CHAPTER: 7 ADDITIONAL STUDIES - …environmentclearance.nic.in/.../13092016PJIO19UPCHAPTER7.pdf ·...

25
Project Name: China Clay Mining Proj Village- Pateli, Tehsil-Jayal & District- Vardan EnviroNet Gurgaon AD 7.0 GENERAL Mining operations are associated wi environment. It would normally req mining operation will be taken up Manager (Grade I). Similarly Ston addressed for which a disaster man steps to avert disasters and also to minimum. Nevertheless, the following natural/ 1. Inundation due to excessive 2. Accidents by heavy machin 3. Slope failures at the mine fa 7.1 Public Hearing Advertisement As per Appendix XI, Clause No 3 “There shall be one public consu Assessment or Environment Ma Environmental clearance shall be individual lease holders in cluster Management Plan for application Assessment or Environment Mana significant change”. Hence, publi 05.01.2016. Final EIA/EMP Report the projects have been accorde Raj/Sectt/Project/Cat 1 (a)B2(EC)14 Details of public hearing conducted Figure ject (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Fin -Nagaur, (Rajasthan), by Sh. Binja Ram Jat. Pag CHAPTER: 7 DDITIONAL STUDIES ith several potential hazards that affect adversely the quire the assistance of emergency services to handle under the supervision and control of qualified sta ne mines also have impending dangers and risk nagement plan has been prepared with an aim of tak o take such action after the disaster which limits t /industrial problems may be encountered during the m e rains. nery. aces etc. t 3 & 4 of amendment made in EIA Notification on ultation for entire cluster after which the final En anagement Plan report for the cluster shall b applied for and issued to the individual projec can use the same Environment Impact Assessmen n for environmental clearance. The cluster Env agement Plan shall be updated as per need keep ic hearing for this cluster has already been con ts for both the projects has been approved by Hon’b ed environmental clearance vide letter no F1( 4-15 dated 24.05.2016 (Vide Sr No in List 24 & 30 r d are given as below: e No.-7.1 Public Hearing Advertisement nal EIA/EMP Report ge | 72 (Chapter-7) e human health and e it effectively. The aff including Mine which need to be king precautionary the damage to the mining operation. dated 15.01.2016, nvironment Impact be prepared” and ct proponent. The nt or Environment vironment Impact ping in view any nducted on dated ble SEAC and both (4)/SEIAA/SEAC- respectively).

Transcript of CHAPTER: 7 ADDITIONAL STUDIES - …environmentclearance.nic.in/.../13092016PJIO19UPCHAPTER7.pdf ·...

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

ADDITIONAL STUDIES

7.0 GENERAL

Mining operations are associated with several potential hazards that affect adversely the human health and

environment. It would normally require the assistance of emergency services to handle it effectively. The

mining operation will be taken up under the

Manager (Grade I). Similarly Stone

addressed for which a disaster management plan has been prepared with an aim of taking precautionary

steps to avert disasters and also to take such action after the disaster which limits the damage to the

minimum.

Nevertheless, the following natural/industrial problems may be encountered during the mining operation.

1. Inundation due to excessive rains.

2. Accidents by heavy machinery.

3. Slope failures at the mine faces etc.

7.1 Public Hearing Advertisement

As per Appendix XI, Clause No 3 & 4 of amendment made in EIA Notification on dated 15.01.2016,

“There shall be one public consultation for entire cluster after

Assessment or Environment Management Plan report for the cluster shall be prepared” and

Environmental clearance shall be applied for and issued to the individual project proponent. The

individual lease holders in cluster

Management Plan for application for environmental clearance. The cluster Environment Impact

Assessment or Environment Management Plan shall be updated as per need keeping in view any

significant change”. Hence, public hearing for this cluster has already been conducted on dated

05.01.2016. Final EIA/EMP Reports for both the projects has been approved by Hon’ble SEAC and both

the projects have been accorded environmental clearance vide letter no

Raj/Sectt/Project/Cat 1 (a)B2(EC)14

Details of public hearing conducted are given as below:

Figure No.

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

CHAPTER: 7

ADDITIONAL STUDIES

Mining operations are associated with several potential hazards that affect adversely the human health and

environment. It would normally require the assistance of emergency services to handle it effectively. The

mining operation will be taken up under the supervision and control of qualified staff including Mine

Stone mines also have impending dangers and risk which need to be

addressed for which a disaster management plan has been prepared with an aim of taking precautionary

teps to avert disasters and also to take such action after the disaster which limits the damage to the

Nevertheless, the following natural/industrial problems may be encountered during the mining operation.

Inundation due to excessive rains.

ents by heavy machinery.

Slope failures at the mine faces etc.

7.1 Public Hearing Advertisement

As per Appendix XI, Clause No 3 & 4 of amendment made in EIA Notification on dated 15.01.2016,

“There shall be one public consultation for entire cluster after which the final Environment Impact

Assessment or Environment Management Plan report for the cluster shall be prepared” and

Environmental clearance shall be applied for and issued to the individual project proponent. The

can use the same Environment Impact Assessment or Environment

Management Plan for application for environmental clearance. The cluster Environment Impact

Assessment or Environment Management Plan shall be updated as per need keeping in view any

t change”. Hence, public hearing for this cluster has already been conducted on dated

05.01.2016. Final EIA/EMP Reports for both the projects has been approved by Hon’ble SEAC and both

the projects have been accorded environmental clearance vide letter no F1(4)/SEIAA/SEAC

Raj/Sectt/Project/Cat 1 (a)B2(EC)14-15 dated 24.05.2016 (Vide Sr No in List 24 & 30 respectively).

Details of public hearing conducted are given as below:

Figure No.-7.1 Public Hearing Advertisement

Final EIA/EMP Report

age | 72 (Chapter-7)

Mining operations are associated with several potential hazards that affect adversely the human health and

environment. It would normally require the assistance of emergency services to handle it effectively. The

supervision and control of qualified staff including Mine

mines also have impending dangers and risk which need to be

addressed for which a disaster management plan has been prepared with an aim of taking precautionary

teps to avert disasters and also to take such action after the disaster which limits the damage to the

Nevertheless, the following natural/industrial problems may be encountered during the mining operation.

As per Appendix XI, Clause No 3 & 4 of amendment made in EIA Notification on dated 15.01.2016,

which the final Environment Impact

Assessment or Environment Management Plan report for the cluster shall be prepared” and

Environmental clearance shall be applied for and issued to the individual project proponent. The

can use the same Environment Impact Assessment or Environment

Management Plan for application for environmental clearance. The cluster Environment Impact

Assessment or Environment Management Plan shall be updated as per need keeping in view any

t change”. Hence, public hearing for this cluster has already been conducted on dated

05.01.2016. Final EIA/EMP Reports for both the projects has been approved by Hon’ble SEAC and both

F1(4)/SEIAA/SEAC-

15 dated 24.05.2016 (Vide Sr No in List 24 & 30 respectively).

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

7.1.1 Photographs of Public Hearing

Figure No.

7.1.2 Minutes of Public Hearing

Proceeding of public consultation (minutes of meetings) of M/s Mateshwari Mines & Minerals and Jai

Hanumaan Mines & Minerals for mining of china clay (Minor

District-Nagaur, Rajasthan is enclosed as Annexure. The action plan of issues raised during public

hearing has been prepared and given as below:

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Hearing

Figure No.-7.2 Photographs of Public Hearing

Minutes of Public Hearing

Proceeding of public consultation (minutes of meetings) of M/s Mateshwari Mines & Minerals and Jai

Hanumaan Mines & Minerals for mining of china clay (Minor Mineral) at Near Vill. Pateli, Tehsil

Nagaur, Rajasthan is enclosed as Annexure. The action plan of issues raised during public

hearing has been prepared and given as below:

Final EIA/EMP Report

age | 73 (Chapter-7)

Proceeding of public consultation (minutes of meetings) of M/s Mateshwari Mines & Minerals and Jai

Mineral) at Near Vill. Pateli, Tehsil-Jayal

Nagaur, Rajasthan is enclosed as Annexure. The action plan of issues raised during public

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

Table 7.1 (A) Action Plan of the issues rose during Public Hear

Proponent (

S.

No.

Name and

Address of

Respondent

Question

1. Shri Babu

Lal

Vill. Pateli,

Tehsil Jayal

What kind of social

benefits will be

made for the local

public ?

2. Shri Gaffar

Kha

Vill. Pateli,

Tehsil Jayal

Impact of proposed

project on

environment

Table 7.1 (B) Action Plan of the issues rose during Public

Project Proponent (

S.

No.

Name and

Address of

Respondent

Question

1. Shri Pappu

Ram

Vill. Pateli,

Tehsil Jayal

Mitigation measures

to control road

accident during

mineral

transportation

2. Shri Lal Das

Vill. Pateli,

Tehsil Jayal

Impact of blasting

during mining

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Table 7.1 (A) Action Plan of the issues rose during Public Hearing and reply given by Project

Proponent (M/s Mateshwari Mines & Minerals)

Action Plan

What kind of social

benefits will be

made for the local

� The mining activity will provide

employment to local people which will

increase socioeconomic status of the area.

Total 66 labours will be required which will

be deployed from local area.

� Educational activities will be promoted by

the lessee. Awareness program will be

arranged covering basic issues related to

primary level education, environment,

health and hygiene etc.

� Healthcare promotional activities will be

undertaken. Pre –Placement and periodic

medical checkups will be done, which will

lift the general health status of the residents

of the area. Health camps, medical aids,

family welfare programmes, immunization

camp, sports etc will be arranged.

� Strengthening of existing community

facilities through the Community

Development Programme.

� There will be improved road

communication due to the proposed project

and maintenance will also be done time to

time.

Impact of proposed

project on

Effective Environmental Management Plan will

be adopted and all pollutants kept within

prescribed limits as per CPCB/MoEF &

CC/RPCB guidelines.

Table 7.1 (B) Action Plan of the issues rose during Public Hearing and reply given by

Project Proponent (M/s Jai Hanuman Mines & Minerals)

Action Plan

Mitigation measures

to control road

accident during

� Overloading of trucks shall be avoided

� Experienced drivers will be recruited

� Vocational training sessions for truck drivers

Impact of blasting No blasting will be proposed because this is a

china clay mining project; hence no blasting

will be required.

Final EIA/EMP Report

age | 74 (Chapter-7)

ing and reply given by Project

Budget

mining activity will provide

employment to local people which will

increase socioeconomic status of the area.

Total 66 labours will be required which will

Educational activities will be promoted by

will be

arranged covering basic issues related to

primary level education, environment,

Healthcare promotional activities will be

Placement and periodic

medical checkups will be done, which will

alth status of the residents

of the area. Health camps, medical aids,

family welfare programmes, immunization

Strengthening of existing community

facilities through the Community

ved road

communication due to the proposed project

and maintenance will also be done time to

Rs 1,50,000 is

proposed under

CSR/ESR

activities.

Effective Environmental Management Plan will

be adopted and all pollutants kept within

prescribed limits as per CPCB/MoEF &

Rs 1,50,000 is

proposed under

EMP activities.

Hearing and reply given by

M/s Jai Hanuman Mines & Minerals)

Budget

Vocational training sessions for truck drivers

Rs.-25,000/year

for Vocational

training

No blasting will be proposed because this is a

china clay mining project; hence no blasting

NA

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

7.2 HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY

All types of industries face certain types of hazards which can disrupt normal activities abruptly. Similar

stone mining also have risks which need to be addressed for which a disaster management plan has been

formulated with an aim of taking precautionary

disaster which limits the damage to minimum. In the sections below, the identification of various hazards,

probable risks during the operational phase of the mining, maximum credible accident analy

consequences analysis are addressed either qualitatively or quantitatively.

Risk assessments will help mine operators to identify high, medium and low risk levels. This is a

requirement of the Occupational Health and Safety Act 2000. Risk assessmen

risks and provide information on the need to safely control the risks. In this way, mine owners and

operators will be able to implement safety improvements. The following natural/industrial problem may

be encountered during the mining operation.

• Inundation: Filling of the mine pit due to excessive rains

• Handling of overburden and heavy machinery,

• Storage of diesel,

• Slope failures at the mine faces or stacks

As per proposal made under the mining plan the area will be

method. Extraction of minerals is to be carried out by mechanized mining means. Water table will not be

touched during the mining process. No high risk accidents like landslides, subsidence flood etc have been

apprehended.

7.2.1 Blasting

There is no Drilling & Blasting proposed for china clay mining project

7.3 Vibration

There is no Drilling & Blasting proposed for china clay mining project

mining activity

7.3.1 Risks due to Inundation

Mining will be done during the non

not likely to happen.

7.3.2 Risks due to Failure of Pit Slope

In order to allay dangers due to open cast slope failure, final pit, slope stability estimat

for the existing mines. Determining the factor of safety, the slopes should be monitored at regular

intervals to check for any possible failure.

7.3.3 Risk due to Handling of Overburden and Heavy Machinery

During the mining, most of the activities are done by the vehicles and the heavy machinery for mining

and handing of the mineral. During extraction of china clay from mining areas soil, grit, kankar etc will

also be removed in form of waste materials. The excavated soil, grit, kankar etc

backfilling of the pits. Therefore there is no risk associated with failure of waste dumps. Heavy machinery

also cause for accidents due to mechanical failure.

7.3.4 Risks of Accidents due to Trucks and Dumpers

Identifying the hazards that come along with the presence of vehicles at the workplace (

operations, loading) can cause harm if not properly handled. Among some of the factors that may make

vehicle accidents more likely are:

• Rough access roads

• Time pressure

• Inadequate brakes (Possibly from lack of maintenance)

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY

All types of industries face certain types of hazards which can disrupt normal activities abruptly. Similar

also have risks which need to be addressed for which a disaster management plan has been

formulated with an aim of taking precautionary steps to avert disasters and also take such action after

disaster which limits the damage to minimum. In the sections below, the identification of various hazards,

probable risks during the operational phase of the mining, maximum credible accident analy

consequences analysis are addressed either qualitatively or quantitatively.

