    171.2 Eligibility(PreQualification )Criteria;page9; clause 3.

    Should have latest bank's certificate ofsolvency issued by schedule bank

    Please clarify the ammount of solvencyrequired.

    Please stick to requirements of RFP requestedfrom Bidder. It is also requested to please readRFP carefully for clarity.

    18

    Annexure 1-CHECK LIST; page 45;clause 6.

    Proforma for Contract Performance Securityas per Annexure 7

    Please clarify whether Annexure 7 has to besubmitted at the time of bidding or only bythe selected bidder.

    Please stick to requirements of RFP requestedfrom Bidder. It is also requested to please readRFP carefully for clarity as these details arealready available in RFP.

    19Annexure 1-CHECK LIST; page 45;clause 7.

    Proforma for Contract as per Annexure 8 Please clarify whether Annexure 7 has to besubmitted at the time of bidding or only bythe selected bidder.

    Please stick to requirements of RFP requestedfrom Bidder. It is also requested to please readRFP carefully for clarity.

    20

    Annexure4(P1), Page50

    Please note that PTCUL reserve completeright to normalize, change quantitiesmentioned below in order to compare the

    price bids submitted by various bidders.Validity of these rates shall atleast 5 yearsfrom the data of LOA.

    Please clarify whether the rates quoted shallbe valid for 5 years. If yes, we would requestyou to kindly re-consider/remove thisclause as the same would not agreeable tomost of the OEM's.

    This is a standard clause in RFP.

    21

    Page 50-52 Prid Bid Please clarify whether the REBATE

    COLUMN in the price Bid could be leftblank.

    Please mention any value in it.

    22Page 51, Price Bid Clause 7 Pricing of Oracle Please confirm whether we need to quote

    for both the options A & B under this clause.Please stick to requirements of RFP requestedfrom Bidder. It is also requested to please readRFP carefully for clarity.

    23

    Page 53, Annexure4(P2)

    Schedule of Price Incidence on Account ofWithdrawl of Deviations Mentioned inTechnical Proposal

    Please confirm whether Annexure 4(P2) hasbe filled only if there are Technical &Commercial Deviations.

    Please stick to requirements of RFP requestedfrom Bidder. It is also requested to please readRFP carefully for clarity.

  • 8/2/2019 Clarifications 29-12-11

    4/25

  • 8/2/2019 Clarifications 29-12-11

    5/25

    Queries Raised by: HCL Infosystem Limited

    S.No.

    RFP Reference/ VendorReference

    RFP Clause Clarification Sought Clarifications by PTCUL

    1

    Part A Technical Details1.2 Eligibility (Pre

    Qualification) Criteria

    Should have Quality Certification for CMMILEVEL iii or should have ISO 9001:2000 &

    ISO 270001 or equivalent/highercertification

    The CMMI & ISO 9001/ISO 27001 arediferent certification, so request you to

    kindly correct the same.

    Please stick to requirements of RFP requestedfrom Bidder. It is also requested to please read

    RFP carefully for clarity.

    2

    Part A Technical Details1.0 Part A point #2, Pg 9;3.1 Pat A High Levelscope of Work, Pg11

    along-with provision of Lab for 10 Nodes Please clarify about the 10 Nodes Lab,whether Vendor is supposed to take thesame under scope of work.

    Yes and it is already mentioned in RFP.

    3

    Part A Technical Details3.1 Part B High Levelscope of Work, Pg11

    Support Services of Data Centre for next 5years for Licensees, Annual TechnicalSupport,

    Hardware and other peripheral equipmentexcept PC's and Printers.

    As per this clause RHEL, UTMSubscriptions etc are not mentioned clearly.

    Need not to be mentioned separately, this allcomes under scope of work as per RFP

    4

    Part A Technical Details3.2 Other Scope of Work,Pg11

    Oracle Installation and Configuration Only supply of Oracle Licenses should beconsidered under the scope of work,whereas installation and configuratin ofOracle Licenses is the part of applicationVendor's Scope.

    5

    Part A Technical Details4.6.4 SAN; Pg 14

    The storage area network should bedesigned and implemented keeping in mind

    Owner's requirement of high availabilityand based on high availability architecture.

    Technically the Entire Solution is notdesigned in a High availability architecture,

    infact with no redundant insrastructure.This clause does not validate the design.Request you to kindly get the entire IT Infrato be in NSPOP mode (NO Singel Point ofFailure.

