum of Natural History and Science, including new roof, dome and SciDome touch projection, sound and software system Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, design, infrastructure, construction and other related costs for mixed-use facility in center of city to be utilized by Millersville University, community services and shopping venues Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, design, infrastructure, construction and other related costs for state-of-the-art medical education building for Lancaster General College of Nursing and Allied Sciences Project Allocation 22,000,000(Base Project Allocation -

$22,000,000) (D) Infrastructure, construction and

other related costs for design and construction of state-of-the-art facility to be utilized as wellness and medical center and aquatic competition and leisure facility Project Allocation 22,500,000(Base Project Allocation -

$22,500,000)

Page 232: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(E) Design, infrastructure, construction and other related costs for renovations to emergency department and entrances to Lancaster Regional Medical Center Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(F) Construction, infrastructure, redevelopment and other related costs for green infrastructure initiative Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (G) Acquisition, construction,

infrastructure, redevelopment and other related costs for North Prince Street redevelopment project Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(H) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in northeastern area Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(I) Acquisition, construction, infrastructure, redevelopment and other related costs for redevelopment projects along South Market Street and South Prince Street Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (J) Acquisition, construction,

infrastructure, redevelopment and other related costs for revitalization initiatives in southwestern area Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(K) Acquisition, construction, redevelopment and other related costs for redevelopment of former Stahr Armory Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(L) Acquisition, construction, infrastructure, redevelopment and

Page 233: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other related costs for West King Street redevelopment project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iv) Elizabethtown Borough

(A) Design, infrastructure, renovations, abatement of hazardous materials and other related costs for building access modifications, including installation of card access boxes, video surveillance cameras, door and window improvements and fire control, at Elizabethtown College Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Site development, infrastructure improvements, construction and renovation of instructional classroom building at Elizabethtown College Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Site development, infrastructure improvements, construction and other related costs for athletic facilities at Elizabethtown College Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(D) Site development, infrastructure improvements, renovation, construction and other related costs for buildings and residence halls at Elizabethtown College Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(E) Construction, renovation and other related costs for site development and infrastructure improvements of buildings and residence halls at Elizabethtown College Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F) Site development, infrastructure improvements, construction, renovation and other related costs for instructional classroom building at Elizabethtown College

Page 234: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(G) Construction and other related costs for athletic fields, field house, fitness center and wellness center for Elizabethtown College Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(H) Renovations, improvements and other related costs for safety and security at Elizabethtown College Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(v) West Hempfield Township (A) Purchase, renovation and other

related costs for community homes by Keystone Human Services to support persons with intellectual disabilities Project Allocation 3,740,000(Base Project Allocation - $3,740,000)

(vi) Manheim Township (A) Purchase, renovation and other

related costs for community homes by Keystone Human Services to support persons with intellectual disabilities Project Allocation 3,740,000(Base Project Allocation - $3,740,000)

(vii) Marietta Borough (A) Acquisition, site preparation,

infrastructure, construction and other related costs for economic development projects, including development of museum on mixed-use site Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (viii) Mount Joy Township

(A) Purchase, renovation and other related costs for community homes by Keystone Human Services to support persons with intellectual disabilities Project Allocation 3,740,000(Base Project Allocation - $3,740,000)

(ix) New Holland Borough (A) Acquisition, infrastructure,

construction and other related costs to expand and modernize food products

Page 235: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

manufacturing facility Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(x) Salisbury Township (A) Acquisition, construction,

infrastructure improvement, including, but not limited to, improvements related to road, highway and parking, and other related costs for direct fulfillment center in the area of the town of Gap Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (xi) Warwick Township

(A) Acquisition, infrastructure, construction and other related costs for development and construction of Rock Lititz, a campus-style commercial park Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(37) Lawrence County (i) City of New Castle

(A) Infrastructure, construction and other related costs for Jameson Health System expansion of ambulatory services, renovation and technology enhancements Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, construction, infrastructure and other related costs for redevelopment in industrial corridor Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Shenango Township (A) Construction, infrastructure and

other related costs for industrial park Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(iii) Union Township (A) Acquisition, construction,

infrastructure, redevelopment and other related costs for mixed-use

Page 236: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

commerce park Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Acquisition, construction,

infrastructure, redevelopment and other related costs for development of mixed-use commercial park Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iv) Wampum and New Beaver Boroughs

(A) Acquisition, construction, infrastructure, redevelopment and other related costs for industrial parks and related projects Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (38) Lebanon County

(i) County projects (A) Design, engineering, infrastructure

improvements, construction and other related costs for redevelopment of Good Samaritan Hospital Cancer Care Center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, infrastructure improvements, construction and related costs for development of North Cornwall Commons project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) City of Lebanon (A) Acquisition, construction and other

costs related to additional student parking for Harrisburg Area Community College, Lebanon Campus Project Allocation 500,000(Base Project Allocation - $500,000)

(iii) Lebanon County Health Facilities Authority (A) Acquisition, construction,

infrastructure and other related costs for Cancer Treatment Center in South Lebanon Township

Page 237: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iv) East Hanover Township (A) Purchase, renovation and other

related costs for community homes to support persons with intellectual disabilities and development of center for Susquehanna Service Dogs program, including construction of kennels and renovations to create training center and offices by Keystone Human Services Project Allocation 3,740,000(Base Project Allocation - $3,740,000)

(39) Lehigh County (i) Catasauqua Borough

(A) Construction, infrastructure improvements and other costs related to the mixed-use Catasauqua redevelopment project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) City of Allentown (A) Acquisition, abatement of hazardous

materials, redevelopment and other related costs for construction of mixed-use facility adjacent to Sacred Heart Hospital Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Infrastructure, rehabilitation, construction and renovation of Lehigh Valley Health Network Health Center Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Construction, renovation and other related costs for rehabilitation of Sacred Heart Hospital Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Acquisition, renovations, abatement of hazardous materials, construction

Page 238: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

and other related costs for rehabilitation of Civic Theatre of Allentown Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(E) Land acquisition, infrastructure improvements, construction and other costs related to Little Lehigh Creek Industrial Corridor redevelopment project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(F) Infrastructure, renovations, construction and other related costs for Miller Symphony Hall's Lyric and Balcony rehabilitation projects Project Allocation 250,000(Base Project Allocation - $250,000)

(G) Acquisition, renovations, construction and other related costs for Da Vinci Discovery Center of Science and Technology Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(H) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for development of properties in City of Allentown Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(I) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment of Oakwood Medical Associates building Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(J) Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for development of medical office building in the vicinity of Sacred Heart Hospital Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(K) Renovation, rehabilitation and other

Page 239: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

related costs for Episcopal House facility Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(L) Construction, redevelopment, abatement of hazardous materials and other related costs for sports medicine, rehabilitation and health center facilities Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(M) Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs for multistory adaptive reuse project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (N) Construction, infrastructure,

abatement of hazardous materials and other related costs for redevelopment of former Agere Technologies plant campus Project Allocation 500,000(Base Project Allocation - $500,000)

(O) Construction, infrastructure, redevelopment and other related costs for athletic field improvements at Cedar Crest College Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(P) Acquisition, construction, infrastructure and other related costs for St. Luke's University Health Network Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii) City of Bethlehem (A) Construction, infrastructure

improvements and other costs related to Lehigh Valley Hospital renovation and expansion project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iv) Fountain Hill Borough

(A) Construction, infrastructure

Page 240: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

improvements and other costs related to St. Luke's Hospital Bethlehem Campus expansion project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Construction, infrastructure improvements and other costs related to storm water retention system for flooding mitigation in Mill 2 complex Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction, infrastructure, redevelopment and other related costs for Mill 2 projects Project Allocation 750,000(Base Project Allocation - $750,000)

(v) Heidelberg Township (A) Acquisition, construction,

infrastructure, abatement of hazardous materials and other related costs for municipal government center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(vi) North Whitehall Township (A) Construction, infrastructure and

other related costs for adult inpatient hospital on KidsPeace Orchard Hills Campus Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(vii) Salisbury Township (A) Construction, infrastructure and

other related costs for renovation and expansion of Lehigh Valley Hospital Cedar Crest Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (viii) South Whitehall Township

(A) Construction, renovation and other related costs for expansion and development of St. Luke's Hospital Anderson Campus Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (B) Construction, renovation and other

Page 241: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

related costs necessary to further develop St. Luke's West End Medical Center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Construction and other related costs for regional EMS and Public Safety Center Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(ix) Upper Macungie Township (A) Acquisition, construction,

infrastructure, abatement of hazardous materials and other related costs for new business development Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, infrastructure and other related costs for new police station Project Allocation 1,900,000(Base Project Allocation - $1,900,000)

(40) Luzerne County (i) County projects

(A) Acquisition, construction, infrastructure and other costs related to development of Lackawanna River Heritage Trail, lower section, along Lackawanna River Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) For acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the county Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(C) Land acquisition, infrastructure improvements, demolition, site improvement, renovation, addition, utility expansion, construction, purchase of medically necessary fixtures and other related costs for hospital and other related facilities of the Greater Hazleton Health Alliance

Page 242: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (D) Acquisition, construction,

infrastructure and other related costs for 20-megawatt frequency regulation plant Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (E) Construction, site preparation,

engineering, grading, rail, ties, ballast, acquiring and installing rail scale and other related materials to extend siding to provide access to Northeast Recycling Solutions Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(i.1) City of Hazleton (A) For the acquisition, construction,

infrastructure, redevelopment, renovations and other costs associated with an economic development project in the city Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Land acquisition, infrastructure improvements, site improvement, renovation, construction and other costs related to Greater Hazleton Health Alliance Health and Wellness Center Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(ii) City of Nanticoke (A) For the acquisition, construction,

infrastructure, redevelopment, renovations and other costs associated with an economic development project in the city Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iii) City of Pittston (A) Acquisition, construction,

infrastructure and other costs related to Main & Market Professional Center project

Page 243: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) For the acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the city Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Construction, infrastructure and other related costs for library expansion project Project Allocation 500,000(Base Project Allocation - $500,000)

(iv) City of Wilkes-Barre (A) Acquisition, construction,

infrastructure and other costs related to redevelopment of Citizens Bank Center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Construction, infrastructure improvements and other costs related to Wilkes University engineering school development project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) For the acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the city Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Acquisition, construction, infrastructure and other related costs for expansion and energy sustainability project at King's College Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(E) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs related to King's College's acquisition and renovation of the Ramada

Page 244: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(v) Dupont Borough (A) Acquisition, construction,

infrastructure and other costs related to Wilkes-Barre/Scranton International Airport economic development project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for senior housing development Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(vi) Hanover Township (A) Rehabilitate existing rail

infrastructure and construct transload facility, including site preparation, engineering, grading, rail, ties, ballast, switch relocation, paving, gravel, fabrication of concrete pad, acquiring and installing truck scale and other related materials necessary in the operation of the new facility Project Allocation 1,400,000(Base Project Allocation - $1,400,000)

(vii) Plains Township (A) Construction, infrastructure

improvements and other costs related to Ultimate Sports facility project Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(41) Lycoming County (i) County projects

(A) Construction, rehabilitation and other related costs to serve NuWeld Corporation manufacturing facility Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, demolition and other costs related to Williamsport Regional Airport terminal building project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Design and construction of facility

Page 245: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

improvements, including directional signage, terminal building, renovations and parking, at Williamsport Regional Airport Project Allocation 3,676,000(Base Project Allocation - $3,676,000)

(D) Acquisition, rehabilitation, construction and other related costs for health care and housing facilities for Susquehanna Health System Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (E) Acquisition, infrastructure,

construction, redevelopment and other related costs for Susquehanna Community Health and Dental Center Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (F) Acquisition, infrastructure,

construction and other related costs for county forensic science center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(G) Acquisition, construction, infrastructure and other related costs for mixed-use development of land located at intersection of Brushy Ridge Road and Fairfield Road in Fairfield Township Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (H) Acquisition, construction,

redevelopment and other related costs for Susquehanna Health System facilities Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (I) Acquisition, construction, facility

improvements, machinery and equipment costs related to renovation and expansion with Jersey Shore Steel Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

Page 246: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(i.1) City of Williamsport (A) Construction, infrastructure and

other related costs for YMCA community center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Construction, infrastructure, abatement of hazardous materials and other related costs for Lycoming Engines Facility improvement project Project Allocation 2,255,000(Base Project Allocation - $2,255,000)

(C) Construction, infrastructure and other related costs for Williamsport YMCA Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Muncy Township (A) Acquisition, site preparation,

infrastructure and construction for commercial and hotel development project to be constructed at Lycoming Mall Road and Lycoming Mall Drive Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(42) McKean County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) City of Bradford

(A) Land acquisition, demolition, site clearance, building rehabilitation, building construction, site work, infrastructure, gateway and streetscape improvements, waterfront development, recreational projects, storm water management for flood control and other community improvements for economic development and community impact projects Project Allocation 10,000,000(Base Project Allocation -

$10,000,000)

Page 247: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(B) Renovation, construction and other related costs to modernize, expand and improve existing facilities of rehabilitation center for individuals with disabilities Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(iii) Foster Township (A) Construction, site work,

infrastructure improvements, land acquisition and other related costs for an at-risk youth education and treatment facility on Main Campus of Beacon Light in Foster Township Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (43) Mercer County

(i) County projects (A) Infrastructure, construction and

other related costs for WaterFire Sharon riverbank development Project Allocation 400,000(Base Project Allocation - $400,000)

(B) Infrastructure and other related costs for construction of multitenant facility in Reynolds Industrial Park Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, infrastructure, construction and other related costs, including abatement of hazardous materials, for rehabilitation of Damascus-Bishop Tube facility Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(D) Acquisition, rehabilitation, construction and other related costs for development of Penn-Ohio Center for Arts & Technology Project Allocation 2,225,000(Base Project Allocation - $2,225,000)

(E) Acquisition, construction, infrastructure and other related costs for facilities development Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

Page 248: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(F) Construction, infrastructure and other related costs for workforce development center Project Allocation 2,225,000(Base Project Allocation - $2,225,000)

(G) Acquisition, construction, infrastructure, redevelopment and other related costs for health care center multitenant facility Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(H) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for redevelopment of industrial facility Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(I) Acquisition, construction, infrastructure and other related costs for industrial or commercial facility Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Greenville Area Economic Development Corporation (A) Acquisition, rehabilitation,

construction and other related costs for redevelopment of Greenville Trinity Industries property Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Renovation and rehabilitation of historical building to transform it into training facility for Greenville Neuromodulation Clinic Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(iii) City of Farrell (A) Acquisition, construction,

infrastructure, redevelopment and other related costs for industrial plaza Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iv) City of Hermitage (A) Acquisition, construction, renovation

and infrastructure improvements to

Page 249: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

industrial facility Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Acquisition, construction and infrastructure improvements for business park project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Acquisition, construction and other related costs for facility development Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(D) Acquisition, construction, infrastructure and other related costs for business park project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(E) Acquisition, construction, infrastructure and other related costs for industrial facility Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(v) City of Sharon (A) Construction, infrastructure,

redevelopment and other related costs for development of downtown Sharon Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Acquisition, construction, infrastructure, redevelopment and other related costs for development projects along Shenango River Project Allocation 500,000(Base Project Allocation - $500,000)

