City Development Plan Madhya Pradesh

Transcript of CDP Mauganj English

  • City development plan

    Mauganj, Madhya Pradesh

    Submitted to:

    Urban Administration and Development Department, GoMP Palika Bhawan, Bhopal, Madhya Pradesh

    Project co-ordination:

    City Managers Association, Madhya Pradesh (CMAMP) Palika Bhawan, Bhopal, Madhya Pradesh

    Submitted by:

    DMG Consulting Pvt. Ltd. A-81, Sector 65, Noida, Uttar Pradesh

  • `

    Mauganj Town

    Mauganj falls under local tourist circuit of Hanumana Deotalab

    Bahuti Water fall Rewa circuit. There are several temples

    found in the town like- Hanuman Temple, Mahadev Temple etc.

    hence the town can be given the name of Temple Town. Tourist

    from different places comes here to see the Rewa fort and

    Museum Complex, Pilli Kothi, and Bahuti Water Fall.

    DISTRICT REWA

    POPULATION- 26411

  • Latitude

    Longitude

    Average rainfall (annual) MM

    Height above mean sea level Mts

    Municipal area (1991) Sq kms

    Municipal area (2001) Sq kms

    Municipal area (2011) Sq kms

    Date of Constitution of ULB Date

    Historic importanceIn one or two

    sentences

    Population Year 1981 (under Municipal

    boundary only)

    Population Year 1991 (under Municipal

    boundary only)

    Population Year 2001 (under Municipal

    boundary only)

    Population Year 2011 (under Municipal

    boundary only)

    Name of Population projection Method

    Projected population adopted Year 2015

    Projected population adopted Year 2025

    Projected population adopted Year 2035

    Land Use% Standard (as per

    UDPFI)

    Land use (Tentative

    in Sq kms )

    Land use (Tentative

    in percentage)

    Residential 45-50% 5.320 58.91

    Commercial 2-3% 0.0098 0.11

    Public - semi public 6-8% 0.141 1.56

    Industrial 8-10% - 0.00

    Roads 10-12% 2.330 25.80

    Recreational 12-14% - 0.00

    Sensitive rest - 0.00

    Water bodies rest 1.230 13.62

    Total Developed area 9.031 100.00

    Agriculture / Undeveloped area rest 27.880 75.54

    Total Municipal Area 36.911

    City Profile

    32,365

    36,618

    DMG Consulting P. Ltd.

    Mauganj

    Yes

    14,281

    17,252

    23,024

    26,411

    Increamental Increase Method

    28,112

    24 degree 41'

    81 degree 53'

    1100 mm

    312 Mts

    46.3 sqkm

    46.3 sqkm

    46.3 sqkm

    NA

    Lan

    d U

    se

    Town level

    June, 1973

    CompanyName

    ULB Name

    Whether the Sectoral Analysis report is as per UADD requisitesP

    op

    ula

    tio

    nT

    ow

    n B

    rief

    Geographical location (Town)

    1

  • Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

    Name of ward

    Ward Population (2001) 1614 1849 1994 1440 1973 2024 1506 1398 789 1261 1809 1885 1185 1183 1114 23024

    Area (sq kms) 1.4 1.5 2.4 2.8 0.4 0.7 0.9 0.8 16.9 0.8 1.1 0.8 1.0 4.4 1.1 36.9

    Density (PPSqkm) 2001 1150 1258 824 519 4723 2765 1756 1770 47 1604 1688 2395 1222 271 989 624

    Male 824 951 1021 750 1006 1049 796 770 413 654 944 966 581 599 546 11870

    Female 790 898 973 690 967 975 710 628 376 607 865 919 604 584 568 11154

    SC NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3639

    ST NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1950

    BPL NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA2900 (60% of

    slum ppl)

    Sex ratio 959 944 953 920 961 929 892 816 910 928 916 951 1040 975 1040 940

    Literacy rate (%) of 2011 56.65 49.29 64.62 78.61 73.32 59.06 63.63 78.3 79.18 57.33 44.23 57.6 58.53 61.09 60.63 61.43

    No. of Primary schools NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 9

    No. of Primary Health

    CentreNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No PHC (1

    CHC & 3

    clinics)

    No. of Households 282 357 390 248 336 364 260 294 165 209 318 313 184 187 195 4102

    Primary occupation

    (Majority)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Seconday occupation NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Tertiary occupation NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of SS/LS industrial

    unitsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    HH scale

    industries

    No. of Commercial

    establishmentsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Slum pockets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Slum population NA 1849 NA NA NA 2984 NA NA NA NA NA NA NA NA NA 4833

    No. of Slum Households NA 313 NA NA NA 302 NA NA NA NA NA NA NA NA NA 615

    No. of Individual water

    connections in the wardNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 614

    No. of Community water

    connectionsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Commercial water

    connectionsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Tubewells NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 10

    No. of Handpumps NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 288

    No. of OHTs NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA1 OHT (45000

    Gallon)

    % Coverage of piped water

    supplyNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 34%

    No. of Individual Toilets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA956 HHs

    (24.6%)

    No. of Individual Septic

    tanksNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 956

    No. of Community Septic

    tanksNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Public toilets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3

    No. of Community toilets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 566 HHs

    % of population Open

    defecationNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 60%

    No. of Dust bins NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 14

    City Profile (Ward Wise)

    2

  • Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

    Name of ward

    City Profile (Ward Wise)

    Wardwise Waste generated

    (Kgs)4 5 6 4 5 6 5 4 2 3 6 6 3 3 4 66

    Road sweeping (1 time or 2

    times)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Total no. of sanitary

    workers in the wardNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 10

    Length of Pucca road (Mts) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 10.44 kms

    Length of Kuccha road

    (Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 4.21 kms

    Length of State Highway NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of National

    HighwayNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 4.45 km

    Length of Road side drains

    Pucca (Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of Natural drains

    (Nallah)

    Pucca/Channelized (Mts)

    NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of Natural drains

    (Nallah) Kuttcha (Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Streetlights NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 780

    No. of Electricity

    connections NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 2944

    Name of Tourist site if any NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Bahuti

    waterfall

    (nearest)

    Name of Heritage site if

    anyNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Bus stop (No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Bus stand(No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Parks (No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Playground(No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Residential

    propertiesNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Commercial

    propertiesNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Total Property tax

    collection (in Rs.)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Property tax coverage(in

    %)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Available Government

    land (Sq kms)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Remarks

    Note: Population data has been given as per the Census-2001. As per the discussion with RGI Census Data for 2011 has not published, which will publish by July 2013.

    3

  • SourceTubewell/Ha

    ndpumpWell River/Lake/Talab

    No. of Tubewell / River / Well

    10 public

    Tube well / 72

    private tube

    well / 288

    Handpump

    396 River Nihayi

    Water Supplied by Tubewell /

    River / Well in MLDNA NA NA

    1.32 MLD

    50 lpcd

    Rs 40/- monthly

    18%

    Yes but not working

    No

    2.85 MLD

    no

    NA

    NA

    NA

    NA

    NA

    Ladha nalla

    NA

    Nihayi river

    NA

    NA

    Nihayi river and Lodha nalla

    NA

    2.5 gram per capita per day

    0.66 tons

    2 times per day

    NA

    NA

    No

    NA

    NA

    NA

    NA

    NA

    NA

    Ph

    ysi

    cal

    Infr

    ast

    ruct

    ure

    Existing Source

    Frequency of Cleaning Individual Septic tanks

    % Coverage under paid water supply

    Is the existing site Dumping site or allotted site for

    Scientific disposal

    Area of allotted landfill site for Scientific disposal

    No. of Tractor trolleys/vehicles available with the ULB for

    carrying Solid waste to the LF site

    Total no. of community septic tanks

    Total no. of Sewage/Mud pumps available with the ULB

    Frequency of Cleaning Community Septic tanks

    Name of natural nallah (Storm water drain)

    Length of natural nallah (Storm water drain) Kms

    Sectoral Analysis

    Frequency of SW collection by the ULB (1 time per day/2

    times per day)

    Collection efficiency of the ULB (%)

    Any initiative for DTDC (Yes /No)

    Any initiative for scientific disposal of waste

    Name of dumping/ landfill site

    Distance of the Dumping site/landfill site from main

    settlement area (Kms)

    Length of road side drain (Kms)

    Coverage of road side drainage w.r.t roads (%)

    Ultimate disposal point of Road side drains

    Any treatment plant/procedure adopted

    Per capita Solid waste generation (Considering

    Standards) (in gms)

    Total SW generation (in Tons)

    Total water supply in the town (MLD)

    Existing Supply rate (LPCD) considering distribution

    losses

    Water Charges per household per month (Rs.)

