CERTIFICATE OF APPROPRIATENESS
APPLICATION FORM
PlANNING & DEVElOPMENT DEPARTMENT
PROPERTY
Address 1001 Preston Street HotJston IX 77002 I I
Historic District I Landmark Main Street Market Squre HCAD # 001 ~~29000001 1-4, 6-9, s I o
Subdivision Lot 1 0, p of 11 , 12 Block 32
DESIGNATION TYPE PROPOSED ACTION
0 Landmark 0 Contributing IX] Alteration or Addition 0 Relocation
0 Protected Landmark IX] Noncontributing 0 Restoration 0 Demolition
0 Archaeological Site 0 Vacant 0 New Construction 0 Excavation
DOCUMENTS 0 Application checklist for each proposed action and all applicable documentation listed within are attached
OWNER APPLICANT (if other than owner)
Name .lobo BIO!!Ot Name
Company Harris County Company
Mailing Address 1 001 Preston Street 7th Floor j
Mailing Address
Ho11ston IX 77002 j
Phone (713)755-5370 Phone
Email Email
Signature
Date Date
ACKNOWLEDGEMENT OF RESPONSIBILITY Requirements: A complete application includes all applicable information requested on checklists to provide a complete and accurate description of existing and proposed conditions. Preliminary review meeting or site visit with staff may be necessary to process the application. Owner contact information and signature is required. Late or incomplete applications will not be considered . Deed Restrictions: You have verified that the work does not violate applicable deed restrictions.
Public Records: If attached materials are protected by copyright law, you grant the City of Houston, its officers, agencies, departments, and employees, non-exclusive rights to reproduce, distribute and publish copyrighted materials before the Houston Archaeolog ical and Historical Commission , the Planning Commission , City Council , and other City of Houston commissions, agencies , and departments, on a City of Houston website, or other public forum for the purposes of appl ication for a Certificate of Appropriateness or building permit, and other educational and not for profit purposes. You hereby represent that you possess the requisite permission or rights being conveyed here to the City.
I Compliance: If granted , you agree to comply with all conqitions of the COA. Revisions to approved work require staff review and may require a new application and HAHC apprpval. Failure to comply with the COA may result in project delays, fines or other penalties .
Planner: ----------------- Application received: _I_ I _ Application complete: _I_ I _
Rev. 02.2015
CERTIFICATE OF APPROPRIATENESS
ALTERATION & ADDITON CHECKLIST
Rev. 10.2014
Well in advance of the COA application deadline contact staff to discuss your project and, if necessary, to make an appointment to meet with staff for a project consultation.
Complete all applicable items and submit with the COA application form. Staff can assist you in determining what items are required for your scope of work. An incomplete application may cause delays in processing or may be deferred to the next agenda. Application materials must clearly represent current and proposed conditions. Refer to Houston Code of Ordinances, Ch. 33 VII, Sec. 33-241 for approval criteria for alteration, rehabilitation, restoration and additions.
PROPERTY ADDRESS:
BUILDING TYPE ALTERATION TYPE
single-family residence
multi-family residence
commercial building
mixed use building
institutional building
garage
carport
accessory structure
other
addition
foundation
wall siding or cladding
windows or doors
porch or balcony
roof
awning or canopy
commercial sign
ramp or lift
other
WRITTEN DESCRIPTION
property description, current conditions and any prior alterations or additions
proposed work; plans to change any exterior features, and/or addition description
current building material conditions and originality of any materials proposed to be repaired or replaced
proposed new materials description; attach specification sheets if necessary
PHOTOGRAPHS label photos with description and location
elevations of all sides
detail photos of exterior elements subject to proposed work
historical photos as evidence for restoration work
DRAWINGS scale like drawings the same; include all dimensions and drawing scale; label with cardinal directions
current site plan
proposed site plan
current floor plans
proposed floor plans
current window and door schedule
proposed window and door schedule
demolition plan
current roof plan
proposed roof plan
current elevations (all sides)
proposed elevations (all sides)
perspective and/or line of sight
City of Houston Planning & Development Department
Historic Preservation Office
Re: Harris County Administration Building at 1001 Preston, Houston, Texas
Fifth Floor Exterior Window Replacement
Executive Summary
This report for the Harris County administration building at 1001 Preston in Houston, Texas is
provided as an attachment to the Certificate of Appropriateness Application Form at the County’s
request and will address the extent of the proposed alteration work to the existing building. The
subject building is a non-contributing building in the Historic District of Main Street Market Square.
Harris County has requested that Kirksey study the existing window system at 1001 Preston and
recommend a new system to replace it on the 5th floor. The current system is a thermally inadequate
single pane system and is in a varying stages of disrepair.
The proposed system is to closely match the existing one in material, color and profile but
incorporate a more energy efficient IGU (Insulating Glass Unit) system. The window replacement
for the entire building will be done in phases over the next few years, floor by floor, so the look for
the fifth floor has to match the existing system as much as possible.
The Proposed Design
A Kawneer PG123 thermally broken window system was recommended. It will fit in the exact same
location as the current one with similar details. Frames & mullions for the proposed system will be
located at the same locations as the existing system, vertically & horizontally.
The County requested that the chair rail at the existing window system be eliminated in the new
system in order for the clear glass to be carried all the way down to floor level instead of the old
configuration of chair rail and spandrel glass below.
The proposed system will meet all current codes & regulations as well as all applicable standards
for air, water, wind & structural performance.
Conclusion
The proposed window replacement will not modify the exterior look of the building. The proposed
alteration is necessary in order to improve the performance of the existing deteriorating window
system.
Photographs of 1001 Preston
Existing window system – exterior view
Existing window system – interior view
Existing exterior view of 1001 Preston
PG123® (Pre-Glaze) ISOWEB® Framing
Solution to Today’s AcceleratedConstruction Schedule
View from interior
© Kawneer Company, Inc. 2007 LITHO IN U.S.A Form No. 07-2018
Kawneer Company, Inc.Technology Park / Atlanta555 Guthridge CourtNorcross, GA 30092
kawneer.com 770 . 449 . 5555
Responding to the need for quality control, simplified fabricationand faster installation, Kawneer has designed PG 123®, a ribbonwindow/framing and multi-lite punched opening system with pre-glaze capability, labor-savings and unit construction. The system isstructural silicone glazed with captured head and sill cans, andintermediate horizontals.
