Change Management Process Version 1.0
Change Management Process
Version 1.0
August, 2005
Duquesne University – Implementation Team
Change Management Process Version 1.0
Disclaimer
This document and all materials contained herein are proprietary property of Duquesne University –
Implementation Team (DU-IT) project and as such are intended for the exclusive use of Duquesne University and any designated third-parties that Duquesne University sees
fit to provide this information to for use in the implementation and support of DU-IT project requirements.
Duquesne University – Implementation Team
Change Management Process Version 1.0
Document Details
Version: 1.0Status: DraftDocument file name: document.docSaved in:Pages (total): 30
Maintaining Org. Unit: DU-IT Project Management Office (PMO)
Initial Creation Date: 10 July 2005Release Date: 5 August 2005
Document Ownership and Maintenance
As the process owners for this process the DU-IT PMO creates and maintains this document. Any changes to this process and this corresponding documentation must be approved by the DU-IT Project Director and Steering Committee prior to release.
Revision History
Version Author Release Date Change Description
1.0 T.P. Morgan N/A Draft release
Duquesne University – Implementation Team
Change Management Process Version 1.0
Table of Contents
PURPOSE................................................................................................................................................... 3
KEY PROCESS OBJECTIVES................................................................................................................... 3
PROCESS SCOPE...................................................................................................................................... 3
PROCESS OVERVIEW............................................................................................................................... 3
THE CHANGE MANAGEMENT PROCESS...............................................................................................2
CHANGE MANAGEMENT PROCEDURES (DETAILED)...........................................................................3
The Change Request Procedure.............................................................................................................3Purpose............................................................................................................................................... 3Procedure............................................................................................................................................ 3
The Change Approval Procedure............................................................................................................3Purpose............................................................................................................................................... 3Procedure............................................................................................................................................ 3
EMERGENCY CHANGE REQUEST...........................................................................................................3
The Emergency Change Process............................................................................................................3Emergency Change Procedure................................................................................................................3
Purpose............................................................................................................................................... 3Procedure............................................................................................................................................ 3
CHANGE MANAGEMENT FORMS............................................................................................................3
Change Request Form (Sample).............................................................................................................3Change Control Log (Sample)...............................................................................................................12Emergency Change Request Form (Sample)..........................................................................................3Emergency Change Control Log (Sample)..............................................................................................3
APPENDICES............................................................................................................................................. 3
Definitions/Key Terms.............................................................................................................................. 3Roles and Responsibilities....................................................................................................................... 3Change Reviewers Key Assignments......................................................................................................3Change Request Key Attributes...............................................................................................................3Emergency Change Request Key Attributes............................................................................................3Emergency Change Control Log Key Attributes......................................................................................3Change Control Board Meeting – Sample Agenda..................................................................................3Change Type........................................................................................................................................... 3Change Status......................................................................................................................................... 3Change Impact........................................................................................................................................ 3Change Priorities..................................................................................................................................... 3Prirority/Impact Matrix.............................................................................................................................. 3Impact Analysis Criteria........................................................................................................................... 3
DU-IT Project
Change Management Process Version 1.0
Purpose
To minimize disruptions in service to developer and users of the Duquesne University – Implementation Team (DU-IT) technology infrastructure by managing change requests and their associated impacts/activities on DU-IT Infrastructure environment. For purposes of this process changes are defined as installs, modifications or deletions that alter the production infrastructure and operations environment.