    Flat/Metered

    Whether any treatment plant exists (Y/N),If yes mention

    capacity (MLD)

    Proposed source (Surface)

    Total sewage generation (MLD)

    Whether any treatment plant exists (Y/N),If yes mention

    capacity

    Total no. of individual septic tanks

    Wa

    ter

    Su

    pp

    lyS

    ewer

    ag

    eD

    rain

    ag

    e

    Ultimate disposal point of nallah

    If site for Scientific disposal is not allotted then whether

    formally requested by the ULB

    SW

    M

    4

  • Sectoral Analysis

    NH 7 (4.45 km)

    NA

    NA

    NA

    CC NA

    WBM 10.44 kms

    Total (kms) 10.44 kms

    (kms) 4.21 kms

    (kms) NA

    1950NA2050 vehicles including jeep, car,

    trucks, 2 wheeler, rikshaw

    NA

    Yes operated by private owners

    1 NA

    2 NA

    3 NA

    NH-7 passing through the town

    780

    780

    336

    261

    NA

    2

    181

    NA

    33/11KV NA

    NA

    NA

    2944

    NA

    NA

    NA

    Ph

    ysi

    cal

    Infr

    ast

    ruct

    ure

    Duration of Electricity supply per day (in Hrs)

    Name of National Highway passing from or nearby from

    the town (NH-XYZ)

    Distance of National Highway if nearby from the town

    (NH-XYZ) in Kms

    Name of State Highway passing from or nearby from the

    town (SH-XYZ)

    Any intracity mass transport mode (yes/no)

    Name of locations facing major traffic issues

    Name of the street beautified as per the

    instructions of UADD

    Bus stand (yes/No)

    Tra

    ffic

    & t

    ran

    spo

    rta

    tio

    nS

    tree

    t li

    gh

    tin

    gP

    ow

    er

    Distance of State Highway if nearby from the town (SH-

    XYZ) in Kms

    Total length of Pucca roads (Kms)

    Total length of Kuccha roads (kms)

    Gap w.r.t Standards

    Total no. of vehicles in the town

    No. of Streetlights having LPS

    Location of Substation

    http://www.mptransco.nic.in

    Total no. of residential connections

    Total no. of Commercial connections

    Total no. of street lights

    No. of Streetlights having Sodium lights

    Ro

    ad

    s

    No. of Streetlights under working condition

    No. of Streetlights having Tubes

    No. of Streetlights having CFL

    No. of Streetlights having Incandescent bulbs

    No. of Streetlights having LED

    Any subsidy for BPL (Y/N)

    5

  • Sectoral AnalysisNA

    NA

    NA

    NA

    NA

    NA

    Nihayi River

    NA

    water bodies

    No

    Government 1 CHC

    Beds NA

    Private 3 private clinics

    BedsEach clinic have 30 beds, 20 beds and 10

    beds

    No

    Name of

    townNA

    Distance

    (Kms)NA

    9

    2 Higher secondary school and 4 secondary

    school

    0 NA

    0 NA

    NA

    NA

    NA

    NA

    NA

    Social security pension scheme for Senior

    Citizens, Physically Challenged and Widows

    No. of ITI

    No. of Hospitals

    Multispeciality hospital if any (Y/N)

    Name of Nearby town reffered for Treatment

    No. of Primary schools

    No. of Secondary/High schools

    No. of Colleges

    Ownership/agency

    Total no. of Pilgrims/ Tourists visiting town per day

    Name of River/Lake/Forest range/Any specific species

    Prevailing Environmental Act/s

    Areas facing threats

    No. of Primary Health centres/Dispensary

    So

    cia

    l se

    curi

    ty s

    chem

    es

    No. of Rain Basera/Night Shelter

    No. of Beneficiaries under Gharelu Kamkaji Mahila

    Yojana

    Ownership of Rain Basera (with ULB/Rental)

    Name of other Social security schemes

    No. of Beneficiaries under SJSRY (Street Vendor)

    No. of Beneficiaries under Haath thela/Rickshaw chalak

    yojna

    So

    cia

    l In

    fra

    stru

    ctu

    re

    Ed

    uca

    tio

    nH

    ealt

    h

    Her

    ita

    ge

    & t

    ou

    rism

    Her

    ita

    ge

    & t

    ou

    rism

    En

    vir

    on

    men

    t

    Name of Heritage site/s

    Ownership/agency

    Prevailing Heritage Act/s

    Name of Tourist site/s

    6

  • Ward

    No

    Name of Slum

    pocket/

    reference

    name

    Notified/ Un-

    notified

    Ward

    population

    Slum

    population

    of Notified

    slums

    Slum

    population

    Individual

    water

    connections

    No. of

    Communit

    y taps

    No. of

    Handpump

    s

    No. of

    Individual

    toilets

    No. of

    Communit

    y toilets

    No. of

    Pucca

    houses

    No. of Semi

    pucca

    houses

    No. of

    Kuccha

    houses

    No. of

    Permanent

    pattas

    distributed

    No. of

    Temporary

    pattas

    distributed

    No. of

    Primary

    school in

    the slum

    pocket

    No. of

    Primary

    Health

    centres in

    the slum

    pocket

    Beneficiari

    es under

    social

    security

    schemes

    Any

    interventio

    ns under

    IHSDP

    (Y/N)

    1 Ward no. 1 NA 1614 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    2 Ward no. 2 Notified 1849 1849 1849 NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    3 Ward no. 3 NA 1994 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    4 Ward no. 4 NA 1440 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    5 Ward no. 5 NA 1973 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    6 Ward no. 6 Noitified 2024 2984 2984 NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    7 Ward no. 7 NA 1506 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    8 Ward no. 8 NA 1398 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    9 Ward no. 9 NA 789 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    10 Ward no. 10 NA 1261 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    11 Ward no. 11 NA 1809 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    12 Ward no. 12 NA 1885 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    13 Ward no. 13 NA 1185 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    14 Ward no. 14 NA 1183 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    15 Ward no. 15 NA 1114 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Total 23024

    Box shows ward having slum population

    Slums & Urban Poor

    Sectoral Analysis

    Note:

    7

  • Components 2015 2025 2035City specific

    Strategies

    Preliminary

    estimateImplementing agency Mode of Implementation (PPP etc.)

    Network coverage to households 40% 100% 100% MNP, UADD, Govt. of M.P. Contract basis

    Per capita supply as per norms (135

    lpcd)135 135 135 MNP, UADD, Govt. of M.P.

    24/7 water supply 20% 50% 85% MNP, UADD, Govt. of M.P.

    Quality of waterAs per WHO

    Standards

    As per WHO

    Standards

    As per WHO

    StandardsMNP, UADD, Govt. of M.P.

    Non revenue water 25% 15% 5% MNP, UADD, Govt. of M.P.

