Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 1 of 92
City Development Plan for Bhedaghat Town
CHAPTER 1: PROJECT INTRODUCTION ............................................................................................ 15 1.1 Project Award and Introduction of Client ............................................................ ............................................15 1.2 Project Brief, Scope & Objectives .................................................................... .................................................16 1.3 Methodology .......................................................................................... ..........................................................16 1.4 Structure of the Report ................................................................................................................................. ...20
CHAPTER 2: PHYSICAL FEATURES OF THE TOWN ....................................................................... 21
2.1 GENERAL CITY PROFILE ............................................................................. ................................................... ........21 2.1.1 Historical Importance ..................... ................................................... ................................................... ............. 21 2.1.2 Jabalpur District Profile ................. ................................................... ................................................... .............. 21 2.1.3 Location and connectivity ................ ................................................... ................................................... .......... 22 2.1.4 Climate & Rainfall ....................... ................................................... ................................................... ................ 22 2.1.5 Topography and Geology .................... ................................................... ................................................... ........ 22 2.1.6 Wind Direction ............................ ................................................... ................................................... ................ 23 2.1.7 Base Map........................................... ................................................... ................................................... .......... 23
CHAPTER 3: DEMOGRAPHIC & SOCIO-ECONOMIC PROFILE ..................................................... 24
3.1 Demography ....................................................................................... ................................................... ..............24 3.1.1 Population Growth Trend ..................... ................................................... ................................................... ........ 24 3.1.2 Population Projections ...................... ................................................... ................................................... ............ 24 3.1.3 Population Density .......................... ................................................... ................................................... .............. 25 3.1.4 Average household Size ...................... ................................................... ................................................... .......... 25 3.1.5 Other Demographic Indicators .............. ................................................... ................................................... ...... 25
3.2: SOCIO ECONOMIC PROFILE .......................................................................... .......................................................25 3.2.1 Sex Ratio ......................................... ................................................... ................................................... ......... 25 3.2.2 Literacy Rate ............................ ................................................... ................................................... ................... 25 3.2.3 Work Participation Ratio (WPR) ............ ................................................... ................................................... ...... 26 3.2.4 Occupation Structure ........................ ................................................... ................................................... ............ 26 3.2.5 Economic Base ............................... ................................................... ................................................... ............... 27
CHAPTER 4: PHYSICAL PLANNING AND GROWTH MANAGEMENT ......................................... 28 4.1 Spatial Growth Trends ............................................................................ .............................................................28 4.2 Spatial Distribution of Population .................................................................................................................. ......28 4.3 Land use.......................................................................................... ................................................... ..................28 4.4 Master plan Provision ............................................................................ ................................................... ...........29 Highlights of the Master Plan: .......................................................................................................................... .........30 4.5 Housing ............................................................................................................................................. ...................31 4.6 Housing in Bhedaghat ............................................................................. .............................................................31 4.7 Housing demand for the year 2035 ................................................................. ................................................... ..31
CHAPTER 5: TOWN INFRASTRUCTURE ............................................................................................ 32
5.1 Water Supply ..................................................................................... ................................................... ...............32 5.1.1 Quality and Quantity of Water at Source ..... ................................................... ................................................... 32 5.1.2 Quality and Quantity of Water in distribution System ........................................... ............................................ 33 5.1.3 Water Distribution Arrangement..................... ................................................... ........................................... 33
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 2 of 92
City Development Plan for Bhedaghat Town
5.1.3 Internal Distribution Networks .................... ................................................... ............................................... 33 5.1.4 Coverage & Supply ................................. ................................................... ................................................... .. 34 5.1.5 Institutional Set-up .............................. ................................................... ................................................... .... 35 5.1.6 Operation & Maintenance (O&M) ..................... ................................................... ......................................... 35 5.1.7 Present and Future Demand and Supply Gaps ......... ................................................... .................................. 36 5.1.8 Water Supply Project .............................. ................................................... ................................................... . 36 5.1.9 Comparative Analysis (Service Levels) ............. ................................................... ........................................... 36 5.1.10 SWOT Analysis ..................................... ................................................... .................................................. 37 5.1.11 Key Issues ........................................ ................................................... ................................................... .... 37 5.1.12 City specific Strategies and Action Plans ......... ................................................... ....................................... 38
5.2 Sewerage System ................................... ................................................... .......................................................39 5.2.1 Existing Sewerage System........................... ................................................... ................................................ 39 5.2.2 Household Latrines .................... ................................................... ................................................... .............. 39
5.3 Existing Sanitation System .......................................................................................................................... .........40 5.3.1 Public Toilets .................................... ................................................... ................................................... ........ 40 5.3.2 Present, Future Demand and Supply Gaps ............ ................................................... ..................................... 40 5.3.3 Sanitation Projects ............................... ................................................... ................................................... .... 40 5.3.4 Comparative Analysis with the UDPFI, CPHEEO Guidelines ............................................... ........................... 40 5.3.5 SWOT Analysis ..................................... ................................................... ................................................... .... 41 5.3.6 Key Issues ........................................ ................................................... ................................................... ......... 41 5.3.7 City specific Strategies and Action Plans ......... ................................................... ........................................... 41
5.4 Solid Waste Management .............................................................................................................................. ......42 5.4.1 Quantity of Waste Generated ....................... ................................................... ............................................. 42 5.4.2 Constituents of Municipal Waste ................... ................................................... ............................................ 42 5.4.3 Current practices of Solid Waste Management........ ................................................... .................................. 42 5.4.4 Segregation & Storage of Solid Waste .............. ................................................... .......................................... 43 5.4.5 Primary and Secondary Collection .................. ................................................... ............................................ 43 5.4.6 Processing & Disposal of Waste..................... ................................................... ............................................. 43 5.4.7 Vehicles for Solid Waste collection and Transportat ion ............................................... ................................. 43 5.4.8 Institutional Set-up .............................. ................................................... ................................................... .... 44 5.4.9 Estimation of Waste Collection .................... ................................................... .............................................. 44 5.4.10 Comparative Analysis with Guidelines .............. ................................................... ..................................... 44 5.4.11 SWOT Analysis ..................................... ................................................... .................................................. 44 5.4.12 Key Issues ........................................ ................................................... ................................................... .... 45 5.4.13 City specific Strategies and Action Plans ......... ................................................... ....................................... 45
5.5 Drainage System ......................................................................................................................................... ......46 5.5.1 Existing Drainage System .................... ................................................... ................................................... .......... 46 5.5.2 Tertiary Drains ............................. ................................................... ................................................... .................. 46 5.5.3 Flood-prone Areas or Environmentally Sensitive Areas ........................................... ........................................... 46 5.5.4 Present and Future Demand and Supply Gaps ... ................................................... ............................................. 47 5.5.5 SWOT Analysis................................ ................................................... ................................................... ............... 47 5.5.6 City specific Strategies and Action Plan .... ................................................... ................................................... .... 47
5.6 Traffic & Transport .............................................................................. ................................................... ..............48 5.6.1 Existing Traffic & Transportation Scenario .. ................................................... ................................................... .. 48 5.6.2 Travel Characteristics............................. ................................................... ................................................... .. 48 Road Network ...................................... ................................................... ................................................... .................. 49 5.6.3 Intermediate Public Transport System .............. ................................................... ......................................... 49 5.6.4 Parking Review .................................... ................................................... ................................................... .... 49
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 3 of 92
City Development Plan for Bhedaghat Town
5.6.5 SWOT Analysis ..................................... ................................................... ................................................... .... 49 5.6.6 Service Adequacy and Key Issues ................... ................................................... ............................................ 49 5.6.7 City specific Strategies and Action Plan .......... ................................................... ............................................ 50
5.7 Street lighting & fire fighting ......................................................................................................................... ...51 5.7.1 Existing Situation of Street Lights .............. ................................................... ................................................ 51 5.7.2 Fire Services ..................................... ................................................... ................................................... ........ 51 5.7.3 Present and Future Demand and Supply Gaps ......... ................................................... .................................. 51 5.7.4 SWOT Analysis ..................................... ................................................... ................................................... .... 51 5.7.5 City specific Strategies and Action Plan .......... ................................................... ............................................ 51
5.8 Urban Poor and Their Accessibility to Basic Services ................................................. .......................................52 5.8.1 Introduction .............................. ................................................... ................................................... .................. 52 5.8.2 Poverty in the Town ............................... ................................................... ................................................... .. 52 5.8.3 Information pertaining to BPL Population and Slum P opulation ......................................... ......................... 52 5.8.4 Present and Future Housing Demand ................. ................................................... ........................................ 53 5.8.5 SWOT Analysis ..................................... ................................................... ................................................... .... 53 5.8.6 Issues ............................................ ................................................... ................................................... ........... 53 5.8.7 City specific Strategies and Action Plans ......... ................................................... ........................................... 54
5.9 Social infrastructure ................................................................................................................................... ......54 5.9.1 Educational Facilities .................... ................................................... ................................................... ............... 54 5.9.2 Health Facilities.................................. ................................................... ................................................... ...... 55 5.9.3 Socio-Cultural Facilities ......................... ................................................... ................................................... ... 56 5.9.4 Recreation/ Leisure/ Parks and Play Grounds ....... ................................................... ..................................... 56 5.9.5 Markets ........................................... ................................................... ................................................... ......... 56 5.9.6 Crematoria & Burial Grounds ....................... ................................................... .............................................. 56 5.9.7 City specific Strategies and Action Plans ......... ................................................... ........................................... 57
CHAPTER 6 INSTITUTIONAL FRAMEWORK .............................................................................. 58
CHAPTER 7 MUNICIPAL FINANCE ....................................................................................................... 60 7. Present Scenario .................................................................................. ................................................... ...............60 7.1 Revenue and Capital Accounts: .................................................................... ................................................... .....60 7.1.1 Financial status: .............................................................................. ................................................... ...............60 7.1.2 Composition of own revenue and expenditure: .................................................... ............................................61
CHAPTER 8 CAPITAL INVESTMENT PLAN (CIP) & FINANCIAL OPERATING PLAN (FOP) 62
8.1 City Investment Plan - Introduction .............................................................. .......................................................62 8.1.1 Water Supply System (WS) .................... ................................................... ................................................... ....... 62 8.1.2 Sewerage .................................... ................................................... ................................................... ................... 63 8.1.3 Storm Water Drains (SWD) .................... ................................................... ................................................... ....... 64 8.1.4 Solid Waste Management (SWM) ................ ................................................... ................................................... . 64 8.1.5 Sanitation .................................. ................................................... ................................................... .................... 65 8.1.6 Traffic & Transportation (T&T) .............. ................................................... ................................................... ........ 66 8.1.7 Electricity and Street Lighting ............. ................................................... ................................................... .......... 67 8.1.8 Urban Poor .................................. ................................................... ................................................... .................. 67 8.1.9 Environmentally Sensitive Areas ............. ................................................... ................................................... ...... 68 8.1.10 Urban Governance ........................... ................................................... ................................................... ........... 68 8.1.11 Social Infrastructure ...................... ................................................... ................................................... .............. 68
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 4 of 92
City Development Plan for Bhedaghat Town
8.2 FINANCIAL OPERATING PLAN (FOP) - Introduction: .............................................................................................70 8.2.1 Objective and Methodology: .................. ................................................... ................................................... ...... 70 8.2.2 Assumptions and Reforms ..................... ................................................... ................................................... ....... 71 8.2.2.2 Municipal Taxes: .................................................. ................................................... ......................................... 71 8.2.2.3 Non-Tax Sources .................................................. ................................................... .......................................... 73 8.2.2.4 New O&M Cost .................................................. ................................................... ............................................ 73
CHAPTER 9: URBAN REFORMS ............................................................................................................ 77
CHAPTER 10: SUMMARY OF WORKSHOP PROCEEDINGS.......................................................... 80 10.1 Purpose and Importance of the workshop .......................................................... ...............................................80 10.2 Stakeholder Identification ...................................................................... ................................................... ........80 10.3 Preparation of handouts and questionnaires ...................................................... ...............................................81 10.4 District level Workshop/Meeting at District Head Quarters (Jabalpur). .............................................................81 10.5 Extended Discussion with Deputy Director ........................................................................................................82
10.6 Town level Workshop/Meeting at Town Level: ...................................................... ............................................82 10.6.1 Preparation for the workshop................ ................................................... ................................................... ..... 82 10.6.2 Presentation on Town profile and discussion with participants ................................. ...................................... 83 10.6.3 Summary of the Sector Analysis ............. ................................................... ................................................... .... 83 10.6.4 Workshop Summary ........................... ................................................... ................................................... ........ 85 10.6.5 Photographs taken during the workshop ...... ................................................... ................................................ 86
CHAPTER 11: CITY VISION .................................................................................................................... 87 11.1 Public Opinion on Existing Infrastructure Facilities and Services in Bhedaghat ..................................................87 11.2 Public opinion on prioritizing the proposed list of developments ......................................................................88 11.3 Planning, developing and managing urban growth in Municipal area ................................................................89 11.4 Sectoral strategy framework ........................................................................................................................ ......89 11.5 Conclusion: Brief strategies, actions and projects for the city ............................................................................91
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 5 of 92
City Development Plan for Bhedaghat Town
LIST OF TABLES
TABLE 2.1 : DETAILS OF URBAN SETTLEMENTS IN JABALPUR DISTRICT-2001 ................................... ............................... 22 TABLE 3.1 DECADAL GROWTH RATE OF THE TOWN.......... ................................................... ............................................ 24 TABLE 3.2: POPULATION PROJECTION OF THE TOWN ........................................................ ............................................. 24
Table 3.3: POPULATION, AREA & DENSITY DETAILS OF THE TOWN………………………….………………………………………………… 25
Table 3.4: CATEGORY-WISE WORKFORCE…………………………………………… ……………………………………………………………………….26
TABLE 4.1: WARD-WISE DETAILS OF THE TOWN ......... ................................................... ................................................. 2 8 TABLE 4.2: UDPFI STANDARDS FOR LAND USE .......... ................................................... ................................................... 29 TABLE 4. 3: LAND USE BREAKUP ..................... ................................................... ................................................... ........... 29 TABLE 4. 4: DETAILS OF HOUSES, HOUSEHOLDS AND HOUSEHOLDS SIZE OF BHEDAGHAT ........................... .................. 31 TABLE 4. 5: HOUSING DEMAND FOR THE YEAR 2035 ...... ................................................... .............................................. 31 TABLE 5.1: DETAILS OF WATER SOURCE & SYSTEM ...... ................................................... ................................................ 32 TABLE 5.2: DETAILS OF ELSR IN BHEDAGHAT .......... ................................................... ................................................... .. 33 TABLE 5.3: DETAILS OF THE DISTRIBUTION SYSTEM .... ................................................... ................................................. 3 3 TABLE 5.4: DETAILS OF WATER SUPPLY CONNECTION IN BHEDAGHAT TOWN ..................................... .......................... 34 TABLE 5.5 : DETAILS OF WATER CONNECTIONS IN BHEDAGHAT ................................................ ..................................... 34 TABLE 5.6 : DOMESTIC WATER SUPPLY DETAILS IN BHEDAGHAT – 2011 ........................................ ................................. 34 TABLE 5.7: DETAILS OF WATER CHARGES IN BHEDAGHAT – 2011 ............................................. ..................................... 36 TABLE 5.8: WATER DEMAND ASSESSMENT – 2035 ........ ................................................... .............................................. 36 TABLE 5.9: SERVICE LEVELS IN BHEDAGHAT ........... ................................................... ................................................... ... 37 TABLE 5.10: DETAILS INDICATING THE EXISTING SANITATION FACILITIES, 2001 .............................. ............................... 39 TABLE 5.11 : DETAILS INDICATING THE EXISTING SANITATION FACILITIES ................................... ................................... 39 TABLE 5.12 : DETAILS OF PUBLIC CONVENIENCE FACILITIES ................................................ ............................................ 40 TABLE 5.13 : DEMAND ASSESSMENT – 2035 ............. ................................................... ................................................... . 40 TABLE 5.14 : SERVICE LEVELS IN BHEDAGHAT .......... ................................................... ................................................... .. 40 TABLE 5.15 : SOLID WASTE DETAILS IN BHEDAGHAT – 2011 ................................................. ........................................... 42 TABLE 5.16 : SOLID WASTE TRANSPORT AND DISPOSAL ARRANGEMENTS ......................................... ............................. 43 TABLE 5.17 : STAFF FOR SOLID WASTE MANAGEMENT IN BHEDAGHAT ........................................... ............................... 44 TABLE 5.18 : DETAILS OF CURRENT SERVICE LEVELS .... ................................................... ................................................. 4 4 TABLE 5.19 : DETAILS INDICATING THE EXISTING DRAINAGE CONNECTIONS .................................... .............................. 46 TABLE 5.20 : DEMAND AND SUPPLY GAPS FOR SWD SYSTEM.................................................... ...................................... 47 TABLE 5.21 : ROAD SURFACE DETAILS ................. ................................................... ................................................... ....... 48 TABLE 5.22 : DETAILS OF STREET LIGHTING IN BHEDAGHAT ................................................. ........................................... 51 TABLE 5.23 : WARD WISE BPL & SLUM DETAILS ......... ................................................... ................................................... 52 TABLE 5.24 : SLUM MATRIX WITH REFERENCE TO INFRASTRUCTURE COVERED .................................... ......................... 53 TABLE 5.25 : DETAILS OF THE EDUCATIONAL INSTITUTIONS IN BHEDAGHAT .................................... .............................. 54 TABLE 5.26 : DETAILS OF MEDICAL FACILITIES IN BHEDA GHAT .............................................. .......................................... 55 TABLE 5.27 : DETAILS OF FUTURE DEMAND FOR THE MEDICAL FACILITIES ..................................... ................................ 55 TABLE 5.28 : DETAILS OF FUTURE DEMAND FOR SOCIO-CULTURAL FACILITIES .................................. ............................. 56 TABLE 8.1: INVESTMENT REQUIREMENTS FOR WATER SUPPLY SECTOR .......................................... .............................. 62 TABLE 8.2: INVESTMENT REQUIREMENTS FOR SEWERAGE SECTOR .............................................. ................................. 63 TABLE 8.3: INVESTMENT REQUIREMENTS FOR STORM WATER DRAINS SECTOR .................................... ....................... 64 TABLE 8.4: INVESTMENT REQUIREMENTS FOR SOLID WASTE MANAGEMENT SECTOR ................................ ................. 64 TABLE 8.5 : INVESTMENT REQUIREMENTS FOR SANITATION SECTOR ............................................ ................................. 65 TABLE 8.6 : INVESTMENT REQUIREMENTS FOR TRAFFIC & TRANSPORTATION ..................................... .......................... 66 TABLE 8.7: INVESTMENT REQUIREMENTS FOR STREET LIGHTING ............................................. .................................... 67 TABLE 8.8: INVESTMENT REQUIREMENTS FOR URBAN POOR .................................................. ...................................... 68 TABLE 8.9: INVESTMENT REQUIREMENTS FOR ENVIRONMENTALLY SENSITIVE AREAS .............................. .................... 68 TABLE 8.10 : INVESTMENT REQUIREMENTS FOR SOCIAL INFRASTRUCTURE FACILITIES ............................ ...................... 69 TABLE 8.11 : SUMMARY OF PROPOSED INVESTMENTS ...... ................................................... ........................................... 69 TABLE 10.1 : SUMMARY/FINDINGS OF THE SECTOR WISE ANALYSIS AND TOWN PROFILE OF BHEDAGHAT .............. .... 83 TABLE 11.1 : SHOWS THE PRIORITIZATION FOR VARIOUS DEVELOPMENTS. ...................................... ............................. 88
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 6 of 92
City Development Plan for Bhedaghat Town
List of Maps
MAP 1.1 Base map
MAP 2.1 Density map
MAP 4.1 Landuse map
MAP 4.2 Future growth map
MAP 5.1 Existing water supply system of Bhedaghat
MAP 5.2 Existing solid waste disposal location map
MAP 5.3 Drainage network Map
MAP 5.4 Environmental Sensitive Areas
MAP 5.5 Road network in Bhedaghat
MAP 5.6 Location of Slums
List of Annexures
ANNEXURE - I FOP
ANNEXURE - II Proposed Landuse Map
ANNEXURE - III Proposed Water Supply Network Map
ANNEXURE - IV Proposed Sewerage System Map(DEWATS)
ANNEXURE – V Proposed Solid waste Disposal Map
ANNEXURE – VI Proposed Road Network Map
EXECUTIVE SUMMARY
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 7 of 92
City Development Plan for Bhedaghat Town
Executive Summary
I. Overview
The Jawaharlal Nehru National Urban Renewal Mission (JnNURM) is an ambitious programme of the
Government of India to bring about improvements in the existing urban service levels and urban
infrastructure in a financially sustainable manner. The primary objective of the programme is to create
economically productive, efficient, equitable and responsive cities. The projects that qualify under this
scheme include sub-sectors of water supply, sewerage and sanitation, drainage, solid waste management,
traffic and transportation facilities, housing infrastructure and basic services for urban poor. Further, special
projects including urban transit systems, urban expressways, sea-links and other sectors of similar nature
would also be covered under this scheme. In order to access funds through the mission, the state
government and the cities seeking assistance require to sign-up to a set of reforms covering various areas of
urban management and good governance.
The City Development Plan (CDP) shall provide a comprehensive long term strategy (Vision 2035) as well as
a City Investment Plan (CIP), based on which the concerned ULB's can approach and be eligible to the
funding under GoI /GoMP schemes along with their own and other sources of finances based on priority
actions and projects identified in the CDP. The document shall also provide Financial Operating Plan (FOP) to
direct the ULBs for mobilizing various financial resources to implement the identified priority projects. The
scope of the services include all necessary steps formulated in JnNURM Toolkit 2, that would help to prepare
the CDP, such as Data Collection & Field Visits, Municipal Staff & all Stakeholders consultative meetings,
Sector Analysis, organizing necessary workshops for the successful completion of the CDP. The specific
objectives of the project are as follows;
• CDP would scale up existing urban development and poverty alleviation schemes within a
comprehensive and coherent strategic planning framework, in order to ensure optimal benefit from
available resources to the citizens of the ULBs.
• CDP would aim to catalyze new thinking and provoke debate through a consultative stakeholder
driven process. The vision and strategic thrusts of the CDP would be built around the lessons and
findings of a comprehensive and rigorous stakeholder consultation and documentation process.
• It is expected that the CDP would serve the purpose and meet the requirements of UIDSSMT and
IHSDP programmes as well as JnNURM and other development schemes.
• The CDP will generate specific priority actions and projects that can be the basis, for mobilizing
funds from diversified sources.
Government of Madhya Pradesh has taken up a huge task of preparation of CDPs for 293 towns and the
consultancy of preparation of reports has been awarded to various consultants and the Bhedaghat is one of
the towns out of the 7 towns assigned to Aarvee Associates.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 8 of 92
City Development Plan for Bhedaghat Town
II. Town Profile
Bhedaghat town is situated on the Eastern bank of the holy river Narmada. During all times in its history,
Bhedaghat formed a part of the adjoining regions viz. Tripuri during the ancient period, Garha during the
medieval times and Jabalpur after territory came within the control of Marathas and the British. As such,
during the respective periods, history of Bhedaghat coincided with the history of the territory concerned. As
a part of the settlement of Tripuri from proto-history to 14th Century A.D., Bhedaghat passed through the
chalcolithic age, age of the Epics and Puranas, the Mauryan age, age of the city-state, age of the Sungas,
the Kanvas, the Dattas, the Satavahanas, the Bodhis, the Senas, the shaka kshatrapas, the Guptas and their
feudatories and finally the mighty Kalachuri rulers of Tripuri. Archaeological remains of some of these ages
have been found at Bhedaghat.
During the medieval times, as a part of the Garha-Mandla Kingdom, Bhedaghat witnessed the rule of Gond
rulers for a period of 344 years from the rise of Kharji in 1440 A.D to arrest of Narhari Shah in 1784 A.D.
Thereafter during the Maratha rule, it was said that the village Bhedaghat was donated by Raghuji Bhonsala
to Mahant Hardeo Puri Gosain. Subsequently the village became a part of the British territory during whose
regime too the disciples of Hardeo puri continued to hold the village as a free grant for perpetuity subject to
the payment of a quitrent of Rs 5. It’s most famous sights are the Dhuandhar Falls, Marble Rocks and the
Chausath Yogini temple.
Bhedaghat is a town with Nagar Parishad status in Jabalpur district in the state of Madhya Pradesh, India.
Geographically, it lies between 23°08′N 79°48′E Latitude,23.13°N 79.80°E Longitude. Bhedaghat is located
at 25 km from Jabalpur and 5 km eastern side on the National Highway 12A leading towards Bhopal-
Jabalpur. Due to meeting of 2 or more rivers, the name Bhed (two) Ghat – Bhedaghat has locally derived.
Due to physical barriers such as Narmada River on south east and hill area on north, the town is
predominantly developed in ribbon pattern along the main road connecting NH 12 A and Nagpur By-pass,
which is passing through the town.
The urban form of the town is predominantly guided by tourism spots and agriculture hinter land. The
overall development resembles completed development.
III. Infrastructure Assessment
� Water Supply
Bhedaghat is mainly dependent on Tube well source for water supply. At present there are 9 Tube wells in
the town which draws about 4.6 Lakh Liters per day. Direct pumping is in practice for storage and
distribution of water supply. Water is supplied through tankers to the areas where water supply is scarce
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 9 of 92
City Development Plan for Bhedaghat Town
and areas not covered with distribution network. Currently the demand for water in Bhedaghat is
approximately 0.89 MLD. The present per capita water supply is 70 LPCD.
� Sewerage
Bhedaghat lacks adequate sanitary facilities. Only 25.16 % of Households have Access to Household
Latrines. Six out of ten houses have no latrine facilities indicating open defecation in the town. 2001 census
indicates that 3.43 per cent of the census houses resort to pit latrine, a practice that has almost become
defunct in the modern cities. However, about 12.89 per cent of the households have water closets. As per
the discussions with the Nagar Parishad officials, as per 2011, there are 20% of households with no latrine
facilities (Open defecation).
� Solid Waste Management
As per the Nagar Parishad officials, approximately 2 tons of waste is collected per day which indicates a
collection performance of 80 per cent. Door-to-door collection is not practiced in the town. As per the Nagar
Parishad officials dumping is done in panchavati (ward 1), balpara (Ward 6) and chakital (ward 8).
� Storm Water Drains
The total length of tertiary drains as per available data is 2.5 km. Out of this, Pucca drains length is 1.5 km
and remaining 1 km length is kutcha in nature. The total drain length accounts to 10 per cent of total road
length.
� Traffic & Transportation
Bhedaghat is well accessed by road. Bhedaghat is located at 25 km from Jabalpur and 5 km eastern side on
the National Highway 12A leading towards Bhopal- Jabalpur. The total road length in Bhedaghat is 24.6 km
out of which 24.6 km is maintained by the Nagar Parishad. Around 19 percent of the roads laid by cement
concrete. The share of WBM roads is 47 per cent and remaining 34 per cent are earthen roads.
The mobility needs of the town are largely catered by mini buses and standard buses including the IPT
mode such as auto rickshaws & jeeps. Bhedaghat town is well connected by rail and air connectivity with
the nearest airport located in Jabalpur, which is at a distance of 25 km from the town. There is one
organized off street parking facilities nearby Dhundhara water falls.
� Street Lighting
In Bhedaghat there are about 416 street lights with different types of electrical fixtures. The average spacing
of street light poles ranges between 50 m to 60 m, as against the norm of 30 m indicating gross inadequacy
of the system. However, this condition is not uniform.
� Urban Poor
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 10 of 92
City Development Plan for Bhedaghat Town
As per discussions with the Nagar Parishad - Bhedaghat, the slum population in the town stands at 2,244,
which accounts to 33.6 per cent of the total population and total slum households are 449, which accounts
to 20.0 per cent of total households.
� Social Infrastructure Facilities
The town has one government hospital and three clinics are providing health services. There are 4 primary
schools in the town. In addition to the primary schools, there are 2 other schools that are catering to the
needs of secondary education and senior secondary education. There are 2 parks in ward 1 and 4, one play
ground in ward 3. It is observed that there is a deficiency in recreational facilities in the town.
There is a weekly market in Bhedaghat town, which is located in ward 4, near municipal office in the town.
This market primarily caters the daily needs of the population of the town. The market functions for 1 day in
a week. About 150 people visit the market on a regular week day. There are 3 burial grounds in the town,
which are primarily serving the needs of Hindu and Muslim religions.
IV. Documentation of Consultative Workshops
� Kick-off Workshop
In the initial (Kick-off Meeting) stage, Project Consultants, M/s
Aarvee associates architects engineers and consultant’s pvt ltd.,
team comprising of Mr. K. Jagadeesh, Mr. B.NeelaKantam Raju, Mr.
Raghu ram, Ms. Sukeerthi and Mr. Ravi Teja visited Jabalpur on 21st
Nov, 2011 and held discussions with Dy. Director, Urban
Development Department at Jabalpur divisional office. On behalf of
the Divisional Commissioner, Jabalpur, Dy. Director, Urban
Development Department, Jabalpur Division chaired the start-up meeting and addressed the Presidents and
CMO’s of all 7 project towns.
Further, consultant’s team visited the Bhedaghat town on
29/11/2011 and conducted “a one day kick-off” meeting
at Nagar Parishad Office. The President, Chief Municipal
Officer (CMO), ULB Officials and other Ward Parishads were
present in the workshop. Consultants briefed about the
project objectives and importance to the stakeholders.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 11 of 92
City Development Plan for Bhedaghat Town
� 2nd Stage Workshop at state & ULB level
In the 2nd Workshop stage, M/s Aarvee associates architects
engineers and consultants pvt ltd representatives, Mr. K.
Jagadeesh, Mr.Raghu ram and Mr.Vishwanath, Urban and
Regional planner, visited Jabalpur on 13th April, 2012 and held
initial discussions with Director, Urban Development Department
at Jabalpur Divisional Office. Shri Gulshan Bamra, Collector,
Jabalpur District has reviewed the progress of the CDP work and Chaired the meeting, addressed the CMO’s
and representatives of all 7 project towns. Detailed deliberations were made with Shri. Rajeev Nigam, Dy.
Director, urban development. He emphasized on;
• Provision of Water Supply, Sanitation and Solid Waste Management,
• Relocation of slums
• Imparting training on folk art and folk culture to the slum dwellers
• Inculcate Social Awareness
• Provision of a buffer zone (Urban Forest) along the river bed
The 2nd stage town level workshop was organized by
Aarvee associates Pvt. Ltd with the co-operation of Chief
Municipal Officer (CMO) Bhedaghat and active participation
of Municipal staff. The information on conducting the
workshop was passed onto Nagar Parishad well in advance
so as to involve as many as identified stakeholders to
participate in the workshop. Workshop on CDP was held at
Bhedaghat Nagar Parishad on 20th of April 2012. The purpose of the workshop was to involve
stakeholders and facilitate in the discussions, record the Comments & obtain suggestions so as to
incorporate them into the plan preparation of CDP.
Summary of workshops
On the whole, there was very good response from all the stakeholders and the major proposals for the
development of Bhedaghat Town are expressed below:
• Provision of potable drinking water
• Improve and increase the capacity of Water Treatment Plant
• Provide better Drainage Network/DEWATS system.
• Provision of root-zone treatment method to recycle the waste water
• Provide better public transportation system
• Provision of Bus stand/bus shelters along the proposed by-pass
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 12 of 92
City Development Plan for Bhedaghat Town
• Improvements to the Solid Waste Management practices like implementation of Door-to-
door collection system.
• Provision of recreational facilities like parks, playgrounds, community halls.
• Provision of women and child healthcare facilities.
• Provision of Diploma/ITI institutions for better employment oppurtunities to youth.
• Provision of agro-based industries like warehouses and cold storages.
• Provision of basic services with Inclusive Planning.
� 3rd Stage Workshop at ULB level
The 3rd stage/final town level workshop was organized by Aarvee
associates Pvt. Ltd with due consultations with Chief Municipal
Officer (CMO) Bhedaghat and active participation of Municipal staff.
The information on conducting the workshop was passed onto
Nagar Parishad well in advance so as to involve as many as
identified stakeholders to participate in the workshop. Workshop on
CDP was held at Bhedaghat Nagar Parishad on 24th of December
2012. The purpose of the workshop was to deliberate on the City
Investment Plan and Financial Operation Plan. Total investment for the Bhedaghat town is estimated to the
tune of about Rs. 30.37 crores by the end of the plan period 2035. All the major proposals are incorporated
as suggested in the earlier workshop held at Bhedaghat town. The stakeholders have readily accepted the
investment plan as well financial operation plan and have expressed their willingness to pay the taxes as per
the Financial Operating Plan.
The sizable investment (49% of the total investment) is worked
out for traffic and transportation sector proposals followed by
urban poor sector. As of now water supply system is quite
sufficient in the town and needs the improvement of pipeline
system at un-served areas. Provision of bus stand, bus shelters,
bye-pass road, additional dust bins & vehicles and landfill site area
and other social infrastructure facilities like parks, play grounds
and community halls are covered in the investment plan.