(44) Mifflin County (i) County projects

(A) Acquisition, construction, infrastructure and other related costs for a Federally Qualified Health Center-anchored multiservice facility Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(ii) Mifflin County Industrial Development Authority (A) Acquisition, construction,

rehabilitation and other costs related to design and construction of

Page 250: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

facilities to be utilized as branch campus of Pennsylvania Highlands Community College Project Allocation 600,000(Base Project Allocation - $600,000)

(B) Acquisition, construction and other related costs for extension of public infrastructure within Mifflin County Industrial Park Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Demolition, remediation, renovations and infrastructure improvements to Mifflin County Industrial Development Corporation Plaza, a brownfield site located in Granville Township Project Allocation 1,250,000(Base Project Allocation - $1,250,000)

(D) Construction, renovation, rehabilitation and other related costs for redevelopment and improvements for Mifflin County senior citizen housing units Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(45) Monroe County (i) Barrett Township

(A) Construction, infrastructure improvements and other costs related to Skytop restoration project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii) Bartonsville (A) Land acquisition, construction,

infrastructure and other related costs for St. Luke's University Health Network development project Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (iii) Coolbaugh and Tobyhanna Townships

(A) Construction, infrastructure and other related costs for expansion of natural gas main from current connection in Arcadia North Business Park in Coolbaugh Township to Tobyhanna Township

Page 251: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(iv) Pocono Township (A) Construction, infrastructure and

other related costs for expansion of natural gas service to center of Monroe County Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(v) Stroudsburg Borough (A) Acquisition, construction,

redevelopment and other related costs for new YMCA Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(vi) Tunkhannock Township (A) Construction, renovation,

infrastructure, utilities, structural and other related costs for facility improvements at the Pocono Raceway Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (46) Montgomery County

(i) County projects (A) Acquisition, infrastructure,

construction and other related costs for renovation and expansion of Rosemont College's Cardinal Hall Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Rehabilitation of railroad, including track improvements, siding extensions, visitors centers, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and preserve corridor for future freight traffic in Berks and Montgomery Counties Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii) Redevelopment Authority of the County of

Montgomery (A) Acquisition, infrastructure,

construction, renovation and

Page 252: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

redevelopment of mill building located at Beech and Evans Streets in Borough of Pottstown Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure, construction, renovation and redevelopment of Empire Firehouse located at Franklin and Chestnut Streets in Borough of Pottstown Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Acquisition, infrastructure, construction and development of health complex on campus of Pottstown Memorial Medical Center in Borough of Pottstown Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(D) Site preparation, infrastructure, construction and other related costs for construction and development of mixed-use commercial center at the intersection of Route 100 and Market Street in Douglass Township Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(ii.1) Abington Township (A) Construction and other related costs

for athletic league building Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction and other related costs for ambulatory services unit renovation Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction and other related costs for inpatient orthopedic unit project Project Allocation 2,188,000(Base Project Allocation - $2,188,000)

(ii.2) Borough of Ambler (A) Infrastructure, redevelopment,

construction and other related costs for parking garage on Lindenwold Avenue Project Allocation 1,700,000

Page 253: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $1,700,000) (iii) Borough of Hatboro

(A) Infrastructure, construction and other related costs for rehabilitation, expansion and modernization of borough facilities, including Borough Hall, police station and public works building Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Acquisition, infrastructure, preservation and other related costs for reuse of existing historic factory Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(iv) Cheltenham Township (A) Construction, infrastructure

improvements, including rehabilitation of sanitary sewer system, and other related costs for business development Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(B) Construction, infrastructure improvements and other costs related to pedestrian signals and crossings Project Allocation 1,750,000(Base Project Allocation - $1,750,000)

(C) Construction, infrastructure improvements and other costs related to Elkins Park West streetscape and transportation enhancement project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(D) Acquisition, infrastructure, construction and other related costs for relocation of Public Works facility Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(E) Construction and other related costs for a fire station expansion project Project Allocation 225,000(Base Project Allocation - $225,000)

(F) Acquisition, construction, redevelopment and other related costs for public works facility relocation Project Allocation 7,500,000

Page 254: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $7,500,000) (G) Construction, infrastructure and

other related costs for streetscape and other enhancements in Elkins Park West Commercial District Project Allocation 1,650,000(Base Project Allocation - $1,650,000)

(H) Construction, infrastructure and other related costs for intersection improvements Project Allocation 875,000(Base Project Allocation - $875,000)

(I) Construction, infrastructure and other related costs for projects related to sewer system Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(J) Construction and other related costs for theatre and auditorium revitalization project Project Allocation 742,000(Base Project Allocation - $742,000)

(K) Acquisition, construction and other related costs for redevelopment of former Tyler Estate and surrounding properties in Elkins Park Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(L) Acquisition, construction, infrastructure and other costs related to Glenside area flood protection project Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(M) Construction, infrastructure and other costs related to Glenside area flood protection project, Phase II, in Cheltenham Township along Tookany Creek Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(N) Construction, infrastructure and other related costs for Tookany Creek headwaters flood control project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(v) Conshohocken Borough

Page 255: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Construction, infrastructure improvements and other costs related to Verizon Building remediation and adaptive reuse project Project Allocation 4,391,000(Base Project Allocation - $4,391,000)

(B) Construction, infrastructure improvements and other costs related to Seven Tower Bridge development project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for redevelopment project at site of former Verizon building Project Allocation 3,821,000(Base Project Allocation - $3,821,000)

(D) Construction, infrastructure, redevelopment and other related costs for development at First and Fayette Streets Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (vi) East Norriton Township

(A) Construction, infrastructure improvements and other costs related to renovation of patient rooms Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(vii) Lower Gwynedd Township (A) Acquisition, infrastructure,

construction and other related costs for Phase III of Bethlehem Pike revitalization project, including streetscape and safety improvements Project Allocation 500,000(Base Project Allocation - $500,000)

(viii) Lower Merion Township (A) Construction, infrastructure

improvements and other costs related to expansion of Ardmore Train Station transit and parking improvements project Project Allocation 10,000,000

Page 256: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $10,000,000)

(B) Construction, infrastructure improvements and other costs related to Rosemont College building renovations Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ix) Lower Providence Township (A) Infrastructure, construction and

other related costs, including abatement of hazardous materials, for redevelopment of Rittenhouse Road CSG Superfund site located in Park Pointe at Lower Providence Business Park Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(x) Montgomery Township (A) Infrastructure, redevelopment and

construction of multipurpose recreational community center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(xi) Norristown Borough (A) Construction, infrastructure

improvements and other costs related to new mixed-income development in downtown Norristown Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Construction, infrastructure improvements and renovations for the Elmwood Park Zoo Protect the Park project Project Allocation 750,000(Base Project Allocation - $750,000)

(C) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for medical office building Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(D) Acquisition, construction, infrastructure, redevelopment and other related costs for supermarket project on Markley Street Project Allocation 2,500,000

Page 257: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $2,500,000) (E) Construction, infrastructure,

redevelopment and other related costs for the George Washington Carver Community Center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xi.1) Plymouth Township (A) Construction, infrastructure

improvements and renovations for the East Plymouth Valley Park Little League facility Project Allocation 300,000(Base Project Allocation - $300,000)

(xii) Springfield Township (A) Construction, infrastructure

improvements and other costs related to Wordsworth Academy Fort Washington project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(xiii) Upper Dublin Township (A) Acquisition, renovation,

infrastructure development, site preparation and construction to support redevelopment and revitalization of Fort Washington Office Park Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (xiv) Upper Merion Township

(A) Construction, infrastructure improvements and other costs related to DeKalb/Gulph redevelopment project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(B) Construction and other related costs for ambulance station project Project Allocation 900,000(Base Project Allocation - $900,000)

(C) Construction, infrastructure, redevelopment and other related costs for senior center project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(D) Construction, infrastructure,

Page 258: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

redevelopment and other related costs for projects related to Triad commercial office facility in King of Prussia Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xv) Upper Moreland Township (A) Construction, infrastructure

improvements and other related costs for Willow Grove Industrial Commons, including construction of regional storm water management basin to improve economic development of the area Project Allocation 500,000(Base Project Allocation - $500,000)

(xvi) Upper Providence Township (A) Construction, infrastructure and

other related costs for Montgomery County Pope John Paul II High School stadium project Project Allocation 500,000(Base Project Allocation - $500,000)

(xvii) Whitemarsh Township (A) Construction, infrastructure

improvements and other costs related to AIM Institute for Learning and Research redevelopment and expansion project Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(xviii) Whitpain Township (A) Construction, infrastructure and

other related costs for renovation of Montgomery County Community College Science Center's west wing Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(47) Montour County (i) (Reserved)

(48) Northampton County (i) County projects

(A) Acquisition, construction, infrastructure and other costs related to community-based outpatient health services facility for Lehigh Valley Health Network

Page 259: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(B) Acquisition, construction, infrastructure and other costs related to renovation of mixed-use buildings in urban areas Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(C) Acquisition, construction, infrastructure and other costs related to warehouse facility project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Bethlehem Township (A) Construction, renovation and other

related costs to expand and further develop St. Luke's Hospital Anderson Campus Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (B) Site development and infrastructure

improvements for Highland Avenue and Mowrer Drive industrial sites Project Allocation 500,000(Base Project Allocation - $500,000)

(iii) City of Bethlehem (A) Construction, renovation,

infrastructure and other related costs for ArtsQuest renovation project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, construction, infrastructure improvements and other costs for the development of a regional convention center and related improvements in the city Project Allocation 25,000,000(Base Project Allocation -

$25,000,000) (C) Construction and other related costs

for hotel and leisure training center Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (D) Construction and other related costs

for technology center

Page 260: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iv) City of Easton

(A) Acquisition, construction, infrastructure and other costs related to High School Sports Hall of Fame Museum Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, construction, infrastructure and other costs related to redevelopment of mixed-use building, including structured parking on Ferry Street Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C) Acquisition, construction, infrastructure and other costs related to redevelopment of mixed-use buildings, including parking and park infrastructure improvements to Centre Square Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (D) Construction, infrastructure and

other costs related to redevelopment of mixed-use commercial/office building with integrated parking and residential upper floor Project Allocation 1,156,000(Base Project Allocation - $1,156,000)

(E) Acquisition, construction, infrastructure and other costs related to Marquis Commons project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(F) Acquisition and redevelopment of the Governor Wolf Building for mixed use Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Acquisition, construction, redevelopment and other related costs for a sports hall of fame museum Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

Page 261: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(H) Construction, redevelopment and other related costs for Governor Wolf Building Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(I) Acquisition, construction and other related costs for redevelopment of Ferry Street Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(J) Acquisition, construction and other related costs for redevelopment of Centre Square Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (v) East Allen Township

(A) Infrastructure and related site costs for Shoppes at Route 512 and East Allen Marketplace renovation project Project Allocation 600,000(Base Project Allocation - $600,000)

(B) Acquisition, construction, infrastructure and other related costs for municipal facility Project Allocation 785,000(Base Project Allocation - $785,000)

(C) Renovation and rehabilitation of Weaversville Intensive Treatment Unit Facility for municipal services building Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(D) Land acquisition, construction and other related costs for municipal facility Project Allocation 785,000(Base Project Allocation - $785,000)

(vi) East Bangor Borough (A) Construction, infrastructure and

other costs related to development of government center, heritage center and community disaster center Project Allocation 150,000(Base Project Allocation - $150,000)

(vi.1) Freemansburg Borough (A) Construction, infrastructure and

Page 262: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other related costs for fire, administration and public works department facilities Project Allocation 1,800,000(Base Project Allocation - $1,800,000)

(vii) Hellertown Borough (A) Acquisition, construction,

infrastructure and other costs related to rehabilitation of former Champion Spark Plug facility Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(viii) Lower Nazareth Township (A) Acquisition, construction,

infrastructure and other costs related to industrial park in Nazareth area Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ix) Portland Borough

(A) Acquisition of land and construction of office building in Portland Industrial Park Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(x) Upper Mt. Bethel Township (A) Acquisition, construction,

infrastructure and other costs related to industrial park project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Acquisition of land and construction

of office building in Portland Industrial Park Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(49) Northumberland County (i) County projects

(A) Redevelopment and other costs related to construction of state-of-the-art carbon processing facility located at Shamokin Carbons Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Northumberland County Industrial Development Authority

Page 263: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(A) Infrastructure, renovation, construction and other related costs for expansion of Strong Industries manufacturing facility Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(iii) City of Sunbury (A) Acquisition, construction,

infrastructure, development and other costs related to redevelopment of former industrial site for new and expanding businesses Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(50) Perry County (i) (Reserved)

(51) Philadelphia County (i) County projects

(A) Renovation of biology labs and associated prep rooms at Community College of Philadelphia's main campus and West Regional Center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Land acquisition, construction, infrastructure and other related costs for design and construction of National Native American Museum Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (C) Construction, infrastructure

improvements and related costs for the development of a museum Project Allocation 50,000,000(Base Project Allocation -

$50,000,000) (D) Infrastructure in support of downtown

highrise office and hotel development, reconstruction of public streets and sidewalks and expanded connections to existing mass transit system Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (E) Acquisition, construction,

reconstruction, rehabilitation,

Page 264: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

remediation, infrastructure improvements, including improvements related to parking and common areas, and other related costs for redevelopment and reuse of Building 22 located at former Philadelphia Naval Yard Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (F) Acquisition, construction,

reconstruction, rehabilitation, remediation, infrastructure improvements, including improvements related to parking and common areas, and other related costs for redevelopment and reuse of Building 18 located at former Philadelphia Naval Yard Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (G) Acquisition, construction,

reconstruction, rehabilitation, remediation, infrastructure improvements, including improvements related to parking and common areas, and other related costs for redevelopment and reuse of Building 16 located at former Philadelphia Naval Yard Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (H) Acquisition, construction,

reconstruction, rehabilitation, remediation, infrastructure improvements, including improvements related to parking and common areas, and other related costs for redevelopment and reuse of Building 19 located at former Philadelphia Naval Yard Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (I) Acquisition, construction,

Page 265: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

reconstruction, rehabilitation, remediation, infrastructure improvements, including improvements related to parking and common areas, and other related costs for redevelopment and reuse of Building 17 located at former Philadelphia Naval Yard Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (J) Construction, redevelopment,

infrastructure and other related costs for Woodmere Art Museum construction and expansion project Project Allocation 6,100,000(Base Project Allocation - $6,100,000)

(K) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 100,000,000(Base Project Allocation -

$100,000,000) (L) Construction, development,

rehabilitation, infrastructure improvements, environmental remediation, renovation, beautification, pedestrian accessibility improvements, enhanced security improvements and other related costs to revitalize the 40th Street Trolley Portal Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii) City of Philadelphia (A) Construction, infrastructure,

rehabilitation improvements and other costs related to Moore College of Art & Design project Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(B) Construction and other related costs for Cascia Center of the National Shrine of Saint Rita project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction, infrastructure and

Page 266: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other costs related to Hotel Indigo project Project Allocation 35,000,000(Base Project Allocation -

$35,000,000) (D) Construction, infrastructure and

other costs related to Reading Viaduct project Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(E) Construction, infrastructure and other costs related to Penn Treaty Village project Project Allocation 55,000,000(Base Project Allocation -

$55,000,000) (F) For building, gallery, exhibit and

site restoration, renovation, construction, infrastructure and technology upgrades at Franklin Institute Project Allocation 25,000,000(Base Project Allocation -