    Consumer metering 80% 100% 100% MNP, UADD, Govt. of M.P. Contract basis

    Cost recovery 100% 100% 100% MNP, UADD, Govt. of M.P.

    Roof water harvesting 40% 80% 100% MNP, UADD, Govt. of M.P.

    Private sector participation 10% 70% 100% Yes

    Storm water drainage network

    coverage80% 100% 100% MNP, UADD, Govt. of M.P. PPP

    Rehabilitation of existing pucca drains 100% 100% 100% MNP, UADD, Govt. of M.P. PPP

    Rehabilitation of existing primary

    nallahs and water bodies100% 100% 100% MNP, UADD, Govt. of M.P. PPP

    Flood prone areas 100% 100% 100% MNP, UADD, Govt. of M.P.

    Sewer network coverage to

    households 60% 100% 100% MNP, UADD, Govt. of M.P. PPP

    Sewage Treatment and disposal

    arrangements 80% 100% 100% MNP, UADD, Govt. of M.P. PPP

    Sewage Recycling and reuse 60% 80% 100% MNP, UADD, Govt. of M.P. PPP

    Cost recovery (as a % of O&M )As per WHO

    Standards

    As per WHO

    Standards

    As per WHO

    StandardsMNP PPP

    Safe sanitation facilities (with focus on

    Urban poor)80% 100% 100% MNP, UADD, Govt. of M.P. PPP

    Door-to-door collection system 80% 100% 100% MNP

    Source segregation 100% 100% 100% MNP

    Improve waste collection efficiency 100% 100% 100% MNP

    Mechanized waste handling Partial Full Full MNP

    Scientific waste disposal Partial Full Full MNP

    Landfill site adequacy Partial Full Full MNP

    Cost recovery of O&M 80% 100% 100% MNP

    Private sector participation 70% 100% 100% MNP, PWD

    988 Lakhs

    Including slum

    area

    190 Lakhs

    Including slum

    area

    329 Lakhs

    Including slum

    area

    241 Lakhs

    Including slum

    area

    To provide 100%

    sewerage system

    with low cost

    sanitation

    projects, proper

    treatment before

    disposal with Root

    zone treatment

    system and

    DEWATS.

    Preparation of

    master plan,

    rehabilitation and

    improvement

    programmes.

    Implementation of

    Integrated waste

    management

    system.

    PPP

    SECTORIAL GOALSYEAR

    PH

    YSI

    CA

    L IN

    FRA

    STR

    UC

    TUR

    E

    WA

    TER

    SU

    PP

    LYD

    RA

    INA

    GE

    SEW

    ERA

    GE

    & S

    AN

    ITA

    TIO

    NSW

    M

    By 2035, 24x7

    hours water

    supply as per the

    standard and full

    network coverage,

    water harvesting,

    consumer

    metering and low

    cost water

    treatment plant

    (Rapid Sand

    filteration).

    8

  • New road formations (13.35 km in

    different location as per the

    development of town)

    - 100% 100% MNP, PWD BOOT

    Road upgradations 50% 100% 100% MNP, PWD PPP

    Widening/ strengthening 50% 100% 100% MNP, PWD PPP

    ROBs/flyovers - - - MNP, PWD -

    Development of bus terminus 60% 100% 100% MNP, PWD BOOT

    Development of truck terminus 70% 100% 100% MNP, PWD BOOT

    Junctions and traffic signal

    improvements100% 100% 100% MNP, PWD PPP

    Mass transit system 30% 60% 100% MNP, PWD BOOT

    Parking facilities 100% 100% 100% MNP, PWD Contract

    New Installation 30% 70% 100% MNP Contract

    Upgradation 100% 100% 100% MNP Contract

    Underground cabling - 70% 100% MNP Contract

    Energy savings 70% 100% 100% MNP Contract

    24/7 electricity supply MNP

    100 % electricity supply MNP

    Development of alternative energy

    sourcesMNP PPP

    100% Fire safety coverage 100% 100% 100% MNP

    Fully equipped fire station 100% 100% 100% MNP

    Identify archaeological resources in

    the city (Heritage listing)MNP, State tourism Dept., MNP & State Tourism Dept.

    Development of green areas as per

    normsMNP, State tourism Dept., PPP

    Water bodies

    preservation/ConservationMNP, State tourism Dept., PPP

    Tourist accommodation adequacy MNP, State tourism Dept.,

    Tourist attraction and circuits regional

    and city levelMNP, State tourism Dept., PPP

    Clean and healthy environment MNP

    Conserved natural environment -

    water bodiesPPP

    Eco-friendly vehicles MNP, GoMP PPP

    Disposal of treated sewage in nallahs MNP

    Desilting of nallahs MNP PPP

    Incineration of bio-medical waste MNP PPP

    Implementation of norms/standards

    for pollution controlMNP MNP

    160 Lakhs

    Including slum

    area

    200 Lakhs

    -

    1085 Lakhs

    Including slum

    area

    Road upgradation

    and development,

    development of

    bus & truck

    terminal,

    signalised

    junctions,

    provision of

    parking facilities

    and strenthening

    Public transport.

    Installation of

    solar street lights

    with CFL & LED

    lights to save

    energy.

    Development of

    underground

    cabling.

    provision of well

    equipped fire

    Development of

    Mauganj as transit

    point for

    surrounding

    tourist points,

    development of

    water fronts,

    improvement of

    connectivity of

    tourist places.

    Development of

    water bodies,

    plantation,

    checking of

    pollution level, use

    of eco-friendly

    vehicles,

    treatment facilities

    for wastes etc.

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    FIR

    E

    FIG

    H

    TIN

    G

    HER

    EITA

    GE

    & T

    OU

    RIS

    M

    HER

    ITA

    GE

    & T

    OU

    RIS

    MEN

    VIR

    ON

    MEN

    T

    100% *

    100% *

    MNP

    State dovt.

    PH

    YSI

    CA

    L IN

    FRA

    STR

    UC

    TUR

    E

    RO

    AD

    S &

    TR

    AFF

    IC M

    AN

    AG

    EMEN

    TST

    REE

    T

    LIG

    HTN

    ING

    PO

    WER

    100% *

    100% *

    9

  • 100% doctor-patient ratio MNP, health dept. Recruitment

    100% patient-bed ratio MNP, health dept. Contract

    Effective implementation of health

    programmes and related services in

    the slum areas of the city

    MNP, health dept. Contract

    Regular checks for water

    contamination in all water bodies of

    the city

    MNP, health dept. Contract

    Literacy rates

    Ensure 100% enrollment in primary

    schoolsEdu. Dept of M.P. and MNP

    100% Teacher student ratio Edu. Dept of M.P. and MNP Recruitment

    Technical, engineering & medical

    education in the cityEdu. Dept of M.P. and MNP PPP

    Developed existing parks MNP Contract / PPP

    Area coverage under recreational

    facilitiesMNP

    Playing facilities MNP

    Provision for green-belts in future

    development plansMNP

    Sufficient infrastructure at

    mela/exhibition groundMNP contract

    Security of tenure for urban poor MPHB, MNP

    Inclusion of 100% urban poor

    population under various central and

    state govts social sectors schemes like

    old-age pension schemes, Scheme for

    handicapped persons, deen-dayal

    antyoday yojana, mid-day meals

    schemes, etc

    - -

    Pucca housing for urban poor 1831 Lakhs PPP

    Access to water connection MNP

    Access to public toilets and urinal

    facilities for all slum householdsMNP Contract / PPP

    Access to dustbins and secondary

    storage pointsMNP Contract / PPP

    Upgradation of kutcha roads to PCC

    roads in slumsMNP PPP

    Improved drainage systems MNP PPP

    Adequate street lighting facilities MNP PPP

    Education facilities MNP PPP

    Community halls etc. MNP PPP

    Adequate health facilities MNP PPP

    Security of tenure for urban poor MPHB, MNP

    Note:

    700 Lakhs

    Including slum

    area

    Included in

    tourism

    -100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    265 Lakhs

    Including slum

    area

    Provision of Land

    ownership,

    improvement

    schemes,

    relocation of

    hazardous slums,

    pucca drain

    network, financial

    support for the

    construction of

    houses

    Strenthening

    infrastructures in

    health centers and

    to run health

    initiative

    programs.

