Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 1 of 92

City Development Plan for Bhedaghat Town

CHAPTER 1: PROJECT INTRODUCTION ............................................................................................ 15 1.1 Project Award and Introduction of Client ............................................................ ............................................15 1.2 Project Brief, Scope & Objectives .................................................................... .................................................16 1.3 Methodology .......................................................................................... ..........................................................16 1.4 Structure of the Report ................................................................................................................................. ...20

CHAPTER 2: PHYSICAL FEATURES OF THE TOWN ....................................................................... 21

2.1 GENERAL CITY PROFILE ............................................................................. ................................................... ........21 2.1.1 Historical Importance ..................... ................................................... ................................................... ............. 21 2.1.2 Jabalpur District Profile ................. ................................................... ................................................... .............. 21 2.1.3 Location and connectivity ................ ................................................... ................................................... .......... 22 2.1.4 Climate & Rainfall ....................... ................................................... ................................................... ................ 22 2.1.5 Topography and Geology .................... ................................................... ................................................... ........ 22 2.1.6 Wind Direction ............................ ................................................... ................................................... ................ 23 2.1.7 Base Map........................................... ................................................... ................................................... .......... 23

CHAPTER 3: DEMOGRAPHIC & SOCIO-ECONOMIC PROFILE ..................................................... 24

3.1 Demography ....................................................................................... ................................................... ..............24 3.1.1 Population Growth Trend ..................... ................................................... ................................................... ........ 24 3.1.2 Population Projections ...................... ................................................... ................................................... ............ 24 3.1.3 Population Density .......................... ................................................... ................................................... .............. 25 3.1.4 Average household Size ...................... ................................................... ................................................... .......... 25 3.1.5 Other Demographic Indicators .............. ................................................... ................................................... ...... 25

3.2: SOCIO ECONOMIC PROFILE .......................................................................... .......................................................25 3.2.1 Sex Ratio ......................................... ................................................... ................................................... ......... 25 3.2.2 Literacy Rate ............................ ................................................... ................................................... ................... 25 3.2.3 Work Participation Ratio (WPR) ............ ................................................... ................................................... ...... 26 3.2.4 Occupation Structure ........................ ................................................... ................................................... ............ 26 3.2.5 Economic Base ............................... ................................................... ................................................... ............... 27

CHAPTER 4: PHYSICAL PLANNING AND GROWTH MANAGEMENT ......................................... 28 4.1 Spatial Growth Trends ............................................................................ .............................................................28 4.2 Spatial Distribution of Population .................................................................................................................. ......28 4.3 Land use.......................................................................................... ................................................... ..................28 4.4 Master plan Provision ............................................................................ ................................................... ...........29 Highlights of the Master Plan: .......................................................................................................................... .........30 4.5 Housing ............................................................................................................................................. ...................31 4.6 Housing in Bhedaghat ............................................................................. .............................................................31 4.7 Housing demand for the year 2035 ................................................................. ................................................... ..31

CHAPTER 5: TOWN INFRASTRUCTURE ............................................................................................ 32

5.1 Water Supply ..................................................................................... ................................................... ...............32 5.1.1 Quality and Quantity of Water at Source ..... ................................................... ................................................... 32 5.1.2 Quality and Quantity of Water in distribution System ........................................... ............................................ 33 5.1.3 Water Distribution Arrangement..................... ................................................... ........................................... 33

Page 9: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 2 of 92

City Development Plan for Bhedaghat Town

5.1.3 Internal Distribution Networks .................... ................................................... ............................................... 33 5.1.4 Coverage & Supply ................................. ................................................... ................................................... .. 34 5.1.5 Institutional Set-up .............................. ................................................... ................................................... .... 35 5.1.6 Operation & Maintenance (O&M) ..................... ................................................... ......................................... 35 5.1.7 Present and Future Demand and Supply Gaps ......... ................................................... .................................. 36 5.1.8 Water Supply Project .............................. ................................................... ................................................... . 36 5.1.9 Comparative Analysis (Service Levels) ............. ................................................... ........................................... 36 5.1.10 SWOT Analysis ..................................... ................................................... .................................................. 37 5.1.11 Key Issues ........................................ ................................................... ................................................... .... 37 5.1.12 City specific Strategies and Action Plans ......... ................................................... ....................................... 38

5.2 Sewerage System ................................... ................................................... .......................................................39 5.2.1 Existing Sewerage System........................... ................................................... ................................................ 39 5.2.2 Household Latrines .................... ................................................... ................................................... .............. 39

5.3 Existing Sanitation System .......................................................................................................................... .........40 5.3.1 Public Toilets .................................... ................................................... ................................................... ........ 40 5.3.2 Present, Future Demand and Supply Gaps ............ ................................................... ..................................... 40 5.3.3 Sanitation Projects ............................... ................................................... ................................................... .... 40 5.3.4 Comparative Analysis with the UDPFI, CPHEEO Guidelines ............................................... ........................... 40 5.3.5 SWOT Analysis ..................................... ................................................... ................................................... .... 41 5.3.6 Key Issues ........................................ ................................................... ................................................... ......... 41 5.3.7 City specific Strategies and Action Plans ......... ................................................... ........................................... 41

5.4 Solid Waste Management .............................................................................................................................. ......42 5.4.1 Quantity of Waste Generated ....................... ................................................... ............................................. 42 5.4.2 Constituents of Municipal Waste ................... ................................................... ............................................ 42 5.4.3 Current practices of Solid Waste Management........ ................................................... .................................. 42 5.4.4 Segregation & Storage of Solid Waste .............. ................................................... .......................................... 43 5.4.5 Primary and Secondary Collection .................. ................................................... ............................................ 43 5.4.6 Processing & Disposal of Waste..................... ................................................... ............................................. 43 5.4.7 Vehicles for Solid Waste collection and Transportat ion ............................................... ................................. 43 5.4.8 Institutional Set-up .............................. ................................................... ................................................... .... 44 5.4.9 Estimation of Waste Collection .................... ................................................... .............................................. 44 5.4.10 Comparative Analysis with Guidelines .............. ................................................... ..................................... 44 5.4.11 SWOT Analysis ..................................... ................................................... .................................................. 44 5.4.12 Key Issues ........................................ ................................................... ................................................... .... 45 5.4.13 City specific Strategies and Action Plans ......... ................................................... ....................................... 45

5.5 Drainage System ......................................................................................................................................... ......46 5.5.1 Existing Drainage System .................... ................................................... ................................................... .......... 46 5.5.2 Tertiary Drains ............................. ................................................... ................................................... .................. 46 5.5.3 Flood-prone Areas or Environmentally Sensitive Areas ........................................... ........................................... 46 5.5.4 Present and Future Demand and Supply Gaps ... ................................................... ............................................. 47 5.5.5 SWOT Analysis................................ ................................................... ................................................... ............... 47 5.5.6 City specific Strategies and Action Plan .... ................................................... ................................................... .... 47

5.6 Traffic & Transport .............................................................................. ................................................... ..............48 5.6.1 Existing Traffic & Transportation Scenario .. ................................................... ................................................... .. 48 5.6.2 Travel Characteristics............................. ................................................... ................................................... .. 48 Road Network ...................................... ................................................... ................................................... .................. 49 5.6.3 Intermediate Public Transport System .............. ................................................... ......................................... 49 5.6.4 Parking Review .................................... ................................................... ................................................... .... 49

Page 10: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 3 of 92

City Development Plan for Bhedaghat Town

5.6.5 SWOT Analysis ..................................... ................................................... ................................................... .... 49 5.6.6 Service Adequacy and Key Issues ................... ................................................... ............................................ 49 5.6.7 City specific Strategies and Action Plan .......... ................................................... ............................................ 50

5.7 Street lighting & fire fighting ......................................................................................................................... ...51 5.7.1 Existing Situation of Street Lights .............. ................................................... ................................................ 51 5.7.2 Fire Services ..................................... ................................................... ................................................... ........ 51 5.7.3 Present and Future Demand and Supply Gaps ......... ................................................... .................................. 51 5.7.4 SWOT Analysis ..................................... ................................................... ................................................... .... 51 5.7.5 City specific Strategies and Action Plan .......... ................................................... ............................................ 51

5.8 Urban Poor and Their Accessibility to Basic Services ................................................. .......................................52 5.8.1 Introduction .............................. ................................................... ................................................... .................. 52 5.8.2 Poverty in the Town ............................... ................................................... ................................................... .. 52 5.8.3 Information pertaining to BPL Population and Slum P opulation ......................................... ......................... 52 5.8.4 Present and Future Housing Demand ................. ................................................... ........................................ 53 5.8.5 SWOT Analysis ..................................... ................................................... ................................................... .... 53 5.8.6 Issues ............................................ ................................................... ................................................... ........... 53 5.8.7 City specific Strategies and Action Plans ......... ................................................... ........................................... 54

5.9 Social infrastructure ................................................................................................................................... ......54 5.9.1 Educational Facilities .................... ................................................... ................................................... ............... 54 5.9.2 Health Facilities.................................. ................................................... ................................................... ...... 55 5.9.3 Socio-Cultural Facilities ......................... ................................................... ................................................... ... 56 5.9.4 Recreation/ Leisure/ Parks and Play Grounds ....... ................................................... ..................................... 56 5.9.5 Markets ........................................... ................................................... ................................................... ......... 56 5.9.6 Crematoria & Burial Grounds ....................... ................................................... .............................................. 56 5.9.7 City specific Strategies and Action Plans ......... ................................................... ........................................... 57

CHAPTER 6 INSTITUTIONAL FRAMEWORK .............................................................................. 58

CHAPTER 7 MUNICIPAL FINANCE ....................................................................................................... 60 7. Present Scenario .................................................................................. ................................................... ...............60 7.1 Revenue and Capital Accounts: .................................................................... ................................................... .....60 7.1.1 Financial status: .............................................................................. ................................................... ...............60 7.1.2 Composition of own revenue and expenditure: .................................................... ............................................61

CHAPTER 8 CAPITAL INVESTMENT PLAN (CIP) & FINANCIAL OPERATING PLAN (FOP) 62

8.1 City Investment Plan - Introduction .............................................................. .......................................................62 8.1.1 Water Supply System (WS) .................... ................................................... ................................................... ....... 62 8.1.2 Sewerage .................................... ................................................... ................................................... ................... 63 8.1.3 Storm Water Drains (SWD) .................... ................................................... ................................................... ....... 64 8.1.4 Solid Waste Management (SWM) ................ ................................................... ................................................... . 64 8.1.5 Sanitation .................................. ................................................... ................................................... .................... 65 8.1.6 Traffic & Transportation (T&T) .............. ................................................... ................................................... ........ 66 8.1.7 Electricity and Street Lighting ............. ................................................... ................................................... .......... 67 8.1.8 Urban Poor .................................. ................................................... ................................................... .................. 67 8.1.9 Environmentally Sensitive Areas ............. ................................................... ................................................... ...... 68 8.1.10 Urban Governance ........................... ................................................... ................................................... ........... 68 8.1.11 Social Infrastructure ...................... ................................................... ................................................... .............. 68

Page 11: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 4 of 92

City Development Plan for Bhedaghat Town

8.2 FINANCIAL OPERATING PLAN (FOP) - Introduction: .............................................................................................70 8.2.1 Objective and Methodology: .................. ................................................... ................................................... ...... 70 8.2.2 Assumptions and Reforms ..................... ................................................... ................................................... ....... 71 8.2.2.2 Municipal Taxes: .................................................. ................................................... ......................................... 71 8.2.2.3 Non-Tax Sources .................................................. ................................................... .......................................... 73 8.2.2.4 New O&M Cost .................................................. ................................................... ............................................ 73

CHAPTER 9: URBAN REFORMS ............................................................................................................ 77

CHAPTER 10: SUMMARY OF WORKSHOP PROCEEDINGS.......................................................... 80 10.1 Purpose and Importance of the workshop .......................................................... ...............................................80 10.2 Stakeholder Identification ...................................................................... ................................................... ........80 10.3 Preparation of handouts and questionnaires ...................................................... ...............................................81 10.4 District level Workshop/Meeting at District Head Quarters (Jabalpur). .............................................................81 10.5 Extended Discussion with Deputy Director ........................................................................................................82

10.6 Town level Workshop/Meeting at Town Level: ...................................................... ............................................82 10.6.1 Preparation for the workshop................ ................................................... ................................................... ..... 82 10.6.2 Presentation on Town profile and discussion with participants ................................. ...................................... 83 10.6.3 Summary of the Sector Analysis ............. ................................................... ................................................... .... 83 10.6.4 Workshop Summary ........................... ................................................... ................................................... ........ 85 10.6.5 Photographs taken during the workshop ...... ................................................... ................................................ 86

CHAPTER 11: CITY VISION .................................................................................................................... 87 11.1 Public Opinion on Existing Infrastructure Facilities and Services in Bhedaghat ..................................................87 11.2 Public opinion on prioritizing the proposed list of developments ......................................................................88 11.3 Planning, developing and managing urban growth in Municipal area ................................................................89 11.4 Sectoral strategy framework ........................................................................................................................ ......89 11.5 Conclusion: Brief strategies, actions and projects for the city ............................................................................91

Page 12: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 5 of 92

City Development Plan for Bhedaghat Town

LIST OF TABLES

TABLE 2.1 : DETAILS OF URBAN SETTLEMENTS IN JABALPUR DISTRICT-2001 ................................... ............................... 22 TABLE 3.1 DECADAL GROWTH RATE OF THE TOWN.......... ................................................... ............................................ 24 TABLE 3.2: POPULATION PROJECTION OF THE TOWN ........................................................ ............................................. 24

Table 3.3: POPULATION, AREA & DENSITY DETAILS OF THE TOWN………………………….………………………………………………… 25

Table 3.4: CATEGORY-WISE WORKFORCE…………………………………………… ……………………………………………………………………….26

TABLE 4.1: WARD-WISE DETAILS OF THE TOWN ......... ................................................... ................................................. 2 8 TABLE 4.2: UDPFI STANDARDS FOR LAND USE .......... ................................................... ................................................... 29 TABLE 4. 3: LAND USE BREAKUP ..................... ................................................... ................................................... ........... 29 TABLE 4. 4: DETAILS OF HOUSES, HOUSEHOLDS AND HOUSEHOLDS SIZE OF BHEDAGHAT ........................... .................. 31 TABLE 4. 5: HOUSING DEMAND FOR THE YEAR 2035 ...... ................................................... .............................................. 31 TABLE 5.1: DETAILS OF WATER SOURCE & SYSTEM ...... ................................................... ................................................ 32 TABLE 5.2: DETAILS OF ELSR IN BHEDAGHAT .......... ................................................... ................................................... .. 33 TABLE 5.3: DETAILS OF THE DISTRIBUTION SYSTEM .... ................................................... ................................................. 3 3 TABLE 5.4: DETAILS OF WATER SUPPLY CONNECTION IN BHEDAGHAT TOWN ..................................... .......................... 34 TABLE 5.5 : DETAILS OF WATER CONNECTIONS IN BHEDAGHAT ................................................ ..................................... 34 TABLE 5.6 : DOMESTIC WATER SUPPLY DETAILS IN BHEDAGHAT – 2011 ........................................ ................................. 34 TABLE 5.7: DETAILS OF WATER CHARGES IN BHEDAGHAT – 2011 ............................................. ..................................... 36 TABLE 5.8: WATER DEMAND ASSESSMENT – 2035 ........ ................................................... .............................................. 36 TABLE 5.9: SERVICE LEVELS IN BHEDAGHAT ........... ................................................... ................................................... ... 37 TABLE 5.10: DETAILS INDICATING THE EXISTING SANITATION FACILITIES, 2001 .............................. ............................... 39 TABLE 5.11 : DETAILS INDICATING THE EXISTING SANITATION FACILITIES ................................... ................................... 39 TABLE 5.12 : DETAILS OF PUBLIC CONVENIENCE FACILITIES ................................................ ............................................ 40 TABLE 5.13 : DEMAND ASSESSMENT – 2035 ............. ................................................... ................................................... . 40 TABLE 5.14 : SERVICE LEVELS IN BHEDAGHAT .......... ................................................... ................................................... .. 40 TABLE 5.15 : SOLID WASTE DETAILS IN BHEDAGHAT – 2011 ................................................. ........................................... 42 TABLE 5.16 : SOLID WASTE TRANSPORT AND DISPOSAL ARRANGEMENTS ......................................... ............................. 43 TABLE 5.17 : STAFF FOR SOLID WASTE MANAGEMENT IN BHEDAGHAT ........................................... ............................... 44 TABLE 5.18 : DETAILS OF CURRENT SERVICE LEVELS .... ................................................... ................................................. 4 4 TABLE 5.19 : DETAILS INDICATING THE EXISTING DRAINAGE CONNECTIONS .................................... .............................. 46 TABLE 5.20 : DEMAND AND SUPPLY GAPS FOR SWD SYSTEM.................................................... ...................................... 47 TABLE 5.21 : ROAD SURFACE DETAILS ................. ................................................... ................................................... ....... 48 TABLE 5.22 : DETAILS OF STREET LIGHTING IN BHEDAGHAT ................................................. ........................................... 51 TABLE 5.23 : WARD WISE BPL & SLUM DETAILS ......... ................................................... ................................................... 52 TABLE 5.24 : SLUM MATRIX WITH REFERENCE TO INFRASTRUCTURE COVERED .................................... ......................... 53 TABLE 5.25 : DETAILS OF THE EDUCATIONAL INSTITUTIONS IN BHEDAGHAT .................................... .............................. 54 TABLE 5.26 : DETAILS OF MEDICAL FACILITIES IN BHEDA GHAT .............................................. .......................................... 55 TABLE 5.27 : DETAILS OF FUTURE DEMAND FOR THE MEDICAL FACILITIES ..................................... ................................ 55 TABLE 5.28 : DETAILS OF FUTURE DEMAND FOR SOCIO-CULTURAL FACILITIES .................................. ............................. 56 TABLE 8.1: INVESTMENT REQUIREMENTS FOR WATER SUPPLY SECTOR .......................................... .............................. 62 TABLE 8.2: INVESTMENT REQUIREMENTS FOR SEWERAGE SECTOR .............................................. ................................. 63 TABLE 8.3: INVESTMENT REQUIREMENTS FOR STORM WATER DRAINS SECTOR .................................... ....................... 64 TABLE 8.4: INVESTMENT REQUIREMENTS FOR SOLID WASTE MANAGEMENT SECTOR ................................ ................. 64 TABLE 8.5 : INVESTMENT REQUIREMENTS FOR SANITATION SECTOR ............................................ ................................. 65 TABLE 8.6 : INVESTMENT REQUIREMENTS FOR TRAFFIC & TRANSPORTATION ..................................... .......................... 66 TABLE 8.7: INVESTMENT REQUIREMENTS FOR STREET LIGHTING ............................................. .................................... 67 TABLE 8.8: INVESTMENT REQUIREMENTS FOR URBAN POOR .................................................. ...................................... 68 TABLE 8.9: INVESTMENT REQUIREMENTS FOR ENVIRONMENTALLY SENSITIVE AREAS .............................. .................... 68 TABLE 8.10 : INVESTMENT REQUIREMENTS FOR SOCIAL INFRASTRUCTURE FACILITIES ............................ ...................... 69 TABLE 8.11 : SUMMARY OF PROPOSED INVESTMENTS ...... ................................................... ........................................... 69 TABLE 10.1 : SUMMARY/FINDINGS OF THE SECTOR WISE ANALYSIS AND TOWN PROFILE OF BHEDAGHAT .............. .... 83 TABLE 11.1 : SHOWS THE PRIORITIZATION FOR VARIOUS DEVELOPMENTS. ...................................... ............................. 88

Page 13: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 6 of 92

City Development Plan for Bhedaghat Town

List of Maps

MAP 1.1 Base map

MAP 2.1 Density map

MAP 4.1 Landuse map

MAP 4.2 Future growth map

MAP 5.1 Existing water supply system of Bhedaghat

MAP 5.2 Existing solid waste disposal location map

MAP 5.3 Drainage network Map

MAP 5.4 Environmental Sensitive Areas

MAP 5.5 Road network in Bhedaghat

MAP 5.6 Location of Slums

List of Annexures

ANNEXURE - I FOP

ANNEXURE - II Proposed Landuse Map

ANNEXURE - III Proposed Water Supply Network Map

ANNEXURE - IV Proposed Sewerage System Map(DEWATS)

ANNEXURE – V Proposed Solid waste Disposal Map

ANNEXURE – VI Proposed Road Network Map

Page 14: CDP Bhedaghat English

EXECUTIVE SUMMARY

Page 15: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 7 of 92

City Development Plan for Bhedaghat Town

Executive Summary

I. Overview

The Jawaharlal Nehru National Urban Renewal Mission (JnNURM) is an ambitious programme of the

Government of India to bring about improvements in the existing urban service levels and urban

infrastructure in a financially sustainable manner. The primary objective of the programme is to create

economically productive, efficient, equitable and responsive cities. The projects that qualify under this

scheme include sub-sectors of water supply, sewerage and sanitation, drainage, solid waste management,

traffic and transportation facilities, housing infrastructure and basic services for urban poor. Further, special

projects including urban transit systems, urban expressways, sea-links and other sectors of similar nature

would also be covered under this scheme. In order to access funds through the mission, the state

government and the cities seeking assistance require to sign-up to a set of reforms covering various areas of

urban management and good governance.

The City Development Plan (CDP) shall provide a comprehensive long term strategy (Vision 2035) as well as

a City Investment Plan (CIP), based on which the concerned ULB's can approach and be eligible to the

funding under GoI /GoMP schemes along with their own and other sources of finances based on priority

actions and projects identified in the CDP. The document shall also provide Financial Operating Plan (FOP) to

direct the ULBs for mobilizing various financial resources to implement the identified priority projects. The

scope of the services include all necessary steps formulated in JnNURM Toolkit 2, that would help to prepare

the CDP, such as Data Collection & Field Visits, Municipal Staff & all Stakeholders consultative meetings,

Sector Analysis, organizing necessary workshops for the successful completion of the CDP. The specific

objectives of the project are as follows;

• CDP would scale up existing urban development and poverty alleviation schemes within a

comprehensive and coherent strategic planning framework, in order to ensure optimal benefit from

available resources to the citizens of the ULBs.

• CDP would aim to catalyze new thinking and provoke debate through a consultative stakeholder

driven process. The vision and strategic thrusts of the CDP would be built around the lessons and

findings of a comprehensive and rigorous stakeholder consultation and documentation process.

• It is expected that the CDP would serve the purpose and meet the requirements of UIDSSMT and

IHSDP programmes as well as JnNURM and other development schemes.

• The CDP will generate specific priority actions and projects that can be the basis, for mobilizing

funds from diversified sources.

Government of Madhya Pradesh has taken up a huge task of preparation of CDPs for 293 towns and the

consultancy of preparation of reports has been awarded to various consultants and the Bhedaghat is one of

the towns out of the 7 towns assigned to Aarvee Associates.

Page 16: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 8 of 92

City Development Plan for Bhedaghat Town

II. Town Profile

Bhedaghat town is situated on the Eastern bank of the holy river Narmada. During all times in its history,

Bhedaghat formed a part of the adjoining regions viz. Tripuri during the ancient period, Garha during the

medieval times and Jabalpur after territory came within the control of Marathas and the British. As such,

during the respective periods, history of Bhedaghat coincided with the history of the territory concerned. As

a part of the settlement of Tripuri from proto-history to 14th Century A.D., Bhedaghat passed through the

chalcolithic age, age of the Epics and Puranas, the Mauryan age, age of the city-state, age of the Sungas,

the Kanvas, the Dattas, the Satavahanas, the Bodhis, the Senas, the shaka kshatrapas, the Guptas and their

feudatories and finally the mighty Kalachuri rulers of Tripuri. Archaeological remains of some of these ages

have been found at Bhedaghat.

During the medieval times, as a part of the Garha-Mandla Kingdom, Bhedaghat witnessed the rule of Gond

rulers for a period of 344 years from the rise of Kharji in 1440 A.D to arrest of Narhari Shah in 1784 A.D.

Thereafter during the Maratha rule, it was said that the village Bhedaghat was donated by Raghuji Bhonsala

to Mahant Hardeo Puri Gosain. Subsequently the village became a part of the British territory during whose

regime too the disciples of Hardeo puri continued to hold the village as a free grant for perpetuity subject to

the payment of a quitrent of Rs 5. It’s most famous sights are the Dhuandhar Falls, Marble Rocks and the

Chausath Yogini temple.

Bhedaghat is a town with Nagar Parishad status in Jabalpur district in the state of Madhya Pradesh, India.

Geographically, it lies between 23°08′N 79°48′E Latitude,23.13°N 79.80°E Longitude. Bhedaghat is located

at 25 km from Jabalpur and 5 km eastern side on the National Highway 12A leading towards Bhopal-

Jabalpur. Due to meeting of 2 or more rivers, the name Bhed (two) Ghat – Bhedaghat has locally derived.

Due to physical barriers such as Narmada River on south east and hill area on north, the town is

predominantly developed in ribbon pattern along the main road connecting NH 12 A and Nagpur By-pass,

which is passing through the town.

The urban form of the town is predominantly guided by tourism spots and agriculture hinter land. The

overall development resembles completed development.

III. Infrastructure Assessment

� Water Supply

Bhedaghat is mainly dependent on Tube well source for water supply. At present there are 9 Tube wells in

the town which draws about 4.6 Lakh Liters per day. Direct pumping is in practice for storage and

distribution of water supply. Water is supplied through tankers to the areas where water supply is scarce

Page 17: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 9 of 92

City Development Plan for Bhedaghat Town

and areas not covered with distribution network. Currently the demand for water in Bhedaghat is

approximately 0.89 MLD. The present per capita water supply is 70 LPCD.

� Sewerage

Bhedaghat lacks adequate sanitary facilities. Only 25.16 % of Households have Access to Household

Latrines. Six out of ten houses have no latrine facilities indicating open defecation in the town. 2001 census

indicates that 3.43 per cent of the census houses resort to pit latrine, a practice that has almost become

defunct in the modern cities. However, about 12.89 per cent of the households have water closets. As per

the discussions with the Nagar Parishad officials, as per 2011, there are 20% of households with no latrine

facilities (Open defecation).

� Solid Waste Management

As per the Nagar Parishad officials, approximately 2 tons of waste is collected per day which indicates a

collection performance of 80 per cent. Door-to-door collection is not practiced in the town. As per the Nagar

Parishad officials dumping is done in panchavati (ward 1), balpara (Ward 6) and chakital (ward 8).

� Storm Water Drains

The total length of tertiary drains as per available data is 2.5 km. Out of this, Pucca drains length is 1.5 km

and remaining 1 km length is kutcha in nature. The total drain length accounts to 10 per cent of total road

length.

� Traffic & Transportation

Bhedaghat is well accessed by road. Bhedaghat is located at 25 km from Jabalpur and 5 km eastern side on

the National Highway 12A leading towards Bhopal- Jabalpur. The total road length in Bhedaghat is 24.6 km

out of which 24.6 km is maintained by the Nagar Parishad. Around 19 percent of the roads laid by cement

concrete. The share of WBM roads is 47 per cent and remaining 34 per cent are earthen roads.

The mobility needs of the town are largely catered by mini buses and standard buses including the IPT

mode such as auto rickshaws & jeeps. Bhedaghat town is well connected by rail and air connectivity with

the nearest airport located in Jabalpur, which is at a distance of 25 km from the town. There is one

organized off street parking facilities nearby Dhundhara water falls.

� Street Lighting

In Bhedaghat there are about 416 street lights with different types of electrical fixtures. The average spacing

of street light poles ranges between 50 m to 60 m, as against the norm of 30 m indicating gross inadequacy

of the system. However, this condition is not uniform.

� Urban Poor

Page 18: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 10 of 92

City Development Plan for Bhedaghat Town

As per discussions with the Nagar Parishad - Bhedaghat, the slum population in the town stands at 2,244,

which accounts to 33.6 per cent of the total population and total slum households are 449, which accounts

to 20.0 per cent of total households.

� Social Infrastructure Facilities

The town has one government hospital and three clinics are providing health services. There are 4 primary

schools in the town. In addition to the primary schools, there are 2 other schools that are catering to the

needs of secondary education and senior secondary education. There are 2 parks in ward 1 and 4, one play

ground in ward 3. It is observed that there is a deficiency in recreational facilities in the town.

There is a weekly market in Bhedaghat town, which is located in ward 4, near municipal office in the town.

This market primarily caters the daily needs of the population of the town. The market functions for 1 day in

a week. About 150 people visit the market on a regular week day. There are 3 burial grounds in the town,

which are primarily serving the needs of Hindu and Muslim religions.

IV. Documentation of Consultative Workshops

� Kick-off Workshop

In the initial (Kick-off Meeting) stage, Project Consultants, M/s

Aarvee associates architects engineers and consultant’s pvt ltd.,

team comprising of Mr. K. Jagadeesh, Mr. B.NeelaKantam Raju, Mr.

Raghu ram, Ms. Sukeerthi and Mr. Ravi Teja visited Jabalpur on 21st

Nov, 2011 and held discussions with Dy. Director, Urban

Development Department at Jabalpur divisional office. On behalf of

the Divisional Commissioner, Jabalpur, Dy. Director, Urban

Development Department, Jabalpur Division chaired the start-up meeting and addressed the Presidents and

CMO’s of all 7 project towns.

Further, consultant’s team visited the Bhedaghat town on

29/11/2011 and conducted “a one day kick-off” meeting

at Nagar Parishad Office. The President, Chief Municipal

Officer (CMO), ULB Officials and other Ward Parishads were

present in the workshop. Consultants briefed about the

project objectives and importance to the stakeholders.

Page 19: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 11 of 92

City Development Plan for Bhedaghat Town

� 2nd Stage Workshop at state & ULB level

In the 2nd Workshop stage, M/s Aarvee associates architects

engineers and consultants pvt ltd representatives, Mr. K.

Jagadeesh, Mr.Raghu ram and Mr.Vishwanath, Urban and

Regional planner, visited Jabalpur on 13th April, 2012 and held

initial discussions with Director, Urban Development Department

at Jabalpur Divisional Office. Shri Gulshan Bamra, Collector,

Jabalpur District has reviewed the progress of the CDP work and Chaired the meeting, addressed the CMO’s

and representatives of all 7 project towns. Detailed deliberations were made with Shri. Rajeev Nigam, Dy.

Director, urban development. He emphasized on;

• Provision of Water Supply, Sanitation and Solid Waste Management,

• Relocation of slums

• Imparting training on folk art and folk culture to the slum dwellers

• Inculcate Social Awareness

• Provision of a buffer zone (Urban Forest) along the river bed

The 2nd stage town level workshop was organized by

Aarvee associates Pvt. Ltd with the co-operation of Chief

Municipal Officer (CMO) Bhedaghat and active participation

of Municipal staff. The information on conducting the

workshop was passed onto Nagar Parishad well in advance

so as to involve as many as identified stakeholders to

participate in the workshop. Workshop on CDP was held at

Bhedaghat Nagar Parishad on 20th of April 2012. The purpose of the workshop was to involve

stakeholders and facilitate in the discussions, record the Comments & obtain suggestions so as to

incorporate them into the plan preparation of CDP.

Summary of workshops

On the whole, there was very good response from all the stakeholders and the major proposals for the

development of Bhedaghat Town are expressed below:

• Provision of potable drinking water

• Improve and increase the capacity of Water Treatment Plant

• Provide better Drainage Network/DEWATS system.

• Provision of root-zone treatment method to recycle the waste water

• Provide better public transportation system

• Provision of Bus stand/bus shelters along the proposed by-pass

Page 20: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 12 of 92

City Development Plan for Bhedaghat Town

• Improvements to the Solid Waste Management practices like implementation of Door-to-

door collection system.

• Provision of recreational facilities like parks, playgrounds, community halls.

• Provision of women and child healthcare facilities.

• Provision of Diploma/ITI institutions for better employment oppurtunities to youth.

• Provision of agro-based industries like warehouses and cold storages.

• Provision of basic services with Inclusive Planning.

� 3rd Stage Workshop at ULB level

The 3rd stage/final town level workshop was organized by Aarvee

associates Pvt. Ltd with due consultations with Chief Municipal

Officer (CMO) Bhedaghat and active participation of Municipal staff.

The information on conducting the workshop was passed onto

Nagar Parishad well in advance so as to involve as many as

identified stakeholders to participate in the workshop. Workshop on

CDP was held at Bhedaghat Nagar Parishad on 24th of December

2012. The purpose of the workshop was to deliberate on the City

Investment Plan and Financial Operation Plan. Total investment for the Bhedaghat town is estimated to the

tune of about Rs. 30.37 crores by the end of the plan period 2035. All the major proposals are incorporated

as suggested in the earlier workshop held at Bhedaghat town. The stakeholders have readily accepted the

investment plan as well financial operation plan and have expressed their willingness to pay the taxes as per

the Financial Operating Plan.

The sizable investment (49% of the total investment) is worked

out for traffic and transportation sector proposals followed by

urban poor sector. As of now water supply system is quite

sufficient in the town and needs the improvement of pipeline

system at un-served areas. Provision of bus stand, bus shelters,

bye-pass road, additional dust bins & vehicles and landfill site area

and other social infrastructure facilities like parks, play grounds

and community halls are covered in the investment plan.

V. Vision statement

Promoting Bhedaghat, known for its rich natural resource “Marble Rocks” with enchanting beauty of

glittering Dhuandhar falls, as a “Ultimate Tourist Destination” in Jabalpur Region facilitating

adequate Physical and Social infrastructure including augmentation of accommodation.

Page 21: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 13 of 92

City Development Plan for Bhedaghat Town

VI. Investment Plan

The summery of Sector wise Investment Required for Implementation of Proposed Projects are as follows;

Sector wise Summery of Investments

Total Amount (lakhs)

Phase 1 Phase 2 Phase 3

2012-2015 2015-2025 2025-2035

Water Supply (WS) 215.55 132.75 48.15 34.65

Sewerage 53.40 18.60 23.20 11.60

Sanitation 61.00 61.00 0 0

Solid Waste Management (SWM) 90.05 73.44 14.41 2.20

Storm Water Drains (SWD) 225.50 158.63 46.25 20.63

Traffic & Transportation (TT) 1486.35 196.60 627.25 662.50

Street Lighting (SL) 316.05 138.96 57.21 119.88

Social Infrastructure (SI) 155.00 65.00 71.25 18.75

Environment 10.00 10.00 0 0

Urban Governance 10.00 10.00 0 0

Urban Poor (UP) 415.00 115.00 112.50 187.50

Grand Total 3037.9 979.98 1000.22 1057.71

VII. Urban Reforms

S.N

o Mandatory Reforms

Reforms Status

at ULB Remarks Target

1

Adoption of the modern

accrual-based double entry system of accounting in ULBs

and Parastatal agencies

Yet to be Implemented

System was not implemented

due to lack of awareness,

professional manpower and software

procurement/equipment. Keen to adopt the system.