V. Vision statement
Promoting Bhedaghat, known for its rich natural resource “Marble Rocks” with enchanting beauty of
glittering Dhuandhar falls, as a “Ultimate Tourist Destination” in Jabalpur Region facilitating
adequate Physical and Social infrastructure including augmentation of accommodation.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 13 of 92
City Development Plan for Bhedaghat Town
VI. Investment Plan
The summery of Sector wise Investment Required for Implementation of Proposed Projects are as follows;
Sector wise Summery of Investments
Total Amount (lakhs)
Phase 1 Phase 2 Phase 3
2012-2015 2015-2025 2025-2035
Water Supply (WS) 215.55 132.75 48.15 34.65
Sewerage 53.40 18.60 23.20 11.60
Sanitation 61.00 61.00 0 0
Solid Waste Management (SWM) 90.05 73.44 14.41 2.20
Storm Water Drains (SWD) 225.50 158.63 46.25 20.63
Traffic & Transportation (TT) 1486.35 196.60 627.25 662.50
Street Lighting (SL) 316.05 138.96 57.21 119.88
Social Infrastructure (SI) 155.00 65.00 71.25 18.75
Environment 10.00 10.00 0 0
Urban Governance 10.00 10.00 0 0
Urban Poor (UP) 415.00 115.00 112.50 187.50
Grand Total 3037.9 979.98 1000.22 1057.71
VII. Urban Reforms
S.N
o Mandatory Reforms
Reforms Status
at ULB Remarks Target
1
Adoption of the modern
accrual-based double entry system of accounting in ULBs
and Parastatal agencies
Yet to be Implemented
System was not implemented
due to lack of awareness,
professional manpower and software
procurement/equipment. Keen to adopt the system.
October, 2013
2
Introduction of a system of E-governance using IT applications such as GIS & MIS
etc.
Yet to be Initiated
System was not implemented
due to lack of funds, except few stand-alone desktop machines being used for
accounting purpose. Keen to adopt the system with
additional funds availability.
March, 2014
3 Reform of Property Tax with GIS applications
Yet to be Initiated
GIS Mapping for utilities need
to be done for effective
collection.
July, 2013
4
Levy of reasonable User Charges by ULBs with the
objective that the full cost of O&M is collected within the
next 5 years.
Partially achieved,
except water and consolidated taxes
Collecting water tariff from
household level and collection efficiency is about 60%. UGD
taxes are nil due to absence
of system and street lighting tax is minimal.
2016-17
(UGD
system may not
be considered
due to proposal of
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 14 of 92
City Development Plan for Bhedaghat Town
DEWATS)
5
Internal earmarking within
local body budget for basic
services to urban poor.
Yet to be Considered
As of now, ULB is not able to spend any amount for urban
poor sector. Specific allocations have not been
made in the budget for urban poor.
2014-2015
6
Provision of basic services to Urban Poor including security
of tenure at affordable prices, improving housing and
infrastructure facilities
Partially Initiated
ULB has issued few "Pattas"
to slum dwellers in the past years
2013-2014
S.No Optional Reforms
Reforms Status
at ULB Remarks Target
1
Revision of bye-laws to streamline the approval
process for construction of buildings, development of site
etc
Yet to be Initiated Possible with the directives of
State level stance.
These
Reforms are
targeted for
implementation
simultane
ously with the
implementation of
Mandatory
reforms
2 Conversion of land from agriculture to non-agriculture
Yet to be Initiated Possible with the directives of State level stance.
3 Introduction of property title
certification system in ULB Yet to be Initiated
Possible with the directives of
State level stance.
4
20-25% of land earmarking for EWS & LIG category with
a system of cross subsidization
Yet to be Initiated Possible with the directives of
State level stance.
5
Revision of byelaws to make
rainwater harvesting mandatory in all buildings
Yet to be Initiated Possible with the directives of
State level stance.
6 Bye-laws for re-use of
recycled water Yet to be Initiated
Possible with the directives of
State level stance.
7 Encouraging PPP models Yet to be Initiated Possible with the directives of
State level stance.
PROJECT INTRODUCTION
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 15 of 92
City Development Plan for Bhedaghat Town
CHAPTER 1: PROJECT INTRODUCTION
1.1 Project Award and Introduction of Client
The Urbanization in Madhya Pradesh is at a faster rate, due to which Urban Local Bodies of the state are
experiencing hard challenges to facilitate the requirements of the growing population with limited technical
and financial resources. GoI as well as GoMP have initiated a number of programmes/schemes to meet the
growing demands of infrastructure and service delivery. The list of GoI schemes include: Urban
Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) and Integrated Housing and
Slum Development Programme (IHSDP). On the other hand GoMP has initiated DFID funded MPUSP, which
links reforms with investment in infrastructure for the poor. In addition to the above there are several other
programmes that have been initiated by the GoI and GOMP.
Preparation of the CDP will take advantage of the Revised CDP preparation toolkit/Heritage cities toolkit
prepared by GoI under JNNURM and UADD/CMAMP guidelines. These toolkits shall provide guidance to the
formulation of a CDP based on the concept of a consultative strategic planning process.
Focus areas: Government of Madhya Pradesh is planning to improve the water supply system of the towns
by upgrading the prevailing systems. Hence, this CDP shall be focusing on water supply sector as one of the
key area in a comprehensive manner. The revenue generation (revenue from ULBs own sources specially
property tax etc.) and strategies for the enhancement of the same shall also be incorporated in the CDP.
Currently planning is only a discretionary function of ULBs in MP and there is a general lack of planning
culture even in the larger Corporations. The CDP's of four cities of MP (Bhopal, Indore, Jabalpur, Ujjain),
included in JNNURM have been already prepared, along with the CDP's of 96 ULBs in the State. The lessons
learnt from these exercises need to be incorporated into the proposed CDPs. The CDP will be linked to the
overall spatial planning, policy framework of Master Plan and more importantly into the annual municipal
budgeting. Linking the investment plan of the CDP with the municipal budgets will be crucial in ensuring the
O&M and thus sustainability of the infrastructure assets created.
Preparation of the CDP shall include city development strategies, which are out comes of a structured
consultative process. The process will enable elected representatives, key staff of MC departments,
parastatal agencies and other institutions, policy makers and the citizens to participate and plan for spatial,
social and economic development of the concern cities. A City Development Plan (CDP) will present both a
vision of a desired future perspective for the city and the ULB’s strategic framework of sectoral plans
translated into actions that define on how the ULB, together with other stakeholders, intends to work
towards achieving their long-term vision for the next five years.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 16 of 92
City Development Plan for Bhedaghat Town
This project of “preparing the City Development Plan (CDP)” for Bhedaghat Parishad Area, Madhya
Pradesh has been entrusted to Aarvee Associates Architects Engineers & Consultants Pvt. Ltd
(Consultant) ,Hyderabad. The work is assigned through Commissioner, Urban Administration and
Development Department, Government of Madhya Pradesh (Client). The aim of this exercise is to
support various Cities/Urban Local Bodies of Madhya Pradesh with a comprehensive City Development Plan
(CDP) for their long term vision.
1.2 Project Brief, Scope & Objectives
The CDP shall provide a comprehensive long term strategy (Vision 2035) as well as a City Investment Plan
(CIP), based on which the concerned ULB's can approach and be eligible to the funding under GoI /GoMP
schemes along with their own and other sources of finances based on priority actions and projects identified
in the CDP. The document shall also provide Financial Operating Plan (FOP) to direct the ULBs for mobilizing
various financial resources to implement the identified priority projects. The scope of the services include all
necessary steps formulated in JNNURM Toolkit 2, that would help to prepare the CDP, such as Data
Collection & Field Visits, Municipal Staff & all Stakeholders consultative meetings, Sector Analysis, organizing
necessary workshops for the successful completion of the CDP. The specific objectives of the project are as
follows;
• CDP would scale up existing urban development and poverty alleviation schemes within a
comprehensive and coherent strategic planning framework, in order to ensure optimal benefit from
available resources to the citizens of the ULBs.
• CDP would aim to catalyze new thinking and provoke debate through a consultative stakeholder
driven process. The vision and strategic thrusts of the CDP would be built around the lessons and
findings of a comprehensive and rigorous stakeholder consultation and documentation process.
• It is expected that the CDP would serve the purpose and meet the requirements of UIDSSMT and
IHSDP programmes as well as JNNURM and other development schemes.
• The CDP will generate specific priority actions and projects that can be the basis, for mobilizing
funds from diversified sources.
1.3 Methodology
The CDP is prepared through a participatory process, wherein the various stakeholders, citizens and the
concerned authorities play a major role in the formation of the vision for the future development of the city.
The planning process therefore has to be a consultative one, with stakeholders representing a varied
spectrum of qualification taking part in the discussions and dialogue leading to the formulation of a vision,
development of objectives, identification of priority sectors and projects. CDP is prepared as a multistage
exercise, mainly with the following Stages;
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 17 of 92
City Development Plan for Bhedaghat Town
Stage 1: Mobilization and Inception
The Consultants with ULB support would organize a one day kick-off workshop to familiarize the
stakeholders with the purpose, process, and expected outcomes of the CDP and build confidence,
understanding and commitment to the CDP. The kick off workshop will help in deriving a consensus along
with the stakeholders firming the process and agreeing upon a structured programme to take the CDP
forward.
Stage 2: Assessment of Existing Situation
In this stage, interaction with various stakeholder groups (meetings, workshops, focus group discussions,
etc.) and review relevant publications, reports, GOs, resolutions, procedures, laws etc. to analyze the current
situation in each of the sector identified. In-depth analysis of the existing situation, covering the
demographic profile, economic profile, urban governance, Physical & Social infrastructure facilities, and
environmental aspects. Gap analysis and future needs will be calculated/identified at every sector level.
Stage 3: Development of City Vision and Sector Goals and Strategies
Based on the cities present scenario and SWOT analysis, the future city vision statement will be formulated.
Discussion will be initiated on strategies, priorities and major actions that may be required in the next five
years to move towards the vision 2035. To achieve the city vision, it is imperative to identify the necessary
goals and strategies for each sector.
Stage 4: Development of Strategies and Priority Actions
The strategies will be evaluated from the perspective of stakeholder’s contribution in achieving the vision
and sector goals. Criteria will be developed for prioritizing the strategies, programmes and projects in
consultation with the Steering Group. The priority actions will support the strategies to achieve the sector
goals.
Stage 5: Preparation of City Investment Plan (CIP) and Financial Operating Plan (FOP)
City Investment Plan (CIP) and Financial Operating Plan (FOP) are the key components in the entire process
of City Development Plan (CDP). Based on the availability of resources, logical sequencing of actions and
potential for immediate implementation, the Consultants will prepare a City Investment Plan (CIP) in
consultation with ULB that lays out the cost and revenue estimates of all priority projects in the next five
years. The preparation of the CIP is a reiterative process requiring adjustments to individual projects as well
as changes in scheduling to make the whole package work financially. The City Investment plan would be
supported with a Financial Operating Plan (FOP).
Stage 6: Draft City Development Plan (CDP)
The Draft CDP includes City Investment Plan (CIP), Financial Operating Plan (FOP), duly considering the
feedback from all the stakeholders and working groups.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 18 of 92
City Development Plan for Bhedaghat Town
Stage 7: Final CDP Document
The final CDP document incorporating the feedback from the workshop and the inputs received at the 2nd
Stage State Level discussion.
In all the above stages, the consultations with all the Stakeholders and working groups will be made
extensively. The following Methodology is adopted for entire process of City Development Plan (CDP) for
Bhedaghat Nagar Parishad.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 19 of 92
City Development Plan for Bhedaghat Town
Fig 1.1 Methodology Followed for the CDP
Stage 1: Mobilisation and Inception Kick-off Workshop with officials of Municipality.
and other key parastatal agencies ,
Data needs and requirements. Reconnaissance visit of project area.
Stage 2: Assessment of Existing Situation
Sector Analysis
City Profile.
1st Stage District Level
1st Stage State Level
Presentation
2nd Workshop to Prioritize Sector Strategies &
Proposals
Stage 3: City Vision and Sector Goals and Strategies
Sector Strategies Vision, Goal and Strategies
Stage 4: Strategies and Priority Actions
Evaluation of Strategies
Reform Action Plans
Stage 5: City Investment Plan (CIP) and FOP
Project Costing and Funding Sources Scheduling Priority Actions and CIP
FOP to Support CIP
Stage 6: Draft CDP including CIP & FOP
Performance Monitoring indicators etc.,
Workshops to Finalize Draft CDP
3rd Workshop to Finalise Draft CDP
2nd Stage District Level Presentation to finalise Draft
2nd Stage State Level Presentation to finalise
Draft CDP
Stage 7: Final CDP including CIP & FOP
Performance Monitoring indicators and Council
Resolution
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 20 of 92
City Development Plan for Bhedaghat Town
1.4 Structure of the Report
Chapter 1: Introduction: Detailed description of Project background and Methodology adopted for the
entire City Development Plan (CDP) process.
Chapter 2, 3 & 4: City Profile: It includes City Profile, Physical features, Demography details, Socio-
Economic details and Housing scenario.
Chapter 5: City Infrastructure: This chapter deals with Physical and Social Infrastructure analysis, demand-
gap analysis, formation of goals, strategies and action plans for respective sectors, SWOT analysis
Chapter 6: Institutional Framework
Chapter 7: Municipal Finance: deals with Income and Expenditure analysis
Chapter 8: Capital Investment Plan: Detailed and summary of Sector wise Investment Required for
Implemetation of Proposed Projects and Financial Operating Plan
Chapter 9: Urban Reforms: status of Mandatory and optional reforms at both ULB and State level
Chapter 10: Summary of Workshop Proceedings
Chapter 11: City Vision: Provide the city vision along with the consolidated sector strategies
PHYSICAL FEATURES OF
THE TOWN
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 21 of 92
City Development Plan for Bhedaghat Town
CHAPTER 2: PHYSICAL FEATURES OF THE TOWN
2.1 GENERAL CITY PROFILE
2.1.1 Historical Importance
Bhedaghat town is situated on the Eastern bank of the holy river Narmada. During all times in its history,
Bhedaghat formed a part of the adjoining regions viz. Tripuri during the ancient period, Garha during the
medieval times and Jabalpur after territory came within the control of Marathas and the British. As such,
during the respective periods, history of Bhedaghat coincided with the history of the territory concerned. As
a part of the settlement of Tripuri from proto-history to 14th Century A.D., Bhedaghat passed through the
chalcolithic age, age of the Epics and Puranas, the Mauryan age, age of the city-state, age of the Sungas,
the Kanvas, the Dattas, the Satavahanas, the Bodhis, the Senas, the shaka kshatrapas, the Guptas and their
feudatories and finally the mighty Kalachuri rulers of Tripuri. Archaeological remains of some of these ages
have been found at Bhedaghat.
Bhedaghat town was constituted in the year 2001. During the medieval times, as a part of the Garha-Mandla
Kingdom, Bhedaghat witnessed the rule of Gond rulers for a period of 344 years from the rise of Kharji in
1440 A.D to arrest of Narhari Shah in 1784 A.D. Thereafter during the Maratha rule, it was said that the
village Bhedaghat was donated by Raghuji Bhonsala to Mahant Hardeo Puri Gosain. Subsequently the village
became a part of the British territory during whose regime too the disciples of Hardeo puri continued to hold
the village as a free grant for perpetuity subject to the payment of a quitrent of Rs 5. It’s most famous
sights are the Duandhar Falls, Marble Rocks and the Chausath Yogini temple.
2.1.2 Jabalpur District Profile
Jabalpur District in Madhya Pradesh state lies in central India and Jabalpur city serves as the administrative
headquarters of the district. The District extends in an area of 10,160 sq.km. Geographically the district is
part of the Mahakoshal region of Madhya Pradesh.
Jabalpur district is bordered by Katni in the north side, Umaria in the North-East direction, Dindori in the
East, Mandla in the South-East side, Seoni in the South, Narsimhapur in the South-West and Damoh in the
north-west direction. The holy Narmada River is the main water source for the district. There are 17 urban
centers in the district, out of which Class VI, V & III consisting of 2 towns in each of the category. Jabalpur
city is categorized under Class I with corporation status, one under Class II and other towns as IV. Majority
of the towns are categorized as Class IV towns. The details are as shown in the following table. Among all
the urban centers, Jabalpur City holds the highest urban population followed by Sihora and Panagar.
Bhedaghat town placed at 16th position in the entire district with Nagar Parishad status.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 22 of 92
City Development Plan for Bhedaghat Town
Table 2.1 : Details of Urban Settlements in Jabalpur District-2001
Source: Census of India, 2011
2.1.3 Location and connectivity
Bhedaghat is a town with Nagar Parishad status in Jabalpur district in the state of Madhya Pradesh, India.
Geographically, it lies between 23°08′N 79°48′E Latitude,23.13°N 79.80°E Longitude. Bhedaghat is located
at 25 km from Jabalpur and 5 km eastern side on the National Highway 12A leading towards Bhopal-
Jabalpur. Due to meeting of 2 or more rivers, the name Bhed (two) Ghat – Bhedaghat has locally derived.
2.1.4 Climate & Rainfall
The climate of the town is pleasant and healthy. It is generally dry except in the monsoon. The temperature
of Bhedaghat varies from 19o C to 31o C. the average rain fall is approximately 1253.7 m.
2.1.5 Topography and Geology
Bhedaghat town is encircled by hills. The red color soil can be seen and shows presence of laterite in the
town. The slope of the town is towards South-East direction.
Name of the
Town
Class of
Town
Civic
Status Area
2001
population
2011
population
Decennial
growth rate
Density
(per sq.km
1 Barela IV NP 9.89 10,880 12,620 15.99 1,276
2 Bhedaghat VI NP 2.37 1,840 6,657 261.79 2,809
3 Bilpura IV CT 2.56 11,819 14,349 21.41 5,605
4 G.C.F. Jabalpur IV CT 7.00 15,283 9,285 -39.25 1,326
5 Jabalpur I M. Corp. 134.94 956,107 1,069,292 11.84 7,924
6 Jabalpur Cantt. II CB 28.49 66,499 72,261 8.66 2,536
7 Katangi IV NP 12.37 17,062 19,040 11.59 1,539
8 Majholi IV NP 6.29 11,318 13,210 16.72 2,100
9 Manegoan V CT 1.89 9,167 12,599 37.44 6,666
10 O.F. Khamaria IV CT 19.93 14,539 9,839 -32.33 494
11 Panagar III M 10.26 25,199 27,932 10.85 2,722
12 Patan IV NP 13.03 13,213 14,324 8.41 1,099
13 Pipariya VI CT 3.97 4,483 5,084 13.41 1,281
14 Shahpura IV NP 6.66 11,958 13,601 13.74 2,042
15 Sihora III M 23.67 37,870 44,048 16.31 1,861
16 Suhagi V CT 2.61 8,145 14,787 81.55 5,666
17 Vehicle Fac. Area J IV CT 3.76 11,958 8,087 -32.37 2,151
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 23 of 92
City Development Plan for Bhedaghat Town
2.1.6 Wind Direction
Winds are controlled by the shifting of pressure belts. They are predominantly from South-West during the
monsoon. In the post monsoon and winter, the wind flow towards south and south-east side. In the
monsoon season, the velocity of wind speed range is 40 km to 50 km per hour.
Figure 2.1 Location Map of Bhedaghat Town
2.1.7 Base Map
The scaled Base Map is not available for Bhedaghat Nagar Parishad. However, a guide map with all the
roads and ward boundaries was acquired from the Nagar Parishad. Taking this map as reference, scaled
Base Map has been prepared using Google satellite imageries. The Preliminary Base map thus Prepared is
shown in Map No.2.1.
DEMOGRAPHIC & SOCIO-
ECONOMIC PROFILE
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 24 of 92
City Development Plan for Bhedaghat Town
CHAPTER 3: DEMOGRAPHIC & SOCIO-ECONOMIC PROFILE
3.1 Demography
Bhedaghat Town is constituted in the year 1995, with an area of 16.33 Sq. kms and it comprises of 6
villages such as Bhedaghat, Bhadapur, Gopalpur, Lahmetaghat, Dalpathpur and Chekethal.
3.1.1 Population Growth Trend
As per 2011 Census (provisional Figures), the total population of Bhedaghat Nagar Parishad is about 6,657.
From the year 2001 to 2011, the growth rate of the town is 22.7%. The following table indicates the
population and growth rate details;
Table 3.1 Decadal Growth Rate of the Town
S.No Year Population Decadal Growth rate (%)
1 2001 5,423 -
2 2011 6,657 22.7
Source: Census of India, 2011
3.1.2 Population Projections
Factors such as growing importance of the town in the region, cultural growth pattern, In-migration,
upcoming new developments were studied for finalizing the future population. Hence, the projections are
made considering different categories like
1. Decadal Growth rate
2. In-migration (plotted development)
Table 3.2: Population Projection of the Town
Sl. No. Methods 2011 2015 2025 2035
1 Arithmetic Increase method 6657 7154 8771 11138
2 Geometric increase method 6657 7058 8446 10605
3 Incremental increase method 6657 7524 9141 11508
The above projected population figures indicate that the population by all methods except Arithmetic
Increase method is above the average growth rate of Bhedaghat and looks on Higher side. So, from the past
population growth trend it is appropriate to consider Arithmetic Increase method as appropriate, figuring to
population of 11,138.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 25 of 92
City Development Plan for Bhedaghat Town
3.1.3 Population Density
As per Census of India, 2011 the population of Bhedaghat Nagar Parishad is about 6,657 and the total
extent of the town is 237 Ha. The gross density of the city is gradually increasing from 2001 to 2011. The
current gross density of the town is 28 persons per Hectare.
Table 3.3: Population, Area & Density Details of the Town
S.No Year Population Area (in ha) Gross Density (ppH)
1 2001 5423 1633 3
2 2011 6657 1633 4
Source: Census of India, 2011
Map No.3.1 shows the Density Details of Bhedaghat
3.1.4 Average household Size
As per Census of India, 2011 the total population of Bhedaghat Nagar Parishad is about 6,657 and total
number households are 1,355. Thus, the household size is 4.9 (~5.0).
3.1.5 Other Demographic Indicators
As per Census of India, 2011 the total SC population of Bhedaghat is about 903 and ST Population is 1174.
The total share of SC population is 13.5 percent of the total population and 17.6 percent is ST population.
3.2: SOCIO ECONOMIC PROFILE
3.2.1 Sex Ratio
As per Census of India, 2011 the sex ratio (female Population
per 1000 male Population) of the town is 885. For the years
1981 & 1991, the sex ratio details are not available from
Census. As per Nagar Parishad, 2001 Sex ratio is 851. The sex
ratio of the town is much lower than the State (930) and
district (928) figures.
3.2.2 Literacy Rate
As per Census of India, 2011 the literacy rate (percentage of
literate population to the total population above 6 years of age)
in Bhedaghat is 62.28 per cent (male literacy rate of 83 per
cent and female literacy rate of 63 per cent) – lower than the
state urban average of 79.67 per cent and national urban
average of 80.30 per cent.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 26 of 92
City Development Plan for Bhedaghat Town
3.2.3 Work Participation Ratio (WPR)
The current workforce participation rate (percentage of main and marginal workers to the total population)
in Bhedaghat is about 42.0 per cent (including 8 per cent of marginal workers); it is quite higher when
compared to UDPFI work force norms i.e., 33 % of total population. Table 3.4 presents the category-wise
workforce composition in Bhedaghat, as per the 2011 Census.
Table 3.4: Category-wise Workforce
S.No Category Total Population Male Female
1 Total Workers 2842 2062 780
2 Main Worker 2320 1803 517
3 Marginal Workers 522 259 263
Source: Census of India, 2011
Figure 3.4 Classification of WPR Figure 3.5 Gender Ratio – WPR
3.2.4 Occupation Structure
As per Census of India, 2011 It is noted that, the total main workforce is 2320. About 14 percent was
employed in cultivators, 27 percent as Agricultural labors and 1.6 percent was in household industry
category (Refer figure 3.6). Almost 58 per cent were employed in “Others” category like trade and
commerce activities, business activities, employees, and other small scale industries like marble design, idol
making etc.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 27 of 92
City Development Plan for Bhedaghat Town
Figure 3.6 Occupation Structure
3.2.5 Economic Base
The main Economic base of Bhedaghat town is Tourism and Agriculture. On an average, twenty to twenty
five thousand people visit Bhedaghat on week days and on weekend may reach sixty thousand. Many skilled
labors self-employed work on stone designing on soft stone locally available to them and potential
agriculture land is available which facilitates double cropping due to presence of perennial river Narmada.
City specific Strategies and Action Plans
Issue Strategy Action Plan
1. Population Growth Rate
Providing Employment Opportunities
• Encouraging small scale industries
related to Agro-based industries
2. Tourism Development of tourism and
heritage facilities
• Development of resorts & tourist spots
• Conservation of heritage structures in and around the city.
PHYSICAL PLANNING AND
GROWTH MANAGEMENT
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 28 of 92
City Development Plan for Bhedaghat Town
CHAPTER 4: PHYSICAL PLANNING AND GROWTH MANAGEMENT
4.1 Spatial Growth Trends
Due to physical barriers such as Narmada River on south east and hill area on north, the town is
predominantly developed in ribbon pattern along the main road connecting NH 12A and Nagpur By-
pass, which is passing through the town.
The urban form of the town is predominantly guided by tourism spots and agriculture hinter land. The
overall development resembles completed development.
4.2 Spatial Distribution of Population
As per the latest statistics obtained from the ULB (Census 2011), the town is divided into 15 wards. The
ward wise population and household details are mentioned in the following table.
Table 4.1: Ward-wise Details of the Town
S.No Wards No. of HH Population
1 Shiwaji Ward 104 446
2 Subash Ward 74 378
3 Mahatma Gandhi Ward 118 535
4 Deendayal Ward 110 559
5 Abdul Kalam ward 70 323
6 Rammanohar Lohiya Ward 111 489
7 Sardar Vallabh Bhai Ward 105 466
8 Maharana Pratap Ward 74 400
9 Rani Durgawati Ward 68 362
10 Vonoba Bhave Ward 70 357
11 Ravi Shankar Shukla Ward 99 458
12 Jawaharlal Nehru Ward 102 509
13 LalBhahadur Shastri Ward 103 494
14 Dr. Ambedkar Ward 89 473
15 Tripur Sundari Ward 90 408
Total 1387 6657 Source: Census of India, 2011
4.3 Land use
The essential characteristics of land use and its pattern have been analyzed in order to address
problems and proposals. The land use map has been prepared based on Google image interpretation
and subsequent ground truth verification.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 29 of 92
City Development Plan for Bhedaghat Town
Table 4.2: UDPFI Standards for Land Use
Land use % of Developed Area
Small Towns Medium Towns Large Cities Metro Cities
Residential 45 – 50 40-45 35-40 35-40
Commercial 2 – 3 3 - 4 4 -5 4-5
Industrial 8 – 10 8-10 10-12 12-14
Public & Semi Public 6 – 8 10-12 12-14 14-16
Recreational 12 – 14 18-20 18-20 20-25
Transport & Communication 10 – 12 12-14 12-14 15-18
Agriculture & Water bodies Balance balance balance balance
The land use percentages were calculated using the updated base map and the available data. As most
of the Nagar Parishad areas are associated with unique features like Heritage Sites or mining activity or
Industrial areas, so these areas has unique significance for land use analysis. The residential land
comprises of 8% of total land & the agriculture area comprises of almost 50%. Map shows the Existing
Land Use Map of Bhedaghat Nagar Parishad. The following table provides the land use percentages.
Table 4. 3: Land use Breakup
Sl. No Existing Land use Area
(sq.km)
% to the
Developable Area % to the Total
1 Residential use 8.39 50.91 0.51
2 Commercial use 0.24 1.46 0.01
3 Public and Semi Public 2.99 18.14 0.18
4 Transportation 2.29 13.90 0.14
5 Recreation Use 2.57 15.59 0.16
Developed Area 16.48 100.00
7 Agriculture Area 969.048 59.34
8 Water bodies 3.74 0.23
9 Hill 344.186 21.08
10 Conservation 299.546 18.34
1633 100
Source: Google image interpretation and subsequent site visits
Map No. 4.1: Existing Landuse of Bhedaghat
4.4 Master plan Provision
Directorate of town and country planning is preparing master plan for Bhedaghat Nagar Parishad, which
is under draft notification stage.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 30 of 92
City Development Plan for Bhedaghat Town
Fig 4.1: Draft out Line Development Plan for Bhedaghat
Bhedaghat Master Plan covers an area of 6073.12 ha which includes 23 villages.
Highlights of the Master Plan:
• Proposed 30 meters Buffer
zone on both side of the
River.
• Proposed 40 feet Link Roads
connecting Bhadapur to
Chowkithal and Ghopalpur to
Dhalpatpur
• Proposed Parking Lot in Ward
Number 6.
• Proposal of Recreational Park in Rudhrakund area.
Source: Town and Country Planning Department
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 31 of 92
City Development Plan for Bhedaghat Town
4.5 Housing
Housing is the constituent of the social infrastructure of the economy. Like the other constituents, such
as the system of education and health, housing divergences also can either reduce or enhance the
disparities in the society.
4.6 Housing in Bhedaghat
According to the census 2011, existing housing units are 1387. The housing is spread in all the 15
wards of Bhedaghat town.
Table 4. 4: Details of houses, households and households size of Bhedaghat
Years Total Population No. of Households Average Household
Size
2001 5,423 1,130 4.8
2011 6,657 1,387 4.8
Source: Census, 2011
4.7 Housing demand for the year 2035
We assumed that the average household size would not fall less than 4.9 by 2015, 2025 and 2035.
Table 4. 5: Housing demand for the year 2035
Category Existing
(2011)
Projected years
2015 2025 2035
Population 6657 7154 8771 11138
Households 1355 1490 1827 2320
Household size 4.9 4.9 4.9 4.9
By the year 2035 the additional Houses required are 933 taking into the consideration one home per
one household. The land requirements for these housing needs are taken into consideration on the
proposed land use map.
Map 4.2: Anticipated Future Growth Map
City specific Strategies and Action Plans
Issue Strategy Action Plan
Haphazard Development Planned Development � Controlling the illegal developments /
haphazard development.
TOWN INFRASTRUCTURE
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 32 of 92
City Development Plan for Bhedaghat Town
CHAPTER 5: TOWN INFRASTRUCTURE
Infrastructure is the basic requirement of urban life and its adequacy and accessibility are two
important ingredients key contributors in the up-gradation and enrichment of quality of urban life which
is the primary objective of any planned development effort. The extent and the nature of problems
faced by different towns vary by size, geographical conditions & local natural resources, state/regional
differentials in the resource availability & the policies, resource base of local authorities and several
such factors directly or indirectly affecting the population of cities/towns.
Social amenities and infrastructure fall under the social welfare objectives of the urban development
programmes, as distinct from economic development objectives and especially in the context of the
rapidly developing liberalized and competitive economic scenario. These infrastructure facilities are
broadly classified into two aspects,
Physical Infrastructure Social Infrastructure
Water Supply Health
Sewerage & Sanitation Education
Solid Waste Management Recreational Facilities
Storm Water Drains Social security
Traffic & Transportation Housing
Street Lighting
5.1 Water Supply
5.1.1 Quality and Quantity of Water at Source
Bhedaghat is mainly dependent on Tube well source for water supply. At present there are 9 Tube wells
in the town which draws about 4.6 Lakh Liters per day. Direct pumping is in practice for storage and
distribution of water supply. Water is supplied through tankers to the areas where water supply is
scarce and areas not covered with distribution network. Currently the demand for water in Bhedaghat is
approximately 0.89 MLD. The details are shown in the Table.
Table 5.1: Details of Water Source & System
Sl. No. Ground Source Particulars Details
1. Number of Tube wells 9
2. Number of Hand pumps 33
3. Number of ELSR’s 1
4. Quantum of water Supplied (MLD) 0.46
5. Per capita consumption (LPCD) 70
6. Estimated Transmission and Distribution losses (% of total supply) 30 Source: Nagar Parishad Bhedaghat
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 33 of 92
City Development Plan for Bhedaghat Town
5.1.2 Quality and Quantity of Water in distribution System
The available data only indicates the total water storage capacities at town level. However, it does not
provide details on the quantity of water supplied at ward level. Thus, the analysis to understand the
services at ward level is difficult. Presently there is one ELSR’s available for water storage which covers
1,2,3,4,5,8,9,10,11,14,15 Wards. The capacity of ELSR is 0.05 ML.
The total available storage capacity is 0.05 ML. As per the Census of India 2011, the population is
6,657. Assuming consumption of 135 LPCD, the total demand for water supply is 0.89 MLD. Assuming
the storage capacity required is 33 per cent of the total water supply is 0.29 ML. It is observed that the
current shortage of storage capacity is about 0.05 ML. The demand of water supply by the end of the
horizon period of CDP is about 1.66 MLD for which storage capacity of 0.54 ML is required by 2035.
Table 5.2 indicates the details of the ELSR and the wards covered. Map 5.1 indicates the water supply
system of the town.
Table 5.2: Details of ELSR in Bhedaghat
Sl.
No. Location of ELSR’s
Capacity
(in ML) Wards Covered
1. ELSR-1, Ward 13 0.05 1,2,3,4,5,8,9,10,11,14,15
Total Storage Capacity (ML) 0.05
Source: Nagar Parishad Bhedaghat
5.1.3 Water Distribution Arrangement
The existing water distribution system in the town is very old and is connected at various places with
new pipelines. GI pipes with diameters ranging from 3.0 mm to 1.5 mm form majority of the water
supply network. Around 12 km of length of pipeline is laid for distribution system and it accounts to 40
per cent of the existing road length. The details of the water supply distribution system given in Table.
Table 5.3: Details of the Distribution System
Main Types Distribution Main Details
or Dimension Range
Percentage of Coverage
Network
Pipe Material
a. CI 3.0 mm to 1.5 mm 100
Source: Nagar Parishad, Bhedaghat, 2010-11
5.1.3 Internal Distribution Networks
The total number of household service connections is 270. There are no metered connections in the
town. These 33 hand pumps are catering to water supply. It is observed that commercial service
connections are very less (7).