    Provision of co-

    education,

    strengthning of

    education

    infrastructures

    and opening of

    vocational training

    centres.

    Development of

    water bodies, mini-

    stadium, exibition

    ground,

    community halls,

    public library etc.

    100% *

    100% *

    100% *

    * Marks - project has to be done till year 2035 by MNP, depending upon city need and available resources.

    100% *

    100% *

    100% *

    100% *

    Included in other

    sector

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SOC

    IAL

    INFR

    AST

    RU

    CTU

    RE

    HEA

    LTH

    EDU

    CA

    TIO

    NR

    ECR

    EATI

    ON

    AL

    Soci

    al s

    ecu

    rity

    sch

    em

    es

    10

  • 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11

    Rates and Tax Revenue - - - - - -

    Assigned Revenues & Compensation - - - - - -

    Rental Income from Municipal Properties - - - - - -

    Fees & User Charges - - - - - -

    Sale & Hire Charges - - - - - -

    Revenue Grants, Contribution and Subsidies - 72.89 102.86 105.12 102.56 159.94

    Income from Investments - - - - - -

    Interest Earned - - - - - -

    Tax - 55.17 76.7 86.34 120.07 164.85

    Non-Tax - 11.14 10.45 10.97 12.77 92.99

    Other Income - - - - - -

    - 139.2 190.01 202.43 235.4 417.78Grants, Contribution for specific purposes - - - - - -

    Secured Loans - - - - - -

    Unsecured Loans - - - - - -

    Deposits - - - - - -

    Deposit works - - - - - -

    - - - - - -

    Establishment Expenses - 35.06 46.94 54.08 60.22 69.35

    Administrative Expenses - - - - - -

    Operations & Maintenance - 34.26 24.76 42.12 40.66 50.56

    Interest & Finance Charges - - - - - -

    Programme Expenses - - - - - -

    Revenue Grants, Contribution and Subsidies - - - - - -

    Miscellaneous Expenses - - - - - -

    Transfer to Fund - - - - - -

    Other - 62.9 102.86 160.3 103.53 214.93

    - 132.22 174.56 256.5 204.41 334.84

    Fixed Assets - - - - - -

    Capital Work-in-Progress - - - - - -

    Investments -General Fund - - - - - -

    Investments-Other Funds - - - - - -

    Stocks/Inventory - - - - - -

    Loans, Advances and Deposits - - - - - -

    Other Assets - - - - - -

    Miscellaneous Expenditure - - - - - -

    - - - - - -

    - - - - - -

    - - - - - -

    Tax includes Property tax, Water tax, Pilgrimage tax, Sewerage tax, conservancy tax And Non-tax sources include Rental from Municipal Properties, sale and other

    charge, fees.

    Note: Refer Madhya Pradesh Municipal Accounting Manual for further details. Can be downloaded from "Download" Section of www.mpurban.gov.in.

    Year

    Municipal Finance (Should be filled carefully and it should be checked whether the capital income is factual or based on assumption

    Rev

    enu

    e In

    com

    e

    Total - Revenue Income (in Lakhs)

    Total Income

    Total Expenditure

    Ca

    pit

    al

    Rec

    eip

    ts

    Total Capital Receipts (in Lakhs)

    Rev

    enu

    e E

    xp

    end

    itu

    re

    Total - Revenue Expenditure (in Lakhs)

    Ca

    pit

    al

    Ex

    pen

    dit

    ure

    s

    Total Capital Expenditure

    11

  • Reforms Achieved (Y/N)

    Any City specific

    Strategies

    adopted

    Preliminary

    estimate (if any)

    for

    implementation

    Implementing

    agency

    2012-13 2013-14 2014-15 2015-16

    Full migration of double accounting

    System

    N25% 50% 75% 100% No Not Available UADD

    Property tax reforms, 85% coverage

    ratio and 90% collection ratio

    N25% 50% 75% 100% No Not Available Nagar Parishad

    Levy of user charges : full recovery of O

    & M charges for sewerage, water supply

    and SWM

    N

    25% 50% 75% 100% No Not Available Nagar Parishad

    Internal earmarking of basic services to

    urban poor

    N25% 50% 75% 100% No Not Available

    Nagar Parishad

    & UADD

    E-governance & Capacity Building N - 67% 33% 100% No 40 lakh UADD

    Provision of basic services to urban poor

    including security of tenure at affordable

    prices, improved existing housing, water

    supply, sanitation

    N

    25% 50% 75% 100% No Not AvailableNagar Parishad

    & UADD

    Reforms Action Plan

    Timeline to achieve reforms till 2015

    12

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida i

    City Development Plan

    Mauganj, Madhya Pradesh

    SUBMITTED TO:-

    Urban Administration and Development

    Department, GoMP

    PROJECT CO-ORDINATION:-

    City Managers' Association Madhya Pradesh

    CONSULTANT:-

    DMG Consulting Pvt. Ltd.

    A-81, Sector- 65, NOIDA (UP)

    Chief Municipal Officer Sub Engineer

    Mauganj Mauganj

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida ii

    Contents

    LIST OF TABLES ...................................................................................... viii

    LIST OF FIGURES ....................................................................................... x

    LIST OF MAPS .......................................................................................... xi

    Executive Summary ................................................................................... 1

    INTRODUCTION ....................................................................................... 11

    1.1 Background ........................................................................................................................... 11

    1.2 Concept and Principle of City Development Plan ................................................................. 11

    1.3 Objective of the Assignment................................................................................................. 12

    1.4 Understanding of Terms of Reference vis a vis Methodology of the Study ......................... 12

    1.5 Approach and Methodology for Preparation of CDP ........................................................... 12

    1.6 Scope of Work ....................................................................................................................... 14

    INTRODUCTION TO MAUGANJ ...................................................................... 22

    2.1 Introduction to Rewa ............................................................................................................ 22

    2.2 Administrative Boundary ...................................................................................................... 22

    2.3 Location and Connectivity .................................................................................................... 23

    2.4 Study Area ............................................................................................................................. 25

    2.5 Physical Characteristics ......................................................................................................... 26

    2.5.1 Topography & Geology ................................................................................................. 26

    2.5.2 Climate .......................................................................................................................... 26

    2.5.3 Agriculture, Industry, Minerals & Flora Fauna .............................................................. 26

    2.6 SWOT Analysis ...................................................................................................................... 27

    DEMOGRAPHIC PROFILES ........................................................................... 29

    3.1 Background ........................................................................................................................... 29

    3.2 Population Trend and Urbanisation ..................................................................................... 29

    3.3 Population Density ................................................................................................................ 30

    3.4 Population Projections .......................................................................................................... 32

    3.5 Methodology Adopted to Estimate Population .................................................................... 33

    3.5.1 Arithmetic Progression Method ................................................................................... 33

    3.5.2 Geometrical Progression Method................................................................................. 34

    3.5.3 Incremental Increase Method ...................................................................................... 34

    3.6 Summary of Population Projection through Various Method .............................................. 35

    3.7 Schedule Caste & Schedule Tribe Population ....................................................................... 35

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida iii

    3.8 Literacy Rate ......................................................................................................................... 36

    3.9 Sex Ratio ............................................................................................................................... 37

    SOCIO-ECONOMIC PROFILES OF THE TOWN ..................................................... 41

    4.1 Background ........................................................................................................................... 41