EconomyPG 123® offers the choice of stock length or factory fabrication and
can be shipped knocked down. In addition, the system can be
pre-assembled and pre-glazed under controlled shop conditions that
save time compared to field construction. Screw spline joinery,
with square cuts and no miters or notching, reduce fabrication time.
Pre-glaze units are installed from the interior of the building to
minimize weather delays and reduce the need for scaffolds and
lift equipment.
PerformancePG 123® incorporates the ISOWEB® glass reinforced nylon thermal
break that provides improved condensation resistance and prevents
thermal transmittance. The System is fully tested, including air and
water infiltration after live load movement.
Fully pressure equalized with a
rain screen gasket to eliminate
the exterior seal between glazed
units, PG 123® is fully tested to
appropriate AAMA, ASTM &
CAN/CSA A-440 standards for air,
water and structural performance.
AestheticsThe ribbon window system is structural silicone glazed on two sides
with optional applied covers for a four-sided captured appearance.
Vertical covers are optional for a clean, monumental appearance
without sight line build up for building owners who prefer more
traditional aesthetics. The ISOWEB Thermal Break offers dual-color
finish options, which means the exterior does not have to match the
interior. PG 123® accommodates a one-inch infill with 1/4" adaptors
for spandrel applications.
For the Finishing TouchPermadonic Anodized finishes are available in Class I and Class II in
seven different colors.
Painted Finishes, including fluoropolymer that meet or exceed
AAMA 2605, are offered in many standard choices and an unlimited
number of specially-designed colors.
Solvent-free powder coatings add the “green” element with high
performance, durability and scratch resistance that meet the
standards of AAMA 2604.
View from exterior
PROJECT TEAM
HARRIS COUNTYOWNER
1001 PRESTON AVENUE, 7TH FLOORHOUSTON, TEXAS 77002-1893713-755-6304
BUILDING EXTERIORSOLUTIONS, LLCENVELOPE CONSULTANT
6975 PORTWEST DRIVE, SUITE 100HOUSTON, TEXAS 77024(713) 467-9840
PROJECT NAME
HARRIS COUNTYADMINISTRATION BUILDING
PROJECT ADDRESS
1001 PRESTON AVENUEHOUSTON, TEXAS 77002-1893
KIRKSEY PROJECT NO. 2015198
© 2015 Kirksey
2015
198
Har
ris C
ount
y [B
imse
rver
] | 1
2/16
/201
5 | 8
:56
AM
HARRIS COUNTY ADMINISTRATION BUILDING1001 PRESTON AVENUE HOUSTON, TEXAS 77002-1893
BID PACKAGE 1 - 5TH FLOOR EXTERIOR WINDOW REPLACEMENTISSUED FOR CONSTRUCTION
22 DECEMBER 2015
REG
IS
TERED ARCHITECT
STATE OF TEXAS
NAGIB MADI
25045
22 December 2015
CD 15 OCT 2015 REVIEW & COORDINATION
22 DEC 2015 ISSUED FOR CONSTRUCTION
1
1
2
2
3
3
4
4
5
5
A A
B B
C C
D DPROJECT TEAM
HARRIS COUNTYOWNER
BUILDING EXTERIORSOLUTIONS, LLCENVELOPE CONSULTANT
NO. DATE ISSUE
PROJECT NAME
HARRIS COUNTYADMINISTRATION BUILDING
PROJECT ADDRESS
1001 PRESTON AVENUEHOUSTON, TEXAS 77002-1893
PROJECT NO.
KIRKSEY PROJECT NO. 2015198KEY PLAN
SHEET TITLE
Project Information & CodeAnalysis
SHEET NUMBER
A0.10© 2015 Kirksey
2015
198
Har
ris C
ount
y [B
imse
rver
] | 1
2/16
/201
5 | 8
:56
AM
C
FFA FIRE ALARMFC FIRE CODEFD FLOOR DRAINFE FIRE EXTINGUISHERFEB FIRE EXTINGUISHER, MOUNTING
BRACKETFEC FIRE EXTINGUISHER, CABINETFG ENTRANCE FLOOR GRILLESFH FIRE HYDRANTFIN FINISH/FINISHEDFIXT FIXTUREFLRG FLOORINGFLR FLOORFLSHG FLASHINGF.P.W. FLOOD PROTECTION WALLFL FLOW LINEFM FACTORY MUTUALFND FOUNDATIONFR GL FRITTED GLASSFRP FIBER REINFORCED PLASTICFRPF FIREPROOF(ING)FSEC FOOD SERVICE EQUIPMENT CONTRACTORFS FULL SIZEFTG FOOTINGFT FOOT (FEET)FURN FURNISHFURR FURRED/FURRINGFV FIELD VERIFYFVC FIRE VALVE CABINETFWC FABRIC WALL COVERINGFWP FABRIC WRAPPED WALL PANELS
GGALV GALVANIZEDGAL GALLONGA GAUGEGC GENERAL CONTRACTORGD GUARDGEN GENERALGF GLASS FILMGI GALVANIZED IRONGL GLASS, GLAZINGGL BLK GLASS BLOCKGMP GUARANTEED MAXIMUM PRICEGR GRADE, GRADINGGRP GRAVELGRT GROUTGSF GLAZING SURFACE FILMGSF GROSS SQUARE FOOTGYP GYPSUM
