Chapter 6Chapter 6
Activity Analysis, Cost Behavior,
and CostEstimation
Activity Analysis, Cost Behavior,
and CostEstimation
![Page 2: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/2.jpg)
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin
Learning Objective
1
Learning Objective
1
![Page 3: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/3.jpg)
6-3
Costprediction
Using knowledgeof cost behavior
to forecastlevel of cost at
a particularactivity. Focusis on the future.
IntroductionIntroduction
Costbehavior
Relationshipbetweencost andactivity.
Process ofdetermining
cost behavior,often focusingon historical
data.
Costestimation
![Page 4: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/4.jpg)
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin
Learning Objective
2
Learning Objective
2
![Page 5: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/5.jpg)
6-5
Total Variable Cost ExampleTotal Variable Cost Example
Your total Pay Per View bill is based on how many Pay Per View shows that you watch.
Number of Pay Per View shows watched
Tot
al P
ay P
er V
iew
Bill
![Page 6: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/6.jpg)
6-6
Variable Cost Per Unit ExampleVariable Cost Per Unit Example
Number of Pay Per View shows watched
Cos
t per
Pay
Per
Vie
w
show
The cost per Pay Per View show is constant. For example, $4.95 per show.
![Page 7: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/7.jpg)
6-7
Step-Variable CostsStep-Variable Costs
Activity
Co
st
Total cost remainsconstant within anarrow range of
activity.
![Page 8: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/8.jpg)
6-8
Step-Variable CostsStep-Variable Costs
Activity
Co
st
Total cost increases to a new higher cost for the
next higher range of activity.
![Page 9: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/9.jpg)
6-9
Total Fixed Cost ExampleTotal Fixed Cost Example
Your monthly basic cable TV bill probably does not change no matter how many hours you watch.
Number of hours watched
Mon
thly
Bas
ic
Cab
le B
ill
![Page 10: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/10.jpg)
6-10
Fixed Cost Per Unit ExampleFixed Cost Per Unit Example
Number of hours watched
Mon
thly
Bas
ic c
able
Bill
pe
r ho
ur w
atch
ed
The average cost per hour decreases as more hours are spent watching cable television.
![Page 11: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/11.jpg)
6-11
Example: Office space is available at a rental rate of $30,000 per year in increments of 1,000 square feet. As the
business grows more space is rented,
increasing the total cost.
Step-Fixed CostsStep-Fixed Costs
Continue
![Page 12: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/12.jpg)
6-12
Ren
t C
ost
in
T
ho
usa
nd
s o
f D
oll
ars
0 1,000 2,000 3,000 Rented Area (Square Feet)
30
60
90
Total cost doesn’t change for a wide range of activity, and then jumps to a new higher cost for the
next higher range of activity.
Step-Fixed CostsStep-Fixed Costs
![Page 13: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/13.jpg)
6-13
Step-variable costs can be adjusted more
quickly and . . .
The width of the activity steps is much
wider for thestep-fixed cost.
How does this type of fixed cost differ
from a step-variable cost?
Step-Fixed CostsStep-Fixed Costs
![Page 14: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/14.jpg)
6-14
A semivariable cost is partly
fixed and partly variable.
Semivariable Cost Semivariable Cost
Consider thefollowing example.
![Page 15: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/15.jpg)
6-15
Fixed Monthly
Utility Charge
Variable
Utility Charge
Activity (Kilowatt Hours)
To
tal
Uti
lity
Co
st
Total semivariable cost
Semivariable Cost Semivariable Cost Slope is
variable costper unit
of activity.
![Page 16: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/16.jpg)
6-16
Curvilinear CostCurvilinear CostCurvilinear
Cost Function
Relevant Range
Activity
To
tal
Co
stCurvilinear
Cost Function
A straight-line(constant unit
variable cost) closely approximates a
curvilinear line withinthe relevant range.
