Claremont Court 76 Packhorse Road
Gerrards Cross SL9 8HY
Instruction
We are instructed by David Charles Property Consultants to conduct a 5 year periodic inspection to
the landlords’ electrical installations at: Claremont Court, SL9 8HY. We attended site on 6th August
2013 to carry out our testing and inspections to current regulations BS7671 – 17th edition.
Property
Claremont is a single block of private flats with an underground car park. The block has flats on 4
levels (G+3) with landlords’ service over G+2 only. All flats are accessed via the common entrance,
hallways, stairs and a lift to 2nd floors, the 3rd floor flat being accessed from 2nd floor. The electrical
intake position is in the car park area with the landlords’ services in a basement cupboard off the
lobby.
Page 2 of 4
Scope
Within the current requirements of BS7671- 17th edition and amendment No. 1 dated January 2012,
it is now a requirement to conduct a fuller range of inspections that require the shutdown of power
to all parts of the property being tested. In this instance there is a single multi-way service head
serving all flats and the landlords’ service giving a separate cut-out to each, therefore a full
inspection was possible without interruption of supply to the private flats.
Installation
There is a single multi-way service in the basement car park giving separate fuse protection to all
flats and the landlords’ service. Sub-mains from the intake run to each flat with local metering. The
landlords’ service and metering is within a basement lobby cupboard. The landlords’ installation
supplies lighting and power to all common areas within the block and outside lights. Lighting is
controlled on time lag switching with outside lighting controlled via photocell.
Page 3 of 4
Limitations
Lift
Results
Claremont is considered as 1 installation being served from a single service position. This report
should be read in conjunction with certificate no. GM/150813/01.
The installation is about 5 years old and therefore installed under the current version of BS7671 -17th
edition. Generally the installation is to a good standard with minor repairs now required.
Overall the installation is considered SATISFACTORY with the following recommendations (C3)
advised:
Code
1. Improve flex to son light in garden C3 2. Provide barrier protection to main service head C3 3. Provide labelling to 17th edition C3
Page 4 of 4
Conclusion
A single installation completed under current standard: BS7671 – 17th edition. The installation is
considered satisfactory with recommendations advised.
For S & M Electrical Ltd. 15th August 2013.
Code Key
C1 Danger present
C2 Potentially dangerous
C3 Improvements recommended
GM/ 150813 /01 1 of 5
Section A : DETAILS OF CLIENT/PERSON ORDERING REPORT
Name
Address
Section B : REASON FOR PRODUCING THIS REPORT
Dates of inspection and testing : August 2013
Section C : DETAILS OF THE INSTALLATION WHICH IS THE SUBJECT OF THIS REPORT
Occupier
Address
Description of premises if other
Estimated age of wiring 5 years
Evidence of additions/alterations years
Installation records available (621.1) Date of last inspection
Section D : EXTENT AND LIMITATIONS OF INSPECTION AND TESTING
Extent of electrical installation covered by this report
Agreed limitations including reasons (634.2)
Agreed with N/A
Operational limitations including reasons
Section E : SUMMARY OF THE CONDITION OF THE INSTALLATION
General condition of the installation (in terms of electrical safety)
Overall assessment of the installation in terms of its suitability for continued use
Section F : RECOMMENDATIONS
Section G : DECLARATION
Inspected and tested by: Report authorised for issue by
Name Name S.FREEMAN
Position Position DIRECTOR
Date Date
Section H : Schedule(s)1 1
and this report is valid only when they are attached to it.
SATISFACTORY
NO
ELECTRICAL INSTALLATION CONDITION REPORT ECA
in the schedule of test results.
Domestic
Lifts
Member Number
5 year periodic test and inspection report (PIR)
Not Apparent
Claremont Court, 76 Packhorse Rd, Gerrards Cross, Bucks, SL9 8HY
Sheet
Landlord
David Charles Property Consultants
240610
29 High Steet, PINNER, HA5 5PJ
Where the overall assessment of the suitability of the installation for continued use above is stated as UNSATISFACTORY, I recommend that any
observations classed as "Danger present" (code C1) or "Potentially dangerous" (code C2) are acted upon as a matter of urgency. Investigations without
delay is recommended for observations identified as "Further investigations required". Observations classified as "Improvements recommended"
(code C3) should be given due consideration .
