35
Cape Cod 208 Plan Scott Horsley Consultant, Cape Cod Commission

description

A presentation about the Cape Cod 208. Presented by Scott Horsley of Horsley-Witten Group during the Buzzards Bay Coalition's 2014 Decision Makers Workshop series. Learn more at www.savebuzzardsbay.org/DecisionMakers

Transcript of Cape Cod 208 Plan Summary

Page 1: Cape Cod 208 Plan Summary

Cape Cod 208 PlanScott HorsleyConsultant, Cape Cod Commission

Page 2: Cape Cod 208 Plan Summary

Pre-Colonial Conditions: Three BaysPre-Colonial Conditions: Three Bays

Contour plot of modeled total nitrogen concentrations (mg/L) in Three Bays, for noanthropogenic loading conditions.

(Source: MEP 2006)

Page 3: Cape Cod 208 Plan Summary

Present Conditions: Three BaysPresent Conditions: Three Bays

Contour plot of average total nitrogen concentrations from results of the present conditions loading scenario, for the Three Bays system.

(Source: MEP 2006)

Page 4: Cape Cod 208 Plan Summary

Build-out Conditions: Three BaysBuild-out Conditions: Three Bays

Contour plot of modeled total nitrogen concentrations (mg/L) in the Three Bays system, for projected build-out loading conditions.

(Source: MEP 2006)

Page 5: Cape Cod 208 Plan Summary
Page 6: Cape Cod 208 Plan Summary

Note: Data averaged from existing Massachusetts Estuaries Project Reports

Page 7: Cape Cod 208 Plan Summary
Page 8: Cape Cod 208 Plan Summary
Page 9: Cape Cod 208 Plan Summary
Page 10: Cape Cod 208 Plan Summary

Rain Garden

Page 11: Cape Cod 208 Plan Summary
Page 12: Cape Cod 208 Plan Summary

Pet Waste Management

Page 13: Cape Cod 208 Plan Summary

Urine-diverting toilet: 90% of N in wastewater is in the urine!

Page 14: Cape Cod 208 Plan Summary
Page 15: Cape Cod 208 Plan Summary

Permeable Reactive Barriers

Page 16: Cape Cod 208 Plan Summary

Permeable Reactive Barriers

Page 17: Cape Cod 208 Plan Summary
Page 18: Cape Cod 208 Plan Summary

Zone II

Page 19: Cape Cod 208 Plan Summary

WWTP

Zone II

Page 20: Cape Cod 208 Plan Summary

WWTP

Zone II

Interceptor/IrrigationWells

Page 21: Cape Cod 208 Plan Summary

TDR: The ConceptTDR: The Concept

preservation areapreservation area

Owner of “sending” Owner of “sending” parcel sells parcel sells development rights in development rights in exchange for exchange for permanent conservation permanent conservation easement.easement.

Owner of Owner of “receiving” parcel “receiving” parcel buys development buys development rights to build at rights to build at densities higher densities higher than allowed under than allowed under base zoning.base zoning.

growth areagrowth area

Page 22: Cape Cod 208 Plan Summary
Page 23: Cape Cod 208 Plan Summary
Page 24: Cape Cod 208 Plan Summary
Page 25: Cape Cod 208 Plan Summary
Page 26: Cape Cod 208 Plan Summary

Kellogg et al., Denitrification and nutrient assimilarion on a restored oyster reef

Page 27: Cape Cod 208 Plan Summary
Page 28: Cape Cod 208 Plan Summary
Page 29: Cape Cod 208 Plan Summary
Page 30: Cape Cod 208 Plan Summary
Page 31: Cape Cod 208 Plan Summary
Page 32: Cape Cod 208 Plan Summary
Page 33: Cape Cod 208 Plan Summary

Federal DEP MADOT BOH ConComm MEPA

CWA GWDP WMA I&A Title 5

WPA Thresholds

Technology/Approach

Stormwater Mngmnt

Fertilizer Mngmnt

Oyster/Aquaculture

Ecotoilets

PRBs

Constructed Wetlands

Fertigation Wells

Phytoremediation

Habitat Restoration

Inlet Widening

Dredging

Page 34: Cape Cod 208 Plan Summary

How do you implement adaptive management?