$25,000,000) (G) Construction, infrastructure and

other related costs for Russell Byers Charter School expansion project Project Allocation 3,125,000(Base Project Allocation - $3,125,000)

(H) Construction, infrastructure and other costs related to Live Arts Festival and Philly Fringe Arts Center project Project Allocation 500,000(Base Project Allocation - $500,000)

(I) Construction, infrastructure and other costs related to Convention Center Hotel mixed-use project Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (J) Construction, infrastructure and

other costs related to Proto Brewery Hotel project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(K) Construction, infrastructure and

Page 267: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other costs related to Stables redevelopment project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(L) Construction, infrastructure and other costs related to Tulip Street redevelopment project Project Allocation 500,000(Base Project Allocation - $500,000)

(M) Construction, infrastructure and other costs related to Columbia Street redevelopment project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(N) Acquisition, construction, infrastructure and other costs related to 1010 Avenue of the Arts New Headquarters Campus Civic Culture Hub project Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(O) Construction, infrastructure and other costs related to Pro-Square Kingsessing Nursing Home project Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(P) Redevelopment, construction, infrastructure and other costs related to Jasper Street Manufacturing Facility project Project Allocation 1,250,000(Base Project Allocation - $1,250,000)

(Q) Redevelopment, construction, infrastructure and other costs related to AC Linen Laundry commercial project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(R) Redevelopment, construction, infrastructure and other costs related to Convention Center Hotel project at 15th and Race Streets Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (S) Facilities construction,

infrastructure, storm water management and restoration of tidal wetland for

Page 268: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Penn Treaty Park Phase I project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (T) Facilities construction,

infrastructure, renovations and other costs related to Franklin Delano Roosevelt Park Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (U) Construction, infrastructure and

other costs related to Salvation Army Eliza Shirley Campus project Project Allocation 1,750,000(Base Project Allocation - $1,750,000)

(V) Acquisition, construction, infrastructure and other costs related to KIPP Philadelphia School project Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(W) Construction, infrastructure and other costs related to East Falls streetscape project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(X) Construction, infrastructure and other costs related to Eastern Pennsylvania Psychiatric Institute redevelopment project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(Y) Construction, demolition, acquisition, infrastructure, redevelopment and other related costs for campus improvements and facilities expansion at Philadelphia University Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (Z) Acquisition, construction,

infrastructure and other costs related to Women's Domestic Violence Shelter residential and commercial facility project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

Page 269: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(AA) Acquisition, construction, infrastructure and other costs related to Free Library of Philadelphia George Institute renovation and building project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(BB) Construction, infrastructure and other costs related to University City Science Center build-out project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(CC) Construction, infrastructure, renovations and other costs for Please Touch Museum restoration project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(DD) Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, design, streets, utilities and other costs associated with development of Innovation Neighborhood by Drexel University Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (EE) Construction, infrastructure,

renovations and other costs for Gaudenzia Foundation Family Center Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(FF) Construction, infrastructure, renovations and other costs for North Philadelphia Health System St. Joseph's Hospital & Girard Medical Center Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(GG) Infrastructure improvements, including electrical and technology upgrades for Holy Family University Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(HH) Construction, infrastructure, renovations and other costs for Holy Family University Marian Hall project

Page 270: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(II) Construction, infrastructure, renovations and other costs for revitalization of former Frankford Arsenal as Shopping Center at the ARSENAL Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(JJ) Construction, infrastructure and other costs related to plant upgrades at S. D. Richman Sons, Inc., facility for automobile shredder project in Port Richmond Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(KK) Construction, infrastructure, renovations and other costs for Fox Chase Cancer Center Comparative Medical Research Facility Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(LL) Construction, infrastructure and other costs related to Fox Chase Cancer Center physicians office building project Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(MM) Construction, infrastructure and other costs related to Fox Chase Cancer Center Outpatient Chemotherapy Infusion Center Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(NN) Construction, infrastructure, renovations and other costs for Fox Chase Cancer Center laboratory research and shared resource facilities Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(OO) Construction, infrastructure, renovations and other costs for Fox Chase Cancer Center Conference Center Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(PP) Construction, infrastructure,

Page 271: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

renovations and other costs for Fox Chase Cancer Center central utility plant upgrades Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(QQ) Demolition, acquisition, construction, infrastructure and other costs for Liddonfield revitalization, renovation and rehabilitation project Project Allocation 35,000,000(Base Project Allocation -

$35,000,000) (RR) Construction, infrastructure,

renovations and other costs for Independence Visitor Center service desk improvement project Project Allocation 500,000(Base Project Allocation - $500,000)

(SS) Acquisition, construction, infrastructure improvements and other costs related to Parkwood Therapeutic Riding Center expansion and revitalization project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(TT) Acquisition, construction, infrastructure improvements and other costs related to Bustleton Bengals Gymnasium Project Allocation 750,000(Base Project Allocation - $750,000)

(UU) Acquisition, construction, infrastructure improvements and other costs related to manufacturing facility near intersection of Comly Road and Roosevelt Boulevard in Northeast Philadelphia Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(VV) Construction, infrastructure and other costs related to Methodist Home for Children incubator/shared kitchen program Project Allocation 500,000(Base Project Allocation - $500,000)

(WW) Construction, infrastructure and other costs related to West 59th and

Page 272: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Market Streets mixed-use, transit-oriented development project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(XX) Acquisition, construction, infrastructure, redevelopment and other costs related to Green Tree School development project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(YY) Construction, infrastructure and other costs related to Schuylkill Crossing at Grays Ferry redevelopment project Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(ZZ) Construction, infrastructure and other costs related to Wistar Institute administrative operations space retrofit project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(AAA) Construction, infrastructure and other costs related to Wistar Institute class A laboratory conversion project Project Allocation 1,600,000(Base Project Allocation - $1,600,000)

(BBB) Construction, infrastructure and other costs related to Boys' Latin of Philadelphia Charter School Middle School building project Project Allocation 700,000(Base Project Allocation - $700,000)

(CCC) Acquisition, infrastructure, construction, redevelopment and other related costs for Greater Philadelphia Health Action Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (DDD) Acquisition, infrastructure,

construction, redevelopment and other related costs for Wynnefield Multipurpose Center Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

Page 273: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(EEE) Construction, infrastructure and other costs related to medical education center at University of Pennsylvania Perelman School of Medicine Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (FFF) Construction, infrastructure and

other costs related to University of Pennsylvania's Walnut Street Gateway streetscape project Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(GGG) Construction, infrastructure and other costs related to Wynne Ballroom redevelopment mixed-use facility project Project Allocation 200,000(Base Project Allocation - $200,000)

(HHH) Construction, infrastructure and other costs related to Magee Rehabilitation Hospital improvement project Project Allocation 500,000(Base Project Allocation - $500,000)

(III) Construction, infrastructure and other costs related to El Centro de Oro Market project Project Allocation 750,000(Base Project Allocation - $750,000)

(JJJ) Acquisition, infrastructure, construction, redevelopment and other related costs for Nueva Esperanza North 5th Street redevelopment Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(KKK) Acquisition, infrastructure, demolition, construction, redevelopment and other related costs for Nueva Esperanza commercial/retail business redevelopment project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(LLL) Construction, infrastructure and other costs related to revitalization of 1711 West Allegheny Avenue

Page 274: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 500,000(Base Project Allocation - $500,000)

(MMM) Acquisition, infrastructure, demolition, construction, redevelopment and other related costs for Plaza Allegheny mixed-use commercial retail shopping center in Fairhill Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(NNN) Construction, infrastructure and other development costs for emergency, inpatient, outpatient and clinical facilities for Temple University Hospital Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (OOO) Construction, infrastructure and

other costs related to University of Pennsylvania South Bank commercial office and research park redevelopment project Project Allocation 2,300,000(Base Project Allocation - $2,300,000)

(PPP) Construction, infrastructure and other costs related to renovation and improvement of North City Congress Senior Community Center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(QQQ) Acquisition, construction, infrastructure and other costs related to North City Congress Community Center facility project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(RRR) Construction, infrastructure and other costs related to Smith Memorial Playhouse Restoration IV and Gateway project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(SSS) Acquisition, construction, infrastructure and other costs related to Chariot Landing-International Row mixed-use revitalization project

Page 275: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 40,000,000(Base Project Allocation -

$40,000,000) (TTT) Acquisition, construction,

infrastructure and development of mixed-use Civil Justice Center campus, including commercial office space for leading legal service organizations Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(UUU) Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research or provide other related activities for Magee Rehabilitation Hospital Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (VVV) Construction, infrastructure and

other costs related to FDR Park Boathouse Cescaphe Ballroom adaptive reuse project Project Allocation 750,000(Base Project Allocation - $750,000)

(WWW) Construction, infrastructure and other costs related to Old City District streetscape improvement project Project Allocation 500,000(Base Project Allocation - $500,000)

(XXX) Acquisition, construction, infrastructure, redevelopment and other related costs for 1010 Avenue of the Arts New Headquarters Campus Civic Culture Hub Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(YYY) Construction, infrastructure and other costs related to WHYY facilities upgrade project Project Allocation 500,000(Base Project Allocation - $500,000)

(ZZZ) Acquisition, construction, infrastructure, redevelopment and other related costs for Friends Select

Page 276: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

School renovation project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(AAAA) Construction, site preparation, expansion and infrastructure-related costs and construction of Chestnut Hill College campus academic center facility Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (BBBB) Construction, infrastructure,

renovations and other costs for National Constitution Center Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (CCCC) Construction, infrastructure,

renovations and other costs for museum administration building at Eastern State Penitentiary Historic Site Project Allocation 6,500,000(Base Project Allocation - $6,500,000)

(DDDD) Construction, infrastructure, renovations and other costs for interior and exterior improvements at Eastern State Penitentiary Historic Site Project Allocation 3,100,000(Base Project Allocation - $3,100,000)

(EEEE) Acquisition, construction, infrastructure, redevelopment and other related costs for 900 North Broad Street project Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(FFFF) Acquisition, construction, infrastructure and other related costs for Divine Lorraine property redevelopment project Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(GGGG) Acquisition, construction, infrastructure and other related costs for redevelopment of Stutz property at 666-667 North Broad Street, 1360-64 Ridge Avenue and 1319 Wallace Street

Page 277: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(HHHH) Acquisition, construction, infrastructure and other related costs for redevelopment of Stevens property at 523 North Broad Street Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(IIII) Acquisition, construction, infrastructure and other related costs for redevelopment of Metropolitan Opera House Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(JJJJ) Acquisition, construction, infrastructure and other related costs for redevelopment of Benjamin Franklin High School property Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (KKKK) Acquisition, construction,

infrastructure and other related costs for redevelopment of Parkway Center City High School property Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(LLLL) Acquisition, construction, infrastructure and other related costs for redevelopment of Julia R. Masterman High School property Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(MMMM) Acquisition, construction, infrastructure and other related costs for redevelopment of Franklin LearningCenter property at 616 North 15th Street Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(NNNN) Acquisition, construction, infrastructure and other related costs for redevelopment of William Penn High School property at 1333 North Broad Street Project Allocation 20,000,000(Base Project Allocation -

Page 278: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

$20,000,000) (OOOO) Acquisition, construction,

infrastructure and other related costs for redevelopment of North Broad Street Salvation Army property at 701 North Broad Street Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (PPPP) Acquisition, construction,

infrastructure, redevelopment and other costs related to Greene Street Friends School expansion project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(QQQQ) Construction, infrastructure and other costs related to the renovation of SHARE Food Program facility Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(RRRR) Construction, infrastructure and other costs related to the Soko site in Old Kensington/Northern Liberties neighborhood Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(SSSS) Acquisition, infrastructure, construction and other related costs for 30 University Place project Project Allocation 6,500,000(Base Project Allocation - $6,500,000)

(TTTT) Acquisition, infrastructure, construction, redevelopment and other related costs for Public Health Management Corporation Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (UUUU) Acquisition, infrastructure,

construction, redevelopment and other related costs for St. Francis Villa housing project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(VVVV) Construction, infrastructure and other related costs for the renovation and modernization of the Center in the

Page 279: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Park senior community center Internet cafe project Project Allocation 250,000(Base Project Allocation - $250,000)

(WWWW) Construction, renovation, infrastructure and other related costs for the Kimmel Center for the Performing Arts Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (XXXX) Acquisition, construction,

infrastructure improvements and other related costs for the renovation of the Mazzoni Center facility and medical practice Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(YYYY) Acquisition, construction, infrastructure improvements and other related costs for the redevelopment of an existing warehouse facility at the intersection of Tulip and Harbison Streets in Wissinoming Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ZZZZ) Construction of the Chinatown Community Center and acquisition, infrastructure improvements and renovation of the Chinatown retail area Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(A5) Construction, renovation, infrastructure and other related costs for the West Philadelphia Branch YMCA Wellness/Fitness Center and family changing area expansion Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B5) Construction, renovation, infrastructure and other related costs for the Park Towne Place redevelopment project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C5) Construction, rehabilitation,

Page 280: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure and other related costs for the Historical Society of Pennsylvania's Center for History and Learning Phase II retrofitting and renovation project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(D5) Construction, rehabilitation, infrastructure and other related costs for the Historical Society of Pennsylvania's Center for History and Learning Phase II renovation and space addition project Project Allocation 13,500,000(Base Project Allocation -

$13,500,000) (E5) Construction, infrastructure and

other related costs for the 4.0 University Place project Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (F5) Construction and infrastructure

improvements for Goodwill Industries store and training center at 5050 Parkside Avenue Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(G5) Construction, renovation and infrastructure improvements for Nueva Esperanza Facilities Project Allocation 4,800,000(Base Project Allocation - $4,800,000)

(H5) Acquisition, construction, infrastructure improvements and other costs related to the 52nd Street Gateway Phase I mixed-use building project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(I5) Acquisition, construction, infrastructure improvements and other costs related to the 52nd Street Gateway Phase II Lifelong Learning Center project Project Allocation 1,300,000(Base Project Allocation - $1,300,000)

Page 281: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(J5) Acquisition, construction, infrastructure improvements and other costs related to the 52nd Street Gateway Phase III transit center project Project Allocation 3,700,000(Base Project Allocation - $3,700,000)

(K5) Acquisition, construction, infrastructure improvements and other related costs for 52nd Street mixed-use development project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (L5) Acquisition, construction,

infrastructure improvements and other related costs for Inglis housing and long-term care facility development project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (M5) Acquisition, construction,

infrastructure improvements and other related costs for Strawberry Mansion housing development project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (N5) Construction, infrastructure

improvements and related costs for the Ligouri Academy renovation project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(O5) Construction, infrastructure improvements and related costs for the Brown's Superstores redevelopment project at North Broad and Spring Garden Streets Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(P5) Construction, infrastructure improvements and related costs for the Brown's redevelopment project at 70th and Elmwood Project Allocation 12,000,000(Base Project Allocation -

Page 282: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

$12,000,000) (Q5) Construction, infrastructure

improvements and related costs for the Brown's Superstores redevelopment project at the 24th and Oregon Shopping Center Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(R5) Construction, infrastructure improvements and related costs for the Brown's Superstores redevelopment project at the PriceRite of Erie Avenue shopping center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(S5) Construction, infrastructure improvements and related costs for the Brown's Superstores redevelopment project at the PriceRite of Mantua shopping center Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(T5) Acquisition, demolition, construction, renovation, infrastructure and other related costs for Thomas Jefferson University projects Project Allocation 25,000,000(Base Project Allocation -