October, 2013

2

Introduction of a system of E-governance using IT applications such as GIS & MIS

etc.

Yet to be Initiated

System was not implemented

due to lack of funds, except few stand-alone desktop machines being used for

accounting purpose. Keen to adopt the system with

additional funds availability.

March, 2014

3 Reform of Property Tax with GIS applications

Yet to be Initiated

GIS Mapping for utilities need

to be done for effective

collection.

July, 2013

4

Levy of reasonable User Charges by ULBs with the

objective that the full cost of O&M is collected within the

next 5 years.

Partially achieved,

except water and consolidated taxes

Collecting water tariff from

household level and collection efficiency is about 60%. UGD

taxes are nil due to absence

of system and street lighting tax is minimal.

2016-17

(UGD

system may not

be considered

due to proposal of

Page 22: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 14 of 92

City Development Plan for Bhedaghat Town

DEWATS)

5

Internal earmarking within

local body budget for basic

services to urban poor.

Yet to be Considered

As of now, ULB is not able to spend any amount for urban

poor sector. Specific allocations have not been

made in the budget for urban poor.

2014-2015

6

Provision of basic services to Urban Poor including security

of tenure at affordable prices, improving housing and

infrastructure facilities

Partially Initiated

ULB has issued few "Pattas"

to slum dwellers in the past years

2013-2014

S.No Optional Reforms

Reforms Status

at ULB Remarks Target

1

Revision of bye-laws to streamline the approval

process for construction of buildings, development of site

etc

Yet to be Initiated Possible with the directives of

State level stance.

These

Reforms are

targeted for

implementation

simultane

ously with the

implementation of

Mandatory

reforms

2 Conversion of land from agriculture to non-agriculture

Yet to be Initiated Possible with the directives of State level stance.

3 Introduction of property title

certification system in ULB Yet to be Initiated

Possible with the directives of

State level stance.

4

20-25% of land earmarking for EWS & LIG category with

a system of cross subsidization

Yet to be Initiated Possible with the directives of

State level stance.

5

Revision of byelaws to make

rainwater harvesting mandatory in all buildings

Yet to be Initiated Possible with the directives of

State level stance.

6 Bye-laws for re-use of

recycled water Yet to be Initiated

Possible with the directives of

State level stance.

7 Encouraging PPP models Yet to be Initiated Possible with the directives of

State level stance.

Page 23: CDP Bhedaghat English

PROJECT INTRODUCTION

Page 24: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 15 of 92

City Development Plan for Bhedaghat Town

CHAPTER 1: PROJECT INTRODUCTION

1.1 Project Award and Introduction of Client

The Urbanization in Madhya Pradesh is at a faster rate, due to which Urban Local Bodies of the state are

experiencing hard challenges to facilitate the requirements of the growing population with limited technical

and financial resources. GoI as well as GoMP have initiated a number of programmes/schemes to meet the

growing demands of infrastructure and service delivery. The list of GoI schemes include: Urban

Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) and Integrated Housing and

Slum Development Programme (IHSDP). On the other hand GoMP has initiated DFID funded MPUSP, which

links reforms with investment in infrastructure for the poor. In addition to the above there are several other

programmes that have been initiated by the GoI and GOMP.

Preparation of the CDP will take advantage of the Revised CDP preparation toolkit/Heritage cities toolkit

prepared by GoI under JNNURM and UADD/CMAMP guidelines. These toolkits shall provide guidance to the

formulation of a CDP based on the concept of a consultative strategic planning process.

Focus areas: Government of Madhya Pradesh is planning to improve the water supply system of the towns

by upgrading the prevailing systems. Hence, this CDP shall be focusing on water supply sector as one of the

key area in a comprehensive manner. The revenue generation (revenue from ULBs own sources specially

property tax etc.) and strategies for the enhancement of the same shall also be incorporated in the CDP.

Currently planning is only a discretionary function of ULBs in MP and there is a general lack of planning

culture even in the larger Corporations. The CDP's of four cities of MP (Bhopal, Indore, Jabalpur, Ujjain),

included in JNNURM have been already prepared, along with the CDP's of 96 ULBs in the State. The lessons

learnt from these exercises need to be incorporated into the proposed CDPs. The CDP will be linked to the

overall spatial planning, policy framework of Master Plan and more importantly into the annual municipal

budgeting. Linking the investment plan of the CDP with the municipal budgets will be crucial in ensuring the

O&M and thus sustainability of the infrastructure assets created.

Preparation of the CDP shall include city development strategies, which are out comes of a structured

consultative process. The process will enable elected representatives, key staff of MC departments,

parastatal agencies and other institutions, policy makers and the citizens to participate and plan for spatial,

social and economic development of the concern cities. A City Development Plan (CDP) will present both a

vision of a desired future perspective for the city and the ULB’s strategic framework of sectoral plans

translated into actions that define on how the ULB, together with other stakeholders, intends to work

towards achieving their long-term vision for the next five years.

Page 25: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 16 of 92

City Development Plan for Bhedaghat Town

This project of “preparing the City Development Plan (CDP)” for Bhedaghat Parishad Area, Madhya

Pradesh has been entrusted to Aarvee Associates Architects Engineers & Consultants Pvt. Ltd

(Consultant) ,Hyderabad. The work is assigned through Commissioner, Urban Administration and

Development Department, Government of Madhya Pradesh (Client). The aim of this exercise is to

support various Cities/Urban Local Bodies of Madhya Pradesh with a comprehensive City Development Plan

(CDP) for their long term vision.

1.2 Project Brief, Scope & Objectives

The CDP shall provide a comprehensive long term strategy (Vision 2035) as well as a City Investment Plan

(CIP), based on which the concerned ULB's can approach and be eligible to the funding under GoI /GoMP

schemes along with their own and other sources of finances based on priority actions and projects identified

in the CDP. The document shall also provide Financial Operating Plan (FOP) to direct the ULBs for mobilizing

various financial resources to implement the identified priority projects. The scope of the services include all

necessary steps formulated in JNNURM Toolkit 2, that would help to prepare the CDP, such as Data

Collection & Field Visits, Municipal Staff & all Stakeholders consultative meetings, Sector Analysis, organizing

necessary workshops for the successful completion of the CDP. The specific objectives of the project are as

follows;

• CDP would scale up existing urban development and poverty alleviation schemes within a

comprehensive and coherent strategic planning framework, in order to ensure optimal benefit from

available resources to the citizens of the ULBs.

• CDP would aim to catalyze new thinking and provoke debate through a consultative stakeholder

driven process. The vision and strategic thrusts of the CDP would be built around the lessons and

findings of a comprehensive and rigorous stakeholder consultation and documentation process.

• It is expected that the CDP would serve the purpose and meet the requirements of UIDSSMT and

IHSDP programmes as well as JNNURM and other development schemes.

• The CDP will generate specific priority actions and projects that can be the basis, for mobilizing

funds from diversified sources.

1.3 Methodology

The CDP is prepared through a participatory process, wherein the various stakeholders, citizens and the

concerned authorities play a major role in the formation of the vision for the future development of the city.

The planning process therefore has to be a consultative one, with stakeholders representing a varied

spectrum of qualification taking part in the discussions and dialogue leading to the formulation of a vision,

development of objectives, identification of priority sectors and projects. CDP is prepared as a multistage

exercise, mainly with the following Stages;

Page 26: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 17 of 92

City Development Plan for Bhedaghat Town

Stage 1: Mobilization and Inception

The Consultants with ULB support would organize a one day kick-off workshop to familiarize the

stakeholders with the purpose, process, and expected outcomes of the CDP and build confidence,

understanding and commitment to the CDP. The kick off workshop will help in deriving a consensus along

with the stakeholders firming the process and agreeing upon a structured programme to take the CDP

forward.

Stage 2: Assessment of Existing Situation

In this stage, interaction with various stakeholder groups (meetings, workshops, focus group discussions,

etc.) and review relevant publications, reports, GOs, resolutions, procedures, laws etc. to analyze the current

situation in each of the sector identified. In-depth analysis of the existing situation, covering the

demographic profile, economic profile, urban governance, Physical & Social infrastructure facilities, and

environmental aspects. Gap analysis and future needs will be calculated/identified at every sector level.

Stage 3: Development of City Vision and Sector Goals and Strategies

Based on the cities present scenario and SWOT analysis, the future city vision statement will be formulated.

Discussion will be initiated on strategies, priorities and major actions that may be required in the next five

years to move towards the vision 2035. To achieve the city vision, it is imperative to identify the necessary

goals and strategies for each sector.

Stage 4: Development of Strategies and Priority Actions

The strategies will be evaluated from the perspective of stakeholder’s contribution in achieving the vision

and sector goals. Criteria will be developed for prioritizing the strategies, programmes and projects in

consultation with the Steering Group. The priority actions will support the strategies to achieve the sector

goals.

Stage 5: Preparation of City Investment Plan (CIP) and Financial Operating Plan (FOP)

City Investment Plan (CIP) and Financial Operating Plan (FOP) are the key components in the entire process

of City Development Plan (CDP). Based on the availability of resources, logical sequencing of actions and

potential for immediate implementation, the Consultants will prepare a City Investment Plan (CIP) in

consultation with ULB that lays out the cost and revenue estimates of all priority projects in the next five

years. The preparation of the CIP is a reiterative process requiring adjustments to individual projects as well

as changes in scheduling to make the whole package work financially. The City Investment plan would be

supported with a Financial Operating Plan (FOP).

Stage 6: Draft City Development Plan (CDP)

The Draft CDP includes City Investment Plan (CIP), Financial Operating Plan (FOP), duly considering the

feedback from all the stakeholders and working groups.

Page 27: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 18 of 92

City Development Plan for Bhedaghat Town

Stage 7: Final CDP Document

The final CDP document incorporating the feedback from the workshop and the inputs received at the 2nd

Stage State Level discussion.

In all the above stages, the consultations with all the Stakeholders and working groups will be made

extensively. The following Methodology is adopted for entire process of City Development Plan (CDP) for

Bhedaghat Nagar Parishad.

Page 28: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 19 of 92

City Development Plan for Bhedaghat Town

Fig 1.1 Methodology Followed for the CDP

Stage 1: Mobilisation and Inception Kick-off Workshop with officials of Municipality.

and other key parastatal agencies ,

Data needs and requirements. Reconnaissance visit of project area.

Stage 2: Assessment of Existing Situation

Sector Analysis

City Profile.

1st Stage District Level

1st Stage State Level

Presentation

2nd Workshop to Prioritize Sector Strategies &

Proposals

Stage 3: City Vision and Sector Goals and Strategies

Sector Strategies Vision, Goal and Strategies

Stage 4: Strategies and Priority Actions

Evaluation of Strategies

Reform Action Plans

Stage 5: City Investment Plan (CIP) and FOP

Project Costing and Funding Sources Scheduling Priority Actions and CIP

FOP to Support CIP

Stage 6: Draft CDP including CIP & FOP

Performance Monitoring indicators etc.,

Workshops to Finalize Draft CDP

3rd Workshop to Finalise Draft CDP

2nd Stage District Level Presentation to finalise Draft

2nd Stage State Level Presentation to finalise

Draft CDP

Stage 7: Final CDP including CIP & FOP

Performance Monitoring indicators and Council

Resolution

Page 29: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 20 of 92

City Development Plan for Bhedaghat Town

1.4 Structure of the Report

Chapter 1: Introduction: Detailed description of Project background and Methodology adopted for the

entire City Development Plan (CDP) process.

Chapter 2, 3 & 4: City Profile: It includes City Profile, Physical features, Demography details, Socio-

Economic details and Housing scenario.

Chapter 5: City Infrastructure: This chapter deals with Physical and Social Infrastructure analysis, demand-

gap analysis, formation of goals, strategies and action plans for respective sectors, SWOT analysis

Chapter 6: Institutional Framework

Chapter 7: Municipal Finance: deals with Income and Expenditure analysis

Chapter 8: Capital Investment Plan: Detailed and summary of Sector wise Investment Required for

Implemetation of Proposed Projects and Financial Operating Plan

Chapter 9: Urban Reforms: status of Mandatory and optional reforms at both ULB and State level

Chapter 10: Summary of Workshop Proceedings

Chapter 11: City Vision: Provide the city vision along with the consolidated sector strategies

Page 30: CDP Bhedaghat English

PHYSICAL FEATURES OF

THE TOWN

Page 31: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 21 of 92

City Development Plan for Bhedaghat Town

CHAPTER 2: PHYSICAL FEATURES OF THE TOWN

2.1 GENERAL CITY PROFILE

2.1.1 Historical Importance

Bhedaghat town is situated on the Eastern bank of the holy river Narmada. During all times in its history,

Bhedaghat formed a part of the adjoining regions viz. Tripuri during the ancient period, Garha during the

medieval times and Jabalpur after territory came within the control of Marathas and the British. As such,

during the respective periods, history of Bhedaghat coincided with the history of the territory concerned. As

a part of the settlement of Tripuri from proto-history to 14th Century A.D., Bhedaghat passed through the

chalcolithic age, age of the Epics and Puranas, the Mauryan age, age of the city-state, age of the Sungas,

the Kanvas, the Dattas, the Satavahanas, the Bodhis, the Senas, the shaka kshatrapas, the Guptas and their

feudatories and finally the mighty Kalachuri rulers of Tripuri. Archaeological remains of some of these ages

have been found at Bhedaghat.

Bhedaghat town was constituted in the year 2001. During the medieval times, as a part of the Garha-Mandla

Kingdom, Bhedaghat witnessed the rule of Gond rulers for a period of 344 years from the rise of Kharji in

1440 A.D to arrest of Narhari Shah in 1784 A.D. Thereafter during the Maratha rule, it was said that the

village Bhedaghat was donated by Raghuji Bhonsala to Mahant Hardeo Puri Gosain. Subsequently the village

became a part of the British territory during whose regime too the disciples of Hardeo puri continued to hold

the village as a free grant for perpetuity subject to the payment of a quitrent of Rs 5. It’s most famous

sights are the Duandhar Falls, Marble Rocks and the Chausath Yogini temple.

2.1.2 Jabalpur District Profile

Jabalpur District in Madhya Pradesh state lies in central India and Jabalpur city serves as the administrative

headquarters of the district. The District extends in an area of 10,160 sq.km. Geographically the district is

part of the Mahakoshal region of Madhya Pradesh.

Jabalpur district is bordered by Katni in the north side, Umaria in the North-East direction, Dindori in the

East, Mandla in the South-East side, Seoni in the South, Narsimhapur in the South-West and Damoh in the

north-west direction. The holy Narmada River is the main water source for the district. There are 17 urban

centers in the district, out of which Class VI, V & III consisting of 2 towns in each of the category. Jabalpur

city is categorized under Class I with corporation status, one under Class II and other towns as IV. Majority

of the towns are categorized as Class IV towns. The details are as shown in the following table. Among all

the urban centers, Jabalpur City holds the highest urban population followed by Sihora and Panagar.

Bhedaghat town placed at 16th position in the entire district with Nagar Parishad status.

Page 32: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 22 of 92

City Development Plan for Bhedaghat Town

Table 2.1 : Details of Urban Settlements in Jabalpur District-2001

Source: Census of India, 2011

2.1.3 Location and connectivity

Bhedaghat is a town with Nagar Parishad status in Jabalpur district in the state of Madhya Pradesh, India.

Geographically, it lies between 23°08′N 79°48′E Latitude,23.13°N 79.80°E Longitude. Bhedaghat is located

at 25 km from Jabalpur and 5 km eastern side on the National Highway 12A leading towards Bhopal-

Jabalpur. Due to meeting of 2 or more rivers, the name Bhed (two) Ghat – Bhedaghat has locally derived.

2.1.4 Climate & Rainfall

The climate of the town is pleasant and healthy. It is generally dry except in the monsoon. The temperature

of Bhedaghat varies from 19o C to 31o C. the average rain fall is approximately 1253.7 m.

2.1.5 Topography and Geology

Bhedaghat town is encircled by hills. The red color soil can be seen and shows presence of laterite in the

town. The slope of the town is towards South-East direction.

Name of the

Town

Class of

Town

Civic

Status Area

2001

population

2011

population

Decennial

growth rate

Density

(per sq.km

1 Barela IV NP 9.89 10,880 12,620 15.99 1,276

2 Bhedaghat VI NP 2.37 1,840 6,657 261.79 2,809

3 Bilpura IV CT 2.56 11,819 14,349 21.41 5,605

4 G.C.F. Jabalpur IV CT 7.00 15,283 9,285 -39.25 1,326

5 Jabalpur I M. Corp. 134.94 956,107 1,069,292 11.84 7,924

6 Jabalpur Cantt. II CB 28.49 66,499 72,261 8.66 2,536

7 Katangi IV NP 12.37 17,062 19,040 11.59 1,539

8 Majholi IV NP 6.29 11,318 13,210 16.72 2,100

9 Manegoan V CT 1.89 9,167 12,599 37.44 6,666

10 O.F. Khamaria IV CT 19.93 14,539 9,839 -32.33 494

11 Panagar III M 10.26 25,199 27,932 10.85 2,722

12 Patan IV NP 13.03 13,213 14,324 8.41 1,099

13 Pipariya VI CT 3.97 4,483 5,084 13.41 1,281

14 Shahpura IV NP 6.66 11,958 13,601 13.74 2,042

15 Sihora III M 23.67 37,870 44,048 16.31 1,861

16 Suhagi V CT 2.61 8,145 14,787 81.55 5,666

17 Vehicle Fac. Area J IV CT 3.76 11,958 8,087 -32.37 2,151

Page 33: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 23 of 92

City Development Plan for Bhedaghat Town

2.1.6 Wind Direction

Winds are controlled by the shifting of pressure belts. They are predominantly from South-West during the

monsoon. In the post monsoon and winter, the wind flow towards south and south-east side. In the

monsoon season, the velocity of wind speed range is 40 km to 50 km per hour.

Figure 2.1 Location Map of Bhedaghat Town

2.1.7 Base Map

The scaled Base Map is not available for Bhedaghat Nagar Parishad. However, a guide map with all the

roads and ward boundaries was acquired from the Nagar Parishad. Taking this map as reference, scaled

Base Map has been prepared using Google satellite imageries. The Preliminary Base map thus Prepared is

shown in Map No.2.1.

Page 34: CDP Bhedaghat English

DEMOGRAPHIC & SOCIO-

ECONOMIC PROFILE

Page 35: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 24 of 92

City Development Plan for Bhedaghat Town

CHAPTER 3: DEMOGRAPHIC & SOCIO-ECONOMIC PROFILE

3.1 Demography

Bhedaghat Town is constituted in the year 1995, with an area of 16.33 Sq. kms and it comprises of 6

villages such as Bhedaghat, Bhadapur, Gopalpur, Lahmetaghat, Dalpathpur and Chekethal.

3.1.1 Population Growth Trend

As per 2011 Census (provisional Figures), the total population of Bhedaghat Nagar Parishad is about 6,657.

From the year 2001 to 2011, the growth rate of the town is 22.7%. The following table indicates the

population and growth rate details;

Table 3.1 Decadal Growth Rate of the Town

S.No Year Population Decadal Growth rate (%)

1 2001 5,423 -

2 2011 6,657 22.7

Source: Census of India, 2011

3.1.2 Population Projections

Factors such as growing importance of the town in the region, cultural growth pattern, In-migration,

upcoming new developments were studied for finalizing the future population. Hence, the projections are

made considering different categories like

1. Decadal Growth rate

2. In-migration (plotted development)

Table 3.2: Population Projection of the Town

Sl. No. Methods 2011 2015 2025 2035

1 Arithmetic Increase method 6657 7154 8771 11138

2 Geometric increase method 6657 7058 8446 10605

3 Incremental increase method 6657 7524 9141 11508

The above projected population figures indicate that the population by all methods except Arithmetic

Increase method is above the average growth rate of Bhedaghat and looks on Higher side. So, from the past

population growth trend it is appropriate to consider Arithmetic Increase method as appropriate, figuring to

population of 11,138.

Page 36: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 25 of 92

City Development Plan for Bhedaghat Town

3.1.3 Population Density

As per Census of India, 2011 the population of Bhedaghat Nagar Parishad is about 6,657 and the total

extent of the town is 237 Ha. The gross density of the city is gradually increasing from 2001 to 2011. The

current gross density of the town is 28 persons per Hectare.

Table 3.3: Population, Area & Density Details of the Town

S.No Year Population Area (in ha) Gross Density (ppH)

1 2001 5423 1633 3

2 2011 6657 1633 4

Source: Census of India, 2011

Map No.3.1 shows the Density Details of Bhedaghat

3.1.4 Average household Size

As per Census of India, 2011 the total population of Bhedaghat Nagar Parishad is about 6,657 and total

number households are 1,355. Thus, the household size is 4.9 (~5.0).

3.1.5 Other Demographic Indicators

As per Census of India, 2011 the total SC population of Bhedaghat is about 903 and ST Population is 1174.

The total share of SC population is 13.5 percent of the total population and 17.6 percent is ST population.

3.2: SOCIO ECONOMIC PROFILE

3.2.1 Sex Ratio

As per Census of India, 2011 the sex ratio (female Population

per 1000 male Population) of the town is 885. For the years

1981 & 1991, the sex ratio details are not available from

Census. As per Nagar Parishad, 2001 Sex ratio is 851. The sex

ratio of the town is much lower than the State (930) and

district (928) figures.

3.2.2 Literacy Rate

As per Census of India, 2011 the literacy rate (percentage of

literate population to the total population above 6 years of age)

in Bhedaghat is 62.28 per cent (male literacy rate of 83 per

cent and female literacy rate of 63 per cent) – lower than the

state urban average of 79.67 per cent and national urban

average of 80.30 per cent.

Page 37: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 26 of 92

City Development Plan for Bhedaghat Town

3.2.3 Work Participation Ratio (WPR)

The current workforce participation rate (percentage of main and marginal workers to the total population)

in Bhedaghat is about 42.0 per cent (including 8 per cent of marginal workers); it is quite higher when

compared to UDPFI work force norms i.e., 33 % of total population. Table 3.4 presents the category-wise

workforce composition in Bhedaghat, as per the 2011 Census.

Table 3.4: Category-wise Workforce

S.No Category Total Population Male Female

1 Total Workers 2842 2062 780

2 Main Worker 2320 1803 517

3 Marginal Workers 522 259 263

Source: Census of India, 2011

Figure 3.4 Classification of WPR Figure 3.5 Gender Ratio – WPR

3.2.4 Occupation Structure

As per Census of India, 2011 It is noted that, the total main workforce is 2320. About 14 percent was

employed in cultivators, 27 percent as Agricultural labors and 1.6 percent was in household industry

category (Refer figure 3.6). Almost 58 per cent were employed in “Others” category like trade and

commerce activities, business activities, employees, and other small scale industries like marble design, idol

making etc.

Page 38: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 27 of 92

City Development Plan for Bhedaghat Town

Figure 3.6 Occupation Structure

3.2.5 Economic Base

The main Economic base of Bhedaghat town is Tourism and Agriculture. On an average, twenty to twenty

five thousand people visit Bhedaghat on week days and on weekend may reach sixty thousand. Many skilled

labors self-employed work on stone designing on soft stone locally available to them and potential

agriculture land is available which facilitates double cropping due to presence of perennial river Narmada.

City specific Strategies and Action Plans

Issue Strategy Action Plan

1. Population Growth Rate

Providing Employment Opportunities

• Encouraging small scale industries

related to Agro-based industries

2. Tourism Development of tourism and

heritage facilities

• Development of resorts & tourist spots

• Conservation of heritage structures in and around the city.

Page 39: CDP Bhedaghat English

PHYSICAL PLANNING AND

GROWTH MANAGEMENT

Page 40: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 28 of 92

City Development Plan for Bhedaghat Town

CHAPTER 4: PHYSICAL PLANNING AND GROWTH MANAGEMENT

4.1 Spatial Growth Trends

Due to physical barriers such as Narmada River on south east and hill area on north, the town is

predominantly developed in ribbon pattern along the main road connecting NH 12A and Nagpur By-

pass, which is passing through the town.

The urban form of the town is predominantly guided by tourism spots and agriculture hinter land. The

overall development resembles completed development.

4.2 Spatial Distribution of Population

As per the latest statistics obtained from the ULB (Census 2011), the town is divided into 15 wards. The

ward wise population and household details are mentioned in the following table.

Table 4.1: Ward-wise Details of the Town

S.No Wards No. of HH Population

1 Shiwaji Ward 104 446

2 Subash Ward 74 378

3 Mahatma Gandhi Ward 118 535

4 Deendayal Ward 110 559

5 Abdul Kalam ward 70 323

6 Rammanohar Lohiya Ward 111 489

7 Sardar Vallabh Bhai Ward 105 466

8 Maharana Pratap Ward 74 400

9 Rani Durgawati Ward 68 362

10 Vonoba Bhave Ward 70 357

11 Ravi Shankar Shukla Ward 99 458

12 Jawaharlal Nehru Ward 102 509

13 LalBhahadur Shastri Ward 103 494

14 Dr. Ambedkar Ward 89 473

15 Tripur Sundari Ward 90 408

Total 1387 6657 Source: Census of India, 2011

4.3 Land use

The essential characteristics of land use and its pattern have been analyzed in order to address

problems and proposals. The land use map has been prepared based on Google image interpretation

and subsequent ground truth verification.

Page 41: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 29 of 92

City Development Plan for Bhedaghat Town

Table 4.2: UDPFI Standards for Land Use

Land use % of Developed Area

Small Towns Medium Towns Large Cities Metro Cities

Residential 45 – 50 40-45 35-40 35-40

Commercial 2 – 3 3 - 4 4 -5 4-5

Industrial 8 – 10 8-10 10-12 12-14

Public & Semi Public 6 – 8 10-12 12-14 14-16

Recreational 12 – 14 18-20 18-20 20-25

Transport & Communication 10 – 12 12-14 12-14 15-18

Agriculture & Water bodies Balance balance balance balance

The land use percentages were calculated using the updated base map and the available data. As most

of the Nagar Parishad areas are associated with unique features like Heritage Sites or mining activity or

Industrial areas, so these areas has unique significance for land use analysis. The residential land

comprises of 8% of total land & the agriculture area comprises of almost 50%. Map shows the Existing

Land Use Map of Bhedaghat Nagar Parishad. The following table provides the land use percentages.

Table 4. 3: Land use Breakup

Sl. No Existing Land use Area

(sq.km)

% to the

Developable Area % to the Total

1 Residential use 8.39 50.91 0.51

2 Commercial use 0.24 1.46 0.01

3 Public and Semi Public 2.99 18.14 0.18

4 Transportation 2.29 13.90 0.14

5 Recreation Use 2.57 15.59 0.16

Developed Area 16.48 100.00

7 Agriculture Area 969.048 59.34

8 Water bodies 3.74 0.23

9 Hill 344.186 21.08

10 Conservation 299.546 18.34

1633 100

Source: Google image interpretation and subsequent site visits

Map No. 4.1: Existing Landuse of Bhedaghat

4.4 Master plan Provision

Directorate of town and country planning is preparing master plan for Bhedaghat Nagar Parishad, which

is under draft notification stage.

Page 42: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 30 of 92

City Development Plan for Bhedaghat Town

Fig 4.1: Draft out Line Development Plan for Bhedaghat

Bhedaghat Master Plan covers an area of 6073.12 ha which includes 23 villages.

Highlights of the Master Plan:

• Proposed 30 meters Buffer

zone on both side of the

River.

• Proposed 40 feet Link Roads

connecting Bhadapur to

Chowkithal and Ghopalpur to

Dhalpatpur

• Proposed Parking Lot in Ward

Number 6.

• Proposal of Recreational Park in Rudhrakund area.

Source: Town and Country Planning Department

Page 43: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 31 of 92

City Development Plan for Bhedaghat Town

4.5 Housing

Housing is the constituent of the social infrastructure of the economy. Like the other constituents, such

as the system of education and health, housing divergences also can either reduce or enhance the

disparities in the society.

4.6 Housing in Bhedaghat

According to the census 2011, existing housing units are 1387. The housing is spread in all the 15

wards of Bhedaghat town.

Table 4. 4: Details of houses, households and households size of Bhedaghat

Years Total Population No. of Households Average Household

Size

2001 5,423 1,130 4.8

2011 6,657 1,387 4.8

Source: Census, 2011

4.7 Housing demand for the year 2035

We assumed that the average household size would not fall less than 4.9 by 2015, 2025 and 2035.

Table 4. 5: Housing demand for the year 2035

Category Existing

(2011)

Projected years

2015 2025 2035

Population 6657 7154 8771 11138

Households 1355 1490 1827 2320

Household size 4.9 4.9 4.9 4.9

By the year 2035 the additional Houses required are 933 taking into the consideration one home per

one household. The land requirements for these housing needs are taken into consideration on the

proposed land use map.

Map 4.2: Anticipated Future Growth Map

City specific Strategies and Action Plans

Issue Strategy Action Plan

Haphazard Development Planned Development � Controlling the illegal developments /

haphazard development.

Page 44: CDP Bhedaghat English

TOWN INFRASTRUCTURE

Page 45: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 32 of 92

City Development Plan for Bhedaghat Town

CHAPTER 5: TOWN INFRASTRUCTURE

Infrastructure is the basic requirement of urban life and its adequacy and accessibility are two

important ingredients key contributors in the up-gradation and enrichment of quality of urban life which

is the primary objective of any planned development effort. The extent and the nature of problems

faced by different towns vary by size, geographical conditions & local natural resources, state/regional

differentials in the resource availability & the policies, resource base of local authorities and several

such factors directly or indirectly affecting the population of cities/towns.

Social amenities and infrastructure fall under the social welfare objectives of the urban development

programmes, as distinct from economic development objectives and especially in the context of the

rapidly developing liberalized and competitive economic scenario. These infrastructure facilities are

broadly classified into two aspects,

Physical Infrastructure Social Infrastructure

Water Supply Health

Sewerage & Sanitation Education

Solid Waste Management Recreational Facilities

Storm Water Drains Social security

Traffic & Transportation Housing

Street Lighting

5.1 Water Supply

5.1.1 Quality and Quantity of Water at Source

Bhedaghat is mainly dependent on Tube well source for water supply. At present there are 9 Tube wells

in the town which draws about 4.6 Lakh Liters per day. Direct pumping is in practice for storage and

distribution of water supply. Water is supplied through tankers to the areas where water supply is

scarce and areas not covered with distribution network. Currently the demand for water in Bhedaghat is

approximately 0.89 MLD. The details are shown in the Table.

Table 5.1: Details of Water Source & System

Sl. No. Ground Source Particulars Details

1. Number of Tube wells 9

2. Number of Hand pumps 33

3. Number of ELSR’s 1

4. Quantum of water Supplied (MLD) 0.46

5. Per capita consumption (LPCD) 70

6. Estimated Transmission and Distribution losses (% of total supply) 30 Source: Nagar Parishad Bhedaghat

Page 46: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 33 of 92

City Development Plan for Bhedaghat Town

5.1.2 Quality and Quantity of Water in distribution System

The available data only indicates the total water storage capacities at town level. However, it does not

provide details on the quantity of water supplied at ward level. Thus, the analysis to understand the

services at ward level is difficult. Presently there is one ELSR’s available for water storage which covers

1,2,3,4,5,8,9,10,11,14,15 Wards. The capacity of ELSR is 0.05 ML.

The total available storage capacity is 0.05 ML. As per the Census of India 2011, the population is

6,657. Assuming consumption of 135 LPCD, the total demand for water supply is 0.89 MLD. Assuming

the storage capacity required is 33 per cent of the total water supply is 0.29 ML. It is observed that the

current shortage of storage capacity is about 0.05 ML. The demand of water supply by the end of the

horizon period of CDP is about 1.66 MLD for which storage capacity of 0.54 ML is required by 2035.

Table 5.2 indicates the details of the ELSR and the wards covered. Map 5.1 indicates the water supply

system of the town.

Table 5.2: Details of ELSR in Bhedaghat

Sl.

No. Location of ELSR’s

Capacity

(in ML) Wards Covered

1. ELSR-1, Ward 13 0.05 1,2,3,4,5,8,9,10,11,14,15

Total Storage Capacity (ML) 0.05

Source: Nagar Parishad Bhedaghat

5.1.3 Water Distribution Arrangement

The existing water distribution system in the town is very old and is connected at various places with

new pipelines. GI pipes with diameters ranging from 3.0 mm to 1.5 mm form majority of the water

supply network. Around 12 km of length of pipeline is laid for distribution system and it accounts to 40

per cent of the existing road length. The details of the water supply distribution system given in Table.

Table 5.3: Details of the Distribution System

Main Types Distribution Main Details

or Dimension Range

Percentage of Coverage

Network

Pipe Material

a. CI 3.0 mm to 1.5 mm 100

Source: Nagar Parishad, Bhedaghat, 2010-11

5.1.3 Internal Distribution Networks

The total number of household service connections is 270. There are no metered connections in the

town. These 33 hand pumps are catering to water supply. It is observed that commercial service

connections are very less (7).

The total number of water supply connections increased from 180 to 270 from past three years. The

details of service connections and growth rates are indicated in Table.

Page 47: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 34 of 92

City Development Plan for Bhedaghat Town

Table 5.4: Details of Water Supply Connection in Bhedaghat Town

Year Connections % Growth of Connections

2009-10 180

2010-11 210 16.66

2011-12 270 28.57

Source: Nagar Parishad, Bhedaghat 2010-11

The domestic connections account to 97.41 per cent of the total connections. The total commercial

connections are account to 2.59 per cent of total connections. There are 45 public stand posts, which

serves 3.24 per cent of total households. Table 5.5 indicates the details of the service connections in

the town.

Map 5.1: Existing Water Supply System of Bhedaghat

Table 5.5: Details of Water Connections in Bhedaghat

Sl. No.