HHB HOSE BIBBHC HOLLOW COREHDCP HANDICAPPEDHDWR HARDWAREHD HEADHFS HALF FULL SIZEHLB HORIZONTAL LOUVER BLINDSHM HOLLOW METALHORIZ HORIZONTALHP HORSEPOWERHR HOURHT HEIGHTHVAC HEATING/VENTILATING/ AIR CONDITIONINGHW HOT WATERHYD HYDRANT
IID INSIDE DIAMETERINCL INCLUDEINFO INFORMATIONINSUL INSULATIONINT INTERIORIN INCHIPS INSIDE PIPE SIZE
JJAN JANITORJST JOISTJT JOINT
LLAM LAMINATE(D)LAV LAVATORYLGTH LENGTHLH LEFT HANDLV LEVELLIN LINEARLL LIVE LOADLT LIGHTLVR LOUVERLWT LIGHTWEIGHT
Mm METERmm MILLIMETERMACH MACHINEMAINT MAINTENCEMAS MASONRYMATL MATERIALMAX MAXIMUMMECH MECHANICALMEJ MASONRY EXPANSION JOINTMEP MECHANICAL, ELECTRICAL PLUMBINGMF METAL FINISHESMFR MANUFACTURERMH MANHOLEMIN MINIMUMMISC MISCELLANEOUSML METAL LATHMLDG MOULDINGMO MASONRY OPENINGMR MOISTURE RESISTANTMSV MANUFACTURED STONE VENEERMTD MOUNTEDMTG MOUNTINGMTL METALMULL MULLIONMWP METAL WALL PANEL
NNIC NOT IN CONTRACTNOM NOMINALNO. or # NUMBERNRA NET RENTABLE SQUARE FOOTNRC NOISE REDUCTION COEFFICIENTNTS NOT TO SCALE
OOA OVERALLOC ON CENTER(S)OCD OVERHEAD COILING DOOROCG OVERHEAD COILING GRILLES
OD OUTSIDE DIAMETEROFCI OWNER FURNISHED/ CONTRACTOR INSTALLEDOFF OFFICEOFOI OWNER FURNISHED/ OWNER INSTALLEDOH OVERHEADOP OPERABLE PARTITIONOPH OPPOSITE HANDOPNG OPENINGOPP OPPOSITEORD OVERFLOW ROOF DRAINO.S. OVERFLOW SCUPPERO/A OUTSIDE AIR
PPAC ARCHITECTURAL PRECAST
CONCRETEPART PARTITIONPC POLISHED CONCRETEPCF POUNDS PER CUBIC FOOTPDP PREFINISHED DECORATIVE PANELSPERF PERFORATEDPLAST PLASTERPLAS PLASTICPLBG PLUMBINGPLWD PLYWOODPNL PANELPOL POLISHEDPRKG PARKINGPR PAIRPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT PAINTPTD PAINTEDPTS PAINTEDPVC POLYVINYL CHLORIDEPVG PAVINGPVMT PAVEMENTP.L. PROPERTY LINEPL PLASTIC LAMINATEP/C PRECASTPFP PREFINISHED PANELQQT QUARRY TILE
RR RISERRAD RADIUSRBA RESILIENT BASE AND ACCESSORYRCP REFLECTED CEILING PLANRD ROOF DRAINREBAR REINFORCING BARRECEPT RECEPTIONRECEP RECEPTACLERECOM RECOMMENDATIONREC RECESSEDREG REGULATIONREINF REINFORCEDREQD REQUIREDRET RETURNREV REVISIONRE REFER TORF RESINOUS FLOORINGRFG ROOFINGRH RIGHT HANDRM ROOMRO ROUGH OPENINGROW RIGHT OF WAYRS ROLLER SHADERSF RESILIENT SHEET FLOORINGRSF RENTABLE SQUARE FOOTRTF RESILIENT TILE FLOORINGR/AG RETURN AIR GRILLER/A RETURN AIR
SSAWU SOUND ABSORBING WALL UNITSSCHED SCHEDULE(D)SC STAINED CONCRETESECT SECTIONSF SQUARE FEETSHLV SHELVES/SHELVINGSHTHG SHEATHINGSHT SHEETSIM SIMILARSKY SKYLIGHTSMV STONE MASONRY VENEERSPEC SPECIFICATIONSQ SQUARESS SOILD SURFACESSTL STAINLESS STEELSTA STATIONSTAB STABILIZE(D)STC SOUND TRANSMISSION COEFFICIENTSTC STONE COUNTERTOPSTF STONE FACINGSTL STEELSTOR STORAGESTRUCT STRUCTURE/STRUCTURALSUSP SUSPENDEDSW SWITCHS/AD SUPPLY AIR DIFFUSER
TT TREADTA TOILET ACCESSORYTCOC TEXTURE COATING ON CONCRETETC TRAFFIC COATINGTEL TELEPHONETEMP TEMPEREDTHK THICK(NESS)THRES THRESHOLDTKBD TACK BOARDT.O. TOP OFTOS TOP OF STEELTOSS TOP OF STRUCTURAL SLABTR TRIM (METAL EDGE TRIM)TRANS TRANSFORMERTS TUBE STEELTTC TELEPHONE TERMINAL CABINETTUC TILT-UP CONCRETETV TELEVISIONTYP TYPICAL
UUL UNDERWRITERS LABORATORYUNO UNLESS NOTED OTHERWISEUPH UPHOLSTERYUR URINAL
VVAC VACUUMVERT VERTICALVEST VESTIBULEVLB VERTICAL LOUVER BLINDS
WWC WALL COVERINGWCD WALL COVERING - DRY ERASEWDW WINDOWWD WOODWDV WOOD VENEERWF WIDE FLANGEWFA WOOD ATHLETIC FLOORINGWFE ENGINEERED WOOD PLANK
FLOORINGWH WALL HUNGWI WROUGHT IRONWP WALL PROTECTIONWR WATER REPELLENTSWWF WELDED WIRE FRABICW.P. WORK POINTW/I WITHINW/O WITHOUTW/ WITH
XXFMR TRANSFORMER
SYMBOLS CENTERLINE
@ AT
[ CHANNEL
ROUND/DIAMETER
PLATE
ANGLE
& AND
/ PER
SQUARE FOOT
± PLUS OR MINUS
AAB ANCHOR BOLTAC ACOUSTICAL SEALANTACC ARCHITECTURAL CAST IN PLACE