The total number of water supply connections increased from 180 to 270 from past three years. The
details of service connections and growth rates are indicated in Table.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 34 of 92
City Development Plan for Bhedaghat Town
Table 5.4: Details of Water Supply Connection in Bhedaghat Town
Year Connections % Growth of Connections
2009-10 180
2010-11 210 16.66
2011-12 270 28.57
Source: Nagar Parishad, Bhedaghat 2010-11
The domestic connections account to 97.41 per cent of the total connections. The total commercial
connections are account to 2.59 per cent of total connections. There are 45 public stand posts, which
serves 3.24 per cent of total households. Table 5.5 indicates the details of the service connections in
the town.
Map 5.1: Existing Water Supply System of Bhedaghat
Table 5.5: Details of Water Connections in Bhedaghat
Sl. No.
Particulars Units
1 Total Population – 2011 6,657
2 Number of Households – 2011 1,387
Connections Number % to total
Connections
% to total
Households
3 Domestic 263 75.6 19.0
4 Non-domestic (other than industrial) 7 2.0 0.5
5 Industrial 0.0 0.0 0.00
6 Public Stand Posts 45 12.9 3.2
7 Hand Pumps 33 9.5 2.4
Total Number of Connections 348 100.0 > 15.0
Source: Nagar Parishad, Bhedaghat, 2010-11
5.1.4 Coverage & Supply
The distribution network covers 50 per cent of the developed area. Water is supplied for a total of 4
hours per day during winter and 2 hours per day in summer. Bhedaghat has very infrequent and
interrupted water supply due to frequent and untimely power cut. The per capita supply works out to
70 lpcd. Thus, the current water supply system is severely dependent on electricity. The areas which
are not covered under supply network are located in ward number 2, 4 and 9.
As per the assessment of officials at Nagar Parishad, low pressure areas are located in six wards. The
details of the existing coverage & supply are indicated in the following Table.
Table 5.6 : Domestic Water Supply Details in Bhedaghat – 2011
Sl. No. Particulars Units
Per Capita Supply
1 Population – 2011 6,657
2 Water Supply (in MLD) 0.46
3 Current Per Capita water supply per day (in LPCD) 70.0
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 35 of 92
City Development Plan for Bhedaghat Town
Sl. No. Particulars Units
4 Per capita supply as per CPHEEO Norm (in LPCD) 135.0
Coverage
5 % population covered under piped Water Supply
6 Areas
with
Surplus Supply Nil 0.0 %
Moderate Supply All wards (except wards with
less supply and no supply) 74.0 %
Less Supply Ward No. 13,7 13.0 %
Inadequate
Supply
Ward No. 12,6 13.0 %
Storage Capacity
7
Total Storage Capacity available (in ML) 0.05
Total Storage Capacity required (in ML) 0.46
Deficit (in ML) 0.41
Distribution Network (%)
8
Good 8 %
Fair 84 %
Bad 8 %
Staff Details
9 Permanent Staff Nil
10 Temporary Staff 11
Source: Nagar Parishad, Bhedaghat, 2010-11
Irrespective of supply from ELSR, every ward is getting the direct supply from remaining tube wells.
The assessment made by the officials at Nagar Parishad, Bhedaghat suggests that the distribution and
transmission losses are about 20 to 25 per cent.
5.1.5 Institutional Set-up
The O&M of the water supply system is taken care of by the Nagar Parishad, Bhedaghat. Currently,
both technical and non-technical duties related to water supply are discharged by 11 temporary
employees of Nagar Parishad. With the growing population, the demand for adequate services is
increasing and the role of the local body as a service provider calls for better performance.
5.1.6 Operation & Maintenance (O&M)
The sustainability of water supply system is assured only if local resources are generated for O&M by
the ULB. The systematic planning, expansion and maintenance requires dedicated planning approach.
Cost Recovery
Nagar Parishad collects a flat rate of Rs.30.00 per month per household for domestic connection and
Rs.120.00 for non-domestic connection. In small towns like Bhedaghat no user charges are collected
on pro-rata basis, the reason being absence of metered devices. None of the connections in Bhedaghat
are metered. The charge for new connection is Rs.1000; which includes road cutting charges as well.
Table 5.7 gives the details of the flat rate per month and the installation for new connection charges.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 36 of 92
City Development Plan for Bhedaghat Town
Table 5.7: Details of Water Charges in Bhedaghat – 2011
Description Charges Per Connection (in Rs)
1. Flat Rate per Month
• Domestic 30.00
• Commercial 120.00
2. New Connection Charges
• Domestic 1000.00
• Commercial 1000.00
Source: Nagar Parishad, Bhedaghat, 2010-11
5.1.7 Present and Future Demand and Supply Gaps
The present per capita water supply is 70 LPCD. The future population growth calls for:
� Augmentation of water on a sustainable basis.
� Increase in storage capacity to meet the requirement of the growing population and increased
developed areas.
Table 5.8: Water Demand Assessment – 2035
Particulars Phase 1 Phase 2 Phase 3
2011-2015 2015-2025 2025-2035
2 Projected Population 7,154 8,771 11,138
3 Projected Households 1490 1827 2320
4 Total quantum of water required
(in MLD) @ 135 lpcd per capita 0.97 1.18 1.50
5 Required capacity of treatment plant (in MLD) 0.97 1.18 1.50
6 Additional Storage capacity (in ML) 0.27 0.34 0.45
Source: Analysis
The cumulative water demand projected for the coming 25 years is indicated in the Table 5.8.
Considering a per capita supply of 135 LPCD the total domestic water demand will be 1.50 MLD by
2035. Adequate facilities for water storage, treatment and supply should be planned.
5.1.8 Water Supply Project
As on now, the town is not covered under any planned schemes/projects for Water supply system in
the town.
5.1.9 Comparative Analysis (Service Levels)
The water system in the town can be improved by efficient extension of the water supply network,
increase in the number of HSC’s, rehabilitation works, and efficient cost recovery plans. The existing
system is not adequate to meet the growing demand of the population. The current service levels are
indicated in the following Table.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 37 of 92
City Development Plan for Bhedaghat Town
Table 5.9: Service Levels in Bhedaghat
Indicator Norm Existing Levels
• Per Capita Supply 135 lpcd 70 lpcd
• Storage capacity 33.0 per cent 10.0 per cent
• Length of distribution network as per cent to total
road length 100 per cent 40 per cent
• Treatment Plant capacity 100 per cent Nil
• Number of HHs with HSC connections 100 per cent 51.0 per cent
• Loss due to leakages 20 per cent 25 per cent
Source: Analysis
5.1.10 SWOT Analysis
Strengths
• Location of Narmada River is potential for future requirement
Weaknesses
• Majorly dependent on ground water • Inadequate network length
• Age of current supply system
• Lack of adequate man power
Opportunities
• Implementation of rain water
harvesting
Threats
• High dependency on electricity as the supply is
also dependent on pumping through motors • Poor distribution of water can lead to health
problems and unhygienic conditions in the Town.
5.1.11 Key Issues
• No treatment plant in the town for purification of water
• Ground water levels are depleting annually.
• Lack of metered connections, reflecting losses in ULB revenue.
• Flat rates are required to be revised as the revenue collected is very meager.
• Distribution system is not adequate as various parts of the town are either not connected or
integrated to the system.
• Major pipelines in the existing system are around 10 years old and require repairs and
rehabilitation measures on priority basis.
• No initiatives for rain water harvesting, reuse of waste water and lack of community participation
and awareness in improving water management system, system efficiency, O&M and decision
making.
• There is no water quality monitoring done on a regular basis both at the transmission end and
consumer end.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 38 of 92
City Development Plan for Bhedaghat Town
5.1.12 City specific Strategies and Action Plans
Issue Goal Strategies Action plans/Proposals
Water Source To provide surface water source
• Identify proper "Network Plan" for Intake Pipe line”
from surface source to the town.
• Surface source from “Narmada River”
• 1.50 MLD capacity of WTP has to
be constructed. • Water requirement for tourism
flow is 0.33 MLD
Inadequate
storage capacity
100 %
storage capacity
• Identify the location and
number of ELSR’s
required. • Storage capacity should
meet future demand
• 2 ELSR’s are required.
• 0.45 ML of additional storage
capacity is required by the
end of the plan period – 2035
Inadequate
Coverage and Supply
Network
100 %
coverage with "potable
water supply"
• Replacement and
extension of existing
network system. • Phase-wise replacement
of pipe lines.
• Supply network plan for
future developments
• 10 km length of existing
network system has to be
replaced. • 12.6 km length of pipeline
network has to be laid in
future development areas.
Inadequate
man power for “Operation
& Maintenance”
100 % O&M
Recovery
• Capacity building
programmes for ULB staff
to improve skills. • Provide metered
household service
connections in a phased manner.
• Regular monitoring
system.
• Training & capacity building
programs for ULB staff.
• New connections for
households in a phased manner.
• Water rate should revise time
to time
Priority Actions
• Provision of water supply system with “Narmada River” as the source
• 10 km length of water supply network system has to be replaced
• Provision of 1.50 MLD Capacity of Water Treatment Plant (WTP) near to the surface source
• 12.6 km length of network system has to be laid for future development areas
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 39 of 92
City Development Plan for Bhedaghat Town
5.2 Sewerage System
5.2.1 Existing Sewerage System
Hundred per cent network coverage for sewerage system is one of the high priority needs of any
developing town and taking up the same would present a major challenge to the implementation
capability of ULBs. Lack of Under Ground Sewerage system in Bhedaghat also leads to unhygienic
conditions in the town.
Table 5.10: Details indicating the Existing Sanitation Facilities, 2001
Particulars Nos.
1. Total Number of Households 1387
Particulars % of Total No. of Households
2. Per cent of Households having Bathroom
Facility within the House 25.16 %
3. Type of Connectivity for Waste water Outlet
1. Closed Drainage 162
2. Open Drainage 116
3. No Drainage 71
Source: Census 2001
Sewage & Sullage Collection
The domestic waste water presently passes through the open drains along the road side. In areas not
served by any kind of drainage network, the waste water flows on the roads and in few places get
stagnated.
The area within the core area (old area) has lack of proper waste water disposal system. Thus, the waste
water is allowed to flow in open areas or vacant sites in these localities. The blocking of drains by the
presence of solid waste is the main cause for stagnation of waste water.
5.2.2 Household Latrines
Bhedaghat lacks adequate sanitary facilities. Only 25.16 % of Households have Access to Household
Latrines. Six out of ten houses have no latrine facilities indicating open defecation in the town. 2001
census indicates that 3.43 per cent of the census houses resort to pit latrine, a practice that has almost
become defunct in the modern cities. However, about 12.89 per cent of the HHs has water closets.
Table 5.11: Details indicating the Existing Sanitation Facilities
Particulars Number of H.H % of Total No. of Households
• Pit Latrine 12 3.43
• Water Closet 45 12.89
• Other Latrine 76 21.77
• No Latrine 216 61.89
349 100
Source: Census 2001
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 40 of 92
City Development Plan for Bhedaghat Town
5.3 Existing Sanitation System
As per the sanitation surveys conducted during 2008, about 25 per cent households have access to
improved sanitation within household and remaining 75 per cent households lack these facilities.
5.3.1 Public Toilets
There are 8 public conveniences with 44 seats in the town. The average users per day are estimated to
be 450. The details of public conveniences are shown in the following Table.
Table 5.12 : Details of Public Convenience facilities
Public Convenience Systems (Sulabh Sauchalaya)
a. Public Conveniences 8
b. Total Seats 44
c. No of Users/ Day 450
Source: Nagar Parishad, Bhedaghat
5.3.2 Present, Future Demand and Supply Gaps
The cumulative sewerage demand projected for the coming 25 years is indicated in the Table 5.13.
Considering a per capita supply of 135 LPCD the total domestic sewerage demand will be 1.33 MLD by
2035 (considering 80 per cent of total water demand).
Table 5.13: Demand Assessment – 2035
Particulars Phase 1 Phase 2 Phase 3
2011-2015 2015-2025 2025-2035
• Projected Population 7,154 8,771 11,138
• Quantum of water required (in MLD) 1490 1827 2320
• Total quantity of sewage (in MLD) 0.97 1.18 1.50
• Length of Trunk Lines (600 mm dia) 0.77 0.95 1.20
• Length of lateral Lines (100 mm dia) 4
• Capacity of treatment plant (in MLD) 16 11
Source: Analysis
5.3.3 Sanitation Projects
At present, there are no Proposed or On-going Projects for augmentation of existing Sewerage system in
the town.
5.3.4 Comparative Analysis with the UDPFI, CPHEEO Guidelines
As per the UDPFI/ CPHEEO norms, about 80 per cent of the total water supply is assumed to be
discharged as sewage. Hence the total sewage generated is estimated about 1.20 MLD.
Table 5.14: Service Levels in Bhedaghat
Indicator Norm Levels
Sewerage Estimated 80 % of water supply 1.20 MLD
Source: Analysis
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 41 of 92
City Development Plan for Bhedaghat Town
5.3.5 SWOT Analysis
Strengths
• 25.16 % of households have access to improved
sanitation.
Weaknesses
• Lack of under Ground sewerage • Mostly the sewage goes into the open drains.
• Inadequate public conveniences • Surface drains are used to carry the sewerage leading
to environment hazards
Opportunities • Availability of undeveloped
land for locating amenities such as Sewerage
Treatment Plant
Threats • Letting out of sewage and sullage into open areas can
lead to health hazards • Prospective degradation of environment due to water
and Air pollution
5.3.6 Key Issues
• Absence of an UGS system, open defecation and stagnation of sewage leading to environmental
and health problems.
• Sewage and waste water entering the water bodies resulting in pollution.
• Mixing up of solid waste with the sewage leading to choking of drains.
5.3.7 City specific Strategies and Action Plans
Issue Goal Strategies Action plans/Proposals
Under Ground
Sewerage (UGS) system
Provision of
UGS with 100 % coverage
• Conducting a detailed physical
survey • Coverage of core areas on
priority basis
• Extension of network to new developed areas
• Preparation of a
Comprehensive Sewerage network plan.
Open defecation
Remove the practice of
open defecation
• Improving the existing public toilets by providing adequate
facilities. • 25 per cent of the households
shall be provided with LCS
focusing on urban poor. • Construct the new public
toilets in unserved areas.
• Improvement of existing public toilets.
• Constructing public toilets in unserved areas.
• Construction of Low Cost
Sanitation units for 75 per cent of the total
Households.
Absence of sewerage
treatment plant
Provision of Sewerage
Treatment Plant
• Capacity of STP should meet the current gap and future
requirements in a phased manner.
• Sewerage quality analysis
needs to be upgraded.
• 1.20 MLD capacity of DEWAT System has to be
constructed. • 0.26 MLD additional for
tourism flow.
Lack of
Operation &
Maintenance
Adopt the
‘utility
mapping’ system
• Training & capacity building
programs for ULB staff.
• Regular monitoring system.
• Private Sector participation
in O&M to increase
efficiency of service delivery.
Priority Actions
• Provision of Public Conveniences near Police station and Nagar Panchayat Office
• Construction of toilets through low cost sanitation programs
• Construction of public toilets in slums & poor settlements
• Campaign at town and community level on prevention of open defecation
• Provision of DEWAT System
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 42 of 92
City Development Plan for Bhedaghat Town
5.4 Solid Waste Management
Unorganised disposal of Solid waste affects major pollutants in a town resulting harmful health effects on
its residents. Urbanization has changed the composition of waste generated in larger towns and cities. It
is seen that the amount and kind of waste generated varies according to the income level. While most of
the residents are unaware of the health hazards, the contributors too are equally unaware of the effects
of pollution on the Town. These risks can be properly managed and their negative effects can be
minimized. Hence, there is a need for proper collection, storage, transportation and scientific disposal of
such waste by the respective local governments.
5.4.1 Quantity of Waste Generated
The quantity of solid waste generated in Bhedaghat has increased in the past few years due to the
growth of commercial and service activities. At present the solid waste generated at household level and
on the streets is collected from the dustbins and open dumping points. The regular collection is confined
to the main streets of the town. The details of the existing SWM system are detailed in the following
Table.
Table 5.15 : Solid Waste Details in Bhedaghat – 2011
Note: Nagar Parishad, Bhedaghat
The average solid waste generated in Bhedaghat town is about 2 Tons per day. The major source of
waste generation is the domestic waste. There is no hospital waste generated in the town.
5.4.2 Constituents of Municipal Waste
The various sources of solid waste generated are out of domestic and commercial usage. Out of the total
waste generated in Bhedaghat, around 60 per cent is domestic waste, 40 per cent is of commercial
waste. The domestic waste has both bio degradable and non-biodegradable components. Some of the
biodegradable components are vegetable waste, meat waste, poultry waste, leftover food particulates
etc. The non-biodegradable waste comprises of plastic, rubber, packaging materials, metal, batteries,
and construction waste.
5.4.3 Current practices of Solid Waste Management
At present open dumping is in practice. Door-to-door collection is in practice in 2 to 5 wards of the town.
The solid waste is dumped along the main roads & vacant lands. This type of open dumping will lead to
unhygienic conditions.
Sl. No. Particular Details
1. Total Population (2011) 6,657
2. Per capita waste generated (in kg) 0.25
3. Quantum of Hospital Waste Generated NIL
4. Total Waste Generated Per Day (in tons) 2
5. Total Waste Collected Per Day (in tons) 1.6
6. Frequency of Waste Collection Weekly Once
7. Collection Performance (%) 80.0
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 43 of 92
City Development Plan for Bhedaghat Town
5.4.4 Segregation & Storage of Solid Waste
At present there are no standard practices followed for segregation and storage.
5.4.5 Primary and Secondary Collection
Both primary and secondary type of collection is practice in the town. In some areas, the solid waste is
collected from houses and is deposited at a predetermined location from where it is carried to dumping
site through trucks. There is no door-to-door collection system in the town.
As per the Nagar Parishad officials, approximately 1.6 tons of waste is collected per day which indicates a
collection performance of 80 per cent. The main roads are swept every day and the waste is deposited in
the containers, and is taken to dumping site. The shortfall in the collection process is due to the following
reasons:
• Solid Waste deposits in the storm water drains are left unattended.
• Improper dumping points and unscientific disposal methods like open dumping of waste on
roadsides, vacant sites, etc.
• Non-availability of adequate infrastructure in terms of number of tractors, dustbins, equipments,
etc.
• Improper collection methods.
5.4.6 Processing & Disposal of Waste
It is informed by the officials at Nagar Parishad that the dumping is done in panchavati (ward 1), balpara
(Ward 6) and chakital (ward 8). The following Table 5.16 indicates the existing transport & disposal
arrangements. Map 5.2 shows disposal location points.
Map 5.2 shows disposal location points.
Table 5.16: Solid Waste Transport and Disposal Arrangements
Particulars Units
1. Number of Dustbins 15
2. Total Number of Vehicles (Tractor) 1
3. Capacity of each vehicle 1
4. Total Number of Tippers/Handcarts 15
5. Age of Vehicle (in Years) 15
6. Persons per vehicle 1 driver + 2 persons
7. Number of trips per day per vehicle 2
8. Type of Disposal Open Dumping
Source: Nagar Parishad, Bhedaghat
5.4.7 Vehicles for Solid Waste collection and Transportation
The Nagar Parishad owns 1 tractor for disposal of solid waste. Capacity of each tractor is 1 Ton. Number
of trips per day per vehicle is two. The distance travelled by each tractor per day is around 3.5 km and
the weekly hour of operation is 8 hours. However lack of adequate infrastructure and manpower has led
to improper removal, transportation and operational efficiency.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 44 of 92
City Development Plan for Bhedaghat Town
5.4.8 Institutional Set-up
Solid Waste Management is enlisted in the state list and is the obligatory responsibility of the ULB
handled by the Health wing of each Nagar Parishad. The MSW rules 2000 puts forth detailed guidelines
for the entire process for handling solid waste management. The staffs for SWM include Environmental
Engineer, Health Officer, Health Inspector and field staff including drivers, cleaners & loaders. The
number of staff in the ULBs varies depending on the size of the ULB. The staffing pattern as provided by
the Nagar Parishad, Bhedaghat indicates that currently 4 employees of Nagar Parishad are discharging
the duties of Solid waste and Sanitation and additional 8 persons are employed for attending various
other duties. The details of the staff are indicated in the Table
Table 5.17 : Staff for Solid Waste Management in Bhedaghat
Staff for SWM Number
Safai Daroga/Driver 1
Jamidar 0
Safai Karmachari 3
Total 4
Temporary staff/Daily Wages 8
Grand Total 12
Source: Nagar Parishad, Bhedaghat
5.4.9 Estimation of Waste Collection
Estimated waste generation in the town by the year 2035 is about 5 tons. Approximately 4.0 tons of
waste collection may be possible based on existing collection performance with some improvement in
management practices.
5.4.10 Comparative Analysis with Guidelines
Table 5.18 : Details of Current Service Levels
Indicator Norms Number of Units
� Waste collection performance 90 – 100 % 80
� Spacing of Dustbins 100 m Irregular
� Road length per conservancy staff 400 – 600 m 2000 m
� Conservancy staff per 100 population 3 1 per 1025 persons
Source: Analysis
5.4.11 SWOT Analysis
Strengths
• Type of solid waste generated is
predominantly domestic,
commercial — absence of
industrial hazardous waste
Weaknesses
• Multiple disposal points.
• Community bins are not available at convenient
locations.
• Functional overlap-sanitation & solid waste
management
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 45 of 92
City Development Plan for Bhedaghat Town
Opportunities
• Adaptation of Vermi Composting
methods
Threats
• Possibility of public health hazards as the
dumping yards are located in the town
• Lack of solid waste management facilities in
the town leading to indiscriminate dumping of
garbage
• Health risks for those working in this sector as
well as residents living around waste depots
5.4.12 Key Issues
• Absence of segregation of waste at source.
• The staff in the ULB is skeletal.
• The locations of dustbins should be fixed with proper intervals and at proper places so that
efficiency can be increased.
• The existing transportation infrastructure and resources are inadequate.
5.4.13 City specific Strategies and Action Plans
Issue Goal Strategies Action Plans/ Proposals
Open
dumping
Suitable space
(landfill site) for
disposal of waste
• Initiating segregation of
waste at source.
• Place collection bins wherever is necessary
(suitable locations).
• Provision of adequate facilities
at landfill site (Platform,
fencing, watchmen shed etc.).
• Provision of community bins
in the town by the end of plan period-2035.
Absence of
Door-to-Door (D2D) collection
100 % D2D
collection
• Identification of primary
collection points. • Scheduling the timings of
collection. • Provision of adequate
equipment & vehicles.
• Provision of 3 auto tippers, 8
try cycles for primary collection.
Lack of skilled
man power
Strengthen the
existing system
• Structuring of man power
requirements and assignmentof responsibilities.
• Conducting capacity building &
Training programmes.
Absence of
segregation ofwaste at the
source
Encourage
“Scientific methods” for
segregation
• “Recycling and Reuse”
methods has to put intopractice.
• Development of sanitary land fill
site. • Equipment and infrastructure as
per MSW guidelines 2000.
Priority Actions • Provision of infrastructure & man power required for efficient solid waste management
• Provision of slaughter house
• Development of solid waste land fill site • Construction of Vermi-composting yard • Campaign for segregation of solid waste at source
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 46 of 92
City Development Plan for Bhedaghat Town
5.5 Drainage System
5.5.1 Existing Drainage System
The storm water drainage system in the town comprises of only tertiary drains. Due to the limitations in
the availability of data, the analysis is confined to the macro level. The storm water drains need to be
strengthened by separating the sanitation, sewerage and drainage aspects, which are currently
intermixed. Bhedaghat needs to develop with an adequate storm water drainage network in a scientific
manner, taking into consideration key parameters of precipitation intensity, catchment delineation,
percolation characteristics and surface run-off.
Primary & Secondary Drains: There is lack of primary and secondary drains in the town.
Map 5.3 shows Drainage network map.
5.5.2 Tertiary Drains
The tertiary drains are constructed on the roadside, built as open type or closed drains and some of them
are of unlined kutcha type. The total length of tertiary drains as per available data is 2.5 km. out of this,
pucca drains length is 1.5 km and remaining 1 km length is kutcha in nature. The total drain length
accounts to 10.5 per cent of total road length. Table 5.19 indicates the details of the type of storm water
drains in the town. The road –drain ratio works out to 1:0.10. In the other words, for every 1000 m road
length, 10 m drain length is available.
Table 5.19: Details indicating the Existing drainage connections
Drain Type Length (km)
1. Open Drains – Pucca 1.5
2. Open Drains – Kutcha 1
3. Closed Drains -
Total 2.5
4. % to Total Road Length 10.5 per cent
5. Road – Drains Ratio 1: 0.10
Source: Census 2001
5.5.3 Flood-prone Areas or Environmentally Sensitive Areas
Environmentally sensitive areas in urban areas require prior attention as they are prone to pollution due
to the increasing demand for land for various development needs, issues related to generation of
biodegradable and non-biodegradable wastes, sewage, etc. Thus, environmentally sensitive areas needs
protection from the likely ill-effects caused due to human interventions. These areas can also lead to
potential health hazards, if not properly protected. A buffer zone (conservation) of 100 meters requires to
be maintained, on either side of Narmda River passing through the Nagar Parishad and its influence area,
as no development Zone
Map 5.4: Environmentally Sensitive Areas
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 47 of 92
City Development Plan for Bhedaghat Town
5.5.4 Present and Future Demand and Supply Gaps
Table 5.20 : Demand and Supply Gaps for SWD System
Sl. No.
Components Length
in km/ Nos.
1 Existing Municipal road length 24.668
2 Additional road length required 1.92
3 Contemplated road length 27
4 Existing pucca drain length 1.5
5 Rehabilitation of existing pucca drain length 0.75
6 Provision of pucca drains in un-served areas (current gap) 23.1
7 Provision of pucca drains in future expansion areas 2
8 Number of lakes requiring development NIL
Source: Analysis
5.5.5 SWOT Analysis
Strengths
• Considerable Size of water body
Weaknesses
• Inadequate coverage area of drainage system
Opportunities
• Development of recreational
spots in abutting areas of water
bodies
Threats
• Pollution in and around Water Body
• Stagnation of waste water in core areas in the
town
5.5.6 City specific Strategies and Action Plan
Issue Goal Strategies Action Plans/ Proposals
Lack of road side pucca
drains
• Provision of road side
drains
• Rehabilitation of existing drains system
and extension to un
served areas. • Provision of road side
drains in future extension areas.
• Rehabilitation of road side pucca drains: 0.75 km.
• Extension of drainage network
in un-served areas. • Provision of road side drains in
future expansion areas.
Provision of drains along
lanes in city core areas
• To create sufficient
space for laying of the
drainage
system
• Removing and avoiding
encroachments.
• Lying of new roads after completing the drainage
network.
Priority Actions
• Strengthening of existing drainages
• Improvement of drainages in outer areas
• Implementation of Rain Water Harvesting
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 48 of 92
City Development Plan for Bhedaghat Town
5.6 Traffic & Transport
5.6.1 Existing Traffic & Transportation Scenario
Transport infrastructure plays a very significant role in the growth and development of any Town. It is
also responsible for the spatial growth of the town thereby increasing the accessibility of peripheral areas
of the town. The objective of studying the transport sector is to analyze the sustainability of the
prevailing transportation system and to further identify its strengths and weaknesses.
Parking is a major concern in Bhedaghat town, particularly at the major tourist attractions of the town.
Intensive commercialization has led to an increase in parking demand along the major roads, especially in
market areas. There is no designated on-street and off-street parking facilities in the core area of the
town as a result of which vehicle users are forced to park their vehicles on the streets. However at the
tourist locations, even though are facilitated by well-defined parking facilities which are managed by
Nagar Parishad, the same are not able to meet the prevailing parking demand.
The details of roads are given in Table
Table 5.21: Road Surface Details
S.No Surface Type
Length
(km)
% to
Total Length
Condition of Road (in km)
Good Fair Bad
A. Municipal Roads
1 Concrete 4.7 19 2.0 2.7 -
2 Tarred/ Black Topped/
Bituminous Topped 6.0 24 - 6.0 -
3 Water Bound Macadam 5.6 23 - 5.6 -
4 Earthen 8.3 34 8.3
Total 24.6 100 2.0 14.3 8.3
Source: Nagar Parishad, Bhedaghat
Map 5.5: Map shows the road network in Bhedaghat
5.6.2 Travel Characteristics
The mobility needs of the town are largely catered by mini buses and standard buses including the IPT
mode such as auto rickshaws & jeeps. The use of personal vehicles i.e. Cars and two wheelers are also
predominantly observed. The town is lacking basic street furniture such as footpaths, street lights, traffic
signs, road markings etc. Absence of foot paths in the town is forcing pedestrians to use the carriageway
thereby hampering the traffic flow. The local commuting is predominantly by walk mode. The junctions
are not regulated by traffic signals and lack of traffic safety. Traffic safety measures are observed to be
non- existence which could be of significant use to guide the traffic and pedestrian movement.
Rail & Air connectivity
Bhedaghat town is well connected by rail and air connectivity with the nearest airport located in Jabalpur,
which is at a distance of 25 km from the town.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 49 of 92
City Development Plan for Bhedaghat Town
Road Network
Most of the roads in the town are of single lane configuration and few are having undivided two lane
configurations. The town is lacking organized road network and hierarchy which is evident in dense areas
of the town. The narrow lanes are leading to bottlenecks for the regular traffic movement and are also
inaccessible for emergency services such as ambulances and fire services.
5.6.3 Intermediate Public Transport System
The local commuting needs of the town are catered largely by IPT mode consisting of autorickshaws,
cars & jeep. Lack of adequate parking facilities has resulted in vehicles being parked along either sides of
the major roads of the town. The unregulated traffic movement and irregular parking of vehicles is
aggravating the problem of congestion and lack of pedestrian safety.
5.6.4 Parking Review
There is one organized off street parking facilities nearby Dhundhara water falls. Whereas on street
parking nearby booting and sawarathi ghat is not regulated. Bus bays, bus shelters are non- existence in
the town. The absence of organized parking is leading to congestion at all junctions, particularly at Rose
garden Junction.
5.6.5 SWOT Analysis
Strengths • Arterial road network is organized
• Major roads are BT roads and local
roads are of CC roads
Weaknesses • Organic form and congestion due to
encroachments in old town areas
• Laying of CC roads without laying utility service networks
• Absence of footpaths and medians • Lack of parking facilities
Opportunities
• Developing bypass road & truck terminals
• Availability of land for developing
bypass roads
Threats
• Lack of access to emergency facilities in residential areas
5.6.6 Service Adequacy and Key Issues
• The regional traffic passing through the town has put the pedestrian safety at stake. The interior
roads cut the State Highways at many points indicative of conflicting points.
• The roads widths are narrow in old areas which create problems to emergency services such as
ambulance and fire services.
• Foot paths are completely absent in all parts of the town. The pedestrian movement is displaced
hindering the traffic movement.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 50 of 92
City Development Plan for Bhedaghat Town
• The main roads carrying heavy traffic are interconnected by narrow streets; this sometimes leads
to choking of traffic flow. These streets are also used as shortcuts leading to loss of quietude in residential areas.
• Lack of organized parking for IPT modes.
5.6.7 City specific Strategies and Action Plan
Traffic & Transportation
Issue Goal Strategies Action Plans/
Proposals
A
Lack of Bus
Stand
• Provision of bus
stand with proper amenities &
adequate facilities
• Provide mini-bus stands
wherever is necessary
• Provision of mini-bus
stands
B
Non-uniform and narrow widths of
roads
6 To make uniform and regular width of the roads
• Removal of current encroachments and avoiding future
encroachments
• Widening of roads
Improvement of Existing roads: • Earthen roads to
WBM roads: 8.331
km • WBM Roads to CC
Roads: 5.617 km Resurfacing of existing
roads: • CC Roads: 1.7 km
• BT Roads: 0.5 km
C
Lack of public parking
spaces
• Provision of “On street and Off
street” parking space in
appropriate locations
• Provision of parking spaces for Rickshaws &
Autos • Provision of parking
spaces in commercial,
public & semipublic places
• Provision of parking
facilities near Market area.
D
Improper Road Junctions
• Improving junctions for safety and smooth flow of traffic and
pedestrians
• Provision of traffic signaling systems
• Provision of medians
• Traffic signals at all the junctions.
E
Lack of Foot
Paths
• Improvement of foot paths
• Provision of foot paths
along the main roads & commercial areas
Main Road Requires
Footpath
Priority
Actions
• Provision of foot paths along the main roads
• Provision of parking facilities near junctions & Markets
• Provision of medians along National Highway
• Provision of high mast lights at all Major junctions
• Provision of traffic signaling systems at all major junctions
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 51 of 92
City Development Plan for Bhedaghat Town
5.7 Street lighting & fire fighting
5.7.1 Existing Situation of Street Lights
Almost all the streets in the town are covered with street lighting. The town is well developed with almost
85% of households having electricity connections. The remaining 15% of the households who are not
having connections are the squatter settlements. 10 to 12 hours of power cut a day.
Street lighting is an important component of Traffic safety and management. In Bhedaghat there are
about 416 street lights with different types of electrical fixtures.
Table 5.22 : Details of Street Lighting in Bhedaghat
Description Street Lights Percentage to Total
1. High Mast Lamps 4 0.96
2. Sodium Vapour Lamps 225 54.09
3. Tube Lights 187 44.95
Total 416 100.00
Source: Nagar Parishad, Bhedaghat
5.7.2 Fire Services
There is no fire station located in the town. Fire station is located at district headquarters Jabalpur.
5.7.3 Present and Future Demand and Supply Gaps
The present shortage is around 376 street lights. By the end of the horizon period, an addition of 726
street lights is to be provided.
5.7.4 SWOT Analysis
Strengths
• Bhedaghat town is nearer to
district headquarter
Weaknesses
• Lack of power supply, Manpower for fire
services.