    4.2 Sex Ratio ............................................................................................................................... 41

    4.3 Literacy Rate ......................................................................................................................... 41

    4.4 Average Household Size ....................................................................................................... 41

    4.5 Workforce Participation ....................................................................................................... 41

    4.6 Work Force Distribution ....................................................................................................... 42

    4.7 Dependency Ratio ................................................................................................................. 43

    4.8 Industrial Activities ............................................................................................................... 44

    4.9 Informal Business and Local Economy (Trade & Commerce) ............................................... 45

    4.10 Heritage and Tourism ........................................................................................................... 46

    4.11 SWOT Analysis ...................................................................................................................... 48

    Physical Planning and Growth Management .................................................... 50

    5.1 Background ........................................................................................................................... 50

    5.2 Spatial Growth Trends .......................................................................................................... 50

    5.3 Spatial Distribution of Population......................................................................................... 51

    5.4 Landuse Analysis ................................................................................................................... 51

    5.5 Housing Scenario .................................................................................................................. 53

    5.5.1 Introduction .................................................................................................................. 53

    5.5.2 Housing Stock................................................................................................................ 53

    5.5.3 Distribution of Houses by Types ................................................................................... 54

    5.5.4 Categories of Housing Structure ................................................................................... 54

    5.5.5 Present and Future Housing Demand ........................................................................... 56

    5.6 Housing Gap Assessment ...................................................................................................... 57

    5.7 Slums Area ............................................................................................................................ 57

    5.8 Future Growth Possibilities ................................................................................................... 57

    5.9 SWOT Analysis ...................................................................................................................... 58

    5.10 City Specific Strategies and Action Plan ................................................................................ 59

    URBAN INFRASTRUCTURE SERVICES .............................................................. 61

    6.1 Introduction .......................................................................................................................... 61

    6.2 Physical Infrastructure .......................................................................................................... 61

    6.2.1 Water Supply ................................................................................................................ 61

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida iv

    Project Identification & Costing................................................................................................... 70

    6.2.2 Sewerage and Sanitation .............................................................................................. 71

    Project Identification & Costing................................................................................................... 81

    6.2.3 Solid Waste Management............................................................................................. 82

    6.2.4 Drainage System ........................................................................................................... 88

    Project Identification & Costing................................................................................................... 91

    6.2.5 Traffic and Transportation ............................................................................................ 92

    Project Identification & Costing................................................................................................... 99

    6.2.6 Street Lighting and Fire Fighting ................................................................................... 99

    6.2.7 Urban Poor and their Accessibility to Basic Services .................................................. 104

    Project Identification & Costing................................................................................................. 111

    6.3 Social Infrastructure............................................................................................................ 111

    6.3.1 Health facilities ........................................................................................................... 111

    6.3.2 Education .................................................................................................................... 113

    6.3.3 Recreation and Entertainment ................................................................................... 116

    6.3.4 Fire Fighting Services .................................................................................................. 116

    6.3.5 SWOT Analysis ............................................................................................................ 119

    6.3.6 Issues ........................................................................................................................... 121

    6.3.7 City Specific Strategies and Action Plan ...................................................................... 121

    Project Identification & Costing................................................................................................. 122

    6.4 Environment ....................................................................................................................... 123

    6.4.1 Flora and Fauna .......................................................................................................... 123

    6.4.2 Pollution Levels (Air, Water and Soil) ......................................................................... 123

    6.4.3 City Green Spaces ....................................................................................................... 123

    6.4.4 Water Front Development and Conservation ............................................................ 124

    6.4.5 SWOT Analysis ............................................................................................................ 124

    6.4.6 Issues ........................................................................................................................... 124

    6.4.7 City Specific Strategies and Action Plan ...................................................................... 124

    6.5 Heritage and Conservation ................................................................................................. 125

    6.5.1 Identification of Tourist Spot at Local and Regional Level .......................................... 125

    6.5.2 Existing Status of Heritage Building ............................................................................ 126

    6.5.3 Existing Regulations/Heritage Guidelines at the ULB and State Level ...................... 126

    6.5.4 Heritage Issues ............................................................................................................ 127

    6.5.5 Tourism Potential of the Town ................................................................................... 127

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida v

    6.5.6 Possibility of Tourism Circuits ..................................................................................... 127

    6.5.7 Comparative Analysis with the UDPFI & UNESCO Guidelines .................................... 128

    6.5.8 SWOT Analysis ............................................................................................................ 128

    6.5.9 Issues ........................................................................................................................... 129

    6.5.10 City Specific Strategies and Action Plan ...................................................................... 129

    Project Identification & Costing................................................................................................. 129

    LOCAL TOURISM CIRCUIT UPGRADATION .......................................................131

    7.1 Background ......................................................................................................................... 131

    7.2 Madhya Pradesh Tourism and Heritage Policy ................................................................... 131

    7.3 Places of Tourist Interest in and Around the City ............................................................... 132

    7.4 Arts & Crafts ........................................................................................................................ 134

    7.5 Existing Status of Major Tourist Destinations ..................................................................... 134

    7.6 Tourist Arrival ..................................................................................................................... 135

    7.7 Assessment of Tourism Supported Infrastructure.............................................................. 135

    7.8 Key Concern Areas for Tourism Development ................................................................... 136

    7.9 Tourism Development Option & Strategies........................................................................ 137

    7.10 Recommended Tourism Development Proposals .............................................................. 138

    7.11 Enhancement and Up-gradation of City Level Infrastructure............................................. 140

    7.12 SWOT Analysis .................................................................................................................... 140

    7.13 Best Practice ....................................................................................................................... 141

    7.14 Summary of Projects ........................................................................................................... 142

    Project Identification & Costing................................................................................................. 142

    Existing Institutional Framework for Development ..........................................144

    8.1 Urban Local Body Structure ................................................................................................ 144

    8.2 Town and Country Planning Department ........................................................................... 145

    8.3 Development Authority ...................................................................................................... 145

    8.4 Public Health Engineering Department .............................................................................. 146

    8.5 Madhya Pradesh Housing and Infrastructure Board .......................................................... 146

    8.6 Madhya Pradesh Pollution Control Board .......................................................................... 146

    8.7 Role of Private Sector in Infrastructure Service Provision .................................................. 147

    8.8 Issues................................................................................................................................... 147

    8.9 City Specific Strategies and Action Plan .............................................................................. 147

    INVESTMENT PLAN AND FINANCING STRATEGIES ...........................................149

    9.1 Revenue Account ................................................................................................................ 149

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida vi

    9.1.1 Key Assumptions ......................................................................................................... 149

    9.1.2 Non Tax Sources.......................................................................................................... 149

    9.2 Revenue Income ................................................................................................................. 149

    9.3 Growth in Income ............................................................................................................... 150

    9.4 Observations ....................................................................................................................... 151

    9.5 Revenue Expenditure .......................................................................................................... 151

    9.6 Capital Account ................................................................................................................... 151

    9.6.1 Capital Income ............................................................................................................ 151

    9.6.2 Capital Expenditure ..................................................................................................... 152

    9.7 Key financial Indicators ....................................................................................................... 153

    9.7.1 Revenue Indicators ..................................................................................................... 153

    9.7.2 Expenditure Indicators ................................................................................................ 153

    9.8 Income, Expenditure and Surplus Deficit: Analysis ............................................................ 153

    9.8.1 Financial Status at a glance ......................................................................................... 153

    9.9 Key issues and Conclusion .................................................................................................. 154

    9.10 City Specific Strategies and Action Plan .............................................................................. 155

    INVESTMENT PRIORITISATION PLAN .............................................................157

    10.1 Project Identification .......................................................................................................... 157

    10.1.1 Physical Infrastructure ................................................................................................ 157