Key Process Objectives
Establish a common approach for requesting/documenting change requests/requirements Implement proper controls/sign-off’s/authorizations for all change requests Describe the required communications/coordination points for properly processing changes Create an audit trail of all DU-IT Infrastructure requested and implemented changes
Process Scope
This process shall be used by all parties requesting changes to/within DU-IT Infrastructure staging and production environments including (but not limited to) changes such as:
Hardware changes System software changes (operating level) Application changes (e.g. functionality updates, web page additions/deletions, URL link
additions/deletions, releases, etc.) Network changes Interface changes (other application, links, uploads/downloads, etc.) Database changes Operational and support procedures and documentation changes Version upgrades/enhancements/patches Planned/scheduled outages
Process Overview
Change request is documented and approved by “business” sponsor/management Change is forwarded to appropriate Change Manager(s) Change Manager(s) log change request and verify change completeness/accuracy Change reviewer(s) access to overall impact of the change request (time/resources etc) Change control board approves change request for implementation Change(s) are implemented on a scheduled basis as appropriate Rejected changes are re-worked or cancelled as appropriate Change status is updated/communicated at each step of the process
DU-IT Project Page 1 of 30
Change Management Process Version 1.0
Change Management Procedures (Detailed)
The Change Request Procedure
Purpose
This procedure describes how the specific requirements of a change are documented and assessed for impact, timing and resource purposes. As noted above, the details and status of the change request are recorded and reported to all affected organizations as needed throughout the process.
Procedure
1. The Change Request (CR) form is completed by any person requesting a change to the DU-IT Infrastructure.
2. After appropriate business approvals/sign-offs have been acquired, the CR is forwarded to the appropriate Change Manager(s).
3. The Change Manager validates the CR for completeness and logs the CR information into the Change Control Log for tracking. Incomplete CR’s are returned to the requestor for update and re-submission.
4. The Change Manager evaluates the nature of the request and makes preliminary assignments as to Change Type, Change Priority and Change Impact.
5. The CR is forwarded to the appropriate Change Reviewer(s) to assess the impact of the change. The Change Reviewer(s) represent an individual or a team depending on the scope, priority and impact of the request. Change Reviewers include designated subject matter experts and managers from application development, support, database and administrations operations as well as project level team members (both DU and third party vendors) as described in the Change Reviewer Key Assignments.
6. The Change Reviewer(s) evaluate the request and describe how the change impacts the infrastructure. In many cases, the original change requestor becomes part of the impact assessment process to provide additional input and guidance. In addition, the change reviewer(s) also validates the priority and change type. The Change Impact Criteria and Priority-Impact Matrix can be used as tools to assess the change.
7. Change Reviewer(s) respond within the timeframe specified by the Change Manager. Timeframe is dependent on the priority of the request.
8. The Change Reviewer(s) provide feedback to the Change Manager to update the Change Control Log and provide the status of the CR to the requestor.
DU-IT Project Page 3 of 30
Change Management Process Version 1.0
The Change Approval Procedure
Purpose
This procedure establishes the Change Control Board (CCB) which is the foundation and structure for management review, coordination and final approval of all change requests. The procedure requires participation from all organizations using and supporting the DU-IT environment. The schedules and status of each change implementation are reported to all affected organizations as needed throughout the process.
Procedure
1. The Change Control Board (CCB) meets on a regular schedule to review new change requests and receive status updates on outstanding requests. The Change Manager is responsible for coordinating and chairing the meeting.
2. The Change Manager provides information from the Change Request form as well as the impact assessment input provided by the Change Reviewers to create a CCB Agenda for the meeting.
3. Changes are reviewed and validated as to Change Impact and Change Priority by the CCB.
4. Changes assessed with Minor Impact by the Change Reviewer(s) can be approved and scheduled for implementation by the Change Manager and do not require CCB approval. All such scheduled changes must be reported to the Board as part of the meeting.
5. The CCB reviews all other changes in detail, and discusses and evaluates each request as to purpose, reasons, impact, cost and benefits. Each Board member represents their department and provides guidance on the change requests.
6. The CCB also reviews multiple requests to coordinate implementations and “package” requests into a single release schedule (e.g. three applications areas requesting migration to a new version of a database).
7. All changes occur to the staging and production environments on a pre-defined schedule. The Change Control Board determines how to schedule the change within the pre-defined schedule based on other planned changes, estimates to complete the updates, testing and implementation and available resources.
8. The CCB approves or rejects the change request documenting reasons for the decision. Approved changes are scheduled for staging and production implementation. The Change Manager updates the Change Control Log and provides the final status to the requestor.
9. If the schedule changes (request delays or changes in priorities) the CCB review the impact and reschedules the change at the next CCB meeting.