Particulars Units

1 Total Population – 2011 6,657

2 Number of Households – 2011 1,387

Connections Number % to total

Connections

% to total

Households

3 Domestic 263 75.6 19.0

4 Non-domestic (other than industrial) 7 2.0 0.5

5 Industrial 0.0 0.0 0.00

6 Public Stand Posts 45 12.9 3.2

7 Hand Pumps 33 9.5 2.4

Total Number of Connections 348 100.0 > 15.0

Source: Nagar Parishad, Bhedaghat, 2010-11

5.1.4 Coverage & Supply

The distribution network covers 50 per cent of the developed area. Water is supplied for a total of 4

hours per day during winter and 2 hours per day in summer. Bhedaghat has very infrequent and

interrupted water supply due to frequent and untimely power cut. The per capita supply works out to

70 lpcd. Thus, the current water supply system is severely dependent on electricity. The areas which

are not covered under supply network are located in ward number 2, 4 and 9.

As per the assessment of officials at Nagar Parishad, low pressure areas are located in six wards. The

details of the existing coverage & supply are indicated in the following Table.

Table 5.6 : Domestic Water Supply Details in Bhedaghat – 2011

Sl. No. Particulars Units

Per Capita Supply

1 Population – 2011 6,657

2 Water Supply (in MLD) 0.46

3 Current Per Capita water supply per day (in LPCD) 70.0

Page 48: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 35 of 92

City Development Plan for Bhedaghat Town

Sl. No. Particulars Units

4 Per capita supply as per CPHEEO Norm (in LPCD) 135.0

Coverage

5 % population covered under piped Water Supply

6 Areas

with

Surplus Supply Nil 0.0 %

Moderate Supply All wards (except wards with

less supply and no supply) 74.0 %

Less Supply Ward No. 13,7 13.0 %

Inadequate

Supply

Ward No. 12,6 13.0 %

Storage Capacity

7

Total Storage Capacity available (in ML) 0.05

Total Storage Capacity required (in ML) 0.46

Deficit (in ML) 0.41

Distribution Network (%)

8

Good 8 %

Fair 84 %

Bad 8 %

Staff Details

9 Permanent Staff Nil

10 Temporary Staff 11

Source: Nagar Parishad, Bhedaghat, 2010-11

Irrespective of supply from ELSR, every ward is getting the direct supply from remaining tube wells.

The assessment made by the officials at Nagar Parishad, Bhedaghat suggests that the distribution and

transmission losses are about 20 to 25 per cent.

5.1.5 Institutional Set-up

The O&M of the water supply system is taken care of by the Nagar Parishad, Bhedaghat. Currently,

both technical and non-technical duties related to water supply are discharged by 11 temporary

employees of Nagar Parishad. With the growing population, the demand for adequate services is

increasing and the role of the local body as a service provider calls for better performance.

5.1.6 Operation & Maintenance (O&M)

The sustainability of water supply system is assured only if local resources are generated for O&M by

the ULB. The systematic planning, expansion and maintenance requires dedicated planning approach.

Cost Recovery

Nagar Parishad collects a flat rate of Rs.30.00 per month per household for domestic connection and

Rs.120.00 for non-domestic connection. In small towns like Bhedaghat no user charges are collected

on pro-rata basis, the reason being absence of metered devices. None of the connections in Bhedaghat

are metered. The charge for new connection is Rs.1000; which includes road cutting charges as well.

Table 5.7 gives the details of the flat rate per month and the installation for new connection charges.

Page 49: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 36 of 92

City Development Plan for Bhedaghat Town

Table 5.7: Details of Water Charges in Bhedaghat – 2011

Description Charges Per Connection (in Rs)

1. Flat Rate per Month

• Domestic 30.00

• Commercial 120.00

2. New Connection Charges

• Domestic 1000.00

• Commercial 1000.00

Source: Nagar Parishad, Bhedaghat, 2010-11

5.1.7 Present and Future Demand and Supply Gaps

The present per capita water supply is 70 LPCD. The future population growth calls for:

� Augmentation of water on a sustainable basis.

� Increase in storage capacity to meet the requirement of the growing population and increased

developed areas.

Table 5.8: Water Demand Assessment – 2035

Particulars Phase 1 Phase 2 Phase 3

2011-2015 2015-2025 2025-2035

2 Projected Population 7,154 8,771 11,138

3 Projected Households 1490 1827 2320

4 Total quantum of water required

(in MLD) @ 135 lpcd per capita 0.97 1.18 1.50

5 Required capacity of treatment plant (in MLD) 0.97 1.18 1.50

6 Additional Storage capacity (in ML) 0.27 0.34 0.45

Source: Analysis

The cumulative water demand projected for the coming 25 years is indicated in the Table 5.8.

Considering a per capita supply of 135 LPCD the total domestic water demand will be 1.50 MLD by

2035. Adequate facilities for water storage, treatment and supply should be planned.

5.1.8 Water Supply Project

As on now, the town is not covered under any planned schemes/projects for Water supply system in

the town.

5.1.9 Comparative Analysis (Service Levels)

The water system in the town can be improved by efficient extension of the water supply network,

increase in the number of HSC’s, rehabilitation works, and efficient cost recovery plans. The existing

system is not adequate to meet the growing demand of the population. The current service levels are

indicated in the following Table.

Page 50: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 37 of 92

City Development Plan for Bhedaghat Town

Table 5.9: Service Levels in Bhedaghat

Indicator Norm Existing Levels

• Per Capita Supply 135 lpcd 70 lpcd

• Storage capacity 33.0 per cent 10.0 per cent

• Length of distribution network as per cent to total

road length 100 per cent 40 per cent

• Treatment Plant capacity 100 per cent Nil

• Number of HHs with HSC connections 100 per cent 51.0 per cent

• Loss due to leakages 20 per cent 25 per cent

Source: Analysis

5.1.10 SWOT Analysis

Strengths

• Location of Narmada River is potential for future requirement

Weaknesses

• Majorly dependent on ground water • Inadequate network length

• Age of current supply system

• Lack of adequate man power

Opportunities

• Implementation of rain water

harvesting

Threats

• High dependency on electricity as the supply is

also dependent on pumping through motors • Poor distribution of water can lead to health

problems and unhygienic conditions in the Town.

5.1.11 Key Issues

• No treatment plant in the town for purification of water

• Ground water levels are depleting annually.

• Lack of metered connections, reflecting losses in ULB revenue.

• Flat rates are required to be revised as the revenue collected is very meager.

• Distribution system is not adequate as various parts of the town are either not connected or

integrated to the system.

• Major pipelines in the existing system are around 10 years old and require repairs and

rehabilitation measures on priority basis.

• No initiatives for rain water harvesting, reuse of waste water and lack of community participation

and awareness in improving water management system, system efficiency, O&M and decision

making.

• There is no water quality monitoring done on a regular basis both at the transmission end and

consumer end.

Page 51: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 38 of 92

City Development Plan for Bhedaghat Town

5.1.12 City specific Strategies and Action Plans

Issue Goal Strategies Action plans/Proposals

Water Source To provide surface water source

• Identify proper "Network Plan" for Intake Pipe line”

from surface source to the town.

• Surface source from “Narmada River”

• 1.50 MLD capacity of WTP has to

be constructed. • Water requirement for tourism

flow is 0.33 MLD

Inadequate

storage capacity

100 %

storage capacity

• Identify the location and

number of ELSR’s

required. • Storage capacity should

meet future demand

• 2 ELSR’s are required.

• 0.45 ML of additional storage

capacity is required by the

end of the plan period – 2035

Inadequate

Coverage and Supply

Network

100 %

coverage with "potable

water supply"

• Replacement and

extension of existing

network system. • Phase-wise replacement

of pipe lines.

• Supply network plan for

future developments

• 10 km length of existing

network system has to be

replaced. • 12.6 km length of pipeline

network has to be laid in

future development areas.

Inadequate

man power for “Operation

& Maintenance”

100 % O&M

Recovery

• Capacity building

programmes for ULB staff

to improve skills. • Provide metered

household service

connections in a phased manner.

• Regular monitoring

system.

• Training & capacity building

programs for ULB staff.

• New connections for

households in a phased manner.

• Water rate should revise time

to time

Priority Actions

• Provision of water supply system with “Narmada River” as the source

• 10 km length of water supply network system has to be replaced

• Provision of 1.50 MLD Capacity of Water Treatment Plant (WTP) near to the surface source

• 12.6 km length of network system has to be laid for future development areas

Page 52: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 39 of 92

City Development Plan for Bhedaghat Town

5.2 Sewerage System

5.2.1 Existing Sewerage System

Hundred per cent network coverage for sewerage system is one of the high priority needs of any

developing town and taking up the same would present a major challenge to the implementation

capability of ULBs. Lack of Under Ground Sewerage system in Bhedaghat also leads to unhygienic

conditions in the town.

Table 5.10: Details indicating the Existing Sanitation Facilities, 2001

Particulars Nos.

1. Total Number of Households 1387

Particulars % of Total No. of Households

2. Per cent of Households having Bathroom

Facility within the House 25.16 %

3. Type of Connectivity for Waste water Outlet

1. Closed Drainage 162

2. Open Drainage 116

3. No Drainage 71

Source: Census 2001

Sewage & Sullage Collection

The domestic waste water presently passes through the open drains along the road side. In areas not

served by any kind of drainage network, the waste water flows on the roads and in few places get

stagnated.

The area within the core area (old area) has lack of proper waste water disposal system. Thus, the waste

water is allowed to flow in open areas or vacant sites in these localities. The blocking of drains by the

presence of solid waste is the main cause for stagnation of waste water.

5.2.2 Household Latrines

Bhedaghat lacks adequate sanitary facilities. Only 25.16 % of Households have Access to Household

Latrines. Six out of ten houses have no latrine facilities indicating open defecation in the town. 2001

census indicates that 3.43 per cent of the census houses resort to pit latrine, a practice that has almost

become defunct in the modern cities. However, about 12.89 per cent of the HHs has water closets.

Table 5.11: Details indicating the Existing Sanitation Facilities

Particulars Number of H.H % of Total No. of Households

• Pit Latrine 12 3.43

• Water Closet 45 12.89

• Other Latrine 76 21.77

• No Latrine 216 61.89

349 100

Source: Census 2001

Page 53: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 40 of 92

City Development Plan for Bhedaghat Town

5.3 Existing Sanitation System

As per the sanitation surveys conducted during 2008, about 25 per cent households have access to

improved sanitation within household and remaining 75 per cent households lack these facilities.

5.3.1 Public Toilets

There are 8 public conveniences with 44 seats in the town. The average users per day are estimated to

be 450. The details of public conveniences are shown in the following Table.

Table 5.12 : Details of Public Convenience facilities

Public Convenience Systems (Sulabh Sauchalaya)

a. Public Conveniences 8

b. Total Seats 44

c. No of Users/ Day 450

Source: Nagar Parishad, Bhedaghat

5.3.2 Present, Future Demand and Supply Gaps

The cumulative sewerage demand projected for the coming 25 years is indicated in the Table 5.13.

Considering a per capita supply of 135 LPCD the total domestic sewerage demand will be 1.33 MLD by

2035 (considering 80 per cent of total water demand).

Table 5.13: Demand Assessment – 2035

Particulars Phase 1 Phase 2 Phase 3

2011-2015 2015-2025 2025-2035

• Projected Population 7,154 8,771 11,138

• Quantum of water required (in MLD) 1490 1827 2320

• Total quantity of sewage (in MLD) 0.97 1.18 1.50

• Length of Trunk Lines (600 mm dia) 0.77 0.95 1.20

• Length of lateral Lines (100 mm dia) 4

• Capacity of treatment plant (in MLD) 16 11

Source: Analysis

5.3.3 Sanitation Projects

At present, there are no Proposed or On-going Projects for augmentation of existing Sewerage system in

the town.

5.3.4 Comparative Analysis with the UDPFI, CPHEEO Guidelines

As per the UDPFI/ CPHEEO norms, about 80 per cent of the total water supply is assumed to be

discharged as sewage. Hence the total sewage generated is estimated about 1.20 MLD.

Table 5.14: Service Levels in Bhedaghat

Indicator Norm Levels

Sewerage Estimated 80 % of water supply 1.20 MLD

Source: Analysis

Page 54: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 41 of 92

City Development Plan for Bhedaghat Town

5.3.5 SWOT Analysis

Strengths

• 25.16 % of households have access to improved

sanitation.

Weaknesses

• Lack of under Ground sewerage • Mostly the sewage goes into the open drains.

• Inadequate public conveniences • Surface drains are used to carry the sewerage leading

to environment hazards

Opportunities • Availability of undeveloped

land for locating amenities such as Sewerage

Treatment Plant

Threats • Letting out of sewage and sullage into open areas can

lead to health hazards • Prospective degradation of environment due to water

and Air pollution

5.3.6 Key Issues

• Absence of an UGS system, open defecation and stagnation of sewage leading to environmental

and health problems.

• Sewage and waste water entering the water bodies resulting in pollution.

• Mixing up of solid waste with the sewage leading to choking of drains.

5.3.7 City specific Strategies and Action Plans

Issue Goal Strategies Action plans/Proposals

Under Ground

Sewerage (UGS) system

Provision of

UGS with 100 % coverage

• Conducting a detailed physical

survey • Coverage of core areas on

priority basis

• Extension of network to new developed areas

• Preparation of a

Comprehensive Sewerage network plan.

Open defecation

Remove the practice of

open defecation

• Improving the existing public toilets by providing adequate

facilities. • 25 per cent of the households

shall be provided with LCS

focusing on urban poor. • Construct the new public

toilets in unserved areas.

• Improvement of existing public toilets.

• Constructing public toilets in unserved areas.

• Construction of Low Cost

Sanitation units for 75 per cent of the total

Households.

Absence of sewerage

treatment plant

Provision of Sewerage

Treatment Plant

• Capacity of STP should meet the current gap and future

requirements in a phased manner.

• Sewerage quality analysis

needs to be upgraded.

• 1.20 MLD capacity of DEWAT System has to be

constructed. • 0.26 MLD additional for

tourism flow.

Lack of

Operation &

Maintenance

Adopt the

‘utility

mapping’ system

• Training & capacity building

programs for ULB staff.

• Regular monitoring system.

• Private Sector participation

in O&M to increase

efficiency of service delivery.

Priority Actions

• Provision of Public Conveniences near Police station and Nagar Panchayat Office

• Construction of toilets through low cost sanitation programs

• Construction of public toilets in slums & poor settlements

• Campaign at town and community level on prevention of open defecation

• Provision of DEWAT System

Page 55: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 42 of 92

City Development Plan for Bhedaghat Town

5.4 Solid Waste Management

Unorganised disposal of Solid waste affects major pollutants in a town resulting harmful health effects on

its residents. Urbanization has changed the composition of waste generated in larger towns and cities. It

is seen that the amount and kind of waste generated varies according to the income level. While most of

the residents are unaware of the health hazards, the contributors too are equally unaware of the effects

of pollution on the Town. These risks can be properly managed and their negative effects can be

minimized. Hence, there is a need for proper collection, storage, transportation and scientific disposal of

such waste by the respective local governments.

5.4.1 Quantity of Waste Generated

The quantity of solid waste generated in Bhedaghat has increased in the past few years due to the

growth of commercial and service activities. At present the solid waste generated at household level and

on the streets is collected from the dustbins and open dumping points. The regular collection is confined

to the main streets of the town. The details of the existing SWM system are detailed in the following

Table.

Table 5.15 : Solid Waste Details in Bhedaghat – 2011

Note: Nagar Parishad, Bhedaghat

The average solid waste generated in Bhedaghat town is about 2 Tons per day. The major source of

waste generation is the domestic waste. There is no hospital waste generated in the town.

5.4.2 Constituents of Municipal Waste

The various sources of solid waste generated are out of domestic and commercial usage. Out of the total

waste generated in Bhedaghat, around 60 per cent is domestic waste, 40 per cent is of commercial

waste. The domestic waste has both bio degradable and non-biodegradable components. Some of the

biodegradable components are vegetable waste, meat waste, poultry waste, leftover food particulates

etc. The non-biodegradable waste comprises of plastic, rubber, packaging materials, metal, batteries,

and construction waste.

5.4.3 Current practices of Solid Waste Management

At present open dumping is in practice. Door-to-door collection is in practice in 2 to 5 wards of the town.

The solid waste is dumped along the main roads & vacant lands. This type of open dumping will lead to

unhygienic conditions.

Sl. No. Particular Details

1. Total Population (2011) 6,657

2. Per capita waste generated (in kg) 0.25

3. Quantum of Hospital Waste Generated NIL

4. Total Waste Generated Per Day (in tons) 2

5. Total Waste Collected Per Day (in tons) 1.6

6. Frequency of Waste Collection Weekly Once

7. Collection Performance (%) 80.0

Page 56: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 43 of 92

City Development Plan for Bhedaghat Town

5.4.4 Segregation & Storage of Solid Waste

At present there are no standard practices followed for segregation and storage.

5.4.5 Primary and Secondary Collection

Both primary and secondary type of collection is practice in the town. In some areas, the solid waste is

collected from houses and is deposited at a predetermined location from where it is carried to dumping

site through trucks. There is no door-to-door collection system in the town.

As per the Nagar Parishad officials, approximately 1.6 tons of waste is collected per day which indicates a

collection performance of 80 per cent. The main roads are swept every day and the waste is deposited in

the containers, and is taken to dumping site. The shortfall in the collection process is due to the following

reasons:

• Solid Waste deposits in the storm water drains are left unattended.

• Improper dumping points and unscientific disposal methods like open dumping of waste on

roadsides, vacant sites, etc.

• Non-availability of adequate infrastructure in terms of number of tractors, dustbins, equipments,

etc.

• Improper collection methods.

5.4.6 Processing & Disposal of Waste

It is informed by the officials at Nagar Parishad that the dumping is done in panchavati (ward 1), balpara

(Ward 6) and chakital (ward 8). The following Table 5.16 indicates the existing transport & disposal

arrangements. Map 5.2 shows disposal location points.

Map 5.2 shows disposal location points.

Table 5.16: Solid Waste Transport and Disposal Arrangements

Particulars Units

1. Number of Dustbins 15

2. Total Number of Vehicles (Tractor) 1

3. Capacity of each vehicle 1

4. Total Number of Tippers/Handcarts 15

5. Age of Vehicle (in Years) 15

6. Persons per vehicle 1 driver + 2 persons

7. Number of trips per day per vehicle 2

8. Type of Disposal Open Dumping

Source: Nagar Parishad, Bhedaghat

5.4.7 Vehicles for Solid Waste collection and Transportation

The Nagar Parishad owns 1 tractor for disposal of solid waste. Capacity of each tractor is 1 Ton. Number

of trips per day per vehicle is two. The distance travelled by each tractor per day is around 3.5 km and

the weekly hour of operation is 8 hours. However lack of adequate infrastructure and manpower has led

to improper removal, transportation and operational efficiency.

Page 57: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 44 of 92

City Development Plan for Bhedaghat Town

5.4.8 Institutional Set-up

Solid Waste Management is enlisted in the state list and is the obligatory responsibility of the ULB

handled by the Health wing of each Nagar Parishad. The MSW rules 2000 puts forth detailed guidelines

for the entire process for handling solid waste management. The staffs for SWM include Environmental

Engineer, Health Officer, Health Inspector and field staff including drivers, cleaners & loaders. The

number of staff in the ULBs varies depending on the size of the ULB. The staffing pattern as provided by

the Nagar Parishad, Bhedaghat indicates that currently 4 employees of Nagar Parishad are discharging

the duties of Solid waste and Sanitation and additional 8 persons are employed for attending various

other duties. The details of the staff are indicated in the Table

Table 5.17 : Staff for Solid Waste Management in Bhedaghat

Staff for SWM Number

Safai Daroga/Driver 1

Jamidar 0

Safai Karmachari 3

Total 4

Temporary staff/Daily Wages 8

Grand Total 12

Source: Nagar Parishad, Bhedaghat

5.4.9 Estimation of Waste Collection

Estimated waste generation in the town by the year 2035 is about 5 tons. Approximately 4.0 tons of

waste collection may be possible based on existing collection performance with some improvement in

management practices.

5.4.10 Comparative Analysis with Guidelines

Table 5.18 : Details of Current Service Levels

Indicator Norms Number of Units

� Waste collection performance 90 – 100 % 80

� Spacing of Dustbins 100 m Irregular

� Road length per conservancy staff 400 – 600 m 2000 m

� Conservancy staff per 100 population 3 1 per 1025 persons

Source: Analysis

5.4.11 SWOT Analysis

Strengths

• Type of solid waste generated is

predominantly domestic,

commercial — absence of

industrial hazardous waste

Weaknesses

• Multiple disposal points.

• Community bins are not available at convenient

locations.

• Functional overlap-sanitation & solid waste

management

Page 58: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 45 of 92

City Development Plan for Bhedaghat Town

Opportunities

• Adaptation of Vermi Composting

methods

Threats

• Possibility of public health hazards as the

dumping yards are located in the town

• Lack of solid waste management facilities in

the town leading to indiscriminate dumping of

garbage

• Health risks for those working in this sector as

well as residents living around waste depots

5.4.12 Key Issues

• Absence of segregation of waste at source.

• The staff in the ULB is skeletal.

• The locations of dustbins should be fixed with proper intervals and at proper places so that

efficiency can be increased.

• The existing transportation infrastructure and resources are inadequate.

5.4.13 City specific Strategies and Action Plans

Issue Goal Strategies Action Plans/ Proposals

Open

dumping

Suitable space

(landfill site) for

disposal of waste

• Initiating segregation of

waste at source.

• Place collection bins wherever is necessary

(suitable locations).

• Provision of adequate facilities

at landfill site (Platform,

fencing, watchmen shed etc.).

• Provision of community bins

in the town by the end of plan period-2035.

Absence of

Door-to-Door (D2D) collection

100 % D2D

collection

• Identification of primary

collection points. • Scheduling the timings of

collection. • Provision of adequate

equipment & vehicles.

• Provision of 3 auto tippers, 8

try cycles for primary collection.

Lack of skilled

man power

Strengthen the

existing system

• Structuring of man power

requirements and assignmentof responsibilities.

• Conducting capacity building &

Training programmes.

Absence of

segregation ofwaste at the

source

Encourage

“Scientific methods” for

segregation

• “Recycling and Reuse”

methods has to put intopractice.

• Development of sanitary land fill

site. • Equipment and infrastructure as

per MSW guidelines 2000.

Priority Actions • Provision of infrastructure & man power required for efficient solid waste management

• Provision of slaughter house

• Development of solid waste land fill site • Construction of Vermi-composting yard • Campaign for segregation of solid waste at source

Page 59: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 46 of 92

City Development Plan for Bhedaghat Town

5.5 Drainage System

5.5.1 Existing Drainage System

The storm water drainage system in the town comprises of only tertiary drains. Due to the limitations in

the availability of data, the analysis is confined to the macro level. The storm water drains need to be

strengthened by separating the sanitation, sewerage and drainage aspects, which are currently

intermixed. Bhedaghat needs to develop with an adequate storm water drainage network in a scientific

manner, taking into consideration key parameters of precipitation intensity, catchment delineation,

percolation characteristics and surface run-off.

Primary & Secondary Drains: There is lack of primary and secondary drains in the town.

Map 5.3 shows Drainage network map.

5.5.2 Tertiary Drains

The tertiary drains are constructed on the roadside, built as open type or closed drains and some of them

are of unlined kutcha type. The total length of tertiary drains as per available data is 2.5 km. out of this,

pucca drains length is 1.5 km and remaining 1 km length is kutcha in nature. The total drain length

accounts to 10.5 per cent of total road length. Table 5.19 indicates the details of the type of storm water

drains in the town. The road –drain ratio works out to 1:0.10. In the other words, for every 1000 m road

length, 10 m drain length is available.

Table 5.19: Details indicating the Existing drainage connections

Drain Type Length (km)

1. Open Drains – Pucca 1.5

2. Open Drains – Kutcha 1

3. Closed Drains -

Total 2.5

4. % to Total Road Length 10.5 per cent

5. Road – Drains Ratio 1: 0.10

Source: Census 2001

5.5.3 Flood-prone Areas or Environmentally Sensitive Areas

Environmentally sensitive areas in urban areas require prior attention as they are prone to pollution due

to the increasing demand for land for various development needs, issues related to generation of

biodegradable and non-biodegradable wastes, sewage, etc. Thus, environmentally sensitive areas needs

protection from the likely ill-effects caused due to human interventions. These areas can also lead to

potential health hazards, if not properly protected. A buffer zone (conservation) of 100 meters requires to

be maintained, on either side of Narmda River passing through the Nagar Parishad and its influence area,

as no development Zone

Map 5.4: Environmentally Sensitive Areas

Page 60: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 47 of 92

City Development Plan for Bhedaghat Town

5.5.4 Present and Future Demand and Supply Gaps

Table 5.20 : Demand and Supply Gaps for SWD System

Sl. No.

Components Length

in km/ Nos.

1 Existing Municipal road length 24.668

2 Additional road length required 1.92

3 Contemplated road length 27

4 Existing pucca drain length 1.5

5 Rehabilitation of existing pucca drain length 0.75

6 Provision of pucca drains in un-served areas (current gap) 23.1

7 Provision of pucca drains in future expansion areas 2

8 Number of lakes requiring development NIL

Source: Analysis

5.5.5 SWOT Analysis

Strengths

• Considerable Size of water body

Weaknesses

• Inadequate coverage area of drainage system

Opportunities

• Development of recreational

spots in abutting areas of water

bodies

Threats

• Pollution in and around Water Body

• Stagnation of waste water in core areas in the

town

5.5.6 City specific Strategies and Action Plan

Issue Goal Strategies Action Plans/ Proposals

Lack of road side pucca

drains

• Provision of road side

drains

• Rehabilitation of existing drains system

and extension to un

served areas. • Provision of road side

drains in future extension areas.

• Rehabilitation of road side pucca drains: 0.75 km.

• Extension of drainage network

in un-served areas. • Provision of road side drains in

future expansion areas.

Provision of drains along

lanes in city core areas

• To create sufficient

space for laying of the

drainage

system

• Removing and avoiding

encroachments.

• Lying of new roads after completing the drainage

network.

Priority Actions

• Strengthening of existing drainages

• Improvement of drainages in outer areas

• Implementation of Rain Water Harvesting

Page 61: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 48 of 92

City Development Plan for Bhedaghat Town

5.6 Traffic & Transport

5.6.1 Existing Traffic & Transportation Scenario

Transport infrastructure plays a very significant role in the growth and development of any Town. It is

also responsible for the spatial growth of the town thereby increasing the accessibility of peripheral areas

of the town. The objective of studying the transport sector is to analyze the sustainability of the

prevailing transportation system and to further identify its strengths and weaknesses.

Parking is a major concern in Bhedaghat town, particularly at the major tourist attractions of the town.

Intensive commercialization has led to an increase in parking demand along the major roads, especially in

market areas. There is no designated on-street and off-street parking facilities in the core area of the

town as a result of which vehicle users are forced to park their vehicles on the streets. However at the

tourist locations, even though are facilitated by well-defined parking facilities which are managed by

Nagar Parishad, the same are not able to meet the prevailing parking demand.

The details of roads are given in Table

Table 5.21: Road Surface Details

S.No Surface Type

Length

(km)

% to

Total Length

Condition of Road (in km)

Good Fair Bad

A. Municipal Roads

1 Concrete 4.7 19 2.0 2.7 -

2 Tarred/ Black Topped/

Bituminous Topped 6.0 24 - 6.0 -

3 Water Bound Macadam 5.6 23 - 5.6 -

4 Earthen 8.3 34 8.3

Total 24.6 100 2.0 14.3 8.3

Source: Nagar Parishad, Bhedaghat

Map 5.5: Map shows the road network in Bhedaghat

5.6.2 Travel Characteristics

The mobility needs of the town are largely catered by mini buses and standard buses including the IPT

mode such as auto rickshaws & jeeps. The use of personal vehicles i.e. Cars and two wheelers are also

predominantly observed. The town is lacking basic street furniture such as footpaths, street lights, traffic

signs, road markings etc. Absence of foot paths in the town is forcing pedestrians to use the carriageway

thereby hampering the traffic flow. The local commuting is predominantly by walk mode. The junctions

are not regulated by traffic signals and lack of traffic safety. Traffic safety measures are observed to be

non- existence which could be of significant use to guide the traffic and pedestrian movement.

Rail & Air connectivity

Bhedaghat town is well connected by rail and air connectivity with the nearest airport located in Jabalpur,

which is at a distance of 25 km from the town.

Page 62: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 49 of 92

City Development Plan for Bhedaghat Town

Road Network

Most of the roads in the town are of single lane configuration and few are having undivided two lane

configurations. The town is lacking organized road network and hierarchy which is evident in dense areas

of the town. The narrow lanes are leading to bottlenecks for the regular traffic movement and are also

inaccessible for emergency services such as ambulances and fire services.

5.6.3 Intermediate Public Transport System

The local commuting needs of the town are catered largely by IPT mode consisting of autorickshaws,

cars & jeep. Lack of adequate parking facilities has resulted in vehicles being parked along either sides of

the major roads of the town. The unregulated traffic movement and irregular parking of vehicles is

aggravating the problem of congestion and lack of pedestrian safety.

5.6.4 Parking Review

There is one organized off street parking facilities nearby Dhundhara water falls. Whereas on street

parking nearby booting and sawarathi ghat is not regulated. Bus bays, bus shelters are non- existence in

the town. The absence of organized parking is leading to congestion at all junctions, particularly at Rose

garden Junction.

5.6.5 SWOT Analysis

Strengths • Arterial road network is organized

• Major roads are BT roads and local

roads are of CC roads

Weaknesses • Organic form and congestion due to

encroachments in old town areas

• Laying of CC roads without laying utility service networks

• Absence of footpaths and medians • Lack of parking facilities

Opportunities

• Developing bypass road & truck terminals

• Availability of land for developing

bypass roads

Threats

• Lack of access to emergency facilities in residential areas

5.6.6 Service Adequacy and Key Issues

• The regional traffic passing through the town has put the pedestrian safety at stake. The interior

roads cut the State Highways at many points indicative of conflicting points.

• The roads widths are narrow in old areas which create problems to emergency services such as

ambulance and fire services.

• Foot paths are completely absent in all parts of the town. The pedestrian movement is displaced

hindering the traffic movement.

Page 63: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 50 of 92

City Development Plan for Bhedaghat Town

• The main roads carrying heavy traffic are interconnected by narrow streets; this sometimes leads

to choking of traffic flow. These streets are also used as shortcuts leading to loss of quietude in residential areas.

• Lack of organized parking for IPT modes.

5.6.7 City specific Strategies and Action Plan

Traffic & Transportation

Issue Goal Strategies Action Plans/

Proposals

A

Lack of Bus

Stand

• Provision of bus

stand with proper amenities &

adequate facilities

• Provide mini-bus stands

wherever is necessary

• Provision of mini-bus

stands

B

Non-uniform and narrow widths of

roads

6 To make uniform and regular width of the roads

• Removal of current encroachments and avoiding future

encroachments

• Widening of roads

Improvement of Existing roads: • Earthen roads to

WBM roads: 8.331

km • WBM Roads to CC

Roads: 5.617 km Resurfacing of existing

roads: • CC Roads: 1.7 km

• BT Roads: 0.5 km

C

Lack of public parking

spaces

• Provision of “On street and Off

street” parking space in

appropriate locations

• Provision of parking spaces for Rickshaws &

Autos • Provision of parking

spaces in commercial,

public & semipublic places

• Provision of parking

facilities near Market area.

D

Improper Road Junctions

• Improving junctions for safety and smooth flow of traffic and

pedestrians

• Provision of traffic signaling systems

• Provision of medians

• Traffic signals at all the junctions.

E

Lack of Foot

Paths

• Improvement of foot paths

• Provision of foot paths

along the main roads & commercial areas

Main Road Requires

Footpath

Priority

Actions

• Provision of foot paths along the main roads

• Provision of parking facilities near junctions & Markets

• Provision of medians along National Highway

• Provision of high mast lights at all Major junctions

• Provision of traffic signaling systems at all major junctions

Page 64: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 51 of 92

City Development Plan for Bhedaghat Town

5.7 Street lighting & fire fighting

5.7.1 Existing Situation of Street Lights

Almost all the streets in the town are covered with street lighting. The town is well developed with almost

85% of households having electricity connections. The remaining 15% of the households who are not

having connections are the squatter settlements. 10 to 12 hours of power cut a day.

Street lighting is an important component of Traffic safety and management. In Bhedaghat there are

about 416 street lights with different types of electrical fixtures.

Table 5.22 : Details of Street Lighting in Bhedaghat

Description Street Lights Percentage to Total

1. High Mast Lamps 4 0.96

2. Sodium Vapour Lamps 225 54.09

3. Tube Lights 187 44.95

Total 416 100.00

Source: Nagar Parishad, Bhedaghat

5.7.2 Fire Services

There is no fire station located in the town. Fire station is located at district headquarters Jabalpur.

5.7.3 Present and Future Demand and Supply Gaps

The present shortage is around 376 street lights. By the end of the horizon period, an addition of 726

street lights is to be provided.

5.7.4 SWOT Analysis

Strengths

• Bhedaghat town is nearer to

district headquarter

Weaknesses

• Lack of power supply, Manpower for fire

services.

Opportunities

• Land available for fire and fighting

services.

Threats

• High density development in core area

5.7.5 City specific Strategies and Action Plan

Issue Goal Strategies Action Plans/ Proposals

Inadequate

Street Lights

• 100 %

coverage of

streets

lighting in the

town

• Provision of street

lights in un-served areas.

• Assessment of

street lights in future

development areas.

• Provision of high

mast poles.

Current gap:

• Provision of sodium vapour: 376 Nos.

Additional street lights:

• Replacement of tube light to sodium vapour

lamp: 187 Nos. • Street lighting for Additional Road length:

726

Page 65: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 52 of 92

City Development Plan for Bhedaghat Town

5.8 Urban Poor and Their Accessibility to Basic Services

5.8.1 Introduction

The urban poor and slums are by-product of economic development and urbanisation process. As per

2001 population census, 285.35 million people reside in urban areas. It constitutes 27.8 per cent of the

total population of the country. In post-independence era while population of India has grown three

times, the urban population has grown five times. The rising urban population has also given rise to

increase in the number of urban poor. It is indispensable to analyse status of poverty for any Town

development exercise. Besides it becomes more important in the state like Madhya Pradesh where level

of poverty is relatively higher.