$25,000,000) (U5) Acquisition, infrastructure and

other capital improvements for the Wordsworth Ford Road project Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(V5) Construction, infrastructure and other related costs for expansion project at Philadelphia Freedom Valley YMCA West Philadelphia branch Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(W5) Construction, infrastructure and other related costs for development of multiuse facility for Temple University athletics, academics and research and local community athletic events

Page 283: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (X5) Acquisition, construction,

infrastructure, redevelopment and other related costs for redevelopment project at Island Avenue and Bartram Avenue Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(Y5) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for Gateway Marriott Hotel and related amenities in the vicinity of Island Avenue and Bartram Avenue intersection Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(Z5) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for 52nd Street Gateway Phase I project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(A6) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for 52nd Street Gateway Phase II project Project Allocation 1,300,000(Base Project Allocation - $1,300,000)

(B6) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for 52nd Street Gateway Phase III project Project Allocation 3,700,000(Base Project Allocation - $3,700,000)

(C6) Acquisition, construction, redevelopment and other related costs for projects at 900 North Broad Street Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(D6) Construction, infrastructure, redevelopment and other related costs

Page 284: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

for ASPIRA school expansion projects Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(E6) Construction and other related costs for community center on Old York Road Project Allocation 500,000(Base Project Allocation - $500,000)

(F6) Acquisition, construction, redevelopment and other related costs for projects at site of Benjamin Franklin High School Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (G6) Construction, infrastructure,

redevelopment, abatement of hazardous materials and other related costs for site of Beury Building on North Broad Street Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(H6) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for Building 16 project at former Philadelphia Naval Yard Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (I6) Acquisition, construction,

infrastructure, redevelopment, abatement of hazardous materials and other related costs for Building 18 project at former Philadelphia Naval Yard Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (J6) Construction, infrastructure,

redevelopment and other related costs for Bustleton Bengals gymnasium project Project Allocation 300,000(Base Project Allocation - $300,000)

(K6) Construction, redevelopment and other related costs for community

Page 285: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

center in Bustleton section of the city Project Allocation 1,300,000(Base Project Allocation - $1,300,000)

(L6) Acquisition, construction, redevelopment and other related costs for medical rehabilitation facility, including ground level rental spaces, in Grays Ferry section of the city Project Allocation 8,500,000(Base Project Allocation - $8,500,000)

(M6) Construction and other related costs for 52nd Street commercial corridor redevelopment Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(N6) Acquisition, redevelopment and other related costs for Charles M. Wingfield Community Center Project Allocation 500,000(Base Project Allocation - $500,000)

(O6) Acquisition, construction and other related costs for children's learning center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(P6) Acquisition, construction, infrastructure, redevelopment and other related costs for projects related to Cristo Rey Philadelphia High School Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(Q6) Acquisition, construction, redevelopment and other related costs for Divine Lorraine property Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(R6) Construction, infrastructure and other related costs for streetscape improvements in East Falls Riverfront Business District Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(S6) Construction, infrastructure, redevelopment and other related costs for outpatient center

Page 286: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(T6) Acquisition, construction, infrastructure, redevelopment and other related costs for supermarket project on West Erie Avenue Project Allocation 4,375,000(Base Project Allocation - $4,375,000)

(U6) Acquisition, construction, infrastructure, redevelopment and other related costs for supermarket project on West Erie Avenue Project Allocation 4,375,000(Base Project Allocation - $4,375,000)

(V6) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for community center Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(W6) Acquisition, construction, redevelopment and other related costs for projects relating to Franklin Learning Center Project Allocation 7,500,000(Base Project Allocation - $7,500,000)

(X6) Acquisition, construction, infrastructure, redevelopment and other related costs for projects relating to George Institute Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(Y6) Acquisition, construction, infrastructure and other related costs for Friends Housing Cooperative, Inc., projects Project Allocation 7,467,000(Base Project Allocation - $7,467,000)

(Z6) Acquisition, construction, redevelopment and other related costs for rehabilitation of building for use as family and health care facility Project Allocation 1,925,000(Base Project Allocation - $1,925,000)

(A7) Acquisition, construction and other related costs for Green Tree School

Page 287: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B7) Acquisition, construction, redevelopment and other related costs for affordable housing and retail development facility Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(C7) Construction, redevelopment and other related costs for Hunting Park revitalization project Project Allocation 1,300,000(Base Project Allocation - $1,300,000)

(D7) Acquisition, construction, redevelopment and other related costs for development of housing and supportive services infrastructure for special needs populations Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(E7) Construction, infrastructure, redevelopment and other related costs for inpatient, outpatient, emergency and clinical facilities Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F7) Acquisition, construction, redevelopment and other related costs for projects at site of Julia R. Masterman High School Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(G7) Acquisition, construction, redevelopment and other related costs for Lehigh Somerset neighborhood revitalization Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(H7) Acquisition, construction, infrastructure, redevelopment and other related costs for projects relating to Mazzoni Center Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(I7) Acquisition, construction, redevelopment and other related costs

Page 288: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

for Metropolitan Opera House Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(J7) Construction and other related costs for multipurpose community facility Project Allocation 550,000(Base Project Allocation - $550,000)

(K7) Acquisition, construction, redevelopment and other related costs for project at site of North Broad Street Salvation Army Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (L7) Construction, infrastructure,

redevelopment and other related costs for transit center project in north Philadelphia Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (M7) Acquisition, construction,

infrastructure, redevelopment and other related costs for revitalization projects in northwest Philadelphia Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(N7) Acquisition, construction, redevelopment and other related costs for project at site of Parkway Center City High School Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(O7) Construction, infrastructure, redevelopment and other related costs for projects at Philadelphia Zoo Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (P7) Acquisition, construction and other

related costs for Philly Fundamentals project Project Allocation 700,000(Base Project Allocation - $700,000)

(Q7) Infrastructure, redevelopment and other related costs for renovations to Pyramid Temple No. 1, including

Page 289: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

elevator replacement Project Allocation 500,000(Base Project Allocation - $500,000)

(R7) Acquisition, construction, infrastructure, redevelopment and other related costs for Richard Allen Preparatory School expansion project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(S7) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in Roxborough District Project Allocation 500,000(Base Project Allocation - $500,000)

(T7) Construction, redevelopment, abatement of hazardous materials and other related costs for the Self Help Movement restoration and beautification project Project Allocation 750,000(Base Project Allocation - $750,000)

(U7) Construction, redevelopment and other related costs for health center facility Project Allocation 300,000(Base Project Allocation - $300,000)

(V7) Acquisition, construction, redevelopment and other related costs for Stevens property on North Broad Street Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(W7) Acquisition, construction, redevelopment and other related costs for projects at Stutz property Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(X7) Acquisition, infrastructure improvements and construction for Taller Puertorriqueno, Inc., expansion project Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(Y7) Construction, infrastructure, redevelopment and other related costs

Page 290: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

for research and clinical care facilities Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(Z7) Acquisition, construction and other related costs for University of the Sciences Project Allocation 25,000,000(Base Project Allocation -

$25,000,000) (A8) Construction and other related costs

for Upsala Renewal project Project Allocation 750,000(Base Project Allocation - $750,000)

(B8) Construction, infrastructure and other related costs for redevelopment of vacant building on Duval Street Project Allocation 500,000(Base Project Allocation - $500,000)

(C8) Acquisition, construction and other related costs for community center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(D8) Construction, infrastructure and other related costs for projects for Philadelphia Freedom Valley YMCA West Philadelphia branch Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(E8) Acquisition, construction, redevelopment and other related costs for projects at site of William Penn High School Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) (F8) Construction, infrastructure,

redevelopment and other related costs for development of properties in west Philadelphia Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(G8) Acquisition, infrastructure, construction, redevelopment, abatement of hazardous materials and other related costs for commercial and mixed-use property development of

Page 291: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

vacant properties in Wynnefield Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (H8) Acquisition, construction,

redevelopment and other related costs for YESHA Family Care Center Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(I8) Construction, acquisition, infrastructure and related costs for the expansion and redevelopment of The Center for Autism Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (J8) Construction, abatement of hazardous

materials and other related costs to renovate the historic Carpenter Shop on the campus of the Friends Hospital to become a community center Project Allocation 500,000(Base Project Allocation - $500,000)

(K8) Acquisition, construction, infrastructure and other related costs for multistory facility spanning Cecil B. Moore Avenue and Oxford Street along Broad Street Project Allocation 25,000,000(Base Project Allocation -

$25,000,000) (L8) Acquisition, construction and other

related costs for CORD Advanced Manufacturing Training Center projects Project Allocation 2,373,000(Base Project Allocation - $2,373,000)

(M8) Construction, infrastructure, redevelopment and other related costs to rehabilitate a historically certified former grain silo building known as the Granary Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(N8) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for Independence Seaport Museum at Penn's

Page 292: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Landing Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(O8) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for preschool project at site of Mill Creek Community and Cultural Center Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(P8) Construction and other related costs for Christy Recreation Center improvement project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(Q8) Construction, infrastructure and other costs related to the Core Project of the Philadelphia Museum of Art Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (R8) Construction, infrastructure,

redevelopment and other related costs for Broad Street Ministry's improvements to the historic building along Avenue of the Arts Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(S8) Acquisition, construction, infrastructure, redevelopment and other related costs for the relocation and expansion of the Council of Spanish Speaking Organizations, Inc. Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(T8) Construction, infrastructure and other related costs for new University City Commercial Health Care Innovation Center building Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(U8) Raymond and Miriam Klein JCC, design, infrastructure, construction and other related costs, including alternative energy projects, for new and existing buildings and facilities

Page 293: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(V8) Construction, infrastructure, redevelopment and other related costs for Museum of Sports Project Allocation 1,200,000(Base Project Allocation - $1,200,000)

(52) Pike County (i) (Reserved)

(53) Potter County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (54) Schuylkill County

(i) Schuylkill Economic Development Corporation (A) Acquisition, infrastructure,

construction, utilities extensions and roadway improvements for development of Schuylkill Airport Business Park in Foster Township Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Acquisition, infrastructure, construction and utilities extensions for expansion of Deer Lake Industrial Park Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(C) Construction of industrial shell building at Tidewood Industrial Park Project Allocation 1,375,000(Base Project Allocation - $1,375,000)

(D) Acquisition, infrastructure, construction and other related costs for rehabilitation of St. Catherine's Medical Complex located in Butler Township and retrofitting it into a multipurpose facility Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(E) Construction of commercial and industrial buildings at Highridge

Page 294: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Business Park Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(F) Construction of industrial shell building at Highridge Business Park Project Allocation 2,925,000(Base Project Allocation - $2,925,000)

(G) Acquisition, infrastructure, construction and utilities extensions for development and construction of 400-acre business park Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(ii) Coaldale Borough (A) Acquisition, infrastructure,

renovation, construction and other related costs for development of outpatient medical facility and dialysis treatment center Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(B) Infrastructure, rehabilitation, construction and other related costs for expansion of St. Luke's Miners Hospital Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (iii) Mahanoy City Borough

(A) Acquisition, infrastructure, renovation, construction and other related costs for development of new outpatient medical office building Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(iii.1) City of Pottsville (A) Infrastructure, construction and

other related costs for infrastructure improvements to Schuylkill Health System facilities Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iv) Tamaqua Borough (A) Acquisition, infrastructure,

renovation, construction and other related costs for development of facility to house state-of-the-art

Page 295: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

police station, antiblight education center, emergency center and magisterial district court Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Acquisition, infrastructure, renovation, construction and other related costs for new state-of-the-art public library to be constructed in downtown historic district Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(C) Acquisition, infrastructure, renovation, construction and other related costs for redevelopment of downtown business district Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(D) Acquisition, infrastructure, renovation, construction, utilities extensions and other related costs for construction of high-tech industrial community park on east end of borough along Route 209 Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(55) Snyder County (i) (Reserved) (ii) Shamokin Dam Borough and Monroe Township

(A) Construction, infrastructure, redevelopment and other related costs for conversion of coal-fired power plant to natural gas-fired combined-cycle power plant Project Allocation 80,000,000(Base Project Allocation -

$80,000,000) (56) Somerset County (i) County projects

(A) Land acquisition, construction, infrastructure and related costs for the expansion of Riggs Industries and its subsidiaries Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Acquisition, construction,

Page 296: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure and other related costs for ambulatory care center Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, construction, infrastructure and other related costs for outdoor recreational tourism facility and related projects Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(D) Acquisition, construction, infrastructure and other related costs for natural gas refueling station Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(E) Acquisition, construction, infrastructure and other related costs for expansion of oil and gas wastewater treatment facility Project Allocation 50,000,000(Base Project Allocation -

$50,000,000)

(i.1) Quemahoning Township (A) Construction, infrastructure and

other related costs for rail projects relating to economic development projects Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(i.2) Shade Township (A) Acquisition, construction,

infrastructure and other related costs for rail siding and transloading facility Project Allocation 2,100,000(Base Project Allocation - $2,100,000)

(ii) Somerset Borough (A) Construction, infrastructure and

other costs related to Somerset Hospital campus improvement project Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(iii) Somerset Township (A) Construction, infrastructure and

other costs related to Twin Lakes Rehabilitation Center project Project Allocation 500,000

Page 297: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $500,000) (iv) Windber Borough

(A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for educational facility projects relating to Windber Coal Heritage Museum Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(57) Sullivan County (i) (Reserved) (ii) Laporte Borough

(A) Infrastructure, redevelopment and other related costs for upgrades to medical equipment and services for rural health clinic Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(58) Susquehanna County (i) The Progress Authority

(A) Infrastructure improvements, renovations, construction and other related costs for improvements to Camp Archbald Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii) Central Bradford Industrial Development Authority (A) Construction, acquisition,

infrastructure, redevelopment and other related costs for a business park along the I-81 corridor Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iii) Bridgewater Township (A) Construction, infrastructure and

other related costs for an extension of a public water line Project Allocation 500,000(Base Project Allocation - $500,000)

(iv) Montrose Borough (A) Construction, infrastructure and

other related costs for an outpatient rehabilitation department, infusion therapy, cardiopulmonary and administrative and business offices to

Page 298: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

the hospital campus for Endless Mountains Health Systems Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(59) Tioga County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Infrastructure, renovation,

construction and other related costs for state-of-the-art cancer center at Soldiers and Sailors Memorial Hospital Project Allocation 2,100,000(Base Project Allocation - $2,100,000)

(C) Infrastructure, renovation, construction and other related costs for a same day surgery unit and state-of-the-art emergency department at Soldiers and Sailors Memorial Hospital Project Allocation 18,500,000(Base Project Allocation -

$18,500,000) (ii) Tioga County Development Corporation

(A) Design, engineering, site development, infrastructure, demolition, construction and other costs related to redevelopment of the former E. H. Hall, Inc./WESTAN Tannery brownfield site into Westfield Business Park Project Allocation 4,600,000(Base Project Allocation - $4,600,000)

