May 8, 2001 2

High Speed Electrical Testing

High Speed Electrical Testing

Jim ChoateJim Choate

Intel CorporationIntel Corporation

Page 3: Choate hs elec_test_final

May 8, 2001 3

AgendaAgenda

Electrical Testing GoalsElectrical Testing Goals Test ModesTest Modes Electrical Testing ProceduresElectrical Testing Procedures Problems to AvoidProblems to Avoid SummarySummary

Page 4: Choate hs elec_test_final

May 8, 2001 4

Goals of the ElectricalCompliance ProgramGoals of the ElectricalCompliance Program

High Quality USB ProductsHigh Quality USB Products Stable, Repeatable, Well Documented TestsStable, Repeatable, Well Documented Tests

– Documented Equipment SetupsDocumented Equipment Setups– Documented Test ProceduresDocumented Test Procedures– Documented Test Assertions and DescriptionsDocumented Test Assertions and Descriptions

Leverage USB FS/LS Electrical TestsLeverage USB FS/LS Electrical Tests– FS and LS Electrical Testing (LS for downstream ports)FS and LS Electrical Testing (LS for downstream ports)– InrushInrush– Drop and DroopDrop and Droop

Page 5: Choate hs elec_test_final

May 8, 2001 5

New Testing AreasNew Testing Areas

ElectricalsElectricals– High Speed Signal QualityHigh Speed Signal Quality– Time Domain Reflectometry Time Domain Reflectometry

(TDR)(TDR)– Receiver Sensitivity and Receiver Sensitivity and

SquelchSquelch– J and K Voltage LevelsJ and K Voltage Levels– ChIRPChIRP

HS Electrical Test Spec On USB-IF Members SiteHS Electrical Test Spec On USB-IF Members Site

– Disconnect thresholdsDisconnect thresholds– Packet ParametersPacket Parameters– Suspend/ResumeSuspend/Resume– High Speed Hub ParametersHigh Speed Hub Parameters

Sync truncationSync truncation EOP dribbleEOP dribble etcetc

USB High Speed Electrical Testing Starts at a High LevelUSB High Speed Electrical Testing Starts at a High Level

Page 6: Choate hs elec_test_final

May 8, 2001 6

USB HS ElectricalTest ModesUSB HS ElectricalTest Modes

High-speed Capable Devices/Hubs Must Support High-speed Capable Devices/Hubs Must Support Test Modes Test Modes

Page 7: Choate hs elec_test_final

May 8, 2001 7

General HS ElectricalTest ProcedureGeneral HS ElectricalTest Procedure

Connect Device Under Test To Test Port on FixtureConnect Device Under Test To Test Port on Fixture Configure DUT With Test Mode SWConfigure DUT With Test Mode SW Isolate DUT from Host with High Speed RelayIsolate DUT from Host with High Speed Relay Make Appropriate Electrical MeasurementsMake Appropriate Electrical Measurements

Page 8: Choate hs elec_test_final

May 8, 2001 8USB HS Test FixtureUSB HS Test Fixture

HS RelayHS RelayHS RelayHS RelayTest PortTest Port

InitializationInitializationPortPort

Diff ProbeDiff ProbeDataDataGeneratorGenerator

90 Ohms90 Ohms

PowerPowerSelectionSelection

CktCkt

PowerPowerSelectionSelection

CktCkt

Vbus1Vbus1 Vbus2Vbus2VccVcc

GndGnd

New Test Fixture(s)New Test Fixture(s)

Signal QualitySignal Quality TDRTDR Receiver SensitivityReceiver Sensitivity ChIRPChIRP J and K LevelsJ and K Levels Disconnect thresholdDisconnect threshold Packet parametersPacket parameters Suspend & ResumeSuspend & Resume Test ModesTest Modes

Page 9: Choate hs elec_test_final

May 8, 2001 9

High Speed Device SignalHigh Speed Device SignalQuality Test FixtureQuality Test Fixture