Risk assessments will help mine operators to identify high, medium and low risk levels. This is a

requirement of the Occupational Health and Safety Act 2000. Risk assessments will help to priorities the

risks and provide information on the need to safely control the risks. In this way, mine owners and

operators will be able to implement safety improvements. The following natural/industrial problem may

he mining operation.

Inundation: Filling of the mine pit due to excessive rains,

Handling of overburden and heavy machinery,

Slope failures at the mine faces or stacks.

As per proposal made under the mining plan the area will be developed by means of opencast mining

method. Extraction of minerals is to be carried out by mechanized mining means. Water table will not be

touched during the mining process. No high risk accidents like landslides, subsidence flood etc have been

There is no Drilling & Blasting proposed for china clay mining project.

There is no Drilling & Blasting proposed for china clay mining project. So there is no vibration due to

Mining will be done during the non-monsoon periods (October-June); therefore problem of inundation is

7.3.2 Risks due to Failure of Pit Slope

In order to allay dangers due to open cast slope failure, final pit, slope stability estimat

for the existing mines. Determining the factor of safety, the slopes should be monitored at regular

intervals to check for any possible failure.

Handling of Overburden and Heavy Machinery

ctivities are done by the vehicles and the heavy machinery for mining

and handing of the mineral. During extraction of china clay from mining areas soil, grit, kankar etc will

also be removed in form of waste materials. The excavated soil, grit, kankar etc

backfilling of the pits. Therefore there is no risk associated with failure of waste dumps. Heavy machinery

also cause for accidents due to mechanical failure.

7.3.4 Risks of Accidents due to Trucks and Dumpers

t come along with the presence of vehicles at the workplace (

operations, loading) can cause harm if not properly handled. Among some of the factors that may make

brakes (Possibly from lack of maintenance)

Final EIA/EMP Report

age | 75 (Chapter-7)

HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY

All types of industries face certain types of hazards which can disrupt normal activities abruptly. Similar

also have risks which need to be addressed for which a disaster management plan has been

steps to avert disasters and also take such action after

disaster which limits the damage to minimum. In the sections below, the identification of various hazards,

probable risks during the operational phase of the mining, maximum credible accident analysis and

Risk assessments will help mine operators to identify high, medium and low risk levels. This is a

ts will help to priorities the

risks and provide information on the need to safely control the risks. In this way, mine owners and

operators will be able to implement safety improvements. The following natural/industrial problem may

developed by means of opencast mining

method. Extraction of minerals is to be carried out by mechanized mining means. Water table will not be

touched during the mining process. No high risk accidents like landslides, subsidence flood etc have been

So there is no vibration due to

June); therefore problem of inundation is

In order to allay dangers due to open cast slope failure, final pit, slope stability estimations will be made

for the existing mines. Determining the factor of safety, the slopes should be monitored at regular

ctivities are done by the vehicles and the heavy machinery for mining

and handing of the mineral. During extraction of china clay from mining areas soil, grit, kankar etc will

also be removed in form of waste materials. The excavated soil, grit, kankar etc will be used for

backfilling of the pits. Therefore there is no risk associated with failure of waste dumps. Heavy machinery

t come along with the presence of vehicles at the workplace (e.g. reversing

operations, loading) can cause harm if not properly handled. Among some of the factors that may make

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

• Carelessly parked vehicles (

• Unsafe coupling and uncoupling of trailers, and

• Untrained drivers

• Overturning vehicles

To avoid such instances we will talk to the workers and their representatives and will involve them in the

risk assessment process and tell them what to do, to reduce risk. All transportation within the mine lease

area should be carried out directly under the supervision and control of mana

• The vehicles will be maintained in good working condition and checked thoroughly at least once

a month by the competent person authorized for the purpose by the management.

• Road signs will be provided at each and every turning point up to the main

required)

• To avoid danger while reversing the vehicles especially at working place/loading points, stopper

should be posted to properly guide reversing/spotting operating.

• Only trained drivers will be hired.

• Overloading of trucks shall be

The results of risk assessment are given in table below:

Table 7.2:

S. No. Activity Hazard Description (Risk)

1. Site planning

and layout

Travel in moving vehicle in

uneven terrain

2. Bench

Formation

Rock falls or slide due to

lack of bench face stability

(bodily injuries)

3. Crushing and

sizing of ROM

Hit by Machineries

Electrical Equipment

(bodily injuries)

4. Transportation

of minerals

Vehicle Accident (bodily

injuries)

5. Transportation

of minerals

Accidental 1fire in vehicle

(bodily injuries, exposure to

heat radiation)

By arranging the above hazards from highest to lowest, the hazards were re

levels. Ranking of hazards based on risk levels are

Table

S.No. Activity

1. Site planning and layout

2. Bench Formation

3. Crushing and sizing of

ROM

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Carelessly parked vehicles (e.g. being parked on a slope without being adequately secured)

Unsafe coupling and uncoupling of trailers, and

k to the workers and their representatives and will involve them in the

risk assessment process and tell them what to do, to reduce risk. All transportation within the mine lease

area should be carried out directly under the supervision and control of management.

The vehicles will be maintained in good working condition and checked thoroughly at least once

a month by the competent person authorized for the purpose by the management.

Road signs will be provided at each and every turning point up to the main

To avoid danger while reversing the vehicles especially at working place/loading points, stopper

should be posted to properly guide reversing/spotting operating.

Only trained drivers will be hired.

Overloading of trucks shall be avoided

The results of risk assessment are given in table below:

: Hazards faced in stone mining operations

Hazard Description (Risk)

Score

Consequen

ces

Exposur

e

Probabili

ty

Travel in moving vehicle in

uneven terrain 1 2 1

Rock falls or slide due to

lack of bench face stability

(bodily injuries)

5 1.5 2

Hit by Machineries –

Electrical Equipment

(bodily injuries)

1 3 3

Vehicle Accident (bodily

5 5 2

Accidental 1fire in vehicle

(bodily injuries, exposure to

heat radiation)

1 5 1

By arranging the above hazards from highest to lowest, the hazards were re-arranged as per their risk

Ranking of hazards based on risk levels are provided below in the Table 7.3.

Table 7.3: Hazards ranked by Risk level

Hazard Description (Risk)

Travel in moving vehicle in uneven terrain

Rock falls or slide due to lack of bench face

stability (bodily injuries)

Hit by Machineries – Electrical Equipment

(bodily injuries)

Final EIA/EMP Report

age | 76 (Chapter-7)

. being parked on a slope without being adequately secured)

k to the workers and their representatives and will involve them in the

risk assessment process and tell them what to do, to reduce risk. All transportation within the mine lease

The vehicles will be maintained in good working condition and checked thoroughly at least once

a month by the competent person authorized for the purpose by the management.

Road signs will be provided at each and every turning point up to the main road (wherever

To avoid danger while reversing the vehicles especially at working place/loading points, stopper

Risk

Level Probabili

ty

Risk

Score

1 2 Level 3

2 15 Level 1

3 9 Level 2

2 50 Level 1

1 5 Level 3

arranged as per their risk

Risk

Score

Risk

Level

2 Level

3

15 Level

1

9 Level

2

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

4. Transportation of

minerals

5. Transportation of

minerals

7.3.5 Hazard Analysis

Broadly, the hazards cover explosive material management, working at heights, slope and bench stability,

mineral transport, mineral processing and force majeure conditions (rainfall

mechanisms due to which hazards (coming under Risk Levels 1

Table 7.4.

Table 7.4: Cause analysis for

S. No. Hazard Description (Risk)

1 Travel in moving vehicle in

uneven terrain

2 Hit by fly rock (bodily

injuries)

3

Rock falls or slide due to lack

of bench face stability (bodily

injuries)

4

Hit by Machineries –

Electrical Equipment (bodily

injuries)

5 Vehicle Accident (bodily

injuries)

6

Accidental 1fire in vehicle

(bodily injuries, exposure to

heat radiation)

7.3.6 Controls and Action Plans

To ensure that causes leading to the possible

action plans are developed and sug

action plans be implemented and reviewed at least annually and also when there are changes to t

plan.

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Vehicle Accident (bodily injuries)

Accidental 1fire in vehicle (bodily injuries,

exposure to heat radiation)

Broadly, the hazards cover explosive material management, working at heights, slope and bench stability,

mineral transport, mineral processing and force majeure conditions (rainfall and

mechanisms due to which hazards (coming under Risk Levels 1 and 2) may actually occur are covered in

: Cause analysis for Level 1 and Level 2 hazards

Hazard Description (Risk) Risk

Score

Risk

Level Cause Analysis

Travel in moving vehicle in 2 Level 3

• Poor visibility • Incompetent driver

• Poorly maintained vehicles

2 Level 3

• Poor access control of blast area

• Poor blasting practices (leading to

excessive fly rock)

Rock falls or slide due to lack

of bench face stability (bodily 15 Level 1

• Improper design of bench • Force

Majeure (such as heavy floods or

rainfall) • Improper blasting practices

• Incompetent blasting personnel

Electrical Equipment (bodily 9 Level 2

• Improper design of equipment

• Improper maintenance • Non usage

of required PPE. • Incompetent

Personnel

Vehicle Accident (bodily 50 Level 1

• Head on collision between vehicle

andanother vehicle (due to poor

visibilityor incompetent drivers)

• Poor vehicle maintenance

Accidental 1fire in vehicle

(bodily injuries, exposure to 5 Level 3

• Accident to vehicle carrying fuel,

and subsequent ignition of spilt fuel

• Improper storage of fuel, in MS

drums, leading to spillage followed

by ignition • Driving with loaded

material on uneven terrain, and

subsequent ignition of spilt fuel

To ensure that causes leading to the possible consequences are prevented from occurring, control and

ggested as described in Table 7.5. It is required that these control and

action plans be implemented and reviewed at least annually and also when there are changes to t

Final EIA/EMP Report

age | 77 (Chapter-7)

50 Level

1

5 Level

3

Broadly, the hazards cover explosive material management, working at heights, slope and bench stability,

and flooding).The

2) may actually occur are covered in

• Poor visibility • Incompetent driver

• Poorly maintained vehicles

• Poor access control of blast area

• Poor blasting practices (leading to

• Improper design of bench • Force

Majeure (such as heavy floods or

rainfall) • Improper blasting practices

• Incompetent blasting personnel

• Improper design of equipment

• Improper maintenance • Non usage

of required PPE. • Incompetent

• Head on collision between vehicle

andanother vehicle (due to poor

visibilityor incompetent drivers)

• Poor vehicle maintenance

• Accident to vehicle carrying fuel,

and subsequent ignition of spilt fuel

• Improper storage of fuel, in MS

drums, leading to spillage followed

ignition • Driving with loaded

material on uneven terrain, and

subsequent ignition of spilt fuel

consequences are prevented from occurring, control and

It is required that these control and

action plans be implemented and reviewed at least annually and also when there are changes to the work

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

Table

S.

No Hazard Causes Control

1 Rock falls

or slide

due to lack

of bench

face

stability

(bodily

Injuries)

Improper

design of

bench

Proper catch bench

design and proper

blasting pattern

reduces over break

Maintain the width

to height ratio

as per DGMS

Force

Majeure

(such as

heavy

floods or

rainfall)

Dewatering or

culverting the storm

water may reduces

slides of bench

Improper

blasting

practices

Good design of

blasting network is

important to reduce

rock fall and slides

of

bench face

Incompet

e

nt

blasting

personnel

Shot firer should

have

shot firer’s permit

granted under

explosive rules

2 Vehicle

accident

(bodily

injuries)

Head on

collision

between

vehicle

and

another

vehicle

(due to

poor

visibility

or

incompet

e

Haul road should be

sprinkled Regularly

Driving at night

shall be avoided

Driver should be

RTO licensed

holder for driving

vehicle

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Table 7.5: Control and Action Plan

Control Relevant

Legislation Procedure

Existing

Procedure

Proper catch bench

design and proper

blasting pattern

reduces over break

Maintain the width

to height ratio

as per DGMS

MMR-1961

Procedure for

opencast

working as per

Reg. 106

Dewatering or

culverting the storm

water may reduces

slides of bench

MMR-1961.

Following

procedures as

per Reg. 127

and

130 of MMR –

1961 for

Dewatering or

and

culverting the

water

Good design of

blasting network is

important to reduce

rock fall and slides

bench face

MMR-1961.

Procedure for

opencast

working as per

Reg. 106

Shot firer should

shot firer’s permit

granted under

explosive rules

MMR -1961

Appointment of

Shot firer as

provided in Reg.

160 of MMR

1961

Haul road should be

sprinkled Regularly

Driving at night

shall be avoided

Driver should be

RTO licensed

holder for driving

MMR –

1961 Motor

Vehicle Act

Sprinkling of

water in haul

road as per Reg.

124 MMR 1961

and appointment

of RTO licensed

drivers

Final EIA/EMP Report

age | 78 (Chapter-7)

Existing

Procedure

(Y/N)

Responsibl

e Person

(Designati

on)

Y Mines

Manager

Y Mines

Manager

Y Mines

Manager

Y Mines

Manager

Y Mines

Manager

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

7.4 DISASTERS MANAGEMENT PLAN

The Disaster Management Plan (DMP) is a guide, giving general considerations, directions, and

procedures for handling emergencies likely to ari

for the TCL on the basis of the Risk Assessment and related findings covered in the report.

7.4.1 Disaster Management Plan: Structure

The Disaster Management Plan (DMP) is supposed to be a dynamic, changing, document focusing on

continual advantage of doing this is to have a system that is in synchronicity with commonly used SHE

systems such as ISO 14001 and OHSAS 18001.