10. Scheduled change requests are released to the staging platform and staging tests are performed per the implementation and test plans by the Change Implementer.
DU-IT Project Page 4 of 30
Change Management Process Version 1.0
Staging tests include, but are not limited to: installation scripts, data conversion, load/stress, rollback/recovery, fail-over, etc. The Change Implementer signs off on the results of the testing of each report.
11. Staging test results are reviewed with the CCB at the next CCB meeting. The results are reviewed by re-examining the impact assessments verifying that each impact has been tested for and/or verified by the Change Implementer(s). Successful staging test results are released for Production Implementation. The Change Manager updates the Change Control Log with the status.
12. Production Implementation results are reviewed with the CCB at the next CCB meeting. Successful Implementation results recorded in the Change Control Log.
13. On a periodic basis, the Change Manager produces a report to communicate all implementations to all involved groups through a standard distribution list. The Change Manager also reviews the Change Control Log and Change Request Forms to analyze for trends on type, frequency and size of changes.
DU-IT Project Page 5 of 30
Change Management Process Version 1.0
Emergency Change Request
On occasion, changes of an “emergency” or critical nature may be required to quickly address production issues/outages. Emergencies usually occur as a result of problems and enter the Change Management process from a request from a Problem Manager.
In the case of emergency changes a streamlined process is used to allow the fastest possible response while still maintaining the proper levels of approval, logging, monitoring, communication and closure of all change related activities.
DU-IT Project Page 6 of 30
Change Management Process Version 1.0
Emergency Change Procedure
Purpose
The emergency change procedure supports the implementation of urgent fixes or updates to the staging or production platforms of the DU-IT infrastructure. Emergency changes follow a streamlined process that still provides for review, approval and logging of changes. To speed processing recovery, many details are captured after the fact.
Procedure
1. The Emergency Change Request (ECR) form is completed by any person requesting an emergency change to the DU-IT Infrastructure and is submitted to the Change Reviewer.
2. The Change Reviewer evaluates the nature of the request and evaluates the urgency using the definitions of Change Type, Change Impact and Change Priority. In many cases, the original change requestor becomes part of the impact assessment process to provide additional input and guidance. In most cases, the Change Reviewer for an ECR is the Change Requestor’s supervisor or an assigned resource within the DU-IT Infrastructure Group.
3. The Change Reviewer(s) also evaluates how the change impacts the infrastructure. The Change Reviewer may elect to involve other members of the Infrastructure Group or the wider CCB if the change is evaluated as Major Impact (multiple systems, etc.).
4. The Change Reviewer(s) approves the ECR and updates the ECR Log to record key information regarding the change. The ECR is forwarded to the Change Implementers for implementation. (Note: the Change Implementers may be the original Change Requestor).
5. The Change Implementor completes the change and provides information to the Change Reviewer to update and close out the ECR Log and Change Management documentation.
6. The Change Reviewer forwards the ECR log to the Change Manager for update to the Change Control Log. The Change Manager provides an update status to the CCB during the next scheduled CCB meeting.
DU-IT Project Page 8 of 30
Change Management Process Version 1.0
Change Request Form (Sample)Change Description/ CR Filename:
Change Request No.: Project:Requested by: Date:
Department/ location Telephone:
Description of the change:
Change needed by (date):Reason for the change:
Requestor Sign off:Approval of Request:
Change Impact Evaluation (use page 2 for details)Change Type
Application DatabaseHardware ProceduresNetwork SecurityOperating System/Utilities
Schedule Outage
Change Priority
Urgent Change Impact
MinorHigh MediumMedium MajorLow
Environment(s) Impacted:
Estimated Resources: [cost or effort]
CTS Internal: External:
Resource requirements:(personnel , h/w, s/w )
Test Plan DescriptionRollback Description
Change Approval or Rejection
Change Request Status Accepted RejectedComments:Change scheduled for (date):Implementation assigned to (names):
CCB Sign off:Change Implementation
Staging test results:
Implementation test results:
Date of ImplementationImplementor Sign Off Date
DU-IT Project Page 10 of 30
Change Management Process Version 1.0
Change Request Form (Sample) cont .