This section deals with the access of urban poor in Bhedaghat to basic services, drawing from secondary

information as well as site visits to slums in the town, and interaction with local residents. The aim is to

identify key issues in service delivery to the poor in Bhedaghat and suggest strategies that would enable

the Nagar Parishad, Bhedaghat to address issues and fulfill its mandate of providing basic services to the

poor in the town.

5.8.2 Poverty in the Town

The total slum ward population of Bhedaghat town is

2,244 which are 33.6 % of the population of total

town. The social composition of the majority of the

slums comprises of SC, ST and other backward

castes. The average household size in the slums is

5.5 and average household income is around 1500

per month.

As per IHSDP report the slums are located in ward 3,4,6,7 and 8. The ward wise slum population is

shown in the following table.

5.8.3 Information pertaining to BPL Population and Slum Population

There are mainly two different types of houses in Bhedaghat – characterized by type of their housing

condition. Predominantly, tiled roof houses are observed in entire city and wood and bamboo materials

used for housing in slums.

Map 5.6 shows Location of Slums

Table 5.23 : Ward Wise Slum Details

Slum Wards Slum Names Ward

Population

Slum

Population

Ward 3 Mahatman Ghandi Ward 655 590

Ward 4 Deendhayal Ward 750 675

Ward 6 Ram Manohar Lohiya Ward 318 286

Ward 7 Sardhar Ballabha Bhayi Ward 436 392

Ward 8 Maharana Prathap Ward 334 300

Total 2493 2243

Page 66: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 53 of 92

City Development Plan for Bhedaghat Town

Source: Nagar Parishad, Bhedaghat

5.8.4 Present and Future Housing Demand

The information on housing scenario in slums is not available.

However, it was indicated that about 40 per cent of the slum

dwellers live in temporary shelters and during the

reconnaissance visits, it was observed that most of the houses

are constructed using brick, wood and bamboo materials.

Table 5.24: Slum Matrix with reference to Infrastructure covered

Slum Name

Wa

rd N

o.

La

nd

Te

nu

re

Wa

ter

Su

pp

ly

(Pip

ed

)

Sa

nit

ati

o

n (

Se

we

r

Lin

e)

SW

M

Str

om

Wa

ter

Dra

ins

Str

ee

t

Lig

hts

Ro

ad

s

Ed

uca

tio

n

He

alt

h

So

cia

l

Se

cu

rity

Mahatman Ghandi Ward 3 Pvt

Deendhayal Ward 4 Pvt

Ram Manohar Lohiya Ward

6 Pvt

Sardhar Ballabha Bhayi

Ward 7 Pvt

Maharana Prathap Ward 8 Pvt

Covered

Partially Covered

5.8.5 SWOT Analysis

Strength

• Availability of land for relocating the slums

Weakness

• Inadequate physical and social infrastructure facilities

• Poor condition of housing status

• Lack of awareness programmes for poverty reduction schemes

Opportunities

• Motivate private sector to participate in slum up-gradation projects

Threats

• Environmental degradation due to lack of access to improved sanitation

5.8.6 Issues

Following are the issues based on the analysis done through secondary sources as well as observations

and discussions with ULB engineers, community based organizations and slum dwellers. Major issues in

brief are given below:

• Inadequate infrastructural facilities like water supply, sewerage and roads, etc.

• Concentrating the larger slums in same location

• Lack of comprehensive urban poverty reduction strategy

Page 67: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 54 of 92

City Development Plan for Bhedaghat Town

• In absence of proper strategy and policies to create affordable housing stock for the urban poor in

the town

• Un-regulated physical development.

5.8.7 City specific Strategies and Action Plans

Urban Poor & Slums

Issue Goal Strategies Action Plans/ Proposals

Lack of access to

basic services

• Universalization of

basic services

• Awareness of the slum

development schemes and programs

• Equitable access to basic

services with minimum standards, within the

affordability limit and willingness to pay

• Livelihood Promotion and Community Development

• Implementation of slum

up-gradation programmes

• Relocate the existing

slums • Provide affordable

housing stock

• Providing adequate social and physical

infrastructure facilities

5.9 Social infrastructure

5.9.1 Educational Facilities

The availability of skilled manpower for diversification of economic base in a town depends on the

provision of quality education. There are 4 primary schools in the town. In addition to the primary

schools, there are 2 other schools that are catering to the needs of secondary education. Students from

surrounding villages are dependent on Bhedaghat town for education purpose. The details of the existing

educational institutions are provided in Table.

Table 5.25: Details of the Educational Institutions in Bhedaghat

Type Norm (UDPFI) Existing Cumulative Demand

2011 2015 2025 2035

Population 6,657 6,657 7,154 8,771 11,138

Primary No. 1/2500 population 4 4 4 5 6

Area 0.4 ha NA 1.6 1.6 2 2.4

Secondary/ High School

No. 1/7500 population 2 2 2 2 2

Area 1.6 ha NA 3.2 3.2 3.2 3.2

Senior Secondary

School

No. 1/7500 population 0 2 2 2 2

Area 1.6 ha NA 3.2 3.2 3.2 3.2

School for Physically

Challenged

No. 1/45000 population 0 0 0 0 0

Area 1.0 ha 0 0 0 0 0

College No. 1/125000 population 0 0 0 0 1

Area 4.0 ha NA 0 0 0 4.0

Poly Technic No. 1/ 1000,000 0 0 0 0 1

Page 68: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 55 of 92

City Development Plan for Bhedaghat Town

Type Norm (UDPFI) Existing Cumulative Demand

2011 2015 2025 2035

Area 2.4 ha 0 0 0 0 2.4

Engineering

College

No. 1/ 1000,000 0 0 0 0 0

Area 4.0 ha 0 0 0 0 0

Source: Town Directory, Census of India, 2001

The nearest engineering, and medical institutions are available at Jabalpur, which is at a distance of 25

km from the town.

A total of 4 primary schools, 2 secondary are required by the end of horizon period. Considering the

dependency of the surrounding rural areas, possibility of developing a Polytechnic college is factored into

the educational requirements of the town, though the population size of Bhedaghat is less.

5.9.2 Health Facilities

The town has one Dispensary with no beds, with an average of 2 persons visiting per day. The details of

the medical facilities available in Bhedaghat town are provided in Table. To avail specialized services,

people resort to travelling to Jabalpur.

Table 5.26 : Details of Medical Facilities in Bhedaghat

Medical Facilities Nos. No. of Beds

1. Hospitals 0 0

2. Health Centers 0 0

3. Dispensary 1 0

Source: Bhedaghat

The available data is compared with UDPFI guidelines to assess the adequacy of medical facilities. The

details of future demand for the medical facilities are provided in Table.

Table 5.27: Details of Future Demand for the Medical Facilities

Sl. No.

Type Norm (UDPFI)

Existing Cumulative Demand

2011 2015 2025 2035

1. Projected Population 6,657 6,657 7,154 8,771 11,138

2. Hospital No. 1 for 100000 persons (100

beds)

0 1 1 1 1

Area 3.7 ha per unit NA 3.7 3.7 3.7 3.7

3. Maternity

Centres

No. 1 for 0.45 lakh

to 1 lakh

0 1 2 2 2

Area 0.2 ha per unit NA 0.2 0.4 0.4 0.4

4. Community

Health Centres

No. 1 for 0.45 lakh

to 1 lakh

0 1 2 2 2

Area 0.2 ha per unit 0.2 0.4 0.4 0.4

Source: Town Directory, Census of India, 2001

Page 69: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 56 of 92

City Development Plan for Bhedaghat Town

5.9.3 Socio-Cultural Facilities

The town does not have any land earmarked for Socio-cultural. There are 2 parks located in ward 1 and

4, one play ground in ward 3 in the town.

Table 5.28: Details of Future Demand for Socio-Cultural Facilities

Type Norm (UDPFI) Existing

Cumulative Demand for

Projected Population

7,154 8,771 11,138

2011 2015 2025 2035

Community Hall No. 1/ 15000 population 0 1 2 3

Local Park No. 1/ 10000 population 2 2 3 4

Cremation Ground No. 2 sites for 5 lakhs (pop) 3 - 4 5

Police Station No. 1 for 90000 (pop) 1 - - -

5.9.4 Recreation/ Leisure/ Parks and Play Grounds

There are 2 parks located in ward 1 and 4, one play ground

in ward 3. It is observed that there is a deficiency in

recreational facilities in the town. There is a need to

develop and maintain further recreational facilities in the

town.

5.9.5 Markets

There is a weekly market in Bhedaghat town, which is located in ward 4, near municipal office in the

town. This market primarily caters the daily needs of the population of the town. The market functions

for 1 day in a week. About 150 people visit the market on a regular week day.

5.9.6 Crematoria & Burial Grounds

There are 3 burial grounds in the town, which are primarily serving the needs of Hindu and Muslim

religions. The burial grounds and crematoria are maintained properly. In quantity, these are sufficient to

cater to the present needs however; there is a need for allotting more space for future requirement.

Page 70: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 57 of 92

City Development Plan for Bhedaghat Town

5.9.7 City specific Strategies and Action Plans

Social Infrastructure

Issue Goal Strategies Action Plans/ Proposals

Inadequate

social infrastructure

• Development

of social infrastructure

to improve the

Quality of Life

• Development of higher

education facilities,

vocational training centers and job oriented training

facilities

• Improvement of specialized health services

• Provision of cultural &

recreational facilities

• Provision of additional burial

grounds • Provision of firefighting

facilities

• Provision of hotels facilities

for visitors (outsiders)

Provision of Educational facilities:

• Primary schools: 2

• Senior secondary schools: 2

• ITI college: 1

• Polytechnic college: 1 Provision of Heath facilities:

• Hospitals: Strengthening with

additional staff

• Maternity hospitals: 2

• Community health centers: 2

Provision of land for additional

burial grounds: 2 Provision of park : 1

Provision fire station: 1 Provision of hotels: 2

Priority Actions • Provision of town level Fire Station

• Provision of Improvement of Existing Parks

• Provision of Burial Grounds

• Provision of College

• Provision of Community Halls

Page 71: CDP Bhedaghat English

INSTITUTIONAL

FRAMEWORK

Page 72: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 58 of 92

City Development Plan for Bhedaghat Town

CHAPTER 6 INSTITUTIONAL FRAMEWORK

The Organizational Structure of the deliberative wing in Bhedaghat Nagar Parishad

Figure 6.1: Organization Structure of the deliberative wing in Bhedaghat Nagar Parishad

As shown in the above figure, President and Vice-President are the elected bodies, whereas the Nagar

Parishad is headed by Chief Municipal Officer.

Public sphere

in Bhopal

President/Chairperson

Ward Councilors

President in Council

Appeal Committee

Ward Committee

Advisory Committee

Departments under Nagar Parishad - Housing, Environment and Public works Department - Water Works Department - Health and Medical Department - Market Department - Education Department - Women and Child Welfare Department - Food and Civil Supplies Department - Rehabilitation and Employment Department - Revenue Department - Law and General Administration Department

Page 73: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 59 of 92

City Development Plan for Bhedaghat Town

The organizational Structure of the Executive wing in Bhedaghat Nagar Parishad

Figure 6.2: Organization Structure of the Executive wing in Bhedaghat Nagar Parishad

Departmental Heads

Chief Municipal Officer

- Public Works Department - Housing, Sanitation Department - Water Supply Department - Finance and Accounts Department - General Administration

Departments - Revenue & Tax Department - Public Relation and Library

Department - Fire Brigade & Workshop Department - Law Section and Legal Cell

Department - Planning and Development

Department - Garden and Parks Department

Zonal Officers

Technical Staff

Non Technical Staff

Ward Officers

Page 74: CDP Bhedaghat English

MUNICIPAL FINANCE

Page 75: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 60 of 92

City Development Plan for Bhedaghat Town

CHAPTER 7 MUNICIPAL FINANCE

7. Present Scenario

The Nagar Parishad prepares budgets for the every year. For the purpose of the analysis, the Nagar

Parishad finances of Bhedaghat have been reviewed for the last five years, commencing from the

financial year 2007-08 and also the items of account have been categorized under the following major

heads:

7.1 Revenue and Capital Accounts:

All recurring items of income and expenditure

are included under revenue head. These include

taxes, charges, salaries, maintenance

expenditure, etc., and items under capital

accounts are non-recurring in nature and include

loans, contributions by GoMP, other agencies

and capital grants under various State and

Central Government programmes. Expenditure items include expenses booked under developmental

works.

7.1.1 Financial status:

Revenue income of Bhedaghat Nagar Parishad has grown to a level of Rs.162 lakhs in the financial year

2011-12 from Rs. 124.98 lakhs in financial year 2007-08, the revenue income had registered an average

annual growth of 9%, whereas the revenue expenditure increased at an average annual rate of 18%. It

can be clearly known that the growth rate in revenue income is less than growth rate in expenditure,

which leads to negative in revenue operating surplus. Since, lack of revenue operating surplus, the capital

account transactions are also considered for the purpose of the Analysis. The capital receipts includes the

grants, Educational improvement ke liye abhidan pension R.P.S etc.,

Page 76: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 61 of 92

City Development Plan for Bhedaghat Town

7.1.2 Composition of own revenue and expenditure:

The revenue expenditure is more than revenue income. Since, there is no revenue operating surplus.

Accordingly, the capital Income and expenses are also considered for the purpose of the analysis. The

graph shows the composition of own revenues and revenue expenditure of Nagar Parishad:

Page 77: CDP Bhedaghat English

CAPITAL INVESTMENT

PLAN (CIP) & FINANCIAL

OPERATING PLAN (FOP)

Page 78: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 62 of 92

City Development Plan for Bhedaghat Town

CHAPTER 8 CAPITAL INVESTMENT PLAN (CIP) & FINANCIAL OPERATING PLAN (FOP)

8.1 City Investment Plan - Introduction

The Capital Investment Plan is the multi-year scheduling of identified and prioritized investments. The

CIP is developed after the in-depth analysis of existing infrastructure, service delivery gaps and various

stakeholder workshops at town and state level. The strategies identified/structured for improvement of

existing service gaps and proposal for future requirement.

The proposed projects are identified under three components;

• Projects for system Augmentation,

• Projects for system Refurbishment and

• Other Development projects.

8.1.1 Water Supply System (WS)

The total investment requirement for the water supply sector is estimated at about Rs. 215.55 Lakh. The

investment requirement is estimated for various components of water supply system, including Storage

facility, pipeline for clear water transmission, internal distribution network and installation of water

meters. The investment requirement for leak detection and rectification in the transmission mains and

internal distribution system is also estimated.

A summary of projects and corresponding capital investment requirement for augmentation and

refurbishment of the water supply system is presented in Table

Table 8.1: Investment Requirements for Water Supply Sector

Water Supply (WS)

Gap/

Demand Unit

Unit Cost

(lakhs)

Total Amount

(lakhs)

Phase

1

Phase

2

Phase

3

2012-2015

2015-2025

2025-2035

A. System Refurbishment

Existing improvement of

pipeline network 4 km 5.5 22.00 22.00 - -

laying of network system in

un-served Areas 6 km 5.5 33.00 33.00 - -

Sub Total (A) 55.00 55.00 0.00 0.00

B. System Augmentation

Pipeline system for

future/additional road

length 13 km 5.5 69.30 - 34.65 34.65

Additional storage capacity 0.45 ML 60 27.00 13.50 13.50 -

Page 79: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 63 of 92

City Development Plan for Bhedaghat Town

Water Supply (WS)

Gap/ Demand

Unit

Unit

Cost (lakhs)

Total

Amount (lakhs)

Phase 1

Phase 2

Phase 3

2012-

2015

2015-

2025

2025-

2035

Treatment Plant Capacity 1.50 MLD 11 16.50 16.50 - -

Centrifugal pumps capacity

required 75 hp 0.17 12.75 12.75 - -

Sub Total (B) 125.55 42.75 48.15 34.65

Intake Pipeline length 1 km 5.5 5.50 5.50 - -

Sub Total (B) 188.57 64.47 69.10 55.00

C. Others

Capacity Building

Programmes for ULB Staff LS 5.00 5.00 - -

DPR Preparation including

topographic survey LS 30.00 30.00 - -

Sub Total (c) 35.00 35.00 0.00 0.00

Grand Total (A+B+C) 215.55 132.75 48.15 34.65

8.1.2 Sewerage

Proposed projects in sewerage sector were identified based on the future demand. In this sector

proposals are to prepare “Root-Zone treatment system” instead of Underground drainage system. Total

proposed investment is Rs. 53.40 lakh, which also includes conducting capacity building programmes at

town level.

A summary of projects and corresponding capital investment requirement for augmentation and

refurbishment of the sewerage system is presented in Table

Table 8.2: Investment Requirements for Sewerage Sector

Sewerage Gap/

Demand Unit

Unit

Cost

(lakhs)

Total

Amount

(lakhs)

Phase 1 Phase 2 Phase 3

2012-

2015

2015-

2025

2025-

2035

A. System Refurbishment

Sewerage network plan- Root

zone system LS 2.00 2.00 - -

Sub Total (A) 2.00 2.00 0.00 0.00

B. System Augmentation

Provision of DEWATS (Baffled

treatment system) 2320 No's 0.02 46.40 11.60 23.20 11.60

Sub Total (B) 46.40 11.60 23.20 11.60

C. Others

Capacity Building Programmes

for ULB Staff LS 5.00 5.00 - -

Sub Total (c) 5.00 5.00 0.00 0.00

Grand Total (A+B+C) 53.40 18.60 23.20 11.60

Page 80: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 64 of 92

City Development Plan for Bhedaghat Town

8.1.3 Storm Water Drains (SWD)

The proposed investment for storm water drainage sector includes upgradation and remodeling of kutcha

to pucca drains, open drains to closed drains and formation new drains in uncovered areas in the city.

The total investment proposed in this sector is Rs. 225.5 lakh and the summary of projects and

corresponding capital investment requirement for augmentation and refurbishment of the storm water

drainage system is presented in Table

Table 8.3: Investment Requirements for Storm Water Drains Sector

Storm Water Drains (SWD)

Gap/ Demand

Unit

Unit

Cost

(lakhs)

Total

Amount

(lakhs)

Phase

1

Phase

2

Phase

3

2012-

2015

2015-

2025

2025-

2035

A. Rehabilitation

Rehabilitation of existing road side drains 0.75 Km 2 1.50 1.50 - -

Provision of road side drains in un-served areas 23 Km 5.5 126.50 126.50 - -

Sub Total (A) 128.00 128.00 0.00 0.00

B. Refurbishment

Pucca drains in future

expansion areas (in km) 15 Km 5.5 82.50 20.63 41.25 20.63

Improvement of Lakes 1 No's 5 5.00 - 5.00 -

Provision of Rainwater

harvesting system LS 10.00 10.00 - -

Sub Total (B) 97.5 30.63 46.25 20.63

Grand Total (A+B) 225.5 158.63 46.25 20.63

8.1.4 Solid Waste Management (SWM)

Proposed projects identified in Solid water Management component consist of procurement of additional

primary collection vehicles, secondary collection vehicles, and transportation vehicles like Dual loaded

dumped placers. For scientific disposal of waste generated in city, development of Landfill sites for non-

recyclable solid waste disposal and Compost site development for recyclable wastes. Total capital

investment proposed in this component is Rs. 90.05 lakh, and the summary of projects and

corresponding capital investment requirement for augmentation and refurbishment of the solid waste

management system is presented in Table

Table 8.4: Investment Requirements for Solid Waste Management Sector

Solid Waste Management

(SWM)

Gap/

Demand Unit

Unit Cost

(lakhs)

Total Amount

(lakhs)

Phase 1

Phase 2

Phase 3

2012-2015

2015-2025

2025-2035

A. Household Level

Auto tippers (1 for 900-1000

HH) 3 HH 2.4 7.20 1.80 3.60 1.80

Page 81: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 65 of 92

City Development Plan for Bhedaghat Town

Solid Waste Management (SWM)

Gap/ Demand

Unit

Unit

Cost (lakhs)

Total

Amount (lakhs)

Phase 1

Phase 2

Phase 3

2012-

2015

2015-

2025

2025-

2035

Try Cycles (1 for 300-400 HH) 8 HH 0.08 0.64 0.16 0.32 0.16

Community Bins (1 for 50-60

HH) 65 HH 0.01 0.65 0.65 - -

Sub Total (A) 8.49 2.61 3.92 1.96

B. Commercial Area

Litter Bins (1 for 200m) 10 m 0.01 0.10 0.1 - -

Sub Total (B) 0.10 0.10 0.00 0.00

C. Street Sweeping & Drain desilting

push carts (1 for 2km) 15 km 0.065 0.98 0.24 0.49 0.24

Sub Total (c) 0.98 0.24 0.49 0.24

D. Secondary Collection

Metal Container (1 for 2000 HH) 2 HH 0.25 0.49 0.49 - -

Dumper Placer vehicles 2 10 20.00 10.00 10.00 -

Sub Total (D) 20.49 10.49 10.00 0.00

E. Disposal site

Improvements at site

(fencing/storage/segregation) LS 50.00 50.00 - -

Construction of Sanitary landfill site LS 5.00 5.00 - -

Sub Total (E) 55.00 55.00 0.00 0.00

F. IEC Activities LS 5.00 5.00 - -

Sub Total (F) 5.00 5.00 0.00 0.00

Grand Total

(A+B+C+D+E+F) 90.05 73.44 14.41 2.20

8.1.5 Sanitation

Proposed projects in Sanitation sector were identified based on the future demand. In sanitation sector it

is proposed to construct 4 nos of public toilets across various locations in the city. Total proposed

investment is Rs. 61.00 lakh, which also includes conducting capacity building programmes at town level

and construction of Low Cost Sanitation Units.

A summary of projects and corresponding capital investment requirement for augmentation and

refurbishment of the Sanitation system is presented in Table

Table 8.5 : Investment Requirements for Sanitation Sector

Sanitation Gap/

Demand Unit

Unit

Cost

(lakhs)

Total

Amount

(lakhs)

Phase 1 Phase 2 Phase 3

2012-

2015

2015-

2025

2025-

2035

A. System Refurbishment

Improvement of Existing

Public Toilets 4 No's 3 12.00 12.00 - -

Page 82: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 66 of 92

City Development Plan for Bhedaghat Town

Sanitation Gap/

Demand Unit

Unit

Cost

(lakhs)

Total

Amount

(lakhs)

Phase 1 Phase 2 Phase 3

2012-

2015

2015-

2025

2025-

2035

Sub Total (A) 12.00 12.00 0.00 0.00

B. System Augmentation

Construction of New Toilets 4 No's 6.5 26.00 26.00 - -

Construction of low cost

sanitation units 450 No's 0.04 18.00 18.00 - -

Sub Total (B) 44.00 44.00

C. Others

Capacity Building

Programmes for ULB Staff LS 5.00 5.00 - -

Sub Total (c) 5.00 5.00 0.00 0.00

Grand Total (A+B+C) 61.00 61.00

8.1.6 Traffic & Transportation (T&T)

The proposed investments in road improvement works consist of strengthening /improvement to existing

roads, upgradation of roads, widening of sub arterial roads in the city and new formation of roads in

extension areas to maintain a better circulation pattern. The investment proposed in road improvement

works is Rs. 1486.35 Lakh. A summary of projects and corresponding capital investment requirement for

augmentation and refurbishment of the Traffic & Transportation is presented in Table

Table 8.6 : Investment Requirements for Traffic & Transportation

Traffic & Transportation (TT)

Gap/ Demand

Unit Unit Cost

(lakhs)

Total Amount

(lakhs)

Phase

1

Phase

2

Phase

3

2012-2015

2015-2025

2025-2035

A. Existing Improvement

CC roads 1.7 km 2.5 4.25 - 4.25 -

WBM roads 0.5 km 20 10.00 10 - -

Sub Total (A) 14.25 10 4.25 0

B. Up gradation of existing

roads

WBM to CC roads 5.6 km 10 56.00 - 56 -

Kucha to WBM roads 8.3 km 22 182.60 182.6 - -

Sub Total (B) 238.6 182.6 56 0

C. Widening of Roads

Arterial road 0.5 km 25 12.50 12.5 0.00 0.00

Sub-Arterial roads 4 km 25 100.00 - - 100

Sub Total (C ) 112.5 12.5 0 100

D. Laying of New roads

laying of roads in future

development areas 15 km 75 1125.00 - 562.5 562.5

Page 83: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 67 of 92

City Development Plan for Bhedaghat Town

Traffic & Transportation (TT)

Gap/ Demand

Unit

Unit

Cost (lakhs)

Total

Amount (lakhs)

Phase 1

Phase 2

Phase 3

2012-

2015

2015-

2025

2025-

2035

Sub Total (D) 1125 0 562.5 562.5

E. Parking Facilities

Near Municipal Office 1 LS 0.5 0.5 - -

Near 3 Tourist/water falls

areas 1 LS 0.5 0.5 - -

1 LS 0.5 0.5 - -

1 LS 2 - 2

Sub Total (E) 3.5 1.5 2 0

F. Bus Shelters

Near Nagar

Parishad/Dhuandhar falls 1 No's 2.5 2.50 2.5 - -

Near lahmetaghat 1 No's 2.5 2.50 - 2.5 -

Sub Total (F) 5 2.5 2.5 0

G. Foot Paths (km)

Along Main Arterial Road 3 Km 7.5 22.50 22.5 0.00 0.00

Sub Total (H) 22.5 22.5 0 0

Grand Total 1521.35 231.6 627.25 662.5

PWD Investment 35 35 0 0

ULB Investment 1486.35 196.6 627.25 662.5

8.1.7 Electricity and Street Lighting

The proposed projects in street lighting include replacement repaired and old tube fixtures and

installation of new fixtures as per standards. To curtail the energy consumption in street lighting sector

power saving switches (CFL) has been proposed. Total investment in street lighting is Rs. 316.05 lakh.

Table 8.7: Investment Requirements for Street Lighting

Street Lighting (SL) Gap/

Demand Unit

Unit Cost

(lakhs)

Total Amount

(lakhs)

Phase

1

Phase

2

Phase

3

2012-2015

2015-2025

2025-2035

Provision of Sodium Vapour/CFL 505 No's 0.15 75.75 75.75 - -

Replacement of bulbs to CFL 345 No's 0.1 34.50 17.25 17.25 -

Street Lighting for additional

road length 1332 No's 0.15 199.80 39.96 39.96 119.88

Provision of high mast lamps 2 No's 3 6.00 6 - -

Grand Total 316.05 138.96 57.21 119.88

8.1.8 Urban Poor

To improve the basic infrastructure facilities inside the slum area and for redevelopment, rehabilitation of

slums following projects have been identified with a total investment of Rs. 415 lakh

Page 84: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 68 of 92

City Development Plan for Bhedaghat Town

Table 8.8: Investment Requirements for Urban Poor

Urban Poor (UP) Gap/

Demand Unit

Unit

Cost

(lakhs)

Total

Amount

(lakhs)

Phase

1

Phase

2

Phase

3

2012-

2015

2015-

2025

2025-

2035

A. Slum Upgradation

Construction of houses 250 No's 1.5 375.00 75 112.5 187.5

Health & Education Programmes LS 15 15 - -

Sub Total (A) 390 90 112.5 187.5

B. Livelihood Promotion

Provision of training

centers/meeting halls etc. LS 15 15 - -

Sub Total (B) 15 15 0 0

C. Social Security

Security of tenure for urban poor LS 10 10 - -

Sub Total ( C ) 10 10 0 0

Grand Total 415 115 112.5 187.5

8.1.9 Environmentally Sensitive Areas

To improve the living environment in the Town, list of projects have been proposed which include

afforestration. Total investment proposed for urban environmental improvement is Rs.10 lakhs.

Table 8.9: Investment Requirements for Environmentally Sensitive Areas

Description

Unit Cost (Lakhs)

Unit Cost (lakhs)

Amount (Lakhs)

Afforestration – in Lake/Pond Catchments Areas 1 10 10

Total 10

8.1.10 Urban Governance

For efficient management of the increasing administrative responsibilities and the welfare activities it is

proposed for e governance, restructuring of Municipal Council (institutional strengthening) organization

setup to take up new responsibility, double entry accounting system, town planning and municipal

information system (MIS), property Mapping – GIS for efficient collection performance. Besides this

capacity building and periodic training also proposed with a total investment of Rs. 10.00 lakh.

8.1.11 Social Infrastructure

Total investment proposed under this head is Rs. 155.00 lakh, which include development of community

halls, renewal of existing commercial establishments, construction of slaughter houses, electric

crematorium, construction of vegetable markets and facilities like social security and emergency services

etc. The detailed cost estimates are presented in Table

Page 85: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 69 of 92

City Development Plan for Bhedaghat Town

Table 8.10 : Investment Requirements for Social Infrastructure Facilities

Social Infrastructure (SI)

Gap/ Demand

Unit

Unit

Cost

(lakhs)

Total

Amount

(lakhs)

Phase 1 Phase 2 Phase 3

2012-

2015

2015-

2025

2025-

2035

Fire & Emergency Services LS 75 - 56.25 18.75

Parks & Playgrounds LS 25 25 - -

Community Halls LS 15 - 15 -

Crematorium Facilities LS 10 10 - -

Market/Slaughter

house/Mela Ground LS 15 15 - -

Social Security LS 15 15 - -

Grand Total 155 65 71.25 18.75

Summary of Sector wise Investments

The summary of proposed investment is presented in Table. Total investment proposed is Rs. 3037.90

lakh out of which Rs. 2622.90 lakh is proposed for urban infrastructure and governance and Rs. 415 lakh

is proposed for basic services to the urban poor and housing for urban poor.

Table 8.11 : Summary of Proposed Investments

Sector wise Summery of Investments

Total

Amount (lakhs)

Phase 1 Phase 2 Phase 3

2012-2015 2015-2025 2025-2035

Water Supply (WS) 215.55 132.75 48.15 34.65

Sewerage 53.40 18.60 23.20 11.60

Sanitation 61.00 61.00 0 0

Solid Waste Management (SWM) 90.05 73.44 14.41 2.20

Storm Water Drains (SWD) 225.50 158.63 46.25 20.63

Traffic & Transportation (TT) 1486.35 196.60 627.25 662.50

Street Lighting (SL) 316.05 138.96 57.21 119.88

Social Infrastructure (SI) 155.00 65.00 71.25 18.75

Environment 10.00 10.00 0 0

Urban Governance 10.00 10.00 0 0

Urban Poor (UP) 415.00 115.00 112.50 187.50

Grand Total 3037.9 979.98 1000.22 1057.71

Page 86: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 72 of 92

City Development Plan for Bhedaghat Town

Presently, there are 270 water connections, out of which, 263 are domestic and 7 are commercial, which

is 56.25% of the property tax assessments. Based on the population, the water connections are assessed

by dividing 5 people per house-hold. In this regard, based on the growth of the population, the

connections are increased to 1151 for the year 2035-36.

• Tax Demand per Assessment

The average monthly water tax demand per assessment in 2011-12 is Rs. 30 for domestic and Rs.120 for

commercial and is proposed/assumed to be revised to Rs. 90 Per month and Rs.150 per month for

domestic and commercial respectively beginning from 2012-13, at a conservative simple growth rate of

15 per cent per 3 years. The new water connection in 2011-12 is Rs.1000 and is proposed to be revised

to Rs.1200 and Rs.1500 from 2012-13 for domestic and commercial connections respectively, at a

conservative simple growth rate of 15 per cent per 3 years.

• Collection Efficiency

It is assumed that BNP would gradually increase its tax collection performance from 75 percent to 90

percent against arrears and current tax demand respectively.

Solid waste charge

• Number of Assessments

The ultimate number of assessments for solid waste charge is purely based on the property tax

assessments. It is assumed the total number of property tax assessments is the base for the collection of

revenue.

• Tax Demand per Assessment

It is assumed that the average monthly solid waste charge demand is Rs. 25 per house hold for domestic

Rs.35 for commercial and it is also assumed that the rate will be revised for every three years at a

conservative growth rate of 15 per cent per every three years.

• Collection Efficiency

It is assumed that BNP would gradually increase its tax collection performance from 65 percent to 90

percent against arrears and current tax demand respectively.

Other Taxes

Other relatively insignificant taxes like Road tax, improved technology tax, Market fees, tourists tax etc.,

are forecast to grow at a nominal rate of 10-15% per cent per annum. These rates are assumed on the

basis of CAGR and Average annual growth (trend) rate, whichever is lower.

Page 87: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 70 of 92

City Development Plan for Bhedaghat Town

8.2 FINANCIAL OPERATING PLAN (FOP) - Introduction:

The Financial Operating Plan (FOP) is a multi-year forecast of finances of the Nagar Parishad. The FOP

has been generated for a short term period (0 to 3 yrs) beginning 2012-13 to 2014-15, and also for the

long-term period till 2035-36. In the context of this assignment, the FOP is generated for the short term

and has been extended for the long-term (20 years) to essentially provide a snapshot of the impact of

identified investments on the municipal finances in the long run.

8.2.1 Objective and Methodology:

The objective of this plan is to assess the investment sustenance capacity of the Nagar Parishad with

respect to the project cost identified in the Capital Investment Plan (CIP) as part of the City Development

Plan (CDP). FOPs are essentially a financial forecast, worked out on the basis of the realistic assumptions

and the growth trends of various components of given Revenue and Capital Receipts and expenditure.

The investment sustenance of the Bhedaghat Nagar Parishad is assessed using a Financial Operating Plan

(FOP) model. The FOP is a multi-year forecast of finances for a term till 2034-35.This analysis is first

done without introducing the identified capital investments in order to arrive at the borrowing and

investment capacities. The second step is to introduce certain reforms and consider necessary measures,

which is expected to improve the financial capability of the Nagar Parishad. The third step is the

sustainability will be checked with the reforms and without reforms. In simple, FOP is worked out under

three scenarios, viz.

a) Base Case; i.e. “Do Nothing” Scenario

b) Introduce reforms with no capital Investments; and

c) Investment Sustenance.