7.4.2 Policy

The Safety Health and Environmental (SHE) policy is existing & accessible to all at site and to other

stakeholders. The policy has been framed considering legislative compliance, stakeholder involvement,

continual improvement, and management by objectives.

7.4.3 Planning

Identification and Prevention of Possible Emergency Situations

Possible emergency situations can broadly be classified into unintended explosions, vehicle collision, and

nt

drivers)

Poor

vehicle

maintena

n ce

Periodic servicing

of

vehicle Brakes and

steering apparatus

should be in good

condition

Headlight and tail

light of the vehicle

should be in

good condition

3 Hit by

Machineri

es –

Electrical

Equipment

(bodily

injuries)

Poor

machiner

y

Maintena

nce

Periodic servicing

of

machineries

Periodic Inspection /

Audit of

Machineries and

Structures

Non Compliance to

SOP

Poor

Cabling /

Earthling

To

Rotating

Equipme

nts

Periodic servicing

of

electrical

instruments.

Periodic Inspection /

Audit of Electrical

equipments

and accessories Non

Compliance to

SOP

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

MANAGEMENT PLAN

The Disaster Management Plan (DMP) is a guide, giving general considerations, directions, and

procedures for handling emergencies likely to arise from planned operations. The DMP has been prepared

for the TCL on the basis of the Risk Assessment and related findings covered in the report.

Disaster Management Plan: Structure

The Disaster Management Plan (DMP) is supposed to be a dynamic, changing, document focusing on

continual advantage of doing this is to have a system that is in synchronicity with commonly used SHE

systems such as ISO 14001 and OHSAS 18001.

he Safety Health and Environmental (SHE) policy is existing & accessible to all at site and to other

stakeholders. The policy has been framed considering legislative compliance, stakeholder involvement,

continual improvement, and management by objectives.

Identification and Prevention of Possible Emergency Situations

Possible emergency situations can broadly be classified into unintended explosions, vehicle collision, and

Periodic servicing

vehicle Brakes and

steering apparatus

should be in good

condition

Headlight and tail

light of the vehicle

should be in

good condition

MMR 1961

Procedure for

Maintenance of

Vehicles under

Reg. 176 of

MMR -1961

Periodic servicing

machineries

Periodic Inspection /

Audit of

Machineries and

Structures

Non Compliance to

MMR 1961

Procedure laid

under Section

174 Chapter

XVI –

Machinery and

Plant of MMR

1961

Periodic servicing

electrical

instruments.

Periodic Inspection /

Audit of Electrical

equipments – cables

and accessories Non

Compliance to

Indian

Electricity

Rules 2003

Section VII –

Works of

Licensees of

Indian

Electricity Rules

2003

Final EIA/EMP Report

age | 79 (Chapter-7)

The Disaster Management Plan (DMP) is a guide, giving general considerations, directions, and

se from planned operations. The DMP has been prepared

for the TCL on the basis of the Risk Assessment and related findings covered in the report.

The Disaster Management Plan (DMP) is supposed to be a dynamic, changing, document focusing on

continual advantage of doing this is to have a system that is in synchronicity with commonly used SHE

he Safety Health and Environmental (SHE) policy is existing & accessible to all at site and to other

stakeholders. The policy has been framed considering legislative compliance, stakeholder involvement,

Possible emergency situations can broadly be classified into unintended explosions, vehicle collision, and

Y Mines

Manager

Y Mines

Manager

Y

Electrical In

charge

under

Mines

Rules 1951

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

inundation. Additional emergency situations can be developed on the ba

prior to commencement of operations.

Emergency Prevention

Some of the ways of preventing emergencies are as follows:

• Preparation of a Preventive Maintenance Schedule Programme and also covering maintenance

schedules for all critical equipments and instruments as per recommendations of the

manufacturers user manuals,

• Importantly, it is of great importance to collect and

incidents and accidents at the site, as well as for recording near

averted. This information gives an indication of how likely or unlikely it is for the site to face

actual emergency and what shall be further action to prevent them from occurring.

• Establishment of an ongoing training and evaluation programme, incorporating the development

of capabilities amongst employees about potential emergencies and ways and means of

identifying and averting the same. Most emergencies do not occur without some incident or an

abnormal situation. So there is always sometime of few seconds to few minutes to arrest an

incident of abnormal situation from turning in to an emergency. This is the role of th

charge who is the incident controller (IC) along with his shift team.

Emergency Plan Objectives

Specific objectives of the Emergency Response Plan are to be clearly listed with regards to the responses

desired for successful management of the

include:

• To define and assess emergencies, including risk and environmental impact assessment.

• To control and contain incidents.

• To safeguard employees.

• To minimize damage to property or / and th

• To inform employees, the general public and the authority on the hazards / risks assessed.

• Safeguard provided residual risk if any and the role to be played by them in the event of

emergency.

• To inform authorities like Safety and Fire Dep

• For effective rescue and treatment of casualties and to count the injured.

• To identify and list fatal accidents if any.

• To secure the safe rehabilitation of affected areas and to restore normally.

• To provide authoritative information to the news media.

• To preserve records, equipments etc. and to organize investigation into the cause of the

emergency and preventive measures to stop its recurrence.

• To ensure safety of staff and patients and resume work.

• To work out a plan with all provisions to handle emergencies and to provide for emergency.

• Preparedness and the periodical rehearsal of the plan.

The objectives are suggested in emergency preparedness plan of TCL. Responsibilities, resources and

timeframes require to be allocated for implementing the objectives.

7.4.4 Implementation

Allocation of Resources

Key Personnel are identified for carrying out specific and assigned duties in case of any kind of

Emergency. All such key personnel shall be available on call

• Commander (Manager Quarries)

• Deputy commander (Personnel Officer)

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

inundation. Additional emergency situations can be developed on the basis of audit or other procedures

prior to commencement of operations.

Some of the ways of preventing emergencies are as follows:

Preparation of a Preventive Maintenance Schedule Programme and also covering maintenance

schedules for all critical equipments and instruments as per recommendations of the

manufacturers user manuals,

Importantly, it is of great importance to collect and analyze information pertaining to minor

incidents and accidents at the site, as well as for recording near-misses or emergencies that were

averted. This information gives an indication of how likely or unlikely it is for the site to face

nd what shall be further action to prevent them from occurring.

Establishment of an ongoing training and evaluation programme, incorporating the development

of capabilities amongst employees about potential emergencies and ways and means of

d averting the same. Most emergencies do not occur without some incident or an

abnormal situation. So there is always sometime of few seconds to few minutes to arrest an

incident of abnormal situation from turning in to an emergency. This is the role of th

charge who is the incident controller (IC) along with his shift team.

Specific objectives of the Emergency Response Plan are to be clearly listed with regards to the responses

desired for successful management of the possible emergency situations. Suggested Objectives could

To define and assess emergencies, including risk and environmental impact assessment.

To control and contain incidents.

To minimize damage to property or / and the environment.

To inform employees, the general public and the authority on the hazards / risks assessed.

Safeguard provided residual risk if any and the role to be played by them in the event of

To inform authorities like Safety and Fire Dept and Mutual Aid Centers to come up for help.

For effective rescue and treatment of casualties and to count the injured.

To identify and list fatal accidents if any.

To secure the safe rehabilitation of affected areas and to restore normally.

authoritative information to the news media.

To preserve records, equipments etc. and to organize investigation into the cause of the

emergency and preventive measures to stop its recurrence.

To ensure safety of staff and patients and resume work.

out a plan with all provisions to handle emergencies and to provide for emergency.

Preparedness and the periodical rehearsal of the plan.

The objectives are suggested in emergency preparedness plan of TCL. Responsibilities, resources and

e to be allocated for implementing the objectives.

Key Personnel are identified for carrying out specific and assigned duties in case of any kind of

Emergency. All such key personnel shall be available on call on holidays and off duty also.

Commander (Manager Quarries)

Deputy commander (Personnel Officer)

Final EIA/EMP Report

age | 80 (Chapter-7)

sis of audit or other procedures

Preparation of a Preventive Maintenance Schedule Programme and also covering maintenance

schedules for all critical equipments and instruments as per recommendations of the

analyze information pertaining to minor

misses or emergencies that were

averted. This information gives an indication of how likely or unlikely it is for the site to face

nd what shall be further action to prevent them from occurring.

Establishment of an ongoing training and evaluation programme, incorporating the development

of capabilities amongst employees about potential emergencies and ways and means of

d averting the same. Most emergencies do not occur without some incident or an

abnormal situation. So there is always sometime of few seconds to few minutes to arrest an

incident of abnormal situation from turning in to an emergency. This is the role of the shift in-

Specific objectives of the Emergency Response Plan are to be clearly listed with regards to the responses

possible emergency situations. Suggested Objectives could

To define and assess emergencies, including risk and environmental impact assessment.

To inform employees, the general public and the authority on the hazards / risks assessed.

Safeguard provided residual risk if any and the role to be played by them in the event of

t and Mutual Aid Centers to come up for help.

To preserve records, equipments etc. and to organize investigation into the cause of the

out a plan with all provisions to handle emergencies and to provide for emergency.

The objectives are suggested in emergency preparedness plan of TCL. Responsibilities, resources and

Key Personnel are identified for carrying out specific and assigned duties in case of any kind of

on holidays and off duty also.

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

• Site Incident Controller (Shift in charge)

• Deputy Incident Controller (Senior Mining Mate)

• Other key personnel

• Essential workers

Responsibilities of Commander / Deputy Commander

• To take charge at the place of incident.

• To activate the Emergency Preparedness Plan according to severity of situation.

• Inform all the employees and relatives of the affected employees.

• Call all key personnel and inform Doctor to be ready for treatment.

• Commander shall deploy staff carry out following functions.

� To coordinate and reinforce Emergency Combat at Site along with Site Incident Controller.

� To liaise with other Departments and

� To supervise Assembly and Evacuation at all points.

� To look after Patients who are bed ridden and any Casualties and give psychological support.

• Activate Assembly and Evacuation Plan if required as per situation by ordering Site Inc

Controller.

• Inform and liaise with Chief Operating Officer, Police department and District Emergency

Authority.

• Arrange for chronological records of emergency to be maintained.

• Issue authorized statements to News Media.

• Ensure that proper considerati

shooting / photographs.

• Deputy Commander shall carry out the responsibilities of Commander in his absence and assist

him in his duties when present.

• Assign Medicare and Emergency Management tas

Responsibilities of Mines Foreman

• To take immediate charge at the site of incident.

• Ensure that immediate steps as per Emergency Preparedness Plan are taken and direct the worker

staff.

• Inform Commander, Deputy Comman

• Shall blow the Siren / Hooter as per situation to declare Emergency.

• Supervise assembly and evacuation as per plan, if required.

• Appoint more than one Deputy Incident Controller to take charge if emergency occurs at more

than one place.

• Ensure that Commander has been alerted.

• Take decisions for controlling the emergency till arrival by Commander.

• Ensure that casualties are receiving adequate attention and medical care.

• Ensure accounting for personnel and rescue of missing per

• Control traffic movement in Quarry premises.

• When emergency is prolonged arrange for relief of rescue workers and catering facilities.

• Deputy Incident Controller shall take charge at site of emergency in the absence of Site Incident

Controller.

• In the presence of same, he shall assist Site Incident Controller or take charge at another location,

if emergency exists in more than one place.

Responsibilities of Essential Workers

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Site Incident Controller (Shift in charge)

Deputy Incident Controller (Senior Mining Mate)

der / Deputy Commander

To take charge at the place of incident.

To activate the Emergency Preparedness Plan according to severity of situation.

Inform all the employees and relatives of the affected employees.

Call all key personnel and inform Doctor to be ready for treatment.

Commander shall deploy staff carry out following functions.

To coordinate and reinforce Emergency Combat at Site along with Site Incident Controller.

To liaise with other Departments and guide their personnel.

To supervise Assembly and Evacuation at all points.

To look after Patients who are bed ridden and any Casualties and give psychological support.

Activate Assembly and Evacuation Plan if required as per situation by ordering Site Inc

Inform and liaise with Chief Operating Officer, Police department and District Emergency

Arrange for chronological records of emergency to be maintained.

Issue authorized statements to News Media.

Ensure that proper consideration is given for preservation of evidence and arrange for video

Deputy Commander shall carry out the responsibilities of Commander in his absence and assist

him in his duties when present.

Assign Medicare and Emergency Management tasks to all persons of management cadre.

Responsibilities of Mines Foreman

To take immediate charge at the site of incident.

Ensure that immediate steps as per Emergency Preparedness Plan are taken and direct the worker

Inform Commander, Deputy Commander and other key personnel’s.

Shall blow the Siren / Hooter as per situation to declare Emergency.

Supervise assembly and evacuation as per plan, if required.

Appoint more than one Deputy Incident Controller to take charge if emergency occurs at more

Ensure that Commander has been alerted.

Take decisions for controlling the emergency till arrival by Commander.

Ensure that casualties are receiving adequate attention and medical care.

Ensure accounting for personnel and rescue of missing persons.

Control traffic movement in Quarry premises.

When emergency is prolonged arrange for relief of rescue workers and catering facilities.

Deputy Incident Controller shall take charge at site of emergency in the absence of Site Incident

the presence of same, he shall assist Site Incident Controller or take charge at another location,

if emergency exists in more than one place.

Responsibilities of Essential Workers

Final EIA/EMP Report

age | 81 (Chapter-7)

To activate the Emergency Preparedness Plan according to severity of situation.

To coordinate and reinforce Emergency Combat at Site along with Site Incident Controller.

To look after Patients who are bed ridden and any Casualties and give psychological support.

Activate Assembly and Evacuation Plan if required as per situation by ordering Site Incident

Inform and liaise with Chief Operating Officer, Police department and District Emergency

on is given for preservation of evidence and arrange for video

Deputy Commander shall carry out the responsibilities of Commander in his absence and assist

ks to all persons of management cadre.

