Chapter 14
Network Design and Implementation
Agenda
• Analysis and Design
• Implementation
• LAN
• Voice Network Design
Analysis and Design Phases
• Request
• Feasibility Study
• Analysis (requirement)
• Alternatives (cost and benefit)
• Design
• Selection
• Cost
• Documentation
• Management approval
Implementation Phases
• Purchasing and vendor agreement
• Installation
• Training, and testing
• Conversion
• Follow up audit
Request
• Source– User
– Senior managers
– Communication department
– External environment (customer, government, etc.)
• Form: formal or informal• Prioritization (costs & benefits analysis)• Outcome: approval, deny, or on hold by
management
Feasibility Study
• Team– User, specialist, and management
• Problems– Technical or non-technical
• Analysis (technical, operational, economical, legal, schedule)
• Report and presentation
• Go or stop
Analysis
• Analysis items– Geographic requirement (scope)– Traffic load analysis
• Peak load (no. of message and length)• National & international busy hour
– Traffic flow pattern by individual location (map)– Response time, reliability, & availability (cost)– Terminal operators (end users & their education
background and needs)– Capacity growth projection (6 months to 5 years)– Constraint: time, cost, and compatibility
• Documentation and reports
Alternatives
• Sources (vendors)
• Availability (enchancements or new products)
• Incompatibility issues
• Costs/services trade off
Design
• Items– Configuration diagram– Routing time (peak and average)– Response time (peak and average)– Delay consideration (queue)
• Simulation– What if for routing, response, and delay
Selection Procedures
• Request for proposal (RFP) or request for quotation (RFQ)
• Selection criteria and its weight
Request for Proposal
• Title• Table of contents• Description of organization• Problem definition• Operation requirements• Format of response• Evaluation criteria• Decision schedule• References
Description of Organization
• Organization chart
• Organization locations
• Overview of system
Problem Definition
• Error rate
• Misrouting
• Time consuming
• Security
Operation Requirements
• Reliability– Down time– Misrouting– Lost message– Transmission error
• Performance– Throughput– Response time– Error rate
Format of Response - I
• Title
• Table of contents
• Overview
• Software (function & feature)
• Hardware (function, feature, & capacity)
• Performance (future growth)
• Site requirement
• Conversion (installation, testing, & schedule)
Format of Response - II
• Maintenance (support)
• Costs
• Warranty Coverage
• User Training
• References
• Other related information
Selection criteria
• Proposed solution
• Compatibility
• Security and backup
• Price
• Technical support
• Product maintenance
• Repair service
• Financial viability
Vendor Response to RFP - I• Introduction
• Executive summary
• Table of contents
• System design
• System feature
• Growth capacity
• Installation and testing methods
• Maintenance arrangements
• Ongoing support
• Installation schedule
• Pricing and timing of payments
• Warranty coverage
• Training and education
• Other Recommendation
Documentation• Diagrams and maps
– Configuration and wiring
• Components list– Hardware: model and specification
– Software: version, release, no. of copies
• Implementation plan (Gantt chart)– Milestones
– Activities
– Schedule
Management Approval
• Review and verification– Users– Operators
• Management: budget
Purchasing
• Vendor agreement – Equipment configuration specification– Acceptance test– Schedule: delivery, installation, testing,
operation– Location: delivery, installation, testing,
operation– Other terms and conditions: payment, warranty,
maintenance
• Get a experienced lawyer
Training
• Types of instruction– Classroom– Hand on– In house– Outside
• Educating– Users– Operators– Maintenance crew
• Security and backup
Testing
• Testing time
• Testing Tools– Software & hardware– IBM’s Telecommunication Network Simulator
• Testing areas – Performance– Stress testing (load)– Error handling– Error recovery procedures
Conversion
• Types– Parallel– Cut over– Pilot– Piece by piece
• Help desk• Vendor technicians or consultants• Implementation problems cleanup
Audit
• After six months
• Check performance or success criteria
• Formal report to management for proper actions
LAN Design
• Number of nodes
• Usage
• Traffic: day and time
• Disk storage
• Speed
• Security and backup
• Compatibility
• Management
Voice Network Design
• Peak load and average load
• Grade of service
• Capacity & usage of circuits
• Overdesigning or planned delay
Points to Remember
• Analysis and Design
• Implementation
• LAN
• Voice Network Design
Discussion
• Develop a simple request for proposal to add e-business to a traditional department store.