    BoM and Requirement have already been definedin the RFP, therefore, Solution and BoM needs to

    sticks to detailing in RFP to meet requirement.

    6

    Part A Technical Details4.6.5 Security; Pg 14

    Firewalls in Data Centre shall be configuredas per best practices

    As per the best Pratices for theImplementation of the datacentre, TheFirewall should be configured in HighAvailability Mode. Request you to kindly

    get the qty of Firewall Changed to 02.

  • 8/2/2019 Clarifications 29-12-11

    6/25

  • 8/2/2019 Clarifications 29-12-11

    7/25

  • 8/2/2019 Clarifications 29-12-11

    8/25

  • 8/2/2019 Clarifications 29-12-11

    9/25

  • 8/2/2019 Clarifications 29-12-11

    10/25

    39

    Part C: Annexures andForms Annexure 4(P1);

    7 Oracle (Option 8) For Option, Weblogic, Forms, and Reportand Services line item needs to added.Please include the same.

    This is typographical error and has been rectified.

  • 8/2/2019 Clarifications 29-12-11

    11/25

  • 8/2/2019 Clarifications 29-12-11

    12/25

    11

    Page No. 61, Annexure10

    DIMENSION OF SERVER & UPS ROOM Please provide the existing floor diagram,indicating partitions required and otherinformation if any

    Site was shown to bidders present in the Pre-BidMeeting and provisions for work has to be madeas per site. Other Bidders are free to visit site tomake a comprehensive plan before bidsubmission. Other details are already mentionedin Part A: Technical Details of RFP from point no.3 to 17.

    12

    Page No. 27, Clause No.

    13

    Glass & Aluminum

    Partitioning, Vinyl Flooring,Fall Ceiling, Distemper,Vanishing Blinds andinfrastructure items like

    Please provide the minimum specification

    required.

    Site was shown to bidders present in the Pre-Bid

    Meeting and provisions for work has to be madeas per site. Other Bidders are free to visit site tomake a comprehensive plan before bidsubmission. Other details are already mentionedin Part A: Technical Details of RFP from point no.3 to 17.

    13

    Page No. 27, Clause No.13

    Earthing, Fixing of Roads,Fans, Four Split/Stand/Roof mounted

    ceiling Ac's (2 Ton),Separate Wiring of UPS,Lighting

    Please provide the minimum specificationrequired.

    Site was shown to bidders present in the Pre-BidMeeting and provisions for work has to be madeas per site. Other Bidders are free to visit site to

    make a comprehensive plan before bidsubmission. Other details are already mentionedin Part A: Technical Details of RFP from point no.3 to 17.

  • 8/2/2019 Clarifications 29-12-11

    13/25

    Gl P ti i Sit h t bidd t i th P Bid

  • 8/2/2019 Clarifications 29-12-11

    14/25

    e.4

    Glass Partioning Site was shown to bidders present in the Pre-BidMeeting and provisions for work has to be madeas per site. Other Bidders are free to visit site tomake a comprehensive plan before bidsubmission. Other details are already mentionedin Part A: Technical Details of RFP from point no.3 to 17.

    1.2

    b Is any BMS needed Kindly confirm Please stick to requirements of RFP requested

    from Bidder.

    22 Kindly confirm if a separate Media Room,

    Staging room is neededPlease stick to requirements of RFP requestedfrom Bidder.

    3

    3 Kindly confirm if the WAN Link Media &Bandwidth needs to be provisioned byBidder or PTCUL

    Please stick to requirements of RFP requestedfrom Bidder and clarification already issuedabove.

    4

    4 Kindly confirm if Fireproof Vault is to be

    provisioned by bidder or will be providd byPTCUL..Kindly mention the capacity (inltrs). If this needs to be provisioned by thebidder them mention the Fire Retardentcapacity (in Hours)

    Site was shown to bidders present in the Pre-Bid

    Meeting and provisions for work has to be madeas per site. Other Bidders are free to visit site tomake a comprehensive plan before bidsubmission. Other details are already mentionedin Part A: Technical Details of RFP from point no.3 to 17.

    5

    5 Rfer Section 8 Page#29 Hardwarefailure/replacement calls should beresolved within 24 HoursHardware failure/replacement at sites

    shoult be resolved within 3 working days

    Kindly clarifyif 24 hours is for DC & 3Working days is for other sites?