Ensure that immediate steps as per Emergency Preparedness Plan are taken and direct the worker

Appoint more than one Deputy Incident Controller to take charge if emergency occurs at more

When emergency is prolonged arrange for relief of rescue workers and catering facilities.

Deputy Incident Controller shall take charge at site of emergency in the absence of Site Incident

the presence of same, he shall assist Site Incident Controller or take charge at another location,

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

A task force of essential trained staff is made available to get work done

Such work shall include -

• Fire fighting and spill control till fire brigade takes the charge.

• To help the fire brigade, if it is so required.

• Emergency engineering work e.g. isolating equipment, materials, urgent repairing or rep

electrical work etc.

• Provision of emergency power, water, lighting, material, etc.

• Movement of equipment, special vehicle and transport to or from the scene of the incident.

• Search, evacuation, rescue and welfare. First

• Manning of assembly points to record the arrival of evacuated personnel. Manning of outside

shelters and welfare of evacuated persons there.

• Assistance at casualty’s reception areas to record details of casualties.

• Assistance at communication center to handl

messengers if necessary.

• Control of traffic at Quarry premises.

7.4.5 Setting up of Emergency Infrastructure

To enable the key persons to implement the DMP, the following infrastructure will require

Assembly Points

In case of emergency the site needs to be evacuated immediately. On evacuation people will

assigned assembly points. The charge will be taken by shift in charge and in his

by Commander will be in charge of

Count. A Board indicating the Assembly Point having

guidance.

Liaison with State Authorities

Government authorities, local hospital, police fire se

kept informed about the occurrence and development of any incident by

necessary help and guidance from these authorities.

Task Force of Essential Staff

A task force of essential trained staff is made available to get work done by the Commander.

Task Force personnel shall be trained to perform tasks as mentioned above.

Emergency Control Center

Manager-Quarry Office will act as Emergency Control Center and provided with required

facilities. The Control Center is situated in an area of minimum risk and close to the road to allow for

ready access by a vehicle if other systems fail or extra communication facilities are needed to be set up.

The Emergency control center should consist of following items:

• External telephones

• Internal telephones

• E-Mail facilities

• Emergency plan

• Stationeries

• Torches and emergency lights.

Fire Fighting

Person noticing the fire shall immediately raise alarm and ask the nearest person to inform

Manager-Quarry.

Portable Fire Extinguisher shall be used in an attempt to extinguish the fire, by the person at site.

Matron shall assess the severity of fire and if likely to be severe shall take following steps

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

A task force of essential trained staff is made available to get work done by Incident Controllers.

Fire fighting and spill control till fire brigade takes the charge.

To help the fire brigade, if it is so required.

Emergency engineering work e.g. isolating equipment, materials, urgent repairing or rep

Provision of emergency power, water, lighting, material, etc.

Movement of equipment, special vehicle and transport to or from the scene of the incident.

Search, evacuation, rescue and welfare. First - Aid and medical help.

nning of assembly points to record the arrival of evacuated personnel. Manning of outside

shelters and welfare of evacuated persons there.

Assistance at casualty’s reception areas to record details of casualties.

Assistance at communication center to handle outgoing and incoming calls and to act as

Control of traffic at Quarry premises.

Setting up of Emergency Infrastructure

To enable the key persons to implement the DMP, the following infrastructure will require

In case of emergency the site needs to be evacuated immediately. On evacuation people will

assigned assembly points. The charge will be taken by shift in charge and in his absence person deployed

by Commander will be in charge of respective assembly points and will supervise Assembly and Head

Count. A Board indicating the Assembly Point having relevant information is placed at point for

Government authorities, local hospital, police fire services, taluka mamlatdar, district

kept informed about the occurrence and development of any incident by Commander and procure

necessary help and guidance from these authorities.

trained staff is made available to get work done by the Commander.

Task Force personnel shall be trained to perform tasks as mentioned above.

Quarry Office will act as Emergency Control Center and provided with required

facilities. The Control Center is situated in an area of minimum risk and close to the road to allow for

ready access by a vehicle if other systems fail or extra communication facilities are needed to be set up.

hould consist of following items:

Torches and emergency lights.

Person noticing the fire shall immediately raise alarm and ask the nearest person to inform

Portable Fire Extinguisher shall be used in an attempt to extinguish the fire, by the person at site.

Matron shall assess the severity of fire and if likely to be severe shall take following steps

Final EIA/EMP Report

age | 82 (Chapter-7)

by Incident Controllers.

Emergency engineering work e.g. isolating equipment, materials, urgent repairing or replacement,

Movement of equipment, special vehicle and transport to or from the scene of the incident.

nning of assembly points to record the arrival of evacuated personnel. Manning of outside

e outgoing and incoming calls and to act as

To enable the key persons to implement the DMP, the following infrastructure will require to be set up:

In case of emergency the site needs to be evacuated immediately. On evacuation people will go to pre-

absence person deployed

will supervise Assembly and Head

relevant information is placed at point for

rvices, taluka mamlatdar, district collector will be

Commander and procure

trained staff is made available to get work done by the Commander.

Quarry Office will act as Emergency Control Center and provided with required communication

facilities. The Control Center is situated in an area of minimum risk and close to the road to allow for

ready access by a vehicle if other systems fail or extra communication facilities are needed to be set up.

Person noticing the fire shall immediately raise alarm and ask the nearest person to inform Matron and

Portable Fire Extinguisher shall be used in an attempt to extinguish the fire, by the person at site.

Matron shall assess the severity of fire and if likely to be severe shall take following steps -

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

• Call fire tenders and mobile t

• Call for assembly of all persons at assembly points

• Arrange for turning "OFF" main switch of electricity supply.

• Manager-Quarry shall review the steps taken by Matron in his capacity as COMMANDER and

establish a "Control Room" in his office.

Immediate Step in Case of Explosion:

At first the concerned security guard should inform about it to the shift

They will take the precaution described in the Work Instruction.

Further Steps in Case of Fire Spreading

Commander shall continuously assess the situation and if it is not being controlled then ensure:

• Assembly of all persons at the assembly points.

• Arrival of fire tenders and / or Mobile Trailer Pump.

• Ensure evacuation in orderly fashion.

• Ensure that any vehicle parked near the Fire Site is taken away to safe area.

• Carry out responsibilities as detailed as above.

Emergency Preparedness for Electrical Shock / Accident

(Applicable in Case of Mechanized Sizing):

• Source of power should be put o

• Injured person should be shifted to safe place.

• Persons engaged in rescuing operation should use all PPEs and take appropriate precaution while

removing the injured persons.

• Trained persons are engaged to giv

• In case of major injury the injured is shifted to the Dispensary/Hospital.

• In case of electrical fire, only CO2 type Fire Extinguisher is used.

• Accident report in prescribed form is sent to appropriate authority in

• All the persons engaged to carry out this operation should be equipped with appropriate PPEs

(Personal Protective Equipments) like safety shoes, helmets, dust masks etc.

7.4.6. Natural Disasters

• Floods: The area is not prone to

the applied area.

• Precautionary measures will be taken to avoid the effects on the workers at the site if the disaster

occurs.

• Earthquake: The project site falls under Seismic Zone II therefo

not anticipated & chances of other natural disaster are also remote (MSK VI). The IS code

assigns zone factor of 0.10 for zone II.

7.4.6.1 Disaster Management

• The shallow depth of activities in china clay mining will

side falls/collapse.

• The complete mining operation will be carried out under the management and control of

experienced and qualified mines manager having certificate of competency to manage the mines

granted by DGMS.

• All the provisions of Mines Act 1952, MMR 1961 and Mines Rules 1955, RMMCR 1986 and

other laws applicable to mine will strictly be compiled with.

• During heavy rainfall the mining activities will be closed.

• All persons in supervisory capacity will be pro

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Call fire tenders and mobile trailer pump from nearby fire department.

Call for assembly of all persons at assembly points

Arrange for turning "OFF" main switch of electricity supply.

Quarry shall review the steps taken by Matron in his capacity as COMMANDER and

ntrol Room" in his office.

Immediate Step in Case of Explosion:

At first the concerned security guard should inform about it to the shift-in-charge and Mgr.

They will take the precaution described in the Work Instruction.

ire Spreading

Commander shall continuously assess the situation and if it is not being controlled then ensure:

Assembly of all persons at the assembly points.

Arrival of fire tenders and / or Mobile Trailer Pump.

Ensure evacuation in orderly fashion.

Ensure that any vehicle parked near the Fire Site is taken away to safe area.

Carry out responsibilities as detailed as above.

Emergency Preparedness for Electrical Shock / Accident

(Applicable in Case of Mechanized Sizing):

Source of power should be put off immediately in case of any electrical shock.

Injured person should be shifted to safe place.

Persons engaged in rescuing operation should use all PPEs and take appropriate precaution while

removing the injured persons.

Trained persons are engaged to give first-aid treatment to injured persons.

In case of major injury the injured is shifted to the Dispensary/Hospital.

In case of electrical fire, only CO2 type Fire Extinguisher is used.

Accident report in prescribed form is sent to appropriate authority in case of reportable injury.

All the persons engaged to carry out this operation should be equipped with appropriate PPEs

(Personal Protective Equipments) like safety shoes, helmets, dust masks etc.

The area is not prone to flood. Because there is no seasonal river/nallah passing through

Precautionary measures will be taken to avoid the effects on the workers at the site if the disaster

The project site falls under Seismic Zone II therefore possibility of earthquake is

not anticipated & chances of other natural disaster are also remote (MSK VI). The IS code

assigns zone factor of 0.10 for zone II.

The shallow depth of activities in china clay mining will not involve any high risk accident due to

The complete mining operation will be carried out under the management and control of

experienced and qualified mines manager having certificate of competency to manage the mines

All the provisions of Mines Act 1952, MMR 1961 and Mines Rules 1955, RMMCR 1986 and

other laws applicable to mine will strictly be compiled with.

During heavy rainfall the mining activities will be closed.

All persons in supervisory capacity will be provided with proper communication facilities.

Final EIA/EMP Report

age | 83 (Chapter-7)

Quarry shall review the steps taken by Matron in his capacity as COMMANDER and

charge and Mgr.-Quarry.

Commander shall continuously assess the situation and if it is not being controlled then ensure:

Persons engaged in rescuing operation should use all PPEs and take appropriate precaution while

case of reportable injury.

All the persons engaged to carry out this operation should be equipped with appropriate PPEs

flood. Because there is no seasonal river/nallah passing through

Precautionary measures will be taken to avoid the effects on the workers at the site if the disaster

re possibility of earthquake is

not anticipated & chances of other natural disaster are also remote (MSK VI). The IS code

not involve any high risk accident due to

The complete mining operation will be carried out under the management and control of

experienced and qualified mines manager having certificate of competency to manage the mines

All the provisions of Mines Act 1952, MMR 1961 and Mines Rules 1955, RMMCR 1986 and

vided with proper communication facilities.

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

• Competent persons will be provided First Aid kits which they will always carry. District Level

Cell & State Level Cell is to take timely precautionary measures to avoid effects of impending

disasters.

• A person will be deputed to be in continuous touch with District/Local Authority level office, for

the timely dissemination of message like heavy rainfall etc. as received from IMD and take

precautionary action to prevent any consequential disaster.

• “Disaster Warning System” as developed will be strictly implemented.

• Identification of nearby hospitals with route and contact number for emergency assistance. The

lessee vehicle also remains at site of most of the time during working. The applicant is capable to

any type of risk.

• Evacuation plan for the workers at the site including contract labours will be developed in nearby

shelters.

• “Emergency Helpline Number” will be displayed at all levels.

• Matron shall withdraw the entire person from work place and accumulate them i

building.

• All the equipment should be withdrawn from mine and kept in a higher site.

• The Quarry Manager may advise to leave the staff depending on security of situation.

• When earthquake hits, all persons shall be encouraged to run out in the open

Assembly Points.

• All the electrical supply should be disconnected by the electrical department.

• All key personnel shall reach Quarry immediately and carry out designated responsibilities.

• All the electrical supply should be disconnected

• Steps detailed in Emergency preparedness are to be carried out.

• As soon as earthquake tremor stops

• Check all areas to ensure that all fires and doused.

• Check all areas for persons t

• Search and Rescue Operation shall be launched with help of Workers, if there is obvious damage

to building.

First Aid

Basic items in a first aid kit consist of items listed in

Table

S. No. Description

1. First aid leaflet

2. Sterilized finger dressing

3. Sterilized hand or foot dressing

4. Sterilized body or large dressing

5. Sterilized burns dressing

6. Sterilized burns dressing

7. Sterilized burns dressing

8. Sterilized cotton wool (25 gm)

9. Cetavolon (28 gm)

10. Eye pads

11. Adhesive plaster

12. Assorted roller bandage

13. Triangular bandages

14. Safety pins

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Competent persons will be provided First Aid kits which they will always carry. District Level

Cell & State Level Cell is to take timely precautionary measures to avoid effects of impending

ll be deputed to be in continuous touch with District/Local Authority level office, for

the timely dissemination of message like heavy rainfall etc. as received from IMD and take

precautionary action to prevent any consequential disaster.

System” as developed will be strictly implemented.

Identification of nearby hospitals with route and contact number for emergency assistance. The

lessee vehicle also remains at site of most of the time during working. The applicant is capable to

Evacuation plan for the workers at the site including contract labours will be developed in nearby

“Emergency Helpline Number” will be displayed at all levels.

Matron shall withdraw the entire person from work place and accumulate them i

All the equipment should be withdrawn from mine and kept in a higher site.

The Quarry Manager may advise to leave the staff depending on security of situation.

When earthquake hits, all persons shall be encouraged to run out in the open areas designated as

All the electrical supply should be disconnected by the electrical department.

All key personnel shall reach Quarry immediately and carry out designated responsibilities.

All the electrical supply should be disconnected by the electrical department.

Steps detailed in Emergency preparedness are to be carried out.