Test PortTest Port Init PortInit Port

To Host ControllerTo Host

ControllerTo Device Under TestTo Device Under Test

Isolation relay powerIsolation relay power

Test SwitchTest SwitchDiff Probe Test PointDiff Probe Test Point

New Test Fixture(s)New Test Fixture(s)

Page 10: Choate hs elec_test_final

May 8, 2001 10

9090

HS Signal QualityTest ProcedureHS Signal QualityTest Procedure

Put Device in Test Mode Put Device in Test Mode Test_PacketTest_Packet– Flip Test Fixture Relays Flip Test Fixture Relays

To Route Output toTo Route Output to90 Ohm Termination90 Ohm Termination

– Capture WaveformCapture Waveformon oscilloscopeon oscilloscope

– Analyze dataAnalyze data Data analysis is Data analysis is

performed by generating performed by generating an eye patternan eye pattern

Test Mode SW

OscilloscopeOscilloscope

USB HS Test FixtureUSB HS Test Fixture

HS RelayHS RelayHS RelayHS Relay

Differential ProbeDifferential Probe

DeviceDeviceUnderUnder TestTest

Page 11: Choate hs elec_test_final

May 8, 2001 11

Eye Pattern GenerationEye Pattern Generation

Time vs. voltage test packet data is transferred Time vs. voltage test packet data is transferred from scope to PC through GPIBfrom scope to PC through GPIB

Page 12: Choate hs elec_test_final

May 8, 2001 12

Eye Pattern GenerationEye Pattern Generation

Signal analysis scripts determine data rate from Signal analysis scripts determine data rate from zero volt crossovers zero volt crossovers – Crossovers indicated at zero crossings belowCrossovers indicated at zero crossings below

Mean bit time calculatedMean bit time calculated Reference frame created Reference frame created

from meanfrom mean

Page 13: Choate hs elec_test_final

May 8, 2001 13

Eye Pattern GenerationEye Pattern Generation

Reference frame position is optimized by Reference frame position is optimized by minimizing least squares error betweenminimizing least squares error betweenreference frame and actual crossoversreference frame and actual crossovers

Reference points between Reference points between runs ignoredruns ignored

Optimized reference pointOptimized reference point

Actual crossoverActual crossover

Page 14: Choate hs elec_test_final

May 8, 2001 14

hs plot

-0.5

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4

0.5

time

volt

s

-0.5

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4

0.5

1 bit time

Eye Pattern GenerationEye Pattern Generation

Data is parsed into Data is parsed into bit time internals bit time internals using optimized using optimized reference framereference frame

Eye pattern created Eye pattern created from bit time from bit time intervalsintervals

Page 15: Choate hs elec_test_final

May 8, 2001 15

Passing Eye PatternPassing Eye Pattern

Example of passing High Speed Eye - Host Example of passing High Speed Eye - Host Controller at TP2Controller at TP2

Page 16: Choate hs elec_test_final

May 8, 2001 16

Failing Eye PatternsFailing Eye Patterns

Min/Max voltage level failureMin/Max voltage level failure Caused by out of spec HS Caused by out of spec HS

terminationtermination

Jitter failureJitter failure Caused by noise from Caused by noise from

power supplypower supply

Page 17: Choate hs elec_test_final

May 8, 2001 17

HS Device Receiver Sensitivityand Squelch Test ProcedureHS Device Receiver Sensitivityand Squelch Test Procedure

DUT is Placed In DUT is Placed In Test_SEO_NAK Test Mode Test_SEO_NAK Test Mode using Test Mode SWusing Test Mode SW

The test fixture replaces The test fixture replaces the host by switching the the host by switching the connection to the Data connection to the Data GeneratorGenerator

Data GeneratorData GeneratorGenerates IN PacketsGenerates IN Packets

Device Must RespondDevice Must Respondfor In Spec Packetsfor In Spec Packets

Device Must Not Respond Device Must Not Respond to Out of Spec Data to Out of Spec Data Generator OutputGenerator Output