    Already mentioned in the RFP.

    6

    6 UTM kindly confirm if the Service. Firewall.VPN Concentrator. Gateway Antivirus.GatewayAntispam Content Filtering. IPS all these arerequired to be available & functional fromday one or it is only the support for theseservices is required.

    Obviously from the day one.

    7

    7 UPS As UPS is to be sized as per load & may

    differ with each bidder. The followingspecificationshould be removed as this makes the UPSspecs Vendor specific. Minimum 6U RackSpace for Power electronics CabinetMinimum 6U Rack Space for BatteryCabinet.

    Project Plan, Requirements and Bill of Materials

    (BoM) are already defined RFP, therefore, Bidderis requested to plan accordingly to meetrequirement.

    7.1

    The UPS shall be contained in two ruggedsteel cabinets one containing the power

    electronics and theother containing

    Please stick to requirements of RFP requestedfrom Bidder.

    The UPS and battery cabinets shall be Please stick to requirements of RFP requested

  • 8/2/2019 Clarifications 29-12-11

    15/25

    7.2

    The UPS and battery cabinets shall becapable of conversion between Tower/Stackand Rack-MountConfiguration

    Please stick to requirements of RFP requestedfrom Bidder.

    8

    8 O&M The RFP expects Operations &Maintenance for 5yrs. But is silent on theQty of ManpowerRequired.

    Kindly fix the type & qty of manpower tosize up for commercials & bring a bidders atcommon platform.

    Already mentioned in the RFP.

    9

    9 Refer Price Bid Sno 5(b) L-3/L2 Switch Kindly confirm if Layer 2 or Layer -3 Switchis expected (Thought the specs given at page# 19 are of L-2 Switch)

    Please read RFP carefully and proposed accordingto Specifications mentioned.

    Queries Raised by: WIPRO LIMITED

  • 8/2/2019 Clarifications 29-12-11

    16/25

    Queries Raised by: WIPRO LIMITED

    S.No.

    RFP Reference/ VendorReference

    RFP Clause Clarification Sought Clarifications by PTCUL

    1

    Page 11, Section 3, Sub-section 3.1

    How would the call flow work for end userissues? Is the vendor expected to setup acentralized service desk for same?Does the vendor need to provide end usersupport services at individual locations ofPTCUL?What are the number of user at each of thelocation supported?Who will provice the tools for TicketManagement, Patch Management etc?Any SLA requirements for support servicesrequired?

    Please read RFP carefully and proposed accordingto Specifications mentioned.

    2

    Page 11, Section 3, Sub-section 3.2

    Conduct Basic Training of user as specified.Please confirm the level of training requiredfor users - Basic Computer operatingtraining or application training?What will be the approximate number ofusers to be trained?All the trainings to be conducted at onlocation or trainings to be conducted atedifferent locations?Will PTCUL provide the trainginfrastructure like - training rooms,

    projector and courseware?

    Please read RFP carefully and proposed accordingto Specifications mentioned.

    3

    Page 11, Section 3, Sub-section 3.2

    Set-up field level assistance units for userhandholding and troubleshooting asspecified by service levels.Please specify the locations and number ofdays of handholding required at eachlocation.

    Please read RFP carefully and proposed accordingto Specifications mentioned.

    4

    Page 14, Section 4, Sub-section 4.6.1

    PTCUL has aked for IP Sec VPNconnectivity between sites, Is this an

    alternate connectivity for redundancy or thiswill be primary connectivity?

    Please read RFP carefully and proposed accordingto Specifications mentioned. Broad

    Band/Internet/ Leased Line shall be provided byPTCUL. Other details are already mentioned inPart A: Technical Details of RFP from point no. 3to 17.

    5

    Page 27, Section 14, Sub-section 14

    Requirement for Field Sites (24 RemoteLocations) - What are the locations addressand number of user at each location?What are the services provided to be atthese locations?How will these locations be connected to

    Data Center?

    Please read RFP carefully and proposed accordingto Specifications mentioned. BroadBand/Internet/ Leased Line shall be provided byPTCUL. Other details are already mentioned inPart A: Technical Details of RFP from point no. 3to 17.

