Chapter 5 (Formwork)
-
Upload
saifulsabdin -
Category
Documents
-
view
217 -
download
0
Transcript of Chapter 5 (Formwork)
-
7/24/2019 Chapter 5 (Formwork)
1/8
KJC 326
5.3 FORMWORK
A number of activities involve in the formwork operations are: -
fabricating erecting
stripping
moving
cleaning
oiling
In the pricing of the forms all the above activities and the materials involved are allowed.It is the surface area of the concrete, that is the contact area that will be measured. At
the time of take-off, the design of the forms does not have to be concerned since only
the area of formwork is measured, thus, the formwork shall be measured in square metre
of contact area. For narrow strips of formwork, that in less than .! metre wide is
normally measured in linear metre. It should be noted that the bulkheads i.e. where wall
is to be continued shall be measured separately. Also the forms to slab edges are
measured separately from forms to beams and forms to walls.
If in a form system there is an opening, and if the si"e of the opening is less than one
square metre, therefore no deduction is made from the total area of the forms.
#rooves, chases, chamfers in formwork that are linear in nature are measured in linear
metre.
Forms to circular column are measured in linear metre to the height of the column and
are described by giving the diameter of the column.
$ % &
-
7/24/2019 Chapter 5 (Formwork)
2/8
KJC 326
5.4 WORKED EXAMPLES
Example 5.4.1 Slab
'ased on drawing as shown in Figure $.(.&, calculate the amount of formwork required
)prepare taking off sheet* and bill of for the slab.
Figure 5.4.1 : Si e Ele!a"i#$ a$ Pla$ %ie& #' Slab
$ % +
-
7/24/2019 Chapter 5 (Formwork)
3/8
KJC 326
A' /A01 2FF 311/
SLA(
awn timber of awn timber of !4 mm thickness !4mm thicknessfor side of slab For soffit of slab
+% (..+$ +. m + ength )5*6(.
ess )-* column+%) .(%+* 6 .(
+% !.$ !.7.+$ &.8$ m +
ength )9*6!.$ess )-* column
+%) .&4%+* 6
.&4&% !.7 !.!+!.!+ &&. ! m +
A' - 'I 2F ;
-
7/24/2019 Chapter 5 (Formwork)
4/8
KJC 326
Example 5.4. S2uare #lum$
'ased on drawing as shown in Figure $.(.+ and Figure $.(.+a, calculate the amount of formwork required for $ nos. of square column. >repare taking off sheet and bill of for the
vertical column and sloped column.
Figure 5.4. : Si e Ele!a"i#$ O' %er"i,al #lum$
Figure 5.4. a : Si e Ele!a"i#$ O' #lum$ A" A$ A$gle
?2 erimeter of column loping distance
+% .( 6 .4 in+$ 6 (%h+% .&4 6 .!7 h 6 (% in+$
&.&7 6 .$m$%+% .$
$% &.&7 .( !4.(. +!.+ m +
$%+% .$.&4 &8.&
$$.& m +
?2
-
7/24/2019 Chapter 5 (Formwork)
5/8
KJC 326
/otal 'ill RMExample 5.4.3 (eam
'ased on drawing as shown in Figure $.(.!, calculate the amount of formwork required,thus prepare taking off sheet and bill of for the beam. /he column is + B+ mm.
Figure 5.4.3 : Si e Ele!a"i#$ A$ Pla$ %ie& O' (eam
$ % $
-
7/24/2019 Chapter 5 (Formwork)
6/8
KJC 326
'1A@ /A01 2FF 311/
(EAM
awn timber of awn timber of !4 mm thickness !4 mm thicknessto outer sides of to outer sides ofbeam &%A-' and beam A%&-+ and+%A-' '%&-+
ength 6(.$ ength 6(. Add ) * column Add ) * column
+%) .+%+* 6 .+ +%) .+%+* 6 .++% (.8 (.8 +% (.+ (.+
.!$ !.+ m + .!$ +. ( m +
awn timber of awn timber of !4 mm thickness !4 mm thicknessto inner sides of to inner sides ofbeam &%A-' and beam A%&-+ and+%A-' '%&-+
ength 6(.$ ength 6(.ess )-* column ess )-* column
+%) .+%+*6 .+ +%) .+%+*6 .++% (.! (.! +% !.4 !.4
.!$ !. & m + .!$ +.77 m +
awn timber of awn timber of !4 mm thickness !4 mm thicknessto soffit of beam to soffit of beam&%A-' and +%A-' A%&-+ and '%&-+
+% (.! +% !.4.+ &.8+ m + .+ &.$+ m +
!.+!. &&.8++. (+.77&.$+
&$.&(
'1A@ - 'I 2F ;
-
7/24/2019 Chapter 5 (Formwork)
7/8
KJC 326
Example 5.4.4 F#u$ a"i#$
'ased on drawing as shown in Figure $.(.( and Figure $.(.(a, calculate the amount of
formwork required for the foundations, prepare taking off sheet and bill.
Figure 5.4.4 : Si e Ele!a"i#$ O' F#u$ a"i#$
Figure 5.4.4.a : Pla$ %ie& O' F#u$ a"i#$
$ % 8
-
7/24/2019 Chapter 5 (Formwork)
8/8
0.28
0.20
0.20
KJC 326
F2