CONCRETEACM ALUMINUM COMPOSITE METALACOUS ACOUSTICALADJUST ADJUSTABLEADJ ADJACENTAD ACCESS DOORAF ACCESS FLOORINGAFF ABOVE FINISH FLOORAGG AGGREGATEAHU AIR HANDLING UNITALT ALTERNATEALUM ALUMINUMANG ANGLEANOD ANODIZEDAPPROX APPROXIMATELYAPC ACOUSTICAL PANEL CEILINGARCH ARCHITECT/ARCHITECTURALASPH ASPHALTATC ACRYLIC TEXTURED COATINGATN ATTENUATION/ATTENUATINGAUTO AUTOMATICAUX AUXILIARYAVE AVENUEAVG AVERAGEA/C AIR CONDITIONINGA/V AUDIO VISUAL
BB BASEBD BOARDBLDG BUILDINGBLKG BLOCKINGBLK BLOCKBM BEAMBOT BOTTOMB.O. BOTTOM OFBR BICYCLE RACKBRG BEARINGBRK BRICKBRKT BRACKETBSMT BASEMENTBTW BETWEENB&B BALLED & BUR LAPPEDB-B BACK TO BACKB.M. BENCH MARKB/F BOTH FACES
CCAB CABINETCB CATCH BASINCCTV CLOSED CIRCUIT TELEVISIONCEM CEMENTCER CERAMICCFMF COLD FORMED METAL FRAMINGCFT CORK FLOOR TILECIP CAST IN PLACE CONCRETECJ CONTROL JOINTCKBD CHALKBOARDCLG CEILINGCLR CLEAR(ANCE)CL CLOSETCM CONSTRUCTION MANAGERCMU CONCRETE MASONRY UNITCNTR COUNTERCOL COLUMNCOMPRESS COMPRESSIBLECOMP COMPOSITIONCONC CONCRETECOND CONDITIONCONF CONFERENCECONST CONSTRUCTIONCONTR CONTRACTORCONT CONTINUOUSCORRU CORRUGATEDCORR CORRIDORCPS CARPET SHEETCPT CARPET TILECSM CAST STONE MASONRYCSMT CASEMENTCTR CENTERCTSK COUNTERSUNKCU FT CUBIC FOOT (FEET)CU YD CUBIC YARDCW COLD/CHILLED WATERC-C CENTER TO CENTERC.O. CASED OPENING
DD DEEP/DEPTHDBL DOUBLEDEFL DEFLECTIONDEFS DECORATIVE EXTERIOR FINISHDF DRINKING FOUNTAINDGL DECORATIVE GLASSDIAG DIAGONALDIA DIAMETERDIM DIMENSIONDISC DISCONNECTDISP DISPENSERDL DEAD LOADDN DOWNDR DOORDS DOWNSPOUTDSC DIMENSIONAL STONE CLADDINGDTL DETAILDWG(S) DRAWING(S)
EEA EACHEFOB EXTERIOR FACE OF BUILDINGEJ EXPANSION JOINTELAS ELASTIC (ELASTOMERIC)ELEC ELECTRICALELEV ELEVATOREL ELEVATIONELAST ELASTOMERICEM ENTRANCE FLOOR MATSEMER EMERGENCYEP EXPLOSION PROOFEQUIP EQUIPMENTEQ EQUALEWC ELECTRIC WATER COOLEREWH ELECTRIC WATER HEATEREW EACH WAYEXH EXHAUSTEXIST EXISTINGEXPAN EXPANSIONEXP EXPOSEDEXT EXTERIOR
ELEVATIONSECTION
PLYWOOD
SPRAYED FIREPROOFING
BATT/BLANKET INSUL.
CONCRETE
RIGID INSUL.
ROOF DECK INSUL.
GYPSUM SHEATHING
PRECAST CONCRETE
GYPSUM WALLBOARD
JOINT FILLER
BACKER ROD & SEALANT
ACOUS. CEILING
CMU
BRICK
CAST/CUT STONE
NATURAL STONE
FINISHED WOOD
METAL LATH & PLASTER
CERAMIC/QUARRY TILE
GLASS/MIRROR
STEEL
ALUMINUM
BRASS/BRONZE
GRADE/EARTH
GRAVEL
SAND
CONT. WOOD BLOCKING
DISCONT. WOOD SHIM
101 A 5
A1/A3.10
ROOM NAME101
A1/A2.80
B3 -
EL. 10.00'
F1
1
EL. 28'-0"T.O.S.
1
B
A
1
EL. 10.00'EXIST.
A B
I
C
T
S
S
H
D Q
D Q
Q
J
C
P
A1/A4.10
A1/A4.20
B1
W1
N
4321a BT GENE CONNECTED EQUIPMENT:
9876 7654 1234 4
A1/A
5.10
123
ACTUAL OCCUPANCY LOAD OF ROOM
HARDWARE SET (IF REQUIRED)
VERTICAL ELEVATION
WALL SECTION
BUILDING SECTION
ELEVATION (INTERIOR AND EXTERIOR)
ENLARGED DETAIL
ROOM / DOOR NUMBER
BASE NOTE
NEW ELEVATION
EXISTING ELEVATION
REVISION NUMBERAND AFFECTED AREA
NEW FLUOR. LIGHT FIXTURE
RELOCATED FLUOR. LIGHT FIXTURE
EXISTING FIXTURE TO BE REMOVED
EXISTING FIXTURE TO REMAIN
(HATCHING INDICATES DIRECTION OF EGRESS)EXIT SIGN
SMOKE DETECTOR
CEILING GRID START POINT
CABLE PULL FOR FURNITURE
POWER POLE
SUSPENDED ACOUSTICALCEILING GRID
DOOR / FRAME TYPE
WALL FINISH
GLASS TYPE
BREAK LINE
EQUIPMENT NOTE
4 PLEX OUTLET
FIXTURE DESIGNATION (TYPICAL - IF REQUIRED)
FIRE ALARM HORN
SPEAKER
LIGHT FIXTURES
THERMOSTAT
PARTITION TYPE
ROOM IDENTIFICATION
SHEET NUMBER
DUPLEX OUTLET
VOICE ONLY - SINGLE / DUPLEX / 4 PLEX
DATA ONLY - SINGLE / DUPLEX / 4 PLEX
VOICE AND DATA - DUPLEX AND 4 PLEX
(RE: PARTITION SCHEDULE FOR DESCRIPTION)
ACCESSORY / PLAN / KEYED NOTE
WINDOW TYPE
FLOOR FINISH NOTE
FLUSH FLOOR MTD. "J" BOX W/
SPECIAL PURPOSE OUTLET
220V OUTLET
VOICE AND/OR DATA
DUPLEX OR 4 PLEX
NORTH ARROW
DETAIL REFERENCEA1/A2.10
DETAIL NUMBER
IONIZATION DETECTOR
FLUSH FLOOR MTD. "J" BOX W/
"J" BOX FOR FURNITURE/OTHER CONNECTION
SECTION DETAIL
CONNECTED EQUIPMENT AND/ORGASES/WATER
EQUIPMENT ID#
STATUS
LOCATION
SPECIAL POWER REQUIREMENTS
MAX. OCCUPANCYLOAD
100
OCC.
