Capital Campaign Kickoff

19
Capital Campaign Kickoff Over 400 parishioners met our architects and got a preview of some of the architectural drawings for our new church.

description

Capital Campaign Kickoff. Over 400 parishioners met our architects and got a preview of some of the architectural drawings for our new church. Capital Campaign Kickoff. Building Committee Chair, Bill Knauer , and Capital Campaign Director, Stephen Carr. Capital Campaign Kickoff. - PowerPoint PPT Presentation

Transcript of Capital Campaign Kickoff

Page 1: Capital Campaign Kickoff

Capital Campaign Kickoff• Over 400 parishioners met our architects and

got a preview of some of the architectural drawings for our new church.

Page 2: Capital Campaign Kickoff

Building Committee Chair, Bill Knauer, and Capital Campaign Director, Stephen Carr

Capital Campaign Kickoff

Page 3: Capital Campaign Kickoff

Capital Campaign Kickoff

Parishioners socialize and get a first look at architectural drawings.

Page 4: Capital Campaign Kickoff

Capital Campaign Kickoff

Father Mosimann talks with some parishioners about some design considerations for our new church.

Page 5: Capital Campaign Kickoff

Capital Campaign KickoffArchitect Art Lohsen points out some design details and responds to parishioner questions.

Page 6: Capital Campaign Kickoff

6

Vision for Our New Church• Respect the central mystery of our faith - the Eucharist– Show unity of the Crucifix, Altar and Tabernacle as the

elements representing this mystery• Enable all to worship through appropriate space design

and use of religious elements• Articulate our history in Leesburg– Incorporating elements of our Little Church– Provide a welcoming façade to our town

Page 7: Capital Campaign Kickoff

A preliminary design for our new church.

Capital Campaign Kickoff

Page 8: Capital Campaign Kickoff

Some preliminary designs for the interior of our new church.

Capital Campaign Kickoff

Page 9: Capital Campaign Kickoff

Some exterior options for our new church.

Capital Campaign Kickoff

Page 10: Capital Campaign Kickoff

A design for our campus

Capital Campaign Kickoff

Page 11: Capital Campaign Kickoff

When can we break ground?When we have 50% of the estimated church construction costs in our building fund.

and

We can demonstrate a plan to successfully retire the remaining 50% debt within a reasonable timeframe.

Page 12: Capital Campaign Kickoff

Arts & Liturgy

Jack Hanssen

Building Committee Members

Bio Summary Sheet is available in the literature racks in vestibule

Communication

Diane Beauchamp

Sue Patania

Jim Patania

Fundraising

Jack Fox

Phil Rusciolelli

Chairperson

Bill Knauer

Finance

Barry Nelen

Scribe

Betty Eisenmann

Hospitality

Katie Maceda

At Large

Jim Wynn

Karen Stapleton

Page 13: Capital Campaign Kickoff

13

Goals of Building Committee• Raise the necessary funds to break ground on our new

church• Finalize design of the new church• Provide information to parishioners• Build a church which gives glory to God, as soon as

possible • Honor the legacy of Leesburg Catholics by providing

a Catholic gateway to the historic district

Page 14: Capital Campaign Kickoff

Spirit DayPreparation for Confirmation

picture

Page 15: Capital Campaign Kickoff

First Youth Mass

Join us for an upcoming Youth Mass on the third Sunday evening of every month

Page 16: Capital Campaign Kickoff

St. Francis of Assisi – October 4

Page 17: Capital Campaign Kickoff

Youth Rally

Page 18: Capital Campaign Kickoff

All Saints Day Parade

Page 19: Capital Campaign Kickoff