Opportunities
• Land available for fire and fighting
services.
Threats
• High density development in core area
5.7.5 City specific Strategies and Action Plan
Issue Goal Strategies Action Plans/ Proposals
Inadequate
Street Lights
• 100 %
coverage of
streets
lighting in the
town
• Provision of street
lights in un-served areas.
• Assessment of
street lights in future
development areas.
• Provision of high
mast poles.
Current gap:
• Provision of sodium vapour: 376 Nos.
Additional street lights:
• Replacement of tube light to sodium vapour
lamp: 187 Nos. • Street lighting for Additional Road length:
726
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 52 of 92
City Development Plan for Bhedaghat Town
5.8 Urban Poor and Their Accessibility to Basic Services
5.8.1 Introduction
The urban poor and slums are by-product of economic development and urbanisation process. As per
2001 population census, 285.35 million people reside in urban areas. It constitutes 27.8 per cent of the
total population of the country. In post-independence era while population of India has grown three
times, the urban population has grown five times. The rising urban population has also given rise to
increase in the number of urban poor. It is indispensable to analyse status of poverty for any Town
development exercise. Besides it becomes more important in the state like Madhya Pradesh where level
of poverty is relatively higher.
This section deals with the access of urban poor in Bhedaghat to basic services, drawing from secondary
information as well as site visits to slums in the town, and interaction with local residents. The aim is to
identify key issues in service delivery to the poor in Bhedaghat and suggest strategies that would enable
the Nagar Parishad, Bhedaghat to address issues and fulfill its mandate of providing basic services to the
poor in the town.
5.8.2 Poverty in the Town
The total slum ward population of Bhedaghat town is
2,244 which are 33.6 % of the population of total
town. The social composition of the majority of the
slums comprises of SC, ST and other backward
castes. The average household size in the slums is
5.5 and average household income is around 1500
per month.
As per IHSDP report the slums are located in ward 3,4,6,7 and 8. The ward wise slum population is
shown in the following table.
5.8.3 Information pertaining to BPL Population and Slum Population
There are mainly two different types of houses in Bhedaghat – characterized by type of their housing
condition. Predominantly, tiled roof houses are observed in entire city and wood and bamboo materials
used for housing in slums.
Map 5.6 shows Location of Slums
Table 5.23 : Ward Wise Slum Details
Slum Wards Slum Names Ward
Population
Slum
Population
Ward 3 Mahatman Ghandi Ward 655 590
Ward 4 Deendhayal Ward 750 675
Ward 6 Ram Manohar Lohiya Ward 318 286
Ward 7 Sardhar Ballabha Bhayi Ward 436 392
Ward 8 Maharana Prathap Ward 334 300
Total 2493 2243
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 53 of 92
City Development Plan for Bhedaghat Town
Source: Nagar Parishad, Bhedaghat
5.8.4 Present and Future Housing Demand
The information on housing scenario in slums is not available.
However, it was indicated that about 40 per cent of the slum
dwellers live in temporary shelters and during the
reconnaissance visits, it was observed that most of the houses
are constructed using brick, wood and bamboo materials.
Table 5.24: Slum Matrix with reference to Infrastructure covered
Slum Name
Wa
rd N
o.
La
nd
Te
nu
re
Wa
ter
Su
pp
ly
(Pip
ed
)
Sa
nit
ati
o
n (
Se
we
r
Lin
e)
SW
M
Str
om
Wa
ter
Dra
ins
Str
ee
t
Lig
hts
Ro
ad
s
Ed
uca
tio
n
He
alt
h
So
cia
l
Se
cu
rity
Mahatman Ghandi Ward 3 Pvt
Deendhayal Ward 4 Pvt
Ram Manohar Lohiya Ward
6 Pvt
Sardhar Ballabha Bhayi
Ward 7 Pvt
Maharana Prathap Ward 8 Pvt
Covered
Partially Covered
5.8.5 SWOT Analysis
Strength
• Availability of land for relocating the slums
Weakness
• Inadequate physical and social infrastructure facilities
• Poor condition of housing status
• Lack of awareness programmes for poverty reduction schemes
Opportunities
• Motivate private sector to participate in slum up-gradation projects
Threats
• Environmental degradation due to lack of access to improved sanitation
5.8.6 Issues
Following are the issues based on the analysis done through secondary sources as well as observations
and discussions with ULB engineers, community based organizations and slum dwellers. Major issues in
brief are given below:
• Inadequate infrastructural facilities like water supply, sewerage and roads, etc.
• Concentrating the larger slums in same location
• Lack of comprehensive urban poverty reduction strategy
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 54 of 92
City Development Plan for Bhedaghat Town
• In absence of proper strategy and policies to create affordable housing stock for the urban poor in
the town
• Un-regulated physical development.
5.8.7 City specific Strategies and Action Plans
Urban Poor & Slums
Issue Goal Strategies Action Plans/ Proposals
Lack of access to
basic services
• Universalization of
basic services
• Awareness of the slum
development schemes and programs
• Equitable access to basic
services with minimum standards, within the
affordability limit and willingness to pay
• Livelihood Promotion and Community Development
• Implementation of slum
up-gradation programmes
• Relocate the existing
slums • Provide affordable
housing stock
• Providing adequate social and physical
infrastructure facilities
5.9 Social infrastructure
5.9.1 Educational Facilities
The availability of skilled manpower for diversification of economic base in a town depends on the
provision of quality education. There are 4 primary schools in the town. In addition to the primary
schools, there are 2 other schools that are catering to the needs of secondary education. Students from
surrounding villages are dependent on Bhedaghat town for education purpose. The details of the existing
educational institutions are provided in Table.
Table 5.25: Details of the Educational Institutions in Bhedaghat
Type Norm (UDPFI) Existing Cumulative Demand
2011 2015 2025 2035
Population 6,657 6,657 7,154 8,771 11,138
Primary No. 1/2500 population 4 4 4 5 6
Area 0.4 ha NA 1.6 1.6 2 2.4
Secondary/ High School
No. 1/7500 population 2 2 2 2 2
Area 1.6 ha NA 3.2 3.2 3.2 3.2
Senior Secondary
School
No. 1/7500 population 0 2 2 2 2
Area 1.6 ha NA 3.2 3.2 3.2 3.2
School for Physically
Challenged
No. 1/45000 population 0 0 0 0 0
Area 1.0 ha 0 0 0 0 0
College No. 1/125000 population 0 0 0 0 1
Area 4.0 ha NA 0 0 0 4.0
Poly Technic No. 1/ 1000,000 0 0 0 0 1
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 55 of 92
City Development Plan for Bhedaghat Town
Type Norm (UDPFI) Existing Cumulative Demand
2011 2015 2025 2035
Area 2.4 ha 0 0 0 0 2.4
Engineering
College
No. 1/ 1000,000 0 0 0 0 0
Area 4.0 ha 0 0 0 0 0
Source: Town Directory, Census of India, 2001
The nearest engineering, and medical institutions are available at Jabalpur, which is at a distance of 25
km from the town.
A total of 4 primary schools, 2 secondary are required by the end of horizon period. Considering the
dependency of the surrounding rural areas, possibility of developing a Polytechnic college is factored into
the educational requirements of the town, though the population size of Bhedaghat is less.
5.9.2 Health Facilities
The town has one Dispensary with no beds, with an average of 2 persons visiting per day. The details of
the medical facilities available in Bhedaghat town are provided in Table. To avail specialized services,
people resort to travelling to Jabalpur.
Table 5.26 : Details of Medical Facilities in Bhedaghat
Medical Facilities Nos. No. of Beds
1. Hospitals 0 0
2. Health Centers 0 0
3. Dispensary 1 0
Source: Bhedaghat
The available data is compared with UDPFI guidelines to assess the adequacy of medical facilities. The
details of future demand for the medical facilities are provided in Table.
Table 5.27: Details of Future Demand for the Medical Facilities
Sl. No.
Type Norm (UDPFI)
Existing Cumulative Demand
2011 2015 2025 2035
1. Projected Population 6,657 6,657 7,154 8,771 11,138
2. Hospital No. 1 for 100000 persons (100
beds)
0 1 1 1 1
Area 3.7 ha per unit NA 3.7 3.7 3.7 3.7
3. Maternity
Centres
No. 1 for 0.45 lakh
to 1 lakh
0 1 2 2 2
Area 0.2 ha per unit NA 0.2 0.4 0.4 0.4
4. Community
Health Centres
No. 1 for 0.45 lakh
to 1 lakh
0 1 2 2 2
Area 0.2 ha per unit 0.2 0.4 0.4 0.4
Source: Town Directory, Census of India, 2001
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 56 of 92
City Development Plan for Bhedaghat Town
5.9.3 Socio-Cultural Facilities
The town does not have any land earmarked for Socio-cultural. There are 2 parks located in ward 1 and
4, one play ground in ward 3 in the town.
Table 5.28: Details of Future Demand for Socio-Cultural Facilities
Type Norm (UDPFI) Existing
Cumulative Demand for
Projected Population
7,154 8,771 11,138
2011 2015 2025 2035
Community Hall No. 1/ 15000 population 0 1 2 3
Local Park No. 1/ 10000 population 2 2 3 4
Cremation Ground No. 2 sites for 5 lakhs (pop) 3 - 4 5
Police Station No. 1 for 90000 (pop) 1 - - -
5.9.4 Recreation/ Leisure/ Parks and Play Grounds
There are 2 parks located in ward 1 and 4, one play ground
in ward 3. It is observed that there is a deficiency in
recreational facilities in the town. There is a need to
develop and maintain further recreational facilities in the
town.
5.9.5 Markets
There is a weekly market in Bhedaghat town, which is located in ward 4, near municipal office in the
town. This market primarily caters the daily needs of the population of the town. The market functions
for 1 day in a week. About 150 people visit the market on a regular week day.
5.9.6 Crematoria & Burial Grounds
There are 3 burial grounds in the town, which are primarily serving the needs of Hindu and Muslim
religions. The burial grounds and crematoria are maintained properly. In quantity, these are sufficient to
cater to the present needs however; there is a need for allotting more space for future requirement.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 57 of 92
City Development Plan for Bhedaghat Town
5.9.7 City specific Strategies and Action Plans
Social Infrastructure
Issue Goal Strategies Action Plans/ Proposals
Inadequate
social infrastructure
• Development
of social infrastructure
to improve the
Quality of Life
• Development of higher
education facilities,
vocational training centers and job oriented training
facilities
• Improvement of specialized health services
• Provision of cultural &
recreational facilities
• Provision of additional burial
grounds • Provision of firefighting
facilities
• Provision of hotels facilities
for visitors (outsiders)
Provision of Educational facilities:
• Primary schools: 2
• Senior secondary schools: 2
• ITI college: 1
• Polytechnic college: 1 Provision of Heath facilities:
• Hospitals: Strengthening with
additional staff
• Maternity hospitals: 2
• Community health centers: 2
Provision of land for additional
burial grounds: 2 Provision of park : 1
Provision fire station: 1 Provision of hotels: 2
Priority Actions • Provision of town level Fire Station
• Provision of Improvement of Existing Parks
• Provision of Burial Grounds
• Provision of College
• Provision of Community Halls
INSTITUTIONAL
FRAMEWORK
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 58 of 92
City Development Plan for Bhedaghat Town
CHAPTER 6 INSTITUTIONAL FRAMEWORK
The Organizational Structure of the deliberative wing in Bhedaghat Nagar Parishad
Figure 6.1: Organization Structure of the deliberative wing in Bhedaghat Nagar Parishad
As shown in the above figure, President and Vice-President are the elected bodies, whereas the Nagar
Parishad is headed by Chief Municipal Officer.
Public sphere
in Bhopal
President/Chairperson
Ward Councilors
President in Council
Appeal Committee
Ward Committee
Advisory Committee
Departments under Nagar Parishad - Housing, Environment and Public works Department - Water Works Department - Health and Medical Department - Market Department - Education Department - Women and Child Welfare Department - Food and Civil Supplies Department - Rehabilitation and Employment Department - Revenue Department - Law and General Administration Department
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 59 of 92
City Development Plan for Bhedaghat Town
The organizational Structure of the Executive wing in Bhedaghat Nagar Parishad
Figure 6.2: Organization Structure of the Executive wing in Bhedaghat Nagar Parishad
Departmental Heads
Chief Municipal Officer
- Public Works Department - Housing, Sanitation Department - Water Supply Department - Finance and Accounts Department - General Administration
Departments - Revenue & Tax Department - Public Relation and Library
Department - Fire Brigade & Workshop Department - Law Section and Legal Cell
Department - Planning and Development
Department - Garden and Parks Department
Zonal Officers
Technical Staff
Non Technical Staff
Ward Officers
MUNICIPAL FINANCE
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 60 of 92
City Development Plan for Bhedaghat Town
CHAPTER 7 MUNICIPAL FINANCE
7. Present Scenario
The Nagar Parishad prepares budgets for the every year. For the purpose of the analysis, the Nagar
Parishad finances of Bhedaghat have been reviewed for the last five years, commencing from the
financial year 2007-08 and also the items of account have been categorized under the following major
heads:
7.1 Revenue and Capital Accounts:
All recurring items of income and expenditure
are included under revenue head. These include
taxes, charges, salaries, maintenance
expenditure, etc., and items under capital
accounts are non-recurring in nature and include
loans, contributions by GoMP, other agencies
and capital grants under various State and
Central Government programmes. Expenditure items include expenses booked under developmental
works.
7.1.1 Financial status:
Revenue income of Bhedaghat Nagar Parishad has grown to a level of Rs.162 lakhs in the financial year
2011-12 from Rs. 124.98 lakhs in financial year 2007-08, the revenue income had registered an average
annual growth of 9%, whereas the revenue expenditure increased at an average annual rate of 18%. It
can be clearly known that the growth rate in revenue income is less than growth rate in expenditure,
which leads to negative in revenue operating surplus. Since, lack of revenue operating surplus, the capital
account transactions are also considered for the purpose of the Analysis. The capital receipts includes the
grants, Educational improvement ke liye abhidan pension R.P.S etc.,
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 61 of 92
City Development Plan for Bhedaghat Town
7.1.2 Composition of own revenue and expenditure:
The revenue expenditure is more than revenue income. Since, there is no revenue operating surplus.
Accordingly, the capital Income and expenses are also considered for the purpose of the analysis. The
graph shows the composition of own revenues and revenue expenditure of Nagar Parishad:
CAPITAL INVESTMENT
PLAN (CIP) & FINANCIAL
OPERATING PLAN (FOP)
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 62 of 92
City Development Plan for Bhedaghat Town
CHAPTER 8 CAPITAL INVESTMENT PLAN (CIP) & FINANCIAL OPERATING PLAN (FOP)
8.1 City Investment Plan - Introduction
The Capital Investment Plan is the multi-year scheduling of identified and prioritized investments. The
CIP is developed after the in-depth analysis of existing infrastructure, service delivery gaps and various
stakeholder workshops at town and state level. The strategies identified/structured for improvement of
existing service gaps and proposal for future requirement.
The proposed projects are identified under three components;
• Projects for system Augmentation,
• Projects for system Refurbishment and
• Other Development projects.
8.1.1 Water Supply System (WS)
The total investment requirement for the water supply sector is estimated at about Rs. 215.55 Lakh. The
investment requirement is estimated for various components of water supply system, including Storage
facility, pipeline for clear water transmission, internal distribution network and installation of water
meters. The investment requirement for leak detection and rectification in the transmission mains and
internal distribution system is also estimated.
A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the water supply system is presented in Table
Table 8.1: Investment Requirements for Water Supply Sector
Water Supply (WS)
Gap/
Demand Unit
Unit Cost
(lakhs)
Total Amount
(lakhs)
Phase
1
Phase
2
Phase
3
2012-2015
2015-2025
2025-2035
A. System Refurbishment
Existing improvement of
pipeline network 4 km 5.5 22.00 22.00 - -
laying of network system in
un-served Areas 6 km 5.5 33.00 33.00 - -
Sub Total (A) 55.00 55.00 0.00 0.00
B. System Augmentation
Pipeline system for
future/additional road
length 13 km 5.5 69.30 - 34.65 34.65
Additional storage capacity 0.45 ML 60 27.00 13.50 13.50 -
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 63 of 92
City Development Plan for Bhedaghat Town
Water Supply (WS)
Gap/ Demand
Unit
Unit
Cost (lakhs)
Total
Amount (lakhs)
Phase 1
Phase 2
Phase 3
2012-
2015
2015-
2025
2025-
2035
Treatment Plant Capacity 1.50 MLD 11 16.50 16.50 - -
Centrifugal pumps capacity
required 75 hp 0.17 12.75 12.75 - -
Sub Total (B) 125.55 42.75 48.15 34.65
Intake Pipeline length 1 km 5.5 5.50 5.50 - -
Sub Total (B) 188.57 64.47 69.10 55.00
C. Others
Capacity Building
Programmes for ULB Staff LS 5.00 5.00 - -
DPR Preparation including
topographic survey LS 30.00 30.00 - -
Sub Total (c) 35.00 35.00 0.00 0.00
Grand Total (A+B+C) 215.55 132.75 48.15 34.65
8.1.2 Sewerage
Proposed projects in sewerage sector were identified based on the future demand. In this sector
proposals are to prepare “Root-Zone treatment system” instead of Underground drainage system. Total
proposed investment is Rs. 53.40 lakh, which also includes conducting capacity building programmes at
town level.
A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the sewerage system is presented in Table
Table 8.2: Investment Requirements for Sewerage Sector
Sewerage Gap/
Demand Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase 1 Phase 2 Phase 3
2012-
2015
2015-
2025
2025-
2035
A. System Refurbishment
Sewerage network plan- Root
zone system LS 2.00 2.00 - -
Sub Total (A) 2.00 2.00 0.00 0.00
B. System Augmentation
Provision of DEWATS (Baffled
treatment system) 2320 No's 0.02 46.40 11.60 23.20 11.60
Sub Total (B) 46.40 11.60 23.20 11.60
C. Others
Capacity Building Programmes
for ULB Staff LS 5.00 5.00 - -
Sub Total (c) 5.00 5.00 0.00 0.00
Grand Total (A+B+C) 53.40 18.60 23.20 11.60
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 64 of 92
City Development Plan for Bhedaghat Town
8.1.3 Storm Water Drains (SWD)
The proposed investment for storm water drainage sector includes upgradation and remodeling of kutcha
to pucca drains, open drains to closed drains and formation new drains in uncovered areas in the city.
The total investment proposed in this sector is Rs. 225.5 lakh and the summary of projects and
corresponding capital investment requirement for augmentation and refurbishment of the storm water
drainage system is presented in Table
Table 8.3: Investment Requirements for Storm Water Drains Sector
Storm Water Drains (SWD)
Gap/ Demand
Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase
1
Phase
2
Phase
3
2012-
2015
2015-
2025
2025-
2035
A. Rehabilitation
Rehabilitation of existing road side drains 0.75 Km 2 1.50 1.50 - -
Provision of road side drains in un-served areas 23 Km 5.5 126.50 126.50 - -
Sub Total (A) 128.00 128.00 0.00 0.00
B. Refurbishment
Pucca drains in future
expansion areas (in km) 15 Km 5.5 82.50 20.63 41.25 20.63
Improvement of Lakes 1 No's 5 5.00 - 5.00 -
Provision of Rainwater
harvesting system LS 10.00 10.00 - -
Sub Total (B) 97.5 30.63 46.25 20.63
Grand Total (A+B) 225.5 158.63 46.25 20.63
8.1.4 Solid Waste Management (SWM)
Proposed projects identified in Solid water Management component consist of procurement of additional
primary collection vehicles, secondary collection vehicles, and transportation vehicles like Dual loaded
dumped placers. For scientific disposal of waste generated in city, development of Landfill sites for non-
recyclable solid waste disposal and Compost site development for recyclable wastes. Total capital
investment proposed in this component is Rs. 90.05 lakh, and the summary of projects and
corresponding capital investment requirement for augmentation and refurbishment of the solid waste
management system is presented in Table
Table 8.4: Investment Requirements for Solid Waste Management Sector
Solid Waste Management
(SWM)
Gap/
Demand Unit
Unit Cost
(lakhs)
Total Amount
(lakhs)
Phase 1
Phase 2
Phase 3
2012-2015
2015-2025
2025-2035
A. Household Level
Auto tippers (1 for 900-1000
HH) 3 HH 2.4 7.20 1.80 3.60 1.80
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 65 of 92
City Development Plan for Bhedaghat Town
Solid Waste Management (SWM)
Gap/ Demand
Unit
Unit
Cost (lakhs)
Total
Amount (lakhs)
Phase 1
Phase 2
Phase 3
2012-
2015
2015-
2025
2025-
2035
Try Cycles (1 for 300-400 HH) 8 HH 0.08 0.64 0.16 0.32 0.16
Community Bins (1 for 50-60
HH) 65 HH 0.01 0.65 0.65 - -
Sub Total (A) 8.49 2.61 3.92 1.96
B. Commercial Area
Litter Bins (1 for 200m) 10 m 0.01 0.10 0.1 - -
Sub Total (B) 0.10 0.10 0.00 0.00
C. Street Sweeping & Drain desilting
push carts (1 for 2km) 15 km 0.065 0.98 0.24 0.49 0.24
Sub Total (c) 0.98 0.24 0.49 0.24
D. Secondary Collection
Metal Container (1 for 2000 HH) 2 HH 0.25 0.49 0.49 - -
Dumper Placer vehicles 2 10 20.00 10.00 10.00 -
Sub Total (D) 20.49 10.49 10.00 0.00
E. Disposal site
Improvements at site
(fencing/storage/segregation) LS 50.00 50.00 - -
Construction of Sanitary landfill site LS 5.00 5.00 - -
Sub Total (E) 55.00 55.00 0.00 0.00
F. IEC Activities LS 5.00 5.00 - -
Sub Total (F) 5.00 5.00 0.00 0.00
Grand Total
(A+B+C+D+E+F) 90.05 73.44 14.41 2.20
8.1.5 Sanitation
Proposed projects in Sanitation sector were identified based on the future demand. In sanitation sector it
is proposed to construct 4 nos of public toilets across various locations in the city. Total proposed
investment is Rs. 61.00 lakh, which also includes conducting capacity building programmes at town level
and construction of Low Cost Sanitation Units.
A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the Sanitation system is presented in Table
Table 8.5 : Investment Requirements for Sanitation Sector
Sanitation Gap/
Demand Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase 1 Phase 2 Phase 3
2012-
2015
2015-
2025
2025-
2035
A. System Refurbishment
Improvement of Existing
Public Toilets 4 No's 3 12.00 12.00 - -
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 66 of 92
City Development Plan for Bhedaghat Town
Sanitation Gap/
Demand Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase 1 Phase 2 Phase 3
2012-
2015
2015-
2025
2025-
2035
Sub Total (A) 12.00 12.00 0.00 0.00
B. System Augmentation
Construction of New Toilets 4 No's 6.5 26.00 26.00 - -
Construction of low cost
sanitation units 450 No's 0.04 18.00 18.00 - -
Sub Total (B) 44.00 44.00
C. Others
Capacity Building
Programmes for ULB Staff LS 5.00 5.00 - -
Sub Total (c) 5.00 5.00 0.00 0.00
Grand Total (A+B+C) 61.00 61.00
8.1.6 Traffic & Transportation (T&T)
The proposed investments in road improvement works consist of strengthening /improvement to existing
roads, upgradation of roads, widening of sub arterial roads in the city and new formation of roads in
extension areas to maintain a better circulation pattern. The investment proposed in road improvement
works is Rs. 1486.35 Lakh. A summary of projects and corresponding capital investment requirement for
augmentation and refurbishment of the Traffic & Transportation is presented in Table
Table 8.6 : Investment Requirements for Traffic & Transportation
Traffic & Transportation (TT)
Gap/ Demand
Unit Unit Cost
(lakhs)
Total Amount
(lakhs)
Phase
1
Phase
2
Phase
3
2012-2015
2015-2025
2025-2035
A. Existing Improvement
CC roads 1.7 km 2.5 4.25 - 4.25 -
WBM roads 0.5 km 20 10.00 10 - -
Sub Total (A) 14.25 10 4.25 0
B. Up gradation of existing
roads
WBM to CC roads 5.6 km 10 56.00 - 56 -
Kucha to WBM roads 8.3 km 22 182.60 182.6 - -
Sub Total (B) 238.6 182.6 56 0
C. Widening of Roads
Arterial road 0.5 km 25 12.50 12.5 0.00 0.00
Sub-Arterial roads 4 km 25 100.00 - - 100
Sub Total (C ) 112.5 12.5 0 100
D. Laying of New roads
laying of roads in future
development areas 15 km 75 1125.00 - 562.5 562.5
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 67 of 92
City Development Plan for Bhedaghat Town
Traffic & Transportation (TT)
Gap/ Demand
Unit
Unit
Cost (lakhs)
Total
Amount (lakhs)
Phase 1
Phase 2
Phase 3
2012-
2015
2015-
2025
2025-
2035
Sub Total (D) 1125 0 562.5 562.5
E. Parking Facilities
Near Municipal Office 1 LS 0.5 0.5 - -
Near 3 Tourist/water falls
areas 1 LS 0.5 0.5 - -
1 LS 0.5 0.5 - -
1 LS 2 - 2
Sub Total (E) 3.5 1.5 2 0
F. Bus Shelters
Near Nagar
Parishad/Dhuandhar falls 1 No's 2.5 2.50 2.5 - -
Near lahmetaghat 1 No's 2.5 2.50 - 2.5 -
Sub Total (F) 5 2.5 2.5 0
G. Foot Paths (km)
Along Main Arterial Road 3 Km 7.5 22.50 22.5 0.00 0.00
Sub Total (H) 22.5 22.5 0 0
Grand Total 1521.35 231.6 627.25 662.5
PWD Investment 35 35 0 0
ULB Investment 1486.35 196.6 627.25 662.5
8.1.7 Electricity and Street Lighting
The proposed projects in street lighting include replacement repaired and old tube fixtures and
installation of new fixtures as per standards. To curtail the energy consumption in street lighting sector
power saving switches (CFL) has been proposed. Total investment in street lighting is Rs. 316.05 lakh.
Table 8.7: Investment Requirements for Street Lighting
Street Lighting (SL) Gap/
Demand Unit
Unit Cost
(lakhs)
Total Amount
(lakhs)
Phase
1
Phase
2
Phase
3
2012-2015
2015-2025
2025-2035
Provision of Sodium Vapour/CFL 505 No's 0.15 75.75 75.75 - -
Replacement of bulbs to CFL 345 No's 0.1 34.50 17.25 17.25 -
Street Lighting for additional
road length 1332 No's 0.15 199.80 39.96 39.96 119.88
Provision of high mast lamps 2 No's 3 6.00 6 - -
Grand Total 316.05 138.96 57.21 119.88
8.1.8 Urban Poor
To improve the basic infrastructure facilities inside the slum area and for redevelopment, rehabilitation of
slums following projects have been identified with a total investment of Rs. 415 lakh
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 68 of 92
City Development Plan for Bhedaghat Town
Table 8.8: Investment Requirements for Urban Poor
Urban Poor (UP) Gap/
Demand Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase
1
Phase
2
Phase
3
2012-
2015
2015-
2025
2025-
2035
A. Slum Upgradation
Construction of houses 250 No's 1.5 375.00 75 112.5 187.5
Health & Education Programmes LS 15 15 - -
Sub Total (A) 390 90 112.5 187.5
B. Livelihood Promotion
Provision of training
centers/meeting halls etc. LS 15 15 - -
Sub Total (B) 15 15 0 0
C. Social Security
Security of tenure for urban poor LS 10 10 - -
Sub Total ( C ) 10 10 0 0
Grand Total 415 115 112.5 187.5
8.1.9 Environmentally Sensitive Areas
To improve the living environment in the Town, list of projects have been proposed which include
afforestration. Total investment proposed for urban environmental improvement is Rs.10 lakhs.
Table 8.9: Investment Requirements for Environmentally Sensitive Areas
Description
Unit Cost (Lakhs)
Unit Cost (lakhs)
Amount (Lakhs)
Afforestration – in Lake/Pond Catchments Areas 1 10 10
Total 10
8.1.10 Urban Governance
For efficient management of the increasing administrative responsibilities and the welfare activities it is
proposed for e governance, restructuring of Municipal Council (institutional strengthening) organization
setup to take up new responsibility, double entry accounting system, town planning and municipal
information system (MIS), property Mapping – GIS for efficient collection performance. Besides this
capacity building and periodic training also proposed with a total investment of Rs. 10.00 lakh.
8.1.11 Social Infrastructure
Total investment proposed under this head is Rs. 155.00 lakh, which include development of community
halls, renewal of existing commercial establishments, construction of slaughter houses, electric
crematorium, construction of vegetable markets and facilities like social security and emergency services
etc. The detailed cost estimates are presented in Table
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 69 of 92
City Development Plan for Bhedaghat Town
Table 8.10 : Investment Requirements for Social Infrastructure Facilities
Social Infrastructure (SI)
Gap/ Demand
Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase 1 Phase 2 Phase 3
2012-
2015
2015-
2025
2025-
2035
Fire & Emergency Services LS 75 - 56.25 18.75
Parks & Playgrounds LS 25 25 - -
Community Halls LS 15 - 15 -
Crematorium Facilities LS 10 10 - -
Market/Slaughter
house/Mela Ground LS 15 15 - -
Social Security LS 15 15 - -
Grand Total 155 65 71.25 18.75
Summary of Sector wise Investments
The summary of proposed investment is presented in Table. Total investment proposed is Rs. 3037.90
lakh out of which Rs. 2622.90 lakh is proposed for urban infrastructure and governance and Rs. 415 lakh
is proposed for basic services to the urban poor and housing for urban poor.
Table 8.11 : Summary of Proposed Investments
Sector wise Summery of Investments
Total
Amount (lakhs)
Phase 1 Phase 2 Phase 3
2012-2015 2015-2025 2025-2035
Water Supply (WS) 215.55 132.75 48.15 34.65
Sewerage 53.40 18.60 23.20 11.60
Sanitation 61.00 61.00 0 0
Solid Waste Management (SWM) 90.05 73.44 14.41 2.20
Storm Water Drains (SWD) 225.50 158.63 46.25 20.63
Traffic & Transportation (TT) 1486.35 196.60 627.25 662.50
Street Lighting (SL) 316.05 138.96 57.21 119.88
Social Infrastructure (SI) 155.00 65.00 71.25 18.75
Environment 10.00 10.00 0 0
Urban Governance 10.00 10.00 0 0
Urban Poor (UP) 415.00 115.00 112.50 187.50
Grand Total 3037.9 979.98 1000.22 1057.71
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 72 of 92
City Development Plan for Bhedaghat Town
Presently, there are 270 water connections, out of which, 263 are domestic and 7 are commercial, which
is 56.25% of the property tax assessments. Based on the population, the water connections are assessed
by dividing 5 people per house-hold. In this regard, based on the growth of the population, the
connections are increased to 1151 for the year 2035-36.
• Tax Demand per Assessment
The average monthly water tax demand per assessment in 2011-12 is Rs. 30 for domestic and Rs.120 for
commercial and is proposed/assumed to be revised to Rs. 90 Per month and Rs.150 per month for
domestic and commercial respectively beginning from 2012-13, at a conservative simple growth rate of
15 per cent per 3 years. The new water connection in 2011-12 is Rs.1000 and is proposed to be revised
to Rs.1200 and Rs.1500 from 2012-13 for domestic and commercial connections respectively, at a
conservative simple growth rate of 15 per cent per 3 years.
• Collection Efficiency
It is assumed that BNP would gradually increase its tax collection performance from 75 percent to 90
percent against arrears and current tax demand respectively.
Solid waste charge
• Number of Assessments
The ultimate number of assessments for solid waste charge is purely based on the property tax
assessments. It is assumed the total number of property tax assessments is the base for the collection of
revenue.
• Tax Demand per Assessment
It is assumed that the average monthly solid waste charge demand is Rs. 25 per house hold for domestic
Rs.35 for commercial and it is also assumed that the rate will be revised for every three years at a
conservative growth rate of 15 per cent per every three years.
• Collection Efficiency
It is assumed that BNP would gradually increase its tax collection performance from 65 percent to 90
percent against arrears and current tax demand respectively.
Other Taxes
Other relatively insignificant taxes like Road tax, improved technology tax, Market fees, tourists tax etc.,
are forecast to grow at a nominal rate of 10-15% per cent per annum. These rates are assumed on the
basis of CAGR and Average annual growth (trend) rate, whichever is lower.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 70 of 92
City Development Plan for Bhedaghat Town
8.2 FINANCIAL OPERATING PLAN (FOP) - Introduction:
The Financial Operating Plan (FOP) is a multi-year forecast of finances of the Nagar Parishad. The FOP
has been generated for a short term period (0 to 3 yrs) beginning 2012-13 to 2014-15, and also for the
long-term period till 2035-36. In the context of this assignment, the FOP is generated for the short term
and has been extended for the long-term (20 years) to essentially provide a snapshot of the impact of
identified investments on the municipal finances in the long run.
8.2.1 Objective and Methodology:
The objective of this plan is to assess the investment sustenance capacity of the Nagar Parishad with
respect to the project cost identified in the Capital Investment Plan (CIP) as part of the City Development
Plan (CDP). FOPs are essentially a financial forecast, worked out on the basis of the realistic assumptions
and the growth trends of various components of given Revenue and Capital Receipts and expenditure.