Page 88: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 71 of 92

City Development Plan for Bhedaghat Town

8.2.2 Assumptions and Reforms

The Analysis is based on a whole range of assumptions related to income and expenditure. These

assumptions plays a vital role to ascertain the investment sustenance and would also provide a tool to

test certain specific policy decisions regarding revenue and expenditure drivers on the overall Parishad

fiscal situation. It explains the assumption adopted for the three FOP scenarios:

8.2.2.1 Assumptions for Forecasting Income and Expenditure:

Generally, the assumptions for forecasting Nagar Parishad income and expenditure for the three

scenarios are considered based on past trends (5-year average growth trend or 5-year compound annual

growth rate - CAGR, whichever is lower), subject to minimum and maximum annual growth rate ceilings.

8.2.2.2 Municipal Taxes:

The primary tax sources, viz. property tax, water tax/charge are forecasted based on assumptions on the

base (number of assessments) and basis (tax demand per assessment) and the collection efficiencies. In

addition to the above taxes, provision is also made for estimating income from solid waste, subject to

implementation of the proposed scheme.

Property Tax

• Number of Assessments

In case of property tax, the total number of property tax assessments in 2011-12 as per BNP (Bhedaghat

Nagar Parishad) records adopted as the base and the property tax assessments are 480. The number of

properties in BNP has increased from 480 to 1406 at a CAGR of 3.69 per cent during 2011-12 to 2035-36.

A nominal growth rate of 2.00 per cent (equivalent to forecast population growth rate of 2.73 per cent

during 2011-12 to 2035-36) is adopted for forecasting the number of property tax assessments.

• Tax Demand per Assessment

The annual property tax demand per assessment in 2011-12 is Rs 200/- for pucca houses and is assumed

to be revised by 25 per cent beginning from 2012-13, at a conservative growth rate of 15 percent for

each three years. The presumed rate for analysis for domestic houses is Rs.250 and commercial is Rs.350

Per annum.

• Collection Efficiency

It is assumed that BNP would consider 60% and 65% in 2012-13 and gradually increase its tax collection

performance to 90 per cent against arrears and current tax demand respectively.

Water Tax/Charges

• Number of Assessments

Page 89: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 73 of 92

City Development Plan for Bhedaghat Town

8.2.2.3 Non-Tax Sources

The non-tax sources of revenue income, viz. municipal own sources, compensation and assigned revenue

and revenue grants are forecast based on past trends. The establishment expenditure of BNP has grown

at a average CAGR of about 11 per cent during the last five years. The same growth rate 1-15% per

annum is assumed for forecasting establishment expenditure. The other expenditures are assumed based

on CAGR and average 5 year trend.

8.2.2.4 New O&M Cost

The capital investments envisaged as per the CIP are bound to impose additional establishment and O&M

expenditure on BNP. Such additional expenditure is estimated based on percentage of capital costs as

estimated by the consultants from their experience in other projects.

FINANCIAL OPERATING PLAN

Before moving to the various scenarios, it is necessary to discuss the details of the Capital Investment

Plan (CIP) and its application on the FOP. The next paragraphs detail on the same. For the purpose of

incorporating new investments, Let us discuss the below:

Phasing of new investments: The identified investments are phased into three; the first one, being

the short term is made for 3 years beginning 2012. The second phase is the mid-term and begins from

2016-2026, and the third one being the long term ends with 2035-36.This is based on the demand and

priorities. The following table gives the details of phasing of investments.

Amount Rs.(lakhs)

Sector wise Summery of Investments

Total Amount (lakhs)

Phase 1 Phase 2 Phase 3

2012-2015 2015-2025 2025-2035

Water Supply (WS) 215.55 132.75 48.15 34.65

Sewerage 53.40 18.60 23.20 11.60

Sanitation 61.00 61.00 0 0

Solid Waste Management (SWM) 90.05 73.44 14.41 2.20

Storm Water Drains (SWD) 225.50 158.63 46.25 20.63

Traffic & Transportation (TT) 1486.35 196.60 627.25 662.50

Street Lighting (SL) 316.05 138.96 57.21 119.88

Social Infrastructure (SI) 155.00 65.00 71.25 18.75

Environment 10.00 10.00 0 0

Urban Governance 10.00 10.00 0 0

Urban Poor (UP) 415.00 115.00 112.50 187.50

Grand Total 3037.9 979.98 1000.22 1057.71

The Grant from the central and state government is considered as 80:10 and the Nagar Parishad will get

its contribution as Loan from outside institutions.

Page 90: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 74 of 92

City Development Plan for Bhedaghat Town

O&M Costs: The details of O&M costs for each sector have been worked out and the same has been

incorporated in the analysis. The annual growth rate of O&M cost is 8% per annum. The details of O&M

calculation:

Rs. In Lakhs

Loan calculations: The Grant mix between central and State Government (GoMP) is taken at a ratio of

80:10, while ULB contribution stays at 10% is considered as Loan taking from outside organization. The

following loan terms have been assumed.

The Principal and interest repayments for the Loan taken is

a) SCENARIO 1: Base Case; i.e. “Do Nothing” Scenario :

The financial operating plan, under the first scenario which is a ‘Do Nothing’ situation (without

introduction of new investments). The details of same can be seen here:

Rs.in Lakhs

Sr.No Particulars Rs.

1 Loan amount (Rs.) 304.29

2 Interest (%) 7.00%

3 Repayment period 15 years

4 Moratorium period 3 Years

Page 91: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 75 of 92

City Development Plan for Bhedaghat Town

It is to be noted that the above FOP is done without introducing any new investments. Since, it has

been observed that the TE/TR ratio is slowly decreasing from 2012-13 and reached 1.07 in the year

2017-18 and having a negative closing Balance of Rs.(1.03) Crores. By the end of the year 2035-36,

the TE/TR ratio is 0.84 and having a Positive closing balance of Rs.12.75 crores. Here, the negative

cash flows are recovered by the year 2026-27.The Computations of the base case scenario has given in

annexure.

b) Scenario 2 Introduce reforms with no capital Investments;

We are introducing reforms that are likely, rather necessary for the ULB to execute, in order to improve

their financial position. Certain assumptions have been made on this account, which are based on the

prevailing trends in various other places. However, based on the assumptions that are already

discussed above, this FOP is prepared.

Rs.in Lakhs

It is to be noted that the above FOP is done without introducing any new investments, but by

introducing some reforms with assumptions. The TE/TR ratio is more than “1” upto 2018-19. By the

end of the plan, in the year 2035-36, the TE/TR ratio is 0.81 and having a closing balance of Rs.19.43

crores. Here, the negative cash flows are recovered by the year 2022-23.

Scenario 3: Investment Sustenance Plan:

This scenario is done to test the strength of ULB after incorporating the new investments on scenario 2.

The same set of assumptions and reforms considered in Scenario 2 is assumed and considered here for

the purpose of Investment sustenance plan. The extract of FOP for few years is given below:

Rs.In Lakhs

Page 92: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 76 of 92

City Development Plan for Bhedaghat Town

It is to be noted that the above FOP is done by introducing new investments. Since, it has been

observed that the TE/TR ratio is more than “1” till 2025-26. By the end of the year 2034-35, the TE/TR

ratio is 0.89 and having a closing balance of Rs.1.70 crores. By implementing Investment plan, We can

observe that the negative surplus in the initial years can only be reckoned at the end of the plan period

i.e.2035-36. The Computations of the Investment plan scenario has been given in the annexure

Recommendations: The recommendation suggested therefore, is that the Nagar Parishad shall first introduce certain

management reforms and also certain management measures (not included in FOP) to start with, try

outsourcing activities, which will enhance revenues. It is advised after implementing measures, and then

the Nagar Parishad is better to move to the Capital Investment plan. i.e implementing the measures gives

rather cash flows than capital investment.

Suggested Measures:

The following measures are suggested to be implemented by the management of Nagar Parishad, which

is helpful for the improvements in managing the municipal activities. A few are given below:

� Improvement to Property tax collections- Have tie-ups with nationalized banks and open ‘E-SEVA’ centers

(like in Andhra Pradesh at Vijayawada Municipal Corporation) for collection of property tax, so that

payments become easier and will improve collection efficiency.

� Do Campaigns within the community to explain the benefits of payment of taxes

� Address Government to expedite in resolving court cases, if any, the books of the municipality.

� We suggest to Impose penalties on unauthorized connections

� As a final step and a more technologically advanced step, it is suggested that the ULB goes in for GIS

mapping of the entire properties, which will help in bringing all properties into tax net. This needs to be

updated periodically. A separate cell in the Municipal Administration is to be maintained in this regard.

� Automatic revision of property tax rates and other taxes once in 3 years shall be made mandatory.

On the expenditure side minimal reforms are helpful to reduce manpower and operational expenditure

can be attempted such as:

� Introduce machinery for water supply like for pumping etc., and there by the Human resource cost for

the new investment can be reduced.

� Outsource of solid waste management activities involving primary and secondary collection; there are

possibilities where, even the vehicles purchases can be invested by the operator.

� Similarly, maintenance of street lights can be outsourced to ESCO (Energy Saving Companies

� Periodical maintenance of pumps, etc. can prevent huge O&M expenditure and this also can be

outsourced.

Page 93: CDP Bhedaghat English

URBAN REFORMS

Page 94: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 77 of 92

City Development Plan for Bhedaghat Town

CHAPTER 9: URBAN REFORMS

The Reforms under JnNURM aim at strengthening urban governments and to decentralize and devolve

functions, finances and functionaries to them so as to enable them to function as self-governing

institutions providing services efficiently and effectively. Broadly, the reforms aim to:

• Provide for an integrated governance framework with transparency and clear lines of

authority and accountability to achieve the objectives of ‘good urban governance’;

• Facilitate and promote inclusiveness, civic engagement and effective participation of the civil

society in city management;

• Contribute towards financial sustainability of cities - strengthen the financial base of the cities

and make them bankable;

• Enable the cities to work towards planned and integrated provision and operation and

maintenance of infrastructure;

• Develop partnerships with public, private and other sectors for better provision and delivery

of services;

• Extend the canvas of IT and e–Governance to all aspects of city management for efficient,

effective and timely service delivery; and

• Promote pro-poor urban governance and work towards slum free cities with universal,

adequate and affordable housing and basic services;

• Ensure renewal and revival of inner cities;

• Contribute to municipal capacity enhancement.

Implementation of Reforms Implementation of governance reforms is central to JnNURM. These reforms address issues of urban

governance and urban poverty in a sustainable manner. In what follows, an overview of mandatory and

optional reforms is presented.

S. No

Mandatory Reforms Reforms

Status at ULB Remarks Target

1

Adoption of the modern accrual-based double entry

system of accounting in ULBs and Parastatal agencies

Yet to be

Implemented

System was not implemented

due to lack of awareness, professional manpower and

software procurement/equipment. Keen

to adopt the system.

October,

2013

2

Introduction of a system of E-governance using IT

applications such as GIS & MIS etc.

Yet to be

Initiated

System was not implemented due to lack of funds, except few

stand-alone desktop machines

being used for accounting purpose. Keen to adopt the

system with additional funds availability.

March,

2014

3 Reform of Property Tax with GIS applications

Yet to be Initiated

GIS Mapping for utilities need to be done for effective collection.

July, 2013

Page 95: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 78 of 92

City Development Plan for Bhedaghat Town

4

Levy of reasonable User

Charges by ULBs with the objective that the full cost of

O&M is collected within the

next 5 years.

Partially

achieved, except water and

consolidated

taxes

Collecting water tariff from

household level and collection efficiency is about 60%. UGS

taxes are nil due to absence of system and street lighting tax is

minimal.

2016-17 (UGS

system

may not be

considered due to

proposal

of DEWATS)

5

Internal earmarking within local

body budget for basic services to urban poor.

Yet to be Considered

As of now, ULB is not able to spend any amount for urban

poor sector. Specific allocations have not been made in the budget for urban poor.

2014-2015

6

Provision of basic services to

Urban Poor including security of

tenure at affordable prices, improving housing and

infrastructure facilities

Partially

Initiated

ULB has issued few "Pattas" to

slum dwellers in the past years 2013-2014

Page 96: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 79 of 92

City Development Plan for Bhedaghat Town

S.No Optional Reforms Reforms

Status at ULB Remarks Target

1

Revision of bye-laws to

streamline the approval process for construction of

buildings, development of site

etc

Yet to be

Initiated

Possible with the directives of State level

stance.

These Reforms

are targeted for implementation

simultaneously with the

implementation of

Mandatory reforms

2 Conversion of land from

agriculture to non-agriculture

Yet to be

Initiated

Possible with the

directives of State level stance.

3 Introduction of property title

certification system in ULB

Yet to be

Initiated

Possible with the directives of State level

stance.

4

20-25% of land earmarking for EWS & LIG category with

a system of cross subsidization

Yet to be

Initiated

Possible with the directives of State level

stance.

5

Revision of byelaws to make

rainwater harvesting mandatory in all buildings

Yet to be

Initiated

Possible with the

directives of State level stance.

6 Bye-laws for re-use of recycled water

Yet to be Initiated

Possible with the

directives of State level stance.

7 Encouraging PPP models Yet to be

Initiated

Possible with the

directives of State level stance.

Page 97: CDP Bhedaghat English

SUMMARY OF WORKSHOP

PROCEEDINGS

Page 98: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 80 of 92

City Development Plan for Bhedaghat Town

CHAPTER 10: SUMMARY OF WORKSHOP PROCEEDINGS

10.1 Purpose and Importance of the workshop

Developing a Vision for the City is essential for the preparation of the City Development Plan (CDP). A

Vision is a statement of where the City/Town wishes to grow, within a given time frame, and is often

expressed in terms of clear expectations. It defines the potential of the city and reflects its unique

attributes in terms of comparative and competitive advantages, values and preferences of the city

residents, relationship of the city to state, national and global economies and of course, the history and

physical characteristics of the city. A vision aligns stakeholders’ energies to work cohesively for the

development of the city. Cities need to systematically consider the future requirements, and design Vision

statement to address the shape of the future for the horizon year.

The main purpose of Stakeholders Workshop is to formulate and develop City Vision and Sector goals and

strategies for Bhedaghat Parishad. The CDP shall reflect the priorities and concerns of the public at city

level. Therefore, at different stages, consultative workshops with various stakeholders required to be

conducted.

10.2 Stakeholder Identification

As per Terms of Reference of “preparation of CDP for Bhedaghat Town” the following stakeholders have

been identified and involved for the workshop.

• MLA (Member of Legislative Assembly)

• Municipal Chairperson

• Ward Councilors

• Chief Municipal Officers

• Town and Country Planning Department – Regional Representative

• Line Departments of the State Government such as Pollution Control Broad, Health Department,

Tourism Department, PHED, PWD, Traffic and transportation etc.,

• Private Sector agencies such as chambers of commerce and industry,

• South Eastern Coalfield Limited – Representative

• Government School – Representative

• State Bank of India – Representative

• Inspector of Police

• Non-governmental and community based organizations

• Representatives of the poor communities

• Representatives of ongoing urban development Programmes

• Representatives of media

All the stakeholders and the citizens of the Town become the planning partners of the City Development

Plan.

Page 99: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 81 of 92

City Development Plan for Bhedaghat Town

All the stakeholders identified play an important role in the City Development Planning Process and their

suggestions on various issues regarding the improvement of the quality of life in the Town are very much

a part of the City Development Plan.

10.3 Preparation of handouts and questionnaires

A four page Handout/questionnaire has been prepared which briefs the process of “City Development

Plan” and particularly the Vision and Goals stage of the Process. The later part is a questionnaire

designed to extract the opinions of all the stakeholders in an organized format. The first part focuses on

performance of existing infrastructure and the second part intends to identify the priority projects

necessary for the people.

10.4 District level Workshop/Meeting at District Head Quarters (Jabalpur).

In the 2nd Workshop stage, M/s aarvee associates architects engineers and consultants’ pvt ltd

representatives, Mr. K. Jagadeesh, Mr. Raghuram and Mr. Vishwanath urban and environmental planner

visited Jabalpur on 13th April, 2012 and held initial discussions with Director, Urban Development

Department at Jabalpur Divisional Office. Shri Gulshan Bamra, Collector, Jabalpur District has revised

the progress of the CDP work and Chaired the meeting, addressed the CMO’s and representatives of all 7

project towns.

District level Workshop

On behalf of the consultant team, Mr. K. Jagadeesh, Manager and Mr. Raghuram, Urban Planner

presented the methodology of the study, Visions and Strategies foreseen for the preparation of City

Page 100: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 82 of 92

City Development Plan for Bhedaghat Town

Development Plan. The consultants addressed the importance of data inputs from various line

departments in the plan preparation. Handouts have been circulated to all the representatives of 7 towns

and details are showed in Annexure 1.

All the suggestions were recorded during the meeting, and shall be incorporated in the Priorities and

Projects stage.

10.5 Extended Discussion with Deputy Director

Detailed deliberations were made with Shri. Rajeev Nigam, Dy. Director, urban development

Department, Jabalpur Division. He emphasized on

• Provision of Water Supply, Sanitation and Solid Waste Management,

• Relocation of slums

• Giving training on folk art and folk culture to the slum dwellers

• Imparting social awareness

• Provision of a buffer zone (Urban Forest) along the river bed

Discussion with Deputy Director

10.6 Town level Workshop/Meeting at Town Level:

10.6.1 Preparation for the workshop

The workshop was organized by Aarvee associates Pvt. Ltd with the co-operation of Chief Municipal

Officer (CMO) Bhedaghat and the Municipal staff. The information on conducting the workshop was

passed onto Nagar Parishad well in advance so as to invite various identified stakeholders to participate

in the workshop. Workshop on CDP was held at Bhedaghat Nagar Parishad on 20th of April 2012. The

purpose of the workshop was to involve stakeholders and facilitate to various discussions, record the

Comments & suggestions to finally incorporate in the preparation of CDP.

Page 101: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 83 of 92

City Development Plan for Bhedaghat Town

10.6.2 Presentation on Town profile and discussion with participants

The workshop started with Introduction to the CDP Process and importance of the public participation in

the process. Firstly, the town profile and sector analysis has been presented to facilitate the discussion

among the participants (Please see enclosed appendix 2 for the copy of presentation). The

summary/Findings of the “Sector Analysis” is also done in the following section of the report.

10.6.3 Summary of the Sector Analysis

The following are the Summary/findings of the sector wise analysis and Town Profile of Bhedaghat,

which was explained to the stakeholders.

Table 10.1 : Summary/findings of the Sector Wise Analysis and Town Profile of Bhedaghat

Sectors Analysis

Demography • The Population of the Municipal area according to the 2011 census is 6,657.

• Decadal Growth rate was 22 % for the 2001 – 2011 years

• Population Density (Persons per Hectare) was 28 (2011 year)

• The estimated population for the year 2035 is 11,138

Landuse • The residential land comprises of 23.65 % of the total developable land.

• The active conservation area constitutes of around 6.98% of the total area.

• The agriculture area comprises of almost 50% of the total area.

Income and expenditure

Income

• Toll tax and Parking charges are the Income sources.

• Property taxes, Grants, other revenues are the major Income sources

• Property taxes and grants are gradually increasing year by year, which explains

the increase in growth and development activities

Expenditure

• Health facilities, new construction, salaries and other expenditure are the

major expenditure sectors. • The priority has been clearly on improving health facilities and new

construction of various infrastructure provisions

Economic

base

• Tourism is the main Source of Economy

• Toll tax and Parking charges contribute to the economy of the Bedhaghat.

• The current workforce participation in Bhedaghat is about 33.0 per cent

(including 9.2 per cent of marginal workers).

Tourism • Tourism is found to be the back bone of the Town’s Economy.

• Separate Facilities like Public Convenience, parking facilities, Public Transport

Facilities, Solid Waste Management for Tourists need to be provided. • Tourism Kiosk centers at tourism places for information to the tourists.

• Exploring avenues to increase the tourism circuit from 1 day to 2 days

Housing • Number of households are 1348 and average households size is 4.8 • By the year 2035 the additional Houses required are 933

Water supply • Nagar Parishad also plays a role in water supply, having 9 Tube wells, 33 hand

pump facility. • Water Supply deficiency wards are 6, 12

• Population covered by water supply is (74%) and 70 LPCD

• Total demand of water will be 1.50 MLD

Page 102: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 84 of 92

City Development Plan for Bhedaghat Town

• Additional Storage capacity for the year 2035 is 0.45 ML

Sewerage/

Sanitation

• Sanitation system is completely through open drains along the roadways and

houses

• Some of the wards drains are maintained properly, but there are issues with

the chocking of water due to presence of waste materials in the drain. • This problem is acute in rainy season.

• There are no regularly planned drains in slum residing wards.

• The storm water also runs through the same drains causing Over - flow

problems in rainy season.

Solid waste management

• Nagar Parishad is responsible to collect and transfer the solid waste generating

from all households in the Nagar Parishad area. • Tractors are available for solid waste collection and transfer

• The collection frequency is once a week, leading to staking of waste along

roadside and near dust bins

• Some of the slum wards have very poor management of solid waste; the

situation demands for better frequency of waste collection by the Nagar

Parishad • No segregation of waste at source of collection.

• Estimated waste generated for the year 2035 is 5.0 tonnes

Roads and

Transportation

• Bhedaghat Nagar Parishad is well connected by roads to surrounding areas of

Jabalpur and other nearby places.

• Nearest Railway station is Jabalpur (25 Kms)

• The total road length in Bhedaghat is 24.6 km.

• There is no Public Transport facility available in Bhedaghat Nagar Parishad to

nearby places.

Electricity • The town is well developed with almost 85% of households having electricity

connections. • The remaining 15% of the households, not having connections are in squatter

settlements.

• 6 to 8 hours of power cut a day.

• There are provisions for street lighting in the main roadways of Nagar

Parishad.

Educational • There are only 4 primary and 2 secondary schools

• A total of 4 primary schools, 2 secondary are required by the end of horizon

period.

• At college level education, people prefer to study in Jabalpur.

Health • The Bhedaghat town has only 1 dispensary which does not have satisfactory health facilities when compared to standards.

Other facilities • There is no petrol filling facility in Bhedaghat.

• There are 2 parks in ward 1 and 4, one play ground in ward 3

Slums • There are 5 slums in Bhedaghat Nagar Parishad

• The total slum population of Bhedaghat is around 2,493, comprising of 33% of

total population

• The BPL Population is around 305.

• There is no government housing scheme implemented in Bhedaghat Nagar

Parishad for Slums • The open drains are either fully or partially covered with trash leading to water

stagnancy and posing unsafe / unhygienic environment

• Absence of Public Toilets

Environmental

Sensitive Areas

• Bhedaghat has many Sites which needs to be conserved like Chousat Yogini

temple, Tripurasundari temple, Narmada Ghats, Dhundhara waterfalls

Page 103: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 85 of 92

City Development Plan for Bhedaghat Town

10.6.4 Workshop Summary

The Meeting was attended by Chief Municipal Officer, Municipal Engineer, and all the Ward Councilors

and general public and gave their valuable suggestions for development of the town.

The workshop summary has been explained in following stages:

1. In the welcome statement, the Chief Municipal Officer briefed the Purpose of the meeting.

2. The Engineer of Bhedaghat Nagar Parishad has also elaborated on the role and need for the CDP.

3. Mr. K.Jagadeesh, Mr. Raghuram and Mr. Vishwanath, Urban Planners representing Aarvee Associates

Pvt Ltd Hyderabad for this project made a Presentation on the Sector analysis and Town Profile on the

following topics.

The Town profile and sector analysis included the following topics

• Introduction about CDP

• Demography Study

• Land use analysis

• Income and Expenditure analysis

• Economic base of the Town

• Housing

• Physical infrastructure

• Water Supply

• Storm water/Sanitation

• Solid Waste Management

• Transportation and Roads

• Electricity

• Social Infrastructure

• Educational Facilities

• Health Facilities

• Other Facilities

• Slums and Environmental Sensitive Areas

• Urban Reforms

• Financial Operating Plan

• Funding Pattern

• Percentage increase in taxes to raise the fund by Nagar Parishad to meet the proposed

projects.

Page 104: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 86 of 92

City Development Plan for Bhedaghat Town

10.6.5 Photographs taken during the workshop

Page 105: CDP Bhedaghat English

CITY VISION

Page 106: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 87 of 92

City Development Plan for Bhedaghat Town

CHAPTER 11: CITY VISION

Introduction

The city development plan is a statement of objectives, policies and standards upon which the physical

economic and social development of the Nagar Parishad are based. The city development plan is based

on proposed broad land use plan (Master plan) showing the existing and proposed locations and intensity

of land development for specific uses such as residential, commercial, industrial, agricultural and

educational uses. The future of the community lies in the vision of the city development plan, so it is

crucial that the city development plan be well thought out and carefully written with the needs of the

community at the forefront, with the continuous involvement of various stakeholders and general public.

Developing a vision statement should be the first step when preparing or writing a city development plan,

a well-crafted statement will tie the rest of the plan together.

Vision statement

Promoting Bhedaghat, known for its rich natural resource “Marble Rocks” with enchanting beauty of

glittering Dhuandhar falls, as a “Ultimate Tourist Destination” in Jabalpur Region facilitating

adequate Physical and Social infrastructure including augmentation of accommodation.

11.1 Public Opinion on Existing Infrastructure Facilities and Services in Bhedaghat

The following figure shows the rating on quality of existing infrastructure services expressed by the

stakeholders of Bhedaghat Town.

Page 107: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 88 of 92

City Development Plan for Bhedaghat Town

Figure 11.1 Shows the rating of quality of existing infrastructure services

As shown in the above figure – The blue color stretch represents “good”, red color represents

“satisfactory” and Green color represents the “not satisfactory” opinions of the people. Even though some

of the facilities represent major portion as satisfactory at present, the service levels would become largely

deficient in the coming years. The CDP aims at evaluating and providing satisfactory service levels for the

year 2035.

11.2 Public opinion on prioritizing the proposed list of developments

Based on the priorities given by the Stakeholders in the Questionnaires, the following ranking for various

proposed developments are identified. The following table provides the prioritization for various

developments.

Table 11.1: shows the prioritization for various developments.

Type of Development Priority New Water Treatment Plant and Supply system 1 Tourism Development 2 Re-design of all open drains 3 Encourage small scale industries 4 Public Transportation Facility 5 Proper collection, segregation and disposal of solid waste 6 Housing schemes for Economically weaker sections 7 City level Recreational Activity Park 8 Provision of Children Parks and Film Theatres 9 Self-Employment schemes from government 10 Allotment of Houses for Retired people through a share based scheme 11 New Market center providing spaces to all types of commodity Providers 12 Re-Design of Bus Stand Space 13 City beautification 14

From the above table it is observed that the first and foremost priority in town which needs immediate

attention is provision of better and sustainable source for water supply system. The provision of housing

schemes for economically weaker sections, Encouraging setting up of small scale industries, re-design of

open drains, job training Programmes, public transportation facility, better garbage disposal, and

provision of children parks and theatres would be the priorities to form a lively and healthy living city. The

developmental aspects like water supply, drainage, garbage etc., leads to healthy environmental

Condition in the town and also helps in improving quality of the life in the town.

Proposal for Bridge connecting Bhedaghat and New Bhedaghat

There was a special request from participates in the workshop for a Bridge across the Narmada river,

which connects Bhedaghat and New Bhedaghat, which will reduces a distance of 40 kms (appox.) to

reach Jabalpur city as shown in the Map no.9.1

Vision statement

Page 108: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 89 of 92

City Development Plan for Bhedaghat Town

The city development plan is a statement of objectives, policies and standards upon which the physical

economic and social development of the Nagar Parishad are based. The city development plan is based

on proposed broad land use plan (Master plan) showing the existing and proposed locations and intensity

of land development for specific uses such as residential, commercial, industrial, agricultural and

educational uses. The future of the community lies in the vision of the city development plan, so it is

crucial that the city development plan be well thought out and carefully written with the needs of the

community at the forefront, with the continuous involvement of various stakeholders and general public.

Developing a vision statement should be the first step when preparing or writing a city development plan,

a well-crafted statement will tie the rest of the plan together.

Essential elements of the vision

Because a vision statement will eventually be incorporated into the city development plan, it is essential

that the community identity or unique resources are identified, so that they are preserved through the

development process. Such categories may include, but are not limited to environmental resources such

as streams, mature woodlands, and agricultural resources historic cultural and scenic resources such as

parks and recreation areas and non-renewable resources of economic value such as sand, gravel, land,

mineral deposits. The vision statement in the city development plan must be specific to be effective. The

community should be proactive with its vision statement.

VISION STATEMENT: Developing Bhedaghat as Tourism Destination (2035)

11.3 Planning, developing and managing urban growth in Municipal area

By the year 2035, municipal area would have well planned development with economically productive and

environmentally sustainable aspects of growth. The development area will be well planned and balanced

with a focus on basic Infrastructure development, also planning for slum rehabilitation. High Quality

services such as water supply, sanitation, waste management, street lighting, health, housing and public

transport will be available to all. Development area will be governed by participatory, responsive and

people-oriented local government.

11.4 Sectoral strategy framework

The overall vision for the town and the Prioritization of the key sectors paved the way to formulate sector

specific vision and strategies. This sector specific approach with year wise strategies will be instrumental

in framing the action plan/ implementation plan. The sector specific reforms and investments are an

integral part of the year wise strategies and would be dealt in CIP section of the CDP.

I. Tourism

At present on an average, 1352 tourists visit Bhedaghat per day out. Provision of tourism Infrastructure

like approach Roads, Public Transport Facilities and parking facilities, Public Convenience, Shopping

Page 109: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 90 of 92

City Development Plan for Bhedaghat Town

Complex and Solid Waste Management. Tourism Kiosk centers and Museum at tourism places for

information to the tourists. Exploring avenues to increase the tourism circuit from 1 day to 2 days

Vision

“Vision is to develop Bhedaghat as a tourism destination (2035)”

II. Water Supply

At present there are 9 Tube wells in the town which draws about 4.6 Lakh Liters per day. The needed

supply of water for the year 2035 would almost 1.66 MLD.

Vision

“Vision is to provide adequate and clean water in an equitable, efficient and sustainable manner”.

III. Sewerage

Analysis from the sewerage sector reveals that sewerage network coverage and maintenance is very low.

The entire town has open drainage system. The poor and slum dwellers lack safe sanitation facilities and

hence are prone to health related diseases. There is also no storm water drains available for the town

Vision

“Vision is to create a healthy community by providing high quality sewerage and storm drain services

based on the principles of quality, equity, value and responsiveness”.

IV. Solid Waste Management

The local governments should effectively involve in efficiently collecting and disposing of solid waste,

encourage people to practice segregation of solid waste at source.

V. Development of open spaces

Small open spaces and vacant areas are available in the Town which could be used as public parks.

Developing the recreational spaces with adequate green coverage would bring lot of relief to the

inhabitants.

Vision

Vision is to create healthy community environment by development of open spaces and recreational

spaces with Public Private Partnership (PPP).

Page 110: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 91 of 92

City Development Plan for Bhedaghat Town

VI. Effective management of urban land

As most of the development is confined to only core area, there is lot of vacant urban land available that

can be effectively used for future development in town. The management of these land parcels must be

through efficient land use plan and with flexible land use zoning regulations.

Vision

“Vision is to prepare an efficient land use plan with optimum utilization of land for present and future

needs and implement the plan in an effective manner.”

VII. Urban Poverty

With about 37% population of the town living in slums and 4.5 % households are accounting as BPL,

urban poverty is a major issue before the town management.

Vision

“The vision is to uplift the quality of life and to place the town slum free as possible by 2035”

The goals formulated to achieve the vision are:

� Access to qualitative and affordable basic services, 100 % literacy

� Universal access to primary health care and no one should die of preventable diseases

� Ensure livelihood to all urban poor, Tenurial security and Affordable Housing

� Provision of land tenure security, Community empowerment

� Linking livelihoods to town’s economy

� Development of housing through partnerships – PPP

� Relocation of slums located in hazardous and vulnerable Areas

� Provision of basic infrastructure – both physical (water, roads, sanitation and sewerage) and

social infrastructure (clinics, schools, training facilities, etc).

11.5 Conclusion: Brief strategies, actions and projects for the city

Urban Planning & Growth Management

The key issues emerging out of planning and growth management is that in-spite of not having master

plan for Bhedaghat town, its lacks in implementation and managing the development in an organized

fashion, which is leading to unplanned haphazard development. Absence of strategic project

implementation mechanism and inadequate financial resources to implement the schemes, lack of private

Page 111: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad

Date: 25-10-2013

Page: Page 92 of 92

City Development Plan for Bhedaghat Town

sector community participation in development process were identified as the existing challenges before

the city Managers.

The CDP process has undergone extensive dialogue with the technical people and public opinion in

prioritizing the key sectors for investments and reform initiatives. The following are the top prioritized

proposals which may guide, facilitate the Town to have a sustainable infrastructure and satisfactory living

conditions with enhanced quality of life.