(iii) Wellsboro Borough (A) Redevelopment, construction and other

related costs for community athletic complex Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(iv) Wellsboro Borough and Richmond Township (A) Construction, acquisition, expansion,

renovation and other related costs for Susquehanna Health/Laurel Health Entities/North Penn Comprehensive

Page 299: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Health Services Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (60) Union County

(i) (Reserved) (ii) Kelly Township

(A) Transportation infrastructure improvements associated with expansion of Evangelical Community Hospital facilities on grounds of existing hospital and on adjacent land Project Allocation 4,100,000(Base Project Allocation - $4,100,000)

(61) Venango County (i) Oil Region Alliance

(A) Acquisition, infrastructure, construction and other related costs for development of senior living multiphase care facility, to include independent cottage campus, assisted living and nursing home care Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(62) Warren County (i) County projects

(A) Acquisition, infrastructure, construction and other related costs for economic project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (63) Washington County

(i) County projects (A) Acquisition, construction,

infrastructure, redevelopment and other costs related to mixed-use business park Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(B) Acquisition, construction, infrastructure, redevelopment and other costs related to development of pad-ready sites along I-79 and Route 19 corridor Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

Page 300: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(C) Acquisition, construction, infrastructure, redevelopment and other costs related to economic development projects Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (D) Acquisition, construction,

infrastructure and other related costs for redevelopment projects relating to natural gas industry Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(E) Acquisition, construction, infrastructure and other related costs for redevelopment projects relating to natural gas industry Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(F) Construction, infrastructure and other related costs for Skypointe Business Park project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(G) Acquisition, construction, infrastructure and other related costs for development of sites adjacent to Washington County Airport Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (H) Construction, rehabilitation and

other related costs for senior living project Project Allocation 2,050,000(Base Project Allocation - $2,050,000)

(I) Construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment and renovation of historical YWCA building on West Maiden Street Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(J) Acquisition, infrastructure and other related costs for development of site along Route 19 and I-70 corridor Project Allocation 5,000,000

Page 301: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $5,000,000) (K) Acquisition, construction,

infrastructure redevelopment and other related costs for development of pad-ready sites Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(L) Construction, abatement of hazardous materials and other related costs for redevelopment of former industrial sites and brownfields Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Allenport Borough (A) Acquisition, construction,

infrastructure, redevelopment and other costs related to site improvement project at Mon River Industrial Park Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (ii.1) Buffalo Township

(A) Acquisition, construction, infrastructure and other related costs for mixed-use trail Project Allocation 500,000(Base Project Allocation - $500,000)

(B) Construction, infrastructure and other related costs for water line installation in Blaine and Buffalo Townships Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii.2) Burgettstown Borough (A) Construction, infrastructure and

other related costs for Starpointe Business Park project Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (ii.3) California Borough

(A) Construction, redevelopment and other related costs for Center in the Woods improvement project Project Allocation 500,000(Base Project Allocation - $500,000)

Page 302: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(ii.4) Canonsburg Borough (A) Acquisition, construction,

infrastructure improvements and other costs related to a Pop Music Hall of Fame project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii.5) Carroll Township (A) Construction, infrastructure

redevelopment and other related costs for projects at Mon Valley YMCA Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, construction, infrastructure and other related costs for loadout facility Project Allocation 4,750,000(Base Project Allocation - $4,750,000)

(C) Construction, redevelopment and other related costs for Monongahela Valley Hospital Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(ii.6) Cecil Township (A) Acquisition, construction,

infrastructure and other related costs for park improvements Project Allocation 1,250,000(Base Project Allocation - $1,250,000)

(iii) Hanover Township (A) Acquisition, construction,

infrastructure, redevelopment and other costs related to Starpointe Business Park expansion project Project Allocation 15,000,000(Base Project Allocation -

$15,000,000) (iii.1) Jefferson Township

(A) Acquisition, construction, infrastructure, redevelopment and other related costs for projects at Meadowcroft Rockshelter and historic village Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iii.2) City of Monongahela (A) Acquisition, construction,

Page 303: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure, redevelopment, abatement of hazardous materials and other related costs for projects relating to Noble J. Dick Aquatorium Project Allocation 600,000(Base Project Allocation - $600,000)

(iii.3) Peters Township (A) Construction, infrastructure,

redevelopment, renovation and other related costs for improvements to Peterswood Park Project Allocation 650,000(Base Project Allocation - $650,000)

(B) Construction, infrastructure, redevelopment, renovation and other related costs for Peters Township Amphitheater Project Allocation 500,000(Base Project Allocation - $500,000)

(iii.4) (Reserved) (iv) South Strabane Township

(A) Acquisition, construction, infrastructure, redevelopment and other costs related to Zediker Station Business Park improvement project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Acquisition, construction,

infrastructure, redevelopment and other costs related to development of business park in the township Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (C) Acquisition, construction,

infrastructure, redevelopment and other costs related to locating sites for support companies for natural gas industry Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(D) Acquisition, construction, infrastructure, redevelopment and other costs related to redevelopment of former industrial sites for new and expanding businesses

Page 304: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(E) Acquisition, construction, infrastructure, redevelopment and other costs related to Mon Valley receiving and loading facility development project Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F) Acquisition, construction, infrastructure, redevelopment and other costs related to development of sites adjacent to Washington County Airport for aviation-related business park Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (G) Acquisition, construction,

infrastructure, redevelopment and other costs related to Skypointe business park Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(H) Acquisition, infrastructure, construction and other related costs for former foundry site mixed-use redevelopment project Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(I) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of former industrial sites Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(J) Acquisition, construction, infrastructure, redevelopment and other related costs for business park project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (K) Acquisition, construction,

infrastructure, redevelopment and other related costs for Zediker

Page 305: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Station Business Park Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (64) Wayne County

(i) (Reserved) (65) Westmoreland County

(i) County projects (A) Construction, renovation,

modernization, reconstruction and expansion of Excela Health System Westmoreland Hospital Intensive Care and short-stay units Project Allocation 4,500,000(Base Project Allocation - $4,500,000)

(B) Construction of Excela Health System Latrobe Ambulatory Care Center Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (C) Construction of Excela Health System

Orthopedic Center of Excellence Project Allocation 11,500,000(Base Project Allocation -

$11,500,000) (D) Infrastructure, renovation, abatement

of hazardous materials, construction and other related costs for state-of-the-art Southern Alleghenies Museum of Art Education, Conference and Collection Management Center Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(ii) Latrobe Redevelopment Authority (A) Construction of LEED-certified

multipurpose athletic, educational and cultural center Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(iii) Westmoreland County Industrial Development Corporation (A) Acquisition, demolition, site

preparation, environmental remediation, construction and other costs related to redevelopment of brownfield and blighted property in City of Jeannette for future

Page 306: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

commercial use Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Acquisition, infrastructure extensions and improvements, construction and other related costs for 150-acre industrial park Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(iv) City of Lower Burrell (A) Acquisition, construction,

demolition, infrastructure, redevelopment and other costs related to Lower Burrell redevelopment project for commercial reuse and development Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(v) City of New Kensington (A) Construction, acquisition,

infrastructure, redevelopment and other related costs for renovation and rehabilitation of downtown business district Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(vi) East Huntingdon Township (A) Construction, infrastructure,

redevelopment and other related costs for Pittsburgh Supercomputing Center projects Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(vii) Hempfield Township (A) Acquisition, construction,

infrastructure, redevelopment and other related costs for development projects Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (viii) City of Monessen

(A) Construction, redevelopment and other related costs for rehabilitation of downtown business district Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(B) Construction, infrastructure and

Page 307: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other related costs for rail expansion project Project Allocation 750,000(Base Project Allocation - $750,000)

(ix) North Huntingdon Township (A) Construction and other related costs

for development of regional facility to be utilized as a professional development center for effective teaching and learning of science, technology, engineering and mathematics Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(x) Upper Burrell Township (A) Acquisition, infrastructure

improvements, construction and other related costs for industrial park Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(66) Wyoming County (i) (Reserved)

(67) York County (i) County projects

(A) Land acquisition, design, adaptive reuse and construction of buildings, exhibits and related site infrastructure for development of Susquehanna River visitor education center Project Allocation 2,200,000(Base Project Allocation - $2,200,000)

(i.1) Redevelopment Authority of the City of York (A) Acquisition, infrastructure,

renovation, construction and rehabilitation for revitalization of West Market Street between George and Beaver Streets Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(B) Acquisition, infrastructure, renovation, construction and other related costs, including abatement of hazardous materials, for redevelopment of Northwest Triangle site and construction of commercial,

Page 308: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

residential and retail mixed-use facilities Project Allocation 6,000,000(Base Project Allocation - $6,000,000)

(ii) Redevelopment Authority of the County of York (A) Infrastructure, renovation,

construction and other related costs for redevelopment of downtown Hanover, including historic buildings, blighted buildings and Hanover State Theatre Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(B) Infrastructure, construction and other related costs for renovations and rehabilitation of York College of Pennsylvania campuses, including classrooms, laboratories, offices and student support facilities Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (C) Infrastructure, construction and

other related costs for renovations and rehabilitation of York College of Pennsylvania's North Campus, including classrooms, laboratories, offices, student support and other academic facilities Project Allocation 12,000,000(Base Project Allocation -

$12,000,000) (iii) City of York

(A) Construction, renovation, infrastructure and other related costs for redevelopment and revitalization of Shipley Energy property Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (B) Construction, infrastructure,

acquisition, redevelopment and other related costs for construction of new buildings in the City of York Project Allocation 15,000,000(Base Project Allocation -

$15,000,000)

Page 309: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(iv) Red Lion Borough (A) Construction, infrastructure and

other related costs for expansion of Kaltreider-Benfer Library Project Allocation 1,040,000(Base Project Allocation - $1,040,000)

(v) Spring Grove Borough (A) Construction, abatement of hazardous

materials, renovation and other related costs for Glatfelter to make modifications to existing cogenerator boiler and replacement of three existing coal-fired boilers with new natural gas-fired package boilers, a new natural gas pipeline and remediation and demolition of old recovery building containing asbestos, lead and biological hazards to comply with Boiler Maximum Achievable Control Technology regulations Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(68) Multiple counties (i) Crawford, Erie, Mercer, Venango and

Warren Counties (A) Acquisition, infrastructure,

renovation and other related costs for demolition of existing structures and construction of several incubator facilities Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(ii) Centre, Columbia, Lackawanna, Luzerne, Mifflin, Montour and Northumberland Counties (A) Acquisition, construction,

infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research and provide other related activities for Geisinger Health System Project Allocation 30,000,000(Base Project Allocation -

$30,000,000) (iii) Pike and Wayne Counties

(A) Wayne Economic Development Corporation, land acquisition,

Page 310: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

construction, infrastructure development and other related costs for career and technology center Project Allocation 11,000,000(Base Project Allocation -

$11,000,000) (iv) Berks, Lehigh and York Counties

(A) Redevelopment Authority of the City of York, acquisition, site preparation, infrastructure, construction and other related costs for Think Loud Development project in Cities of Reading, Allentown and York, including renovations and strategic reuse of historic properties and installation of fiber optic infrastructure Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (v) Allegheny, Beaver, Cambria, Erie,

Washington and Westmoreland Counties (A) Acquisition, construction,

infrastructure, redevelopment and other costs related to Children's Hospital of Pittsburgh of UPMC Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (vi) Lackawanna and Luzerne Counties

(A) Acquisition, construction, infrastructure and other costs related to Mine Drainage Treatment Works project Project Allocation 18,000,000(Base Project Allocation -

$18,000,000) (vii) Montgomery and Philadelphia Counties

(A) Construction, infrastructure and other costs related to Saint Joseph's University improvement project Project Allocation 21,300,000(Base Project Allocation -

$21,300,000) (B) City Avenue Special Services

District. Construction, infrastructure improvements and other related costs

Page 311: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

on City Avenue for pedestrian and vehicular hazard mitigation and storm water management in Lower Merion Township and the City of Philadelphia Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(viii) Berks and Montgomery Counties (A) Construction, infrastructure and

other related costs for rehabilitation of historic Civil War era railroad project Project Allocation 4,000,000(Base Project Allocation - $4,000,000)

(ix) Fayette and Somerset Counties (A) Infrastructure improvements, new

construction and renovations at Seven Springs Mountain Resort, Seven Springs Borough Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(x) Allegheny and Beaver Counties (A) Site development, new construction,

acquisition, expansion, additions, infrastructure, improvements, rehabilitation, renovation and other related costs for automated food distribution center on a site owned by Pittsburgh DC 2013, LLC Project Allocation 20,000,000(Base Project Allocation -

$20,000,000) Section 7. Itemization of flood control projects.

Additional capital projects in the category of flood control projects to be constructed by the Department of Environmental Protection, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated costs, as follows:

Project Total Project Allocation

(1) Department of Environmental Protection (i) Allegheny County

(A) Funding for flood protection and rehabilitation of Pine Creek in Shaler Township Project Allocation 900,000(Base Project Allocation - $810,000) (Design & Contingencies - $90,000)

Page 312: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(B) Infrastructure, construction and other costs related to Pine Creek Watershed flood control project, including reconstruction of culvert and retrofit of three existing detention basins Project Allocation 96,000(Base Project Allocation - $80,000) (Design & Contingencies - $16,000)

(ii) Bucks County (A) Construction and other related costs

to construct stream bed line with riprap and bank stabilization to control erosion and flooding in Langhorne Borough Project Allocation 100,000(Base Project Allocation - $100,000)

(B) Rehabilitation and other related costs for retention basin for Poquessing Creek in Bensalem Township Project Allocation 500,000(Base Project Allocation - $500,000)

(iii) Cambria County (A) Additional funding for DGS Project

184-34, City of Johnstown, channel improvements to St. Clair Run, including rehabilitation and mitigation Project Allocation 1,350,000(Base Project Allocation - $1,215,000) (Design & Contingencies - $135,000)

(B) Funding for flood protection of Solomon's Run, including rehabilitation and mitigation, in City of Johnstown Project Allocation 540,000(Base Project Allocation - $486,000) (Design & Contingencies - $54,000)

(C) Rehabilitate five levee drainage structures along Chest Creek and Flannigan Run, including mitigation, in Patton Borough and Chest and Elder Townships Project Allocation 1,350,000(Base Project Allocation - $1,215,000) (Design & Contingencies - $135,000)

(D) Funding for flood protection of

Page 313: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Solomon's Run, including rehabilitation and mitigation, in Stonycreek Township and Dale Borough Project Allocation 900,000(Base Project Allocation - $810,000) (Design & Contingencies - $90,000)

(iv) Chester County (A) Construction, infrastructure and

other related costs for storm water control in Schuylkill Township Project Allocation 7,000,000(Base Project Allocation - $7,000,000)

(B) Construction, infrastructure and other related costs to address existing watershed problems, accelerated stream bank erosion and water quality in Tredyffrin Township Project Allocation 9,000,000(Base Project Allocation - $9,000,000)

(C) Acquisition, construction, infrastructure, redevelopment and other related costs for flood mitigation projects along Chester Creek, including upgrades to levee Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (v) Columbia County

(A) Rehabilitation and other related costs for bank stabilization, gravel bar removal and debris removal at Columbia County Soil Conservation Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(vi) Delaware County (A) Construction, infrastructure and

other costs related to installation of stream gauge on Darby Creek Project Allocation 538,000(Base Project Allocation - $538,000)