As soon as earthquake tremor stops - Site Incident Controller (Matron) shall :

Check all areas to ensure that all fires and doused.

Check all areas for persons trapped inside.

Search and Rescue Operation shall be launched with help of Workers, if there is obvious damage

Basic items in a first aid kit consist of items listed in Table 7.6.

Table 7.6: Suggested Items in First Aid Kit

Description Quantity

First aid leaflet 1 copy

Sterilized finger dressing 10 nos.

Sterilized hand or foot dressing 10 nos.

Sterilized body or large dressing 6 nos.

Sterilized burns dressing -small 4 nos.

Sterilized burns dressing -large 2 nos.

Sterilized burns dressing – extra large 6 nos.

Sterilized cotton wool (25 gm) 2 tubes

Cetavolon (28 gm) 2 tubes

6 nos.

Adhesive plaster 1 spool

Assorted roller bandage 6 nos.

Triangular bandages 6 nos.

Safety pins 6 nos.

Final EIA/EMP Report

age | 84 (Chapter-7)

Competent persons will be provided First Aid kits which they will always carry. District Level

Cell & State Level Cell is to take timely precautionary measures to avoid effects of impending

ll be deputed to be in continuous touch with District/Local Authority level office, for

the timely dissemination of message like heavy rainfall etc. as received from IMD and take

Identification of nearby hospitals with route and contact number for emergency assistance. The

lessee vehicle also remains at site of most of the time during working. The applicant is capable to

Evacuation plan for the workers at the site including contract labours will be developed in nearby

Matron shall withdraw the entire person from work place and accumulate them in quarry

The Quarry Manager may advise to leave the staff depending on security of situation.

areas designated as

All key personnel shall reach Quarry immediately and carry out designated responsibilities.

Search and Rescue Operation shall be launched with help of Workers, if there is obvious damage

Quantity

1 copy

10 nos.

10 nos.

6 nos.

4 nos.

2 nos.

6 nos.

2 tubes

2 tubes

6 nos.

1 spool

6 nos.

6 nos.

6 nos.

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

15. Scissors, ordinary, 12.7cms, both sides sharp

16. Savlon liquid, 150 ml, or equivalent

17. Cotton wool for padding, 100 gm

18. Eye Ointment of sulphacetamide preparation

19. Loose woven gauze (28”x8”), compressed pack

20. Aspirin, 300 mg (10 tablets)

21. Scribbling Pad, 4”x 6” with a pencil in a plastic cover

22. Adhesive dressing strips

23. Field dressing of modified army pattern

24. Record cards in a plastic cover

25. Torch, medium size without cells

26. Eye wash

27. Wooden splints, small

28. Wooden splints, big

Treatment of affected persons

i. Injured / Affected persons shall be provided suitable first

for further treatment depending on injury.

ii. Patients requiring further treatment shall be sent in Ambulances to Hospitals in

iii. Patients suffering from minor problems shall be discharged and sent home after preliminary

treatment.

7.4.7 Post Emergency Activities

Medical checkup: Medical checkup of affected persons if any and suitable medical aid shall be provided.

Collection of Records: Exact information shall be collected regarding cause of Emergency and remedial

measures suggested preventing recurrence.

Inquiry: Detailed inquiry shall be carried out to find out cause which will be in the form of fact finding

and recommendations made to suitable authority.

Insurance Claims (if any): Insurance claims for damage due to consequences of emergency shall be

filed.

7.4.8 Mock Drill

Full scale mock drill shall be conducted at least once a year in coordination with Safety De

Manager-Quarry shall declare the emergency for mock drill and all persons concerned shall perform

duties as per Responsibilities given in this Plan.

7.4.9 Training

Regular training of all concerned personnel will be conducted to enable the Staff

Emergency be it Natural Disasters, Fire in Equipment, Building or any explosion in quarry.

7.4.10 DMP Audit, Non Conformance and Corrective Action and Preventive Action

Since this DMP has been designed as a dynamic document, it is requi

at regular intervals. Ideally, persons auditing the DMP should be external auditors (i.e. not employed at

the site being audited). The audit should result in a set of findings that are put before the site management

for review.

Audits will be periodic, at intervals that are decided by the Head Office. Audit reports shall state the exact

non-compliance with the particular clause of this DMP, and should include steps to be taken to attain

compliance, through corrective and

7.4.11 Training and Human Resources Development

i. Appointment and delegating qualified and experienced personnel in various disciplines.

ii. Adequate training/refresher training will be provided to the supervisors, workers keeping in view

provisions of Mines Vocational Training Rules, 1966; Mine Rules, 1955, Mines Rescue Rules, 1985.

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Scissors, ordinary, 12.7cms, both sides sharp 1 pair

Savlon liquid, 150 ml, or equivalent 2 nos.

Cotton wool for padding, 100 gm 2 packets

Eye Ointment of sulphacetamide preparation 1 tube

Loose woven gauze (28”x8”), compressed pack 1 packet

Aspirin, 300 mg (10 tablets) 5 strips

Scribbling Pad, 4”x 6” with a pencil in a plastic cover 1 no.

Adhesive dressing strips 10 strips

Field dressing of modified army pattern 3 nos.

Record cards in a plastic cover 1 set

Torch, medium size without cells 1 no.

1 no.

Wooden splints, small 1 set

Wooden splints, big 1 set

Injured / Affected persons shall be provided suitable first-aid treatment and sent to Co.'s Doctor

for further treatment depending on injury.

Patients requiring further treatment shall be sent in Ambulances to Hospitals in

Patients suffering from minor problems shall be discharged and sent home after preliminary

: Medical checkup of affected persons if any and suitable medical aid shall be provided.

Exact information shall be collected regarding cause of Emergency and remedial

measures suggested preventing recurrence.

Detailed inquiry shall be carried out to find out cause which will be in the form of fact finding

ecommendations made to suitable authority.

Insurance claims for damage due to consequences of emergency shall be

Full scale mock drill shall be conducted at least once a year in coordination with Safety De

Quarry shall declare the emergency for mock drill and all persons concerned shall perform

duties as per Responsibilities given in this Plan.

Regular training of all concerned personnel will be conducted to enable the Staff to face any type of

Emergency be it Natural Disasters, Fire in Equipment, Building or any explosion in quarry.

DMP Audit, Non Conformance and Corrective Action and Preventive Action

Since this DMP has been designed as a dynamic document, it is required that its performance be audited

at regular intervals. Ideally, persons auditing the DMP should be external auditors (i.e. not employed at

the site being audited). The audit should result in a set of findings that are put before the site management

Audits will be periodic, at intervals that are decided by the Head Office. Audit reports shall state the exact

compliance with the particular clause of this DMP, and should include steps to be taken to attain

compliance, through corrective and preventive actions.

Training and Human Resources Development

Appointment and delegating qualified and experienced personnel in various disciplines.

Adequate training/refresher training will be provided to the supervisors, workers keeping in view

provisions of Mines Vocational Training Rules, 1966; Mine Rules, 1955, Mines Rescue Rules, 1985.

Final EIA/EMP Report

age | 85 (Chapter-7)

1 pair

2 nos.

2 packets

1 tube

1 packet

5 strips

1 no.

10 strips

3 nos.

1 set

1 no.

1 no.

1 set

1 set

aid treatment and sent to Co.'s Doctor

Patients requiring further treatment shall be sent in Ambulances to Hospitals in Nagar.

Patients suffering from minor problems shall be discharged and sent home after preliminary

: Medical checkup of affected persons if any and suitable medical aid shall be provided.

Exact information shall be collected regarding cause of Emergency and remedial

Detailed inquiry shall be carried out to find out cause which will be in the form of fact finding

Insurance claims for damage due to consequences of emergency shall be

Full scale mock drill shall be conducted at least once a year in coordination with Safety Department.

Quarry shall declare the emergency for mock drill and all persons concerned shall perform

to face any type of

Emergency be it Natural Disasters, Fire in Equipment, Building or any explosion in quarry.

DMP Audit, Non Conformance and Corrective Action and Preventive Action

red that its performance be audited

at regular intervals. Ideally, persons auditing the DMP should be external auditors (i.e. not employed at

the site being audited). The audit should result in a set of findings that are put before the site management

Audits will be periodic, at intervals that are decided by the Head Office. Audit reports shall state the exact

compliance with the particular clause of this DMP, and should include steps to be taken to attain

Appointment and delegating qualified and experienced personnel in various disciplines.

Adequate training/refresher training will be provided to the supervisors, workers keeping in view

provisions of Mines Vocational Training Rules, 1966; Mine Rules, 1955, Mines Rescue Rules, 1985.

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

iii. Personnel who have to operate and maintain HEMM, Trucks etc are to be trained under the guidance

of the manufacturers and as per provisions of DGMS Circular Te

in opencast mines. Recommendation of Seventh Conference on Safety in Mines on “Safety in Open

Cast Mining”, “Traffic Rules and Procedures”, “Mobile equipments and Highway Delivery

Vehicles”, “Operations and Operator Train

iv. The training of mine personnel shall be provided regularly with respect to environmental protection.

v. Special courses for employees will be arranged for afforestation, revegetation, reclamation, health

hazards (identification), malaria eradication

company.

7.5 RAIN WATER HARVESTING

The rain water harvesting is proposed by Project Proponent and allocated a budget of Rs.10,0

EMP budget. There are 1 Nos. of rainwater harvesting pit of 160 KL each will be installed at mine site.

The size of rainwater harvesting is given in

Figure 7.3: Rainwater Harvesting Pit

7.6 OCCUPATIONAL HEALTH HAZARDS

Dry-pit mining by open cast method

mineral. At site, during excavation and loading activity, dust is main pollutant which affects the health of

workers whereas environmental and climatic conditions also generate the healt

occupational health hazard means gaining an understanding of the source (its location and magnitude or

concentration), identifying an exposure pathway (

determination of likely a receptor (someone receiving the stuff that is migrating). Occupational hazard

due to stone mining mainly comes under the physical hazards. Possible physical hazards are as below

mention:

7.6.1 Physical Hazards Due To Mining Operations

Following health related hazards were indentified due to

a) Light: The workers may be exposed to the risk of poor illumination or excessive brightness. The

effects are eye strain, headache, eye pain and lachrymation, congestion around the cornea and eye

fatigue.

b) Heat and Humidity: The most common physical hazard is heat. The direct effects of heat

exposure are burns, heat exhaustion, heat stroke and heat cramps; the

decreased efficiency, increased fatigue and enhanced accident rates. Heat and humidity are

encountered in hot and humid condition when temperatures and air temperatures

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Personnel who have to operate and maintain HEMM, Trucks etc are to be trained under the guidance

of the manufacturers and as per provisions of DGMS Circular Technical 1/1989 regarding accidents

in opencast mines. Recommendation of Seventh Conference on Safety in Mines on “Safety in Open

Cast Mining”, “Traffic Rules and Procedures”, “Mobile equipments and Highway Delivery

Vehicles”, “Operations and Operator Training” and other related circulars.

The training of mine personnel shall be provided regularly with respect to environmental protection.

Special courses for employees will be arranged for afforestation, revegetation, reclamation, health

on), malaria eradication and HIV prevention etc in the training centre of the

RAIN WATER HARVESTING

The rain water harvesting is proposed by Project Proponent and allocated a budget of Rs.10,0

Nos. of rainwater harvesting pit of 160 KL each will be installed at mine site.

The size of rainwater harvesting is given in figure 7.3.

Figure 7.3: Rainwater Harvesting Pit

OCCUPATIONAL HEALTH HAZARDS

pit mining by open cast method involves dust generation by excavation, loading and transportation of

mineral. At site, during excavation and loading activity, dust is main pollutant which affects the health of

workers whereas environmental and climatic conditions also generate the health problems. Addressing the

occupational health hazard means gaining an understanding of the source (its location and magnitude or

concentration), identifying an exposure pathway (e.g. a means to get it in contact with someone), and

determination of likely a receptor (someone receiving the stuff that is migrating). Occupational hazard

mining mainly comes under the physical hazards. Possible physical hazards are as below

.1 Physical Hazards Due To Mining Operations

Following health related hazards were indentified due to stone mining operations to the workers:

The workers may be exposed to the risk of poor illumination or excessive brightness. The

are eye strain, headache, eye pain and lachrymation, congestion around the cornea and eye

The most common physical hazard is heat. The direct effects of heat

exposure are burns, heat exhaustion, heat stroke and heat cramps; the indirect effects are

decreased efficiency, increased fatigue and enhanced accident rates. Heat and humidity are

encountered in hot and humid condition when temperatures and air temperatures

Final EIA/EMP Report

age | 86 (Chapter-7)

Personnel who have to operate and maintain HEMM, Trucks etc are to be trained under the guidance

chnical 1/1989 regarding accidents

in opencast mines. Recommendation of Seventh Conference on Safety in Mines on “Safety in Open

Cast Mining”, “Traffic Rules and Procedures”, “Mobile equipments and Highway Delivery

The training of mine personnel shall be provided regularly with respect to environmental protection.