NN
Project Site Location
1001 PRESTON STHOUSTON, TX 77002
AREA MAP
BUSH I.A.H.
HOBBY
DOWNTOWNHOUSTON
10
8
8
8
8
610
610
610
59
5945
288
290
45
10
610
LOCAL MAP
PRESTON ST
CONGRESS ST
FRANKLIN ST
COMMERCE ST
PRAIRIE ST
TRAV
IS ST
FANN
IN ST
SAN J
ACINT
O ST
CARO
LINE S
T
MILAM ST
Date: October 16, 2015 Project Description: Demolition and replacement of existing window wall system on Level 5 only. Applicable Codes Include: 2006 International Building Code Edition [with City of Houston Amendments] 2006 International Fire Code [with City of Houston Amendments] 2006 Uniform Mechanical Code [with City of Houston Amendments] 2006 Uniform Plumbing Code [with City of Houston Amendments] 2011 National Electrical Code [with City of Houston Amendments] 2009 IECC [with City of Houston Amendments] or ASHRAE 90.1-2007 [with City of Houston Amendments] Cool Roof Guideline NFPA 10 Texas Accessibility Standards (TAS) 2012 City of Houston Parking Ordinance and Planning
Construction Type(s): Table 601 (p87) Type of Building Type I-B
Occupancy Type(s): Chapter 3 Major use of Building Business Group B Automatic Sprinkler System (903): Provided
Project # 2015198
If issued as Addendum, indicate addendum # here a a
If issued as Bulletin, indicate bulletin # here b b
If issued as Clarification, indicate # here c c
Des
crip
tio
n:
Des
crip
tio
n:
project name:
Dat
e:
XX
/XX
/201
5
Dat
e:
project address 1001 Preston Street Houston, Texas 77002
Issu
e #
1
Issu
e #
Delta # Delta #Sheet # Sheet Name:GENERAL INFORMATION
A0.00 Cover SheetA0.10 Project Information/Code Analysis
ARCHITECTURAL DRAWINGS
A2.10 Level 5 Demolition Plan
A2.30 Level 5 Floor Plan
A3.10 Exterior Elevations
A4.20 Wall Sections
A5.10 Details
drawing dated:drawing dated:
Harris County Administration Building, Level 5
Form
at Is
sued
----
----
---:
If is
sued
with
in th
is s
et, i
ndic
ate
here
Form
at Is
sued
----
----
---:
Kirksey | Architecture
If is
sued
with
in th
is s
et, i
ndic
ate
here
Issu
ed F
or P
erm
it
ABBREVIATIONS MATERIALS ARCH. REF. SYMBOLS PROJECT MAPS
B5CODE ANALYSISSCALE: 1:0.48
C5INDEX OF DRAWINGS
REG
IS
TERED ARCHITECT
STATE OF TEXAS
NAGIB MADI
25045
22 December 2015
CD 15 OCT 2015 REVIEW & COORDINATION
22 DEC 2015 ISSUED FOR CONSTRUCTION
1
1
2
2
3
3
4
4
5
5
A A
B B
C C
D DPROJECT TEAM
HARRIS COUNTYOWNER
BUILDING EXTERIORSOLUTIONS, LLCENVELOPE CONSULTANT
NO. DATE ISSUE
PROJECT NAME
HARRIS COUNTYADMINISTRATION BUILDING
PROJECT ADDRESS
1001 PRESTON AVENUEHOUSTON, TEXAS 77002-1893
PROJECT NO.
KIRKSEY PROJECT NO. 2015198KEY PLAN
SHEET TITLE
Level 5 Demolition Floor Plan
SHEET NUMBER
A2.10© 2015 Kirksey
2015
198
Har
ris C
ount
y [B
imse
rver
] | 1
2/16
/201
5 | 8
:56
AM
INTERIOR EXISTINGCONDITIONS NOT
IN SCOPE
INTERIOR EXISTINGCONDITIONS NOT
IN SCOPE
EXISTING STRUCT.TO REMAIN
14'-10 1/4" 42'-0" 42'-0" 42'-0" 42'-0" 42'-0" 14'-9 3/4"
27'-9
1/2"
65'-1
0"27
'-6 1/
2"
239'-8"
121'-
2"
1 2 3 4 5 6
A
B
ALLEYWAY
FANN
IN
MAIN
PRESTON
EXISTING INTERIORCONDITIONS NOT INSCOPE
DEMOLITION LEGEND
REMOVE EXISTINGWINDOW WALL
EXISTING GRATING TOREMAIN
NOTE:
REFER TO SPECIFICATIONS, SECTION 020700FOR DEMOLITION CRITERIA
REMOVE EXISTING WINDOW WALLON FOUR ELEVATIONS
NN
A5LEVEL5 DEMOLITION PLANSCALE: 1/8" = 1'-0"
PLANNORTH
TRUENORTH
REG
IS
TERED ARCHITECT
STATE OF TEXAS
NAGIB MADI
25045
22 December 2015
CD 15 OCT 2015 REVIEW & COORDINATION
22 DEC 2015 ISSUED FOR CONSTRUCTION
1
1
2
2
3
3
4
4
5
5
A A
B B
C C
D DPROJECT TEAM
HARRIS COUNTYOWNER
BUILDING EXTERIORSOLUTIONS, LLCENVELOPE CONSULTANT
NO. DATE ISSUE
PROJECT NAME
HARRIS COUNTYADMINISTRATION BUILDING
PROJECT ADDRESS
1001 PRESTON AVENUEHOUSTON, TEXAS 77002-1893
PROJECT NO.