(B) Acquisition, demolition, construction, infrastructure and other costs related to Darby Borough flood remediation program Project Allocation 6,200,000(Base Project Allocation - $6,200,000)

(C) Upgrades and deferred maintenance,

Page 314: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Phase VII Project Allocation 550,000(Base Project Allocation - $550,000)

(vii) Lackawanna County (A) Rehabilitate seven levee drainage

structures along Lackawanna River, including mitigation, in Mayfield Borough Project Allocation 2,700,000(Base Project Allocation - $2,430,000) (Design & Contingencies - $270,000)

(B) Funding for Moosic flood protection project, including rehabilitation and mitigation, along Spring Creek Project Allocation 2,700,000(Base Project Allocation - $2,430,000) (Design & Contingencies - $270,000)

(C) Funding for Blakely flood protection project, including rehabilitation and mitigation, along Hull Creek in Blakely and Dickson City Boroughs Project Allocation 900,000(Base Project Allocation - $810,000) (Design & Contingencies - $90,000)

(D) Funding for Scranton flood control project, including rehabilitation and mitigation, along Roaring Brook Project Allocation 4,500,000(Base Project Allocation - $4,050,000) (Design & Contingencies - $450,000)

(E) Construction, infrastructure and other related costs for Racket Brook Creek retaining wall replacement project in City of Carbondale Project Allocation 1,540,000(Base Project Allocation - $1,540,000)

(F) Construction, infrastructure and other related costs for Mayfield Borough levee extension project Project Allocation 772,000(Base Project Allocation - $772,000)

(G) Construction, infrastructure and other related costs for Tinklepaugh Creek flood mitigation projects in Archbald and Blakely Boroughs Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

Page 315: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(viii) Luzerne County (A) Additional funding for DGS Project

182-3, flood protection project for Wadham Creek, including rehabilitation and mitigation, in Plymouth Borough Project Allocation 540,000(Base Project Allocation - $486,000) (Design & Contingencies - $54,000)

(B) Funding for Mocanaqua flood protection project, including rehabilitation and mitigation along Turtle Creek, in Conyngham Township Project Allocation 540,000(Base Project Allocation - $486,000) (Design & Contingencies - $54,000)

(ix) Montgomery County (A) Funding for Ambler flood protection

project, including acquisition, infrastructure, rehabilitation and construction of storm water bypass facility, culverts and upstream neighborhood regional detention basins Project Allocation 2,475,000(Base Project Allocation - $2,250,000) (Design & Contingencies - $225,000)

(B) Funding for Turnpike Drive storm water improvement project, including infrastructure, rehabilitation and construction of regional storm water management basin in Upper Moreland Township Project Allocation 550,000(Base Project Allocation - $500,000) (Design & Contingencies - $50,000)

(C) Acquisition, construction, infrastructure and other costs related to Glenside Flood Control buyout project in Cheltenham Township Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(D) Construction, infrastructure and other costs related to flood control improvement projects in headwaters of Tookany Creek in Cheltenham Township Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(E) Construction, infrastructure and

Page 316: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

other costs related to Glenside flood control project Phase II in Cheltenham Township Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(F) Acquisition, construction, infrastructure and other costs related to Glenside area flood protection project Project Allocation 8,000,000(Base Project Allocation - $8,000,000)

(G) Construction, infrastructure and other costs related to Glenside area flood protection project, Phase II, in Cheltenham Township along Tookany Creek Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(H) Construction, infrastructure and other related costs to Tookany Creek headwaters flood control project Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(x) Northampton County (A) Permanent reconstruction of storm

sewer system causing the flooding of private, residential properties in Bangor Borough Project Allocation 506,000(Base Project Allocation - $506,000)

(B) Repairs to mitigate flood water in several areas throughout Lower Saucon Township Project Allocation 1,250,000(Base Project Allocation - $1,250,000)

(xi) Northumberland County (A) Construction, infrastructure,

acquisition and other related costs for rehabilitation of Shamokin Creek and Quaker Run Creek channels to alleviate flooding in Coal Township Project Allocation 14,000,000(Base Project Allocation -

$14,000,000) (xii) Potter County

(A) Rehabilitate three levee drainage structures along Allegheny River and

Page 317: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Mill Creek, including mitigation, in Coudersport Borough Project Allocation 900,000(Base Project Allocation - $810,000) (Design & Contingencies - $90,000)

(xiii) Schuylkill County (A) Funding for McAdoo flood protection

project, including rehabilitation and mitigation, along Celebration Creek in McAdoo Borough, Kline and Banks Townships Project Allocation 540,000(Base Project Allocation - $486,000) (Design & Contingencies - $54,000)

(xiv) Somerset County (A) Rehabilitate 25 levee drainage

structures along Paint Creek, including mitigation, in Windber and Paint Boroughs Project Allocation 4,950,000(Base Project Allocation - $4,455,000) (Design & Contingencies - $495,000)

(B) Rehabilitate 18 levee drainage structures along Coxes Creek, including mitigation, in Rockwood Borough Project Allocation 3,600,000(Base Project Allocation - $3,240,000) (Design & Contingencies - $360,000)

(C) Construction, infrastructure and other costs related to North Fork dam and bridge modifications and repair project Project Allocation 10,000,000(Base Project Allocation -

$10,000,000) (D) Construction, redevelopment,

rehabilitation and other related costs for Hyndman Borough levee Project Allocation 500,000(Base Project Allocation - $500,000)

(xv) Warren County (A) Rehabilitate nine levee drainage

structures along Glade Run, including mitigation, in City of Warren Project Allocation 1,800,000(Base Project Allocation - $1,620,000)

Page 318: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Design & Contingencies - $180,000) (xvi) Wayne County

(A) Funding for White Mills channel improvement project, including rehabilitation and mitigation along Lollipop Creek, at White Mills Village, Texas Township Project Allocation 540,000(Base Project Allocation - $486,000) (Design & Contingencies - $54,000)

(xvii) Westmoreland County (A) Rehabilitate existing flood

protection along Jacks Run, including levee rehabilitation, slope stabilization, flood wall repairs, concrete channel construction and replacement of three drainage structures in South Greensburg Borough Project Allocation 3,600,000(Base Project Allocation - $3,240,000) (Design & Contingencies - $360,000)

(B) Additional funding for DGS Project 182-7, flood protection in Jeannette City and Penn Borough Project Allocation 5,000,000(Base Project Allocation - $5,000,000)

(C) Acquisition, construction, infrastructure and other related costs for flood plain improvements, retention ponds, retaining walls and acid mine mitigation sites in Murrysville Borough Project Allocation 750,000(Base Project Allocation - $750,000)

(xviii) Somerset and Fayette Counties (A) Rehabilitate 18 levee drainage

structures along the Youghiogheny and Casselman Rivers, including mitigation, in Confluence Borough Project Allocation 4,050,000(Base Project Allocation - $3,645,000) (Design & Contingencies - $405,000)

(xix) Chester, Delaware and Montgomery Counties (A) Regional watershed improvement

project, including funding for ACE feasibility study

Page 319: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 125,000(Base Project Allocation - $125,000)

Section 8. Itemization of Keystone Recreation, Park and Conservation Fund projects.

Projects in the category of public improvement projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by current revenues of the Keystone Recreation, Park and Conservation Fund are hereby itemized, together with their respective estimated costs, as follows:

Project Total Project Allocation

(1) Department of Conservation and Natural Resources (i) Bald Eagle State Forest

(A) Rehabilitate or replace Sand Mountain Trail Project Allocation 316,000(Base Project Allocation - $316,000)

(B) Upgrade sewage treatment plant Project Allocation 500,000(Base Project Allocation - $500,000)

(ii) Bald Eagle State Park (A) Renovate park office to meet

accessibility requirements and improve visitor services Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(iii) Blue Knob State Park (A) Pave and replace culverts at Willow

Springs Road

Project Allocation 250,000(Base Project Allocation - $250,000)

(iv) Buchanan State Forest (A) Construct Buchanan Resource

Management Center Project Allocation 1,750,000(Base Project Allocation - $1,750,000)

(v) Caledonia State Park (A) Replace shower houses and comfort

stations in Chinquapin Hill Campground and renovate campsites Project Allocation 1,300,000(Base Project Allocation - $1,300,000)

(vi) Codorus State Park (A) Replace sailboat areas and restrooms

and rehabilitate sewage system

Page 320: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 450,000(Base Project Allocation - $450,000)

(vii) Cook Forest State Park (A) Rehabilitate water storage tanks,

including cleaning, painting, replacing level controls and maintenance access Project Allocation 600,000(Base Project Allocation - $600,000)

(B) Repair sewage line inflow and infiltration Project Allocation 250,000(Base Project Allocation - $250,000)

(viii) Cook State Forest (A) Replace sewage lines

Project Allocation 175,000(Base Project Allocation - $175,000)

(ix) Delaware Canal State Park (A) Replace Ferry Street Bridge

Project Allocation 900,000(Base Project Allocation - $900,000)

(B) Replace Smithtown Bridge No. 5 Project Allocation 800,000(Base Project Allocation - $800,000)

(C) Replace or rehabilitate Phillips Mills, Smithtown No. 3 and Lower Limeport Bridges Project Allocation 1,200,000(Base Project Allocation - $1,200,000)

(D) Replace culverts on Rabbit Run Project Allocation 750,000(Base Project Allocation - $750,000)

(E) Reconstruct canal overflows along canal Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(x) Denton Hill State Park (A) Upgrade, rehabilitation or

replacement of ski lift, lighting, equipment, parking and structures to improve operations and safety to public Project Allocation 750,000(Base Project Allocation - $750,000)

(xi) Evansburg State Park (A) Replace sewer lines throughout park

Project Allocation 480,000

Page 321: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $480,000) (xii) Frances Slocum State Park

(A) Demolish sewage treatment plant and construct municipal sewer connection Project Allocation 900,000(Base Project Allocation - $900,000)

(xii.1) French Creek State Park (A) Construct Schuylkill River Trail

connection Project Allocation 600,000(Base Project Allocation - $600,000)

(xiii) Gifford Pinchot State Park (A) Rehabilitate five shower houses

Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(xiv) Hickory Run State Park (A) Replace pit latrines with modern

comfort stations in two organized group camps Project Allocation 2,200,000(Base Project Allocation - $2,200,000)

(xv) Hills Creek State Park (A) Rehabilitate sewage treatment plant,

sewer lines and lift stations Project Allocation 250,000(Base Project Allocation - $250,000)

(B) Replace campground washhouses Project Allocation 2,500,000(Base Project Allocation - $2,500,000)

(xvi) Lackawanna State Park (A) Rehabilitate pool complex and day-use

area, including renovation of bath houses and addition of space for lifeguard and first aid station Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xvi.1) Lackawanna State Forest (A) Construct pole building for equipment

storage at Thornhurst Project Allocation 244,000(Base Project Allocation - $244,000)

(xvii) Laurel Ridge State Park (A) Replace Laurel Highlands Hiking Trail

Bridge within the park and construct horse trail and parking/camping facilities at Bakers Run Project Allocation 1,600,000

Page 322: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $1,600,000) (xvii.1) Lehigh Gorge State Park

(A) Replace Drake's Creek Bridge No. 0508 Project Allocation 300,000(Base Project Allocation - $300,000)

(B) Repair Glen Onoko Bridge, Phase 1 Project Allocation 300,000(Base Project Allocation - $300,000)

(C) Replace Bald Mountain Bridge Project Allocation 250,000(Base Project Allocation - $250,000)

(xviii) Little Pine State Park (A) Rehabilitate shooting range to meet

current safety and accessibility standards Project Allocation 400,000(Base Project Allocation - $400,000)

(xviii.1) Locust Lake State Park (A) Rehabilitate sewage treatment plant

Project Allocation 300,000(Base Project Allocation - $300,000)

(xix) Loyalsock State Forest (A) Rehabilitate Hillsgrove Ranger

Station equipment storage shed Project Allocation 525,000(Base Project Allocation - $525,000)

(B) Repair Pleasant Stream Road Project Allocation 200,000(Base Project Allocation - $200,000)

(C) Repair Sones Pond Dam, including replacing outlet structure and repairing embankment Project Allocation 300,000(Base Project Allocation - $300,000)

(xix.1) Marsh Creek State Park (A) Emergency spillway concrete repairs

at dam Project Allocation 450,000(Base Project Allocation - $450,000)

(xix.2) Michaux State Forest (A) Construct equipment storage building

Project Allocation 250,000(Base Project Allocation - $250,000)

(xix.3) Park Region 3 (A) Replace HVAC system and upgrade ADA

accessibility at regional office Project Allocation 200,000

Page 323: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $200,000) (xx) Moraine State Park

(A) Upgrade sewage treatment plant Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(B) Rehabilitate and upgrade water treatment plant Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(xxi) Nescopeck State Park (A) Construct culvert at Riley's Pond

Project Allocation 600,000(Base Project Allocation - $600,000)

(xxii) Nockamixon State Park (A) Replace pit latrines with modern

comfort stations Project Allocation 650,000(Base Project Allocation - $650,000)

(B) Replace boat rental docks Project Allocation 400,000(Base Project Allocation - $400,000)

(xxiii) Ohiopyle State Park (A) Repair sewage collection system and

sewage treatment plant to meet current effluent standards Project Allocation 3,500,000(Base Project Allocation - $3,500,000)

(xxiv) Park Region 1 (A) Renovate or replace HVAC system at

regional office Project Allocation 250,000(Base Project Allocation - $250,000)

(xxv) Presque Isle State Park (A) Provide for road flooding mitigation,

Predisaster Mitigation Grant Project Project Allocation 400,000(Base Project Allocation - $400,000)

(B) Replace sand mound Phase 4 B11 and B10 Project Allocation 250,000(Base Project Allocation - $250,000)

(xxvi) Prince Gallitzin State Park (A) Rehabilitate Beaver Valley Marina

Project Allocation 3,000,000(Base Project Allocation - $3,000,000)

(xxvii) Pymatuning State Park (A) Connect Jamestown sewage to sewer

Page 324: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

authority Project Allocation 500,000(Base Project Allocation - $500,000)

(B) Demolish sewage treatment plant at Linesville Project Allocation 250,000(Base Project Allocation - $250,000)

(C) Rehabilitate Linesville Livery Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xxviii) Ricketts Glen State Park (A) Replace pit latrine along Route 118

with modern flush facility Project Allocation 400,000(Base Project Allocation - $400,000)

(B) Replace dam controls and outlet works Project Allocation 800,000(Base Project Allocation - $800,000)

(C) Reconstruct main park road and parking lots with repaving Project Allocation 750,000(Base Project Allocation - $750,000)

(xxix) Ridley Creek State Park (A) Renovate mansion kitchen

Project Allocation 250,000(Base Project Allocation - $250,000)

(xxx) Salt Springs State Park (A) Replace existing sanitary station

with new comfort station, including infrastructure Project Allocation 437,000(Base Project Allocation - $437,000)

(xxxi) Shawnee State Park (A) Pave areas near and around

campgrounds Project Allocation 250,000(Base Project Allocation - $250,000)