    10.1.2 Social Infrastructure .................................................................................................... 159

    10.1.3 Tourism ....................................................................................................................... 159

    10.2 Basis for project identification: ........................................................................................... 159

    10.3 Projects for system and infrastructure Augmentation ....................................................... 160

    10.4 Projects for System and Infrastructure Refurbishment ...................................................... 160

    10.5 Sector Wise Project Identification and Costing .................................................................. 161

    10.5.1 Physical Infrastructure ................................................................................................ 161

    10.5.2 Urban Poor .................................................................................................................. 164

    10.5.3 Social Infrastructure .................................................................................................... 165

    10.5.4 Tourism ....................................................................................................................... 165

    10.5.5 Other Components ..................................................................................................... 166

    10.5.6 Urban Reforms & Capacity Building ........................................................................... 166

    10.5.7 Sectorwise Total Cost .................................................................................................. 167

    10.6 City Investment Plan ........................................................................................................... 167

    10.6.1 City Investment Plan for 2012- 2015 (Phase I) ........................................................... 167

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida vii

    10.6.2 City Investment Plan for 2016- 2020 (Phase II) .......................................................... 169

    10.6.3 City Investment Plan for 2021- 2025 (Phase III) ......................................................... 170

    10.6.4 City Investment Plan for 2026- 2030 (Phase IV) ......................................................... 171

    10.6.5 City Investment Plan for 2031- 2035 (Phase V) .......................................................... 171

    10.6.6 Financing plan: ............................................................................................................ 172

    URBAN REFORMS ....................................................................................180

    11.1 Background ......................................................................................................................... 180

    11.2 Objectives of reforms ......................................................................................................... 180

    11.3 Need for reform initiatives ................................................................................................. 180

    11.4 Structure of reforms ........................................................................................................... 181

    11.5 MANDATORY REFORMS ...................................................................................................... 181

    11.6 OPTIONAL REFORMS (State and ULB/Para-statal level) ..................................................... 182

    11.7 Status of Mandatory & optional Reforms........................................................................... 184

    11.8 Issues................................................................................................................................... 184

    11.9 Town Specific Strategies and Action Plan ........................................................................... 184

    TOWN VISION ........................................................................................186

    12.1 Summary of Sectoral Strategies .......................................................................................... 186

    12.2 Town Vision......................................................................................................................... 196

    12.3 Town Positioning ................................................................................................................ 197

    Annexure

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida viii

    LIST OF TABLES

    Table 2-1 Study Area ............................................................................................................................. 25

    Table 2-2 Average Annual Rainfall in Mauganj ..................................................................................... 26

    Table 3-1 Comparative Assessment of Urban Population .................................................................... 29

    Table 3-2 Population Growth Trends .................................................................................................... 29

    Table 3-3 Population Density Trend ..................................................................................................... 30

    Table 3-4 Demographics of the Town ................................................................................................... 31

    Table 3-5 Trend of Population in Mauganj Town ................................................................................. 33

    Table 3-6 Population Projections: Arithmetic Progression Method ..................................................... 33

    Table 3-7 Calculation of Population Projection .................................................................................... 34

    Table 3-8 Population Projection: Geometric Progression Method ...................................................... 34

    Table 3-9 Calculation of Population Projection Incremental Increase Method ................................ 34

    Table 3-10 Population Projection: Incremental Increase Method ....................................................... 35

    Table 3-11 Comparative Assessment of Urban SC & ST Population ..................................................... 35

    Table 3-12 Comparative Assessment of Literacy Rate ......................................................................... 36

    Table 3-13 Comparative Assessment of Sex Ratio................................................................................ 38

    Table 3-14 Ward Wise Comparative Assessment of Sex Ratio - Mauganj............................................ 39

    Table 4-1 Comparative Assessment of Household Size ........................................................................ 41

    Table 4-2 Comparative Assessment of WFPR ....................................................................................... 42

    Table 4-3 Ward Wise Comparative Assessment of WFPR & Work Force Distribution ......................... 43

    Table 4-4 Comparative Assessment of Non-Working Population ........................................................ 43

    Table 4-5 Ward Wise Comparative Assessment of Dependent Population & Dependency Ratio ....... 44

    Table 4-6 List of important industries in Rewa District and its surrounding Districts ......................... 44

    Table 4-7 List of Important Centers/Spots for Tourists at Town and Regional Level ........................... 46

    Table 5-1 Ward wise Distribution of Population Density in Mauganj .................................................. 51

    Table 5-2 Land-use Distribution - Mauganj .......................................................................................... 52

    Table 5-3 Comparative Assessment of Household Size ........................................................................ 53

    Table 5-4 Housing Demand ................................................................................................................... 56

    Table 5-5 Housing Gap .......................................................................................................................... 57

    Table 5-4 Slum areas ............................................................................................................................. 57

    Table 6-1 Main sources of water supply in Mauganj town .................................................................. 61

    Table 6-2 Salient Features of Water Supply System in Mauganj .......................................................... 62

    Table 6-3 Type and number of public water connections .................................................................... 64

    Table 6-4 Present and future demand & supply gaps of water supply ................................................ 64

    Table 6-5 Gap Assessment and Future Requirement/Demand ............................................................ 64

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida ix

    Table 6-6 Performance Indicators ........................................................................................................ 65

    Table 6-7 Goals & Services Outcomes for different Horizon Years ...................................................... 66

    Table 6-8 Existing scenario of Sewerage and Sanitation ...................................................................... 71

    Table 6-9 Demand and Supply Gaps of Household Toilets ................................................................... 73

    Table 6-10 Municipal Solid waste Generation, Mauganj ...................................................................... 82

    Table 6-11 Ward wise Collection and Disposal of Solid Waste ............................................................ 84

    Table 6-12 Estimation of waste Generation ......................................................................................... 85

    Table 6-13 List of Major Water Bodies and Drains ............................................................................... 89

    Table 6-14 Present and Future Demand and Supply Gaps for Drainage System ................................. 89

    Table 6-15 Goals & Services Outcomes for Different Horizon Years .................................................... 90

    Table 6-16 Types of Roads and Lengths in Mauganj Town .................................................................. 94

    Table 6-17 Space Standards of Roads ................................................................................................... 96

    Table 6-18 Desirable of Footpaths ........................................................................................................ 96

    Table 6-19 Goals & Services Outcomes for Different Horizon Years .................................................... 97

    Table 6-20 Street Lighting in Mauganj Nagar Parishad ........................................................................ 99

    Table 6-21 Ward wise distribution of different type of lights, Mauganj ............................................ 100

    Table 6-22 Future Requirement of Man Power for Fire Fighting ....................................................... 101

    Table 6-23 Performance Indicators regarding Street Lighting ........................................................... 101

    Table 6-24 Sources of Lighting in Town at Household Level in Mauganj ........................................... 102

    Table 6-25 Type of Cooking Fuel Used at Household Level in Mauganj ............................................. 102

    Table 6-26 Goals & Services Outcomes for Different Horizon Years .................................................. 103

    Table 6-27 Slums in Mauganj .............................................................................................................. 104

    Table 6-28 Ward Wise Distribution of Slum and BPL Population ....................................................... 105

    Table 6-29 Present and Future Demand of Housing .......................................................................... 108

    Table 6-30 Planning Norms and Standards for future provision of Health Infrastructure ............. 112

    Table 6-31 Government Educational Institutions,Mauganj ............................................................ 113

    Table 6-32 Comparative Assessment of Literacy Rate ....................................................................... 114

    Table 6-33 Ward Wise Comparative Assessment of Literacy Rate - Mauganj ................................... 114

    Table 6-34 Comparative Analysis with UDPFI Guidelines Social Infrastructure .............................. 116

    Table 6-35 Present and Future Demand and Supply Gap Social Infrastructure .............................. 117