The inspection and testing detailed in this report and accompanying schedules have been carried out in accordence with BS7671:2008 (IET wiring regs) 17th /1
Certificate number
if yes, age
6th
N/A
schedule(s) of inspections schedule(s) of test results are attached. The attached schedule(s) are part of this document
Subject to the necessary remedial action being taken , I recommend that the installation is further inspected and tested by: 18/08/2018
Landlords installation for common parts as detailed
been inspected unless specifically agreed between the client and inspector prior to inspection
I being the person responsible for the inspection and testing of the electrical installation (as indicated by my signature below), particulars of which
are described above, having excerised reasonable skill and care when carrying out the inspection and testing, hereby declare that the information
in this report, including the observations and the attached schedules, provides an accurate assessment of the condition of the electrical installation
taking into account the stated extent and limitations in Section D of this report.
SATISFACTORY. Improvements advised.
None
N/A
G.MARSHALL
It should be noted that cables concealed within trunking and conduits, under floors, in roof spaces and generally within the fabric of the building or underground have NOT
INSPECTOR
S & M ELECTRICAL LTD. JUBLIEE HOUSE, STANMORE, HA7 4RY
An unsatisfactory assessment indicated that dangerous (code C1) and/or potentially dangerous (code C2) conditions have been identified
15/08/2013 16/08/2013
ELECTRICAL INSTALLATION CONDITION REPORT
Sheet 2 of 5
Section I : SUPPLY CHARACTERISTICS AND EARTHING ARRANGEMENTS
TN-C a.c. x d.c. Nominal voltage U/Uo 415 V BS(EN)
TN-S 1 phase, 2 wire 2 wire Nominal frequency, f 50 Hz
TN-C-S X 2 phase, 3 wire 3 wire Prospective fault current, Ipf 3.00 kA Type
TT 3 phase, 3 wire External loop impedence, Ze 0.08 Oh
IT 3 phase, 4 wire x Rated 100 A
Confirmation of polarity x Note: By enquiry or measurement
Other sources of supply (as detailed on attached schedule
Section J: PARTICULARS OF INSTALLATION REFFERED TO IN REPORT
Distributors facility x Type
Location
Resistance to earth Ohms
Main Protective conductors
Earthing conductor Material Csa 16 mm2 Connection verified X
Main protective bonding conductors Material Csa 16 mm2 Connection verified X
To incoming water service X To incoming gas supply X To incoming oil service To structural steel
To lightning protection To other incoming services Specify:
Main switch/Switch fuse/ circuit breaker/RCD If RCD main switch
Location Current rating A Rated operating current Idn N/A mA
BS(EN) Fuse /device rating A Rated time delay N/A ms
No. poles Voltage rating V Measured operating time (at Idn) N/A ms
Section K : OBSERVATIONS
x
C1 Danger present, Risk of injury, Immediate action required.
C2 Potentially dangerous, Urgent remedial action required
C3 Improvement recommended
ECA
No remedial action is required The following observations are made
Earthing arrangements Number and type of live conductors Nature and type of supply parameters
100
100
Supply protective device
Means of earthing Details of earth electrode (where applicable)
Installation earth
electrode
N/A
1361
HRC
Referring to the attached schedules of inspection and test results, and subject to the limitations specified in the Extent and
Limitations of inspection and testing section
Copper
Copper
Basement cupb.
947/3
3 415
ObservationsClassification
code
Further investigations
required
Improvements recommended with report C3 No
One of the following codes, as appropriate, has been allocated to each of the observations made to indicate to the
person responsible for the installation the degree of urgency for remedial action required.