    5.0 MINIMUM Layer 2 VPN (VPLS) Please remove this clause. As shown in Please read RFP carefully and proposed according

  • 8/2/2019 Clarifications 29-12-11

    17/25

    6

    5.0 MINIMUMSPECFICATION FORHARWARE, 7.IPSECWAN/INTERNETROUTER, Point 5 MPLSSupport

    Layer 2 VPN (VPLS) Please remove this clause. As shown inFigure 1 at Page 13 of RFPand mentioned insection 4.6.1 of RFP, A WAN network is tobe setup by the vendor using IP-Sec VPNtechnology which has been asked in routeralready. Whereas Virtual Private LANServices (VPLS) is a class of VPN thatsupports the connection of multiple sites in

    a single bridged domain over a managedIP/MPLS network. VPLS is used by Serviceprovider. So, request you to remove thesame.

    Please read RFP carefully and proposed accordingto Specifications mentioned. BroadBand/Internet/ Leased Line shall be provided byPTCUL. Other details are already mentioned inPart A: Technical Details of RFP from point no. 3to 17.

    7

    5.0 MINIMUMSPECFICATION FORHARWARE, 7.IPSECWAN/INTERNETROUTER, Point 7 IPSecVPN

    Concurrent VPN tunnels 512 MB Please clarify/remove this clause. Pleaseclarify this clause as in performancespecifications of router you have alreadyasked the 256 VPN tunnels and 400 Mbps ofthroughput. This clause seems to berepetitive and contradictory to earlierclause. So please remove this clause.

    This is a typographical error in it and Sl. No. 7 (7),Page No. 18, Clause 5.0 Minimum Specificationfor Hardware should be read as "Concurrent VPNtunnels".

    8

    5.0 MINIMUMSPECFICATION FORHARWARE, 7.IPSECWAN/INTERNETROUTER, Point 11 Flashand Memory

    Should have 4 DIMM Slots Please remove this clause and increase theflash upgradeble requirement to 8 GB.Please remove the specific requirement ofmentioning the number of DIMM slot. Werequest you to ask for the sufficientscalability in terms of Flash Memory ratherthen mentioning number of DIMM slots.

    Please stick to requirements of RFP requestedfrom Bidder.

    9

    5.0 MINIMUMSPECFICATION FORHARWARE, 7.IPSECWAN/INTERNETROUTER, Point 12Physical Specifications

    19" Rack Mountable, 2U Please amend this clause to 19" RackMountable. Fixed configuration modularrouters comes in rack size from 1RU to 4RU. So, we request you to ensure that routershould be rack mounted but not to bind thesame with 2 RU specification.

    Please stick to requirements of RFP requestedfrom Bidder.

  • 8/2/2019 Clarifications 29-12-11

    18/25

    What size of media storage space you are Site was shown to bidders present in the Pre-Bid

  • 8/2/2019 Clarifications 29-12-11

    19/25

    looking please clarify the capacity. Meeting and provisions for work has to be madeas per site. Other Bidders are free to visit site tomake a comprehensive plan before bidsubmission. Other details are already mentionedin Part A: Technical Details of RFP from point no.3 to 17.

    13

    Page No. 27, Clause No.

    13, Site development asper room dimensions -electrical work

    Also provide the scope of job from main EB

    source to Data Centre IT panel andassuming that after Data Centre LT Panelthe bidder has to take care the futherdistribution in data centre area.

    Site was shown to bidders present in the Pre-Bid

    Meeting and provisions for work has to be madeas per site. Other Bidders are free to visit site tomake a comprehensive plan before bidsubmission. Other details are already mentionedin Part A: Technical Details of RFP from point no.3 to 17.

    since you have asked for the Generatorplease provide the DG capacity and itsspecification or shall bidder calcalculate its

    own as per the load, pls confirm.

    Yes this is solution specific and technical solutionshould be such so as to meet requirementsmentioned in RFP.

    14

    General Since precision cooling is preferable for DataCentre request you to pls add on thePrecision cooling specification for serverfarm area and rest other area can be bycomfort cooling.

    Please stick to requirements of RFP requestedfrom Bidder.

    15

    General Bid has not asked for CCTV, Access control,BMS, Fire and detection and other DataCentre security product as its important for

    data securing, please clarify.

    Please stick to requirements of RFP requestedfrom Bidder.

    16 Page No. 11, Point 3.2 Please specify working hours.

    The uptime % is not mentioned however theclient has specified resolution time. Pleaseinclude query if we need to know theuptime%.