    Table 6-36 List of Important Centers/Spots for Tourists at Town and Regional Level ....................... 125

    Table 7-1 Assessment of tourist destination in & around the city ..................................................... 134

    Table 7-2 Key Concern Areas and related issues ................................................................................ 136

    Table 8-1 Powers and Functions of Mauganj Nagar Parishad ............................................................ 144

    Table 9-1 Year wise Income from Various Sources ............................................................................ 152

    Table 9-2 Year wise Expenditure of Mauganj Nagar Parishad ............................................................ 152

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida x

    Table 9-3 Income and Expenditure Status of MNP ............................................................................. 154

    Table 10-1 Proposed work, Project cost and Implementing Agencies for Water Supply ................... 161

    Table 10-2 Proposed Project, Project Cost and Implementing Agencies for Sewerage and Sanitation ............................................................................................................................................................ 162

    Table 10-3 Proposed Project, Project Cost and Implementing Agencies for Solid Waste Management ............................................................................................................................................................ 162

    Table 10-4 Proposed Project, Project Cost and Implementing Agencies for Storm Water Drainage 163

    Table 10-5 Proposed Project, Project Cost and Implementing Agencies for Traffic and Transportation ............................................................................................................................................................ 164

    Table 10-6 Proposed Project, Project Cost and Implementing Agencies for Street Lighting and Fire Fighting ............................................................................................................................................... 164

    Table 10-7 Proposed Project, Project Cost and Implementing Agencies for Urban Poor .................. 164

    Table 10-8 Proposed Project, Project Cost and Implementing Agencies for Health Facilities ........... 165

    Table 10-9 Proposed Project, Project Cost and Implementing Agencies for Education Facilities ...... 165

    Table 10-10 Proposed Project, Project Cost and Implementing Agencies for Tourism ..................... 165

    Table 10-11 Proposed Project, Project Cost and Implementing Agencies for Other Development works................................................................................................................................................... 166

    Table 10-12 Proposed Project, Project Cost and Implementing Agencies for Urban Reforms and Capacity Buildings ............................................................................................................................... 166

    Table 10-13 Sector wise Proposed Project and their Cost ................................................................. 167

    Table 10-14 Sector wise Project cost and Yearly Schedule of Expenditure (Phase I) ......................... 167

    Table 10-15 Sector wise Project cost and Yearly Schedule of Expenditure (Phase II) ........................ 169

    Table 10-16 Sector wise Project cost and Yearly Schedule of Expenditure (Phase III) ....................... 170

    Table 10-17 Sector wise Project cost and Yearly Schedule of Expenditure (Phase IV) ...................... 171

    Table 10-18 Sector wise Project cost and Yearly Schedule of Expenditure (Phase V) ....................... 171

    Table 10-19: Overall financing plan of investment plans: ............................................................... 176

    Table 10-20 Revenue Collection from 2008-2035 at Normal Growth rate of 14% ............................ 178

    Table 10-21 Revenue Collection from 2008-2035 at Performing Growth rate of 14% ...................... 178

    LIST OF FIGURES

    Figure1.1 Kick-off workshops at Mauganj Nagar Parishad ................................................................... 13

    Figure 1.2: Specific Objectives of CDP .................................................................................................. 14

    Figure1.3: Stage 1: Inception ................................................................................................................ 16

    file:///H:\CDP%20nitish%20Final\Mauganj\final%20Mauganj_Draft%20Report%20_edited_AH_20_11_2012.docx%23_Toc341190188file:///H:\CDP%20nitish%20Final\Mauganj\final%20Mauganj_Draft%20Report%20_edited_AH_20_11_2012.docx%23_Toc341190189file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc375294659

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida xi

    Figure 1.4: Stage 2: Sector Assessment and City Profile ...................................................................... 17

    Figure 1.5: Stage 3: City Vision and Development Objectives .............................................................. 18

    Figure 1.6: Stage 4: Draft CDP............................................................................................................... 19

    Figure 1.7: Schematic Diagram for Methodology of City Development Plan Preparation ................... 20

    Figure 4.1 Major Market and Whole Sale Trading Area ....................................................................... 46

    Figure 6.1 Typical rapid sand filter water treatment with components .............................................. 70

    Figure 6.2 Office of the Mahila Milan is on top of the constructed toilet block under the program .. 74

    Figure 6.3 Root zone Treatment Plant .................................................................................................. 76

    Figure 6.4 Main DEWATS modules for physical and biological wastewater treatment ....................... 78

    Figure 6.5 Use of the biogas generated from the DEWATS .................................................................. 79

    Figure 6.6 Pour flush single pit and twin pit toilet................................................................................ 80

    Figure 6.7 Schematic diagram of Septic Tank ....................................................................................... 81

    Figure 7.1 Rani Gujra Talab ................................................................................................................ 132

    Figure 7.2 Bahuti water fall................................................................................................................. 133

    Figure 7.3 Rewa Fort ........................................................................................................................... 133

    Figure 7.4 Museum in Rewa Fort ........................................................................................................ 133

    Figure 7.5 Pili Kothi ............................................................................................................................. 134

    Figure 7.6 Major Tourist circuits around the Mauganj city ................................................................ 138

    Figure 8.1 Involvements of Different Stakeholders in the Consultation Process ............................... 160

    LIST OF MAPS

    Map 2-1 Site Location Mauganj ............................................................................................................ 23

    Map 2-2 Regional Connectivity - Mauganj, M.P. .................................................................................. 24

    Map 2-3 Study Area Mauganj Nagar Parishad ................................................................................... 25

    Map 3-1 Ward Wise Population Density .............................................................................................. 32

    Map 3-2 Ward Wise Literacy Rate ........................................................................................................ 37

    file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc375294668file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc375294675file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc375294676file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc375294677file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc375294678file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc375294679file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc374629160file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc374629161file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc374629162file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc374629163file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc374629164

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida xii

    Map 3-3 Ward Wise Sex Ratio .............................................................................................................. 38

    Map 5-1 Mauganj Urban Growth Scenario ........................................................................................... 50

    Map 5-2 Existing Landuse Map ............................................................................................................. 52

    Map 5-3 Mauganj: Future Growth Possibilities .................................................................................... 58

    Map 6-1 Existing and Proposed Water Supply Network ...................................................................... 62

    Map 6-2 Existing and Proposed Transport Network ............................................................................ 93

    Map 6-3 Location of Urban Poor in the Town .................................................................................... 106

    Map 6-4 Existing and Proposed Social Infrastructure ........................................................................ 112

    Map 6-5 Proposed Tourism Circuit at Regional Level ......................................................................... 128

    file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc374629165file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc374629166file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc374629167file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc374629168file:///F:\DMG%20Consulting\CDP%20of%207%20towns\Final%20Reports\Mauganj\Mauganj.docx%23_Toc374629172

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida 1

    Executive Summary

    Introduction

    Government of India (GoI) and Government of Madhya Pradesh (GoMP) have made several initiatives through various programmes to meet the growing demands of infrastructure and service delivery. Subsequently, the GoI and GoMPexecuted various program such as City Development (a) Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT), (b) Integrated Housing and Slum Development Programme (IHSDP), (c) the GoMP initiated DFID funded MPUSP, which links reform with investment in infrastructure for the poor, etc. Other than this, there are several programmes that have been initiated by the GoI and GoMP.

    This is the Phase-II assignment of GoMP where they are preparing City Development plans (CDP) for

    258 towns. In the phase-I stage they already done CDPs for 258 towns. In this Phase DMG Consulting

    Pvt. Ltd did CDPs for 7 towns out of the 258 towns.

    Based on this programme, GoMP launched Mukhyamantri Sahari Adhusanrachna Bikas Yojana,

    which is going to be, funded all the projects proposed in the CDPs to the respective ULB.