![Page 17: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/17.jpg)
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin
Learning Objective
3
Learning Objective
3
![Page 18: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/18.jpg)
6-18
Curvilinear CostCurvilinear CostCurvilinear
Cost Function
Relevant Range
Activity
To
tal
Co
stCurvilinear
Cost Function
A straight-Line(constant unit
variable cost) closely approximates a
curvilinear line withinthe relevant range.
![Page 19: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/19.jpg)
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin
Learning Objective
4
Learning Objective
4
![Page 20: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/20.jpg)
6-20
Engineered, Committed and Engineered, Committed and Discretionary CostsDiscretionary Costs
DiscretionaryMay be altered in the short term by current managerial decisions.
CommittedLong-term, cannot be reduced in the short
term.
Engineered
Physical relationship with activity measure.
Depreciation on Buildings and
equipment
Advertising and Research and Development
Direct Materials
![Page 21: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/21.jpg)
6-21
Cost Behavior in Other IndustriesCost Behavior in Other IndustriesMerchandisers
Cost of Goods Sold
Manufacturers
Direct Material, Direct Labor, and Variable
Manufacturing Overhead
Merchandisers and Manufacturers
Sales commissions and shipping costs
Service Organizations
Supplies and travel
Examples of variable costs
![Page 22: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/22.jpg)
6-22
Examples of fixed costs
Merchandisers, manufacturers, and service organizations
Real estate taxesInsurance
Sales salariesDepreciation
Cost Behavior in Other IndustriesCost Behavior in Other Industries
![Page 23: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/23.jpg)
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin
Learning Objective
5
Learning Objective
5
![Page 24: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/24.jpg)
6-24
Account-Classification Method
Visual-Fit Method
High-Low Method
Least-Squares Regression Method
Cost EstimationCost Estimation
![Page 25: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/25.jpg)
6-25
Account Classification MethodAccount Classification Method
Cost estimates are based on areview of each account making up
the total cost being analyzed.
![Page 26: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/26.jpg)
6-26
A scatter diagram of past cost behavior may be helpful in analyzing mixed costs.
Visual-Fit MethodVisual-Fit Method
![Page 27: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/27.jpg)
6-27
Plot the data points on a graph (total cost vs. activity).
0 1 2 3 4
*
To
tal
Co
st i
n1,
000’
s o
f D
oll
ars
10
20
0
***
**
**
*
*
Activity, 1,000’s of Units Produced
Visual-Fit Method
![Page 28: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/28.jpg)
6-28
Draw a line through the plotted data points so that about equal numbers of points fall above and below the line.
Visual-Fit Method
0 1 2 3 4
*
To
tal
Co
st i
n1,
000’
s o
f D
oll
ars
10
20
0
***
**
**
*
*
Activity, 1,000’s of Units Produced
![Page 29: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/29.jpg)
6-29
Visual-Fit Method
Vertical distance is total cost,
approximately $16,000.
0 1 2 3 4
*
To
tal
Co
st i
n1,
000’
s o
f D
oll
ars
10
20
0
***
**
**
*
*
Activity, 1,000’s of Units Produced
Estimated fixed cost = $10,000
![Page 30: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/30.jpg)
6-30
OwlCo recorded the following production activity and maintenance costs for two months:
Using these two levels of activity, compute: the variable cost per unit. the total fixed cost.