The investment sustenance of the Bhedaghat Nagar Parishad is assessed using a Financial Operating Plan
(FOP) model. The FOP is a multi-year forecast of finances for a term till 2034-35.This analysis is first
done without introducing the identified capital investments in order to arrive at the borrowing and
investment capacities. The second step is to introduce certain reforms and consider necessary measures,
which is expected to improve the financial capability of the Nagar Parishad. The third step is the
sustainability will be checked with the reforms and without reforms. In simple, FOP is worked out under
three scenarios, viz.
a) Base Case; i.e. “Do Nothing” Scenario
b) Introduce reforms with no capital Investments; and
c) Investment Sustenance.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 71 of 92
City Development Plan for Bhedaghat Town
8.2.2 Assumptions and Reforms
The Analysis is based on a whole range of assumptions related to income and expenditure. These
assumptions plays a vital role to ascertain the investment sustenance and would also provide a tool to
test certain specific policy decisions regarding revenue and expenditure drivers on the overall Parishad
fiscal situation. It explains the assumption adopted for the three FOP scenarios:
8.2.2.1 Assumptions for Forecasting Income and Expenditure:
Generally, the assumptions for forecasting Nagar Parishad income and expenditure for the three
scenarios are considered based on past trends (5-year average growth trend or 5-year compound annual
growth rate - CAGR, whichever is lower), subject to minimum and maximum annual growth rate ceilings.
8.2.2.2 Municipal Taxes:
The primary tax sources, viz. property tax, water tax/charge are forecasted based on assumptions on the
base (number of assessments) and basis (tax demand per assessment) and the collection efficiencies. In
addition to the above taxes, provision is also made for estimating income from solid waste, subject to
implementation of the proposed scheme.
Property Tax
• Number of Assessments
In case of property tax, the total number of property tax assessments in 2011-12 as per BNP (Bhedaghat
Nagar Parishad) records adopted as the base and the property tax assessments are 480. The number of
properties in BNP has increased from 480 to 1406 at a CAGR of 3.69 per cent during 2011-12 to 2035-36.
A nominal growth rate of 2.00 per cent (equivalent to forecast population growth rate of 2.73 per cent
during 2011-12 to 2035-36) is adopted for forecasting the number of property tax assessments.
• Tax Demand per Assessment
The annual property tax demand per assessment in 2011-12 is Rs 200/- for pucca houses and is assumed
to be revised by 25 per cent beginning from 2012-13, at a conservative growth rate of 15 percent for
each three years. The presumed rate for analysis for domestic houses is Rs.250 and commercial is Rs.350
Per annum.
• Collection Efficiency
It is assumed that BNP would consider 60% and 65% in 2012-13 and gradually increase its tax collection
performance to 90 per cent against arrears and current tax demand respectively.
Water Tax/Charges
• Number of Assessments
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 73 of 92
City Development Plan for Bhedaghat Town
8.2.2.3 Non-Tax Sources
The non-tax sources of revenue income, viz. municipal own sources, compensation and assigned revenue
and revenue grants are forecast based on past trends. The establishment expenditure of BNP has grown
at a average CAGR of about 11 per cent during the last five years. The same growth rate 1-15% per
annum is assumed for forecasting establishment expenditure. The other expenditures are assumed based
on CAGR and average 5 year trend.
8.2.2.4 New O&M Cost
The capital investments envisaged as per the CIP are bound to impose additional establishment and O&M
expenditure on BNP. Such additional expenditure is estimated based on percentage of capital costs as
estimated by the consultants from their experience in other projects.
FINANCIAL OPERATING PLAN
Before moving to the various scenarios, it is necessary to discuss the details of the Capital Investment
Plan (CIP) and its application on the FOP. The next paragraphs detail on the same. For the purpose of
incorporating new investments, Let us discuss the below:
Phasing of new investments: The identified investments are phased into three; the first one, being
the short term is made for 3 years beginning 2012. The second phase is the mid-term and begins from
2016-2026, and the third one being the long term ends with 2035-36.This is based on the demand and
priorities. The following table gives the details of phasing of investments.
Amount Rs.(lakhs)
Sector wise Summery of Investments
Total Amount (lakhs)
Phase 1 Phase 2 Phase 3
2012-2015 2015-2025 2025-2035
Water Supply (WS) 215.55 132.75 48.15 34.65
Sewerage 53.40 18.60 23.20 11.60
Sanitation 61.00 61.00 0 0
Solid Waste Management (SWM) 90.05 73.44 14.41 2.20
Storm Water Drains (SWD) 225.50 158.63 46.25 20.63
Traffic & Transportation (TT) 1486.35 196.60 627.25 662.50
Street Lighting (SL) 316.05 138.96 57.21 119.88
Social Infrastructure (SI) 155.00 65.00 71.25 18.75
Environment 10.00 10.00 0 0
Urban Governance 10.00 10.00 0 0
Urban Poor (UP) 415.00 115.00 112.50 187.50
Grand Total 3037.9 979.98 1000.22 1057.71
The Grant from the central and state government is considered as 80:10 and the Nagar Parishad will get
its contribution as Loan from outside institutions.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 74 of 92
City Development Plan for Bhedaghat Town
O&M Costs: The details of O&M costs for each sector have been worked out and the same has been
incorporated in the analysis. The annual growth rate of O&M cost is 8% per annum. The details of O&M
calculation:
Rs. In Lakhs
Loan calculations: The Grant mix between central and State Government (GoMP) is taken at a ratio of
80:10, while ULB contribution stays at 10% is considered as Loan taking from outside organization. The
following loan terms have been assumed.
The Principal and interest repayments for the Loan taken is
a) SCENARIO 1: Base Case; i.e. “Do Nothing” Scenario :
The financial operating plan, under the first scenario which is a ‘Do Nothing’ situation (without
introduction of new investments). The details of same can be seen here:
Rs.in Lakhs
Sr.No Particulars Rs.
1 Loan amount (Rs.) 304.29
2 Interest (%) 7.00%
3 Repayment period 15 years
4 Moratorium period 3 Years
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 75 of 92
City Development Plan for Bhedaghat Town
It is to be noted that the above FOP is done without introducing any new investments. Since, it has
been observed that the TE/TR ratio is slowly decreasing from 2012-13 and reached 1.07 in the year
2017-18 and having a negative closing Balance of Rs.(1.03) Crores. By the end of the year 2035-36,
the TE/TR ratio is 0.84 and having a Positive closing balance of Rs.12.75 crores. Here, the negative
cash flows are recovered by the year 2026-27.The Computations of the base case scenario has given in
annexure.
b) Scenario 2 Introduce reforms with no capital Investments;
We are introducing reforms that are likely, rather necessary for the ULB to execute, in order to improve
their financial position. Certain assumptions have been made on this account, which are based on the
prevailing trends in various other places. However, based on the assumptions that are already
discussed above, this FOP is prepared.
Rs.in Lakhs
It is to be noted that the above FOP is done without introducing any new investments, but by
introducing some reforms with assumptions. The TE/TR ratio is more than “1” upto 2018-19. By the
end of the plan, in the year 2035-36, the TE/TR ratio is 0.81 and having a closing balance of Rs.19.43
crores. Here, the negative cash flows are recovered by the year 2022-23.
Scenario 3: Investment Sustenance Plan:
This scenario is done to test the strength of ULB after incorporating the new investments on scenario 2.
The same set of assumptions and reforms considered in Scenario 2 is assumed and considered here for
the purpose of Investment sustenance plan. The extract of FOP for few years is given below:
Rs.In Lakhs
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 76 of 92
City Development Plan for Bhedaghat Town
It is to be noted that the above FOP is done by introducing new investments. Since, it has been
observed that the TE/TR ratio is more than “1” till 2025-26. By the end of the year 2034-35, the TE/TR
ratio is 0.89 and having a closing balance of Rs.1.70 crores. By implementing Investment plan, We can
observe that the negative surplus in the initial years can only be reckoned at the end of the plan period
i.e.2035-36. The Computations of the Investment plan scenario has been given in the annexure
Recommendations: The recommendation suggested therefore, is that the Nagar Parishad shall first introduce certain
management reforms and also certain management measures (not included in FOP) to start with, try
outsourcing activities, which will enhance revenues. It is advised after implementing measures, and then
the Nagar Parishad is better to move to the Capital Investment plan. i.e implementing the measures gives
rather cash flows than capital investment.
Suggested Measures:
The following measures are suggested to be implemented by the management of Nagar Parishad, which
is helpful for the improvements in managing the municipal activities. A few are given below:
� Improvement to Property tax collections- Have tie-ups with nationalized banks and open ‘E-SEVA’ centers
(like in Andhra Pradesh at Vijayawada Municipal Corporation) for collection of property tax, so that
payments become easier and will improve collection efficiency.
� Do Campaigns within the community to explain the benefits of payment of taxes
� Address Government to expedite in resolving court cases, if any, the books of the municipality.
� We suggest to Impose penalties on unauthorized connections
� As a final step and a more technologically advanced step, it is suggested that the ULB goes in for GIS
mapping of the entire properties, which will help in bringing all properties into tax net. This needs to be
updated periodically. A separate cell in the Municipal Administration is to be maintained in this regard.
� Automatic revision of property tax rates and other taxes once in 3 years shall be made mandatory.
On the expenditure side minimal reforms are helpful to reduce manpower and operational expenditure
can be attempted such as:
� Introduce machinery for water supply like for pumping etc., and there by the Human resource cost for
the new investment can be reduced.
� Outsource of solid waste management activities involving primary and secondary collection; there are
possibilities where, even the vehicles purchases can be invested by the operator.
� Similarly, maintenance of street lights can be outsourced to ESCO (Energy Saving Companies
� Periodical maintenance of pumps, etc. can prevent huge O&M expenditure and this also can be
outsourced.
URBAN REFORMS
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 77 of 92
City Development Plan for Bhedaghat Town
CHAPTER 9: URBAN REFORMS
The Reforms under JnNURM aim at strengthening urban governments and to decentralize and devolve
functions, finances and functionaries to them so as to enable them to function as self-governing
institutions providing services efficiently and effectively. Broadly, the reforms aim to:
• Provide for an integrated governance framework with transparency and clear lines of
authority and accountability to achieve the objectives of ‘good urban governance’;
• Facilitate and promote inclusiveness, civic engagement and effective participation of the civil
society in city management;
• Contribute towards financial sustainability of cities - strengthen the financial base of the cities
and make them bankable;
• Enable the cities to work towards planned and integrated provision and operation and
maintenance of infrastructure;
• Develop partnerships with public, private and other sectors for better provision and delivery
of services;
• Extend the canvas of IT and e–Governance to all aspects of city management for efficient,
effective and timely service delivery; and
• Promote pro-poor urban governance and work towards slum free cities with universal,
adequate and affordable housing and basic services;
• Ensure renewal and revival of inner cities;
• Contribute to municipal capacity enhancement.
Implementation of Reforms Implementation of governance reforms is central to JnNURM. These reforms address issues of urban
governance and urban poverty in a sustainable manner. In what follows, an overview of mandatory and
optional reforms is presented.
S. No
Mandatory Reforms Reforms
Status at ULB Remarks Target
1
Adoption of the modern accrual-based double entry
system of accounting in ULBs and Parastatal agencies
Yet to be
Implemented
System was not implemented
due to lack of awareness, professional manpower and
software procurement/equipment. Keen
to adopt the system.
October,
2013
2
Introduction of a system of E-governance using IT
applications such as GIS & MIS etc.
Yet to be
Initiated
System was not implemented due to lack of funds, except few
stand-alone desktop machines
being used for accounting purpose. Keen to adopt the
system with additional funds availability.
March,
2014
3 Reform of Property Tax with GIS applications
Yet to be Initiated
GIS Mapping for utilities need to be done for effective collection.
July, 2013
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 78 of 92
City Development Plan for Bhedaghat Town
4
Levy of reasonable User
Charges by ULBs with the objective that the full cost of
O&M is collected within the
next 5 years.
Partially
achieved, except water and
consolidated
taxes
Collecting water tariff from
household level and collection efficiency is about 60%. UGS
taxes are nil due to absence of system and street lighting tax is
minimal.
2016-17 (UGS
system
may not be
considered due to
proposal
of DEWATS)
5
Internal earmarking within local
body budget for basic services to urban poor.
Yet to be Considered
As of now, ULB is not able to spend any amount for urban
poor sector. Specific allocations have not been made in the budget for urban poor.
2014-2015
6
Provision of basic services to
Urban Poor including security of
tenure at affordable prices, improving housing and
infrastructure facilities
Partially
Initiated
ULB has issued few "Pattas" to
slum dwellers in the past years 2013-2014
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 79 of 92
City Development Plan for Bhedaghat Town
S.No Optional Reforms Reforms
Status at ULB Remarks Target
1
Revision of bye-laws to
streamline the approval process for construction of
buildings, development of site
etc
Yet to be
Initiated
Possible with the directives of State level
stance.
These Reforms
are targeted for implementation
simultaneously with the
implementation of
Mandatory reforms
2 Conversion of land from
agriculture to non-agriculture
Yet to be
Initiated
Possible with the
directives of State level stance.
3 Introduction of property title
certification system in ULB
Yet to be
Initiated
Possible with the directives of State level
stance.
4
20-25% of land earmarking for EWS & LIG category with
a system of cross subsidization
Yet to be
Initiated
Possible with the directives of State level
stance.
5
Revision of byelaws to make
rainwater harvesting mandatory in all buildings
Yet to be
Initiated
Possible with the
directives of State level stance.
6 Bye-laws for re-use of recycled water
Yet to be Initiated
Possible with the
directives of State level stance.
7 Encouraging PPP models Yet to be
Initiated
Possible with the
directives of State level stance.
SUMMARY OF WORKSHOP
PROCEEDINGS
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 80 of 92
City Development Plan for Bhedaghat Town
CHAPTER 10: SUMMARY OF WORKSHOP PROCEEDINGS
10.1 Purpose and Importance of the workshop
Developing a Vision for the City is essential for the preparation of the City Development Plan (CDP). A
Vision is a statement of where the City/Town wishes to grow, within a given time frame, and is often
expressed in terms of clear expectations. It defines the potential of the city and reflects its unique
attributes in terms of comparative and competitive advantages, values and preferences of the city
residents, relationship of the city to state, national and global economies and of course, the history and
physical characteristics of the city. A vision aligns stakeholders’ energies to work cohesively for the
development of the city. Cities need to systematically consider the future requirements, and design Vision
statement to address the shape of the future for the horizon year.
The main purpose of Stakeholders Workshop is to formulate and develop City Vision and Sector goals and
strategies for Bhedaghat Parishad. The CDP shall reflect the priorities and concerns of the public at city
level. Therefore, at different stages, consultative workshops with various stakeholders required to be
conducted.
10.2 Stakeholder Identification
As per Terms of Reference of “preparation of CDP for Bhedaghat Town” the following stakeholders have
been identified and involved for the workshop.
• MLA (Member of Legislative Assembly)
• Municipal Chairperson
• Ward Councilors
• Chief Municipal Officers
• Town and Country Planning Department – Regional Representative
• Line Departments of the State Government such as Pollution Control Broad, Health Department,
Tourism Department, PHED, PWD, Traffic and transportation etc.,
• Private Sector agencies such as chambers of commerce and industry,
• South Eastern Coalfield Limited – Representative
• Government School – Representative
• State Bank of India – Representative
• Inspector of Police
• Non-governmental and community based organizations
• Representatives of the poor communities
• Representatives of ongoing urban development Programmes
• Representatives of media
All the stakeholders and the citizens of the Town become the planning partners of the City Development
Plan.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 81 of 92
City Development Plan for Bhedaghat Town
All the stakeholders identified play an important role in the City Development Planning Process and their
suggestions on various issues regarding the improvement of the quality of life in the Town are very much
a part of the City Development Plan.
10.3 Preparation of handouts and questionnaires
A four page Handout/questionnaire has been prepared which briefs the process of “City Development
Plan” and particularly the Vision and Goals stage of the Process. The later part is a questionnaire
designed to extract the opinions of all the stakeholders in an organized format. The first part focuses on
performance of existing infrastructure and the second part intends to identify the priority projects
necessary for the people.
10.4 District level Workshop/Meeting at District Head Quarters (Jabalpur).
In the 2nd Workshop stage, M/s aarvee associates architects engineers and consultants’ pvt ltd
representatives, Mr. K. Jagadeesh, Mr. Raghuram and Mr. Vishwanath urban and environmental planner
visited Jabalpur on 13th April, 2012 and held initial discussions with Director, Urban Development
Department at Jabalpur Divisional Office. Shri Gulshan Bamra, Collector, Jabalpur District has revised
the progress of the CDP work and Chaired the meeting, addressed the CMO’s and representatives of all 7
project towns.
District level Workshop
On behalf of the consultant team, Mr. K. Jagadeesh, Manager and Mr. Raghuram, Urban Planner
presented the methodology of the study, Visions and Strategies foreseen for the preparation of City
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 82 of 92
City Development Plan for Bhedaghat Town
Development Plan. The consultants addressed the importance of data inputs from various line
departments in the plan preparation. Handouts have been circulated to all the representatives of 7 towns
and details are showed in Annexure 1.
All the suggestions were recorded during the meeting, and shall be incorporated in the Priorities and
Projects stage.
10.5 Extended Discussion with Deputy Director
Detailed deliberations were made with Shri. Rajeev Nigam, Dy. Director, urban development
Department, Jabalpur Division. He emphasized on
• Provision of Water Supply, Sanitation and Solid Waste Management,
• Relocation of slums
• Giving training on folk art and folk culture to the slum dwellers
• Imparting social awareness
• Provision of a buffer zone (Urban Forest) along the river bed
Discussion with Deputy Director
10.6 Town level Workshop/Meeting at Town Level:
10.6.1 Preparation for the workshop
The workshop was organized by Aarvee associates Pvt. Ltd with the co-operation of Chief Municipal
Officer (CMO) Bhedaghat and the Municipal staff. The information on conducting the workshop was
passed onto Nagar Parishad well in advance so as to invite various identified stakeholders to participate
in the workshop. Workshop on CDP was held at Bhedaghat Nagar Parishad on 20th of April 2012. The
purpose of the workshop was to involve stakeholders and facilitate to various discussions, record the
Comments & suggestions to finally incorporate in the preparation of CDP.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 83 of 92
City Development Plan for Bhedaghat Town
10.6.2 Presentation on Town profile and discussion with participants
The workshop started with Introduction to the CDP Process and importance of the public participation in
the process. Firstly, the town profile and sector analysis has been presented to facilitate the discussion
among the participants (Please see enclosed appendix 2 for the copy of presentation). The
summary/Findings of the “Sector Analysis” is also done in the following section of the report.
10.6.3 Summary of the Sector Analysis
The following are the Summary/findings of the sector wise analysis and Town Profile of Bhedaghat,
which was explained to the stakeholders.
Table 10.1 : Summary/findings of the Sector Wise Analysis and Town Profile of Bhedaghat
Sectors Analysis
Demography • The Population of the Municipal area according to the 2011 census is 6,657.
• Decadal Growth rate was 22 % for the 2001 – 2011 years
• Population Density (Persons per Hectare) was 28 (2011 year)
• The estimated population for the year 2035 is 11,138
Landuse • The residential land comprises of 23.65 % of the total developable land.
• The active conservation area constitutes of around 6.98% of the total area.
• The agriculture area comprises of almost 50% of the total area.
Income and expenditure
Income
• Toll tax and Parking charges are the Income sources.
• Property taxes, Grants, other revenues are the major Income sources
• Property taxes and grants are gradually increasing year by year, which explains
the increase in growth and development activities
Expenditure
• Health facilities, new construction, salaries and other expenditure are the
major expenditure sectors. • The priority has been clearly on improving health facilities and new
construction of various infrastructure provisions
Economic
base
• Tourism is the main Source of Economy
• Toll tax and Parking charges contribute to the economy of the Bedhaghat.
• The current workforce participation in Bhedaghat is about 33.0 per cent
(including 9.2 per cent of marginal workers).
Tourism • Tourism is found to be the back bone of the Town’s Economy.
• Separate Facilities like Public Convenience, parking facilities, Public Transport
Facilities, Solid Waste Management for Tourists need to be provided. • Tourism Kiosk centers at tourism places for information to the tourists.
• Exploring avenues to increase the tourism circuit from 1 day to 2 days
Housing • Number of households are 1348 and average households size is 4.8 • By the year 2035 the additional Houses required are 933
Water supply • Nagar Parishad also plays a role in water supply, having 9 Tube wells, 33 hand
pump facility. • Water Supply deficiency wards are 6, 12
• Population covered by water supply is (74%) and 70 LPCD
• Total demand of water will be 1.50 MLD
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 84 of 92
City Development Plan for Bhedaghat Town
• Additional Storage capacity for the year 2035 is 0.45 ML
Sewerage/
Sanitation
• Sanitation system is completely through open drains along the roadways and
houses
• Some of the wards drains are maintained properly, but there are issues with
the chocking of water due to presence of waste materials in the drain. • This problem is acute in rainy season.
• There are no regularly planned drains in slum residing wards.
• The storm water also runs through the same drains causing Over - flow
problems in rainy season.
Solid waste management
• Nagar Parishad is responsible to collect and transfer the solid waste generating
from all households in the Nagar Parishad area. • Tractors are available for solid waste collection and transfer
• The collection frequency is once a week, leading to staking of waste along
roadside and near dust bins
• Some of the slum wards have very poor management of solid waste; the
situation demands for better frequency of waste collection by the Nagar
Parishad • No segregation of waste at source of collection.
• Estimated waste generated for the year 2035 is 5.0 tonnes
Roads and
Transportation
• Bhedaghat Nagar Parishad is well connected by roads to surrounding areas of
Jabalpur and other nearby places.
• Nearest Railway station is Jabalpur (25 Kms)
• The total road length in Bhedaghat is 24.6 km.
• There is no Public Transport facility available in Bhedaghat Nagar Parishad to
nearby places.
Electricity • The town is well developed with almost 85% of households having electricity
connections. • The remaining 15% of the households, not having connections are in squatter
settlements.
• 6 to 8 hours of power cut a day.
• There are provisions for street lighting in the main roadways of Nagar
Parishad.
Educational • There are only 4 primary and 2 secondary schools
• A total of 4 primary schools, 2 secondary are required by the end of horizon
period.
• At college level education, people prefer to study in Jabalpur.
Health • The Bhedaghat town has only 1 dispensary which does not have satisfactory health facilities when compared to standards.
Other facilities • There is no petrol filling facility in Bhedaghat.
• There are 2 parks in ward 1 and 4, one play ground in ward 3
Slums • There are 5 slums in Bhedaghat Nagar Parishad
• The total slum population of Bhedaghat is around 2,493, comprising of 33% of
total population
• The BPL Population is around 305.
• There is no government housing scheme implemented in Bhedaghat Nagar
Parishad for Slums • The open drains are either fully or partially covered with trash leading to water
stagnancy and posing unsafe / unhygienic environment
• Absence of Public Toilets
Environmental
Sensitive Areas
• Bhedaghat has many Sites which needs to be conserved like Chousat Yogini
temple, Tripurasundari temple, Narmada Ghats, Dhundhara waterfalls
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 85 of 92
City Development Plan for Bhedaghat Town
10.6.4 Workshop Summary
The Meeting was attended by Chief Municipal Officer, Municipal Engineer, and all the Ward Councilors
and general public and gave their valuable suggestions for development of the town.
The workshop summary has been explained in following stages:
1. In the welcome statement, the Chief Municipal Officer briefed the Purpose of the meeting.
2. The Engineer of Bhedaghat Nagar Parishad has also elaborated on the role and need for the CDP.
3. Mr. K.Jagadeesh, Mr. Raghuram and Mr. Vishwanath, Urban Planners representing Aarvee Associates
Pvt Ltd Hyderabad for this project made a Presentation on the Sector analysis and Town Profile on the
following topics.
The Town profile and sector analysis included the following topics
• Introduction about CDP
• Demography Study
• Land use analysis
• Income and Expenditure analysis
• Economic base of the Town
• Housing
• Physical infrastructure
• Water Supply
• Storm water/Sanitation
• Solid Waste Management
• Transportation and Roads
• Electricity
• Social Infrastructure
• Educational Facilities
• Health Facilities
• Other Facilities
• Slums and Environmental Sensitive Areas
• Urban Reforms
• Financial Operating Plan
• Funding Pattern
• Percentage increase in taxes to raise the fund by Nagar Parishad to meet the proposed
projects.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 86 of 92
City Development Plan for Bhedaghat Town
10.6.5 Photographs taken during the workshop
CITY VISION
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 87 of 92
City Development Plan for Bhedaghat Town
CHAPTER 11: CITY VISION
Introduction
The city development plan is a statement of objectives, policies and standards upon which the physical
economic and social development of the Nagar Parishad are based. The city development plan is based
on proposed broad land use plan (Master plan) showing the existing and proposed locations and intensity
of land development for specific uses such as residential, commercial, industrial, agricultural and
educational uses. The future of the community lies in the vision of the city development plan, so it is
crucial that the city development plan be well thought out and carefully written with the needs of the
community at the forefront, with the continuous involvement of various stakeholders and general public.
Developing a vision statement should be the first step when preparing or writing a city development plan,
a well-crafted statement will tie the rest of the plan together.
Vision statement
Promoting Bhedaghat, known for its rich natural resource “Marble Rocks” with enchanting beauty of
glittering Dhuandhar falls, as a “Ultimate Tourist Destination” in Jabalpur Region facilitating
adequate Physical and Social infrastructure including augmentation of accommodation.
11.1 Public Opinion on Existing Infrastructure Facilities and Services in Bhedaghat
The following figure shows the rating on quality of existing infrastructure services expressed by the
stakeholders of Bhedaghat Town.
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 88 of 92
City Development Plan for Bhedaghat Town
Figure 11.1 Shows the rating of quality of existing infrastructure services
As shown in the above figure – The blue color stretch represents “good”, red color represents
“satisfactory” and Green color represents the “not satisfactory” opinions of the people. Even though some
of the facilities represent major portion as satisfactory at present, the service levels would become largely
deficient in the coming years. The CDP aims at evaluating and providing satisfactory service levels for the
year 2035.
11.2 Public opinion on prioritizing the proposed list of developments
Based on the priorities given by the Stakeholders in the Questionnaires, the following ranking for various
proposed developments are identified. The following table provides the prioritization for various
developments.
Table 11.1: shows the prioritization for various developments.
Type of Development Priority New Water Treatment Plant and Supply system 1 Tourism Development 2 Re-design of all open drains 3 Encourage small scale industries 4 Public Transportation Facility 5 Proper collection, segregation and disposal of solid waste 6 Housing schemes for Economically weaker sections 7 City level Recreational Activity Park 8 Provision of Children Parks and Film Theatres 9 Self-Employment schemes from government 10 Allotment of Houses for Retired people through a share based scheme 11 New Market center providing spaces to all types of commodity Providers 12 Re-Design of Bus Stand Space 13 City beautification 14
From the above table it is observed that the first and foremost priority in town which needs immediate
attention is provision of better and sustainable source for water supply system. The provision of housing
schemes for economically weaker sections, Encouraging setting up of small scale industries, re-design of
open drains, job training Programmes, public transportation facility, better garbage disposal, and
provision of children parks and theatres would be the priorities to form a lively and healthy living city. The
developmental aspects like water supply, drainage, garbage etc., leads to healthy environmental
Condition in the town and also helps in improving quality of the life in the town.
Proposal for Bridge connecting Bhedaghat and New Bhedaghat
There was a special request from participates in the workshop for a Bridge across the Narmada river,
which connects Bhedaghat and New Bhedaghat, which will reduces a distance of 40 kms (appox.) to
reach Jabalpur city as shown in the Map no.9.1
Vision statement
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 89 of 92
City Development Plan for Bhedaghat Town
The city development plan is a statement of objectives, policies and standards upon which the physical
economic and social development of the Nagar Parishad are based. The city development plan is based
on proposed broad land use plan (Master plan) showing the existing and proposed locations and intensity
of land development for specific uses such as residential, commercial, industrial, agricultural and
educational uses. The future of the community lies in the vision of the city development plan, so it is
crucial that the city development plan be well thought out and carefully written with the needs of the
community at the forefront, with the continuous involvement of various stakeholders and general public.
Developing a vision statement should be the first step when preparing or writing a city development plan,
a well-crafted statement will tie the rest of the plan together.
Essential elements of the vision
Because a vision statement will eventually be incorporated into the city development plan, it is essential
that the community identity or unique resources are identified, so that they are preserved through the
development process. Such categories may include, but are not limited to environmental resources such
as streams, mature woodlands, and agricultural resources historic cultural and scenic resources such as
parks and recreation areas and non-renewable resources of economic value such as sand, gravel, land,
mineral deposits. The vision statement in the city development plan must be specific to be effective. The
community should be proactive with its vision statement.
VISION STATEMENT: Developing Bhedaghat as Tourism Destination (2035)
11.3 Planning, developing and managing urban growth in Municipal area
By the year 2035, municipal area would have well planned development with economically productive and
environmentally sustainable aspects of growth. The development area will be well planned and balanced
with a focus on basic Infrastructure development, also planning for slum rehabilitation. High Quality
services such as water supply, sanitation, waste management, street lighting, health, housing and public
transport will be available to all. Development area will be governed by participatory, responsive and
people-oriented local government.
11.4 Sectoral strategy framework
The overall vision for the town and the Prioritization of the key sectors paved the way to formulate sector
specific vision and strategies. This sector specific approach with year wise strategies will be instrumental
in framing the action plan/ implementation plan. The sector specific reforms and investments are an
integral part of the year wise strategies and would be dealt in CIP section of the CDP.
I. Tourism
At present on an average, 1352 tourists visit Bhedaghat per day out. Provision of tourism Infrastructure
like approach Roads, Public Transport Facilities and parking facilities, Public Convenience, Shopping
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 90 of 92
City Development Plan for Bhedaghat Town
Complex and Solid Waste Management. Tourism Kiosk centers and Museum at tourism places for
information to the tourists. Exploring avenues to increase the tourism circuit from 1 day to 2 days
Vision
“Vision is to develop Bhedaghat as a tourism destination (2035)”
II. Water Supply
At present there are 9 Tube wells in the town which draws about 4.6 Lakh Liters per day. The needed
supply of water for the year 2035 would almost 1.66 MLD.
Vision
“Vision is to provide adequate and clean water in an equitable, efficient and sustainable manner”.
III. Sewerage
Analysis from the sewerage sector reveals that sewerage network coverage and maintenance is very low.
The entire town has open drainage system. The poor and slum dwellers lack safe sanitation facilities and
hence are prone to health related diseases. There is also no storm water drains available for the town
Vision
“Vision is to create a healthy community by providing high quality sewerage and storm drain services
based on the principles of quality, equity, value and responsiveness”.
IV. Solid Waste Management
The local governments should effectively involve in efficiently collecting and disposing of solid waste,
encourage people to practice segregation of solid waste at source.
V. Development of open spaces
Small open spaces and vacant areas are available in the Town which could be used as public parks.
Developing the recreational spaces with adequate green coverage would bring lot of relief to the
inhabitants.
Vision
Vision is to create healthy community environment by development of open spaces and recreational
spaces with Public Private Partnership (PPP).
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 91 of 92
City Development Plan for Bhedaghat Town
VI. Effective management of urban land
As most of the development is confined to only core area, there is lot of vacant urban land available that
can be effectively used for future development in town. The management of these land parcels must be
through efficient land use plan and with flexible land use zoning regulations.
Vision
“Vision is to prepare an efficient land use plan with optimum utilization of land for present and future
needs and implement the plan in an effective manner.”
VII. Urban Poverty
With about 37% population of the town living in slums and 4.5 % households are accounting as BPL,
urban poverty is a major issue before the town management.
Vision
“The vision is to uplift the quality of life and to place the town slum free as possible by 2035”
The goals formulated to achieve the vision are:
� Access to qualitative and affordable basic services, 100 % literacy
� Universal access to primary health care and no one should die of preventable diseases
� Ensure livelihood to all urban poor, Tenurial security and Affordable Housing
� Provision of land tenure security, Community empowerment
� Linking livelihoods to town’s economy
� Development of housing through partnerships – PPP
� Relocation of slums located in hazardous and vulnerable Areas
� Provision of basic infrastructure – both physical (water, roads, sanitation and sewerage) and
social infrastructure (clinics, schools, training facilities, etc).
11.5 Conclusion: Brief strategies, actions and projects for the city
Urban Planning & Growth Management
The key issues emerging out of planning and growth management is that in-spite of not having master
plan for Bhedaghat town, its lacks in implementation and managing the development in an organized
fashion, which is leading to unplanned haphazard development. Absence of strategic project
implementation mechanism and inadequate financial resources to implement the schemes, lack of private
Doc: Final Report for Bhedaghat Nagar Parishad
Date: 25-10-2013
Page: Page 92 of 92
City Development Plan for Bhedaghat Town
sector community participation in development process were identified as the existing challenges before
the city Managers.
The CDP process has undergone extensive dialogue with the technical people and public opinion in
prioritizing the key sectors for investments and reform initiatives. The following are the top prioritized
proposals which may guide, facilitate the Town to have a sustainable infrastructure and satisfactory living
conditions with enhanced quality of life.