KIRKSEY PROJECT NO. 2015198KEY PLAN
SHEET TITLE
Level 5 Floor Plan
SHEET NUMBER
A2.30© 2015 Kirksey
2015
198
Har
ris C
ount
y [B
imse
rver
] | 1
2/16
/201
5 | 1
:12
PM
C5/A3.10
B5/A
3.10
A5/A
3.10
A3/A4.20 A5/A4.20
C3/A
4.20
C5/A
4.20
5'-7" 228'-6 1/2" FIELD VERIFY 5'-6 1/2"
14'-10 1/4" 42'-0" 42'-0" 42'-0" 42'-0" 42'-0" 14'-9 3/4"
5'-7 1
/2"10
9'-11
1/2"
FIE
LD V
ERIF
Y5'-
7"
27'-9
1/2"
65'-1
0"27
'-6 1/
2"
4'-4 1
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"4'-
4 1/4"
5'-7 1
/2"4'-
4 1/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
5'-0 3
/4"5'-
0 3/4"
4'-4 1
/4"5'-
7"
5'-7" 4'-0 1/4" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 4'-0 1/4" 5'-6 1/2"
239'-8"
121'-
2"
4'-0 1/4" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 4'-0 1/4"
D5/A3.10
NEW INTERIOR BUILD-OUTNOT IN SCOPE
NEW INTERIOR BUILD-OUTNOT IN SCOPE
ACCESS DOOR
MOCKUP LOCATIONRE: SPECIFICATIONS
UP
UP
FD
1 2 3 4 5 6
A
B
OFFICE516
OFFICE PO-2517
CONF-NORTH518
OFFICE PO-2519
OFFICE520
OFFICE521
OFFICE522
OFFICE524
OFFICE527
LOBBY500
MECHX10
WOMEN507
MECHX6
MEN504
TELX11
TELX7
JANITORX8
OFFICE PO-3541
OFFICE PO-2551
OFFICE553
OFFICE554OFFICE
556
OFFICE558
OFFICE PO-2562
CONF-SOUTH563
OFFICE PO-2564
OFFICE566
OFFICE568
OFFICE570
OFFICE571
OFFICE PO-2572
OFFICE PO-3573
OFFICE586
OFFICE585
OFFICE PO-2584
CONF-WEST583
OFFICE510
OFFICE PO-2511
OFFICE512
OFFICE PO-2513
OFFICE514
PVT RESTRM532
CONF-EAST533
OFFICE537
OFFICE PO-2538
OFFICE540
OFFICE550
OFFICE552
STORAGE555
OFFICE557
OFFICE559
TRAINING ROOM505
OFFICE539
COPY ROOM594
EMPLOYEELOUNGE
592
OFFICE569
OFFICE535
EXECUTIVELOUNGE
536
STAIR BX9
STAIR CX5
VEST
531
STORAGE515
VEST.X4
OFFICE567
OFFICE565
ELEV VEST.X2
IDF503
OFFICE561
OFFICE534CONF-NE
523
OFFICE PO-4530
OFFICE PO-4580
PVT RESTRM582
VEST
581
CORR 5H5
CORR 8H8
CO
RR
9H
9
CO
RR
6H
6
OFFICE PO-2526
CORR 7H7
CORR 3H3
WAITING AREA506
CO
RR
2H
2
CO
RR
4H
4
OFFICE590
OFFICE591
CORR 1H1
RECEPTION501
LOUNGE507A
SIDE MTG506A
SIDE MTG506B
CORR 10H10
LIBRARY525
MEDIA ROOM525A
OFFICE588
OFFICE589
ALLEYWAY
FANN
IN
MAIN
PRESTON
NEW INTERIOR BUILD-OUTNOT IN SCOPE, SHOWNFOR REFERENCE
LEGEND
NEW WINDOW WALL
EXISTING GRATING TOREMAIN
A5/A5.10TYP.
NN
A5LEVEL5 FLOOR PLANSCALE: 1/8" = 1'-0"
PLANNORTH
TRUENORTH
REG
IS
TERED ARCHITECT
STATE OF TEXAS
NAGIB MADI
25045
22 December 2015
CD 15 OCT 2015 REVIEW & COORDINATION
22 DEC 2015 ISSUED FOR CONSTRUCTION
1
1
2
2
3
3
4
4
5
5
A A
B B
C C
D DPROJECT TEAM
HARRIS COUNTYOWNER
BUILDING EXTERIORSOLUTIONS, LLCENVELOPE CONSULTANT
NO. DATE ISSUE
PROJECT NAME
HARRIS COUNTYADMINISTRATION BUILDING
PROJECT ADDRESS
1001 PRESTON AVENUEHOUSTON, TEXAS 77002-1893
PROJECT NO.