Sheet 3 of 5
Note: This form is suitable for many types of smaller installations not exclusively domestic
a C1 or C2 C3 Not verified NV Limitation Lim Not applicable N/A
1.0
1.1
1.2
1.3
1.4
1.5
1.6
2.0
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
4.0
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17
4.18
4.19
ECA
Unacceptable
conditionImprovement
recommended
Acceptable
condition
CONDITION REPORT INSPECTION SCHEDULE
OUTCOMES
Item No.Further
investigationsOutcomeDescription
DISTRIBUTORS/SUPPLY INTAKE EQUIPMENT
Service cable condition C3 No
C3 No
a
a
a
a
N/A
a
N/A
a
a
N/A
a
N/A
N/A
a
a
a
a
a
a
a
a
a
a
C3 No
N/A
N/A
a
a
N/A
a
N/A
aExamination of protective device(s) and base(s) ; correct type and rating (no signs of
unacceptable thermal damage, arcing or overheating ) (421.1.3)
Single pole protective devices in line conductor only (132.14.1;530.3.2)
Confirmation of main protective bonding conductor size (544.1)
Condition and accessibility of main protective bonding conductor connections (543.3.2;
544.1.2)Accessibility and condition of all protective bonding connections (543.3.2)
CONSUMER UNITS/DISTRIBUTION BOARDS
Adequacy of working space/accessibilty to consumer unit/ distribution board (132.12;513.1)
Security of fixings (134.1.1)
Condition of enclosure in terms of IP rating etc (416.2)
Condition of enclosure in terms of fire rating etc (526.5)
Enclosure not damaged/deteriorated so as to impair safty (621.2 iii)
Protection against mechanical damage where cables enter consumer unit/distribution board
(522.8.1;522.8.11)
Protection against electromagnetic effects where cables enter consumer unit/distribution
board / enclosures (521.5.1)
Presence of main linked switch (as required by 537.1.4)
Operation of main switch (functional check) (612.13.2)
Manual operation of circuit breakers and RCD's to prove disconnection (612.13.2)
Correct identification of circuit details and protective devices (514.8.1;514.9.1)
Presence of RCD quarterly test notice present at or near consumer unit/distribution board
(514.12.2)Presence of non-standard (mixed) cable colour warning notice at or near the consumer
unit/distribution board (514.14)
Condition of service head
Condition of tails -distributor
Condition of tails -consumer
Condition of metering equipment
Condition of isolator (where present)
Accessibility and condition of earthing conductor at MET (543.3.2)
PRESENCE OF ADEQUATE ARRANGEMENTS FOR SECONDARY OR ALTERNATE SOURCES SUCH
AS MICROGENERATION (551.6;551.7)
EARTHING/BONDING ARRANGEMENTS (411.3; chap 54)
Provision of earthing/bonding labels at all appropriate locations (514.13.1)
Confirmation of earthing conductor size (542.3; 543.1.1)
Presence and condition of distributors earthing arrangement (542.1.2.3; 542.1.2.2)
Presence and condition of earth electrode where applicable (542.1.2.3)
RCDs provided for fault protection - including RCBO's (411.4.9;411.5.2;431.2)
RCDs provided for additional protection - including RCBO's (411.3.3;415.1)
Presence of alternative supply warning notice at or near the consumer unit/distribution board
(514.15)
Presence of other required labelling (please specify) (Section 514)
Sheet 4 of 5
5.0
5.1
5.2
5.3
5.4
- to include the integrity of the conduit and trunking systems (metallic and plastic)
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
- For supply to mobile equipment not exceeding 32a rating for use outdoors (411.3.3)
- For cables concealed in walls or partitions (522.6.102;522.6.103)
5.13
5.14
5.15
5.16
5.17
5.18
5.19
6.0
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
7.0 OTHER PART 7 SPECIAL INSTALLATIONS OR LOCATIONS
7.1
Name: Signature Date
Condition of insulation of live parts (416.1)
Non sheathed cables protected by enclosure in conduit, duct or trunking (521.10.1) a
Identification of conductors (514.3.1)
Cables correctly supported throughout their run (522.8.5)
FINAL CIRCUITS
Adequacy of cables for current-carrying capacity with regard for the type and nature of the
installation (Section 523)
Co-ordination between conductors and overload protective devices (433.1;533.2.1)
Adequacy of protective devices: type and rated current for fault protection (411.3)
Presence and adequacy of circuit protective conductors (411.3.1.1; Section 543.1)
Wiring system(s) appropriate for the type and nature of the installation and external influences
(section 522)
Concealed cables installed in prescribed zones (see Section D: Extent and limitations)
(522.6.101)Consealed cables incorporating earthed armour or sheath, or run within earthed wiring system,
or otherwise protected against mechanical damage from nails, screws and the like (see section
D: Extent and limitations) (522.6.101;522.6.103)
Provision of additional protection by RCD not exceeding 30mA
Provision of fire barriers, sealing arrangements and protection against thermal effects (section
527)
Band II cables segregated / seperated from band I cables (528.1)
Cables segregated / seperated from communication cabling (528.2)
Cables segregated / seperated from non electrical services (528.3)
-For all socket outlets of rating 20a or less provided for use by ordinary persons unless an
exception is permitted (411.3.3)
Termination of cables at enclosures - indicate extent of sampling in section D of the report
(section 526)
- Cables soundly made and under no undue strain (562.6)
- No basic insulation of a conductor visible outside enclosure (526.8)
- Connections of live conductors adequately enclosed (526.5)
- Adequately connected at point of entry to enclosure (glands, bushes etc) (522.8.5)
Condition of accessories including socket outlets, switches and joint boxes (621.2 iii)
Suitability of accessories for external influences (512.2)
LOCATIONS CONTAINING A BATH OR SHOWER
Additional protection for all low voltage (LV) circuits by RCD not exceeding 30mA (701.411.3.3)
Where used as a protective measure, requirements for SELV or PELV met (701.414.4.5)
Shaver sockets comply with BS EN 61558-2-5 formerly BS 3535 (701.512.3)
Suitability of equipment for external influences for installed location in terms of IP rating
(701.512.2)
Presence of supplimentry bonding conductors , unless not required by BS7671:2008
(701.415.2)
Low voltage (eg 230v) socket outlets sited at least 3m from zone 1 (701.512.3)
Suitability of equipment for installation in a particular zone (701.512.3)
a
a
a
a
a
a
a
a
C3 No
N/A
N/A
a
a
a
a
a
25%
a
a
a
a
a
a
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Tested by:
Item No. Description
15/08/2013
OutcomeFurther
investigations
a
Suitability of current-using equipment for a particular position within the location (701.55)
List all other special installations or locations present, if any (record seperately the results of
particular inspections applied).