• Re-design and development of open drains

• New water treatment plant and supply system

• Development of Solid Waste Management system- door to door collection

• Housing schemes for economically weaker sections

• Encouragement of small scale agro-based industries- Warehouses and cold storage

• Providing Public Transportation System

• Providing Recreational Facilities

Page 112: CDP Bhedaghat English

TOURISM

Page 113: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 1 of 34

City Development Plan for Bhedaghat Town

CHAPTER 1: GENERAL INTRODUCTION ............................................................................................. 3

1.1 Introduction ..................................................................................................................................................... 3

1.2 Need for the study ............................................................................................................................................. 3

1.3 Objectives ......................................................................................................................................................... 3

1.4 Scope ................................................................................................................................................................. 3

CHAPTER 2: CONCEPTS ............................................................................................................................. 5

2.1 Definition and Concept of Tourism ....................................................................................................................... 5

2.2 Types of tourism ................................................................................................................................................... 5

2.3 Components of Tourism infrastructure ................................................................................................................. 5

CHAPTER 3: HERITAGE AND TOURISM - BEDHAGHAT .................................................................. 9

3.1 City historical importance: An entrancing dream land of nature ........................................................................... 9

3.2 Marble Rocks and Waterfall on the Narmada ....................................................................................................... 9

3.3 Name and local legends .......................................................................................................................................10

3.4 Historical Importance ..........................................................................................................................................11

3.5 Monuments and sculptures .................................................................................................................................14

CHAPTER 4: OTHER HERITAGE BULIDINGS- BHEDAGHAT ....................................................... 19

CHAPTER 5: TOURISM RESOURCES ................................................................................................... 23

5.1 Tourism Resources: ..............................................................................................................................................23

5.2 Tourism infrastructure .........................................................................................................................................24

CHAPTER 6: TOURISM STATISTICS .................................................................................................... 25

6.1 Tourists: ...............................................................................................................................................................25

6.2 Direct and Indirect Employment Generation........................................................................................................25

6.3 Income Multiplier Effect ......................................................................................................................................26

6.4 Accommodation Facilities: ...................................................................................................................................26

6.5 Tourism Circuit:....................................................................................................................................................27

CHAPTER 7: TOURISM PROJECTIONS ............................................................................................... 28

7.1 Tourists Projections: ............................................................................................................................................28

7.2 Tourism infrastructure .........................................................................................................................................28

7.3 Accommodation: .................................................................................................................................................29

7.4 SWOT analysis .....................................................................................................................................................30

7.5 Recommendations ...............................................................................................................................................31

CHAPTER 8: TOURISM PROPOSALS ................................................................................................... 32

Page 114: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 2 of 34

City Development Plan for Bhedaghat Town

LIST OF TABLES

TABLE 1: TOURISM PLACES ........................... ................................................... ................................................... .............. 23

TABLE 2: TOURIST ARRIVAL DETAILS IN BHEDAGHAT ....................................................... ............................................... 25

TABLE 3: EMPLOYMENT GENERATION DETAILS ........... ................................................... ................................................ 25

TABLE 4:: INCOME DETAILS .......................... ................................................... ................................................... .............. 26

TABLE 5: ACCOMMODATION DETAILS ................... ................................................... ................................................... .... 26

TABLE 6: TOURISTS PROJECTIONS ..................... ................................................... ................................................... ......... 28

TABLE 7: TOURISTS WATER SUPPLY DETAILS IN BHEDAGHAT – 2011 .......................................... ................................... 28

TABLE 8: WATER DEMAND ASSESSMENT PER DAY .......... ................................................... ............................................. 28

TABLE 9: SEWERAGE ESTIMATED IN BHEDAGHAT ......... ................................................... ............................................... 29

TABLE 10: DETAILS OF PUBLIC CONVENIENCE SYSTEMS ... ................................................... ............................................ 29

TABLE 11: TOURIST PROJECTIONS ..................... ................................................... ................................................... ......... 29

List of Maps

MAP Tourism Map

Page 115: CDP Bhedaghat English

CHAPTER 1: GENERAL

INTRODUCTION

Page 116: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 3 of 34

City Development Plan for Bhedaghat Town

Heritage and Tourism

CHAPTER 1: General Introduction

1.1 Introduction

Tourism is one of the fastest growing non – polluting industries and has been recognized as an economic

activity of great importance. The benefits of the industry in terms of employment and income multiplier

effects have a significant impact on the development of the city. When compared with the IT industry, which

is presently considered as the most promising industry for economic development of any town / city, one

can see that tourism industry has performed better globally. The Indian government, to boost tourism of

various kinds in India, has set up the ministry of tourism and culture. This ministry recently launched a

campaign called “Incredible India !” to encourage different types of tourism. As a result we could see a lot of

growth in national and international tourists.

1.2 Need for the study

Bhedaghat is one of the major tourism centers in the State of Madhya Pradesh. Bhedaghat is known for its

recreational and historical monuments. A major attraction for the tourists is the “Narmada River”. Bhedaghat

is going to witness a tremendous boom in the tourist’s arrivals, being located close to Jabalpur (25 kms) it

has the potential to attract visitors. With the large number of site seeing places existing within and around

Bhedaghat, it offers an example for the planning and intensive development of tourists infrastructure like

Transport, accommodation, eating places, shopping facilities, parks, playground, cultural and entertainment

facilities and amenities like water supply, drainage, solid waste disposal,. etc. within the framework of

architectural and design controls

1.3 Objectives

• To study existing tourism and heritage characteristics and their behavioural pattern.

• To identify tourism resources and infrastructure and impact of tourism on development of city.

• To establish the gaps between the existing supply and demand of tourism infrastructure.

• To identify major heritage buildings and tourism spots within development area.

• To identify policies, issues and strategies in development of city

1.4 Scope

• The study would analysis the present tourism and heritage scenario. This would involve assessing

the tourism inflows and income generated.

• The study also let us to profile the existing level of facilities being offered to tourists. These facilities

could be in terms of accommodation facilities, transportation, communication and other facilities.

• The study would analysis the impact of tourism on the town.

• The study would identify main issues in development of tourism and heritage in Bhedaghat town

Page 117: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 4 of 34

City Development Plan for Bhedaghat Town

Bhedaghat has a special scenic, recreational and historical value. Its ecology entails some of the following

elements:

• Places of religious Importance

• Places of Historic and archeological Importance

• Excellent Trekking Destination

• Good Picnic Spots

Page 118: CDP Bhedaghat English

CHAPTER 2: CONCEPTS

Page 119: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 5 of 34

City Development Plan for Bhedaghat Town

CHAPTER 2: Concepts

2.1 Definition and Concept of Tourism

Conceptually, Tourism as defined by the Department of Tourism, New Delhi is the sum of the phenomena

and relationships arising from the travel from the travel and the stay of non -residents in so far as they do

not lead to a permanent residence and are not connected with any activity. Broadly the concept of tourism

as characterized by the Department of tourism is:

• A movement of people to various destinations and has two components - the Journey and the stay -

both of which take place outside the normal area of residence and work.

• The movement is of a temporary nature and for a short duration which distinguishes it from

migration.

• It gives rise to activities at destination which are distinct from those of the resident population of the

place visited.

• The main motive for participation in tourism is largely recreation and visit is made for purpose other

than seeking permanent residence or employment remuneration from within the place visited.

Tourism, in pure sense is essentially a pleasure activity and involves a discretionary use of freely disposable

incomes and of free time. (Bhatia, 1978).

2.2 Types of tourism

• Ethnic Tourism To see the quaint customs of remote groups.

• Cultural Tourism To visit and have links with rural societies.

• Historical Tourism To visit museums, cathedrals and great heritage sites.

• Environmental Tourism For higher incomes elite to visit every remote environment.

• Recreational Tourism Mass-holiday-recreational tourism.

The two forms of Tourism include

1. Domestic

2. International Tourism

2.3 Components of Tourism infrastructure

For development of Tourism in a city certain type of tourism infrastructure is required. The various

components of Tourism infrastructure include:

Page 120: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 6 of 34

City Development Plan for Bhedaghat Town

� Transport

The linkages of a city with rest of the country through Road, Rail and Air plays an important role in

making the Tourist city accessible, and therefore is an important necessity especially for attracting

foreign tourists. The local mode of transportation according to the convenience and paying capacity

of each individual or group of tourists should be available for visiting various sites in and around the

city.

� Accommodations

Simultaneously with the changes in the modes of transport and patterns of tourist traffic, various

new types of accommodations have emerged. The traditional serviced form of accommodation

provided in commercial establishments like hotels, motels, boarding houses, holiday camps etc. have

made way for the more flexible and functional forms such as rented apartments, self-contained

motels and condominium.

� Public utilities and services

To support accommodation facilities in a city there should also be certain other supporting services

present in a city. These services include water supply, drainage, solid waste disposal and public

conveniences. Besides these basic medical and Health facilities also constitute an important

component of the Tourism Infrastructure

� Entertainment and Recreational facilities

Presence of some historical sites in a city fail to attract tourists for a longer duration of stay,

therefore provision of Recreational facilities and some entertainment in form of evening cultural

shows is very essential. Some auxiliary facilities tend to support rather than induce growth. These

include a variety of shops and other establishments, some of which are oriented especially to the

tourists but largely serve the residents of the area. Dealers in sports goods, food stores, restaurants,

chemists, bank fall under this category. The supporting industries, usually small business, provide

many other facilities for tourists.

These comprise souvenir or duty free shops (for goods), laundries and guides (for services)

and festival areas and recreational facilities (for activities).

2.4 Impact of Tourism on a City

The concern for environment has resulted in a very wide definition of the term environment which includes

not merely the elements of natural environment - land, air, water, fauna and flora - but also covers social

and cultural aspects of people lives. Both the natural and manmade environments constitute the basic

resources for tourism for studying the physical, economic and socio cultural impacts of Tourism.

Page 121: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 7 of 34

City Development Plan for Bhedaghat Town

1. Economic impact of Tourism

The economic role of tourism is not restricted to the effects produced by International Tourism alone.

The benefits to the national economies from the spin - off from Tourism and its importance in national

economy are universally recognized. The impact of Tourism is also seen in terms of balance of

payments, employment generation and income multiplier effect and contribution to the Gross Domestic

Product.

2. Socio - Cultural impact of Tourism

Planned in proper manner tourism undoubtedly provides positive socio-cultural advantage. They are:

• Tourism constitutes a method of developing and promoting certain traditional arts and crafts of a region

where these activities are on decline.

• Tourism accentuates the values of a society and facilitates social mobility. The result is broadening in the

outlook of both Participants and inhabitants of the region visited. The negative impacts of tourism on the

social and cultural environment may transform local social habits by disturbing the basic and long

established values and behavior of the host population. The “co-existence” of tourists and the resident

population often leads to social tension and transformation of social values.

3. Physical impacts

The natural environment of the region is a great attraction for the tourists. A high quality of

environment is thus essential for tourism on the other hand; the quality of environment is, threatened

by tourism development itself which is promoted because of its economic importance. Four major

sources of ‘environmental stress’ due to tourist generated activities.

• The replacement of a natural environment by a new built environment has a variety of far - reaching

and long lasting results in terms of existing biological species and physical conditions in the area. It may

also cause significant changes in visual amenity.

• The second area of stress results from generation of new or increased waste residual. It creates water

pollution through the discharge of inadequately treated effluents and sewage into water bodies.

• The third important environmental impact concerns the recreational activities. The effect of these

activities includes soil compassion and erosion, change in plant cover and species diversity.

• A fourth associated area of stress is the effect of tourist development on seasonal population increases

densities resulting in physical congestion in many areas. Seasonal influxes also increase demand for

natural resources.

Page 122: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 8 of 34

City Development Plan for Bhedaghat Town

4. Symbiotic relationship

Tourism has been responsible for inculcating environmental appreciation. An attractive environment is

the very basis of the Tourism industry and the conservation of scenic areas, besides historical and

cultural heritage, is of the utmost significance for its success. Tourism not only promotes conservation

but also provides the economic means by which such measures can be taken. The maintenance and

repairs of a large number of historical buildings and other attractions are due to tourism money. In the

context of tourism development, conservation has been of four kinds.

• Tourism has provided the incentive and stimulus for the conservation of natural resources like

establishment of national parks and protection of threatened diverse species of wild auxiliary tourist

services, provision of infrastructure facilities etc. which are secondary effects of conservation.

• Tourism has led to restoration and regeneration of several sites of historical and cultural interest. The

major tourists’ assets of the area- have been restored and rejuvenated mainly because of the stimulus

provided by tourism.

Tourism has been solely responsible for the transformation of old buildings and Sites by retaining their

original features and putting them to better use for tourism facilities

Page 123: CDP Bhedaghat English

CHAPTER 3: HERITAGE AND

TOURISM - BEDHAGHAT

Page 124: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 9 of 34

City Development Plan for Bhedaghat Town

CHAPTER 3: Heritage and Tourism - Bedhaghat

3.1 City historical importance: An entrancing dream land of nature

Bhedaghat is a Nagar Parishad situated on the bank of the river Narmada in the tashil and district of

Jabalpur,at a distance of about 25 kms from Jabalpur city by road. On map its location is 2308'N, 78048'E;

MSL 408mts the nearest railway station is at a distance of about 5 kms Bhedaghat on the main line of

western central railway connecting Jabalpur and Itarsi on the Mumbai-Howrah via Allahabad main line. The

nearest airport is Jabalpur which is connected by air with Delhi, soaring in glittering splendor, the marble

rocks at Bhedaghat is known all over the world for its scenic beauty. The site has the attention of the people

during all phases of Indian history as is evidenced by number of archaeological remains located in the

village.

3.2 Marble Rocks and Waterfall on the Narmada The river Narmada, the longest of east-west flowing rivers of India, the traditional boundary line dividing the

north and south of the country culturally, rises from the Amarkantak hills of Vindhyan mountains of the

northern fringe of the Deccan peninsula. After flowing past for about 327 km from its source at Amarkantak,

the Narmada enters into the marble country of Bhedaghat. Here the river pent up into a third of its width,

for a space of about 3.22 kmts, forces its way through the mighty and majestic marble rocks of over 32 mts

in height. The scenic beauty it produces has perhaps no parallel in the world not even the famous river

Colorado, which flow through the American desert of the Arizona with its lofty banks can complete it either

in splendor or in quiet. The perpendicular marble rocks, which fringe the crystal clear placid waters, are

dazzlingly bright against the vast blue of the sky. Beneath the snow white pinnacle the reflected sunlight

loses its brilliance and gradually mellows in to softer shade as a doves breast. Further below, it almost melts

into rippling waves, quivering and dancing under the glaring sun. These magnificent marble rocks are not

evenly shaded with only one color of pure white: here and there the brilliant whiteness is tinted with veins of

blue, pink and azure of celestial rainbow. On the moon light, when the whole scratch of water is transformed

into a sheet of liquid silver and when the whole area is nothing less than a dream land, a boat journey

between these sheer walls of pure marbles is surely entrancing the eye never wearies of the infinite beauty,

nor the ear of the constant splashing of water amidst the sylvan solitude. In the narrow channel of the

mighty river there is a place where the steep marbles approach each other closely from opposite banks that

local people have a very aptly named it the 'monkey- leap'(Bandar kudni).

The large volume of water which has depth of 51.51 mts near the travelers rest house, makes its first

plunge into the mighty rift of water fall, locally known as 'Dhuvandhar' (the fall of smoke),again producing a

surrounding of heavenly bliss. Bana- kunda and Rudra- kunda are two other picturesque spots on the

Narmada at Bhedaghat and number of religious legends is associated with them.

Beyond the marble rocks the Narmada enters a plain and traverses the southern portion of the district. But

before leaving the Bhedaghat it confluences with a small rivulet known as Bawanganga which possible is the

original course of the Narmada. This is confirmed by find of geological anquities in the sections of the rivulet

during research’s conducted by various international and national agencies geologists confirm that

Page 125: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 10 of 34

City Development Plan for Bhedaghat Town

Bawanganga is the original course of the Narmada and the water fall and the marble rocks are later

formations created out of earthquake and various other tectonic movements underground.

3.3 Name and local legends

Many local legends exist about Bhedaghat to prove the scared character of its various spots. According to

one these, Bhedaghat is said to have taken its name from the legendary Bhrigu rishi who used to live on the

bank of Narmada at the spot close to the modern rest house no.2. It is also suggested that the name might

have been originate from the term Bhera, meaning place, signifying the confluence of the two rivers, the

Narmada and the Bawanganga, which takes place here. Some scholars believe that the name may be a

modern form of some such original word like Bhairavighat. So named because of the fact that the place was

a famous center of Sakti worship. Archaeological remains prove that Bhedaghat was the center of Sakta

worship from ancient times.

Many legendary stories exist about 'Bandar kundi' Panchavati ghat. Saraswati ghat and other spots and

these are narrated by the boat drivers to the visitors while ferrying across the marble rocks.

GEO ARCHAEOLOGICAL INVESTIGATION

BHEDAGHAT has been an important focal point of research in course of Geo-archaeological investigation

conducted in the middle Narmada valley during over 150 years of researches beginning with 1832 .it is a

well-known fact that the Narmada alluvium provides a standard yard stick for the Pleistocene chronology of

the Deccan and also for the post Villafranchain deposit in India .it is mainly on the basis of Narmada fauna

that the boulder conglomerate formation of northern India has been assigned a middle Pleistocene age. The

middle Narmada valley between Bhedaghat and Handia district. Has not only exposed fairly thick alluvial

deposit ranging in age from the middle Pleistocene to early Holocene, but also has yielded Lithic or stonage

tools of various cultural stages. Recent exposure of a quaternary deposit at Bhedaghat by team of

archaeologists from the Deccan College, Pune, is an interesting discovery. It is one of classical sections found

on the Narmada river revealing the activities of the early man. The section reveals at least four separate

units. The base of the most recent unit has been radio carbon dated to 25,160 B.P. and contains upper

palaeolithic artifacts datable between 30000 and 10000 BC. The middle unit is undated but contains

Bandar Kudni Dhuwandhar

Page 126: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 11 of 34

City Development Plan for Bhedaghat Town

advanced Acheulian artifacts earlier too stonage artifacts were discovered at Bhedaghat and reported by

number of teams of archaeologists. Discovery in 1982 of the fossilized skull -cap of Narmada man from

Hathnora in the Sheore district in the middle Narmada valley, has added new dimensions towards prehistoric

researches in the sub-continent. The skull cap is dated at 5-6 lakh year old.

3.4 Historical Importance

Bhedaghat town is situated on the Eastern bank of the holy river Narmada. During all times in its history,

Bhedaghat formed a part of the adjoining regions viz. Tripuri during the ancient period, Garha during the

medieval times and Jabalpur after territory came within the control of Marathas and the British. As such,

during the respective periods, history of Bhedaghat coincided with the history of the territory concerned.

As a part of the settlement of Tripuri from proto-history to 14th Century A.D., Bhedaghat passed through the

chalcolithic age, age of the Epics and Puranas, the Mauryan age, age of the city-state, age of the Sungas,

the Kanvas, the Dattas, the Satavahanas, the Bodhis, the Senas, the shaka kshatrapas, the Guptas and their

feudatories and finally the mighty Kalachuri rulers of Tripuri. Archaelogical remains of some of these ages

have been found at Bhedaghat.

During the medieval times, as a part of the Garha-Mandla Kingdom, Bhedaghat witnessed the rule of Gond

rulers for a period of 344 years from the rise of Kharji in 1440 A.D to arrest of Narhari Shah in 1784 A.D.

Thereafter during the Maratha rule, it was said that the village Bhedaghat was donated by Raghuji Bhonsala

to Mahant Hardeo Puri Gosain. Subsequently the village became a part of the British territory during whose

regime too the disciples of

Hardeo puri continued to hold

the village as a free grant for

perpetuity subject to the

payment of a quitrent of Rs 5.

It’s most famous sights are

the Duandhar Falls, Marble

Rocks and the Chausath

Equus namadicus (skull) Bos namadicus (Skull)

Page 127: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 12 of 34

City Development Plan for Bhedaghat Town

Yogini temple.

Archaeological remains

Apart from the lower, middle, upper, palaeolithic and Mesolithic tools of stone age found from Bhedaghat

during various Geo-archaeological investigations discussed above, the village has yielded some important

archaeological source material which are as follows:

Coins

A bronze circular coin of the Satavahana ruler siree data was discovered from the bank of the Bawanganga

in 1954.the Satavahana rule lasted over tripuri from the middle of the first century BC. To 2nd century A.D

this particular coin on the account of existence of the name of the ruler on its observe, went a long way in

solving the chronology of the Satavahana on national level.

Inscriptions:

• Statue inscriptions of western kshatrapa period (c. 50 A.D.) were found inscribed on two statues

discovered from Dhuvandhar in 1918-19. The inscription mentions that the statues are now in possessions of

Nagpur museum.

• Stone inscription of Kalachuri ruler Narasimha dated in kalachuri Samvat 907 (1155 A.D.).This

inscription was procured form Bhedaghat by Dr. F. E. hall in 1857 and preserved in the cabinet of the

american oriental society at new haven (USA) where it is now preserved. The object of the inscription is to

record that kings mother Alhanadevi, the widow of Gayakarna constructed a temple of Shiva under the name

of Vaidyanath together with a Matha and a hall for study with which she endowed with the income from two

villages viz. Namaundi in the Jauli-pattala and Makarapataka on the right bank of the Narmada in the land

near the foot of the hills, for the worship of the deity.

• Gaurishankar temple inscription of kalchuri ruler Vijayasimha. This inscription is incised on a stone

slab let into the front wall, on the right -hand side of the door of the Garbhagriha of the Gaurishankar

temple situated within the circular cloister of the Chaunsatha Yogini temple. Its object is to record the

obeisance of the Maharajni Gosaladevi, her son maharaja Vijayasimhadeva, the kalchuri ruler of tripuri, and

the crown prince Ajayasimhadeva, to the enshrined god who appears to be named hare as Bhagnakhidra

• Chaunsatha Yogini image inscription, which are discussed below.

Yakshi – Kushana Age Inscription on Yakshi image

Page 128: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 13 of 34

City Development Plan for Bhedaghat Town

• Inscription on the image of the Buddhist deity Tara mentioning the Buddhist formula. The image was

placed inside the Garbhagriha of the Gaurishankara temple. It was thrown out when it was recognized as a

Buddhist idol. It created a sensational history for it when it was taken to Calcutta in 1926. it has now come

back again and placed in the Garbhagriha

• Pachamatha temple inscription of about 9th – 10th century installed into the plinth of the temple no.4

in the complex. The purpose of it is to record financial assistance given for some construction work. The

inscription was brought from some other place and installed in the plinth of the temple.

• Pachmatha temple inscription of Vikram era 1810 (1752 A.D.). This inscription is written on the door-

frame of temple no-3 built at the Pachmatha complex. The inscription begins with the adoration of

Kamantaka Shiva and further highlights the death of hero and mentions the names of Amadeva Goswami of

(the village), Uma,Vachoji, Kora and Maranadeua.

• Gaurishankara temple bell inscription dated Samvat 1977 (1920 A.D) recording its installation by

swami Buddhapuri.

Inscription of Kalchuri Ruler Narasimha Deva

(1155 A.D) Gaurashankar Temple Inscription

Pachmatha Temple Inscription

Page 129: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 14 of 34

City Development Plan for Bhedaghat Town

3.5 Monuments and sculptures

The temple of Chaunsatha Yogini

Immediately above the confluence of the Narmada and

Bawanganga, the fork of rock rise into a small circular hill. Atop

this hill is situated the 10th century A.D. Temple of the extinct cult

of Chaunsatha Yogini. Placed topographically at the highest point

amongst the surroundings, the position this temple is unique and

commanding. A long flight of roughly hewn steps lead right up

from the bed of the Narmada to the south-eastern entrance of

the temple. From its north-eastern entrance another flight of steps

lead one to the road which connects the waterfall. Close beneath,

on the south the blue water of the Narmada seems to sleep, spell, spellbound, under the snow-white walls

that shut them in.

To the north and the west the view is bounded by thickly wooded height; but on the east the eye looks

down on a long reach of the river, stretching away for miles towards Jabalpur.

Among many obscure cults of ancient and early medieval India the cults of Chaunsatha Yyogin was one.

Yoginis are essentially attendants of the mother goddess, through different interpretations exist. Through

literacy reference to Yoginis may be traced as far back as post- Vedic period in India, regular cult worship of

the Yogini came into existence sometimes during the 8th – 9th century A.D. The lead in the direction was

taken by saint Machchhendranatha, the founder of the Yogini Kaula sect, the tenets of which are revealed in

the work kaulajnananirnaya, the authorship of which is ascribed to him.

The followers of Yogini Kaula sect tried to spread their teaching far and wide all over India through the main

regions of their activities seem to have been modern Indian states of Uttar Pradesh, Madhya Pradesh, Orrisa

and the district of Coimbatore. Extant remains of the Yogini temples have been found at: Hirapur and

Ranipur Jharial in Orissa; Khajuraho, 65 in cases of Mitauli, 42 in cases of Dudahi and Badoh and the largest

number-81 in case of Bhedaghat. This makes the Bhedaghat temple unique. Architecturally, the temples of

Cuahsatha Yogini Bell Inscription

Interior view and plan of Chaunsatha Yogini Temple

Page 130: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 15 of 34

City Development Plan for Bhedaghat Town

Chaunsatha Yogini are either circular or rectangular in shape with Yogini sculptures installed on pedestals

along the inner side of the walls of the circulating cloister with or without a temple erected at the center of

the cloister. The Khajuraho and Badoh temples are rectangular, the rest are circular.

Apart from the temple remains, isolated collections of Yogini sculptures have been found in MP. At Naresar,

Hingalgarh, Lokahari and Shahdol in addition to several museums in India and abroad. Interesting Yogini

sculptures are in the collections of : the Musee' Guimet in Paris, the Detroit institute of art, the royal Ontario

museum, the Brooklyn museum, the Minneapolis institute of arts and the Kansas collection.

The circular cloister of the Bhedaghat temple consists of a huge thick wall along outer edge of a circular

platform, inside which there is a circular row of pillars and pilasters arranged in two concentric circles. A flat

roof with a low ribbed chhajja running all along is supported by these pillars and pilasters. The inner

diameter of the cloister is 34.5 meters and the outer is 40.8 meters. The number of pillars in front row is 84

and an equal number of pilasters are arranged opposite to them against the black wall. 81 equidistant

pedestals are erected on the circular platform and images of Yoginis and other deities are fixed on them.

The following sculptures are found arranged in serial order:

• Crudely craved male/female figure of Kaushana period

• Yogini Shri Simhasimha

• Yogini Shri Rrushing

• Yogini Shri Kamada

• Yogini Shri

• Yogini Shri Amtakari

• Yogini lion-headed -uninscribed

• Yogini Shri Erudri

• Yogini Shri Nandini

• Yogini Shri Vibhatsa

• Yogini Shri Varahi

• Yogini Shri Mamdodari

• Yogini Shri Sarvvatomukhi

Kaumari (Post – Gupta Period)

Gaurishankar Temple

Page 131: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 16 of 34

City Development Plan for Bhedaghat Town

• Yogini Shri Thirachitta

• Yogini Shri Khemukhi

• Yogini Shri Jamavi

• unnamed Yogini

• Yogini Shri Audara

• unnamed twelve-armed three eye god

• lower part of Yogini Shri Yamuna, upper part of Yogini image

unnamed

• lower part of unnamed Yogini

• broken dancing Matrika of post-Gupta period

• Yogini Shri Pandavi

• Yogini Shri Niladamvara

• broken four-armed male god of post-Gupta

• Yogini Shri Teramva

• Yogini Shri Shandini

• Yogini Shri Pimgala

• Yogini Shri Aahkala

• broken dancing Matrika of post- Gupta period

• dancing Ganesha of post-Gupta period

• Yogini Shri Masa Varddhani

• Standing figure of male god-broken

• Yogini Shri Ridhalidevi

• uninscribed Hanuman

• four armed dancing figure of Ganesha

• Yogini Shri Chhatra-samvara

• Yogini Shri Ajita

• Yogini Shri Chandika

• Yogini Shri Ananda

• Yogini Shriaingini

• Yogini Shri Brahmani

• Yogini Shri Maheshwari

• Yogini Shri Takari

• Yogini Shri Tapani

• Yogini Shri Padmahamsa

• Yogini Shrihamsini

• broken lower part of a Yogini image

Yogini Shri Sarrvatomukhi

Yogini Shri Virendri

Yogini Shir Vaishnavi

Page 132: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 17 of 34

City Development Plan for Bhedaghat Town

• broken lower part of a Bodhisattva

49-b. Only upper part female deity

49-a. Only lower part of left end of the pedestal of an image

• Yogini Shri Ishwari

• Yogini Shri Thani

• Yogini Shri Indrajali

• Yogini Shri Ga Hanai

• broken lower part of a Yogini Yogini

• Yogini Shri Indrani

• Yogini Shri Jha nigini

• Yogini Shri Uttala

• Yogini Shri Nalini

• Yogini Shri Lampata

• Yogini Shri Sudri

• Yogini Shri Rtssamada

• Yogini Shri Gamdhari

• Yogini Shri Jahanvi

• Yogini Shri Dakini

• Yogini Shri Vamdhani

• Yogini Shri Darpahari

• Dancing Matrika image of post-Gupta period.

• Yogini Shri Rangini

• Yogini Shri Jaha

• Yogini Shri Thakkini

• Yogini Shri Ghamatali

• Yogini Shri Dhadhdhari

• Yogini Shri image of post-Gupta period

• Yogini Shri Vaishnavi

• Yogini Shri Bhishani

• Yogini Shri Shatanusamavara

• Yogini Shri Kshatradharmini

• unnamed Yogini

• Yogini Shri Phanendri

• Yogini Shri Virendri

• Yogini Shri Thakini

Gaurishankar in Garbhagriha

Yogini Shri Jahnavi

Page 133: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 18 of 34

City Development Plan for Bhedaghat Town

An analytical study of these sculptures makes it clear that these belong to three phases; one of Kushana

period (no.1), seven of post-Gupta period (no.22, 25, 30, 3, 67, 67-a73) and the rest of the period of the

Kalachuris when the temple in the present shape was built up this indicates that originally a small temple of

the Matrikas was built up on this mound sometime during 1st century A.D. When the Kushanas ruled over

this region. In 7th-8th century A.D., during the post-Gupta period sculptures. The present shape of the

temple came into existence when Yuvarajadeva I, the kalchuri ruler came to power in 915 A.D.

Epigraphic evidence supports this statement.

Of the kalachuri sculptures too, no.26 is of supreme goddess Mahishasuramardini who could not be

considered a Yogini Four, viz. no. 3, 20, 63 and 69 are respectively of the river goddesses Narmada, Yamuna,

Ganga and Sarswati. The remaining 61 are Yogini sculptures. Of these ten are unnamed. The remaining six

are Siva, Ganesha, Hanumana and Boshisattva.

The temple of Gaurishanakr stands inside the circular cloister, though not exactly in the center of the cloister

or on the central line of it to explain this various theories have been propounded. The existing temple faces

north and the plan of the Garbhagirha is exactly same through on a reduced scale, as one of the shrine of

the Triple-shrine temple of kalachuri ruler Karna at Amarkantak. The Mandapa in front and small shrine

which contains the bulls on the Gosladevi discussed above.

Inside the Garbhagriha is a rare image of Gaurishankara under worship. In this Shiva and Parvarthiare

shown seated on the back of standing Nandi. Termed as Kalyanasundara, this image depicts the scene of

departure of Shiva after his marriage with Parvati. This is further confirmed by inscription 'Vareshvarah'

inscribed on the pedestal of the image. Sculptures of three-headed Shiva,Surya, dancing Ganesha, Lakshmi-

narayana, karttikeya, Naga and Nagi and the Buddhist deity Tara are also fixed in the wall, surrounding the

central deity in the Garbhagirha.

Page 134: CDP Bhedaghat English

CHAPTER 4: OTHER

HERITAGE BULIDINGS-

BHEDAGHAT

Page 135: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 19 of 34

City Development Plan for Bhedaghat Town

CHAPTER 4: OTHER HERITAGE BULIDINGS- BHEDAGHAT

GOLAKI MATHA

In a pillar inscription found that from Malkapuram

(dist.Guntur, Andhra Pradesh) it is stated that king

Yuvarajadeva of kalachuri dynasty gave as

Bhiksha, three lakhs of villages to his guru

Sadbhavashambhu of the Golkai Matha situated

between Narmada and Ganga. This Golaki Matha

was so named on account of its attachment with

the Gol (round) temple of Chaunsatha Yogini

Remains of this Matha may be identified with the

ruined two storied rectangular structure situated

just opposite to the steps that lead to the temple which begins from the road side. This was the famous

tantric center known all over India, the branches of which were established at Cudappah, Kurnool,

Guntur, and north Arcot district. In the religious history of ancient India, the Shiva Acharyas of Golkai

Matha occupy a prominent place for their learning. In modern terminology the structure is known as

Haveli.

PACHMATHA COMPLEX

Opposite the Haveli is situated a group of five temples, known as Panchmatha. Parts of this group were

built during different periods. Temple no.1 is a panchayatan temple built on a plinth measuring

22.93*19.1 meters. The Ganesh image kept in the Garbhagirha was stolen in 1990. The temple may be

dated to c. 14-15th Century A.D.

Temple no.2 situated at the back of the above is plain octagonal in structure with Shikhara in Nagara

style with Gond influence. The Adhisthana is plain and is 1 meter high. Temple no.3 situated to the

north of no.1 is a square structure with Shikhara of Nagara style with Gond influence. An inscription of

Vikram Samvat 1810(1752 A.D.) is inscribed on the door-frame of the temple. The temple is datable to

c. 14th – 15th century A.D.

Temple no.4 situated along the edge of the road

is square in plan with spiraled Amalaka,

decorative Shikhara in curvilinear and leaf

designs. An inscription of about 9-10th century

A.D is installed into the plinth of the temple is

datable to c. early 14th century A.D situated

towards back of complex is a square pillared

structure with corbelled dome, locally known as

Page 136: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 20 of 34

City Development Plan for Bhedaghat Town

Samadhi of Mahant Mahadeo Puri. It has plain brackets and exteriors.

Rest house

To the back of the Pachmatha complex, along the road leading to Dhuvandhar is situated government

rest house no.2. rest house no.1 is located further north. Built during 1830-35, these are colonial

structures with load bearing walls, pillared portico and sloping roofs. The rest houses provide good view

of the Narmada.

SHIVA TEMPLE

Within the boundary of rest house no.1 is situated a Shiva temple datable to c. 17th century A.D. The

temple is a plain structure built on a high plinth. The Garbhagriha of this small temple has a central

dome. The walls are plain and the cornice, parapet and lower portion of the dome have leaf design.

Pachmatha temple - 2 Pachmatha temple - 3 Pachmatha temple - 4

Page 137: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 21 of 34

City Development Plan for Bhedaghat Town

MARHIA MATHA: 1-2

a temple datable to c. 14th – 15th century A.D. known as Marhia Matha exist near the river and is

accessed through various homes. It has a domical roof, the walls are plain. It is datable to Gond period.

Another structure on a high mound, also known as Marhia Matha and built near Adhyatma Vigyan

Nauka is a religious Samadhi. The entire structure is plain and has arched false niche. It is painted and

cemented.

In front of it, along the road and surrounded by modern house exist ruins of a temple with domical

structure of Gond period.

NACH GHAR

An open recreational dance hall originally built in 1837 and recently renovated is an octagonal building

with pillars on each corner having sloping roof with terracotta tiles. The flooring is of marble. The

inscription is missing now.

Panchavati Ghat Marhia Math No. 2

Samadhi of Mahant Mahadeo Puri Mariha Math No. 1

Page 138: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 22 of 34

City Development Plan for Bhedaghat Town

Grave of James Coudie

Near the Nagar Panchayat office is located the grave of Jamed Coudie, II Batn. Scott 18 rifle which is

dated the 17th July, 1894. The slab bearing the inscription is missing now.