(xxxii) Shikellamy State Park (A) Construct permanent causeway

Project Allocation 1,500,000(Base Project Allocation - $1,500,000)

(B) Replace Bag Nos. 6 and 7 and construct permanent causeway Project Allocation 1,000,000(Base Project Allocation - $1,000,000)

(xxxiii) Sinnemahoning State Park (A) Rehabilitate dam gates operators,

Page 325: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

including electrical repairs Project Allocation 250,000(Base Project Allocation - $250,000)

(B) Rehabilitate access roadway to visitors center Project Allocation 250,000(Base Project Allocation - $250,000)

(xxxiv) Sproul State Forest (A) Rehabilitate Bakers Run horse trailer

parking/camping Project Allocation 250,000(Base Project Allocation - $250,000)

(B) Rehabilitate Bakers Run boat launch and canoe access Project Allocation 200,000(Base Project Allocation - $200,000)

(C) Construct Hyner hang gliding landing strip within park Project Allocation 225,000(Base Project Allocation - $225,000)

(xxxv) Susquehannock State Park (A) Rehabilitate roads and drainage and

pave main park roads Project Allocation 250,000(Base Project Allocation - $250,000)

(xxxvi) Tiadaghton State Forest (A) Relocate Trout Run Road

Project Allocation 225,000(Base Project Allocation - $225,000)

(B) Construct trail bridge along Black Forest Trail over Slate Run Project Allocation 200,000(Base Project Allocation - $200,000)

(xxxvi.1) Tioga State Forest (A) Upgrade to Pine Creek Trail and 287

at-grade trail crossing Project Allocation 175,000(Base Project Allocation - $175,000)

(xxxvii) Tobyhanna State Park (A) Pave roads throughout park

Project Allocation 350,000(Base Project Allocation - $350,000)

(xxxviii) Weiser State Forest (A) Construct Weiser Resource Management

Center Project Allocation 3,300,000(Base Project Allocation - $3,300,000)

Page 326: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(xxxix) Worlds End State Park (A) Reconstruct cabin area access

Project Allocation 2,000,000(Base Project Allocation - $2,000,000)

(xl) Yellow Creek State Park (A) Rehabilitate beach area buildings

Project Allocation 600,000(Base Project Allocation - $600,000)

Section 9. Itemization of State forestry bridge projects. Projects in the category of State forestry bridge projects to

be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by oil company franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv) (relating to imposition of tax) are hereby itemized, together with their respective estimated costs, as follows:

Project Total Project Allocation

(1) Cameron County (i) Elk State Forest

(A) Rehabilitate Whitehead Road/Whitehead Run - 9000 Project Allocation 250,000(Base Project Allocation - $250,000)

(B) Replace bridge on Whitehead Road over Whitehead Run Project Allocation 250,000(Base Project Allocation - $250,000)

(C) Replace bridge on Naval Hollow Road over Naval Hollow Creek Project Allocation 150,000(Base Project Allocation - $150,000)

(D) Replace bridge on Ford - administration road over East Branch of Hicks Run Project Allocation 250,000(Base Project Allocation - $250,000)

(E) Replace bridge on Bell Draft Road over McDonald Run Project Allocation 300,000(Base Project Allocation - $300,000)

(F) Replace bridge on Bell Draft Road over Bell Draft Run Project Allocation 200,000(Base Project Allocation - $200,000)

(G) Replace bridge on Bell Draft Road over Shaffer Draft

Page 327: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 150,000(Base Project Allocation - $150,000)

(2) Centre County (i) Moshannon State Forest

(A) Replace Shirks Road over Black Moshannon Creek Bridge No. 9-0028 Project Allocation 300,000(Base Project Allocation - $300,000)

(B) Replace Clay Mine Road over Six Mile Run - No. 0029 bridge and Huckleberry Road over Black Moshannon Creek - No. 0016 Project Allocation 700,000(Base Project Allocation - $700,000)

(3) Clarion County (i) Kittanning State Forest

(A) Replace bridge on Corbett Road over Little Clear Creek and bridge on Corbett Road over Clear Creek Project Allocation 400,000(Base Project Allocation - $400,000)

(4) Clearfield County (i) Moshannon State Forest

(A) Replace bridge on Laurel Ridge Road over Laurel Run and bridge on Jack Dent Road over Medix Run Project Allocation 650,000(Base Project Allocation - $650,000)

(B) Replace bridge on Ames Road over Deer Creek Project Allocation 200,000(Base Project Allocation - $200,000)

(5) Clinton County (i) Sproul State Forest

(A) Replace Beaver Dam Road over left fork of Beaver Dam Run Project Allocation 400,000(Base Project Allocation - $400,000)

(B) Replace culvert at Little Greenlick Road over Little Greenlick Run Project Allocation 250,000(Base Project Allocation - $250,000)

(C) Replace Birch Island Road over Amos Branch Bridge No. 10-0040 Project Allocation 300,000(Base Project Allocation - $300,000)

(D) Replace State Line Road over Beauty

Page 328: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Run Bridge No. 10-0029 Project Allocation 325,000(Base Project Allocation - $325,000)

(E) Replace bridge on Graham Road over Ferney Road Project Allocation 200,000(Base Project Allocation - $200,000)

(F) Replace bridge on Penrose Road over box culvert, near intersection with Coon Run Road Project Allocation 150,000(Base Project Allocation - $150,000)

(G) Replace bridge on Birch Island Road over Amos Branch Project Allocation 175,000(Base Project Allocation - $175,000)

(H) Replace bridge on Slate Line Road over Beauty Run Project Allocation 200,000(Base Project Allocation - $200,000)

(I) Replace bridge on Birch Island Road over Amos Branch Project Allocation 175,000(Base Project Allocation - $175,000)

(6) Elk County (i) Elk State Forest

(A) Replace Dents Run Road over Bear Hollow No. 13-9005 and Weatherboard Run No. 13-9006 Project Allocation 500,000(Base Project Allocation - $500,000)

(B) Replace Bridge No. 13-9025, Little Dents Road over Little Dents Run Project Allocation 200,000(Base Project Allocation - $200,000)

(7) Huntingdon County (i) Rothrock State Forest

(A) Replace old culvert at Laurel Run Road with box culvert over tributary to Galbraith Gap Run Project Allocation 100,000(Base Project Allocation - $100,000)

(B) Rehabilitate bridge at Crowfield Road over Standing Stone Creek Project Allocation 150,000(Base Project Allocation - $150,000)

(C) Replace pipe culvert at Thickhead

Page 329: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Mountain Road over Sinking Creek Project Allocation 200,000(Base Project Allocation - $200,000)

(D) Replace three small box culverts at Martin and Frew Roads Project Allocation 500,000(Base Project Allocation - $500,000)

(E) Replace bridge at Beidler Road over Laurel Run Project Allocation 350,000(Base Project Allocation - $350,000)

(F) Replace bridge on Lingle Valley Road over Laurel Creek Project Allocation 350,000(Base Project Allocation - $350,000)

(G) Replace bridges on Martin Gap Road 1 and 2 and on Frew Road Project Allocation 600,000(Base Project Allocation - $600,000)

(H) Replace bridge on Diamond Valley Road over Globe Run, No. 5-0023, No. 24 Project Allocation 400,000(Base Project Allocation - $400,000)

(I) Replace bridge on Crowfield Road over Standing Stone Creek Project Allocation 150,000(Base Project Allocation - $150,000)

(J) Replace bridge on Thickhead Mountain Road over Sinking Creek Project Allocation 200,000(Base Project Allocation - $200,000)

(K) Replace bridge on Laurel Run Road over tributary to Galbraith Gap Run Project Allocation 175,000(Base Project Allocation - $175,000)

(L) Install guiderail at seven bridges Project Allocation 350,000(Base Project Allocation - $350,000)

(8) Lycoming County (i) Tiadaghton State Forest

(A) Replace four Francis Road/Slate Run Road structures Project Allocation 800,000(Base Project Allocation - $800,000)

(B) Replace Limbaugh Road over English Run culvert Project Allocation 225,000

Page 330: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $225,000) (C) Replace Bridge No. 16-0001 on Spoor

Hollow Road over Norris Brook Project Allocation 325,000(Base Project Allocation - $325,000)

(ii) Tioga State Forest (A) Replace Owasse Road/Chimney Hollow

Project Allocation 175,000(Base Project Allocation - $175,000)

(B) Replace Cedar Mountain Road over Cedar Run Bridge No. 16-0014 Project Allocation 300,000(Base Project Allocation - $300,000)

(C) Replace Landrus Road at South Creek -No. 0023 Project Allocation 325,000(Base Project Allocation - $325,000)

(D) Replace Spoor Hollow Road over Norris Brook Bridge No. 16-0001 Project Allocation 325,000(Base Project Allocation - $325,000)

(E) Replace bridge on Zinck Fork Road over Upper Pine Bottom, No. 12-0047 Project Allocation 250,000(Base Project Allocation - $250,000)

(F) Replace bridges on Slate Run Road over Manor Fork No. 12-0041, Daugherty Run No. 12-9006 and culvert at Fill Trestle No. 12-9028 Project Allocation 600,000(Base Project Allocation - $600,000)

(G) Replace bridge on Cove Road over Fourth Gap Project Allocation 250,000(Base Project Allocation - $250,000)

(H) Replace bridge on English Run Road over English Run Project Allocation 325,000(Base Project Allocation - $325,000)

(I) Replace bridge on Lower Pine Road over Lower Pine Bottom Run Project Allocation 350,000(Base Project Allocation - $350,000)

(9) Monroe County (i) Delaware State Forest

(A) Replace bridge on Five Mile Meadow Road over unnamed creek and bridge on

Page 331: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Five Mile Meadow Road over Little Bushkill Creek Project Allocation 300,000(Base Project Allocation - $300,000)

(B) Replace bridge on Bald Hill Road over unnamed creek Project Allocation 280,000(Base Project Allocation - $280,000)

(C) Replace bridge on Gunter Valley Road over Trout Run Project Allocation 200,000(Base Project Allocation - $200,000)

(D) Replace Gunter Valley box culvert Project Allocation 200,000(Base Project Allocation - $200,000)

(10) Perry County (i) Tuscarora State Forest

(A) Replace bridge over Couch Road Project Allocation 150,000(Base Project Allocation - $150,000)

(B) Replace bridge at Colonel Denning Road over Doubling Gap Creek Project Allocation 175,000(Base Project Allocation - $175,000)

(C) Replace bridge on Gunter Valley Road over Trout Run Project Allocation 200,000(Base Project Allocation - $200,000)

(D) Replace Meadow Run Road Bridge over Laurel Run Project Allocation 300,000(Base Project Allocation - $300,000)

(E) Replace bridge on Couch Road Project Allocation 150,000(Base Project Allocation - $150,000)

(F) Replace bridge on Gunter Valley Project Allocation 200,000(Base Project Allocation - $200,000)

(G) Replace bridge on access road for Colonel Denning over Doubling Gap Creek Project Allocation 175,000(Base Project Allocation - $175,000)

(11) Potter County (i) Elk State Forest

(A) Replace structures for Bridge No. 13-0045, East Cowley Run Road over East

Page 332: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Cowley Run Project Allocation 300,000(Base Project Allocation - $300,000)

(ii) Susquehannock State Forest (A) Replace Bridge No. 15-9013, Nelson

Run Road over Gas Well Hollow Project Allocation 200,000(Base Project Allocation - $200,000)

(12) Schuylkill County (i) Weiser State Forest

(A) Construct a roadway and culvert over stream at Jefferson Tract and Road in South Manheim Township Project Allocation 200,000(Base Project Allocation - $200,000)

(B) Replace White Oak Road over Wolf Run and Mud Run and Lykens Road - No. 9000 Project Allocation 400,000(Base Project Allocation - $400,000)

(C) Construct culvert at Weaver Road, Second Mountain over unnamed tributary Project Allocation 200,000(Base Project Allocation - $200,000)

(D) Replace bridge on Jefferson Tract and Road Project Allocation 200,000(Base Project Allocation - $200,000)

(E) Replace bridge on Weaver Road, Second Mountain over ford crossing Project Allocation 200,000(Base Project Allocation - $200,000)

(F) Replace bridges on White Oak over Wolf Run and White Oak over Mud Run Project Allocation 400,000(Base Project Allocation - $400,000)

(G) Replace bridges on Roaring Creek Tract Project Allocation 700,000(Base Project Allocation - $700,000)

(H) Construct Weaver Road ford crossing box culvert Project Allocation 200,000(Base Project Allocation - $200,000)

(13) Somerset County (i) Forbes State Forest

(A) Replace three bridges at South Wolf Rock Road

Page 333: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation 600,000(Base Project Allocation - $600,000)

(B) Rehabilitate Jones Mill Run Road and Blue Hole Road bridges, widen roads and replace deck bridge with precast box culvert Project Allocation 600,000(Base Project Allocation - $600,000)

(C) Replace box culvert, bridge and roadway on South Wolfe Rock Road Project Allocation 800,000(Base Project Allocation - $800,000)

(ii) Gallitzin State Forest (A) Replace culvert at Shade Road over

unnamed tributary to Shade Creek Project Allocation 250,000(Base Project Allocation - $250,000)

(14) Sullivan County (i) Loyalsock State Forest

(A) Rehabilitate Yellow Dog Road over Rock Run - No. 0017 Project Allocation 350,000(Base Project Allocation - $350,000)

(B) Rehabilitate Hillsgrove Road over tributary to Pleasant Stream, No. 12-9018 Project Allocation 250,000(Base Project Allocation - $250,000)

(C) Replace Bridge No. 20-9011, High Knob Road over Ketchum Run Project Allocation 250,000(Base Project Allocation - $250,000)

(D) Replace bridge on Rock Run Road over Loyalsock Creek Project Allocation 300,000(Base Project Allocation - $300,000)

(15) Tioga County (i) Tioga State Forest

(A) Replace bridge on Cedar Mountain Road over Cedar Mountain Run Project Allocation 300,000(Base Project Allocation - $300,000)

(B) Replace bridge on Owasee Road over Chimney Hollow Project Allocation 175,000(Base Project Allocation - $175,000)

(C) Replace bridge on Spoor Hollow Road

Page 334: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

over Norris Brook Project Allocation 325,000(Base Project Allocation - $325,000)

(D) Replace bridge on Landrus Road over South Creek Project Allocation 325,000(Base Project Allocation - $325,000)

(16) Union County (i) Bald Eagle State Forest

(A) Replace bridge on Bear Run Road over Bear Run Creek Project Allocation 250,000(Base Project Allocation - $250,000)

(17) Westmoreland County (i) Forbes State Forest

(A) Replace bridge on South Wolfe Rock Road over tributary to Tub Mill Run and bridge on South Wolfe Rock Road over Tub Mill Run Project Allocation 600,000(Base Project Allocation - $600,000)

Section 10. Itemization of Snowmobile/ATV Program Restricted Revenue Account current revenue projects.

Projects in the category of Snowmobile/ATV Program Restricted Revenue Account projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from Snowmobile/ATV Program Restricted Revenue Account current revenue are hereby itemized, together with their respective estimated costs, as follows:

Project Total Project Allocation

(1) Monroe County (i) Delaware State Forest

(A) Construct or rehabilitate ATV trail in Dixon Miller Recreation Area Project Allocation 250,000(Base Project Allocation - $250,000)

Section 11. Itemization of Pennsylvania Fish and Boat Commission capital projects.