MARSHALL
N/A
N/A
N/A
Location
Name Marshall Type Ref No.
Date 15/08/13 Size mm2 ZS Ohms 9104044Title Tester Protection PFC ka
Earth Fault RCD
Trip Time
6 ka @1n
Ref Description Amps
Installed
Method
Live
mm2
CPC
mm2 Zs Ohns ms
1L1 Spare B 6 X x x x x x x x x x x x x
1L2 Spare B 10 X x x x x x x x x x x x x
1L3 Spare B 10 X x x x x x x x x x x x x
2L1 Door B 10 X 2.5 1.5 0.48 x x x >50 >50 ok 0.42 x x
2L2 Lights - G + 1 + 2 C 10 X 1.0 1.5 1.13 x x x >50 >50 ok 0.86 26 ok
2L3 Lights - ext B 10 X 1.5 2.5 1.26 x x x >50 >50 ok 1.59 28 ok
3L1 Lights - Car park B 10 X 1.5 1.0 0.61 x x x >50 >50 ok 0.77 28 ok
3L2 Lights - basement B 10 X 1.0 1.0 0.38 x x x >50 >50 ok 0.29 28 ok
3L3 Heating B 32 X 2.5 1.5 x 0.44 0.46 x >50 >50 ok 0.48 26 ok
4L1 Fire Alarm B 10 X 2.5 1.5 x x x x x x x x x x
4L2 Gate power B 10 X 2.5 2.5 1.38 x x x >50 >50 ok 1.65 36 ok
4L3 Sockets all B 20 X 2.5 1.5 0.38 x x x >50 >50 ok 0.64 28 ok
5L1 Pumps C 16 X 4.0 M x x x x x x x x x x
5L2 Pumps C 16 X 4.0 M x x x x x x x x x x
5L3 Pumps C 16 X 4.0 M x x x x x x x x x x
6L1 Lift C 32 X 4.0 M x x x x x x x x x x
6L2 Lift C 32 X 4.0 M x x x x x x x x x x
6L3 Lift C 32 X 4.0 M x x x x x x x x x x
Comments
M = Mechanical earthing. Sheet 5 of 5
Type
Overcurrent device
short circuit capacity
Conductors Continuity
Insulation
Resistance
Po
larity
L-E
Moh
N-E
Moh
S & M Electrical Ltd. Schedule of Test ResultsJubliee House, Stanmore, Middx.
Property : Claremont Court, 76 Packhorse Rd, Gerrards Cross, Bucks, SL9 8HY
25 0.09 Fluke 1651
RCBO test
Tester Details Sub- Main Dist Board Basement cupboardTails Instrument Type Verified
04/03/2013
1361 2.67Installed Circuits Test Results
Other
Tests
CircuitsCopper
Ring Loop
ImpedanceR1
+R2
Ohm
P-P
Ohm
N-N
Ohm
61009
61009
60898
E-E
Ohm
60898
60898
60898
60898
61009
60898
60898
60898
60898
60898
61009
61009
61009
61009
60898
RCBO test
RCBO test
RCBO test
RCBO test
ECA
Remarks
RCBO test
RCBO test