• Re-design and development of open drains
• New water treatment plant and supply system
• Development of Solid Waste Management system- door to door collection
• Housing schemes for economically weaker sections
• Encouragement of small scale agro-based industries- Warehouses and cold storage
• Providing Public Transportation System
• Providing Recreational Facilities
TOURISM
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 1 of 34
City Development Plan for Bhedaghat Town
CHAPTER 1: GENERAL INTRODUCTION ............................................................................................. 3
1.1 Introduction ..................................................................................................................................................... 3
1.2 Need for the study ............................................................................................................................................. 3
1.3 Objectives ......................................................................................................................................................... 3
1.4 Scope ................................................................................................................................................................. 3
CHAPTER 2: CONCEPTS ............................................................................................................................. 5
2.1 Definition and Concept of Tourism ....................................................................................................................... 5
2.2 Types of tourism ................................................................................................................................................... 5
2.3 Components of Tourism infrastructure ................................................................................................................. 5
CHAPTER 3: HERITAGE AND TOURISM - BEDHAGHAT .................................................................. 9
3.1 City historical importance: An entrancing dream land of nature ........................................................................... 9
3.2 Marble Rocks and Waterfall on the Narmada ....................................................................................................... 9
3.3 Name and local legends .......................................................................................................................................10
3.4 Historical Importance ..........................................................................................................................................11
3.5 Monuments and sculptures .................................................................................................................................14
CHAPTER 4: OTHER HERITAGE BULIDINGS- BHEDAGHAT ....................................................... 19
CHAPTER 5: TOURISM RESOURCES ................................................................................................... 23
5.1 Tourism Resources: ..............................................................................................................................................23
5.2 Tourism infrastructure .........................................................................................................................................24
CHAPTER 6: TOURISM STATISTICS .................................................................................................... 25
6.1 Tourists: ...............................................................................................................................................................25
6.2 Direct and Indirect Employment Generation........................................................................................................25
6.3 Income Multiplier Effect ......................................................................................................................................26
6.4 Accommodation Facilities: ...................................................................................................................................26
6.5 Tourism Circuit:....................................................................................................................................................27
CHAPTER 7: TOURISM PROJECTIONS ............................................................................................... 28
7.1 Tourists Projections: ............................................................................................................................................28
7.2 Tourism infrastructure .........................................................................................................................................28
7.3 Accommodation: .................................................................................................................................................29
7.4 SWOT analysis .....................................................................................................................................................30
7.5 Recommendations ...............................................................................................................................................31
CHAPTER 8: TOURISM PROPOSALS ................................................................................................... 32
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 2 of 34
City Development Plan for Bhedaghat Town
LIST OF TABLES
TABLE 1: TOURISM PLACES ........................... ................................................... ................................................... .............. 23
TABLE 2: TOURIST ARRIVAL DETAILS IN BHEDAGHAT ....................................................... ............................................... 25
TABLE 3: EMPLOYMENT GENERATION DETAILS ........... ................................................... ................................................ 25
TABLE 4:: INCOME DETAILS .......................... ................................................... ................................................... .............. 26
TABLE 5: ACCOMMODATION DETAILS ................... ................................................... ................................................... .... 26
TABLE 6: TOURISTS PROJECTIONS ..................... ................................................... ................................................... ......... 28
TABLE 7: TOURISTS WATER SUPPLY DETAILS IN BHEDAGHAT – 2011 .......................................... ................................... 28
TABLE 8: WATER DEMAND ASSESSMENT PER DAY .......... ................................................... ............................................. 28
TABLE 9: SEWERAGE ESTIMATED IN BHEDAGHAT ......... ................................................... ............................................... 29
TABLE 10: DETAILS OF PUBLIC CONVENIENCE SYSTEMS ... ................................................... ............................................ 29
TABLE 11: TOURIST PROJECTIONS ..................... ................................................... ................................................... ......... 29
List of Maps
MAP Tourism Map
CHAPTER 1: GENERAL
INTRODUCTION
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 3 of 34
City Development Plan for Bhedaghat Town
Heritage and Tourism
CHAPTER 1: General Introduction
1.1 Introduction
Tourism is one of the fastest growing non – polluting industries and has been recognized as an economic
activity of great importance. The benefits of the industry in terms of employment and income multiplier
effects have a significant impact on the development of the city. When compared with the IT industry, which
is presently considered as the most promising industry for economic development of any town / city, one
can see that tourism industry has performed better globally. The Indian government, to boost tourism of
various kinds in India, has set up the ministry of tourism and culture. This ministry recently launched a
campaign called “Incredible India !” to encourage different types of tourism. As a result we could see a lot of
growth in national and international tourists.
1.2 Need for the study
Bhedaghat is one of the major tourism centers in the State of Madhya Pradesh. Bhedaghat is known for its
recreational and historical monuments. A major attraction for the tourists is the “Narmada River”. Bhedaghat
is going to witness a tremendous boom in the tourist’s arrivals, being located close to Jabalpur (25 kms) it
has the potential to attract visitors. With the large number of site seeing places existing within and around
Bhedaghat, it offers an example for the planning and intensive development of tourists infrastructure like
Transport, accommodation, eating places, shopping facilities, parks, playground, cultural and entertainment
facilities and amenities like water supply, drainage, solid waste disposal,. etc. within the framework of
architectural and design controls
1.3 Objectives
• To study existing tourism and heritage characteristics and their behavioural pattern.
• To identify tourism resources and infrastructure and impact of tourism on development of city.
• To establish the gaps between the existing supply and demand of tourism infrastructure.
• To identify major heritage buildings and tourism spots within development area.
• To identify policies, issues and strategies in development of city
1.4 Scope
• The study would analysis the present tourism and heritage scenario. This would involve assessing
the tourism inflows and income generated.
• The study also let us to profile the existing level of facilities being offered to tourists. These facilities
could be in terms of accommodation facilities, transportation, communication and other facilities.
• The study would analysis the impact of tourism on the town.
• The study would identify main issues in development of tourism and heritage in Bhedaghat town
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 4 of 34
City Development Plan for Bhedaghat Town
Bhedaghat has a special scenic, recreational and historical value. Its ecology entails some of the following
elements:
• Places of religious Importance
• Places of Historic and archeological Importance
• Excellent Trekking Destination
• Good Picnic Spots
CHAPTER 2: CONCEPTS
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 5 of 34
City Development Plan for Bhedaghat Town
CHAPTER 2: Concepts
2.1 Definition and Concept of Tourism
Conceptually, Tourism as defined by the Department of Tourism, New Delhi is the sum of the phenomena
and relationships arising from the travel from the travel and the stay of non -residents in so far as they do
not lead to a permanent residence and are not connected with any activity. Broadly the concept of tourism
as characterized by the Department of tourism is:
• A movement of people to various destinations and has two components - the Journey and the stay -
both of which take place outside the normal area of residence and work.
• The movement is of a temporary nature and for a short duration which distinguishes it from
migration.
• It gives rise to activities at destination which are distinct from those of the resident population of the
place visited.
• The main motive for participation in tourism is largely recreation and visit is made for purpose other
than seeking permanent residence or employment remuneration from within the place visited.
Tourism, in pure sense is essentially a pleasure activity and involves a discretionary use of freely disposable
incomes and of free time. (Bhatia, 1978).
2.2 Types of tourism
• Ethnic Tourism To see the quaint customs of remote groups.
• Cultural Tourism To visit and have links with rural societies.
• Historical Tourism To visit museums, cathedrals and great heritage sites.
• Environmental Tourism For higher incomes elite to visit every remote environment.
• Recreational Tourism Mass-holiday-recreational tourism.
The two forms of Tourism include
1. Domestic
2. International Tourism
2.3 Components of Tourism infrastructure
For development of Tourism in a city certain type of tourism infrastructure is required. The various
components of Tourism infrastructure include:
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 6 of 34
City Development Plan for Bhedaghat Town
� Transport
The linkages of a city with rest of the country through Road, Rail and Air plays an important role in
making the Tourist city accessible, and therefore is an important necessity especially for attracting
foreign tourists. The local mode of transportation according to the convenience and paying capacity
of each individual or group of tourists should be available for visiting various sites in and around the
city.
� Accommodations
Simultaneously with the changes in the modes of transport and patterns of tourist traffic, various
new types of accommodations have emerged. The traditional serviced form of accommodation
provided in commercial establishments like hotels, motels, boarding houses, holiday camps etc. have
made way for the more flexible and functional forms such as rented apartments, self-contained
motels and condominium.
� Public utilities and services
To support accommodation facilities in a city there should also be certain other supporting services
present in a city. These services include water supply, drainage, solid waste disposal and public
conveniences. Besides these basic medical and Health facilities also constitute an important
component of the Tourism Infrastructure
� Entertainment and Recreational facilities
Presence of some historical sites in a city fail to attract tourists for a longer duration of stay,
therefore provision of Recreational facilities and some entertainment in form of evening cultural
shows is very essential. Some auxiliary facilities tend to support rather than induce growth. These
include a variety of shops and other establishments, some of which are oriented especially to the
tourists but largely serve the residents of the area. Dealers in sports goods, food stores, restaurants,
chemists, bank fall under this category. The supporting industries, usually small business, provide
many other facilities for tourists.
These comprise souvenir or duty free shops (for goods), laundries and guides (for services)
and festival areas and recreational facilities (for activities).
2.4 Impact of Tourism on a City
The concern for environment has resulted in a very wide definition of the term environment which includes
not merely the elements of natural environment - land, air, water, fauna and flora - but also covers social
and cultural aspects of people lives. Both the natural and manmade environments constitute the basic
resources for tourism for studying the physical, economic and socio cultural impacts of Tourism.
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 7 of 34
City Development Plan for Bhedaghat Town
1. Economic impact of Tourism
The economic role of tourism is not restricted to the effects produced by International Tourism alone.
The benefits to the national economies from the spin - off from Tourism and its importance in national
economy are universally recognized. The impact of Tourism is also seen in terms of balance of
payments, employment generation and income multiplier effect and contribution to the Gross Domestic
Product.
2. Socio - Cultural impact of Tourism
Planned in proper manner tourism undoubtedly provides positive socio-cultural advantage. They are:
• Tourism constitutes a method of developing and promoting certain traditional arts and crafts of a region
where these activities are on decline.
• Tourism accentuates the values of a society and facilitates social mobility. The result is broadening in the
outlook of both Participants and inhabitants of the region visited. The negative impacts of tourism on the
social and cultural environment may transform local social habits by disturbing the basic and long
established values and behavior of the host population. The “co-existence” of tourists and the resident
population often leads to social tension and transformation of social values.
3. Physical impacts
The natural environment of the region is a great attraction for the tourists. A high quality of
environment is thus essential for tourism on the other hand; the quality of environment is, threatened
by tourism development itself which is promoted because of its economic importance. Four major
sources of ‘environmental stress’ due to tourist generated activities.
• The replacement of a natural environment by a new built environment has a variety of far - reaching
and long lasting results in terms of existing biological species and physical conditions in the area. It may
also cause significant changes in visual amenity.
• The second area of stress results from generation of new or increased waste residual. It creates water
pollution through the discharge of inadequately treated effluents and sewage into water bodies.
• The third important environmental impact concerns the recreational activities. The effect of these
activities includes soil compassion and erosion, change in plant cover and species diversity.
• A fourth associated area of stress is the effect of tourist development on seasonal population increases
densities resulting in physical congestion in many areas. Seasonal influxes also increase demand for
natural resources.
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 8 of 34
City Development Plan for Bhedaghat Town
4. Symbiotic relationship
Tourism has been responsible for inculcating environmental appreciation. An attractive environment is
the very basis of the Tourism industry and the conservation of scenic areas, besides historical and
cultural heritage, is of the utmost significance for its success. Tourism not only promotes conservation
but also provides the economic means by which such measures can be taken. The maintenance and
repairs of a large number of historical buildings and other attractions are due to tourism money. In the
context of tourism development, conservation has been of four kinds.
• Tourism has provided the incentive and stimulus for the conservation of natural resources like
establishment of national parks and protection of threatened diverse species of wild auxiliary tourist
services, provision of infrastructure facilities etc. which are secondary effects of conservation.
• Tourism has led to restoration and regeneration of several sites of historical and cultural interest. The
major tourists’ assets of the area- have been restored and rejuvenated mainly because of the stimulus
provided by tourism.
Tourism has been solely responsible for the transformation of old buildings and Sites by retaining their
original features and putting them to better use for tourism facilities
CHAPTER 3: HERITAGE AND
TOURISM - BEDHAGHAT
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 9 of 34
City Development Plan for Bhedaghat Town
CHAPTER 3: Heritage and Tourism - Bedhaghat
3.1 City historical importance: An entrancing dream land of nature
Bhedaghat is a Nagar Parishad situated on the bank of the river Narmada in the tashil and district of
Jabalpur,at a distance of about 25 kms from Jabalpur city by road. On map its location is 2308'N, 78048'E;
MSL 408mts the nearest railway station is at a distance of about 5 kms Bhedaghat on the main line of
western central railway connecting Jabalpur and Itarsi on the Mumbai-Howrah via Allahabad main line. The
nearest airport is Jabalpur which is connected by air with Delhi, soaring in glittering splendor, the marble
rocks at Bhedaghat is known all over the world for its scenic beauty. The site has the attention of the people
during all phases of Indian history as is evidenced by number of archaeological remains located in the
village.
3.2 Marble Rocks and Waterfall on the Narmada The river Narmada, the longest of east-west flowing rivers of India, the traditional boundary line dividing the
north and south of the country culturally, rises from the Amarkantak hills of Vindhyan mountains of the
northern fringe of the Deccan peninsula. After flowing past for about 327 km from its source at Amarkantak,
the Narmada enters into the marble country of Bhedaghat. Here the river pent up into a third of its width,
for a space of about 3.22 kmts, forces its way through the mighty and majestic marble rocks of over 32 mts
in height. The scenic beauty it produces has perhaps no parallel in the world not even the famous river
Colorado, which flow through the American desert of the Arizona with its lofty banks can complete it either
in splendor or in quiet. The perpendicular marble rocks, which fringe the crystal clear placid waters, are
dazzlingly bright against the vast blue of the sky. Beneath the snow white pinnacle the reflected sunlight
loses its brilliance and gradually mellows in to softer shade as a doves breast. Further below, it almost melts
into rippling waves, quivering and dancing under the glaring sun. These magnificent marble rocks are not
evenly shaded with only one color of pure white: here and there the brilliant whiteness is tinted with veins of
blue, pink and azure of celestial rainbow. On the moon light, when the whole scratch of water is transformed
into a sheet of liquid silver and when the whole area is nothing less than a dream land, a boat journey
between these sheer walls of pure marbles is surely entrancing the eye never wearies of the infinite beauty,
nor the ear of the constant splashing of water amidst the sylvan solitude. In the narrow channel of the
mighty river there is a place where the steep marbles approach each other closely from opposite banks that
local people have a very aptly named it the 'monkey- leap'(Bandar kudni).
The large volume of water which has depth of 51.51 mts near the travelers rest house, makes its first
plunge into the mighty rift of water fall, locally known as 'Dhuvandhar' (the fall of smoke),again producing a
surrounding of heavenly bliss. Bana- kunda and Rudra- kunda are two other picturesque spots on the
Narmada at Bhedaghat and number of religious legends is associated with them.
Beyond the marble rocks the Narmada enters a plain and traverses the southern portion of the district. But
before leaving the Bhedaghat it confluences with a small rivulet known as Bawanganga which possible is the
original course of the Narmada. This is confirmed by find of geological anquities in the sections of the rivulet
during research’s conducted by various international and national agencies geologists confirm that
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 10 of 34
City Development Plan for Bhedaghat Town
Bawanganga is the original course of the Narmada and the water fall and the marble rocks are later
formations created out of earthquake and various other tectonic movements underground.
3.3 Name and local legends
Many local legends exist about Bhedaghat to prove the scared character of its various spots. According to
one these, Bhedaghat is said to have taken its name from the legendary Bhrigu rishi who used to live on the
bank of Narmada at the spot close to the modern rest house no.2. It is also suggested that the name might
have been originate from the term Bhera, meaning place, signifying the confluence of the two rivers, the
Narmada and the Bawanganga, which takes place here. Some scholars believe that the name may be a
modern form of some such original word like Bhairavighat. So named because of the fact that the place was
a famous center of Sakti worship. Archaeological remains prove that Bhedaghat was the center of Sakta
worship from ancient times.
Many legendary stories exist about 'Bandar kundi' Panchavati ghat. Saraswati ghat and other spots and
these are narrated by the boat drivers to the visitors while ferrying across the marble rocks.
GEO ARCHAEOLOGICAL INVESTIGATION
BHEDAGHAT has been an important focal point of research in course of Geo-archaeological investigation
conducted in the middle Narmada valley during over 150 years of researches beginning with 1832 .it is a
well-known fact that the Narmada alluvium provides a standard yard stick for the Pleistocene chronology of
the Deccan and also for the post Villafranchain deposit in India .it is mainly on the basis of Narmada fauna
that the boulder conglomerate formation of northern India has been assigned a middle Pleistocene age. The
middle Narmada valley between Bhedaghat and Handia district. Has not only exposed fairly thick alluvial
deposit ranging in age from the middle Pleistocene to early Holocene, but also has yielded Lithic or stonage
tools of various cultural stages. Recent exposure of a quaternary deposit at Bhedaghat by team of
archaeologists from the Deccan College, Pune, is an interesting discovery. It is one of classical sections found
on the Narmada river revealing the activities of the early man. The section reveals at least four separate
units. The base of the most recent unit has been radio carbon dated to 25,160 B.P. and contains upper
palaeolithic artifacts datable between 30000 and 10000 BC. The middle unit is undated but contains
Bandar Kudni Dhuwandhar
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 11 of 34
City Development Plan for Bhedaghat Town
advanced Acheulian artifacts earlier too stonage artifacts were discovered at Bhedaghat and reported by
number of teams of archaeologists. Discovery in 1982 of the fossilized skull -cap of Narmada man from
Hathnora in the Sheore district in the middle Narmada valley, has added new dimensions towards prehistoric
researches in the sub-continent. The skull cap is dated at 5-6 lakh year old.
3.4 Historical Importance
Bhedaghat town is situated on the Eastern bank of the holy river Narmada. During all times in its history,
Bhedaghat formed a part of the adjoining regions viz. Tripuri during the ancient period, Garha during the
medieval times and Jabalpur after territory came within the control of Marathas and the British. As such,
during the respective periods, history of Bhedaghat coincided with the history of the territory concerned.
As a part of the settlement of Tripuri from proto-history to 14th Century A.D., Bhedaghat passed through the
chalcolithic age, age of the Epics and Puranas, the Mauryan age, age of the city-state, age of the Sungas,
the Kanvas, the Dattas, the Satavahanas, the Bodhis, the Senas, the shaka kshatrapas, the Guptas and their
feudatories and finally the mighty Kalachuri rulers of Tripuri. Archaelogical remains of some of these ages
have been found at Bhedaghat.
During the medieval times, as a part of the Garha-Mandla Kingdom, Bhedaghat witnessed the rule of Gond
rulers for a period of 344 years from the rise of Kharji in 1440 A.D to arrest of Narhari Shah in 1784 A.D.
Thereafter during the Maratha rule, it was said that the village Bhedaghat was donated by Raghuji Bhonsala
to Mahant Hardeo Puri Gosain. Subsequently the village became a part of the British territory during whose
regime too the disciples of
Hardeo puri continued to hold
the village as a free grant for
perpetuity subject to the
payment of a quitrent of Rs 5.
It’s most famous sights are
the Duandhar Falls, Marble
Rocks and the Chausath
Equus namadicus (skull) Bos namadicus (Skull)
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 12 of 34
City Development Plan for Bhedaghat Town
Yogini temple.
Archaeological remains
Apart from the lower, middle, upper, palaeolithic and Mesolithic tools of stone age found from Bhedaghat
during various Geo-archaeological investigations discussed above, the village has yielded some important
archaeological source material which are as follows:
Coins
A bronze circular coin of the Satavahana ruler siree data was discovered from the bank of the Bawanganga
in 1954.the Satavahana rule lasted over tripuri from the middle of the first century BC. To 2nd century A.D
this particular coin on the account of existence of the name of the ruler on its observe, went a long way in
solving the chronology of the Satavahana on national level.
Inscriptions:
• Statue inscriptions of western kshatrapa period (c. 50 A.D.) were found inscribed on two statues
discovered from Dhuvandhar in 1918-19. The inscription mentions that the statues are now in possessions of
Nagpur museum.
• Stone inscription of Kalachuri ruler Narasimha dated in kalachuri Samvat 907 (1155 A.D.).This
inscription was procured form Bhedaghat by Dr. F. E. hall in 1857 and preserved in the cabinet of the
american oriental society at new haven (USA) where it is now preserved. The object of the inscription is to
record that kings mother Alhanadevi, the widow of Gayakarna constructed a temple of Shiva under the name
of Vaidyanath together with a Matha and a hall for study with which she endowed with the income from two
villages viz. Namaundi in the Jauli-pattala and Makarapataka on the right bank of the Narmada in the land
near the foot of the hills, for the worship of the deity.
• Gaurishankar temple inscription of kalchuri ruler Vijayasimha. This inscription is incised on a stone
slab let into the front wall, on the right -hand side of the door of the Garbhagriha of the Gaurishankar
temple situated within the circular cloister of the Chaunsatha Yogini temple. Its object is to record the
obeisance of the Maharajni Gosaladevi, her son maharaja Vijayasimhadeva, the kalchuri ruler of tripuri, and
the crown prince Ajayasimhadeva, to the enshrined god who appears to be named hare as Bhagnakhidra
• Chaunsatha Yogini image inscription, which are discussed below.
Yakshi – Kushana Age Inscription on Yakshi image
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 13 of 34
City Development Plan for Bhedaghat Town
• Inscription on the image of the Buddhist deity Tara mentioning the Buddhist formula. The image was
placed inside the Garbhagriha of the Gaurishankara temple. It was thrown out when it was recognized as a
Buddhist idol. It created a sensational history for it when it was taken to Calcutta in 1926. it has now come
back again and placed in the Garbhagriha
• Pachamatha temple inscription of about 9th – 10th century installed into the plinth of the temple no.4
in the complex. The purpose of it is to record financial assistance given for some construction work. The
inscription was brought from some other place and installed in the plinth of the temple.
• Pachmatha temple inscription of Vikram era 1810 (1752 A.D.). This inscription is written on the door-
frame of temple no-3 built at the Pachmatha complex. The inscription begins with the adoration of
Kamantaka Shiva and further highlights the death of hero and mentions the names of Amadeva Goswami of
(the village), Uma,Vachoji, Kora and Maranadeua.
• Gaurishankara temple bell inscription dated Samvat 1977 (1920 A.D) recording its installation by
swami Buddhapuri.
Inscription of Kalchuri Ruler Narasimha Deva
(1155 A.D) Gaurashankar Temple Inscription
Pachmatha Temple Inscription
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 14 of 34
City Development Plan for Bhedaghat Town
3.5 Monuments and sculptures
The temple of Chaunsatha Yogini
Immediately above the confluence of the Narmada and
Bawanganga, the fork of rock rise into a small circular hill. Atop
this hill is situated the 10th century A.D. Temple of the extinct cult
of Chaunsatha Yogini. Placed topographically at the highest point
amongst the surroundings, the position this temple is unique and
commanding. A long flight of roughly hewn steps lead right up
from the bed of the Narmada to the south-eastern entrance of
the temple. From its north-eastern entrance another flight of steps
lead one to the road which connects the waterfall. Close beneath,
on the south the blue water of the Narmada seems to sleep, spell, spellbound, under the snow-white walls
that shut them in.
To the north and the west the view is bounded by thickly wooded height; but on the east the eye looks
down on a long reach of the river, stretching away for miles towards Jabalpur.
Among many obscure cults of ancient and early medieval India the cults of Chaunsatha Yyogin was one.
Yoginis are essentially attendants of the mother goddess, through different interpretations exist. Through
literacy reference to Yoginis may be traced as far back as post- Vedic period in India, regular cult worship of
the Yogini came into existence sometimes during the 8th – 9th century A.D. The lead in the direction was
taken by saint Machchhendranatha, the founder of the Yogini Kaula sect, the tenets of which are revealed in
the work kaulajnananirnaya, the authorship of which is ascribed to him.
The followers of Yogini Kaula sect tried to spread their teaching far and wide all over India through the main
regions of their activities seem to have been modern Indian states of Uttar Pradesh, Madhya Pradesh, Orrisa
and the district of Coimbatore. Extant remains of the Yogini temples have been found at: Hirapur and
Ranipur Jharial in Orissa; Khajuraho, 65 in cases of Mitauli, 42 in cases of Dudahi and Badoh and the largest
number-81 in case of Bhedaghat. This makes the Bhedaghat temple unique. Architecturally, the temples of
Cuahsatha Yogini Bell Inscription
Interior view and plan of Chaunsatha Yogini Temple
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 15 of 34
City Development Plan for Bhedaghat Town
Chaunsatha Yogini are either circular or rectangular in shape with Yogini sculptures installed on pedestals
along the inner side of the walls of the circulating cloister with or without a temple erected at the center of
the cloister. The Khajuraho and Badoh temples are rectangular, the rest are circular.
Apart from the temple remains, isolated collections of Yogini sculptures have been found in MP. At Naresar,
Hingalgarh, Lokahari and Shahdol in addition to several museums in India and abroad. Interesting Yogini
sculptures are in the collections of : the Musee' Guimet in Paris, the Detroit institute of art, the royal Ontario
museum, the Brooklyn museum, the Minneapolis institute of arts and the Kansas collection.
The circular cloister of the Bhedaghat temple consists of a huge thick wall along outer edge of a circular
platform, inside which there is a circular row of pillars and pilasters arranged in two concentric circles. A flat
roof with a low ribbed chhajja running all along is supported by these pillars and pilasters. The inner
diameter of the cloister is 34.5 meters and the outer is 40.8 meters. The number of pillars in front row is 84
and an equal number of pilasters are arranged opposite to them against the black wall. 81 equidistant
pedestals are erected on the circular platform and images of Yoginis and other deities are fixed on them.
The following sculptures are found arranged in serial order:
• Crudely craved male/female figure of Kaushana period
• Yogini Shri Simhasimha
• Yogini Shri Rrushing
• Yogini Shri Kamada
• Yogini Shri
• Yogini Shri Amtakari
• Yogini lion-headed -uninscribed
• Yogini Shri Erudri
• Yogini Shri Nandini
• Yogini Shri Vibhatsa
• Yogini Shri Varahi
• Yogini Shri Mamdodari
• Yogini Shri Sarvvatomukhi
Kaumari (Post – Gupta Period)
Gaurishankar Temple
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 16 of 34
City Development Plan for Bhedaghat Town
• Yogini Shri Thirachitta
• Yogini Shri Khemukhi
• Yogini Shri Jamavi
• unnamed Yogini
• Yogini Shri Audara
• unnamed twelve-armed three eye god
• lower part of Yogini Shri Yamuna, upper part of Yogini image
unnamed
• lower part of unnamed Yogini
• broken dancing Matrika of post-Gupta period
• Yogini Shri Pandavi
• Yogini Shri Niladamvara
• broken four-armed male god of post-Gupta
• Yogini Shri Teramva
• Yogini Shri Shandini
• Yogini Shri Pimgala
• Yogini Shri Aahkala
• broken dancing Matrika of post- Gupta period
• dancing Ganesha of post-Gupta period
• Yogini Shri Masa Varddhani
• Standing figure of male god-broken
• Yogini Shri Ridhalidevi
• uninscribed Hanuman
• four armed dancing figure of Ganesha
• Yogini Shri Chhatra-samvara
• Yogini Shri Ajita
• Yogini Shri Chandika
• Yogini Shri Ananda
• Yogini Shriaingini
• Yogini Shri Brahmani
• Yogini Shri Maheshwari
• Yogini Shri Takari
• Yogini Shri Tapani
• Yogini Shri Padmahamsa
• Yogini Shrihamsini
• broken lower part of a Yogini image
Yogini Shri Sarrvatomukhi
Yogini Shri Virendri
Yogini Shir Vaishnavi
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 17 of 34
City Development Plan for Bhedaghat Town
• broken lower part of a Bodhisattva
49-b. Only upper part female deity
49-a. Only lower part of left end of the pedestal of an image
• Yogini Shri Ishwari
• Yogini Shri Thani
• Yogini Shri Indrajali
• Yogini Shri Ga Hanai
• broken lower part of a Yogini Yogini
• Yogini Shri Indrani
• Yogini Shri Jha nigini
• Yogini Shri Uttala
• Yogini Shri Nalini
• Yogini Shri Lampata
• Yogini Shri Sudri
• Yogini Shri Rtssamada
• Yogini Shri Gamdhari
• Yogini Shri Jahanvi
• Yogini Shri Dakini
• Yogini Shri Vamdhani
• Yogini Shri Darpahari
• Dancing Matrika image of post-Gupta period.
• Yogini Shri Rangini
• Yogini Shri Jaha
• Yogini Shri Thakkini
• Yogini Shri Ghamatali
• Yogini Shri Dhadhdhari
• Yogini Shri image of post-Gupta period
• Yogini Shri Vaishnavi
• Yogini Shri Bhishani
• Yogini Shri Shatanusamavara
• Yogini Shri Kshatradharmini
• unnamed Yogini
• Yogini Shri Phanendri
• Yogini Shri Virendri
• Yogini Shri Thakini
Gaurishankar in Garbhagriha
Yogini Shri Jahnavi
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 18 of 34
City Development Plan for Bhedaghat Town
An analytical study of these sculptures makes it clear that these belong to three phases; one of Kushana
period (no.1), seven of post-Gupta period (no.22, 25, 30, 3, 67, 67-a73) and the rest of the period of the
Kalachuris when the temple in the present shape was built up this indicates that originally a small temple of
the Matrikas was built up on this mound sometime during 1st century A.D. When the Kushanas ruled over
this region. In 7th-8th century A.D., during the post-Gupta period sculptures. The present shape of the
temple came into existence when Yuvarajadeva I, the kalchuri ruler came to power in 915 A.D.
Epigraphic evidence supports this statement.
Of the kalachuri sculptures too, no.26 is of supreme goddess Mahishasuramardini who could not be
considered a Yogini Four, viz. no. 3, 20, 63 and 69 are respectively of the river goddesses Narmada, Yamuna,
Ganga and Sarswati. The remaining 61 are Yogini sculptures. Of these ten are unnamed. The remaining six
are Siva, Ganesha, Hanumana and Boshisattva.
The temple of Gaurishanakr stands inside the circular cloister, though not exactly in the center of the cloister
or on the central line of it to explain this various theories have been propounded. The existing temple faces
north and the plan of the Garbhagirha is exactly same through on a reduced scale, as one of the shrine of
the Triple-shrine temple of kalachuri ruler Karna at Amarkantak. The Mandapa in front and small shrine
which contains the bulls on the Gosladevi discussed above.
Inside the Garbhagriha is a rare image of Gaurishankara under worship. In this Shiva and Parvarthiare
shown seated on the back of standing Nandi. Termed as Kalyanasundara, this image depicts the scene of
departure of Shiva after his marriage with Parvati. This is further confirmed by inscription 'Vareshvarah'
inscribed on the pedestal of the image. Sculptures of three-headed Shiva,Surya, dancing Ganesha, Lakshmi-
narayana, karttikeya, Naga and Nagi and the Buddhist deity Tara are also fixed in the wall, surrounding the
central deity in the Garbhagirha.
CHAPTER 4: OTHER
HERITAGE BULIDINGS-
BHEDAGHAT
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 19 of 34
City Development Plan for Bhedaghat Town
CHAPTER 4: OTHER HERITAGE BULIDINGS- BHEDAGHAT
GOLAKI MATHA
In a pillar inscription found that from Malkapuram
(dist.Guntur, Andhra Pradesh) it is stated that king
Yuvarajadeva of kalachuri dynasty gave as
Bhiksha, three lakhs of villages to his guru
Sadbhavashambhu of the Golkai Matha situated
between Narmada and Ganga. This Golaki Matha
was so named on account of its attachment with
the Gol (round) temple of Chaunsatha Yogini
Remains of this Matha may be identified with the
ruined two storied rectangular structure situated
just opposite to the steps that lead to the temple which begins from the road side. This was the famous
tantric center known all over India, the branches of which were established at Cudappah, Kurnool,
Guntur, and north Arcot district. In the religious history of ancient India, the Shiva Acharyas of Golkai
Matha occupy a prominent place for their learning. In modern terminology the structure is known as
Haveli.
PACHMATHA COMPLEX
Opposite the Haveli is situated a group of five temples, known as Panchmatha. Parts of this group were
built during different periods. Temple no.1 is a panchayatan temple built on a plinth measuring
22.93*19.1 meters. The Ganesh image kept in the Garbhagirha was stolen in 1990. The temple may be
dated to c. 14-15th Century A.D.
Temple no.2 situated at the back of the above is plain octagonal in structure with Shikhara in Nagara
style with Gond influence. The Adhisthana is plain and is 1 meter high. Temple no.3 situated to the
north of no.1 is a square structure with Shikhara of Nagara style with Gond influence. An inscription of
Vikram Samvat 1810(1752 A.D.) is inscribed on the door-frame of the temple. The temple is datable to
c. 14th – 15th century A.D.
Temple no.4 situated along the edge of the road
is square in plan with spiraled Amalaka,
decorative Shikhara in curvilinear and leaf
designs. An inscription of about 9-10th century
A.D is installed into the plinth of the temple is
datable to c. early 14th century A.D situated
towards back of complex is a square pillared
structure with corbelled dome, locally known as
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 20 of 34
City Development Plan for Bhedaghat Town
Samadhi of Mahant Mahadeo Puri. It has plain brackets and exteriors.
Rest house
To the back of the Pachmatha complex, along the road leading to Dhuvandhar is situated government
rest house no.2. rest house no.1 is located further north. Built during 1830-35, these are colonial
structures with load bearing walls, pillared portico and sloping roofs. The rest houses provide good view
of the Narmada.
SHIVA TEMPLE
Within the boundary of rest house no.1 is situated a Shiva temple datable to c. 17th century A.D. The
temple is a plain structure built on a high plinth. The Garbhagriha of this small temple has a central
dome. The walls are plain and the cornice, parapet and lower portion of the dome have leaf design.
Pachmatha temple - 2 Pachmatha temple - 3 Pachmatha temple - 4
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 21 of 34
City Development Plan for Bhedaghat Town
MARHIA MATHA: 1-2
a temple datable to c. 14th – 15th century A.D. known as Marhia Matha exist near the river and is
accessed through various homes. It has a domical roof, the walls are plain. It is datable to Gond period.