The individual capital projects in the category of public improvement projects to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by the current revenues of the Fish Fund and the Boat Fund pursuant to executive authorizations are hereby itemized, together with their respective estimated costs, as follows: Total Project

Page 335: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Project Allocation (1) Pennsylvania Fish and Boat Commission

(i) Beaver County (A) Construction and other related costs

for the Hereford Manor Dams Project Allocation 7,500,000

(i.1) Berks County (A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Kaercher Creek (PA 478) Project Allocation 5,063,000

(ii) Bucks County (A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Levittown Lake Project Allocation 1,875,000

(iii) Cambria County (A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Duman Lake Project Allocation 1,875,000

(iv) Carbon County (A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Mauch Chunk Lake (PA 462) Project Allocation 5,625,000

(v) Centre County (A) Design, permit and breach Gap Dam

Project Allocation 250,000(B) Additional funds to construct a dam

in the vicinity of Colyer Lake to meet current dam safety requirements Project Allocation 3,140,000

(C) Additional funds to replace or remodel Pleasant Gap Regional Office Buildings Project Allocation 2,375,000

(D) Additional funds to design, rehabilitate and construct buildings, effluent treatment and related infrastructure at Pleasant Gap Project Allocation 3,013,000

(E) Additional funds to design, rehabilitate and construct buildings, effluent treatment and related

Page 336: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

infrastructure at Benner Spring Project Allocation 5,044,000

(F) Additional funds to design, rehabilitate and construct buildings, effluent treatment and related infrastructure at Bellefonte Project Allocation 5,375,000

(vi) Columbia County (A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Briar Creek Lake (PA 497) Project Allocation 6,875,000

(vii) Crawford County (A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Tamarack Lake Project Allocation 11,097,000

(viii) Cumberland County (A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Shaffer Mill Dam Project Allocation 625,000

(B) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, Springfield Reservoir Project Allocation 625,000

(ix) Erie County (A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Hatchery Dam Project Allocation 625,000

(B) Additional funds to design, rehabilitate and construct buildings, effluent treatment and related infrastructure at Fairview Project Allocation 734,000

(C) Design, permit and construct marina, outbuilding and effluent treatment facility improvements at Northeast Project Allocation 10,625,000

(x) Fulton County (A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements,

Page 337: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Meadow Grounds Dam Project Allocation 2,188,000

(xi) Indiana County (A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Hemlock Lake (Straight Run Dam) Project Allocation 3,438,000

(xii) Juniata County (A) Additional funds to design,

rehabilitate and construct fish-rearing facilities and related infrastructure, Van Dyke Project Allocation 2,875,000

(xiii) Luzerne County (A) Design, permit and breach the Mt.

Springs 2 Dam Project Allocation 250,000

(B) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, Lily Lake Project Allocation 313,000

(C) Additional funds to design, permit and construct a rehabilitated dam to meet current dam safety requirements, Harris Pond Dam Project Allocation 2,625,000

(xiv) Lycoming County (A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Rose Valley Lake Project Allocation 3,438,000

(xv) Northampton County (A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, East Bangor Lake Project Allocation 557,000

(xvi) Snyder County (A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Walker Lake (PA 637) Project Allocation 7,688,000

(xvii) Somerset County (A) Additional funds to design, permit

Page 338: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

and construct a rehabilitated dam to meet current dam safety requirements, Somerset Lake Project Allocation 1,700,000

(B) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, High Point Lake Project Allocation 8,250,000

(xviii) Sullivan County (A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Hunters Lake Recreation Dam Project Allocation 1,250,000

(xix) Susquehanna County (A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Stump Pond Dam (Purdy) Project Allocation 625,000

(xx) Tioga County (A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Beechwood Lake (PA 454) Project Allocation 6,188,000

(xxi) Venango County (A) Additional funds to design, permit

and construct a rehabilitated dam to meet current dam safety requirements, Kahle Lake Project Allocation 4,825,000

(xxii) Warren County (A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Browns Pond Project Allocation 625,000

(xxiii) Wayne County (A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Douglas Pond Project Allocation 625,000

(B) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, Long Pond Project Allocation 625,000

(C) Additional funds to permit and

Page 339: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

construct a rehabilitated dam to meet current dam safety requirements, Belmont Lake Project Allocation 1,188,000

(D) Additional funds to design, permit and construct a rehabilitated dam to meet current dam safety requirements, Lower Woods Pond Project Allocation 1,188,000

(E) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, Miller Pond Project Allocation 6,563,000

(F) Design, permit and construct a rehabilitated dam to meet current dam safety requirements, White Oak Pond Project Allocation 6,563,000

(xxiv) Wyoming County (A) Design, permit and construct a

rehabilitated dam to meet current dam safety requirements, Winola Lake Project Allocation 313,000

Section 12. Itemization of Manufacturing Fund current revenue projects.

The individual capital projects in the category of public improvement projects to be developed by the Department of General Services, its successors or assigns, for the Department of Corrections, and to be financed from current revenues of the Manufacturing Fund are hereby itemized, together with their respective estimated costs, as follows:

Project Total Project Allocation

(1) Department of Corrections (i) State Correctional Institution at Forest

(A) Interior construction of Correctional Institute building to provide for correctional incentives program Project Allocation 7,500,000(Base Project Allocation - $6,000,000) (Design & Contingencies - $1,500,000)

Section 13. Itemization of Oil and Gas Lease Fund capital projects.

The individual capital projects in the category of public improvement projects to be developed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from current revenues of the Oil and Gas

Page 340: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Lease Fund are hereby itemized, together with their respective estimated costs, as follows:

Project Total Project Allocation

(1) Department of Conservation and Natural Resources (i) Codorus State Park

(A) Construction of camping cottages within park Project Allocation 150,000(Base Project Allocation - $150,000)

(ii) Ricketts Glen State Park (A) Construction of camping cottages

within park Project Allocation 548,000(Base Project Allocation - $548,000)

Section 14. Itemization of Environmental Stewardship Fund capital projects.

The individual projects to be developed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from current revenues of the Environmental Stewardship Fund are hereby itemized, together with their respective estimated costs, as follows:

Project Total Project Allocation

(1) Department of Conservation and Natural Resources (i) Ridley Creek State Park

(A) Construct equestrian riding facility Project Allocation 900,000(Base Project Allocation - $900,000)

Section 15. Itemization of highway bridge projects. The individual capital projects in the category of highway

bridge projects to be constructed by the Department of Transportation, its successors or assigns and to be financed from current revenues or by the incurring of debt are hereby itemized, together with their respective estimated costs, as follows:

Project Total Project Allocation

(1) Northumberland County (i) Local bridges (Reserved) (ii) State bridges

(A) Tenth Street Bridge in Trevorton over Zerbe Run, Zerbe Township, Bridge Replacement Project Allocation 190,000

Page 341: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

(Base Project Allocation - $190,000) Section 15.1. Itemization of State Stores Fund current revenue

projects. The individual capital projects in the category of public

improvement projects to be developed by the Department of General Services, its successors or assigns, for the Pennsylvania Liquor Control Board, and to be financed from current revenues of the State Stores Fund are hereby itemized with their respective itemized costs as follows:

Project Total Project Allocation

(1) Pennsylvania Liquor Control Board (i) Northwest Office Building

(A) Replace security and fire detection systems at Northwest Office Building located on Forster Street Project Allocation 1,500,000 (Base Project Allocation - $1,350,000) (Design & Contingencies - $150,000)

(B) Install replacement windows throughout Northwest Office Building located at Forster Street Project Allocation 1,500,000 (Base Project Allocation - $1,200,000) (Design & Contingencies - $300,000)

(C) Masonry repointing and exterior repairs of Northwest Office Building located on Forster Street Project Allocation 1,000,000 (Base Project Allocation - $900,000) (Design & Contingencies - $100,000)

Section 16. Provisions relating to highway bridge projects. (a) Limitation on expenditure of funds.--The following shall

apply to itemizations under section 15: (1) Any moneys derived from the incurring of debt shall

be used solely for effecting the rehabilitation, replacement or removal of bridges located on State highways. All other bridge rehabilitation, replacement or removal shall be financed from current revenue.

(2) Notwithstanding any law to the contrary, the projects itemized in the act of December 8, 1982 (P.L.848, No.235), known as the Highway-Railroad and Highway Bridge Capital Budget Act for 1982-1983, may be financed from current revenue. (b) Allocation of funds.--As follows:

(1) Whenever the Department of Transportation determines that the full estimated financial costs of the projects

Page 342: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

itemized in section 15 are not necessary for the proper design, acquisition or construction of such projects, the excess funds no longer required may be allocated by the Department of Transportation to increase the estimated costs of any one or more of the projects specifically itemized in a capital budget.

(2) Moneys raised or expended by municipalities after the effective date of this act, in anticipation of receipt of funds authorized for projects itemized by this act, may be reimbursable to those municipalities. (c) Policy on jobs and materials.--As follows:

(1) It is the declared policy of the Commonwealth that the construction projects authorized in section 15 be used, to the greatest extent possible, to provide for the creation of jobs and the rehiring of the unemployed in this Commonwealth. In order to reach this goal, firms with Commonwealth-based facilities shall be actively solicited to make bids on contracts to furnish products and materials, including, but not limited to, steel and steel products, to be used in these projects.

(2) Every contract document entered into to undertake a project contained in section 15 shall provide that any steel or other products to be used or supplied in the performance of this contract shall be required to be manufactured by plants in the United States unless the secretary determines, on a contract-by-contract basis, that certain required products are not produced in the United States in sufficient quantities to meet the requirements of the contract. Such a determination and the reasons for the determination shall be published in the Pennsylvania Bulletin. Decisions made under this subsection shall not be inconsistent with the general provisions of the act of March 3, 1978 (P.L.6, No.3), known as the Steel Products Procurement Act.

(3) Minorities and women.--It is also the declared policy of the Commonwealth to require and encourage substantial participation by minorities and women in the construction projects authorized in section 15. (d) Payment of capital debt service.--The repayment of any

debt incurred pursuant to section 15 shall be made from the Highway Bridge Improvement Restricted Account, and such repayment shall have first claim on the revenues of the account.

(e) Authorization and debt cumulation.--The additional authorization and debt allowance provided for in section 15 shall be added to the total authorizations and debt incurred pursuant to the Highway-Railroad and Highway Bridge Capital Budget Act for 1982-1983, as amended and supplemented. Section

Page 343: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

15 shall be construed as a supplement to the Highway-Railroad and Highway Bridge Capital Budget Act for 1982-1983. Section 17. Debt authorization.

(a) Public improvements.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $4,664,749,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects specifically itemized in a capital budget.

(b) Furniture and equipment.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $165,120,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget.

(c) Transportation assistance.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $1,939,709,000 as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.

(d) Redevelopment assistance.--Subject to the limitation in section 317(b) of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, the Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $6,744,668,000 as may be found necessary to carry out the redevelopment assistance capital projects specifically itemized in a capital budget.

(e) Flood control.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not

Page 344: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

exceeding in the aggregate the sum of $137,852,000 as may be found necessary to carry out the acquisition and construction of the flood control projects specifically itemized in a capital budget.

(f) Pennsylvania Fish and Boat Commission projects.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $136,241,000 as may be found necessary to carry out the acquisition and construction of the Pennsylvania Fish and Boat Commission projects specifically itemized in a capital budget.

(g) Highway bridge projects.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $190,000 as may be found necessary to carry out the acquisition and construction of the State projects specifically itemized in a capital budget. Section 18. Issue of bonds.

The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, the Auditor General and the State Treasurer shall determine, but the latest stated maturity date shall not exceed estimated useful life of the projects being financed as stated in section 19. Section 19. Estimated useful life and term of debt.

(a) Estimated useful life.--The General Assembly states that the estimated useful life of the public improvement projects itemized in this act is as follows:

(1) Public improvement projects, 30 years. (2) Furniture and equipment projects, 10 years. (3) Transportation assistance projects:

(i) Rolling stock, 15 years. (ii) Passenger buses, 12 years. (iii) Furniture and equipment, 10 years. (iv) All others, 30 years.

(b) Term of debt.--The maximum term of the debt authorized to be incurred under this act is 30 years. Section 20. Appropriations.

(a) Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General

Page 345: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Services in the maximum amount of $4,664,749,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(b) Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $165,120,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(c) Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount of $1,931,709,000 to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the moneys as required and certified by it to be legally due and payable.

(d) Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community and Economic Development in the maximum amount of $6,744,668,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance capital projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community and Economic Development the moneys as required and certified by it to be legally due and payable.

(e) Flood control.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Protection in the maximum amount of $137,852,000 to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental

Page 346: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

Protection the moneys as required and certified by it to be legally due and payable.

(f) Pennsylvania Fish and Boat Commission projects.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Pennsylvania Fish and Boat Commission in the maximum amount of $136,241,000 to be used by it exclusively to defray the financial cost of the Pennsylvania Fish and Boat Commission projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Pennsylvania Fish and Boat Commission the moneys as required and certified by it to be legally due and payable.

(g) Highway bridge projects.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount of $190,000 to be used by it exclusively to defray the financial costs of the highway bridge projects specifically itemized in this capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay out to the department the moneys as required and certified by it to be legally due and payable. Section 21. Federal funds.

(a) Projects itemized in this act.--In addition to those funds appropriated in section 20, all moneys received from the Federal Government for the projects specifically itemized in this act are also hereby appropriated for those projects.

(b) Projects not requiring itemization.--Department of Military and Veterans Affairs construction projects which are totally federally funded but which are to be administered by the Department of General Services are hereby authorized. Section 22. Delegation.

For the public improvement projects specifically itemized in section 3(b)(2), the Department of General Services may delegate the authority to construct, improve, equip, furnish, maintain, acquire or operate such projects to the Philadelphia Regional Port Authority. Notwithstanding any provision of law to the contrary, the Philadelphia Regional Port Authority, at its discretion and subsequent to the aforementioned delegation, may contract with one or more of the tenant companies leasing or operating port facilities at the Port of Philadelphia for the purpose of constructing, improving, equipping, furnishing, maintaining, acquiring or operating the public improvement projects specifically itemized in section 3(b)(2). Any project itemized in section 3(b)(2) delegated to the Philadelphia Regional Port Authority for the purpose of constructing,

Page 347: CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2013Budget Project Itemization Act of 2013-2014. Section 2. Total authorizations. (a) Public improvements.--The total authorization for the

improving, equipping, furnishing, maintaining, acquiring or operating the project shall be exempt from the section 1 first paragraph of the act of May 1, 1913 (P.L.155, No.104), referred to as the Separations Act, and the provisions of the act of March 3, 1978 (P.L.6, No.3), known as the Steel Products Procurement Act, and any provisions of the law requiring the bidding of projects. Section 23. Editorial changes.

In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and departmental totals as necessary to agree with the total monetary amounts of the projects. Section 24. Effective date.

This act shall take effect immediately.