  • 8/2/2019 Clarifications 29-12-11

    20/25

    5.0 Minimum

    f

    LTO4/LTO5 Drives Please be specific which Tape Drive is

    d h d ff

    As per Bill of Material.

  • 8/2/2019 Clarifications 29-12-11

    21/25

    8specification

    for hardware

    required as there is cost difference

    between the same. Kindly deleted LTO4

    or LTO5.

    9

    5.0 Minimum

    specification

    for hardware

    Specifications for Backup software is not

    mentioned. We suggest to include the

    Detailed specifications of the Backup

    Software as per the Scope of Work underBackup.

    Requirements are to be met as specified in RFPand propose in Technical Solution. So, Bidder isrequested to plan accordingly to meetrequirements.

    10

    5.0 Minimum

    specification for

    hardware, RHEL

    Standard Server

    Edition; Pg 17

    All Servers must be provided with latest

    version of 64-bit Red Hat Enterprise

    Linux Operating System for 1 socket pair

    (i.e.2 populated sockets) up to 1 gues

    with 1 year Standard support.

    1 Year Standard Support is mentioned,

    whereas as per clause mentioned on Page

    11, the software support/subscription is

    required for 5 years. This needs to be

    changed to 5 Years Support.

    This is a typographical error in it and Sl. No. 6 (1),Page No. 17, Clause 5.0 Minimum Specificationfor Hardware should be read as "5 years".

    11

    Part C: Annexures and

    Forms, Annexure 4

    (P1); Pg 50

    Fiber optic based 2 TB or more row

    capacity (approx.) external RAID-5 or

    better Dual RAID controller with 1GB

    cache each with SAN switch.

    Fiber Optic based Storage is expected

    with a SAN Switch based solution, but on

    the contrary the specifications do not

    include and SAN Switch. Please refine the

    statement.

    Please refer to clarification mentioned above.

    12

    Part C: Annexures and

    Forms, Annexure 4

    (P1); Pg 51

    Tape Library, LTO-5 or better/Backup

    Tape Drive

    This statement contradicts with the

    specifications of device. LTO-4/LTO-5

    will give he flexibility of quoting for

    either of them but there is a cost

    difference in both. Please suggest which

    drive is required.

    Please refer to clarification mentioned above.

    Queries Raised by: MUDRA

  • 8/2/2019 Clarifications 29-12-11

    22/25

    S.No.

    RFP Reference/ VendorReference

    RFP Clause Clarification Sought Clarifications by PTCUL

    1

    5.0 Minimum

    specification for

    hardware, Other

    Passive Components;

    Pg 17

    2x24 Port Patch Panel It should be 2x24 port Cat6A based Patch

    Panel.

    Please stick to requirements of RFP requestedfrom Bidder and is understood. It is alsorequested to please read RFP carefully for clarity.

    2

    5.0 Minimum

    specification for

    hardware, Unified

    Threat Management

    Applicance; Pg 21

    Subscriptions of different functionalities

    such as IPS/IDS, Gateway Antivirus,

    Gateway Antispam are not mentioned

    specifically. We suggest, based on the

    clause mentioned on page 11, it should be

    bundled with 5 Year Subscription

    License.

    Need not to be mentioned separately, this allcomes under scope of work as per RFP

    3

    Part C: Annexures and

    Forms, Annexure 4(P1); Pg 51

    Layer 2 Swtich (Managed)/Layer 3

    Switch(24)

    Specs mentioned in Technical Specs

    section is for a Layer - 2 POE Switch, thusthe same needs to be changed.

    Please read RFP carefully and proposed according

    to Specifications mentioned.

    Queries Raised by: HP & M/s ESDS SOFTWARE SOLUTION PVT. LTD.

  • 8/2/2019 Clarifications 29-12-11

    23/25

    S.No.

    RFP Reference/ VendorReference

    RFP Clause Clarification Sought Clarifications by PTCUL

    1

    7. IPSECWAN/INTERNETROUTER/Page No.18

    Port Configuration:Shall have at least 4 nos of 10/100/1000RJ45 LAN Ports

    225 KPPS of Router performance is asked .With this performance the router will usemaximum 100 Mbps bandwidth on port ,and the gigabit port is not required at all.More over, the gigabit bandwidth contains

    more electrical interferences hence it is lessstable as compare to fast ethernet and atrouter end the link stability is veryimportant, hence we request you to modifythe clause as "Shall have at least 4 nos of10/100 RJ45 LAN Ports"

    Please stick to requirements of RFP requestedfrom Bidder. It is also requested to please readRFP carefully for clarity.