Special courses for employees will be arranged for afforestation, revegetation, reclamation, health

prevention etc in the training centre of the

The rain water harvesting is proposed by Project Proponent and allocated a budget of Rs.10,000 under

Nos. of rainwater harvesting pit of 160 KL each will be installed at mine site.

involves dust generation by excavation, loading and transportation of

mineral. At site, during excavation and loading activity, dust is main pollutant which affects the health of

h problems. Addressing the

occupational health hazard means gaining an understanding of the source (its location and magnitude or

a means to get it in contact with someone), and

determination of likely a receptor (someone receiving the stuff that is migrating). Occupational hazard

mining mainly comes under the physical hazards. Possible physical hazards are as below

mining operations to the workers:

The workers may be exposed to the risk of poor illumination or excessive brightness. The

are eye strain, headache, eye pain and lachrymation, congestion around the cornea and eye

The most common physical hazard is heat. The direct effects of heat

indirect effects are

decreased efficiency, increased fatigue and enhanced accident rates. Heat and humidity are

encountered in hot and humid condition when temperatures and air temperatures increase in

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

summer time up to 46.60C or above in the river bed mining area.

c) Eye Irritation: During the high windy days in summer the

like itching and watering of eyes.

d) Respiratory Problems: Large amounts of dust in air can be a health hazard, exacerbat

respiratory disorders such as asthma and irritating the lungs and bronchial passages.

e) Noise Induced Hearing Loss:

7.6.2 Medical Examination Schedule

To minimize the health impacts PP

provided for use by the work personnel. All workers will be subjected to Initial Medical Examination as

per Mines Rule 1955 at the time of appointment. Periodical Medical Examination will be

least once in five years. Medical camps will be organized. The detail of health check up and periodical

medical examination schedule is given below.

Table 7.

S. No Activities

1. Initial Medical Examination (Mine Workers)

A. Physical Check -up

B. Psychological Test

C. Audiometric Test

D. Respiratory Test

2. Periodical Medical Examination (Mine Workers)

A. Physical Check -up

B. Audiometric Test

C. Eye Check -up

D. Respiratory Test

3. Medical Camp (Mine Workers

and Nearby Villagers

4. Training (Mine Workers)

Note: Medical Follow Ups Work force will be divided

Age Group PME as per Mine Rule 1955

Less than 25 years Once in a Three Years

Between 25 to 40 Years Once in a Three Years

Above 40 years Once in a Three Years

7.7 SOCIO ECONOMIC IMPACT OF THE PROJECT AND SAFETY MEASURES

Socio Economic Impact Assessment (SEIA) re

characteristics of human being living in a given geographical area during a given period. SEIA is carried

out separately but concurrently with Environment Impact Assessment (EIA). It focuses the effect of the

project on social and economic well being of the community.

7.7.1 Impact on Demographic Composition

The proposed project will hardly make any difference in the demographic composition of the study area

as the additional employment it envisages to create will be met locally to the maximum extent. Hence, the

chances of migration of people from outside the study area are remote. Accordingly, there will be no

variation in the total population of the study area including that of sex ratio, when the mine starts

operating.

7.7.2 Employment Opportunities

The proposed project will provide e

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

C or above in the river bed mining area.

During the high windy days in summer the stone could be the problems for eyes

like itching and watering of eyes.

Large amounts of dust in air can be a health hazard, exacerbat

respiratory disorders such as asthma and irritating the lungs and bronchial passages.

Noise Induced Hearing Loss: Machinery is the main source of noise pollution at the mine site.

Medical Examination Schedule

To minimize the health impacts PPE like dust masks, ear plugs/ muffs and other equipments will be

provided for use by the work personnel. All workers will be subjected to Initial Medical Examination as

per Mines Rule 1955 at the time of appointment. Periodical Medical Examination will be

least once in five years. Medical camps will be organized. The detail of health check up and periodical

medical examination schedule is given below.

Table 7.7: Medical Examination Schedule

1st Year 2

nd Year 3

rd Year 4

th

Initial Medical Examination (Mine Workers)

- - -

- - -

- - -

Periodical Medical Examination (Mine Workers)

-

-

-

-

Medical Camp (Mine Workers -

Training (Mine Workers)

Medical Follow Ups Work force will be divided into three targeted groups age wise as follows:

PME as per Mine Rule 1955 Special Examination

Once in a Three Years In case of emergencies

Once in a Three Years In case of emergencies

Once in a Three Years In case of emergencies

SOCIO ECONOMIC IMPACT OF THE PROJECT AND SAFETY MEASURES

Socio Economic Impact Assessment (SEIA) refers to systematic analysis of various social and economic

living in a given geographical area during a given period. SEIA is carried

out separately but concurrently with Environment Impact Assessment (EIA). It focuses the effect of the

project on social and economic well being of the community.

Demographic Composition

The proposed project will hardly make any difference in the demographic composition of the study area

as the additional employment it envisages to create will be met locally to the maximum extent. Hence, the

people from outside the study area are remote. Accordingly, there will be no

variation in the total population of the study area including that of sex ratio, when the mine starts

The proposed project will provide employment to the local people. It has been estimated that

Final EIA/EMP Report

age | 87 (Chapter-7)

could be the problems for eyes

Large amounts of dust in air can be a health hazard, exacerbating

respiratory disorders such as asthma and irritating the lungs and bronchial passages.

Machinery is the main source of noise pollution at the mine site.

E like dust masks, ear plugs/ muffs and other equipments will be

provided for use by the work personnel. All workers will be subjected to Initial Medical Examination as

per Mines Rule 1955 at the time of appointment. Periodical Medical Examination will be conducted at

least once in five years. Medical camps will be organized. The detail of health check up and periodical

th Year 5

th Year

-

-

-

into three targeted groups age wise as follows:

Special Examination

In case of emergencies

In case of emergencies

In case of emergencies

SOCIO ECONOMIC IMPACT OF THE PROJECT AND SAFETY MEASURES

fers to systematic analysis of various social and economic

living in a given geographical area during a given period. SEIA is carried

out separately but concurrently with Environment Impact Assessment (EIA). It focuses the effect of the

The proposed project will hardly make any difference in the demographic composition of the study area

as the additional employment it envisages to create will be met locally to the maximum extent. Hence, the

people from outside the study area are remote. Accordingly, there will be no

variation in the total population of the study area including that of sex ratio, when the mine starts

mployment to the local people. It has been estimated that 21 people

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

will get direct employment in this mining project. It is a positive impact of the project since it is providing

employment opportunities to the local people.

7.7.3 Increased Supply of China Clay

With the commencement of the proposed mining project the supply of

between demand and supply will decrease to some extent, if not fully.

7.7.4 Impact on Agriculture

The entire mining area is private Agriculture land fertile in nature but

applied area so there is very less impact observed on the agriculture works due to mining activity.

7.7.5 Impact on Road Development

Movement of tractor-trolleys and other vehicles to and fro

substantially, when mining will start. The existing roads connecting the quarry with the National and

State Highways are mostly narrow mud roads. There will be mud slide

roads are not widened and their conditions are not improved. Hence, there is good scope for road

development in the mining area. Further, there are risks of accidents during loading of extracted minerals

into tractor-trolleys and transportation to markets for sell. However, accidents can be avoided by taking

due care and precautions.

7.7.6 Income to Government

The proposed mining activity will benefit the State in the form of royalty, dead rent, fees and earning

from taxes.

7.7.7 Impact on Law and Order

As most of the workers to be employed in the proposed mining project are local residents no law and

order problem is envisaged. It is expected that the workers will attend to their duties from their residence

and return to their homes after the day’s work. There would have been law and order problem if the

workers were migrants and lived in shanties closed to the mining area. However, to meet any untoward

incident one police post may be set up closed to the mining area.

7.7.8 Impact on Health

There are no chances of occurring diseases, due to

non-toxic. Excessive inhalation of fugitive dust

necessary protection will be taken.

7.8 REHABILITATION AND RESETTLEMENT (R & R)

There is no displacement of the population within the project area and adjacent nearby area and the

complete lease area is Pvt. Agriculture land. However Social development of village will be considered as

per social activities. Provision and maintenance of protective works like drains, parapet walls, retaining

walls, check dams, Management of Air and water quality, Man

and mining machinery disposal, Safety and security. The resources required for management of these

operations will be supervision, raw materials (mainly stone available at mines), gates, fencing, transport

and Communication. All the above operations will be carried out in three months time.

7.9 ENVIRONMENTAL AND SOCIAL

Proposed ESR Activities - Apart from the various environmental protection measures, the project

proponent is conscious of its social

undertake the following works in the surrounding areas of the mine.

• Community Health Improvement activities such as periodically medical checkup camps,

donation camps and health awar

practices shall be implemented

• Disinfection of dug wells and other potable water sources and awareness camps shall be

organized on water borne diseases, health and hygiene etc.

• Improvement in community educational activities will cover the distribution of educational

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

will get direct employment in this mining project. It is a positive impact of the project since it is providing

employment opportunities to the local people.

a Clay in the Market

With the commencement of the proposed mining project the supply of stone will increase and the gap

between demand and supply will decrease to some extent, if not fully.

The entire mining area is private Agriculture land fertile in nature but no agriculture work is going in the

so there is very less impact observed on the agriculture works due to mining activity.

.5 Impact on Road Development

trolleys and other vehicles to and from the mining site is expected to increase

substantially, when mining will start. The existing roads connecting the quarry with the National and

State Highways are mostly narrow mud roads. There will be mud slide and traffic bottle neck if these

roads are not widened and their conditions are not improved. Hence, there is good scope for road

development in the mining area. Further, there are risks of accidents during loading of extracted minerals

eys and transportation to markets for sell. However, accidents can be avoided by taking

The proposed mining activity will benefit the State in the form of royalty, dead rent, fees and earning

As most of the workers to be employed in the proposed mining project are local residents no law and

order problem is envisaged. It is expected that the workers will attend to their duties from their residence

eir homes after the day’s work. There would have been law and order problem if the

workers were migrants and lived in shanties closed to the mining area. However, to meet any untoward

incident one police post may be set up closed to the mining area.

There are no chances of occurring diseases, due to semi mechanized mining of China Clay

fugitive dust is a serious health concern. To avoid respiratory problem

REHABILITATION AND RESETTLEMENT (R & R)

There is no displacement of the population within the project area and adjacent nearby area and the

rea is Pvt. Agriculture land. However Social development of village will be considered as

per social activities. Provision and maintenance of protective works like drains, parapet walls, retaining

walls, check dams, Management of Air and water quality, Management of Waste, top soil, infrastructure

and mining machinery disposal, Safety and security. The resources required for management of these

operations will be supervision, raw materials (mainly stone available at mines), gates, fencing, transport

munication. All the above operations will be carried out in three months time.

SOCIAL RESPONSIBILITY

Apart from the various environmental protection measures, the project

proponent is conscious of its social responsibility and as any good corporate citizen, it is proposed to

undertake the following works in the surrounding areas of the mine.

Community Health Improvement activities such as periodically medical checkup camps,

donation camps and health awareness camps for child and mother care, health and hygiene

practices shall be implemented

Disinfection of dug wells and other potable water sources and awareness camps shall be

organized on water borne diseases, health and hygiene etc.

ity educational activities will cover the distribution of educational

Final EIA/EMP Report

age | 88 (Chapter-7)

will get direct employment in this mining project. It is a positive impact of the project since it is providing

will increase and the gap

agriculture work is going in the

so there is very less impact observed on the agriculture works due to mining activity.

the mining site is expected to increase

substantially, when mining will start. The existing roads connecting the quarry with the National and

and traffic bottle neck if these

roads are not widened and their conditions are not improved. Hence, there is good scope for road

development in the mining area. Further, there are risks of accidents during loading of extracted minerals

eys and transportation to markets for sell. However, accidents can be avoided by taking

The proposed mining activity will benefit the State in the form of royalty, dead rent, fees and earning

As most of the workers to be employed in the proposed mining project are local residents no law and

order problem is envisaged. It is expected that the workers will attend to their duties from their residence

eir homes after the day’s work. There would have been law and order problem if the

workers were migrants and lived in shanties closed to the mining area. However, to meet any untoward

China Clay. China Clay is

is a serious health concern. To avoid respiratory problem

There is no displacement of the population within the project area and adjacent nearby area and the

rea is Pvt. Agriculture land. However Social development of village will be considered as

per social activities. Provision and maintenance of protective works like drains, parapet walls, retaining

agement of Waste, top soil, infrastructure

and mining machinery disposal, Safety and security. The resources required for management of these

operations will be supervision, raw materials (mainly stone available at mines), gates, fencing, transport

Apart from the various environmental protection measures, the project

responsibility and as any good corporate citizen, it is proposed to

Community Health Improvement activities such as periodically medical checkup camps, blood

eness camps for child and mother care, health and hygiene

Disinfection of dug wells and other potable water sources and awareness camps shall be

ity educational activities will cover the distribution of educational

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

books, stationary and aids and other infrastructure facilities etc.

• Decrease water scarcity problem at a possible extent during scarcity period through conducting

water conservation programs and by built up rain water harvesting pits

• Afforestation programs will involve the activities such as greenbelt development, plantation of

trees in villages’ road side and development of nursery for maintaining the greenery of the area &

preventing pollution.

Therefore, the proposed mining project can be considered “significantly positive” i.e. keep regular watch

on adverse impacts through practicing pollution control measures and post monitoring with simultaneous

contribution towards raising standard of living of the people in study area together with its development.

Sh. Binja Ram Jat, proposed to incur approx.

Social Responsibility given below in

Table 7.

S. No. Planned Activities under

1. Community Education Facilities

• Augmentation of furniture, blackboard, etc in village schools

• Award scholarship to meritorious

• Distribution of educational books, stationary, uniforms and aids etc.

2. Community Health Improvement

• Disinfection facilities for dug wells and other potable water sources.

• Periodically medical checkup camps, blood donation camps.

• Eye checkup camps

• Health awareness camps for child and mother care, health and hygiene practices.

3. Community Welfare Activities

• Worship places development & beautification

• Distribution of seeds & saplings

• Promotion & support to various Govt. Schemes.

4. Infrastructural Development

• Installation/ Repair of Hand Pumps/ Bore wells

• Grampanchayat dug-well de

• Construction and mantainence of village roads adjacent to project site

5. Community Water Conservation

• Rain water harvesting ponds and ground

• Water conservation awareness programs

6. Afforestation Programs

• Plantation of trees in villages road side

• Development of nursery

7. Community Capacity Building

• Imparting vocational training for technical skills, self employment training

stitching, embroidery, tailoring, handicrafts

Table 7.9 : Budget for

Sr. No.