Another structure on a high mound, also known as Marhia Matha and built near Adhyatma Vigyan
Nauka is a religious Samadhi. The entire structure is plain and has arched false niche. It is painted and
cemented.
In front of it, along the road and surrounded by modern house exist ruins of a temple with domical
structure of Gond period.
NACH GHAR
An open recreational dance hall originally built in 1837 and recently renovated is an octagonal building
with pillars on each corner having sloping roof with terracotta tiles. The flooring is of marble. The
inscription is missing now.
Panchavati Ghat Marhia Math No. 2
Samadhi of Mahant Mahadeo Puri Mariha Math No. 1
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 22 of 34
City Development Plan for Bhedaghat Town
Grave of James Coudie
Near the Nagar Panchayat office is located the grave of Jamed Coudie, II Batn. Scott 18 rifle which is
dated the 17th July, 1894. The slab bearing the inscription is missing now.
Shiva temple (Saraswati- ghat)
This plain squared structured datable to c. 14th – 15th century A.D. Is situated on a mound on the road
leading to Saraswati ghat. It is ruins now.
Dharamshala
This double storied rectangular building was built near Saraswati ghat at the instance of Raja Gokuldas.
Jain Temple
Shri Shantinatha Digambar Jain temple built in the Panchavati area, along the road leading to
Dhuwandhar is a modern structure built after 1970.
The Ghats
Panchavati ghat is an old structure datable to c. early 16th century A.D. Saraswati ghat is situated on
Bhedaghat – Jabalpur road, a kmts Earlier than Bhedaghat on the slope to the right of the Bawanganga
bride. It is meeting point of the Narmada and the Bawanganga. The ghat is also old as revealed by
existing remains of old steps. The ghats in their original form must have been in existence since times
immemorial.
This in short is a brief account of the past glory of Bhedaghat an essential part of the city of Jabalpur.
It has been rightly said ''our identity is the result of our past. In the same way as we inherit the genes
of our parents, we are also made up of genes of our past heritage”. It is expected that all of us shall
leave no stone unturned to value and preserve the rich heritage of our composite culture
Nach Ghar Saraswati Ghat
CHAPTER 5: TOURISM
RESOURCES
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 23 of 34
City Development Plan for Bhedaghat Town
CHAPTER 5: TOURISM RESOURCES
5.1 Tourism Resources:
Table 1: Tourism Places
Name of the Place
Distance
from
Bhedaghat
Approach
Road
Tourist
awareness
on locations
Facilities
Parking
Facilities
Dhundhara (water
fall) Bhedaghat 1 km Available Available
Public
Convenience
Off Street
Organized
Chausath Yogini
Mandir, Bhedaghat 0 km Available Available
No Facilities
Available
On street un
Organized
Rudra Kund 1 km Available Not Available No Facilities
Available
On street un
Organized
Saraswati Ghat 1.5 km Available Available Public
Convenience
Off Street
Organized
Pashupati Nath
Mandir, Gopalpur 2 km Available Not Available
No Facilities
Available No Facilities
Lakhmi Narayan
Mandir, Gopalpur 2 km
Not
Available Not Available
No Facilities
Available No Facilities
Kalyanika Ashram,
Gopalpur 2 km
Not
Available Not Available
No Facilities
Available No Facilities
Lameta Ghat,
Thilamadleshwar
Mandir
3 km Not
Available Not Available
No Facilities
Available No Facilities
Radha Krishna
Mandir, Lameta Ghat 3 km
Not
Available Not Available
No Facilities
Available No Facilities
Ghagra water fall,
Lameta ghat 3 km
Not
Available Not Available
No Facilities
Available No Facilities
Rani Mahal, Badal
mahal, Bhedaghat 0.5 km
Not
Available Not Available
No Facilities
Available No Facilities
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 24 of 34
City Development Plan for Bhedaghat Town
5.2 Tourism infrastructure
There are various infrastructure requirements in terms of:
• Accommodation: There are 5 hotels and Madhya Pradesh tourism guest houses are available in
Ward 5
• Restaurants: There are no Major restaurants in the town. Available hotels only provide Lodging
and boarding facilities. Rejuvenation
• Utilities and Services: Public Toilets are available near the Ghat areas.
• Information Centres: There are no information centres in the town which is a major problem.
• Tourism packages: There are no packages which is also a major problem
• Conservation of monuments: There are 2 conservation monuments in ward 7 and 11 which needs
major attention.
CHAPTER 6: TOURISM
STATISTICS
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 25 of 34
City Development Plan for Bhedaghat Town
CHAPTER 6: TOURISM STATISTICS
6.1 Tourists:
The two forms of Tourists include
Domestic Tourists and International Tourists
Table 2: Tourist arrival details in Bhedaghat
Number of tourist arrivals in Bhedaghat
Year Domestic %
variation International
%
variation Total
%
variation
2007 657000 1740 658740
2008 730000 11% 1382 -20.57 731382 11%
2009 803000 10% 1172 -15.2 804172 10%
2010 912500 14% 672 -42.66 913172 14%
On an average, 2500 tourists per day visit Bhedaghat out of which around 99.8% are domestic tourists,
while the rest are international tourists.
The peak season is considered as November to
June and non-peak season is rainy season
which is from July to October.
Toll tax and Parking charges contribute to a
large extent to the economy of the Bedhaghat.
6.2 Direct and Indirect Employment Generation
Table 3: Employment generation details
Year
Flow of Tourists Direct Employment Indirect
employment
Total
employment Domestic International Total Domestic International Total
2007 657,000 1,740 658,740 164250 870 165120 988110 1153230
2008 730000 1,382 731,382 182500 691 183191 1097073 1280264
2009 803000 1,172 804,172 200750 586 201336 1206258 1407594
2010 912500 672 913,172 228125 336 228461 1369758 1598219
Assumption:
4 domestic tourists = 1 direct employment
2 international tourist = 1 direct employment
Indirect tourism multiplier = 1.5
Source: ESCAP study report on "economic impact of tourism in India”
Marble idols and carving of sculpture is famous in the town and is an important income generation
which is also exported to all parts of India.
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 26 of 34
City Development Plan for Bhedaghat Town
6.3 Income Multiplier Effect
Money spent by the tourist in the country is turned over
several times. In the process the total income earned from
tourism is number of times more than the actual spending.
This phenomenon is referred to as the income multiplier
effect.
The average percentage spent on different categories of
tourist expenditure
The source of income for the Nagar Parishad is by toll tax and parking charges.
Table 4:: Income details
Year No. of Tourists No of Vehicles Income per Vehicle Total Income
2010 9,13,172 91300 25 22,82,500
It is evident from the above table that approximately 23 Lakhs is generated from the tourism sector to
Nagar Parishad.
6.4 Accommodation Facilities:
There are 5 hotels in Bhedaghat which approximately have 50 rooms with 100 Beds.
Table 5: Accommodation details
Accommodation Facilities
Hotel Category Number No. of Rooms No. of Beds
Hotels 5 50 100
Tourists arrival per day = 2500
Total no. of beds available = 100
As Bhedaghat is placed as one day tourism circuit, most of the tourists do not prefer to stay in
Bhedaghat, which is a negative point to the economy of Bhedaghat.
year Income
2006-2007 519259
2007-2008 485239
2008-2009 1525427
2009-2010 819455
23%
25%
18%
34%
Share of tourist expenditure (%)
Accomodation Food Transport Shopping
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 27 of 34
City Development Plan for Bhedaghat Town
6.5 Tourism Circuit:
Bhedaghat is merely at a distance of about 25 km from Jabalpur and absence of tourist information
center on existing tourism resources restricts Bhedaghat as one day tourist circuit.
Map 3.1: showing tourism places of Bhedaghat
CHAPTER 7: TOURISM
PROJECTIONS
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 28 of 34
City Development Plan for Bhedaghat Town
CHAPTER 7: TOURISM PROJECTIONS
7.1 Tourists Projections:
Table 6: Tourists Projections
Method Projected
Tourists 2011
Projected
Tourists 2015
Projected
Tourists 2025
Projected
Tourists 2035
Growth Rate Based Projections 9,13,172 10,68,411 13,03,462 16,29,327
Decadal Growth Rate 11% 17% 39% 47%
Per day Tourists 2500 2927 3571 4464
The Past Trends in the Tourists were decreasing, but by the induced growth like connectivity and
improved facilities there will be an expected growth of 11 to 50 % in tourist’s inflow.
For 2010 = 2500 tourists per day
1. For the year 2015 = 10,68,411 (Tourists inflow per day is 2927)
2. For the year 2025 (Intermediate stage)= 13,03,462 (Tourists inflow per day is 3571)
3. For the year 2035 (Ultimate stage) = 16,29,327 (Tourists inflow per day is 4464)
7.2 Tourism infrastructure
Table 7: Tourists Water Supply Details in Bhedaghat – 2011
Sl. No. Particulars Units
Per Capita Supply
1 Population – 2010 (per day) 2500
2 Current Per Capita water supply per day (in LPCD) 70.0
3 Per capita supply as per CPHEEO Norm (in LPCD) 135.0
Table 8: Water Demand Assessment per day
Particulars Phase 1 Phase 2 Phase 3
2015 2025 2035
• Projected Population per day 2927 3571 4464
• Total quantum of water required
(in MLD) @ 135 lpcd per capita 0.40 0.48 0.60
• Capacity of treatment plant (in MLD) 0.40 0.48 0.60
Source: Analysis
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 29 of 34
City Development Plan for Bhedaghat Town
Table 9: Sewerage Estimated in Bhedaghat
Indicator Norm Levels
Sewerage Estimated 80 % of water supply 0.48 MLD
Source: Analysis
Sanitation System
Public Toilets
There is a need for 8 more public conveniences with 40 seats in the town. The details of public
conveniences are shown in the Table 10.
Table 10: Details of Public Convenience Systems
Public Convenience Systems (Sulabh Sauchalaya)
a. Public Conveniences 8
b. Total Seats 40
Source: Analysis
7.3 Accommodation:
After making Bhedaghat a 2 days tourism circuit, with better connectivity and information dissemination
to the tourists, it is expected to attract more tourists. As the tourism attractions around the Bhedaghat
are within 3-5 kms distance making Bhedaghat a prospective centre for accommodation.
Assuming 30% of total number of tourists staying in Bhedaghat, there are 5 hotels which are
accommodating around 100 beds approximately.
Table 11: Tourist projections
Method Projected
Tourists 2011
Projected
Tourists Year
2015
Projected
Tourists Year
2025
Projected
Tourists
Year 2035
Per day Tourists 2500 2927 3571 4464
30 % of tourists 750 878 1071 1339
Hotels Required (Per hotel 30
Rooms) Cumulative Demand
10 12 16 20
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 30 of 34
City Development Plan for Bhedaghat Town
7.4 SWOT analysis
• Strengths:
The town has both recreational and Historical Tourism attraction. The town is predominantly dependent
on tourism as its Economic base.
• Weaknesses:
Being close to Jabalpur (25 km) Bhedaghat places itself for a one day tourism circuit. Bhedaghat is not
attracting many tourists as it is not properly connected to other tourism attractions around it.
• Opportunities:
Making Bhedaghat a 2 day tourism circuit as there are many places near Bhedaghat which can be
improvised as tourism places. Improved tourist infrastructure would provide tremendous opportunities.
• Threats: The existing facilities and civic amenities may not be sufficient for the needs of
tourist inflow.
Strengths Weaknesses Opportunities Threats
Scenic Beauty Poorly linked with the region
Potential of attracting more tourists which in turn
will give economic benefits
Deforestation
Less crowded, so less
polluted
Less popularity and
promotion
Employment to the local
people
Exploitation of natural
resources and migration
Issues: Strategies:
•• Absence of Public
Transport system
•• Improving existing Infrastructure Facilities like information center,
Water supply facilities and Public Convenience in Dhuandhar water falls
•• Absence of proper
Information system
on tourism places to
the tourists.
•• Improving existing Infrastructure Facilities like information center,
Water supply facilities and Public Convenience in Saraswati Ghat.
•• Resort facilities in Rudra Kund.
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 31 of 34
City Development Plan for Bhedaghat Town
7.5 Recommendations
• Promotion of tourism related activities.
• To increase tourism arrivals into the Town.
• Encourage the preservation, conservation and excavation of archaeological and historical sites
in places of tourist interest.
• Maintaining and improving the standard of existing hotels.
• Establishment of tourism information centers
• Running more cultural festivals to attract more tourism
• Make availability of tourism guides and all tourism spots
• Development of facilities and conveniences at tourist spots in hierarchical manner
• Development of better recreational opportunities for the local people
CHAPTER 8: TOURISM
PROPOSALS
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 32 of 34
City Development Plan for Bhedaghat Town
CHAPTER 8: TOURISM PROPOSALS
The heritage walk is a concept in which people are made to get closer to the town by taking
them through a guided walk and getting them familiar with the historical importance and strong
recreational character of the town.
The heritage walk makes people aware of the heritage and also guides them through the historic
and religious important building. The walks will be conducted by trained guides and can also be
supported with slideshows, pamphlets and stage shows.
Bus facility: These Buses might have a capacity of about 100 passengers. This kind of project
will require proper road surface. The advent of these buses will control pollution and improve the
mode of public transportation in the town.
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 33 of 34
City Development Plan for Bhedaghat Town
Community parks provide breathing spaces and at the same time form a platform for
interaction among the society. The parks should be preferably designed in such a way that they
require very less maintenance in the long run and at the same time give a welcoming and
friendly impression to the user.
The materials used could be more indigenous in nature and the parks could be designed as an
extension of heritage spaces, even theme parks attract more tourists.
Adventurous activities to promote Tourism:
Trekking in the forest will be designed in interesting paths and can have shopping places at
some points to provide employment and economy.
Tyrolean traverse:
A Tyrolean traverse is a method of crossing through
free space between two high points on a rope
without a hanging cart or cart equivalent.
Doc: Final Report for Bhedaghat Nagar Parishad – Tourism
Date: 25-10-2013
Page: Page 34 of 34
City Development Plan for Bhedaghat Town
River front development:
Riverfront should have a wonderful place to walk,
special pavers, sidewalks, way finding signage,
banners, and an easy-to-follow street pattern.
It should be pedestrian-friendly, long with public
plazas, seating areas, kiosks, street vendors or
performers, or something else of interest.
Eco tourism:
TOURISM COSTING
Destinations Proposed Project Govt. Cost Phase -I Phase -II Phase -III
Improvement of Approach Road 0.2 0.2 _ PWD Public PIDDC 0.2
1 1 _ MPSTDC Public PIDDC 1
0.3 0.3 _ MPSTDC Public PIDDC 0.3
Drinking Water 0.1 0.1 _ MPSTDC Public UIDSSMT 0.1
Illumination of Ghat 0.3 0.3 _ MPSTDC Public PIDDC 0.3
0.25 0.25 _ MPSTDC Public PIDDC 0.25
0.3 0.3 _ MPSTDC Public PIDDC 0.3
Natural History Museum 2 2 _ MPSTDC Public PIDDC 1 1
Solid Waste Management 0.2 0.2 _ MPSTDC Public UIDSSMT 0.2
Life guards and well equipped Rescue and First aid Unit 0.25 0.25 _ MPSTDC Public PIDDC 0.25
Total 4.9 4.9 _ 1.35 2.55 1
2 2 _ MPSTDC Public PIDDC 1 1
Solid Waste Management 0.2 0.2 _ MPSTDC Public UIDSSMT 0.2
Safety and Life Guards with First Aid Equipment 0.5 0.5 _ MPSTDC Public PIDDC 0.5
0.1 0.1 _ MPSTDC Public PIDDC 0.1
Total 2.8 2.8 _ 0.8 1 1
Conservation and Restoration 0.75 0.75 _ MPSTDC Public PIDDC 0.75
Illumination effects 0.3 0.3 _ MPSTDC Public PIDDC 0.15 0.15
0.1 0.1 _ MPSTDC Public PIDDC 0.1
Total 1.15 1.15 _ 0.85 0.15 0.15
Other Monuments
Conservation and Restoration and fencing of each monuments 3 3 _ MPSTDC Public PIDDC 1.5 1.5
Provision of Drinking Water at Each Monument 0.75 0.75 _ MPSTDC Public PIDDC 0.75
2.5 2.5 _ MPSTDC Public PIDDC 1.25 1.25
Public Conveniences at two locations on the Heritage Trail 0.3 0.3 _ MPSTDC Public UIDSSMT 0.3
1 1 _ MPSTDC Public PIDDC 1
Illumination of each monument 1.5 1.5 _ MPSTDC Public PIDDC 1.5
Site landscaping at each monument 1 1 _ MPSTDC Public PIDDC 1
Trained guides 0.1 0.03 0.07 MPSTDC PPP 0.1
Indicative Cost
(Rs. Cr.)
Private Funding
Implementing Agency
Mode of Funding
Existing Schemes
Lambeta Ghat
Redevelopment of Lambeta Ghat
Upgradation of Public Conveniences and Changing Rooms
Restoration and Conservation of Hanuman Mandir and Shiv Mandir
Directional and Information Signages
Dhuandhar Falls
Upgradation and Redevelopment of the Public Area around the Falls
Signages
Chausath Yogini Temple
Information Signages
Development of a Heritage Trail with improvement of approach roads
Directional and Information Signages at each Monument
Hunar se Rojgar Yojna
Destinations Proposed Project Govt. Cost Phase -I Phase -II Phase -IIIIndicative
Cost (Rs. Cr.)
Private Funding
Implementing Agency
Mode of Funding
Existing Schemes
1 0.25 0.75 MPSTDC PPP PIDDC 1
Total 11.15 10.33 0.82 4.15 4.25 2.75
1 1 _ PWD Public PIDDC 1
Illumination effects 0.5 0.5 _ MPSTDC Public PIDDC 0.5
Drinking Water 0.2 0.2 _ MPSTDC Public UIDSSMT 0.2
Public Conveniences 0.3 0.3 _ MPSTDC Public UIDSSMT 0.3
Solid Waste Management 0.1 0.1 _ MPSTDC Public UIDSSMT 0.1
Parking for 30 cars 0.5 0.13 0.37 MPSTDC PPP PIDDC 0.5
Total 2.6 2.23 0.37 0.6 2
2 0.5 1.5 MPSTDC PPP PIDDC 2
Nature Therapy and Meditation Center 5 1.25 3.75 MPSTDC PPP PIDDC 2.5 2.5
4no Houseboats 3 0.75 2.25 MPSTDC PPP PIDDC 1.5 1.5
4 4 MPSTDC Public PIDDC 2 2
Rescue and First aid Unit well equipped emergency boat 1 1 MPSTDC Public PIDDC 1
3.5 0.88 2.62 MPSTDC PPP PIDDC 1.05 1.225 1.225
Meditation Park 2 2 MPSTDC Public PIDDC 1 1
Budget accommodation(30 rooms) 7.24 1.81 5.43 MPSTDC PPP PIDDC 2.172 2.534 2.534
Aquarium 6 1.5 4.5 MPSTDC PPP PIDDC 3 3
Total 33.74 13.69 20.05 5.222 14.759 13.759
Grand Total 56.34 35.1 21.24 12.972 24.709 18.659
5 no. six seater shuttle services to operate on the heritage trail
Saraswathi Ghat
Redevelopment of Saraswathi Ghat
Bhedaghat
4no Mini Buses to operate from Bhedaghat to Jabalpur
Upgradation of Cruise Boats and Facilities and provision of 2 new Boats
Cultural and Laser Show in an Open Air Theater developed amongst the rocks
SPECIAL PAPER
SPECIAL PAPER
ON
CONSERVATION & TOURISM
INTRODUCTION - CONSERVATION OF HERITAGE SITES INCLUDING TOURISM
Nature conservation and tourism in the contemporary sense date from the first half of the nineteenth century
and, to a large extent, have developed parallel to one another. Conservation of heritage sites shall include
buildings, artifacts, structures, areas and precincts of historic, aesthetic, architectural, cultural or
environmentally significant nature (heritage buildings and heritage precincts), natural feature areas of
environmental significance or sites of scenic beauty.
Tourism, in all its forms, is of crucial importance to the economic, social and environmental well-being of the
whole country. The planning system has a vital role to play in terms of facilitating the development and
improvement of tourism in appropriate locations.
Ecotourism and protected areas:
Protected areas, which are also regions of significant tourist attraction, are formed in three ways:
• Tourist regions that have been exploited particularly intensively are put under protection. This is a
typical case for mountain national parks.
• A region is recognized as an interesting site after it has been declared a protected area - who would
have thought that vast marshlands or peat bogs could become an attraction until naturalists began
calling for their protection?
• Protection is introduced, among other reasons, to save the tourist attractions of a region, e.g. from
industrial exploitation. This is the objective of many scenic protection areas.
The mandate of the Tourism and Conservation Planning is 'To conserve the rich biodiversity of the Protected
Areas and to develop, sustainable tourism in collaboration with stakeholders for the benefit of all the People
living in Bhedaghat town’
Bhedaghat has a special scenic, recreational and historical value. Its ecology entails some of the following
elements:
• Places of religious Importance
• Places of Historic and archeological Importance
• Excellent Trekking Destination
• Good Picnic Spots
CONSERVATION OF MONUMENTS AND SCULPTURES:
The temple of Chaunsatha Yogini
Immediately above the confluence of the Narmada and Bawanganga, the fork of rock rise into a small circular
hill. Atop this hill is situated the 10th century A.D. Temple of the extinct cult of Chaunsatha Yogini. Placed
topographically at the highest point amongst the surroundings, the position this temple is unique and
commanding. A long flight of roughly hewn steps lead right up from the bed of the Narmada to the south-
eastern entrance of the temple. From its north-eastern entrance another flight of steps lead one to the road
which connects the waterfall. Close beneath, on the south the blue water of the Narmada seems to sleep,
spell, spellbound, under the snow-white walls that shut them in.
To the north and the west the view is bounded by thickly wooded height; but on the east the eye looks down
on a long reach of the river, stretching away for miles towards Jabalpur.
Among many obscure cults of ancient and early medieval India the cults of Chaunsatha Yyogin was one.
Yoginis are essentially attendants of the mother goddess, through different interpretations exist. Through
literacy reference to Yoginis may be traced as far back as post- Vedic period in India, regular cult worship of
the Yogini came into existence sometimes during the 8th – 9th century A.D. The lead in the direction was
taken by saint Machchhendranatha, the founder of the Yogini Kaula sect, the tenets of which are revealed in
the work kaulajnananirnaya, the authorship of which is ascribed to him.
The followers of Yogini Kaula sect tried to spread their teaching far and wide all over India through the main
regions of their activities seem to have been modern Indian states of Uttarpradesh, Madhya Pradesh, Orrisa
and the district of Coimbatore. Extant remains of the Yogini temples have been found at: Hirapur and Ranipur
Jharial in Orissa; Khajuraho, 65 in cases of Mitauli, 42 in cases of Dudahi and Badoh and the largest number-
81 in case of Bhedaghat. This makes the Bhedaghat temple unique. Architecturally, the temples of
Chaunsatha Yogini are either circular or rectangular in shape with Yogini sculptures installed on pedestals
along the inner side of the walls of the circulating cloister with or without a temple erected at the center of
the cloister. The Khajuraho and Badoh temples are rectangular, the rest are circular.
Interior view and plan of Chaunsatha Yogini Temple
Apart from the temple remains, isolated collections of Yogini sculptures have been found in MP. At Naresar,
Hingalgarh, Lokahari and Shahdol in addition to several museums in India and abroad. Interesting Yogini
sculptures are in the collections of : the Musee' Guimet in Paris, the Detroit institute of art, the royal Ontario
museum, the Brooklyn museum, the Minneapolis institute of arts and the Kansas collection.
The circular cloister of the Bhedaghat temple consists of a huge thick wall along outer edge of a circular
platform, inside which there is a circular row of pillars and pilasters arranged in two concentric circles. A flat
roof with a low ribbed chhajja running all along is supported by these pillars and pilasters. The inner diameter
of the cloister is 34.5 meters and the outer is 40.8meters. The number of pillars in front row is 84 and an
equal number of pilasters are arranged opposite to them against the black wall. 81 equidistant pedestals are
erected on the circular platform and images of Yoginis and other deities are fixed on them.
GOLAKI MATHA
In a pillar inscription found that from Malkapuram
(dist.Guntur, Andhrapradesh) it is stated that king
Yuvarajadeva of kalachuri dynasty gave as
Bhiksha, three lakhs of villages to his guru
Sadbhavashambhu of the Golkai Matha situated
between Narmada and Ganga. This Golaki Matha
was so named on account of its attachment with
the Gol (round) temple of Chaunsatha Yogini
Remains of this Matha may be identified with the
ruined two storied rectangular structure situated just opposite to the steps that lead to the temple which
begins from the road side. This was the famous tantric center known all over India, the branches of which
were established at Cudappah, Kurnool, Guntur, and north Arcot district. In the religious history of ancient
India, the Shiva Acharyas of Golkai Matha occupy a prominent place for their learning. In modern terminology
the structure is known as Haveli.
Gaurishankar Temple
PACHMATHA COMPLEX
Opposite the Haveli is situated a group of five temples, known as Panchmatha. Parts of this group were built
during different periods. Temple no.1 is a panchayatan temple built on a plinth measuring 22.93*19.1 meters.
The Ganesh image kept in the Garbhagirha was stolen in 1990. The temple may be dated to c. 14-15th
Century A.D.
Temple no.2 situated at the back of the above is plain octagonal in structure with Shikhara in Nagara style
with Gond influence. The Adhisthana is plain and is 1
meter high.
Temple no.3 situated to the north of no.1 is a square
structure with Shikhara of Nagara style with Gond
influence. An inscription of Vikram Samvat 1810(1752
A.D.) is inscribed on the door-frame of the temple.
The temple is datable to c. 14th – 15th century A.D.
Temple no.4 situated along the edge of the road is
square in plan with spiraled Amalaka, decorative
Shikhara in curvilinear and leaf designs. An inscription
of about 9-10th century A.D is installed into the plinth of the temple is datable to c. early 14th century A.D
situated towards back of complex is a square pillared structure with corbelled dome, locally known as
Samadhi of Mahant Mahadeo Puri. It has plain brackets and exteriors.
Pachmatha temple - 2 Pachmatha temple - 3 Pachmatha temple - 4
SHIVA TEMPLE
Within the boundary of rest house no.1 is situated a Shiva temple datable to c. 17th century A.D. The temple
is a plain structure built on a high plinth. The Garbhagriha of this small temple has a central dome. The walls
are plain and the cornice, parapet and lower portion of the dome have leaf design.
MARHIA MATHA: 1-2
a temple datable to c. 14th – 15th century A.D. known as Marhia Matha exist near the river and is accessed
through various homes. It has a domical roof, the walls are plain. It is datable to Gond period.
Another structure on a high mound, also known as Marhia Matha and built near Adhyatma Vigyan Nauka is a
religious Samadhi. The entire structure is plain and has arched false niche. It is painted and cemented.
In front of it, along the road and surrounded by modern house exist ruins of a temple with domical structure
of Gond period.
Panchavati Ghat Marhia Math No. 2
Samadhi of Mahant Mahadeo Puri Mariha Math No. 1
Important Sites which have to be conserved:
Bhedaghat is a town and a Nagar Panchayat in Jabalpur district. It is situated by the side of river Narmada
and is approximately 20 km from Jabalpur city. It’s most famous sights are the Dhuandhar Falls, Marble
Rocks, and the Chausath Yogini temple.
Dhuandhar Falls Lamheda Ghat
Tourists Destination and their Description:
Town Tourist Destination Description
Jabalpur
Bargi Reservoir Bargi Dam is built on Narmada River. Its reserved
water is used for Hydropower generation and irrigation
purpose.
Dumna Nature
Reserve
The Dumna Nature Reserve is an eco-tourism site in
Jabalpur.
Madan Mahal Fort Madan Mahal fort was built in 11th century by 38th
Gond (Tribe) ruler. It is built on top of the hill and
visible from most of the city part.
Tilwara Ghat Is one of the main among the several Ghats around
the Narmada river and has the Gandhi Smarak.
Jabalpur Palace Jabalpur has the palace of Gond kings. It possess
gifted natural scenic beauty of hills, ponds, river,
water-fall, historical monuments etc.
Existing Infrastructure Gaps - Bhedaghat
• Improvement in the solid waste management is required for the town as well for its tourist sites.
• Lack of direction signages in the town to reach the different tourist spots.
• Night Illumination of Madan Mohan fort, Chausath Yogini Temple and Tilwara ghat.
• Restoration and conservation of Hanuman Mandir and Shiv Mandir
• Improvement in street lighting and public conveniences, onsite, is required for some tourist sites.
• Lack of drinking water
The key components can be:
• Conservation of Ghats.
• General landscaping for ornamental plantation
• Designing pathways, sit outs along the river side for the tourists.
• Waste water treatment before flowing into River.
• Street furniture and public conveniences
• Lighting and illumination
Sitting components for the tourists Pathways along the river bank
WORKSHOP HANDOUTS
12/19/2011
1
ehar {dH.mg �moOZm 2e8{d8�mo3
ehar ÓemgZ Am–a {dH.mg {d^mJ6 �Ï� ÓXoe gaH.ma
1
n[a�moOZm gœ{jÒV Am–a godmAm| H.m H.m��7jo¿:
� e8{d8�mo8 go ~šhV XrK H.m{bH. H.m� 7Zr{V 2{d©OZ #!$&3 2{d©OZ #!$&3 2{d©OZ #!$&3 2{d©OZ #!$&3 Ho. gmW7gmW ehar {Zdoe �moOZmehar {Zdoe �moOZmehar {Zdoe �moOZmehar {Zdoe �moOZm
2e8{Z8�mo3 CnbÖY H.amZm h– {Oggo gœ~œ{YV e8.Wm8{Z8 Ho.Ðà gaH.ma6 �8n�8 gaH.ma �moOZm Ho.
gmW7gmW e8{d8�mo8 �| ÓmW{�H.Vm H.m� Am–a n[a�moOZm nhMmZ Ho. AmYma na IwX Ho. Edœ AÐ�
8moVm| go {Z{Y�mœ ÓmÒV H.aZo �mo°� hm|Jr 0
� BZ X.VmdoOm| �| {dÁmr� n[aMmbZ �moOZm{dÁmr� n[aMmbZ �moOZm{dÁmr� n[aMmbZ �moOZm{dÁmr� n[aMmbZ �moOZm 2{d8n8�mo83 ^r Xr OmE Vm{H. e8{Z8�mo8 nhMmZr JB
n[a�moOZmAm| Ho. AZwnmbZ Ho. {bE {d{^Ñ {dÁmr� 8moVm| go YZ OwQ>m gHo. 0
� godmAm| Ho. H.m� 7jo¿ �| Oo EZ EZ �w Ama E� Qy>b{H.Q>7# �| ~mVmE JE g^r AmdD�H. H.X�
em{�b hm| {Oggo e8{d8�mo nyam H.aZo �| �XX {�b gHo. O–go AmYma gm�J�r O�m H.aZm Am–a
jo¿7Xm–am6 ZJa n[afX H.��mo[a�m| Am–a g^r AÐ� XmdoXmam| go |̂Q>6 jo¿ {dDbofU AmdD�
H.m� embmAm| H.m Am�moOZ Am–a e8{d8�mo [anmoQ> nyam H.aZm 0
2
12/19/2011
2
� ehar {dH.mg �moOZm �| eha H.m gmnoj �h¾d Am–a AZwÄD� XmoZmo h— 0
� �h eha Ho. dV �mZ {dH.mg H.s p.W{V Xem Vm h– {H. A~ h� H.hm¦ h– ?
� �h n[adV Z H.s {XemAm| H.mo ~VmVm h– {H. h�| H.hm¦ OmZm h– ?
� �h X~md jo¿m| H.s nhMmZ H.admVm h– {H. ÓmW{�H.Vm AmYma na h�| N�m H.aZm Mm{hE ?
� Bg�| n[adV Z bo AmZo Ho. {bE d–H.pÞnH. am.Vo6 H.m� Zr{V Am–a h.Vjon H.m ^r gwPmd hmoVm h– {H. h�| bQ� ÓmÒV H.aZo �|
H–.go h.Vjon H.a| 0
� Bg�| R�o.�dH . Am–a {d©OZ hmoZo go OmZ gH.Vo h— n[a�moOZmAm| H.s nhMmZ H–.go hmo Am–a AZwnmbZ H–.go H.a| 0
� �h gwgœ.Wm{nV H.aVm h– {H. {Zdoe {ZU � Ho. �yÞ�mœH.Z Ho. {bE VH .gœJV Edœ gwgœJV T>mœMo go H–.go {ZnQ>m OmE 0
n[aM�:n[aM�:n[aM�:n[aM�:
3
� Odmhabmb ZohÝ. ZoeZb A~ Z [a{Zdb {�{eZ 2Oo8EZ8EZ8�w8Ama8E�3 H.mo Ï�mZ �| aIVo hVE ehar {dH.mg
�moOZm ~Zm�r JB h– Vm{H. {H.©R.m�Vr C¾nmXH.Vm6 gR. b6 Ð�m�gœJV Am–a Ó^mdZr� eham| Ho. bQ� V–�ma {H.�o
Om gHo. 0
� Bg bQ� H.mo ÓmÒV H.aZo Ho. CÇoD� go �h gœH|.{ÃV H.aVm h– {H. Am{W H. Am–a gm�m{OH. AmYm[aH. gœ.WmZ Ho.