Data GeneratorData GeneratorTest Mode

SW

USB 2.0 Test FixtureUSB 2.0 Test Fixture

HS RelayHS RelayHS RelayHS Relay

Device underDevice under testtest

SMASMA

Page 18: Choate hs elec_test_final

May 8, 2001 18

Device response Device response to nominal to nominal packetspackets

Device response Device response to minimum to minimum packetspackets

Device must not Device must not respond to respond to packets below packets below squelch thresholdsquelch threshold

HS Device Receiver Sensitivity and Squelch Test ResultsHS Device Receiver Sensitivity and Squelch Test Results

DG packetDG packetDG packetDG packet Device ResponseDevice Response No Device ResponseNo Device ResponseNo Device ResponseNo Device Response

Minimum Receiver sensitivity thresholdMinimum Receiver sensitivity threshold

Page 19: Choate hs elec_test_final

May 8, 2001 19

TDR Test ProcedureTDR Test Procedure

Device Under Test Device Under Test Placed In Placed In Test_SEO_NAK ModeTest_SEO_NAK Mode

Relay Switches Idle Data Relay Switches Idle Data Lines to TDR Lines to TDR

TDR BroadcastsTDR BroadcastsTest SignalTest Signal

TDR MeasuresTDR MeasuresSignal Reflections To Signal Reflections To Determine Termination Determine Termination And PCB ImpedanceAnd PCB Impedance

TDRTDRTest Mode

SW

USB 2.0 Test FixtureUSB 2.0 Test Fixture

HS RelayHS RelayHS RelayHS Relay

Device UnderDevice Under TestTest

SMASMA

Page 20: Choate hs elec_test_final

May 8, 2001 20

Open voltage step indicates Open voltage step indicates connector connector

reference locationreference location

TDR Test ProcedureTDR Test Procedure

Determining connector reference locationDetermining connector reference location– TDR connected to test fixtureTDR connected to test fixture– Test fixture disconnected from device under testTest fixture disconnected from device under test– Voltage step occurs at connector end (open step)Voltage step occurs at connector end (open step)

Page 21: Choate hs elec_test_final

May 8, 2001 21

ZHSTHRU70 to 110 Ohms

(red cursors)

ZHSTERM80 to 100 Ohms(yellow region)

USB connector

Excursion of ZHSTHRU passes using exception window

TDR Test ProcedureTDR Test Procedure

Measuring TDR responseMeasuring TDR response

Page 22: Choate hs elec_test_final

May 8, 2001 22

Violates ZHSTHRU for > 800psViolates ZHSTHRU for > 800ps

TDR Test ProcedureTDR Test Procedure

TDR Test FailsTDR Test Fails– Cause: Using a ribbon cable between the PCB & USB connectorCause: Using a ribbon cable between the PCB & USB connector

Page 23: Choate hs elec_test_final

May 8, 2001 23

Other Test ModesOther Test Modes

Test_J & Test_KTest_J & Test_K– Port enters and remains in the high-speedPort enters and remains in the high-speed

J or K stateJ or K state– Allows testing of output voltage and impedanceAllows testing of output voltage and impedance

when each output is high or lowwhen each output is high or low Test Force EnableTest Force Enable

– Allows testing disconnectAllows testing disconnect

Page 24: Choate hs elec_test_final

May 8, 2001 24

ConclusionsConclusions

High Speed Electrical Testing is Comprehensive High Speed Electrical Testing is Comprehensive – Electrical TestingElectrical Testing

HS Signal QualityHS Signal Quality TDRTDR Receiver SensitivityReceiver Sensitivity Suspend/ResumeSuspend/Resume

– Repeater TestingRepeater Testing Sync truncation, EOP dribble, etcSync truncation, EOP dribble, etc

Well Documented TestsWell Documented Tests– Test ProceduresTest Procedures– Test SpecificationsTest Specifications