JAMAICA INTERMODAL - CMA CGM · 2021. 3. 24. · Ocho Rios Morant Bay Savanna la Mar CMA CGM...
of 1
/1
Embed Size (px)
Transcript of JAMAICA INTERMODAL - CMA CGM · 2021. 3. 24. · Ocho Rios Morant Bay Savanna la Mar CMA CGM...
Savanna la Mar
CMA CGM Strengths
CMA CGM Contact
• In addition to worldwide maritime coverage, CMA CGM can also offer to their customers an extensive inland coverage connecting main ports of call to/from any inland destination in Jamaica.
• For Jamaican shippers, we can offer Inland Solutions at destination complementing the already existing worldwide maritime coverage.
• Competitive and reliable inland solutions for Reefer cargo available
• Possibility to move OOG and overweight cargo - under consult
• Pre-advise of 48 hours to have the transport performed applied to Import and Export Carrier Haulage (depending on empty equipment availability for EXP)
• Integrated Ocean and Haulage (Multimodal) solutions for: amajor projects i.e. Construction for the hotel sector asolar power plants amajor infrastructure work i.e bridges and road works aSpecial Economic Zone (SEZ)
• Newly developed north and south coast highways cuts travelling time by 45 minutes to the North and West Coast via South Coast highways
• GPS tracking on all trucking equipment
Mr George GAVIN [email protected]
July 2018
w w
w .c
m a-
cg m
.c om
CMA CGM Strengths
CMA CGM Contact
• In addition to worldwide maritime coverage, CMA CGM can also offer to their customers an extensive inland coverage connecting main ports of call to/from any inland destination in Jamaica.
• For Jamaican shippers, we can offer Inland Solutions at destination complementing the already existing worldwide maritime coverage.
• Competitive and reliable inland solutions for Reefer cargo available
• Possibility to move OOG and overweight cargo - under consult
• Pre-advise of 48 hours to have the transport performed applied to Import and Export Carrier Haulage (depending on empty equipment availability for EXP)
• Integrated Ocean and Haulage (Multimodal) solutions for: amajor projects i.e. Construction for the hotel sector asolar power plants amajor infrastructure work i.e bridges and road works aSpecial Economic Zone (SEZ)
• Newly developed north and south coast highways cuts travelling time by 45 minutes to the North and West Coast via South Coast highways
• GPS tracking on all trucking equipment
Mr George GAVIN [email protected]
July 2018
w w
w .c
m a-
cg m
.c om