Change Impact Assessment Change Request No:Component Change
Reviewer Name
Effort / Cost
Impact description Test Description
Test Performed
Date
DU-IT Project Page 11 of 30
Change Management Process Version 1.0
Change Control Log (Sample)
Change Request Nbr
CR Filename
Requested By
Request Date
Department/ Location
Telephone
Description of Change Environment
Change Priority
Change Status
Date Scheduled
Change Implementers
Staging Results Notes Date Implemented
Implementation Results Notes
DU-IT Project Page 12 of 30
Change Management Process Version 1.0
Emergency Change Request Form (Sample)Change Description/ CR Filename
Change Request No.: Project:Requested by: Date:
Department/ location Telephone:
Description of the change:
Reason for the change:
Requestor Sign off:Approval of Request:
Change Impact EvaluationChange Type
Application Database
Hardware ProceduresNetwork SecurityOperating System/Utilities
Outage/Schedule
Change Priority
Urgent Change Impact
Minor
High MediumMedium MajorLow
Environment(s) Impacted:
Change Request Status Accepted RejectedComments:
Change scheduled for (date):Implementation assigned to (names):
Change Implementation
Date of ImplementationImplementor Sign Off Date
DU-IT Project Page 13 of 30
Change Management Process Version 1.0
Emergency Change Control Log (Sample)
Change Request No.
ECR Filename
Requested By
Request Date Department/ Location Telephone
Description of Change
Environment Change Priority
Change Status Date Implemented
DU-IT Project Page 14 of 30
Change Management Process Version 1.0
Definitions/Key Terms
Change – any modification to the staging and production DU-IT infrastructure including: Hardware changes System software changes (operating level) Application changes (e.g. functionality, web page additions/deletions, URL link
additions/deletions, releases, content changes, etc.) Network changes Interface changes (other applications, links, uploads/downloads, etc.) Database changes Operational and support procedures and documentation changes Version upgrades/enhancements/patches Planned/scheduled outages
DU-IT Infrastructure – all hardware, network and software components for the common web infrastructure environment
Emergency Change - an urgent request to correct a problem in the production environment
Change Request – a request to modify the production DU-IT environments.
Change Control Log – a record of all change requests and their current status, updated continuously throughout the process.
Staging Tests – application system and network tests to validate planned changes will perform as expected.
DU-IT Project Page 16 of 30
Change Management Process Version 1.0
Roles and Responsibilities
Role ResponsibilitiesChange Requestor Initiates a request for change
Modifies a change request Acquires business/management approvals for change
Change Manager Monitors all change activities in the DU-IT Infrastructure environment
Receives request for change from change requestors Tracks changes to closure Receives, logs and allocates a priority, in
collaboration with the requestor to all CR’s Distributes CR’s to Change Reviewer for impact
assessment Schedules CR reviews for CCB meeting, issues
agenda and circulates CR’s to CCB members in advance of meetings to allow prior consideration
Chairs all CCB meetings Updates the Change Control Log with all progress,
including any actions taken to correct problems and/or to take opportunities to improve service quality
Reviews all implemented Changes to ensure that they have met their objectives. Refers back any changes that have been backed out or have failed
Closes CR’s Produces regular and accurate management reports Updates list of CCB members, Change Reviewers
and administrative formsChange Control Board Analyzes the change request for validity, feasibility
Accepts or Rejects a request for change Assigns the request for change to change reviewers
for impact analysis Assigns request to change implementor for
implementing accepted change requests Approves changes implementation
Change Reviewer Review requested changes Analyze the impact of implementing the requested
change Assess resource and timing requirements for change
Change Implementers Implement the approved change as requested Provide status of change implementation. Back out/roll back failed changes
DU-IT Project Page 17 of 30
Change Management Process Version 1.0
Change Reviewers Key Assignments
Change ReviewerComponent Name Location/PhoneServers – Linux (hardware/operating system/utilities)
Sheryl Reinhard X4263
Servers – Unix (hardware/operating system/utilities)
Sheryl Reinhard / Matt Madill
X4263 / X5205
Servers – Windows(hardware/operating system/utilities)
Dale Joseph/Emery Secosky
X4790 / X4454
Storage Area Network Dale Joseph X4790Networking – LAN Hank McCarthy X4789Networking – WAN Hank McCarthy X4789