    2

    7. IPSECWAN/INTERNETROUTER/Page No.18

    Performance:AES256+SHA-1/3DES+SHA-1 VPNperformance of at least 400 MBPS

    As compared to Router performance whichis 225 KPPS the VPN performance asked isextremely high. With this router

    performance the VPN performance must notexceed 250 Mbps, hence we request you tomodify the clause as "AES256+SHA-1/3DES+SHA-1 VPN performance of atleast 250 MBPS" . Currently the clause isfavoring a Single OEM and hence requestyou to make the chnage to make it genericwithout impacting the overall requirementas submitted please

    Please stick to requirements of RFP requestedfrom Bidder. It is also requested to please readRFP carefully for clarity.

    3

    7. IPSEC

    WAN/INTERNETROUTER/Page No.18

    Routing

    Should support 64K/5K BGP/OSPF Routes

    As per the envisaged network infrastructure

    there is not much requirement of BGP. BGPis generally used for backing the corerouting decision on internet . Withinintranet OSPF is used and OSPF which is therequirement of this network, its routesasked are very low hence we request you tomodify the clause as "Should support30K/10K BGP/OSPF Routes" to make itgeneric for all OEMs and enable them tobid

    Please stick to requirements of RFP requested

    from Bidder. It is also requested to please readRFP carefully for clarity.

    4

    7. IPSECWAN/INTERNETROUTER/Page No.18

    IPsec VPNConcurrent VPN tunnels 512MB

    VPN tunnels is not a memory term hence itshould not be measured in MB. VPN tunnelis generally only numbers, hence we requestyou to modify the clause as "ConcurrentVPN tunnels 512"

    Please refer to clarification mentioned above.

  • 8/2/2019 Clarifications 29-12-11

    24/25

    8. L2 SWITCH POWERON ETHERNET

    1000BASE-ZX (SFP) 1000BASE ZX is non standard gigabitEthernet transmission using 1,550 nm

  • 8/2/2019 Clarifications 29-12-11

    25/25

    11

    (PoE)/Page No.20g ,

    wavelength to achieve distances of at least70 km over single-mode fiber.Today'sstandard use 1000Base-LH(SFP) using1550nm to achive 70 Km distance,hence werequest you to modify the clause as1000BASE-ZX(SFP)/1000BASE-LH(SFP)

    12

    8. L2 SWITCH POWERON ETHERNET(PoE)/Page No.20

    1000BASE-CWDM SFP 1470 nm1000BASE-CWDM SFP 1490 nm1000BASE-CWDM SFP 1510 nm1000BASE-CWDM SFP 1530 nm1000BASE-CWDM SFP 1550 nm1000BASE-CWDM SFP 1570 nm1000BASE-CWDM SFP 1590 nm7 Standards1000BASE-CWDM SFP 1610 nm

    This network infrastructure doesnt haveneed of CWDM.CWDM is used in telecom& defence organizations and it is generallyfeature of industry grade switches hence werequest you to remove this clause" which isnot the requirement of the RFP/department.

    Please stick to requirements of RFP requestedfrom Bidder. It is also requested to please readRFP carefully for clarity.

    13

    4.(SAN) Host Interface Storage to be provided with 4 or moe 8Gbps Fibre connectivity ports with 8 portfibrechannel HBA

    Instead of 8 port fibre channel it should be 8port FC redundant switches. Please clarify

    Please stick to requirements of RFP requestedfrom Bidder. It is also requested to please readRFP carefully for clarity.

    14

    4. (SAN) RAIDConfiguration

    RAID controller should support RAID levels0, 1, 3, 5, 6, and 10

    Hardware RAID is not mentioned whichresults in better reliability and performanceand hence request you to kindly amend theclause as " RAID controller should supportHardware RAID levels 0, 1, 3, 5, 6, and 10

    15

    1.Database Server PCI Ports PCI ports have been replaced by PCI-e ports

    and hence request you to kindly amend theclause as : 4 PCI-e slots scalable to min 6slots for future expansion