CMA CGM DPW -May 21 2013

11
What the Customer is Really Looking For - A Global Shipping Line’s Expectations from a Global Container Terminal Operator Meeting between CMA CGM and DPW Tuesday, May 21 st 2013.

Transcript of CMA CGM DPW -May 21 2013

Page 1: CMA CGM DPW -May 21 2013

What the Customer is Really Looking For - A Global Shipping Line’s Expectations from a Global Container Terminal Operator

Meeting between CMA CGM and DPWTuesday, May 21st 2013.

Page 2: CMA CGM DPW -May 21 2013

CMA CGM FLEET:

CMA CGM has 428 vessels in its fleet. 336 vessels are chartered and 92 are owned.

Average age of CMA CGM total fleet : 9 years old.

Average age of CMA CGM owned fleet: 8 years old.

The average capacity of CMA CGM vessels: 3,553 Teus.

The maximum capacity of a CMA CGM vessel is 16,022 Teus (Marco Polo, Jules Verne and A. Von Humboldt).

Average speed of CMA CGM vessel: 21kn. Range from 12.5 kn to 26 kn.

Customer expectations

Page 3: CMA CGM DPW -May 21 2013

Operations:

Vessel turnaround: Bunker savings.

Crane productivity: Buffer in the pro forma.

Yard management/ T/S blocks: smooth operations.

Speed gates: Gate congestion.

Security: Compliance.(stowaway – additional gangway watch)

Safety standards: Avoid terminal interruption.

Trained personnel: discipline/ Sufficient labor Avoid incidents.

Customer expectations

Page 4: CMA CGM DPW -May 21 2013

Operations (continued):

Equipment up to date + maintenance: Reliability.

Terminal turn time (moves): Rapid delivery.

Efficient yard process: Customer convenience/ avoid Yard handling/ Shifting.

Good relationship with Port authority/local public entities.

Customer expectations

Page 5: CMA CGM DPW -May 21 2013

Costs:

Costs vs volumes: economy of scales.

Sufficient free pool: Paramaribo has a very low free pool (less than 350 Teus) and Caucedo has no free pool (7 free days).

Restows rebates: Restows in Caucedo costs $ 50 to $ 80 (different service). Standardized price for restows.

Control pilotage, Control tug and Line handlers (lumpsum). Terminal to take control of the waterfront activity/ procedure and work closely to provide better costs structure.

Encourage vendors to operate in close Port premises (space) and Terminal Operators to invest in off dock facilities (empties). Terminals should also lease/ acquire land space in the Port vicinity.

On dock rail services, sufficient rail cars/length: expedite cargo delivery.

Customer expectations

Page 6: CMA CGM DPW -May 21 2013

Costs (continued):

Dockage/Wharfage. (combine fees).

Rebate for local moves.

Additional services: M&R, container freight station, bonded transload facility.

In house logistics provider/trucker. (Drayage & ITT moves).

Customer expectations

Page 7: CMA CGM DPW -May 21 2013

Customer expectations

Page 8: CMA CGM DPW -May 21 2013

Customer expectations

Page 9: CMA CGM DPW -May 21 2013

Impact on customer service:

Reliable EDI interface, efficient data integration and manipulation.

Reliable Information flow.

Attending customer needs.

Pro activeness to customer demands.

Automated report systems tools.

User friendly website.

Dedicated block for high volume customers.

Dedicated block for VIP customers and time sensitive customers.

Customer expectations

Page 10: CMA CGM DPW -May 21 2013

Impact on customer service (continued):

Gate appointment system.

Flexibility with late gates (exports).

Units released with late gates and customs hold (imports).

Customer friendly representatives (conversant/familiar/dedicated representative for each carrier)).

Able to express issues in lay man term and remain professional and respectful at all times. (customer engagement program)

Customer expectations

Page 11: CMA CGM DPW -May 21 2013

Thank you for the opportunity!

Customer expectations