Networking – Routers/Hubs Hank McCarthy X4789Security - Software Updates Greg A. Jerry X 5395Security - Firewall Emery Secosky X4454Security – Authentication (LDAP)
Jeff Fine X4621
Database (Oracle) Greg A. Jerry X5395Database (SQL Server) Dale Joseph X4790Content Management ToolsMiddleware Tools Greg A. Jerry X5395Application Server - Oracle Greg A. Jerry X5395Application – Portal Paul Allison X6056Application – Banner Paul Allison X6056Application – Adirondack Paul Allison X6056
DU-IT Project Page 18 of 30
Change Management Process Version 1.0
Change Request Key Attributes
Change DescriptionChange Request Number (CR)
A sequential number assigned to record change
Project Name of the project under which CR is being requested (if applicable)
Requested by Name of person requesting changeDate Submission date of CR Department/location telephone
Department/location/telephone of change requestor
Description of change Detailed text describing nature of changeChange needed by (date) Date by which change needs to be implemented
(if applicable)Reason for change Detailed text describing reasons and benefits to
making the changeChange requestor signatureApproval signature
Change AssessmentChange Impacts Assessment as to what components and how the
change impacts the existing staging and production infrastructure (detailed)
Change Priority Assessment of the urgency of the request to evaluate scheduling and resource assignment.
Environment Impacted Logical names/tables of servers/networks being impacted by change
Estimated Resources Estimates as to the effort and/or cost required (both internal and external) to prepare and implement the change into the staging and production infrastructure
Testing Plan Description of the test plan to validate changes in the staging and production infrastructure
Rollback Plan Description of the plan to restore the environment to pre-change status in the event the change fails
Description of Change Components
Detailed list of impact of change on production environmentChange Approvals
Change Status Status of the CR (Open, Reviewed, Scheduled, Approved, Implemented, Failed)
Comments Reasons (if any) from Change Control Board as to status
Date Scheduled Dates for staging and production implementation Change Implementers Name of person/department assigned to manage
change implementationCCB Signoff Approval of representative of Change Control
Board
DU-IT Project Page 19 of 30
Change Management Process Version 1.0
Change ImplementationStaging Results Description of staging results/date of completionImplementation Results Description of production implementation
results/date of completionImplementation sign off
DU-IT Project Page 20 of 30
Change Management Process Version 1.0
Change Control Log Key Attributes
Change Control LogChange Request Number A sequential number assigned to record changeRequested by Name of person requesting changeRequest Date Submission date of CR Department/location telephone
Department/location/telephone of change requestor
Description of change Detailed text describing nature of changeEnvironment Impacted Logical names/tables of servers/networks being
impacted by changeReason for change Detailed text describing reasons and benefits to
making the changeChange Priority Assessment of the urgency of the request to
evaluate scheduling and resource assignment.Change Status Status of the CR (Open, Reviewed, Approved,
Scheduled, Implemented, Failed)Date Scheduled Dates for staging and production implementation Change Implementers Name of person/department assigned to manage
change implementationStaging Results Description of staging results/date of completionDate Implemented Description of production implementation
results/date of completion
DU-IT Project Page 21 of 30
Change Management Process Version 1.0
Emergency Change Request Key Attributes
Change DescriptionEmergency Change Request Number (ECR)
A sequential number assigned to record change (logged by the Change Manager after the fact)
Project Name of the project under which CR is being requested (if applicable)
Requested by Name of person requesting changeDate Submission date of CR Department/location telephone
Department/location/telephone of change requestor
Description of change Detailed text describing nature of changeReason for change Detailed text describing reasons and benefits to
making the changeChange requestor sign off Approval of request
Change AssessmentChange Impacts Assessment as to what components and how the
change impacts the existing staging and production infrastructure
Change Priority Always set to UrgentEnvironment Impacted Logical names/tables of servers/networks being
impacted by changeChange Approvals
Change Request Status of the CR (Accepted, Rejected)Comments Reasons (if any) from Change Control Board as to
statusDate Scheduled Dates for staging and production implementation Change Implementers Name of person/department assigned to manage