Shiva temple (Saraswati- ghat)

This plain squared structured datable to c. 14th – 15th century A.D. Is situated on a mound on the road

leading to Saraswati ghat. It is ruins now.

Dharamshala

This double storied rectangular building was built near Saraswati ghat at the instance of Raja Gokuldas.

Jain Temple

Shri Shantinatha Digambar Jain temple built in the Panchavati area, along the road leading to

Dhuwandhar is a modern structure built after 1970.

The Ghats

Panchavati ghat is an old structure datable to c. early 16th century A.D. Saraswati ghat is situated on

Bhedaghat – Jabalpur road, a kmts Earlier than Bhedaghat on the slope to the right of the Bawanganga

bride. It is meeting point of the Narmada and the Bawanganga. The ghat is also old as revealed by

existing remains of old steps. The ghats in their original form must have been in existence since times

immemorial.

This in short is a brief account of the past glory of Bhedaghat an essential part of the city of Jabalpur.

It has been rightly said ''our identity is the result of our past. In the same way as we inherit the genes

of our parents, we are also made up of genes of our past heritage”. It is expected that all of us shall

leave no stone unturned to value and preserve the rich heritage of our composite culture

Nach Ghar Saraswati Ghat

Page 139: CDP Bhedaghat English

CHAPTER 5: TOURISM

RESOURCES

Page 140: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 23 of 34

City Development Plan for Bhedaghat Town

CHAPTER 5: TOURISM RESOURCES

5.1 Tourism Resources:

Table 1: Tourism Places

Name of the Place

Distance

from

Bhedaghat

Approach

Road

Tourist

awareness

on locations

Facilities

Parking

Facilities

Dhundhara (water

fall) Bhedaghat 1 km Available Available

Public

Convenience

Off Street

Organized

Chausath Yogini

Mandir, Bhedaghat 0 km Available Available

No Facilities

Available

On street un

Organized

Rudra Kund 1 km Available Not Available No Facilities

Available

On street un

Organized

Saraswati Ghat 1.5 km Available Available Public

Convenience

Off Street

Organized

Pashupati Nath

Mandir, Gopalpur 2 km Available Not Available

No Facilities

Available No Facilities

Lakhmi Narayan

Mandir, Gopalpur 2 km

Not

Available Not Available

No Facilities

Available No Facilities

Kalyanika Ashram,

Gopalpur 2 km

Not

Available Not Available

No Facilities

Available No Facilities

Lameta Ghat,

Thilamadleshwar

Mandir

3 km Not

Available Not Available

No Facilities

Available No Facilities

Radha Krishna

Mandir, Lameta Ghat 3 km

Not

Available Not Available

No Facilities

Available No Facilities

Ghagra water fall,

Lameta ghat 3 km

Not

Available Not Available

No Facilities

Available No Facilities

Rani Mahal, Badal

mahal, Bhedaghat 0.5 km

Not

Available Not Available

No Facilities

Available No Facilities

Page 141: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 24 of 34

City Development Plan for Bhedaghat Town

5.2 Tourism infrastructure

There are various infrastructure requirements in terms of:

• Accommodation: There are 5 hotels and Madhya Pradesh tourism guest houses are available in

Ward 5

• Restaurants: There are no Major restaurants in the town. Available hotels only provide Lodging

and boarding facilities. Rejuvenation

• Utilities and Services: Public Toilets are available near the Ghat areas.

• Information Centres: There are no information centres in the town which is a major problem.

• Tourism packages: There are no packages which is also a major problem

• Conservation of monuments: There are 2 conservation monuments in ward 7 and 11 which needs

major attention.

Page 142: CDP Bhedaghat English

CHAPTER 6: TOURISM

STATISTICS

Page 143: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 25 of 34

City Development Plan for Bhedaghat Town

CHAPTER 6: TOURISM STATISTICS

6.1 Tourists:

The two forms of Tourists include

Domestic Tourists and International Tourists

Table 2: Tourist arrival details in Bhedaghat

Number of tourist arrivals in Bhedaghat

Year Domestic %

variation International

%

variation Total

%

variation

2007 657000 1740 658740

2008 730000 11% 1382 -20.57 731382 11%

2009 803000 10% 1172 -15.2 804172 10%

2010 912500 14% 672 -42.66 913172 14%

On an average, 2500 tourists per day visit Bhedaghat out of which around 99.8% are domestic tourists,

while the rest are international tourists.

The peak season is considered as November to

June and non-peak season is rainy season

which is from July to October.

Toll tax and Parking charges contribute to a

large extent to the economy of the Bedhaghat.

6.2 Direct and Indirect Employment Generation

Table 3: Employment generation details

Year

Flow of Tourists Direct Employment Indirect

employment

Total

employment Domestic International Total Domestic International Total

2007 657,000 1,740 658,740 164250 870 165120 988110 1153230

2008 730000 1,382 731,382 182500 691 183191 1097073 1280264

2009 803000 1,172 804,172 200750 586 201336 1206258 1407594

2010 912500 672 913,172 228125 336 228461 1369758 1598219

Assumption:

4 domestic tourists = 1 direct employment

2 international tourist = 1 direct employment

Indirect tourism multiplier = 1.5

Source: ESCAP study report on "economic impact of tourism in India”

Marble idols and carving of sculpture is famous in the town and is an important income generation

which is also exported to all parts of India.

Page 144: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 26 of 34

City Development Plan for Bhedaghat Town

6.3 Income Multiplier Effect

Money spent by the tourist in the country is turned over

several times. In the process the total income earned from

tourism is number of times more than the actual spending.

This phenomenon is referred to as the income multiplier

effect.

The average percentage spent on different categories of

tourist expenditure

The source of income for the Nagar Parishad is by toll tax and parking charges.

Table 4:: Income details

Year No. of Tourists No of Vehicles Income per Vehicle Total Income

2010 9,13,172 91300 25 22,82,500

It is evident from the above table that approximately 23 Lakhs is generated from the tourism sector to

Nagar Parishad.

6.4 Accommodation Facilities:

There are 5 hotels in Bhedaghat which approximately have 50 rooms with 100 Beds.

Table 5: Accommodation details

Accommodation Facilities

Hotel Category Number No. of Rooms No. of Beds

Hotels 5 50 100

Tourists arrival per day = 2500

Total no. of beds available = 100

As Bhedaghat is placed as one day tourism circuit, most of the tourists do not prefer to stay in

Bhedaghat, which is a negative point to the economy of Bhedaghat.

year Income

2006-2007 519259

2007-2008 485239

2008-2009 1525427

2009-2010 819455

23%

25%

18%

34%

Share of tourist expenditure (%)

Accomodation Food Transport Shopping

Page 145: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 27 of 34

City Development Plan for Bhedaghat Town

6.5 Tourism Circuit:

Bhedaghat is merely at a distance of about 25 km from Jabalpur and absence of tourist information

center on existing tourism resources restricts Bhedaghat as one day tourist circuit.

Map 3.1: showing tourism places of Bhedaghat

Page 146: CDP Bhedaghat English

CHAPTER 7: TOURISM

PROJECTIONS

Page 147: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 28 of 34

City Development Plan for Bhedaghat Town

CHAPTER 7: TOURISM PROJECTIONS

7.1 Tourists Projections:

Table 6: Tourists Projections

Method Projected

Tourists 2011

Projected

Tourists 2015

Projected

Tourists 2025

Projected

Tourists 2035

Growth Rate Based Projections 9,13,172 10,68,411 13,03,462 16,29,327

Decadal Growth Rate 11% 17% 39% 47%

Per day Tourists 2500 2927 3571 4464

The Past Trends in the Tourists were decreasing, but by the induced growth like connectivity and

improved facilities there will be an expected growth of 11 to 50 % in tourist’s inflow.

For 2010 = 2500 tourists per day

1. For the year 2015 = 10,68,411 (Tourists inflow per day is 2927)

2. For the year 2025 (Intermediate stage)= 13,03,462 (Tourists inflow per day is 3571)

3. For the year 2035 (Ultimate stage) = 16,29,327 (Tourists inflow per day is 4464)

7.2 Tourism infrastructure

Table 7: Tourists Water Supply Details in Bhedaghat – 2011

Sl. No. Particulars Units

Per Capita Supply

1 Population – 2010 (per day) 2500

2 Current Per Capita water supply per day (in LPCD) 70.0

3 Per capita supply as per CPHEEO Norm (in LPCD) 135.0

Table 8: Water Demand Assessment per day

Particulars Phase 1 Phase 2 Phase 3

2015 2025 2035

• Projected Population per day 2927 3571 4464

• Total quantum of water required

(in MLD) @ 135 lpcd per capita 0.40 0.48 0.60

• Capacity of treatment plant (in MLD) 0.40 0.48 0.60

Source: Analysis

Page 148: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 29 of 34

City Development Plan for Bhedaghat Town

Table 9: Sewerage Estimated in Bhedaghat

Indicator Norm Levels

Sewerage Estimated 80 % of water supply 0.48 MLD

Source: Analysis

Sanitation System

Public Toilets

There is a need for 8 more public conveniences with 40 seats in the town. The details of public

conveniences are shown in the Table 10.

Table 10: Details of Public Convenience Systems

Public Convenience Systems (Sulabh Sauchalaya)

a. Public Conveniences 8

b. Total Seats 40

Source: Analysis

7.3 Accommodation:

After making Bhedaghat a 2 days tourism circuit, with better connectivity and information dissemination

to the tourists, it is expected to attract more tourists. As the tourism attractions around the Bhedaghat

are within 3-5 kms distance making Bhedaghat a prospective centre for accommodation.

Assuming 30% of total number of tourists staying in Bhedaghat, there are 5 hotels which are

accommodating around 100 beds approximately.

Table 11: Tourist projections

Method Projected

Tourists 2011

Projected

Tourists Year

2015

Projected

Tourists Year

2025

Projected

Tourists

Year 2035

Per day Tourists 2500 2927 3571 4464

30 % of tourists 750 878 1071 1339

Hotels Required (Per hotel 30

Rooms) Cumulative Demand

10 12 16 20

Page 149: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 30 of 34

City Development Plan for Bhedaghat Town

7.4 SWOT analysis

• Strengths:

The town has both recreational and Historical Tourism attraction. The town is predominantly dependent

on tourism as its Economic base.

• Weaknesses:

Being close to Jabalpur (25 km) Bhedaghat places itself for a one day tourism circuit. Bhedaghat is not

attracting many tourists as it is not properly connected to other tourism attractions around it.

• Opportunities:

Making Bhedaghat a 2 day tourism circuit as there are many places near Bhedaghat which can be

improvised as tourism places. Improved tourist infrastructure would provide tremendous opportunities.

• Threats: The existing facilities and civic amenities may not be sufficient for the needs of

tourist inflow.

Strengths Weaknesses Opportunities Threats

Scenic Beauty Poorly linked with the region

Potential of attracting more tourists which in turn

will give economic benefits

Deforestation

Less crowded, so less

polluted

Less popularity and

promotion

Employment to the local

people

Exploitation of natural

resources and migration

Issues: Strategies:

•• Absence of Public

Transport system

•• Improving existing Infrastructure Facilities like information center,

Water supply facilities and Public Convenience in Dhuandhar water falls

•• Absence of proper

Information system

on tourism places to

the tourists.

•• Improving existing Infrastructure Facilities like information center,

Water supply facilities and Public Convenience in Saraswati Ghat.

•• Resort facilities in Rudra Kund.

Page 150: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 31 of 34

City Development Plan for Bhedaghat Town

7.5 Recommendations

• Promotion of tourism related activities.

• To increase tourism arrivals into the Town.

• Encourage the preservation, conservation and excavation of archaeological and historical sites

in places of tourist interest.

• Maintaining and improving the standard of existing hotels.

• Establishment of tourism information centers

• Running more cultural festivals to attract more tourism

• Make availability of tourism guides and all tourism spots

• Development of facilities and conveniences at tourist spots in hierarchical manner

• Development of better recreational opportunities for the local people

Page 151: CDP Bhedaghat English

CHAPTER 8: TOURISM

PROPOSALS

Page 152: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 32 of 34

City Development Plan for Bhedaghat Town

CHAPTER 8: TOURISM PROPOSALS

The heritage walk is a concept in which people are made to get closer to the town by taking

them through a guided walk and getting them familiar with the historical importance and strong

recreational character of the town.

The heritage walk makes people aware of the heritage and also guides them through the historic

and religious important building. The walks will be conducted by trained guides and can also be

supported with slideshows, pamphlets and stage shows.

Bus facility: These Buses might have a capacity of about 100 passengers. This kind of project

will require proper road surface. The advent of these buses will control pollution and improve the

mode of public transportation in the town.

Page 153: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 33 of 34

City Development Plan for Bhedaghat Town

Community parks provide breathing spaces and at the same time form a platform for

interaction among the society. The parks should be preferably designed in such a way that they

require very less maintenance in the long run and at the same time give a welcoming and

friendly impression to the user.

The materials used could be more indigenous in nature and the parks could be designed as an

extension of heritage spaces, even theme parks attract more tourists.

Adventurous activities to promote Tourism:

Trekking in the forest will be designed in interesting paths and can have shopping places at

some points to provide employment and economy.

Tyrolean traverse:

A Tyrolean traverse is a method of crossing through

free space between two high points on a rope

without a hanging cart or cart equivalent.

Page 154: CDP Bhedaghat English

Doc: Final Report for Bhedaghat Nagar Parishad – Tourism

Date: 25-10-2013

Page: Page 34 of 34

City Development Plan for Bhedaghat Town

River front development:

Riverfront should have a wonderful place to walk,

special pavers, sidewalks, way finding signage,

banners, and an easy-to-follow street pattern.

It should be pedestrian-friendly, long with public

plazas, seating areas, kiosks, street vendors or

performers, or something else of interest.

Eco tourism:

Page 155: CDP Bhedaghat English

TOURISM COSTING

Page 156: CDP Bhedaghat English

Destinations Proposed Project Govt. Cost Phase -I Phase -II Phase -III

Improvement of Approach Road 0.2 0.2 _ PWD Public PIDDC 0.2

1 1 _ MPSTDC Public PIDDC 1

0.3 0.3 _ MPSTDC Public PIDDC 0.3

Drinking Water 0.1 0.1 _ MPSTDC Public UIDSSMT 0.1

Illumination of Ghat 0.3 0.3 _ MPSTDC Public PIDDC 0.3

0.25 0.25 _ MPSTDC Public PIDDC 0.25

0.3 0.3 _ MPSTDC Public PIDDC 0.3

Natural History Museum 2 2 _ MPSTDC Public PIDDC 1 1

Solid Waste Management 0.2 0.2 _ MPSTDC Public UIDSSMT 0.2

Life guards and well equipped Rescue and First aid Unit 0.25 0.25 _ MPSTDC Public PIDDC 0.25

Total 4.9 4.9 _ 1.35 2.55 1

2 2 _ MPSTDC Public PIDDC 1 1

Solid Waste Management 0.2 0.2 _ MPSTDC Public UIDSSMT 0.2

Safety and Life Guards with First Aid Equipment 0.5 0.5 _ MPSTDC Public PIDDC 0.5

0.1 0.1 _ MPSTDC Public PIDDC 0.1

Total 2.8 2.8 _ 0.8 1 1

Conservation and Restoration 0.75 0.75 _ MPSTDC Public PIDDC 0.75

Illumination effects 0.3 0.3 _ MPSTDC Public PIDDC 0.15 0.15

0.1 0.1 _ MPSTDC Public PIDDC 0.1

Total 1.15 1.15 _ 0.85 0.15 0.15

Other Monuments

Conservation and Restoration and fencing of each monuments 3 3 _ MPSTDC Public PIDDC 1.5 1.5

Provision of Drinking Water at Each Monument 0.75 0.75 _ MPSTDC Public PIDDC 0.75

2.5 2.5 _ MPSTDC Public PIDDC 1.25 1.25

Public Conveniences at two locations on the Heritage Trail 0.3 0.3 _ MPSTDC Public UIDSSMT 0.3

1 1 _ MPSTDC Public PIDDC 1

Illumination of each monument 1.5 1.5 _ MPSTDC Public PIDDC 1.5

Site landscaping at each monument 1 1 _ MPSTDC Public PIDDC 1

Trained guides 0.1 0.03 0.07 MPSTDC PPP 0.1

Indicative Cost

(Rs. Cr.)

Private Funding

Implementing Agency

Mode of Funding

Existing Schemes

Lambeta Ghat

Redevelopment of Lambeta Ghat

Upgradation of Public Conveniences and Changing Rooms

Restoration and Conservation of Hanuman Mandir and Shiv Mandir

Directional and Information Signages

Dhuandhar Falls

Upgradation and Redevelopment of the Public Area around the Falls

Signages

Chausath Yogini Temple

Information Signages

Development of a Heritage Trail with improvement of approach roads

Directional and Information Signages at each Monument

Hunar se Rojgar Yojna

Page 157: CDP Bhedaghat English

Destinations Proposed Project Govt. Cost Phase -I Phase -II Phase -IIIIndicative

Cost (Rs. Cr.)

Private Funding

Implementing Agency

Mode of Funding

Existing Schemes

1 0.25 0.75 MPSTDC PPP PIDDC 1

Total 11.15 10.33 0.82 4.15 4.25 2.75

1 1 _ PWD Public PIDDC 1

Illumination effects 0.5 0.5 _ MPSTDC Public PIDDC 0.5

Drinking Water 0.2 0.2 _ MPSTDC Public UIDSSMT 0.2

Public Conveniences 0.3 0.3 _ MPSTDC Public UIDSSMT 0.3

Solid Waste Management 0.1 0.1 _ MPSTDC Public UIDSSMT 0.1

Parking for 30 cars 0.5 0.13 0.37 MPSTDC PPP PIDDC 0.5

Total 2.6 2.23 0.37 0.6 2

2 0.5 1.5 MPSTDC PPP PIDDC 2

Nature Therapy and Meditation Center 5 1.25 3.75 MPSTDC PPP PIDDC 2.5 2.5

4no Houseboats 3 0.75 2.25 MPSTDC PPP PIDDC 1.5 1.5

4 4 MPSTDC Public PIDDC 2 2

Rescue and First aid Unit well equipped emergency boat 1 1 MPSTDC Public PIDDC 1

3.5 0.88 2.62 MPSTDC PPP PIDDC 1.05 1.225 1.225

Meditation Park 2 2 MPSTDC Public PIDDC 1 1

Budget accommodation(30 rooms) 7.24 1.81 5.43 MPSTDC PPP PIDDC 2.172 2.534 2.534

Aquarium 6 1.5 4.5 MPSTDC PPP PIDDC 3 3

Total 33.74 13.69 20.05 5.222 14.759 13.759

Grand Total 56.34 35.1 21.24 12.972 24.709 18.659

5 no. six seater shuttle services to operate on the heritage trail

Saraswathi Ghat

Redevelopment of Saraswathi Ghat

Bhedaghat

4no Mini Buses to operate from Bhedaghat to Jabalpur

Upgradation of Cruise Boats and Facilities and provision of 2 new Boats

Cultural and Laser Show in an Open Air Theater developed amongst the rocks

Page 158: CDP Bhedaghat English

SPECIAL PAPER

Page 159: CDP Bhedaghat English

SPECIAL PAPER

ON

CONSERVATION & TOURISM

INTRODUCTION - CONSERVATION OF HERITAGE SITES INCLUDING TOURISM

Nature conservation and tourism in the contemporary sense date from the first half of the nineteenth century

and, to a large extent, have developed parallel to one another. Conservation of heritage sites shall include

buildings, artifacts, structures, areas and precincts of historic, aesthetic, architectural, cultural or

environmentally significant nature (heritage buildings and heritage precincts), natural feature areas of

environmental significance or sites of scenic beauty.

Tourism, in all its forms, is of crucial importance to the economic, social and environmental well-being of the

whole country. The planning system has a vital role to play in terms of facilitating the development and

improvement of tourism in appropriate locations.

Ecotourism and protected areas:

Protected areas, which are also regions of significant tourist attraction, are formed in three ways:

• Tourist regions that have been exploited particularly intensively are put under protection. This is a

typical case for mountain national parks.

• A region is recognized as an interesting site after it has been declared a protected area - who would

have thought that vast marshlands or peat bogs could become an attraction until naturalists began

calling for their protection?

• Protection is introduced, among other reasons, to save the tourist attractions of a region, e.g. from

industrial exploitation. This is the objective of many scenic protection areas.

The mandate of the Tourism and Conservation Planning is 'To conserve the rich biodiversity of the Protected

Areas and to develop, sustainable tourism in collaboration with stakeholders for the benefit of all the People

living in Bhedaghat town’

Bhedaghat has a special scenic, recreational and historical value. Its ecology entails some of the following

elements:

• Places of religious Importance

• Places of Historic and archeological Importance

• Excellent Trekking Destination

• Good Picnic Spots

Page 160: CDP Bhedaghat English

CONSERVATION OF MONUMENTS AND SCULPTURES:

The temple of Chaunsatha Yogini

Immediately above the confluence of the Narmada and Bawanganga, the fork of rock rise into a small circular

hill. Atop this hill is situated the 10th century A.D. Temple of the extinct cult of Chaunsatha Yogini. Placed

topographically at the highest point amongst the surroundings, the position this temple is unique and

commanding. A long flight of roughly hewn steps lead right up from the bed of the Narmada to the south-

eastern entrance of the temple. From its north-eastern entrance another flight of steps lead one to the road

which connects the waterfall. Close beneath, on the south the blue water of the Narmada seems to sleep,

spell, spellbound, under the snow-white walls that shut them in.

To the north and the west the view is bounded by thickly wooded height; but on the east the eye looks down

on a long reach of the river, stretching away for miles towards Jabalpur.

Among many obscure cults of ancient and early medieval India the cults of Chaunsatha Yyogin was one.

Yoginis are essentially attendants of the mother goddess, through different interpretations exist. Through

literacy reference to Yoginis may be traced as far back as post- Vedic period in India, regular cult worship of

the Yogini came into existence sometimes during the 8th – 9th century A.D. The lead in the direction was

taken by saint Machchhendranatha, the founder of the Yogini Kaula sect, the tenets of which are revealed in

the work kaulajnananirnaya, the authorship of which is ascribed to him.

The followers of Yogini Kaula sect tried to spread their teaching far and wide all over India through the main

regions of their activities seem to have been modern Indian states of Uttarpradesh, Madhya Pradesh, Orrisa

and the district of Coimbatore. Extant remains of the Yogini temples have been found at: Hirapur and Ranipur

Jharial in Orissa; Khajuraho, 65 in cases of Mitauli, 42 in cases of Dudahi and Badoh and the largest number-

81 in case of Bhedaghat. This makes the Bhedaghat temple unique. Architecturally, the temples of

Chaunsatha Yogini are either circular or rectangular in shape with Yogini sculptures installed on pedestals

along the inner side of the walls of the circulating cloister with or without a temple erected at the center of

the cloister. The Khajuraho and Badoh temples are rectangular, the rest are circular.

Interior view and plan of Chaunsatha Yogini Temple

Page 161: CDP Bhedaghat English

Apart from the temple remains, isolated collections of Yogini sculptures have been found in MP. At Naresar,

Hingalgarh, Lokahari and Shahdol in addition to several museums in India and abroad. Interesting Yogini

sculptures are in the collections of : the Musee' Guimet in Paris, the Detroit institute of art, the royal Ontario

museum, the Brooklyn museum, the Minneapolis institute of arts and the Kansas collection.

The circular cloister of the Bhedaghat temple consists of a huge thick wall along outer edge of a circular

platform, inside which there is a circular row of pillars and pilasters arranged in two concentric circles. A flat

roof with a low ribbed chhajja running all along is supported by these pillars and pilasters. The inner diameter

of the cloister is 34.5 meters and the outer is 40.8meters. The number of pillars in front row is 84 and an

equal number of pilasters are arranged opposite to them against the black wall. 81 equidistant pedestals are

erected on the circular platform and images of Yoginis and other deities are fixed on them.

GOLAKI MATHA

In a pillar inscription found that from Malkapuram

(dist.Guntur, Andhrapradesh) it is stated that king

Yuvarajadeva of kalachuri dynasty gave as

Bhiksha, three lakhs of villages to his guru

Sadbhavashambhu of the Golkai Matha situated

between Narmada and Ganga. This Golaki Matha

was so named on account of its attachment with

the Gol (round) temple of Chaunsatha Yogini

Remains of this Matha may be identified with the

ruined two storied rectangular structure situated just opposite to the steps that lead to the temple which

begins from the road side. This was the famous tantric center known all over India, the branches of which

were established at Cudappah, Kurnool, Guntur, and north Arcot district. In the religious history of ancient

India, the Shiva Acharyas of Golkai Matha occupy a prominent place for their learning. In modern terminology

the structure is known as Haveli.

Gaurishankar Temple

Page 162: CDP Bhedaghat English

PACHMATHA COMPLEX

Opposite the Haveli is situated a group of five temples, known as Panchmatha. Parts of this group were built

during different periods. Temple no.1 is a panchayatan temple built on a plinth measuring 22.93*19.1 meters.

The Ganesh image kept in the Garbhagirha was stolen in 1990. The temple may be dated to c. 14-15th

Century A.D.

Temple no.2 situated at the back of the above is plain octagonal in structure with Shikhara in Nagara style

with Gond influence. The Adhisthana is plain and is 1

meter high.

Temple no.3 situated to the north of no.1 is a square

structure with Shikhara of Nagara style with Gond

influence. An inscription of Vikram Samvat 1810(1752

A.D.) is inscribed on the door-frame of the temple.

The temple is datable to c. 14th – 15th century A.D.

Temple no.4 situated along the edge of the road is

square in plan with spiraled Amalaka, decorative

Shikhara in curvilinear and leaf designs. An inscription

of about 9-10th century A.D is installed into the plinth of the temple is datable to c. early 14th century A.D

situated towards back of complex is a square pillared structure with corbelled dome, locally known as

Samadhi of Mahant Mahadeo Puri. It has plain brackets and exteriors.

Pachmatha temple - 2 Pachmatha temple - 3 Pachmatha temple - 4

Page 163: CDP Bhedaghat English

SHIVA TEMPLE

Within the boundary of rest house no.1 is situated a Shiva temple datable to c. 17th century A.D. The temple

is a plain structure built on a high plinth. The Garbhagriha of this small temple has a central dome. The walls

are plain and the cornice, parapet and lower portion of the dome have leaf design.

MARHIA MATHA: 1-2

a temple datable to c. 14th – 15th century A.D. known as Marhia Matha exist near the river and is accessed

through various homes. It has a domical roof, the walls are plain. It is datable to Gond period.

Another structure on a high mound, also known as Marhia Matha and built near Adhyatma Vigyan Nauka is a

religious Samadhi. The entire structure is plain and has arched false niche. It is painted and cemented.

In front of it, along the road and surrounded by modern house exist ruins of a temple with domical structure

of Gond period.

Panchavati Ghat Marhia Math No. 2

Samadhi of Mahant Mahadeo Puri Mariha Math No. 1

Page 164: CDP Bhedaghat English

Important Sites which have to be conserved:

Bhedaghat is a town and a Nagar Panchayat in Jabalpur district. It is situated by the side of river Narmada

and is approximately 20 km from Jabalpur city. It’s most famous sights are the Dhuandhar Falls, Marble

Rocks, and the Chausath Yogini temple.

Dhuandhar Falls Lamheda Ghat

Tourists Destination and their Description:

Town Tourist Destination Description

Jabalpur

Bargi Reservoir Bargi Dam is built on Narmada River. Its reserved

water is used for Hydropower generation and irrigation

purpose.

Dumna Nature

Reserve

The Dumna Nature Reserve is an eco-tourism site in

Jabalpur.

Madan Mahal Fort Madan Mahal fort was built in 11th century by 38th

Gond (Tribe) ruler. It is built on top of the hill and

visible from most of the city part.

Tilwara Ghat Is one of the main among the several Ghats around

the Narmada river and has the Gandhi Smarak.

Jabalpur Palace Jabalpur has the palace of Gond kings. It possess

gifted natural scenic beauty of hills, ponds, river,

water-fall, historical monuments etc.

Page 165: CDP Bhedaghat English

Existing Infrastructure Gaps - Bhedaghat

• Improvement in the solid waste management is required for the town as well for its tourist sites.

• Lack of direction signages in the town to reach the different tourist spots.

• Night Illumination of Madan Mohan fort, Chausath Yogini Temple and Tilwara ghat.

• Restoration and conservation of Hanuman Mandir and Shiv Mandir

• Improvement in street lighting and public conveniences, onsite, is required for some tourist sites.

• Lack of drinking water

The key components can be:

• Conservation of Ghats.

• General landscaping for ornamental plantation

• Designing pathways, sit outs along the river side for the tourists.

• Waste water treatment before flowing into River.

• Street furniture and public conveniences

• Lighting and illumination

Sitting components for the tourists Pathways along the river bank

Page 166: CDP Bhedaghat English

WORKSHOP HANDOUTS

Page 167: CDP Bhedaghat English

12/19/2011

1

ehar {dH.mg �moOZm 2e8{d8�mo3

ehar ÓemgZ Am–a {dH.mg {d^mJ6 �Ï� ÓXoe gaH.ma

1

n[a�moOZm gœ{jÒV Am–a godmAm| H.m H.m��7jo¿:

� e8{d8�mo8 go ~šhV XrK H.m{bH. H.m� 7Zr{V 2{d©OZ #!$&3 2{d©OZ #!$&3 2{d©OZ #!$&3 2{d©OZ #!$&3 Ho. gmW7gmW ehar {Zdoe �moOZmehar {Zdoe �moOZmehar {Zdoe �moOZmehar {Zdoe �moOZm

2e8{Z8�mo3 CnbÖY H.amZm h– {Oggo gœ~œ{YV e8.Wm8{Z8 Ho.Ðà gaH.ma6 �8n�8 gaH.ma �moOZm Ho.

gmW7gmW e8{d8�mo8 �| ÓmW{�H.Vm H.m� Am–a n[a�moOZm nhMmZ Ho. AmYma na IwX Ho. Edœ AÐ�

8moVm| go {Z{Y�mœ ÓmÒV H.aZo �mo°� hm|Jr 0

� BZ X.VmdoOm| �| {dÁmr� n[aMmbZ �moOZm{dÁmr� n[aMmbZ �moOZm{dÁmr� n[aMmbZ �moOZm{dÁmr� n[aMmbZ �moOZm 2{d8n8�mo83 ^r Xr OmE Vm{H. e8{Z8�mo8 nhMmZr JB

n[a�moOZmAm| Ho. AZwnmbZ Ho. {bE {d{^Ñ {dÁmr� 8moVm| go YZ OwQ>m gHo. 0

� godmAm| Ho. H.m� 7jo¿ �| Oo EZ EZ �w Ama E� Qy>b{H.Q>7# �| ~mVmE JE g^r AmdD�H. H.X�

em{�b hm| {Oggo e8{d8�mo nyam H.aZo �| �XX {�b gHo. O–go AmYma gm�J�r O�m H.aZm Am–a

jo¿7Xm–am6 ZJa n[afX H.��mo[a�m| Am–a g^r AÐ� XmdoXmam| go |̂Q>6 jo¿ {dDbofU AmdD�

H.m� embmAm| H.m Am�moOZ Am–a e8{d8�mo [anmoQ> nyam H.aZm 0

2

Page 168: CDP Bhedaghat English

12/19/2011

2

� ehar {dH.mg �moOZm �| eha H.m gmnoj �h¾d Am–a AZwÄD� XmoZmo h— 0

� �h eha Ho. dV �mZ {dH.mg H.s p.W{V Xem Vm h– {H. A~ h� H.hm¦ h– ?

� �h n[adV Z H.s {XemAm| H.mo ~VmVm h– {H. h�| H.hm¦ OmZm h– ?

� �h X~md jo¿m| H.s nhMmZ H.admVm h– {H. ÓmW{�H.Vm AmYma na h�| N�m H.aZm Mm{hE ?

� Bg�| n[adV Z bo AmZo Ho. {bE d–H.pÞnH. am.Vo6 H.m� Zr{V Am–a h.Vjon H.m ^r gwPmd hmoVm h– {H. h�| bQ� ÓmÒV H.aZo �|

H–.go h.Vjon H.a| 0

� Bg�| R�o.�dH . Am–a {d©OZ hmoZo go OmZ gH.Vo h— n[a�moOZmAm| H.s nhMmZ H–.go hmo Am–a AZwnmbZ H–.go H.a| 0

� �h gwgœ.Wm{nV H.aVm h– {H. {Zdoe {ZU � Ho. �yÞ�mœH.Z Ho. {bE VH .gœJV Edœ gwgœJV T>mœMo go H–.go {ZnQ>m OmE 0

n[aM�:n[aM�:n[aM�:n[aM�:

3

� Odmhabmb ZohÝ. ZoeZb A~ Z [a{Zdb {�{eZ 2Oo8EZ8EZ8�w8Ama8E�3 H.mo Ï�mZ �| aIVo hVE ehar {dH.mg

�moOZm ~Zm�r JB h– Vm{H. {H.©R.m�Vr C¾nmXH.Vm6 gR. b6 Ð�m�gœJV Am–a Ó^mdZr� eham| Ho. bQ� V–�ma {H.�o

Om gHo. 0

� Bg bQ� H.mo ÓmÒV H.aZo Ho. CÇoD� go �h gœH|.{ÃV H.aVm h– {H. Am{W H. Am–a gm�m{OH. AmYm[aH. gœ.WmZ Ho.

{dH.mg6 H.m� 7Zr{V {Og�| ehar Jar~ bmoJm| H.mo Ó^m{dV H.aZo dmbr g�.�mE¦6 gaH.mar ZJanm{bH.mAm| H.mo

�©O~yV H.aZo Amoa CZHo. {dÁmr� boIm7OmoIm Am–a ~OQ> ÓUmbr VWm Ó{H.�m6 Odm~Xohr Am–a nmaX{e Vm bmZo Ho.