1 Contribution for “Swachchh Bharat Abhiyan” at Village Pat

2 Supply of Drinking water

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

books, stationary and aids and other infrastructure facilities etc.

Decrease water scarcity problem at a possible extent during scarcity period through conducting

grams and by built up rain water harvesting pits.

Afforestation programs will involve the activities such as greenbelt development, plantation of

trees in villages’ road side and development of nursery for maintaining the greenery of the area &

Therefore, the proposed mining project can be considered “significantly positive” i.e. keep regular watch

on adverse impacts through practicing pollution control measures and post monitoring with simultaneous

standard of living of the people in study area together with its development.

proposed to incur approx. Rs. 1.80 Lakhs per annum towards Environmental

Responsibility given below in Table 7.8. The major activities provided in below

Table 7.8: Need Specific Proposed ESR Activities

Planned Activities under ESR as per specific needs

Community Education Facilities

Augmentation of furniture, blackboard, etc in village schools

Award scholarship to meritorious students

Distribution of educational books, stationary, uniforms and aids etc.

Community Health Improvement

Disinfection facilities for dug wells and other potable water sources.

Periodically medical checkup camps, blood donation camps.

Health awareness camps for child and mother care, health and hygiene practices.

Community Welfare Activities

Worship places development & beautification

Distribution of seeds & saplings

Promotion & support to various Govt. Schemes.

Development

Installation/ Repair of Hand Pumps/ Bore wells

well de-siltation and deepening

Construction and mantainence of village roads adjacent to project site

Community Water Conservation

Rain water harvesting ponds and ground water recharge pits

Water conservation awareness programs

Afforestation Programs

Plantation of trees in villages road side

Development of nursery

Community Capacity Building

Imparting vocational training for technical skills, self employment training

stitching, embroidery, tailoring, handicrafts

: Budget for Environmental and Social Responsibility

Description

Contribution for “Swachchh Bharat Abhiyan” at Village Pateli

Supply of Drinking water Facilities at Village Pateli

Final EIA/EMP Report

age | 89 (Chapter-7)

Decrease water scarcity problem at a possible extent during scarcity period through conducting

Afforestation programs will involve the activities such as greenbelt development, plantation of

trees in villages’ road side and development of nursery for maintaining the greenery of the area &

Therefore, the proposed mining project can be considered “significantly positive” i.e. keep regular watch

on adverse impacts through practicing pollution control measures and post monitoring with simultaneous

standard of living of the people in study area together with its development.

Environmental and

elow Table 7.9:

Health awareness camps for child and mother care, health and hygiene practices.

Imparting vocational training for technical skills, self employment training for women as

Social Responsibility

Cost

20,000

40,000

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

3 Contribution For improvement of education at Village

School Pateli

4 Health Facilities at Village Pat

It is expected that this will improve the socio

popularity of the project proponent will enhance. The local community in the study area desired that the

project proponent should take up the following development initiatives for the betterment of the local people.

a) Health camps in project village

b) Distribution of books and stationeries to meritorious students in the study area

c) One time donation to the schools for drinking water facilities

d) Training camps for skill development

For each activity the funds to be earmarked by the propone

authority and the beneficiaries. It has been planned to undertake a concurrent evaluation of the activities to

be taken up under the ESR program.

7.10 PREDICTION OF IMPACTS AND MITIGATION MEASURES FOR CLUSThe area pollution is in the form of dust, fumes and gases generated by mining machineries and during

different mining operations. The dust once allowed to go into atmospheric cannot be controlled hence it’s

desirable not to allow them to be forme

7.10.1 Impacts of Air Pollution & Its Mitigation Measures

Surface mining, including opencast mining has always been a source of dust generation. The various

pollutants like SPM, SO2 & NO2 are not expected to have considerable variation from the existing levels

within study area which are generally below the limits specified by CPCB. The pollutant levels within lease

area will not rise considerably and are expected to confirm to the per

measures.

In this mining project the only source of emission is excavation, transportation, loading, hauling operation

and handling of mineral viz. China Clay

The likely sources of air pollution with respect to

• Operation of diesel based equipment like excavator, loader truck tractors

• Transportation of mineral

• Hauling & spillage of waste during loading & unloading handling.

• Air pollution from unpaved roads & surface.

7.10.1.1 Air Pollution Modeling Impact assessment is an important part of Environmental Impact Assessment Study. There are various

techniques available to predict the impacts. Mathematical modeling is an established and accepted technique

to predict the impacts. The open cast mines are potential sources of air pollution.

In this section impact on air environment due to emissions generated from China Clay

Area 364.4728 ha and total no. of leases 87.

Kharenarnoliya & Borwa Tehsil Jayal, Nagaur & Munda,

Average production capacity of cluster

87

(A) Meteorological Data The meteorology of the project area plays very important role in dispersion of pollutants and buildup of

pollution within the atmosphere. In the present study, one season (March 2015

data has been taken to find the dispersion of pollutant

which is an important parameter to express the dispersive potential of atmosphere, has been taken from the

atlas of hourly mixing height and assimilative capacity of atmosphere in India (S.D. Attri et al.

Windrose diagram of one season meteorological data used for modeling is shown given below

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Contribution For improvement of education at Village

Health Facilities at Village Pateli

Total

It is expected that this will improve the socio-economic status of the people and at the same time the

popularity of the project proponent will enhance. The local community in the study area desired that the

project proponent should take up the following development initiatives for the betterment of the local people.

project village

Distribution of books and stationeries to meritorious students in the study area

One time donation to the schools for drinking water facilities

Training camps for skill development

For each activity the funds to be earmarked by the proponent will be decided after discussion with the local

authority and the beneficiaries. It has been planned to undertake a concurrent evaluation of the activities to

SR program.

7.10 PREDICTION OF IMPACTS AND MITIGATION MEASURES FOR CLUSThe area pollution is in the form of dust, fumes and gases generated by mining machineries and during

different mining operations. The dust once allowed to go into atmospheric cannot be controlled hence it’s

desirable not to allow them to be formed and Suppressed at the generating source.

Impacts of Air Pollution & Its Mitigation Measures

Surface mining, including opencast mining has always been a source of dust generation. The various

NO2 are not expected to have considerable variation from the existing levels

within study area which are generally below the limits specified by CPCB. The pollutant levels within lease

area will not rise considerably and are expected to confirm to the permissible limits with proper mitigation

In this mining project the only source of emission is excavation, transportation, loading, hauling operation

and handling of mineral viz. China Clay

The likely sources of air pollution with respect to activities are:

Operation of diesel based equipment like excavator, loader truck tractors-trolley & tippers etc.

Hauling & spillage of waste during loading & unloading handling.

Air pollution from unpaved roads & surface.

Impact assessment is an important part of Environmental Impact Assessment Study. There are various

techniques available to predict the impacts. Mathematical modeling is an established and accepted technique

he open cast mines are potential sources of air pollution.

In this section impact on air environment due to emissions generated from China Clay

Area 364.4728 ha and total no. of leases 87. The mines is located in village Pateli, Jhunj

Kharenarnoliya & Borwa Tehsil Jayal, Nagaur & Munda, Nagaur district in the state of Rajasthan. Total

of cluster is planned 30,63,298 TPA. Area 364.4728 ha and total no. of leases

rology of the project area plays very important role in dispersion of pollutants and buildup of

pollution within the atmosphere. In the present study, one season (March 2015 – May 2015) meteorological

data has been taken to find the dispersion of pollutant concentration. The mixing height for study period,

which is an important parameter to express the dispersive potential of atmosphere, has been taken from the

atlas of hourly mixing height and assimilative capacity of atmosphere in India (S.D. Attri et al.

Windrose diagram of one season meteorological data used for modeling is shown given below

Final EIA/EMP Report

age | 90 (Chapter-7)

50,000

70,000

1,80,000

and at the same time the

popularity of the project proponent will enhance. The local community in the study area desired that the

project proponent should take up the following development initiatives for the betterment of the local people.

nt will be decided after discussion with the local

authority and the beneficiaries. It has been planned to undertake a concurrent evaluation of the activities to

7.10 PREDICTION OF IMPACTS AND MITIGATION MEASURES FOR CLUSTER AREA The area pollution is in the form of dust, fumes and gases generated by mining machineries and during

different mining operations. The dust once allowed to go into atmospheric cannot be controlled hence it’s

Surface mining, including opencast mining has always been a source of dust generation. The various

NO2 are not expected to have considerable variation from the existing levels

within study area which are generally below the limits specified by CPCB. The pollutant levels within lease

missible limits with proper mitigation

In this mining project the only source of emission is excavation, transportation, loading, hauling operation

trolley & tippers etc.

Impact assessment is an important part of Environmental Impact Assessment Study. There are various

techniques available to predict the impacts. Mathematical modeling is an established and accepted technique

Cluster Mining, Total

, Jhunjhala, Firozpur,

Nagaur district in the state of Rajasthan. Total

Area 364.4728 ha and total no. of leases

rology of the project area plays very important role in dispersion of pollutants and buildup of

May 2015) meteorological

concentration. The mixing height for study period,

which is an important parameter to express the dispersive potential of atmosphere, has been taken from the

atlas of hourly mixing height and assimilative capacity of atmosphere in India (S.D. Attri et al., 2008).

Windrose diagram of one season meteorological data used for modeling is shown given below in Figure 7.4.

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

(B) Modeling Methodology

� ISCST3 Model

The ISCST3 model was used to predict the GLC of PM10 due to loading activity at mine site. China Clay

will be transported by trucks. Loaded trucks will travel on Kuccha road made for plying of trucks. No. of

such temporary road will provide access to the m

activity at mine site and having equivalent emission rates were setup in mining lease to predict the maximum

incremental concentration of PM10 at baseline monitoring location

incremental concentration PM10 was added to baseline concentration to obtain the cumulative concentration

level at baseline stations.

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Figure 7.4 - Windrose Diagram

The ISCST3 model was used to predict the GLC of PM10 due to loading activity at mine site. China Clay

will be transported by trucks. Loaded trucks will travel on Kuccha road made for plying of trucks. No. of

such temporary road will provide access to the movement of loaded trucks. Point source resembling loading

activity at mine site and having equivalent emission rates were setup in mining lease to predict the maximum

incremental concentration of PM10 at baseline monitoring location (as shown in Figure 7.5

incremental concentration PM10 was added to baseline concentration to obtain the cumulative concentration

Final EIA/EMP Report

age | 91 (Chapter-7)

The ISCST3 model was used to predict the GLC of PM10 due to loading activity at mine site. China Clay

will be transported by trucks. Loaded trucks will travel on Kuccha road made for plying of trucks. No. of

ovement of loaded trucks. Point source resembling loading

activity at mine site and having equivalent emission rates were setup in mining lease to predict the maximum

(as shown in Figure 7.5). The predicted

incremental concentration PM10 was added to baseline concentration to obtain the cumulative concentration

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

� CALINE4 Model

CALINE4 model was used to predict the worst case GLC of P

(unpaved road) between the mine site and nearest paved road. In the present project, dumpers having 20

tonne capacity have been proposed to transport the mined China clay from mining area. The model was set

up with haul road links along the mining lease and receptors at all the AAQM locations to predict the

pollutant concentration. Since CALINE4 has options to predict only 1

concentration, the model was used to predict 1

into 24-hour GLC using Turner Equation

due to transportation were added to baseline concentrations to obtain the cumulative concentration levels.

(C) Results The maximum incremental concentration of PM10 wiz.

active mining area (loading locations). These loading locations are generally away from sensitive receptors

(settlements etc.). As the distance from sou

drastically due to settling of PM10 particles under gravity. A graphical representation of the variation of

PM10 concentration w.r.t distance is presented in

impact of loading activity at mine site is limited to 300m only. The predicted maximum incremental

concentration due to transportation was found at A1 (Ambient Air Quality Monitoring Station

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Figure 7.5 – ISCST3 Model Setup

CALINE4 model was used to predict the worst case GLC of PM10 due to dumper movement on haul road

(unpaved road) between the mine site and nearest paved road. In the present project, dumpers having 20

tonne capacity have been proposed to transport the mined China clay from mining area. The model was set

aul road links along the mining lease and receptors at all the AAQM locations to predict the

pollutant concentration. Since CALINE4 has options to predict only 1-hour and 8

concentration, the model was used to predict 1-hour worst case GLC of pollutant which was later converted

hour GLC using Turner Equation1. The 24-hour incremental concentrations (predicted) of pollutants

due to transportation were added to baseline concentrations to obtain the cumulative concentration levels.

The maximum incremental concentration of PM10 wiz.1.8 ug/m3 was predicted inside the core zone near

active mining area (loading locations). These loading locations are generally away from sensitive receptors

(settlements etc.). As the distance from source increases, the incremental concentration of PM10 drops

drastically due to settling of PM10 particles under gravity. A graphical representation of the variation of

PM10 concentration w.r.t distance is presented in Figure 7.6. As evident from the line gr

impact of loading activity at mine site is limited to 300m only. The predicted maximum incremental

concentration due to transportation was found at A1 (Ambient Air Quality Monitoring Station

Final EIA/EMP Report

age | 92 (Chapter-7)

M10 due to dumper movement on haul road

(unpaved road) between the mine site and nearest paved road. In the present project, dumpers having 20

tonne capacity have been proposed to transport the mined China clay from mining area. The model was set-

aul road links along the mining lease and receptors at all the AAQM locations to predict the

hour and 8-hour pollutant

f pollutant which was later converted

hour incremental concentrations (predicted) of pollutants

due to transportation were added to baseline concentrations to obtain the cumulative concentration levels.

ug/m3 was predicted inside the core zone near

active mining area (loading locations). These loading locations are generally away from sensitive receptors

rce increases, the incremental concentration of PM10 drops

drastically due to settling of PM10 particles under gravity. A graphical representation of the variation of

evident from the line graph, the maximum

impact of loading activity at mine site is limited to 300m only. The predicted maximum incremental

concentration due to transportation was found at A1 (Ambient Air Quality Monitoring Station - 1).