change implementationCCB Signoff Approval of representative of Change Control
Board
DU-IT Project Page 22 of 30
Change Management Process Version 1.0
Emergency Change Control Log Key Attributes
Emergency Change Control LogChange Request Number A sequential number assigned to record change
(start with E)Requested by Name of person requesting changeRequest Date Submission date of CR Environment Impacted Logical names/tables of servers/networks being
impacted by changeDepartment/location telephone
Department/location/telephone of change requestor
Description of change Detailed text describing nature of changeChange Priority Assessment of the urgency of the request to
evaluate scheduling and resource assignment.Change Status Status of the CR (Open, Implemented, Failed)Date Implemented Description of production implementation
results/date of completion
DU-IT Project Page 23 of 30
Change Management Process Version 1.0
Change Control Board Meeting – Sample Agenda
Introduction/Roll Call
Review past meeting minutes
Emergency Change Requests installed in productionReview Emergency Change Control Log
Minor Impact Changes installed in productionReview Change Control Log
Status updates to open Change RequestsReview Change Control LogUpdate Staging and Implementation Schedules if needed
New Change RequestsReview Change RequestDiscuss ImpactApprove/Reject
Open topics
Action Item Assignments
Close Meeting
DU-IT Project Page 24 of 30
Change Management Process Version 1.0
Change Type
Change Type Application Changes made to application systems, including
new implementations or functional updates, application development tools and utilities, location/directory changes, interfaces to other applications, updates to web site pages, URL links, etc.
Operating System Upgrades, migrations, installation, de-installs of system level software – (operating system, utilities, middleware, tools) and configurations (servers, disk arrays, etc.) that impact the operational environment.
Database Upgrades, migrations, installation, de-install of database software and database utilities as well as database configurations changes configurations (servers, disk arrays, etc.) that impact the operational environment.
Procedures Changes/updates to processing schedule and sequences (including runbooks), scripts for back ups, batch processes, etc. Documentation updates that require notification and distribution to other groups.
Security Changes/updates to security authorization and authentication to forms, processes and documents and just deal with impact analysis. Changes/updates to the data center or university firewalls.
Scheduled Outages Changes/Updates to planned events (e.g. system maintenance, backup times)
DU-IT Project Page 25 of 30
Change Management Process Version 1.0
Change Status
Change StatusOpen Initial status upon completing forms and
submitting to Change ManagerReviewed Updated status after reviewers have assessed
change and provided feedback (prior to CCB decision)
Approved Updated status after CCB has discussed change and approved/scheduled change for implementation
Rejected Updated status after CCB has discussed change and denied the request
Failed Updated status after change implementation has been attempted and failed
Implemented Updated status after changed implementation has been successful
Closed Updated status after change has been reviewed for closure by the CCB.
DU-IT Project Page 26 of 30
Change Management Process Version 1.0
Change Impact
Change ImpactMinor Impact Changes are typically updates to individual or non-
mission critical applications such as the introduction of new features such as new web pages or web links Minimal resources are required for testing in the staging environment and implementation into production.
The Change Manager has the authority to approve and release these changes for staging and implementation. Changes must be recorded in the Change Control Log and reported to the CCB.
Medium Impact Changes affect more than one system or application and/ or significant resources are required for staging testing and implementation.The change request must be scheduled for discussion at the next CCB meeting. Prior to the meeting the Change Request and the impact analysis must be circulated to the CCB, and possibly a wider audience if deemed necessary by the Change Manager or the CCB members, for additional impact and resource assessment.
Changes of this category are typically updates or implementation of important systems or major server or network components.
Major Impact Changes are updates or installations of central systems such as the upgrade of an operating system release, major changes in the network or the migration to a new user domain environment. Large amounts of resources are required for staging testing and/or implementation.
