CITY OF SAGINAW LEAD SERVICE LINE
REPLACEMENT PROGRAM City Council Meeting
August 5, 2019
1
OHM Advisors®
WHY DO WE CARE ABOUT LEAD?
2
EPA LEAD AND COPPER RULE TIMELINE
1986-88 1991 2004-07 2011
Lead Ban and EPA Lead and Lead and Reduction of
Lead Copper Rule Copper Rule Lead in Drinking
Contamination Revisions Water Act
& Control Act
OHM Advisors®3
MICHIGAN LEAD AND COPPER RULE UPDATE
2014-2016 2017 Jan 29, 2018 June 14, 2018
Stakeholder & Rule Changes Flint Water Crisis Public Meetings Draft Rule Finalized
OHM Advisors®4
SIGNIFICANT EVENTS
Sept 14, 2018 Oct 2018 Dec 11, 2018 Jan 1, 2019
Statewide Community Legal New Sampling Advisory Council Advisory
Challenges Procedures for should have been Councils
sites with LSLs formed Appointed
OHM Advisors®5
KEY COMPLIANCE DATES
Jan 1, 2020 Jan 1, 2021 Jan 1, 2025 Preliminary Distribution Start Lead Service Verified Distribution System Materials Line Replacements System Materials Inventory Inventory Updated at 5% per year Lead action level from 15 Sampling Pool to 12 parts per billion
OHM Advisors®6
RIGHT-OF-WAY PERMIT -------------Road rig ht-of-way (varies per street)
SIDEWALK· STREET
[
WM~CONNECTIO!i_WME~XTENSl~-
WATERMAIN I (SIZE VARIES) WATER SHUT
~ - OFF BOX ~ I
L---------------J WATER SERVICE LINE
Replacement requirement includes publicly and privately-owned
portions of the Lead Service Line
OHM Advisors®7
SAGINAW PROGRESS TO DATE
Michigan EGLE Pilot Drinking Water Grant $963,000 Verification of pipe materials Review of existing records
Emergency Replacements ~600 lead service lines
Bay Street and Mackinaw Construction projects
Public Engagement Materials
Water Advisory Board created on November 26, 2018 and first met on February 27, 2019
Has met 3 times to date (February, May, June)
OHM Advisors®8
OHM Advisors®9
ESTIMATES
30,000 service lines in the City
Approximately 12,000 lead service line replacements
20-25 years to complete all replacements
Plan to replace lead services first, followed by galvanized services. Copper services may be replaced if needed.
City will replace any service line 2” and smaller in diameter for a maximum of 1 replacement during the 20-25 year period so all residents benefit from the fee.
OHM Advisors®10
PLANS FOR COST EFFECTIVE REPLACEMENTS
Utilize City Staff to Complete Replacements
Better quality control
Better communication
Keeps money in the City
Lower Cost
City replacement cost - $3,000
Contractor replacement costs average $4,500 or more
OHM Advisors®11
SHORT AND LONG TERM COST EXPECTATIONS
Establish a new Service Line Division in the budget to track costs and progress.
Replacement costs will change over time.
Labor and material costs will go up
Improved learning curve will increase efficiencies
OHM Advisors®12
QUESTIONS
City of Saginaw
Maintenance and Service Department
1701 S. Jefferson
Saginaw, MI 48601
Tel: 989-759-1612