{bE T>mœMm V–�ma H.aZm6 ^y{� Am–a Jšh {Z�m U {dnUZ na Ó^md S>mbZo {d{YH. ~mYmAm| H.mo XYa H.aZo Ho. N�m

Cnm� {H.�o OmEœ 0

� �h eham| H.mo AmYma ÓXmZ H.aVm h– {Og�œo ehar jo¿m| �| gwYma bmZo Am–a ehar AmYm[aV T>mœMm| Ho. {bE Ó¾�j

{Zdoe H.aZo �| �XX {�b gHo. 0

n[aM�:n[aM�:n[aM�:n[aM�:

4

Page 169: CDP Bhedaghat English

12/19/2011

3

dJuH.aU Edœ Ó{H�.�m AZwgaU

!Q>oO7" gœJ�hU Am–a Ómaœ^:

Bg Ad.Wm �| ZJa n[afX6 XmdoXma Am–a H.m� dJ Ho. gX.� Am–a ZJa H.m gd}jU H.aZo dmbmoH.� Mm[a�m| Ho. {bE EH. {H.H.7Am¥R. H.m� embm Am�mo {OV H.s OmVr h– 0

!Q>oO7# dV�(mZ n[ap!W{V�m| H.m {ZYm�aU:

dV �mZ n[ap.W{V�m| H.m JhZ {dDbofU {H.�m OmVm h– {Og�| S>o�moJ�m{R.H. ÓmoR.mBb6 EH.moZm{�H.ÓmoR.mBb6 A~ Z JdaZ|g6 A~ Z BÐR�.m.Q¨>NMa Am–a EZdamBZ�|Q>b EgnoNQ> em{�b h– 0

!Q>oO7$ {gQ>r {d©OZ H.m {dH.mg Am–a jo¿ b0� Edœ H.m��7Zr{V:

eha H.m gmnoj Am–a {d©OZ H.m {dH.mg

!Q>oO7% H.m��Zr{V�m| Am–a ÓmW{(H.Vm H.m�� H.m {dH.mg:

eha Ho. ^mdr {dH.mg Ho. {bE eha Edœ {d©OZ H.s dV �mZ p.W{V�m| �| Z©OXr{H.�mœ bmZo hoVw EH.H.m� 7ÓUmbr V–�ma H.aZm 0

5

!Q>oO7& eha {Zdoe �moOZm 2e8{Z8�mo3 Am–a {dÁmr� ÓMmbZ �moOZm 2{d8Ó8�mo3:

eha {Zdoe Am–a {dÁmr� ÓMmbZ �moOZm g{hV {dÁmr� H.m� 7Zr{V V–�ma H.aZm 0

!Q>oO7' S¨>mÕQ> {gQ>r {dH.mg �moOZm 2e8{d8�mo3:

g^r XmdoXmam| Edœ H.m� Xbm| go ÓmÒV R.sS>7~–H. H.mo Ï�mZ �| aIVo hVE eha {Zdoe �moOZm 2e8{Z8�mo3 Am–a{dÁmr� ÓMmbZ �moOZm 2{d8Ó8�mo3 g{hV S¨>mÕQ> {gQ>r {dH.mg �moOZm V–�ma H.aZm 0

!Q>oO7( Aœ{V( e8{d8�mo8 ÓboI:

Aœ{V� H.m� embm H.s R.sS> ~–H. 2Ó{V{H�.�m3 VWm am´� .Va MMm go ÓmÒV Ó{V{H�.�m H.mo em{�b H.aVo hVEAœ{V� eha {dH.mg �moOZm V–�ma H.s OmEJr 0

Cn�w NV g^r .Q>oOm| �| g^r XmdoXmam| Am–a H.m� Xbm| Ho. gmW ß�mnH. Ý.n go nam�e {H.�m OmEJm 0

dJuH.aU Edœ Ó{H�.�m AZwgaU

6

Page 170: CDP Bhedaghat English

12/19/2011

4

H.m`�7ÓUmbr 2gr8S>r8nr83:H.m`�7ÓUmbr 2gr8S>r8nr83:H.m`�7ÓUmbr 2gr8S>r8nr83:H.m`�7ÓUmbr 2gr8S>r8nr83:

7

H.m��embm H.m CÇoB� Am–a (h¾d:

� XmdoXmam| 2.Q>oH. hmoÞS>a3 H.s H.m� embm H.m �w®� CÇ oD� {gQ>r {d©OZ H.m {dH.mg H.aZm h– Am–a ZJa n[afX Ho. jo¿ bQ� VWm�moOZm ~ZmZm h– 0 e8{d8�mo8 eha .Va Ho. bmoJmoœ H.s ÓmW{�H.VmAm| Am–a {MœVmAm| H.mo XYa H.aVm h– 0 AV: {^Ñ7{^Ñ MaUm| �|AZoH. ÓH.ma Ho. XmdoXmam| Ho. {bE H.m� embm Am�mo{OV H.aVr h– 0

� eha {dH.mg �moOZm 2e8{d8�mo3 V–�ma H.aZo Ho. {bE eha Ho. {d©OZ H.m {dH.mg H.aZm AmdD�H. h– 0 {d©OZ V–�mar goeha9ZJa H.s Xem Am–a {Xem H.m {X�oJ�o g�� Ho. ^rVa nVm MbVm h– Am–a .nbQ AnojmEœ gm�Zo Am OmVr >h— 0

� �h eha H.s j�Vm VWm VwbZm¾�H. Am–a Ó{V�moJr lod>VmAm |6 �yÞ� Am–a eha {Zdm{g�m| H.s ngœX6 eha Am–a am´�6 ame¨> Am–a{dDd Am{W H. p.W{V H.m gœ~œY Am–a eha H.s Eo{Vhm{gH. Am–a ^m–Jmo{bH. {deofVmAmoœ H.mo {ZÝ.{nV H.aVm h– 0

� Bg {d©OZ go eha Ho. {dH.mg Ho. {bE XmdoXmam| Ho. ggpNVerb H.m� H.aZo H.s H.m� epNV H.m nVm MbVm h– 0

� eham| Ho. ^{db� H.m EH. nÈ{VnyU �moOZm H.mo AnZmZo H.s AmdD�H.Vm h– Am–a #!$& df Ho. {bE ^{db� Ho. AmH.maZwgma{d©OZ .Q>oQ>�|Q> V–�ma H.aZm h– 0

8

Page 171: CDP Bhedaghat English

12/19/2011

5

�{gQ>r ÓmoR.mBb

�Ozgmœp®�H.s>

�gm_m{OH. Am{W H. nmDd {M¿

�^m–{VH. �moOZm~ÈVm Edœ dš{È Ó~œYZ

�jo¿ {dDbofU

• Ob Amny{V Ó~ÐYZ

• R>mog Hy.S>m> Ó~œYZ

• �b ß�d.Wm6 ~mT> Ob {ZH.mgr9gR.mB Ó~ÐY

• g…S>H. Am–a n[adhZ

• .Q¨>rQ> bmBQ> Am–a Ap°Ze�Z

• JœXr7~.Vr VWm gœdoXZerb n�m daU jo¿ 9 X{©H.�mZygr jo¿

• gm�m{OH. ß�d.Wm 2BœR�.m.Q¨>NMa3

�n�m daUr� gœdoXZerb Edœ gœajU jo¿

� ZJa n[afX Ho. Am�7 ß�� H.m gœ{jÒV {ddaU

Data Requirement

������������������������������������9

Page 172: CDP Bhedaghat English
Page 173: CDP Bhedaghat English
Page 174: CDP Bhedaghat English
Page 175: CDP Bhedaghat English
Page 176: CDP Bhedaghat English
Page 177: CDP Bhedaghat English
Page 178: CDP Bhedaghat English
Page 179: CDP Bhedaghat English
Page 180: CDP Bhedaghat English
Page 181: CDP Bhedaghat English
Page 182: CDP Bhedaghat English
Page 183: CDP Bhedaghat English
Page 184: CDP Bhedaghat English
Page 185: CDP Bhedaghat English
Page 186: CDP Bhedaghat English
Page 187: CDP Bhedaghat English
Page 188: CDP Bhedaghat English
Page 189: CDP Bhedaghat English
Page 190: CDP Bhedaghat English
Page 191: CDP Bhedaghat English
Page 192: CDP Bhedaghat English
Page 193: CDP Bhedaghat English

CHECKLIST

Page 194: CDP Bhedaghat English

Latitude

Longitude

Average rainfall (annual) MM

Height above mean sea level Mts

Municipal area (1991) Sq kms

Municipal area (2001) Sq kms

Municipal area (2011) Sq kms

Date of Constitution of ULB Date

Historic importance

In one or

two

sentences

Population Year 1981 (under Municipal boundary

only)

Population Year 1991 (under Municipal boundary

only)

Population Year 2001 (under Municipal boundary

only)

Population Year 2011 (under Municipal boundary

only)

Name of Population projection Method

Projected population adopted Year 2015

Projected population adopted Year 2025

Projected population adopted Year 2035

Land Use

% Standard

(as per

UDPFI)

Land use

(Tentative in Sq

kms )

Land use (Tentative in

percentage)

Residential 48.0 0.084 3.20

Commercial 2.0 0.002 0.08

Public - semi public 8.0 0.3 11.44

Agriculture 5.0 1.2 45.77

Hill Areas 10.0 0.612 23.34

Roads 12.0 0.196 7.48

Green area 7.0 0.026 0.99

Sensitive 3.0 0.165 6.29

Water bodies 5.0 0.037 1.41

Total 2.622

La

nd

Use

Po

pu

lati

on

Town level

NA

NA

5423

6657

Geometrical Increase Method

8174

10036

12321

Whether the Sectoral Analysis report is as per UADD requisites Yes

To

wn

Bri

ef

Geographical location (Town)23

0 08'

790 48'

1253.7

2.37

2.37

2.37

2001 january

Bhedaghat town is situated by the side of

river Narmada. It’s most famous sights are

the Duandhar Falls, Marble Rocks and the

Chausath Yogini temple

City ProfileCompany Name Aarvee associates

ULB Name Bhedaghat

Page 195: CDP Bhedaghat English

Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

Name of ward Shiwaji Ward Subash Ward Mahatma Gandhi WDeendayal WardAbdul Kalam warRammanohar LohSardar Vallabh Bhai WMaharana Pratap WarRani Durgawati WarVonoba Bhave WaRavi Shankar ShuklaJawaharlal Nehru WLalBhahadur ShastriDr. Ambedkar WarTripur Sundari Ward

Ward Population (2001) 446 378 535 559 323 489 466 400 362 357 458 509 494 473 408 6657

Area (sq kms) 0.15 0.01 0.61 0.01 0.43 1.20 5.54 1.19 1.01 0.83 0.62 1.97 1.26 0.79 0.56 16

Density (PPSqkm) 2905 35697 878 44179 752 408 84 337 360 431 739 259 391 596 728 88742

Male population 225 197 291 303 175 276 227 215 193 187 256 255 260 247 226 3533

Female Population 221 181 244 256 148 213 239 185 169 170 202 254 234 226 182 3124

SC 37 2 58 219 60 19 22 230 17 48 100 5 48 29 9 903

ST 88 81 236 38 67 267 70 27 48 0 17 15 56 132 32 1174

BPL 54 45 64 67 39 59 56 48 43 43 55 61 59 57 49 799

Sex ratio 982 919 838 845 846 772 1053 860 876 909 789 996 900 915 805 13305

Literacy rate (%) 29.53020134 20.37037037 38.13084112 35.42039356 30.1242236 42.94478528 43.77682403 23.80952381 26.51933702 36.59217877 35.44857768 42.94117647 35.02024291 25.15856237 29.41176471 495

No. of Primary schools 0 1 0 1 1 0 0 0 0 0 1 0 0 0 0 4

No. of Primary Health Centre 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1

No. of Households 102 73 117 108 67 110 102 71 67 67 98 99 100 87 87 1355

Primary occupation (Majority) sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture sculpture

Secondary occupation Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture

Tertiary occupation business business business business business business business business business business business business business business business

No. of SS/LS industrial units Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

No. of Commercial establishments 0 0 0 12 8 0 0 0 0 0 0 0 0 0 0 20

No. of Slum pockets 0 0 1 1 0 1 1 1 0 0 0 0 0 0 0 5

Slum population 0 0 482 503 0 440 419 360 0 0 0 0 0 0 0 2204

No. of Slum Households 0 0 88 91 0 80 76 65 0 0 0 0 0 0 0 401

No. of Individual water connections in the

ward61 44 70 65 40 66 61 43 40 40 59 59 60 52 52 813

No. of Community water connections Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

No. of Commercial water connections 0 0 0 16 10 0 0 0 0 0 0 0 0 0 0 26

No. of Tube wells 1 1 1 1 1 1 1 0 0 1 1 1 0 0 0 10

No. of Hand pumps 2 3 1 3 3 4 2 4 3 2 2 0 3 0 1 33

No. of OHTs 0 0 0 0 0 0 0 0 0 0 0 0 1 2 3 6

% Coverage of piped water supply 74 74 74 74 74 45 55 74 74 74 74 45 55 74 74 1014

No. of Individual Toilets 87 62 99 92 57 94 87 60 57 57 83 84 85 74 74 1152

No. of Individual Septic tanks 51 37 59 54 34 55 51 36 34 34 49 50 50 44 44 678

No. of Community Septic tanks Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

No. of Community toilets Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

% of population - Open defecation 77 55 88 81 50 83 77 53 50 50 74 74 75 65 65 1016

No. of Dust bins 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15

Wardwise Waste generated (Kgs) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

Road sweeping (1 time or 2 times) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15

Total no. of sanitary workers in the ward 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 8

Length of Pucca road (Mts) 580.6 321.7 2684.5 967.4 35.7 0 3991.5 0 0 2694.6 1821.7 0 0 2124.0 413.2 15635

Length of Kuccha road (Mts) 0 0 0 0 0 3454.3 0 1147.3 1470.5 0 0 1592.2 1384.5 0 0 9049

Length of State Highway Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

Length of National Highway Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

No. of Streetlights 25 31 33 35 24 25 21 34 29 33 19 37 21 27 22 416

No. of Electricity connections 92 66 105 97 60 99 92 64 60 60 88 89 90 78 78 1220

Name of Tourist site if any

Name of Heritage site if any

Bus stop (No.) No No No No No No No No No No No No No No No

Bus stand(No.) No No No No No No No No No No No No No No No

Parks (No.) 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2

Playground(No.) 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1

No. of Residential properties

No. of Commercial properties 37 2 58 219 60 19 22 230 17 48 100 5 48 29 9

Total Property tax collection (in Rs.)

Property tax coverage(in %)

Available Government land (Sq kms)

Remarks

City Profile (Ward Wise)

Page 196: CDP Bhedaghat English

Source Tube well Hand Pumps River/Lake

No. of Tube well / River / Well 9 33 1

Water Supplied by Tubewell / River /

Well in MLD0.46

0.46

70

30 (Flat)

45

No

Narmada river

0.368

No

674

Nil

Nil

Once in 6 months

NA

Narmada river

2.5

10.20%

No

250

2.00

Once in a Week

80

Practicing in few wards in the town

No

Dumping site

No

3.5

2 Trolleys

Yes

NH-12 A

12

SH-22

5

CC 4.683

WBM / others 11.654

Total (kms) 16.337

(kms) 8.331

(kms)

Ro

ad

s

Name of National Highway passing from or nearby from the town

Distance of National Highway if nearby from the town in Kms

Name of State Highway passing from or nearby from the town

Distance of State Highway if nearby from the town (SH-XYZ) in Kms

Total length of Pucca roads (Kms)

Total length of Kuccha roads (kms)

Gap w.r.t Standards

SW

M

Per capita Solid waste generation (Considering Standards) (in gms)

Total SW generation (in Tons)

Frequency of SW collection by the ULB (1 time per day/2 times per day)

Collection efficiency of the ULB (%)

Any initiative for DTDC (Yes /No)

Any initiative for scientific disposal of waste

Name of dumping/ landfill site

Is the existing site Dumping site or allotted site for Scientific disposal

Area of allotted landfill site for Scientific disposal

Distance of the Dumping site/landfill site from main settlement area (Kms)

No. of Tractor trolleys/vehicles available with the ULB for carrying Solid waste to

the LF site

If site for Scientific disposal is not allotted then whether formally requested by

the ULB

Frequency of Cleaning Individual Septic tanks

Frequency of Cleaning Community Septic tanks

Dra

ina

ge

Name of natural nallah (Storm water drain)

Length of natural nallah (Storm water drain) Kms

Ultimate disposal point of nallah

Length of road side drain (Kms)

Coverage of road side drainage w.r.t roads (%)

Ultimate disposal point of Road side drains

Any treatment plant/procedure adopted

Sectoral Analysis

Ph

ysi

cal

Infr

ast

ruct

ure

Wa

ter

Su

pp

ly

Existing Source

Total water supply in the town (MLD)

Existing Supply rate (LPCD) considering distribution losses

Water Charges per household per month (Rs.) Flat/Metered

% Coverage under paid water supply

Whether any treatment plant exists (Y/N),If yes mention capacity (MLD)

Proposed source (Surface)

Sew

era

ge

Total sewage generation (MLD)

Whether any treatment plant exists (Y/N),If yes mention capacity

Total no. of individual septic tanks

Total no. of community septic tanks

Total no. of Sewage/Mud pumps available with the ULB

Page 197: CDP Bhedaghat English

No

Yes Auto service

1 Nil

2 Nil

3 Nil

416

416

187

0

0

0

0

400 KV

220KV Jabalpur

132KV Shahpura

Y (Single phase)

14

Nil

Nil

Nil

Chousat Yogini temple, Tripurasundari temple,

Naramada Ghats, Dundhara waterfalls

MP Tourism dept

1200 to 1500

Narmada river

Madhya Pradesh Environ….Act 199..

1

Government 0

Beds 0

Private 0

Beds 0

No 0

Name of town Jabalpur

Distance (Kms) 18 kms

6 200 (Students capacity)

3 150-200(Students capacity)

0

0

Nil

Nil

1

ULB

Name of Scheme Beneficiaries

Deendayal antodaya Nil

Widow pension 80% of widows are getting benefits

No. of Beneficiaries under Gharelu Kamkaji Mahila Yojana

Name of other Social security schemes

So

cia

l In

fra

stru

ctu

re

Hea

lth

No. of Primary Health centres/Dispensary

No. of Hospitals

Multispeciality hospital if any (Y/N)

Name of Nearby town reffered for Treatment

Ed

uca

tio

n No. of Primary schools

No. of Secondary/High schools

No. of Colleges

No. of ITI

So

cia

l se

curi

ty s

chem

es

No. of Beneficiaries under SJSRY (Street Vendor)

No. of Beneficiaries under Haath thela/Rickshaw chalak yojna

No. of Rain Basera/Night Shelter

Ownership of Rain Basera (with ULB/Rental)

Her

ita

ge

& t

ou

rism

Her

ita

ge

& t

ou

rism

Name of Heritage site/s

Ownership/agency

Prevailing Heritage Act/s

Name of Tourist site/s

Ownership/agency

Total no. of Pilgrims/ Tourists visiting town per day

En

vir

on

men

t Name of River/Lake/Forest range/Any specific species

Prevailing Environmental Act/s

Areas facing threats

No. of Streetlights having LED

No. of Streetlights having LPS

Po

wer

Location of Substation http://www.mptransco.nic.in

Total no. of residential connections

Total no. of Commercial connections

Any subsidy for BPL (Y/N)

Duration of Electricity supply per day (in Hrs)

Total no. of street lights

No. of Streetlights under working condition

No. of Streetlights having Tubes

No. of Streetlights having CFL

No. of Streetlights having Incandescent bulbs

Ph

ysi

cal

Infr

ast

ruct

ure

Tra

ffic

&

tra

nsp

ort

ati

on

Total no. of vehicles in the town

Bus stand (yes/No)

Any intracity mass transport mode (yes/no)

Name of locations facing major traffic issues

Name of the street beautified as per the instructions of

UADD

Str

eet

lig

hti

ng

Page 198: CDP Bhedaghat English

Ward No Name of Slum pocket/ reference nameNotified/ Un-

notified

Ward

population

Slum

population

Individual

water

connections

No. of

Community

taps

No. of

Handpumps

No. of

Individual

toilets

No. of

Community

toilets

No. of Pucca

houses

No. of Semi

pucca houses

No. of Kuccha

houses

No. of

Permanent

pattas

distributed

No. of

Temporary

pattas

distributed

No. of

Primary

school in the

slum pocket

No. of

Primary

Health centres

in the slum

pocket

Beneficiaries

under social

security

schemes

Any

interventions

under IHSDP

(Y/N)

Ward 3 Mahatman Ghandi Ward Notified 655 590 101 Nil 3 80 Nil 32 21 54 Nil Nil Nil Nil 413 No

Ward 4 Deendhayal Ward Notified 750 675 116 Nil 4 92 Nil 37 25 62 Nil Nil Nil Nil 473 No

Ward 6 Ram Manohar Lohiya Ward Notified 318 286 49 Nil 8 39 Nil 16 10 26 Nil Nil Nil Nil 200 No

Ward 7 Sardhar Ballabha Bhayi Ward Notified 436 392 67 Nil 2 54 Nil 21 14 36 Nil Nil Nil Nil 275 No

Ward 8 Maharana Prathap Ward Notified 334 301 52 Nil 6 41 Nil 17 11 28 Nil Nil Nil Nil 210 No

Total 2493 2244 385 23 306 122 82 204 1571

Sectoral AnalysisSlums & Urban Poor

Page 199: CDP Bhedaghat English

Details 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13

Revenue Receipts

Tax receipts

Land and House Dues 5843510 6249200 10780600 11258019 10500000 11340000

Property Taxes 0 0 23290 11475 12000 12120

Cleaning Tax 0 2829 0 0 0 0

11. Electricity 28860 30880 80257 119600 125000 143750

14.Piligrims tax 990488 1376056 819445 950007 950000 959500

15. Tourists Tax 0 32035 205620 269600 270000 272700

On road 496687 453488 226342 0 0 0

Rudrkund 0 158179 88460 0 0 0

16. Improvement Tax 2280 3000 0 0 0 0

17. Dance or Advertisement Tax 285700 219800 0 0 0 0

19 Other Improvement taxes 0 0 1001 5750 6000 6060

a Fees 0 0 0 1800 0 0

b Market fees 0 0 1938 0 2000 2020

c. Naye Pulo Patkar 0 2039 0 572 0 0

Weekly Market Fee 2186 1177 0 341272 342000 393300

7649711.00 8528683.00 12226953.00 12958095.00 12207000.00 13129450.00

Income from Municipal Property

C. Revenue from other sources 0.00 0.00 890.00 0 0.00 0

I. Land rent 49467.00 858.00 8898.00 224480 225000.00 258750

a. Shasan dwara diya gaye najul rent 0.00 0.00 15370.00 0 0.00 0

b. Najul Bhoomi se bhinn anny bhoomo se prapthi 30740.00 15370.00 0.00 125475 125000.00 141250

II. House rent 77408.00 48009.00 549243.00 968913 912000.00 1048800

III. Bhoomi aur Bhoomi Upaj ke vikay se Income 352699.00 356872.00 0.00 0 0.00 0

a. Najul Bhoomi se prapthi aye 3400.00 0.00 0.00 0 0.00 0

d. Collection from Public Parks 16976.00 13470.00 15774.00 8902 9000.00 9090

c. others 0.00 0.00 81121.00 97849 98000.00 98980

a. Markets Rent and Fees 0.00 0.00 0.00 1770 2000.00 2020

1 Water tax 130000.00 110302.00 33917.00 0 0.00 0

2 water Usage 20000.00 11500.00 1750.00 0 0.00 0

others 1635860.00 1635860.00 0.00 0 0.00 0

Collections from the Duties given to Private persons 0.00 0.00 148230.00 217315 220000.00 222200

a Saarvjanik priyadharshaneey aur mela 71046.00 9725.00 9042.00 241286 180000.00 207000

d Others 80000.00 0.00 0.00 0 0.00 0

- Others 100200.00 0.00 0.00 0 0.00 0

Shaashkiy Prathibhitiyon ke vikray agem adhi bank se pratyaharan t 140000.00 46250.00 69100.00 0 0.00 0

Udhaar / Amanth raashi 0.00 226050.00 460930.00 0 277000.00 279770

b Kule Bazzar prapth kiye gaye Udhhaar 0.00 15950.00 0.00 0 0.00 0

udhhar ke bhugdhaan hetu kshran nivaaran 0.00 159410.00 0.00 0 0.00 0

nidhi se prapthiye check / photocopy 71628.00 2679.00 6850.00 0 0.00 0

Agrim / Amkeshan / Samanyojan 0.00 3410.00 90463.00 243482 244000.00 246440

b Anya nikshep 107500.00 0.00 62207.00 0.00 0.00 0

2886924.00 2655715.00 1553785.00 2129472.00 2292000.00 2514300.00

Fees, Service Charges & Penalties

Revenue from other sources 0.00 0.00 0.00 0 0.00 0

b. boat fee 506305.00 829179.00 946749.00 1179561 1200000.00 1368000

e khadv aur peyi products ke vikray ke liye anugnayapith fees 0.00 0.00 19331.00 0 0.00 0

f. Vadhi ko keliye anugnayapith fees 0.00 0.00 580.00 0 0.00 0

g Dhalal Commission, agent nappayi tullayi vaalo se anugnayapith f 0.00 0.00 439.00 0 1000.00 1010

IX. Asthayi Thor se Prapthi Kiraya 148625.00 0.00 64501.00 0.00 0.00 0

a open land ka bhoobhatak 66200.00 0.00 0.00 0 0.00 0

XV. Purana banda aur imaaratho ke saamaan vikray aagaam 0.00 63351.00 0.00 0 0.00 0

samany aur vishesh 0.00 50000.00 0.00 0 0.00 0

Shasan se 1230900.00 1700000.00 0.00 0 0.00 0

samany pryojana keliye moolbhoot sadak 0.00 653000.00 655100.00 2713023 500000.00 505000

c Educational improvement ke liye 0.00 1807400.00 0.00 0 0.00 0

e Entertainment ke liye / rope way fencing 0.00 246000.00 0.00 0 0.00 0

2 Stahaniy nikayon se 0.00 621000.00 300000.00 0 0.00 0

b samanya prayojana ke liye adhikari 0.00 45000.00 0.00 0 0.00 0

c Educational improvement ke liye 0.00 390453.00 590546.00 0 0.00 0

1952030.00 6405383.00 2577246.00 3892584.00 1701000.00 1874010.00

Revenue Transfers

Octroi 8926.00 6698.00 0.00 0.00 0.00 0.00

Grand Total 12497591.00 17596479.00 16357984.00 18980151.00 16200000.00 17517760.00

Capital Receipts

3 various other Categories of Roads improvement \ protection 0.00 0.00 0.00 404194 200000.00 202000.00

a For General improvements 0.00 0.00 816300.00 200000.00 300000.00 303000.00

B Educational improvement ke liye abhidan pension R.P.S 1782745.00 1482975.00 1379650.00 2200000 1500000.00 1545000.00

Sub-total 1782745.00 1482975.00 2195950.00 2804194 2000000.00 2050000.00

Grand Total 14280336.00 19079454.00 18553934.00 21784345.00 18200000.00 19567760.00

Revenue Expenditure

Establishments and Salaries

normal administration and collection dues 3550334.00 4482000.00 6037167.00 6034781 6500000.00 7020000.00

Establishment of general admin offices 0.00 93684.00 103976.00 1767195 2000000.00 2020000.00

Allowance / Emergency 56271.00 43954.00 51589.00 0 0.00 0.00

Emergency 912545.00 913683.00 1539031.00 0 0.00 0.00

mange evam navka ghat kar patkar sangrahan 442482.00 497542.00 0.00 0 0.00 0.00

i. Establishment 0.00 0.00 537669.00 0 0.00 0.00

ii. Emergency 193180.00 441639.00 559164.00 0 0.00 0.00

5154812.00 6472502.00 8828596.00 7801976.00 8500000.00 9040000.00

Page 200: CDP Bhedaghat English

Office expenditure

People protection 0.00 0.00 0.00 0 0.00 0.00

iii. Emergency (Extinguisher, engine, bucket, repair tools) 180185.00 0.00 0.00 384778 0.00 0.00

B. Power / Light 0.00 0.00 0.00 0 0.00 0.00

i. samagri (Lamp, oil, bulb, repair tools) 61750.00 221068.00 114159.00 223272.00 250000.00 252500.00

electricity supply expenditure 1157008.00 1258767.00 1274847.00 1017076 1500000.00 1545000.00

New works 56670.00 0.00 0.00 0 0.00 0.00

forest animals, snakes, stay dogs vinash 44180.00 0.00 0.00 0 0.00 0.00

Others 25327.00 0.00 0.00 48627 0.00 0.00

Water protection and provision 0.00 0.00 0.00 0 0.00 0.00

water supply 0.00 0.00 0.00 160340 300000.00 303000.00

- General Repair 175350.00 0.00 0.00 42035 600000.00 636000.00

ii. Expenditure on New Works 0.00 159018.00 266237.00 0 0.00 0.00

iii. Establishment of Wells ,Lakes and pumps and maintenance 194692.00 0.00 117041.00 933325 200000.00 202000.00

ii. Emergency 0.00 0.00 17840.00 0 0.00 0.00

iii. General maintenance 5672.00 0.00 0.00 67383 0.00 0.00

iv. others 0.00 0.00 4200.00 3600 3000.00 3030.00

New works / vuksharopan, trigard 0.00 0.00 0.00 283440 100000.00 101000.00

New O&M cost

EAI

1900834.00 1638853.00 1794324.00 3163876.00 2953000.00 3042530.00

Public health and services

ii. - permanent establishment of public toilets 0.00 0.00 10250.00 0.00 0.00 0.00

iv. Road Cleaning 0.00 87185.00 66626.00 0.00 0.00 0.00

- Establishment of Dustbins and their maintenance 0.00 75776.00 0.00 0 0 0.00

I. Post , banglar, sarayi, hotel, darmshala aur uski maintenance 0.00 11140.00 0.00 0 0 0.00

- Establishment 0.00 189140.00 0.00 0 0 0.00

0.00 363241.00 76876.00 0 0 0

Improvements

Public Works 0.00 2708477.00 0.00 85000 0 0.00

Construction of Roads, paths, drains maintenance and renovation 0.00 0.00 93803.00 1169020 0 0.00

New roads, lanes and drains construction 0.00 0.00 210401.00 99877 4000000 4040000.00

Maintenance 0.00 0.00 151734.00 261792 0 0.00

Anushandhan 0.00 0.00 126475.00 467195 0 0.00

other works 444028.00 177498.00 570190.00 0 0 0.00

Tree vardhak sarvajani udhan vatika kule midhan 23990.00 0.00 0.00 0 0 0.00

Samajik Kalyana kari karyakalap (Kalyan Mandhapam) 0.00 172400.00 0.00 0 0 0.00

- anya Prabhath 0.00 30100.00 0.00 0 0 0.00

birth, death and marriage registration 0.00 2400.00 0.00 0 0 0.00

- primary schools and mid day meal 471332.00 422333.00 512572.00 2213268 3000000 3420000.00

- pension establishment / prasikshan 1251400.00 1005991.00 1354941.00 0 0 0.00

- upkaran and akasmiktha 0.00 149000.00 0.00 0 0 0.00

- Bal sadhan sishu mandir etc 153244.00 61052.00 0.00 0 0 0.00

. establishment 209000.00 119903.00 0.00 0 0 0.00

- Emergency 80000.00 23884.00 0.00 320904 0 0.00

2632994.00 4873038.00 3020116.00 4617056 7000000 7460000

Others

others 0.00 0.00 95330.00 840705.00 1060000.00 1070600.00

Actual expenditure on work done for the private people 0.00 71364.00 0.00 0.00 0.00 0.00

sarva janik pradarshani melle 0.00 87796.00 19308.00 31636.00 50000.00 50500.00

kanuni prabhar (legal charges) swagath sarthkar 0.00 4200.00 28767.00 26800.00 100000.00 101000.00

Bhavish Nidhi Me Anushandhaan Pension updhaan Anukampaa ba 0.00 4480.00 0.00 238844.00 300000.00 303000.00

Telephone trunkcall 1898.00 24178.00 28659.00 14839.00 30000.00 32400.00

Lekaa examination fees 22504.00 49670.00 92000.00 47000.00 100000.00 105000.00

others 91015.00 93764.00 48126.00 29270.00 0.00 0.00

prathiboothiyo me run nivaaran nidhi ko chodkar sanchit nidhi jama 0.00 100627.00 0.00 0.00 0.00 0.00

Bhachat Bank / Dhak Ticket 0.00 500.00 500.00 500.00 1000.00 1010.00

Run nivaaran nidhi me Bhoogdhaan 1635860.00 317525.00 0.00 0.00 0.00 0.00

Entertainment 0.00 0.00 225104.00 222728.00 0.00 0.00

Narmada Mahostsav 0.00 0.00 661927.00 502857.00 1000000.00 1010000.00

others 109498.00 0.00 48573.00 0.00 0.00 0.00

Nikhshep 3279.00 0.00 4723.00 0.00 0.00 0.00

Nividha / Gharohar rashi / S.D 0.00 0.00 0.00 885861.00 800000.00 808000.00

Athithi sathkar 0.00 0.00 0.00 145109.00 200000.00 202000.00

15 august , 26 January 0.00 0.00 0.00 79544.00 100000.00 101000.00

1864054.00 754104.00 1253017.00 3065693.00 3741000.00 3784510.00

Grand Total 11552694.00 14101738.00 14972929.00 18648601.00 22194000.00 23327040.00

Capital Expenditure

ii. Buildings 960662.00 139237.00 1209396.00 240397.00 0.00 0.00

- Construction 0.00 0.00 104898.00 377997.00 0.00 0.00

- Maintenance (WBM) 0.00 0.00 567153.00 0.00 0.00 0.00

- Buildings rent 0.00 42700.00 27500.00 0.00 0.00 0.00

960662.00 181937.00 1908947.00 618394.00 0.00 0.00

Total Expenditure 12513356.00 14283675.00 16881876.00 19266995.00 22194000.00 23327040.00

Page 201: CDP Bhedaghat English

Reforms Achieved (Y/N)Any City specific

Strategies adopted

Preliminary estimate

(if any) for

implementation

Implementing agency

2012-13 2013-14 2014-15 2015-16

Full migration of double accounting System N

Property tax reforms, 85% coverage ratio and

90% collection ratio

N

Levy of user charges : full recovery of O & M

charges for sewerage, water supply and SWM

N

Internal earmarking of basic services to urban

poor

N

E-governance N

Provision of basic services to urban poor

including security of tenure at affordable prices,

improved housing, water supply, sanitation

N

Reforms Action Plan

Time line to achieve reforms till 2015