Tests in the staging environment cover not only the direct impacted system(s) but also the complete infrastructure. Detailed information including the impact analysis must be distributed to all relevant groups. Partial information must be delivered to additional groups such as suppliers or vendors, in particular if they are needed in case of an unsuccessful installation or problems during the installation.
Customers should be informed timely if services (e. g. DU-IT Project services) are not available for a time.
DU-IT Project Page 27 of 30
Change Management Process Version 1.0
Change Priorities
Change PrioritiesPriority 1 - Emergency
Causes loss of service or severe usability problems to a large number of users, or some equally serious problem. Immediate action is required. Resources are allocated immediately to implement authorized change. Typical situations are virus attacks, server security violations from outside the enterprise (through internet/ firewall) or crashes of mission critical systems. Implementation in the production environment has priority against all other scheduled and pending activities of the required staff. The implemented change must still be logged by the change manager and reported to the CCB.
Priority 2 - High Priority :
Severely affects some users or impacts a large number of users. Typically given the highest priority when being considered by the CCB for staging and implementation scheduling. Typical situations for this level of priority are the preventive protection (e. g. against new viruses) or fixing poorly developed and installed mission critical systems. All information of the change request form has to be delivered and tests in the staging environment have to be performed. The CCB may evaluate scheduling of the change outside of the next scheduled release or upgrade.
Priority 3 - Medium Priority
No severe impact but does require resources for both staging and implementation. Typically is assigned for scheduled maintenance changes and/or functionality improvements to applications. Preventive fixes or improvements on the IT infrastructure (e. g. required capacity improvements notified through monitoring processes) are typically allocated in this level. No special resources are required for integration testing and deployment.
Priority 4 - Low Priority
A change is justified and necessary but can wait until the next scheduled release or upgrade. To be allocated resources as schedules permit.Changes in this level are planned through the defined update cycle for software releases and hardware upgrades or the implementation plans of new services
DU-IT Project Page 28 of 30
Change Management Process Version 1.0
Priority/Impact Matrix
Priority
ImpactEmergency High Medium Low
Minor
Allocate resources when available (usually same day)
Install change per emergency process
Schedule changes as needed (usually same day fix)
Assess impact and resource availability
Re-prioritize schedules and resources for next available installation
Schedule as needed within other change priorities
Assess impact and resource availability
Group change requests together into releases
Schedule normally
Group change requests together into releases
Schedule normally
Medium
Allocate resources as soon as available (usually same day)
Implement change per emergency change process
Install change per emergency process
Assess impact and resource availability
Re-prioritize schedules and resources for next available schedule installation
Assess impact and resource availability
Group change requests together into releases
Schedule normally
Look to group change requests together into releases
Schedule normally
Major
Re-prioritize schedules and resources as soon as possible (usually immediately)
Immediately notify impacted groups and management
Implement change per emergency process
Assess impact and resource availability
Re-prioritize schedules and resources if needed
Evaluate need for CCB to authorize non-scheduled change
Assess impact and resource availability
Group change requests (functionally or technically) together into releases
Schedule normally
Look to group change requests together into releases
Schedule normally
DU-IT Project Page 29 of 30
Change Management Process Version 1.0
Impact Analysis Criteria
Analysis CriteriaImpacted Area Assessment
Applications and Interfaces
Impact to applications running in the infrastructure environment
Business Benefits Assess statements as to – regulatory or mandated requirements– cost reduction potential– revenue generation potential– improvement of business processes– improvement to technology infrastructure
(efficiency, effectiveness)Contingency/Disaster Recovery
Impact to existing contingency or disaster recovery plans
Cost/Effort Estimates
Cost and effort /resource estimates required to implement the change
Interdependencies Other projects or change requests which depend upon this request and/or are required for successful implementation
Performance and Capacity
Implications on infrastructure performance and capacity of change
Risk Implications of failure of the change based on size and scope of the request
Security Implications for user or system securityTechnical information
Sufficiency of the technical information available to assess the change
Urgency of request
Level of urgency – should be implemented in immediately, near term, long term, etc..
User organizations Impact on users of the applications and/or infrastructure