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

Figure 7.6 The predicted maximum cumulative GLC of PM10 was found to be 78.304 ug/m3 at A5 (Ambient Air

Quality Monitoring Station – 3); which is lower than the permissible NAAQ standard for PM10

concentration (100µg/m3). The predicted 24 hours gro

monitoring locations are presented in Table 1 below. The graphical representation is given

predicted concentration for CO was found to be 0.0µg/m3 owing to very less traffic to and from th

area.

Table 7.10 – Predicted GLC of PM10 at Ambient Air Quality Monitoring Stations

Location

Code Location Name

Max Baseline

Conc. (µg/m

A1 Project Site 65

A2 Village Bodwa 71.8

A3 Village Jhunjala 71.8

A4 Village Naradana 66.1

A5 Village Arwar 78.3

A6 Village rupthal 72.1

A7 Village Chhauta

Kalan 68.5

-0.5

0

0.5

1

1.5

2

150 300 450

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Figure 7.6 – Incremental Concentration v/s Distance GraphThe predicted maximum cumulative GLC of PM10 was found to be 78.304 ug/m3 at A5 (Ambient Air

3); which is lower than the permissible NAAQ standard for PM10

concentration (100µg/m3). The predicted 24 hours ground level concentrations at baseline air quality

monitoring locations are presented in Table 1 below. The graphical representation is given

predicted concentration for CO was found to be 0.0µg/m3 owing to very less traffic to and from th

Predicted GLC of PM10 at Ambient Air Quality Monitoring Stations

Max Baseline

Conc. (µg/m3)

Predicted GLC (µg/m3)

– ISCST3 Model

Predicted GLC

(µg/m3) – CALINE4

Model

1.8 0.09

0.005 0

0.08 0.005

0 0

0.002 0.002

0.004 0.004

0 0

450 600 750 900 1050 1200 1350 1500

Concentration

Final EIA/EMP Report

age | 93 (Chapter-7)

v/s Distance Graph The predicted maximum cumulative GLC of PM10 was found to be 78.304 ug/m3 at A5 (Ambient Air

3); which is lower than the permissible NAAQ standard for PM10

und level concentrations at baseline air quality

monitoring locations are presented in Table 1 below. The graphical representation is given in Figure 7.7. The

predicted concentration for CO was found to be 0.0µg/m3 owing to very less traffic to and from the mining

Predicted GLC of PM10 at Ambient Air Quality Monitoring Stations

Predicted GLC

CALINE4 Cumulative

GLC (µg/m3)

66.89

71.805

71.885

66.1

78.304

72.108

68.5

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

Figure 7.7

The contour maps showing the predicted concentration levels of PM10 are presented in

Figure 7.9.

Figure 7.8 – Spatial distribution of predicted GLCs of PM10

0

10

20

30

40

50

60

70

80

90

100

A1 A2 A3

Co

nc.

g/m

3)

Location Code

Graphical representation of model results

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Figure 7.7 – Graphical representation of model results

The contour maps showing the predicted concentration levels of PM10 are presented in

Spatial distribution of predicted GLCs of PM10 due to Mining

A4 A5 A6 A7

Location Code

Graphical representation of model results

Max Baseline Conc. (µg/m3)

Predicted GLC (µg/m3)

Model

Cumulative GLC (µg/m3)

Permisible Limit

Final EIA/EMP Report

age | 94 (Chapter-7)

The contour maps showing the predicted concentration levels of PM10 are presented in Figure 7.8 and

due to Mining

Graphical representation of model results

Max Baseline Conc. (µg/m3)

Predicted GLC (µg/m3) – ISCST3

Cumulative GLC (µg/m3)

Permisible Limit

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

Figure 7.9 – Spatial distribution of PM10 GLC due to transportation

(D) Conclusion � From the results of ISCST3 and CALINE4 models, it is concluded that the maximum cumulative

concentrations of PM10 both due to mining activities and transportation are expected to be within

the prescribed standards for PM10. It is to be noted that the predi

mining activities and transportation are insignificant.

� The maximum impact of incremental concentration of PM10 due to loading activity at mine site

is confined to limited distance (300m) only. Beyond 300m distance the concen

due to mining activities is expected to be lower due to settlement of PM10 particles over short

distances. The same is confirmed by the low predicted concentration levels of PM10 at ambient

air quality stations (Figure 7.6 and Table 7.10).

� The incremental concentration due to transportation is limited to the length of unpaved haul road

from the mining lease area until nearest paved roads.

� The concentration of CO due to vehicle exhaust is negligible due to small number of vehicles

plying on haul road. The concentrations of SOx and NOx generated from mining area are

expected to be low due to absence of any major source.

� The predicted concentrations are due to proposed china clay mine only and higher pollutant

concentrations may be observed in t

anthropogenic activities, data for which is not available.

� The overall impact on air quality due to proposed mining project is expected to be low extending

to close vicinity of mining lease area

7.10.1.2 Mitigation Measures

The proposed mining operations are not anticipated to raise the concentration of the pollutants beyond

prescribed limits. However, the following measures are suggested mitigate any

pollutants -

� Plantation of trees along haul roads to help to reduce the impact of dust in the nearby villages;

� Planning transportation routes of mined material so as to reach the nearest paved roads by shortest

route. (minimize transportation over unpaved road);

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Spatial distribution of PM10 GLC due to transportation

From the results of ISCST3 and CALINE4 models, it is concluded that the maximum cumulative

concentrations of PM10 both due to mining activities and transportation are expected to be within

the prescribed standards for PM10. It is to be noted that the predicted concentrations from both

mining activities and transportation are insignificant.

The maximum impact of incremental concentration of PM10 due to loading activity at mine site

is confined to limited distance (300m) only. Beyond 300m distance the concen

due to mining activities is expected to be lower due to settlement of PM10 particles over short

distances. The same is confirmed by the low predicted concentration levels of PM10 at ambient

stations (Figure 7.6 and Table 7.10).

The incremental concentration due to transportation is limited to the length of unpaved haul road

from the mining lease area until nearest paved roads.

The concentration of CO due to vehicle exhaust is negligible due to small number of vehicles

aul road. The concentrations of SOx and NOx generated from mining area are

expected to be low due to absence of any major source.

The predicted concentrations are due to proposed china clay mine only and higher pollutant

concentrations may be observed in the study area due to simultaneous operations of other mines /

anthropogenic activities, data for which is not available.

The overall impact on air quality due to proposed mining project is expected to be low extending

to close vicinity of mining lease area and in proximity of unpaved haul roads only.

The proposed mining operations are not anticipated to raise the concentration of the pollutants beyond

prescribed limits. However, the following measures are suggested mitigate any harmful impacts of

Plantation of trees along haul roads to help to reduce the impact of dust in the nearby villages;

Planning transportation routes of mined material so as to reach the nearest paved roads by shortest

rtation over unpaved road);

Final EIA/EMP Report

age | 95 (Chapter-7)

Spatial distribution of PM10 GLC due to transportation

From the results of ISCST3 and CALINE4 models, it is concluded that the maximum cumulative

concentrations of PM10 both due to mining activities and transportation are expected to be within

cted concentrations from both

The maximum impact of incremental concentration of PM10 due to loading activity at mine site

is confined to limited distance (300m) only. Beyond 300m distance the concentration of PM10

due to mining activities is expected to be lower due to settlement of PM10 particles over short

distances. The same is confirmed by the low predicted concentration levels of PM10 at ambient

The incremental concentration due to transportation is limited to the length of unpaved haul road

The concentration of CO due to vehicle exhaust is negligible due to small number of vehicles

aul road. The concentrations of SOx and NOx generated from mining area are

The predicted concentrations are due to proposed china clay mine only and higher pollutant

he study area due to simultaneous operations of other mines /

The overall impact on air quality due to proposed mining project is expected to be low extending

and in proximity of unpaved haul roads only.

The proposed mining operations are not anticipated to raise the concentration of the pollutants beyond

harmful impacts of

Plantation of trees along haul roads to help to reduce the impact of dust in the nearby villages;

Planning transportation routes of mined material so as to reach the nearest paved roads by shortest

Project Name: China Clay Mining Project (M.L. No.

Village- Pateli, Tehsil-Jayal & District-

Vardan EnviroNet Gurgaon

� Dust mask shall be provided to the workers engaged at dust generation points like excavations

and loading points;

� Regular water sprinkling on unpaved roads to avoid dust generation during transportation;

� Transportation of material shall be carried out during day time only;

� The speed of dumpers plying on the haul road should limited to avoid generation of dust;

� Haul road shall be covered with gravels; and

� Covering of material during transportation on dumpers to prevent spill

dumpers. The dumpers shall be covered by tarpaulin. Overloading shall be avoided.

7.10.1.3 Control of Gaseous Pollution

Gaseous emissions from diesel machineries are proposed to control by proper maintenance and using

good quality silencers. The gaseous pollution in the area is within the permissible limits.

7.10.1.4 Control of Dust PollutionThe dust pollution is proposed to minimize by adopting following measures:

(A) Transport operation: The wide and leveled compact roads are prop

Water sprinklers will be provided on haul roads once in a day especially during dry season.

(B) Others: water spray provided on over burden before loading for transportation to minimize the

dust.

The plantation proposed in the area will increase the moisture level in the atmosphere, which arrest the

dust generation during mining.

7.11 SUMMARY

The public hearing of M/s Mateshwari Mines & Minerals and Jai Hanumaan Mines & Minerals for mining

of china clay (Minor Mineral) at Ne

include after public consultation Risk assessments will help mine operators to identify high, medium and low

risk levels. This is a requirement of the Occupational Health and Safety Act

to priorities the risks and provide information on the need to safely control the risks. In this way, mine

owners and operators will be able to implement safety improvements.

associated with several potential hazards to both the employees and the public at large. A worker in a mine

will be able to work under conditions, which are adequately safe and healthy. At the same time the

environmental conditions also will not impair his working effici

adequate safety in mines. Hence mine safety is one of the most essential aspects of any working mine.

mining project has positive impact on social and

provides employment opportunities to local people and many social welfare works done by project

proponent. No displacement is involved for the proposed project. Hence, R&R plan is not applicable for the

project.

Mining Project (M.L. No.-09/2013, Area 4.0752 Ha.) Cat. B1 Final EIA/EMP Report

-Nagaur, (Rajasthan), by Sh. Binja Ram Jat.

Page

Dust mask shall be provided to the workers engaged at dust generation points like excavations

Regular water sprinkling on unpaved roads to avoid dust generation during transportation;

material shall be carried out during day time only;

The speed of dumpers plying on the haul road should limited to avoid generation of dust;

Haul road shall be covered with gravels; and

Covering of material during transportation on dumpers to prevent spillage of china clay from the

dumpers. The dumpers shall be covered by tarpaulin. Overloading shall be avoided.

.10.1.3 Control of Gaseous Pollution

Gaseous emissions from diesel machineries are proposed to control by proper maintenance and using

y silencers. The gaseous pollution in the area is within the permissible limits.

.10.1.4 Control of Dust Pollution The dust pollution is proposed to minimize by adopting following measures:

Transport operation: The wide and leveled compact roads are proposed for vehicular Movements.

Water sprinklers will be provided on haul roads once in a day especially during dry season.

Others: water spray provided on over burden before loading for transportation to minimize the

area will increase the moisture level in the atmosphere, which arrest the

The public hearing of M/s Mateshwari Mines & Minerals and Jai Hanumaan Mines & Minerals for mining

of china clay (Minor Mineral) at Near Vill. Pateli, Tehsil-Jayal District-Nagaur, Rajasthan

include after public consultation Risk assessments will help mine operators to identify high, medium and low

risk levels. This is a requirement of the Occupational Health and Safety Act 2000. Risk assessments will help

to priorities the risks and provide information on the need to safely control the risks. In this way, mine

owners and operators will be able to implement safety improvements. Mining and allied activities are

several potential hazards to both the employees and the public at large. A worker in a mine

will be able to work under conditions, which are adequately safe and healthy. At the same time the

environmental conditions also will not impair his working efficiency. This is possible only when there is

adequate safety in mines. Hence mine safety is one of the most essential aspects of any working mine.

mining project has positive impact on social and economic well being of the community because this project

provides employment opportunities to local people and many social welfare works done by project

No displacement is involved for the proposed project. Hence, R&R plan is not applicable for the

Final EIA/EMP Report

age | 96 (Chapter-7)

Dust mask shall be provided to the workers engaged at dust generation points like excavations

Regular water sprinkling on unpaved roads to avoid dust generation during transportation;

The speed of dumpers plying on the haul road should limited to avoid generation of dust;

age of china clay from the

dumpers. The dumpers shall be covered by tarpaulin. Overloading shall be avoided.

Gaseous emissions from diesel machineries are proposed to control by proper maintenance and using

y silencers. The gaseous pollution in the area is within the permissible limits.

osed for vehicular Movements.

Water sprinklers will be provided on haul roads once in a day especially during dry season.

Others: water spray provided on over burden before loading for transportation to minimize the

area will increase the moisture level in the atmosphere, which arrest the

The public hearing of M/s Mateshwari Mines & Minerals and Jai Hanumaan Mines & Minerals for mining

Nagaur, Rajasthan project will

include after public consultation Risk assessments will help mine operators to identify high, medium and low

2000. Risk assessments will help

to priorities the risks and provide information on the need to safely control the risks. In this way, mine

Mining and allied activities are

several potential hazards to both the employees and the public at large. A worker in a mine

will be able to work under conditions, which are adequately safe and healthy. At the same time the

ency. This is possible only when there is

adequate safety in mines. Hence mine safety is one of the most essential aspects of any working mine. This

economic well being of the community because this project

provides employment opportunities to local people and many social welfare works done by project

No displacement is involved for the proposed project. Hence, R&R plan is not applicable for the