{dH.mg6 H.m� 7Zr{V {Og�| ehar Jar~ bmoJm| H.mo Ó^m{dV H.aZo dmbr g�.�mE¦6 gaH.mar ZJanm{bH.mAm| H.mo
�©O~yV H.aZo Amoa CZHo. {dÁmr� boIm7OmoIm Am–a ~OQ> ÓUmbr VWm Ó{H.�m6 Odm~Xohr Am–a nmaX{e Vm bmZo Ho.
{bE T>mœMm V–�ma H.aZm6 ^y{� Am–a Jšh {Z�m U {dnUZ na Ó^md S>mbZo {d{YH. ~mYmAm| H.mo XYa H.aZo Ho. N�m
Cnm� {H.�o OmEœ 0
� �h eham| H.mo AmYma ÓXmZ H.aVm h– {Og�œo ehar jo¿m| �| gwYma bmZo Am–a ehar AmYm[aV T>mœMm| Ho. {bE Ó¾�j
{Zdoe H.aZo �| �XX {�b gHo. 0
n[aM�:n[aM�:n[aM�:n[aM�:
4
12/19/2011
3
dJuH.aU Edœ Ó{H�.�m AZwgaU
!Q>oO7" gœJ�hU Am–a Ómaœ^:
Bg Ad.Wm �| ZJa n[afX6 XmdoXma Am–a H.m� dJ Ho. gX.� Am–a ZJa H.m gd}jU H.aZo dmbmoH.� Mm[a�m| Ho. {bE EH. {H.H.7Am¥R. H.m� embm Am�mo {OV H.s OmVr h– 0
!Q>oO7# dV�(mZ n[ap!W{V�m| H.m {ZYm�aU:
dV �mZ n[ap.W{V�m| H.m JhZ {dDbofU {H.�m OmVm h– {Og�| S>o�moJ�m{R.H. ÓmoR.mBb6 EH.moZm{�H.ÓmoR.mBb6 A~ Z JdaZ|g6 A~ Z BÐR�.m.Q¨>NMa Am–a EZdamBZ�|Q>b EgnoNQ> em{�b h– 0
!Q>oO7$ {gQ>r {d©OZ H.m {dH.mg Am–a jo¿ b0� Edœ H.m��7Zr{V:
eha H.m gmnoj Am–a {d©OZ H.m {dH.mg
!Q>oO7% H.m��Zr{V�m| Am–a ÓmW{(H.Vm H.m�� H.m {dH.mg:
eha Ho. ^mdr {dH.mg Ho. {bE eha Edœ {d©OZ H.s dV �mZ p.W{V�m| �| Z©OXr{H.�mœ bmZo hoVw EH.H.m� 7ÓUmbr V–�ma H.aZm 0
5
!Q>oO7& eha {Zdoe �moOZm 2e8{Z8�mo3 Am–a {dÁmr� ÓMmbZ �moOZm 2{d8Ó8�mo3:
eha {Zdoe Am–a {dÁmr� ÓMmbZ �moOZm g{hV {dÁmr� H.m� 7Zr{V V–�ma H.aZm 0
!Q>oO7' S¨>mÕQ> {gQ>r {dH.mg �moOZm 2e8{d8�mo3:
g^r XmdoXmam| Edœ H.m� Xbm| go ÓmÒV R.sS>7~–H. H.mo Ï�mZ �| aIVo hVE eha {Zdoe �moOZm 2e8{Z8�mo3 Am–a{dÁmr� ÓMmbZ �moOZm 2{d8Ó8�mo3 g{hV S¨>mÕQ> {gQ>r {dH.mg �moOZm V–�ma H.aZm 0
!Q>oO7( Aœ{V( e8{d8�mo8 ÓboI:
Aœ{V� H.m� embm H.s R.sS> ~–H. 2Ó{V{H�.�m3 VWm am´� .Va MMm go ÓmÒV Ó{V{H�.�m H.mo em{�b H.aVo hVEAœ{V� eha {dH.mg �moOZm V–�ma H.s OmEJr 0
Cn�w NV g^r .Q>oOm| �| g^r XmdoXmam| Am–a H.m� Xbm| Ho. gmW ß�mnH. Ý.n go nam�e {H.�m OmEJm 0
dJuH.aU Edœ Ó{H�.�m AZwgaU
6
12/19/2011
4
H.m`�7ÓUmbr 2gr8S>r8nr83:H.m`�7ÓUmbr 2gr8S>r8nr83:H.m`�7ÓUmbr 2gr8S>r8nr83:H.m`�7ÓUmbr 2gr8S>r8nr83:
7
H.m��embm H.m CÇoB� Am–a (h¾d:
� XmdoXmam| 2.Q>oH. hmoÞS>a3 H.s H.m� embm H.m �w®� CÇ oD� {gQ>r {d©OZ H.m {dH.mg H.aZm h– Am–a ZJa n[afX Ho. jo¿ bQ� VWm�moOZm ~ZmZm h– 0 e8{d8�mo8 eha .Va Ho. bmoJmoœ H.s ÓmW{�H.VmAm| Am–a {MœVmAm| H.mo XYa H.aVm h– 0 AV: {^Ñ7{^Ñ MaUm| �|AZoH. ÓH.ma Ho. XmdoXmam| Ho. {bE H.m� embm Am�mo{OV H.aVr h– 0
� eha {dH.mg �moOZm 2e8{d8�mo3 V–�ma H.aZo Ho. {bE eha Ho. {d©OZ H.m {dH.mg H.aZm AmdD�H. h– 0 {d©OZ V–�mar goeha9ZJa H.s Xem Am–a {Xem H.m {X�oJ�o g�� Ho. ^rVa nVm MbVm h– Am–a .nbQ AnojmEœ gm�Zo Am OmVr >h— 0
� �h eha H.s j�Vm VWm VwbZm¾�H. Am–a Ó{V�moJr lod>VmAm |6 �yÞ� Am–a eha {Zdm{g�m| H.s ngœX6 eha Am–a am´�6 ame¨> Am–a{dDd Am{W H. p.W{V H.m gœ~œY Am–a eha H.s Eo{Vhm{gH. Am–a ^m–Jmo{bH. {deofVmAmoœ H.mo {ZÝ.{nV H.aVm h– 0
� Bg {d©OZ go eha Ho. {dH.mg Ho. {bE XmdoXmam| Ho. ggpNVerb H.m� H.aZo H.s H.m� epNV H.m nVm MbVm h– 0
� eham| Ho. ^{db� H.m EH. nÈ{VnyU �moOZm H.mo AnZmZo H.s AmdD�H.Vm h– Am–a #!$& df Ho. {bE ^{db� Ho. AmH.maZwgma{d©OZ .Q>oQ>�|Q> V–�ma H.aZm h– 0
8
12/19/2011
5
�{gQ>r ÓmoR.mBb
�Ozgmœp®�H.s>
�gm_m{OH. Am{W H. nmDd {M¿
�^m–{VH. �moOZm~ÈVm Edœ dš{È Ó~œYZ
�jo¿ {dDbofU
• Ob Amny{V Ó~ÐYZ
• R>mog Hy.S>m> Ó~œYZ
• �b ß�d.Wm6 ~mT> Ob {ZH.mgr9gR.mB Ó~ÐY
• g…S>H. Am–a n[adhZ
• .Q¨>rQ> bmBQ> Am–a Ap°Ze�Z
• JœXr7~.Vr VWm gœdoXZerb n�m daU jo¿ 9 X{©H.�mZygr jo¿
• gm�m{OH. ß�d.Wm 2BœR�.m.Q¨>NMa3
�n�m daUr� gœdoXZerb Edœ gœajU jo¿
� ZJa n[afX Ho. Am�7 ß�� H.m gœ{jÒV {ddaU
Data Requirement
������������������������������������9
CHECKLIST
Latitude
Longitude
Average rainfall (annual) MM
Height above mean sea level Mts
Municipal area (1991) Sq kms
Municipal area (2001) Sq kms
Municipal area (2011) Sq kms
Date of Constitution of ULB Date
Historic importance
In one or
two
sentences
Population Year 1981 (under Municipal boundary
only)
Population Year 1991 (under Municipal boundary
only)
Population Year 2001 (under Municipal boundary
only)
Population Year 2011 (under Municipal boundary
only)
Name of Population projection Method
Projected population adopted Year 2015
Projected population adopted Year 2025
Projected population adopted Year 2035
Land Use
% Standard
(as per
UDPFI)
Land use
(Tentative in Sq
kms )
Land use (Tentative in
percentage)
Residential 48.0 0.084 3.20
Commercial 2.0 0.002 0.08
Public - semi public 8.0 0.3 11.44
Agriculture 5.0 1.2 45.77
Hill Areas 10.0 0.612 23.34
Roads 12.0 0.196 7.48
Green area 7.0 0.026 0.99
Sensitive 3.0 0.165 6.29
Water bodies 5.0 0.037 1.41
Total 2.622
La
nd
Use
Po
pu
lati
on
Town level
NA
NA
5423
6657
Geometrical Increase Method
8174
10036
12321
Whether the Sectoral Analysis report is as per UADD requisites Yes
To
wn
Bri
ef
Geographical location (Town)23
0 08'
790 48'
1253.7
2.37
2.37
2.37
2001 january
Bhedaghat town is situated by the side of
river Narmada. It’s most famous sights are
the Duandhar Falls, Marble Rocks and the
Chausath Yogini temple
City ProfileCompany Name Aarvee associates
ULB Name Bhedaghat
Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total
Name of ward Shiwaji Ward Subash Ward Mahatma Gandhi WDeendayal WardAbdul Kalam warRammanohar LohSardar Vallabh Bhai WMaharana Pratap WarRani Durgawati WarVonoba Bhave WaRavi Shankar ShuklaJawaharlal Nehru WLalBhahadur ShastriDr. Ambedkar WarTripur Sundari Ward
Ward Population (2001) 446 378 535 559 323 489 466 400 362 357 458 509 494 473 408 6657
Area (sq kms) 0.15 0.01 0.61 0.01 0.43 1.20 5.54 1.19 1.01 0.83 0.62 1.97 1.26 0.79 0.56 16
Density (PPSqkm) 2905 35697 878 44179 752 408 84 337 360 431 739 259 391 596 728 88742
Male population 225 197 291 303 175 276 227 215 193 187 256 255 260 247 226 3533
Female Population 221 181 244 256 148 213 239 185 169 170 202 254 234 226 182 3124
SC 37 2 58 219 60 19 22 230 17 48 100 5 48 29 9 903
ST 88 81 236 38 67 267 70 27 48 0 17 15 56 132 32 1174
BPL 54 45 64 67 39 59 56 48 43 43 55 61 59 57 49 799
Sex ratio 982 919 838 845 846 772 1053 860 876 909 789 996 900 915 805 13305
Literacy rate (%) 29.53020134 20.37037037 38.13084112 35.42039356 30.1242236 42.94478528 43.77682403 23.80952381 26.51933702 36.59217877 35.44857768 42.94117647 35.02024291 25.15856237 29.41176471 495
No. of Primary schools 0 1 0 1 1 0 0 0 0 0 1 0 0 0 0 4
No. of Primary Health Centre 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1
No. of Households 102 73 117 108 67 110 102 71 67 67 98 99 100 87 87 1355
Primary occupation (Majority) sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture
Secondary occupation Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture
Tertiary occupation business business business business business business business business business business business business business business business
No. of SS/LS industrial units Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
No. of Commercial establishments 0 0 0 12 8 0 0 0 0 0 0 0 0 0 0 20
No. of Slum pockets 0 0 1 1 0 1 1 1 0 0 0 0 0 0 0 5
Slum population 0 0 482 503 0 440 419 360 0 0 0 0 0 0 0 2204
No. of Slum Households 0 0 88 91 0 80 76 65 0 0 0 0 0 0 0 401
No. of Individual water connections in the
ward61 44 70 65 40 66 61 43 40 40 59 59 60 52 52 813
No. of Community water connections Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
No. of Commercial water connections 0 0 0 16 10 0 0 0 0 0 0 0 0 0 0 26
No. of Tube wells 1 1 1 1 1 1 1 0 0 1 1 1 0 0 0 10
No. of Hand pumps 2 3 1 3 3 4 2 4 3 2 2 0 3 0 1 33
No. of OHTs 0 0 0 0 0 0 0 0 0 0 0 0 1 2 3 6
% Coverage of piped water supply 74 74 74 74 74 45 55 74 74 74 74 45 55 74 74 1014
No. of Individual Toilets 87 62 99 92 57 94 87 60 57 57 83 84 85 74 74 1152
No. of Individual Septic tanks 51 37 59 54 34 55 51 36 34 34 49 50 50 44 44 678
No. of Community Septic tanks Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
No. of Community toilets Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
% of population - Open defecation 77 55 88 81 50 83 77 53 50 50 74 74 75 65 65 1016
No. of Dust bins 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15
Wardwise Waste generated (Kgs) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Road sweeping (1 time or 2 times) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15
Total no. of sanitary workers in the ward 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 8
Length of Pucca road (Mts) 580.6 321.7 2684.5 967.4 35.7 0 3991.5 0 0 2694.6 1821.7 0 0 2124.0 413.2 15635
Length of Kuccha road (Mts) 0 0 0 0 0 3454.3 0 1147.3 1470.5 0 0 1592.2 1384.5 0 0 9049
Length of State Highway Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Length of National Highway Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
No. of Streetlights 25 31 33 35 24 25 21 34 29 33 19 37 21 27 22 416
No. of Electricity connections 92 66 105 97 60 99 92 64 60 60 88 89 90 78 78 1220
Name of Tourist site if any
Name of Heritage site if any
Bus stop (No.) No No No No No No No No No No No No No No No
Bus stand(No.) No No No No No No No No No No No No No No No
Parks (No.) 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2
Playground(No.) 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
No. of Residential properties
No. of Commercial properties 37 2 58 219 60 19 22 230 17 48 100 5 48 29 9
Total Property tax collection (in Rs.)
Property tax coverage(in %)
Available Government land (Sq kms)
Remarks
City Profile (Ward Wise)
Source Tube well Hand Pumps River/Lake
No. of Tube well / River / Well 9 33 1
Water Supplied by Tubewell / River /
Well in MLD0.46
0.46
70
30 (Flat)
45
No
Narmada river
0.368
No
674
Nil
Nil
Once in 6 months
NA
Narmada river
2.5
10.20%
No
250
2.00
Once in a Week
80
Practicing in few wards in the town
No
Dumping site
No
3.5
2 Trolleys
Yes
NH-12 A
12
SH-22
5
CC 4.683
WBM / others 11.654
Total (kms) 16.337
(kms) 8.331
(kms)
Ro
ad
s
Name of National Highway passing from or nearby from the town
Distance of National Highway if nearby from the town in Kms
Name of State Highway passing from or nearby from the town
Distance of State Highway if nearby from the town (SH-XYZ) in Kms
Total length of Pucca roads (Kms)
Total length of Kuccha roads (kms)
Gap w.r.t Standards
SW
M
Per capita Solid waste generation (Considering Standards) (in gms)
Total SW generation (in Tons)
Frequency of SW collection by the ULB (1 time per day/2 times per day)
Collection efficiency of the ULB (%)
Any initiative for DTDC (Yes /No)
Any initiative for scientific disposal of waste
Name of dumping/ landfill site
Is the existing site Dumping site or allotted site for Scientific disposal
Area of allotted landfill site for Scientific disposal
Distance of the Dumping site/landfill site from main settlement area (Kms)
No. of Tractor trolleys/vehicles available with the ULB for carrying Solid waste to
the LF site
If site for Scientific disposal is not allotted then whether formally requested by
the ULB
Frequency of Cleaning Individual Septic tanks
Frequency of Cleaning Community Septic tanks
Dra
ina
ge
Name of natural nallah (Storm water drain)
Length of natural nallah (Storm water drain) Kms
Ultimate disposal point of nallah
Length of road side drain (Kms)
Coverage of road side drainage w.r.t roads (%)
Ultimate disposal point of Road side drains
Any treatment plant/procedure adopted
Sectoral Analysis
Ph
ysi
cal
Infr
ast
ruct
ure
Wa
ter
Su
pp
ly
Existing Source
Total water supply in the town (MLD)
Existing Supply rate (LPCD) considering distribution losses
Water Charges per household per month (Rs.) Flat/Metered
% Coverage under paid water supply
Whether any treatment plant exists (Y/N),If yes mention capacity (MLD)
Proposed source (Surface)
Sew
era
ge
Total sewage generation (MLD)
Whether any treatment plant exists (Y/N),If yes mention capacity
Total no. of individual septic tanks
Total no. of community septic tanks
Total no. of Sewage/Mud pumps available with the ULB
No
Yes Auto service
1 Nil
2 Nil
3 Nil
416
416
187
0
0
0
0
400 KV
220KV Jabalpur
132KV Shahpura
Y (Single phase)
14
Nil
Nil
Nil
Chousat Yogini temple, Tripurasundari temple,
Naramada Ghats, Dundhara waterfalls
MP Tourism dept
1200 to 1500
Narmada river
Madhya Pradesh Environ….Act 199..
1
Government 0
Beds 0
Private 0
Beds 0
No 0
Name of town Jabalpur
Distance (Kms) 18 kms
6 200 (Students capacity)
3 150-200(Students capacity)
0
0
Nil
Nil
1
ULB
Name of Scheme Beneficiaries
Deendayal antodaya Nil
Widow pension 80% of widows are getting benefits
No. of Beneficiaries under Gharelu Kamkaji Mahila Yojana
Name of other Social security schemes
So
cia
l In
fra
stru
ctu
re
Hea
lth
No. of Primary Health centres/Dispensary
No. of Hospitals
Multispeciality hospital if any (Y/N)
Name of Nearby town reffered for Treatment
Ed
uca
tio
n No. of Primary schools
No. of Secondary/High schools
No. of Colleges
No. of ITI
So
cia
l se
curi
ty s
chem
es
No. of Beneficiaries under SJSRY (Street Vendor)
No. of Beneficiaries under Haath thela/Rickshaw chalak yojna
No. of Rain Basera/Night Shelter
Ownership of Rain Basera (with ULB/Rental)
Her
ita
ge
& t
ou
rism
Her
ita
ge
& t
ou
rism
Name of Heritage site/s
Ownership/agency
Prevailing Heritage Act/s
Name of Tourist site/s
Ownership/agency
Total no. of Pilgrims/ Tourists visiting town per day
En
vir
on
men
t Name of River/Lake/Forest range/Any specific species
Prevailing Environmental Act/s
Areas facing threats
No. of Streetlights having LED
No. of Streetlights having LPS
Po
wer
Location of Substation http://www.mptransco.nic.in
Total no. of residential connections
Total no. of Commercial connections
Any subsidy for BPL (Y/N)
Duration of Electricity supply per day (in Hrs)
Total no. of street lights
No. of Streetlights under working condition
No. of Streetlights having Tubes
No. of Streetlights having CFL
No. of Streetlights having Incandescent bulbs
Ph
ysi
cal
Infr
ast
ruct
ure
Tra
ffic
&
tra
nsp
ort
ati
on
Total no. of vehicles in the town
Bus stand (yes/No)
Any intracity mass transport mode (yes/no)
Name of locations facing major traffic issues
Name of the street beautified as per the instructions of
UADD
Str
eet
lig
hti
ng
Ward No Name of Slum pocket/ reference nameNotified/ Un-
notified
Ward
population
Slum
population
Individual
water
connections
No. of
Community
taps
No. of
Handpumps
No. of
Individual
toilets
No. of
Community
toilets
No. of Pucca
houses
No. of Semi
pucca houses
No. of Kuccha
houses
No. of
Permanent
pattas
distributed
No. of
Temporary
pattas
distributed
No. of
Primary
school in the
slum pocket
No. of
Primary
Health centres
in the slum
Beneficiaries
under social
security
schemes
Any
interventions
under IHSDP
(Y/N)
Ward 3 Mahatman Ghandi Ward Notified 655 590 101 Nil 3 80 Nil 32 21 54 Nil Nil Nil Nil 413 No
Ward 4 Deendhayal Ward Notified 750 675 116 Nil 4 92 Nil 37 25 62 Nil Nil Nil Nil 473 No
Ward 6 Ram Manohar Lohiya Ward Notified 318 286 49 Nil 8 39 Nil 16 10 26 Nil Nil Nil Nil 200 No
Ward 7 Sardhar Ballabha Bhayi Ward Notified 436 392 67 Nil 2 54 Nil 21 14 36 Nil Nil Nil Nil 275 No
Ward 8 Maharana Prathap Ward Notified 334 301 52 Nil 6 41 Nil 17 11 28 Nil Nil Nil Nil 210 No
Total 2493 2244 385 23 306 122 82 204 1571
Sectoral AnalysisSlums & Urban Poor
Details 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13
Revenue Receipts
Tax receipts
Land and House Dues 5843510 6249200 10780600 11258019 10500000 11340000
Property Taxes 0 0 23290 11475 12000 12120
Cleaning Tax 0 2829 0 0 0 0
11. Electricity 28860 30880 80257 119600 125000 143750
14.Piligrims tax 990488 1376056 819445 950007 950000 959500
15. Tourists Tax 0 32035 205620 269600 270000 272700
On road 496687 453488 226342 0 0 0
Rudrkund 0 158179 88460 0 0 0
16. Improvement Tax 2280 3000 0 0 0 0
17. Dance or Advertisement Tax 285700 219800 0 0 0 0
19 Other Improvement taxes 0 0 1001 5750 6000 6060
a Fees 0 0 0 1800 0 0
b Market fees 0 0 1938 0 2000 2020
c. Naye Pulo Patkar 0 2039 0 572 0 0
Weekly Market Fee 2186 1177 0 341272 342000 393300
7649711.00 8528683.00 12226953.00 12958095.00 12207000.00 13129450.00
Income from Municipal Property
C. Revenue from other sources 0.00 0.00 890.00 0 0.00 0
I. Land rent 49467.00 858.00 8898.00 224480 225000.00 258750
a. Shasan dwara diya gaye najul rent 0.00 0.00 15370.00 0 0.00 0
b. Najul Bhoomi se bhinn anny bhoomo se prapthi 30740.00 15370.00 0.00 125475 125000.00 141250
II. House rent 77408.00 48009.00 549243.00 968913 912000.00 1048800
III. Bhoomi aur Bhoomi Upaj ke vikay se Income 352699.00 356872.00 0.00 0 0.00 0
a. Najul Bhoomi se prapthi aye 3400.00 0.00 0.00 0 0.00 0
d. Collection from Public Parks 16976.00 13470.00 15774.00 8902 9000.00 9090
c. others 0.00 0.00 81121.00 97849 98000.00 98980
a. Markets Rent and Fees 0.00 0.00 0.00 1770 2000.00 2020
1 Water tax 130000.00 110302.00 33917.00 0 0.00 0
2 water Usage 20000.00 11500.00 1750.00 0 0.00 0
others 1635860.00 1635860.00 0.00 0 0.00 0
Collections from the Duties given to Private persons 0.00 0.00 148230.00 217315 220000.00 222200
a Saarvjanik priyadharshaneey aur mela 71046.00 9725.00 9042.00 241286 180000.00 207000
d Others 80000.00 0.00 0.00 0 0.00 0
- Others 100200.00 0.00 0.00 0 0.00 0
Shaashkiy Prathibhitiyon ke vikray agem adhi bank se pratyaharan t 140000.00 46250.00 69100.00 0 0.00 0
Udhaar / Amanth raashi 0.00 226050.00 460930.00 0 277000.00 279770
b Kule Bazzar prapth kiye gaye Udhhaar 0.00 15950.00 0.00 0 0.00 0
udhhar ke bhugdhaan hetu kshran nivaaran 0.00 159410.00 0.00 0 0.00 0
nidhi se prapthiye check / photocopy 71628.00 2679.00 6850.00 0 0.00 0
Agrim / Amkeshan / Samanyojan 0.00 3410.00 90463.00 243482 244000.00 246440
b Anya nikshep 107500.00 0.00 62207.00 0.00 0.00 0
2886924.00 2655715.00 1553785.00 2129472.00 2292000.00 2514300.00
Fees, Service Charges & Penalties
Revenue from other sources 0.00 0.00 0.00 0 0.00 0
b. boat fee 506305.00 829179.00 946749.00 1179561 1200000.00 1368000
e khadv aur peyi products ke vikray ke liye anugnayapith fees 0.00 0.00 19331.00 0 0.00 0
f. Vadhi ko keliye anugnayapith fees 0.00 0.00 580.00 0 0.00 0
g Dhalal Commission, agent nappayi tullayi vaalo se anugnayapith f 0.00 0.00 439.00 0 1000.00 1010
IX. Asthayi Thor se Prapthi Kiraya 148625.00 0.00 64501.00 0.00 0.00 0
a open land ka bhoobhatak 66200.00 0.00 0.00 0 0.00 0
XV. Purana banda aur imaaratho ke saamaan vikray aagaam 0.00 63351.00 0.00 0 0.00 0
samany aur vishesh 0.00 50000.00 0.00 0 0.00 0
Shasan se 1230900.00 1700000.00 0.00 0 0.00 0
samany pryojana keliye moolbhoot sadak 0.00 653000.00 655100.00 2713023 500000.00 505000
c Educational improvement ke liye 0.00 1807400.00 0.00 0 0.00 0
e Entertainment ke liye / rope way fencing 0.00 246000.00 0.00 0 0.00 0
2 Stahaniy nikayon se 0.00 621000.00 300000.00 0 0.00 0
b samanya prayojana ke liye adhikari 0.00 45000.00 0.00 0 0.00 0
c Educational improvement ke liye 0.00 390453.00 590546.00 0 0.00 0
1952030.00 6405383.00 2577246.00 3892584.00 1701000.00 1874010.00
Revenue Transfers
Octroi 8926.00 6698.00 0.00 0.00 0.00 0.00
Grand Total 12497591.00 17596479.00 16357984.00 18980151.00 16200000.00 17517760.00
Capital Receipts
3 various other Categories of Roads improvement \ protection 0.00 0.00 0.00 404194 200000.00 202000.00
a For General improvements 0.00 0.00 816300.00 200000.00 300000.00 303000.00
B Educational improvement ke liye abhidan pension R.P.S 1782745.00 1482975.00 1379650.00 2200000 1500000.00 1545000.00
Sub-total 1782745.00 1482975.00 2195950.00 2804194 2000000.00 2050000.00
Grand Total 14280336.00 19079454.00 18553934.00 21784345.00 18200000.00 19567760.00
Revenue Expenditure
Establishments and Salaries
normal administration and collection dues 3550334.00 4482000.00 6037167.00 6034781 6500000.00 7020000.00
Establishment of general admin offices 0.00 93684.00 103976.00 1767195 2000000.00 2020000.00
Allowance / Emergency 56271.00 43954.00 51589.00 0 0.00 0.00
Emergency 912545.00 913683.00 1539031.00 0 0.00 0.00
mange evam navka ghat kar patkar sangrahan 442482.00 497542.00 0.00 0 0.00 0.00
i. Establishment 0.00 0.00 537669.00 0 0.00 0.00
ii. Emergency 193180.00 441639.00 559164.00 0 0.00 0.00
5154812.00 6472502.00 8828596.00 7801976.00 8500000.00 9040000.00
Office expenditure
People protection 0.00 0.00 0.00 0 0.00 0.00
iii. Emergency (Extinguisher, engine, bucket, repair tools) 180185.00 0.00 0.00 384778 0.00 0.00
B. Power / Light 0.00 0.00 0.00 0 0.00 0.00
i. samagri (Lamp, oil, bulb, repair tools) 61750.00 221068.00 114159.00 223272.00 250000.00 252500.00
electricity supply expenditure 1157008.00 1258767.00 1274847.00 1017076 1500000.00 1545000.00
New works 56670.00 0.00 0.00 0 0.00 0.00
forest animals, snakes, stay dogs vinash 44180.00 0.00 0.00 0 0.00 0.00
Others 25327.00 0.00 0.00 48627 0.00 0.00
Water protection and provision 0.00 0.00 0.00 0 0.00 0.00
water supply 0.00 0.00 0.00 160340 300000.00 303000.00
- General Repair 175350.00 0.00 0.00 42035 600000.00 636000.00
ii. Expenditure on New Works 0.00 159018.00 266237.00 0 0.00 0.00
iii. Establishment of Wells ,Lakes and pumps and maintenance 194692.00 0.00 117041.00 933325 200000.00 202000.00
ii. Emergency 0.00 0.00 17840.00 0 0.00 0.00
iii. General maintenance 5672.00 0.00 0.00 67383 0.00 0.00
iv. others 0.00 0.00 4200.00 3600 3000.00 3030.00
New works / vuksharopan, trigard 0.00 0.00 0.00 283440 100000.00 101000.00
New O&M cost
EAI
1900834.00 1638853.00 1794324.00 3163876.00 2953000.00 3042530.00
Public health and services
ii. - permanent establishment of public toilets 0.00 0.00 10250.00 0.00 0.00 0.00
iv. Road Cleaning 0.00 87185.00 66626.00 0.00 0.00 0.00
- Establishment of Dustbins and their maintenance 0.00 75776.00 0.00 0 0 0.00
I. Post , banglar, sarayi, hotel, darmshala aur uski maintenance 0.00 11140.00 0.00 0 0 0.00
- Establishment 0.00 189140.00 0.00 0 0 0.00
0.00 363241.00 76876.00 0 0 0
Improvements
Public Works 0.00 2708477.00 0.00 85000 0 0.00
Construction of Roads, paths, drains maintenance and renovation 0.00 0.00 93803.00 1169020 0 0.00
New roads, lanes and drains construction 0.00 0.00 210401.00 99877 4000000 4040000.00
Maintenance 0.00 0.00 151734.00 261792 0 0.00
Anushandhan 0.00 0.00 126475.00 467195 0 0.00
other works 444028.00 177498.00 570190.00 0 0 0.00
Tree vardhak sarvajani udhan vatika kule midhan 23990.00 0.00 0.00 0 0 0.00
Samajik Kalyana kari karyakalap (Kalyan Mandhapam) 0.00 172400.00 0.00 0 0 0.00
- anya Prabhath 0.00 30100.00 0.00 0 0 0.00
birth, death and marriage registration 0.00 2400.00 0.00 0 0 0.00
- primary schools and mid day meal 471332.00 422333.00 512572.00 2213268 3000000 3420000.00
- pension establishment / prasikshan 1251400.00 1005991.00 1354941.00 0 0 0.00
- upkaran and akasmiktha 0.00 149000.00 0.00 0 0 0.00
- Bal sadhan sishu mandir etc 153244.00 61052.00 0.00 0 0 0.00
. establishment 209000.00 119903.00 0.00 0 0 0.00
- Emergency 80000.00 23884.00 0.00 320904 0 0.00
2632994.00 4873038.00 3020116.00 4617056 7000000 7460000
Others
others 0.00 0.00 95330.00 840705.00 1060000.00 1070600.00
Actual expenditure on work done for the private people 0.00 71364.00 0.00 0.00 0.00 0.00
sarva janik pradarshani melle 0.00 87796.00 19308.00 31636.00 50000.00 50500.00
kanuni prabhar (legal charges) swagath sarthkar 0.00 4200.00 28767.00 26800.00 100000.00 101000.00
Bhavish Nidhi Me Anushandhaan Pension updhaan Anukampaa ba 0.00 4480.00 0.00 238844.00 300000.00 303000.00
Telephone trunkcall 1898.00 24178.00 28659.00 14839.00 30000.00 32400.00
Lekaa examination fees 22504.00 49670.00 92000.00 47000.00 100000.00 105000.00
others 91015.00 93764.00 48126.00 29270.00 0.00 0.00
prathiboothiyo me run nivaaran nidhi ko chodkar sanchit nidhi jama 0.00 100627.00 0.00 0.00 0.00 0.00
Bhachat Bank / Dhak Ticket 0.00 500.00 500.00 500.00 1000.00 1010.00
Run nivaaran nidhi me Bhoogdhaan 1635860.00 317525.00 0.00 0.00 0.00 0.00
Entertainment 0.00 0.00 225104.00 222728.00 0.00 0.00
Narmada Mahostsav 0.00 0.00 661927.00 502857.00 1000000.00 1010000.00
others 109498.00 0.00 48573.00 0.00 0.00 0.00
Nikhshep 3279.00 0.00 4723.00 0.00 0.00 0.00
Nividha / Gharohar rashi / S.D 0.00 0.00 0.00 885861.00 800000.00 808000.00
Athithi sathkar 0.00 0.00 0.00 145109.00 200000.00 202000.00
15 august , 26 January 0.00 0.00 0.00 79544.00 100000.00 101000.00
1864054.00 754104.00 1253017.00 3065693.00 3741000.00 3784510.00
Grand Total 11552694.00 14101738.00 14972929.00 18648601.00 22194000.00 23327040.00
Capital Expenditure
ii. Buildings 960662.00 139237.00 1209396.00 240397.00 0.00 0.00
- Construction 0.00 0.00 104898.00 377997.00 0.00 0.00
- Maintenance (WBM) 0.00 0.00 567153.00 0.00 0.00 0.00
- Buildings rent 0.00 42700.00 27500.00 0.00 0.00 0.00
960662.00 181937.00 1908947.00 618394.00 0.00 0.00
Total Expenditure 12513356.00 14283675.00 16881876.00 19266995.00 22194000.00 23327040.00
Reforms Achieved (Y/N)Any City specific
Strategies adopted
Preliminary estimate
(if any) for
implementation
Implementing agency
2012-13 2013-14 2014-15 2015-16
Full migration of double accounting System N
Property tax reforms, 85% coverage ratio and
90% collection ratio
N
Levy of user charges : full recovery of O & M
charges for sewerage, water supply and SWM
N
Internal earmarking of basic services to urban
poor
N
E-governance N
Provision of basic services to urban poor
including security of tenure at affordable prices,
improved housing, water supply, sanitation
N
Reforms Action Plan
Time line to achieve reforms till 2015
ANNEXURES