The High-Low MethodThe High-Low Method
Units Cost
High activity level 9,000 9,700$ Low activity level 5,000 6,100
![Page 31: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/31.jpg)
6-31
Units Cost
High activity level 9,000 9,700$Low activity level 5,000 6,100 Change 4,000 3,600$
The High-Low Method
![Page 32: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/32.jpg)
6-32
Units Cost
High activity level 9,000 9,700$Low activity level 5,000 6,100 Change 4,000 3,600$
Unit variable cost =in costin units
The High-Low Method
![Page 33: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/33.jpg)
6-33
Units Cost
High activity level 9,000 9,700$Low activity level 5,000 6,100 Change 4,000 3,600$
Unit variable cost = $3,600 ÷ 4,000 units = $0.90 per unit
The High-Low Method
![Page 34: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/34.jpg)
6-34
Units Cost
High activity level 9,000 9,700$Low activity level 5,000 6,100 Change 4,000 3,600$
Unit variable cost = $3,600 ÷ 4,000 units = $0.90 per unit Fixed cost = Total cost – Total variable cost
The High-Low Method
![Page 35: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/35.jpg)
6-35
Unit variable cost = $3,600 ÷ 4,000 units = $0.90 per unit Fixed cost = Total cost – Total variable cost
Fixed cost = $9,700 – ($0.90 per unit × 9,000 units)
Units Cost
High activity level 9,000 9,700$Low activity level 5,000 6,100 Change 4,000 3,600$
The High-Low Method
![Page 36: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/36.jpg)
6-36
Units Cost
High activity level 9,000 9,700$Low activity level 5,000 6,100 Change 4,000 3,600$
Unit variable cost = $3,600 ÷ 4,000 units = $.90 per unit Fixed cost = Total cost – Total variable cost
Fixed cost = $9,700 – ($.90 per unit × 9,000 units)
Fixed cost = $9,700 – $8,100 = $1,600
The High-Low Method
![Page 37: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/37.jpg)
6-37
Regression is a statistical procedure usedto determine the relationship between variables
such as activity and cost.
Least-Squares Regression Least-Squares Regression MethodMethod
Activity
To
tal
Co
st The objective ofthe regressionmethod is the
general cost equation:Y = a + bX
![Page 38: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/38.jpg)
6-38
Y = a + bX
Total Cost is thedependent variable.
The activity (X) is theindependent variable.
The X term coefficient (b)is the estimate of variablecost per unit of activity,
the slope of the cost line.
The intercept term (a) isthe estimate of fixed costs.
Equation Form of Least-Squares Equation Form of Least-Squares Regression LineRegression Line
![Page 39: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/39.jpg)
6-39
• Statistics courses and computer courses deal with detailed regression computations using computer spreadsheet software.
• Accountants and managers must be able to interpret and use regression estimates.
Least-Squares Regression Least-Squares Regression MethodMethod
![Page 40: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/40.jpg)
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin
Learning Objective
6
Learning Objective
6
![Page 41: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/41.jpg)
6-41
Terms in the equation have the samemeaning as in simple regression with
only one independent variable.
Multiple RegressionMultiple Regression
Multiple regression includes two or more independent variables:
Y = a + b1X1 + b2X2
![Page 42: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/42.jpg)
6-42
Engineering MethodEngineering Methodof Cost Estimationof Cost Estimation
Cost estimates are based on measurement and pricing of the work involved.
![Page 43: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/43.jpg)
6-43
Direct Labor
•Material requiredfor each unit isobtained from
engineering drawings and specification sheets.
•Material prices are determined from
vendor bids.
•Analyze the kindof work performed.
•Estimate the time required for each labor
skill for each unit.
•Use local wage rates to obtain labor cost
per unit.
Direct Material
Engineering MethodEngineering Methodof Cost Estimationof Cost Estimation
![Page 44: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/44.jpg)
6-44
Effect of LearningEffect of Learningon Cost Behavioron Cost Behavior
As I make more of thesethings it takes me less
time for each one. It mustbe the learning curve effect
that the boss wastalking about.
I’ve noticed the same thing. And if you
include all the variable overhead costs that are also declining, that must be the experience curve.
![Page 45: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/45.jpg)
6-45
Learning CurveLearning Curve
Cumulative Production Output
Ave
rag
e L
abo
rT
ime
per
Un
it
Learning effectsare large initially.
Learning effectsbecome smaller, eventually
reaching steady state.
![Page 46: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/46.jpg)
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin
Learning Objective
7
Learning Objective
7
![Page 47: Chap 006 managerial accounting Hilton](https://reader033.fdocuments.net/reader033/viewer/2022061401/55cf935e550346f57b9d5dca/html5/thumbnails/47.jpg)
6-47
Data Collection ProblemsData Collection Problems
1. Missing data.
2. Outlier data points.
3. Mismatched time periods costs.
4. Trade-offs in choosing the time period.
5. Allocated and discretionary costs.
6. Inflation.