KIRKSEY PROJECT NO. 2015198KEY PLAN
SHEET TITLE
Exterior Elevations
SHEET NUMBER
A3.10© 2015 Kirksey
2015
198
Har
ris C
ount
y [B
imse
rver
] | 1
2/16
/201
5 | 8
:56
AM
A B
15'-0
"
A5/A
4.20
EXISTING LEVEL 6 WINDOWS TO REMAIN
EXISTING LEVEL 4 WINDOWS TO REMAIN
EXISTING CONCRETE PANELS
EXISTING CONCRETE PANELS
NEW WINDOW SYSTEM @ LEVEL 5
EL. 49'-6"
EL. 64'-6"LEVEL5
EL. 79'-6"LEVEL 6
A2/A5.10
6 5 4 3 2 1
15'-0
"
MOCKUP LOCATION
C3/A
4.20
EXISTING LEVEL 6 WINDOWS TO REMAIN
EXISTING LEVEL 4 WINDOWS TO REMAIN
EXISTING CONCRETE PANELS
EXISTING CONCRETE PANELS
NEW WINDOW SYSTEM @ LEVEL 5
EL. 64'-6"LEVEL5
EL. 79'-6"LEVEL 6A3/A5.10
AB
15'-0
"
MOCKUP LOCATION
A3/A
4.20
EXISTING LEVEL 6 WINDOWS TO REMAIN
EXISTING LEVEL 4 WINDOWS TO REMAIN
EXISTING CONCRETE PANELS
EXISTING CONCRETE PANELS
NEW WINDOW SYSTEM @ LEVEL 5
EL. 64'-6"LEVEL5
EL. 79'-6"LEVEL 6A1/A5.10 A2/A5.10
654321
15'-0
"
C5/A
4.20
EXISTING LEVEL 6 WINDOWS TO REMAIN
EXISTING LEVEL 4 WINDOWS TO REMAIN
EXISTING CONCRETE PANELS
EXISTING CONCRETE PANELS
NEW WINDOW SYSTEM @ LEVEL 5
EL. 64'-6"LEVEL5
EL. 79'-6"LEVEL 6A3/A5.10
B5EAST ELEVATIONSCALE: 1/8" = 1'-0"
D5NORTH ELEVATIONSCALE: 1/8" = 1'-0"
A5WEST ELEVATIONSCALE: 1/8" = 1'-0"
C5SOUTH ELEVATIONSCALE: 1/8" = 1'-0"
REG
IS
TERED ARCHITECT
STATE OF TEXAS
NAGIB MADI
25045
22 December 2015
CD 15 OCT 2015 REVIEW & COORDINATION
22 DEC 2015 ISSUED FOR CONSTRUCTION
1
1
2
2
3
3
4
4
5
5
A A
B B
C C
D DPROJECT TEAM
HARRIS COUNTYOWNER
BUILDING EXTERIORSOLUTIONS, LLCENVELOPE CONSULTANT
NO. DATE ISSUE
PROJECT NAME
HARRIS COUNTYADMINISTRATION BUILDING
PROJECT ADDRESS
1001 PRESTON AVENUEHOUSTON, TEXAS 77002-1893
PROJECT NO.
KIRKSEY PROJECT NO. 2015198KEY PLAN
SHEET TITLE
Wall Sections
SHEET NUMBER
A4.20© 2015 Kirksey
2015
198
Har
ris C
ount
y [B
imse
rver
] | 1
2/16
/201
5 | 8
:56
AM
15'-0
"
9'-0"
1'-11
"
10'-1
1"4'-
1"
9'-1 1
/2" A
FF1'-
9 1/2"
2" 6"
CEILING NOT INSCOPE
EXISTING STRUCT. CONCRETEFRAMINGEXISTING STRUCT. CONCRETEFRAMING
EXISTING GRATING
2" FOAM-IN-PLACEINSULATION
RETURN INSULATION6" UNDER SLAB
RETURN INSULATIONTO GLAZING SYSTEM
NOTE:
GRAY-OUT GRAPHICS INDICATESEXISTING TO REMAIN- FORREFERENCE ONLY
+64'-6"5 LEVEL5
+79'-6"6 LEVEL 6
EL. 64'-6"LEVEL 5
EL. 79'-6"LEVEL 6
C5/A5.10
B5/A5.10
NEW SCHEDULED GLAZING INALUMINUM WINDOW WALL SYSTEM
NEW 2 1/2" CW-90CW INSULATION
EXISTING GRATING
15'-0
"
10'-1
1"4'-
1"
9'-0"
1'-11
"
9'-1 1
/2"1'-
9 1/2"
6" 2"
CEILING, NOT INSCOPE
EXISTING STRUCT. CONCRETEFRAMING
EXISTING STRUCT. CONCRETEFRAMING
EXISTING GRATING
2" FOAM-IN-PLACEINSULATION
RETURN INSULATION6" UNDER SLAB
RETURN INSULATIONTO GLAZING SYSTEM
NOTE:
GRAY-OUT GRAPHICS INDICATESEXISTING TO REMAIN- FOR
REFERENCE ONLY
+64'-6"5 LEVEL5
+79'-6"6 LEVEL 6
EL. 64'-6"LEVEL 5
EL. 79'-6"LEVEL 6
C5/A5.10OPP.
B5/A5.10OPP.
SCHEDULED GLAZING IN ALUMINUMWINDOW WALL SYSTEM
2 1/2" CW-90CW INSULATION
EXISTING GRATING
10'-1
1"4'-
1"
9'-0"
AFF
1'-11
"
15'-0
"
9'-1 1
/2" A
FF1'-
9 1/2"
2" 6"
CEILING NOT INSCOPE
SCHEDULED GLAZING IN ALUMINUMWINDOW WALL SYSTEM
EXISTING STRUCT. CONCRETEFRAMINGEXISTING STRUCT. CONCRETEFRAMING
EXISTING GRATING
EXISTING COLUMNS
2" FOAM-IN-PLACEINSULATION
RETURN INSULATION6" UNDER SLAB
RETURN INSULATIONTO GLAZING SYSTEM
NOTE:
GRAY-OUT GRAPHICS INDICATESEXISTING TO REMAIN- FORREFERENCE ONLY
+64'-6"5 LEVEL5
+79'-6"6 LEVEL 6
EL. 64'-6"LEVEL 5
EL. 79'-6"LEVEL 6
C5/A5.10
B5/A5.10
2 1/2" CW-90CW INSULATION
EXISTING GRATING
10'-1
1"4'-
1"
9'-0"
1'-11
"
15'-0
"
9'-1 1
/2" A
FF1'-
9 1/2"
6" 2"
CEILING NOT INSCOPE
SCHEDULED GLAZING IN ALUMINUMWINDOW WALL SYSTEM
EXISTING STRUCT. CONCRETEFRAMING
EXISTING STRUCT. CONCRETEFRAMING
EXISTING GRATING
2" FOAM-IN-PLACEINSULATION
RETURN INSULATION6" UNDER SLAB
RETURN INSULATIONTO GLAZING SYSTEM
NOTE:
GRAY-OUT GRAPHICS INDICATESEXISTING TO REMAIN- FOR
REFERENCE ONLY
EL. 64'-6"LEVEL 5
EL. 79'-6"LEVEL 6
C5/A5.10OPP.