    Objectives and scope of the Assignment

    The objective of the assignment is to prepare a City Development plan (CDP) with the vision of a desired future perspective for the city and formulate a strategic framework and interventions through sectoral plans translated into actions that define on how the ULB, together with other stakeholders, intends to work towards achieving their long-term vision in the next five years. The above foremost objective is to achieve and translate into developmental outputs in the form of projects, programme and implementation process which intend to cover the following:

    The CDP will scale up existing urban development and poverty alleviation schemes within a comprehensive and coherent strategic planning framework in order to ensure optimal benefit from available resources for the citizens of the Urban Local Body.

    The CDP should aim to catalyze new thinking and provoke debate through a consultative stakeholder driven process and vision.

    Strategic thrusts of the CDP will be built around the lessons and findings of a comprehensive and rigorous stakeholder consultation and documentation process.

    It is expected that the CDP will serve the requirements of the UIDSSMT and IHSDP programmes as well as JNNURM and other development schemes.

    The CDP will generate specific priority actions and projects that can be the basis for mobilizing funding from diverse sources.

    The scope of work include: (a) Inception Report covering Current status, systems and procedures, reconnaissance and kick off workshop, b) Sector Analysis Report on the economic opportunity and potential for local/regional economic development with special reference to the poor, transport study with emphasis on low cost public transport and livelihoods, heritage conservation and tourism, environmental sustainability, access to housing, employment and social and environmental services by the poor, health and education services gap in the town, sectoral issues addressed under the Master Plan . C) City Profile covering assessment of the existing situation in all the sectors identified, emerging issues, SWOT analysis and projection of the present gaps and future requirements. This

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida 2

    will be done within the framework of parameters relating to demography, economic base, finance, physical and environmental issues, infrastructure, institutions and universalisation of services especially for the poor, d) Evolving City Objectives and formulate sectoral strategies based on the stakeholders consultation f) Development strategy and Action Plan g) Evaluation of Sectoral vision and Action Plan in consultation with the stakeholders h) Analysis of Governance Framework & Reform Action Plans, i) Preparation of a City Investment Plan (CIP) and a Financing Strategy (Financial Operating Plan).

    The Draft Final Report provided (a) Introduction including scope of work, methodology adopted and consultation process of Stakeholders in project identification process b) Physical feature of the town contains location, physiographic and landform, municipal area and planning area c) Demographic profile including population projection along with other demographic indicators d) Socio - Economic profile of the town including sex ratio, literacy, WFPR, industrial activities, trade and commerce, tourism and issues, e) Physical planning and Growth management including spatial distribution, growth trends, municipal wards, status of housing and demand, study of Master Plan provisions, future growth possibilities f) status of Infrastructure including water supply, Sewerage and Sanitation, Solid waste management, Drainage and flooding, Traffic and transportation, Street lighting and Fire fighting, BPL population and Slum population, Social Infrastructure, status of Environment, tourism and Heritage conservation g) Existing Institutional framework h) current status of municipal accounting system and financial management system, Investment Plan and Financing Strategies for revenue account, income, capital expenditure, key issues i) Investment Prioritization plan including sector wise project identification and costing, Investment plan and financial plan, j) Urban Reforms, strategy and action plan k) City Vision.

    Physical Features of the Town

    Mauganj is a small town in district of Rewa in Madhya Pradesh. Is the main town of the Mauganj mandal. It is located at a 40 km distance from the Main City Rewa in District. It is located 482 km distance from its State Main City Bhopal. Mauganj has a good connectivity with the adjoining areas. The town covers an area of 46.3 Sq. Kms. which accommodates a population of 26,411 (2011 Census). The town consists of 15 wards. Most of the population is concentrated along the national highway 7 which passes from the middle of the town.

    The terrain of the region is typified as plain to gently sloping towards north. The medium deep black soil is intensively cultivated and is highly productive. Mauganj is located at the altitude of 313 m above the mean sea level. The climate of the area is relatively moderate. During the winter season the temperature falls down to as low as 15.5 degree Celsius. In summer, temperature rises to 42 degree during the month of May and June. The average rainfall varies between 100 cm to 150 cm.

    Demographic profile of the town

    As per, the census 2011, the population of Mauganj town was 26,411 persons. The town has witnessed a steady decrease in the growth rates in population since 1981 to 2011. The reduced growth rates in population can be attributed to the slowdown in the local economy, lack of infrastructure and employment in the town. The maximum decadal growth of the town was recorded 1981-91 at 41% which has declined to around 19% in 2001-2011 decade. As per the Census 2011, the gross population density in Mauganj was 570 persons per sq.km (5.7 ppH), which has increased from 497 (4.97 PPH) in 1991. Ward number 1,2,3,5,6,7,11,12 have maximum concentration of people while other wards have mostly vacant agricultural land.

    Population projection

    The design population for the next 25 years have been forecasted for Mauganj. Decadal Growth trends and the guidelines detailed out in CPHEEO Manual have also been considered. Thus the

  • City Development Plan, Mauganj, M.P.

    DMG Consulting Pvt. Ltd., Noida 3

    population has been taken as calculated by Incremental increase method which is much close to being realistic. It is estimated to 36618 populations by the end of the year 2035.

    Socio - Economic profile of the town

    To assess the socio-economic profile of the project cities, understand the profile of the residents, their access to services and their priorities for improvement of the existing infrastructure etc, a diagnostic study is required to be carried out.

    As of 2001 the sex - ratio of Mauganj was 938 females/1000 males which is higher than average of Madhya Pradesh (920) and India (933)

    As of 2011 the Literacy rate in Mauganj was 61.43 per cent (male literacy rate of 69.69 per cent and female literacy rate of 52.61 per cent) which seem to be much lower than the national average for urban India for the year 2001.

    The total number of Household is 4102 as per the 2001 census. The average household size in Mauganj works out to be 5.6, which is almost at par with the average household size of the state.

    As per 2001 census, the Mauganj Nagar Parishad has low Work Force Participation Rate (WFPR), is recorded at 32.27% indicating high dependency ratio, while the National Urban average accounts for 32.25%.

    Industrial Growth Pattern and Potential

    The Mauganj town has no major industries within its vicinity; however there are industrial units within the Rewa District and in surrounding districts which provides direct and indirect employment to resident of the town apart from Small Scale Household Industries within town.

    Trade and commerce

    The town is a major centre for the wholesale trade for the nearby villages, as much as 50% of the working population is involved in the tertiary sector. Mauganj town has small scale market for the local requirement. The economy of the city is predominantly ago-based and with production based in the surrounding hinterland. Town doesnt have any grain market; hence people have to go in another town to sell their produce. Most of the commercial activities are centrally located along the highway. The products sold in the informal markets are vegetables, fruits, cloths, and garments, hardware and grocery items. The overall economy of the town is highly localised economy. The economy is confined to only low economic activities of the hinterland which is primarily agrarian.

    Physical planning and Growth management

    The Mauganj town exhibits a linear settlement pattern with majority of the houses located along the national highway 7 Naigarhi road and Belaha road suggesting ribbon development pattern. About 70% of the land is undeveloped and only 30% of the land is used for settlements purposes. Most of the settlements are located in ward number 1, 2,3,5,6,7,11 and 12. Other wards are very scantily populated. Major developments have taken place in the areas along the road in form of mixed land-use congested unplanned developments, which constitutes about 85% of the developed area. The percentage of commercial activity is miniscule, which is less than 1% and most of the developed area is occupied by houses, roads and water bodies.

    Housing: As stated before there is a higher population density along road in the centre of the town. Outer parts of the towns are sparsely populated relative to the inner town. In the town out of the total number of houses more than 31% are permanent in nature, 69% acco