B5/A5.10OPP.
2 1/2" CW-90CW INSULATION
EXISTING GRATING
EXISTING COLUMNS
A3 WALL SECTION- WESTSCALE: 3/4" = 1'-0" A5WALL SECTION- EASTSCALE: 3/4" = 1'-0"
C3WALL SECTION- NORTHSCALE: 3/4" = 1'-0" C5WALL SECTION- SOUTHSCALE: 3/4" = 1'-0"
REG
IS
TERED ARCHITECT
STATE OF TEXAS
NAGIB MADI
25045
22 December 2015
CD 15 OCT 2015 REVIEW & COORDINATION
22 DEC 2015 ISSUED FOR CONSTRUCTION
1
1
2
2
3
3
4
4
5
5
A A
B B
C C
D DPROJECT TEAM
HARRIS COUNTYOWNER
BUILDING EXTERIORSOLUTIONS, LLCENVELOPE CONSULTANT
NO. DATE ISSUE
PROJECT NAME
HARRIS COUNTYADMINISTRATION BUILDING
PROJECT ADDRESS
1001 PRESTON AVENUEHOUSTON, TEXAS 77002-1893
PROJECT NO.
KIRKSEY PROJECT NO. 2015198KEY PLAN
SHEET TITLE
Exterior Plan Details
SHEET NUMBER
A5.10© 2015 Kirksey
2015
198
Har
ris C
ount
y [B
imse
rver
] | 1
2/16
/201
5 | 8
:56
AM
1" 6"
1"6"
F.V.
F.V.
NEW SCHEDULED GLAZING INALUMINUM WINDOW WALL SYSTEM
CONCRETE BEAM EDGE
3/4"
2 1/4"
1"
6"
1/2"
NEW SCHEDULED GLAZING INALUMINUM WINDOW WALL SYSTEM
EXISTING GRATING
DUAL SEALANT & BACKER RODNEW STEEL ANCHOR
EXISTING STEEL EMBED
EXISTING CONCRETE BEAM/SLAB
THERMAL BREAK
WEEP TUBE
F.V.
1'-9"
1/2"
9'-0"
AFF
1"
2 1/4"
2 1/4"
9'-1 1
/2" A
FF 3/4"
1 1/2"
2" FOAM-IN-PLACEINSULATION
RETURN INSULATIONTO GLAZING SYSTEM
NEW SCHEDULED GLAZING INALUMINUM WINDOW WALL SYSTEM
DUAL SEALANT & BACKER ROD
EXISTING STEEL EMBED
EXISTING CONCRETE BEAM
2 1/2" CW-90CW INSULATION
THERMAL BREAK
CEILING NOT IN SCOPE
GL-1GL-1 GL-1
GL-1
GL-1S GL-1SGL-1S
10'-1
1"
9'-1 1
/2"1'-
9 1/2"
2'-6"
6'-5 1
/4"2 1
/4"
5'-0 3/4"
4'-0" 2 1/4"
8 1/4"
ACCESS DOOR
EXISTING CONCRETEBEAM
EXISTING CONCRETEBEAM
PROVIDE DEADLOCKWITH KEY ON BOTHSIDES BY CW MFR. GL-1GL-1 GL-1
GL-1S GL-1SGL-1S
5'-0 3/4"
10'-1
1"
9'-1 1
/2"1'-
9 1/2"
GL-1GL-1 GL-1
GL-1S GL-1SGL-1S
5'-3"
10'-1
1"
9'-1 1
/2"1'-
9 1/2"
088000 GLAZING GL-1 Description________Vision Manufacturer_______Viracon Product___________VNE 24-63 Outside glass_______1/4" Optiwhite HS Surface #2_________VNE - 63 Insulated space_____1/2" airspace Surface #3_________N/A Inside glass________1/4" Optiwhite HS Transmittance (VLT)_ 66% U-Value (Winter)____.29 U-Value (Summer)__.26 SHGC____________.29 GL-1S Description________Opaque Spandrel Glass Manufacturer_______Viracon Product___________VNE1-63
Outside glass_______1/4" Clear HS Surface #2_________VNE - 63 Insulated space_____1/2" airspace Surface #4_________Black V907 Inside glass________1/4" Clear HS Transmittance (VLT)_ 62% U-Value (Winter)____.29 U-Value (Summer)___.26 SHGC____________.29
NOTE:
MULLION COLOR SELECTION TO MATCH EXISTING
A5 90° STRUCTURAL SILICONE GLAZED OUTSIDE CORNER DETAILSCALE: 3" = 1'-0"
B5SILL SECTION DTLSCALE: 3" = 1'-0"
C5HEAD SECTION DTLSCALE: 3" = 1'-0"
A1ACCESS DOOR ELEVATIONSCALE: 3/8" = 1'-0" A2WINDOW TYPE 1SCALE: 3/8" = 1'-0" A3WINDOW TYPE 2SCALE: 3/8" = 1'-0"
B3GLASS TYPE SCHEDULE
REG
IS
TERED ARCHITECT
STATE OF TEXAS
NAGIB MADI
25045
22 December 2015