1 Canadian Regulatory Perspective on Safety Challenges for New NPP A. Viktorov, Canadian Nuclear Safety Commission IAEA Technical Meeting June 22-26, 2015

Transcript of Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on...

Page 1: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

1

Canadian Regulatory Perspective on Safety Challenges for New NPP

A. Viktorov, Canadian Nuclear Safety Commission

IAEA Technical Meeting

June 22-26, 2015

Page 2: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

2

How this presentation works..

1. CNSC outline

2. Preparation for new build in Canada

3. Canadian requirements related to the TM scope

4. Special case – small reactors

Page 3: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

3

1. Canadian Nuclear Safety Commission

• Established May 2000, under the Nuclear Safety and Control Act

• Replaced the AECB, established in 1946, under the Atomic Energy Control Act

• The CNSC regulates all nuclear-related facilities and activities

Page 4: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

4

1. Our Mission

To protect the health, safety and security of persons and the environment; and to implement Canada’s international commitments on the peaceful use of nuclear energy

To disseminate objective scientific, technical and regulatory information to the public concerning the activities of the Commission and the effects on the environment and on the health and safety of persons

Page 5: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

5

1. CNSC Core Activities

• Develop regulatory framework

• Carry out licensing and certification

• Assess baseline compliance

• Support Canada's international obligations

• Engage stakeholders through public hearings and consultations

Commitment to continuous improvement

Page 6: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

6

2. Preparation for New Build

• Site preparation licence issued in August 2012 for Darlington B

• Technology not specified

– But several specific reactor designs considered

• Decision is contested in courts

Page 7: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

7

Act

Regulations

Licences, Certificates, Licence

Conditions and Orders

Requirements

“must meet”

Enabling

Legislation

Requirements

Guidance

2. Mature regulatory framework for new NPP

• Most of regulatory documents for nuclear power reactors updated recently

• Coherent approach for all nuclear facilities

Page 8: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

8 8

2. CNSC Licensing Process

Site preparation

under

Licence to

Prepare Site

Construction

under

Licence to

Construct

Five stages in the lifecycle of a nuclear facility

Operation

under

Licence to

Operate

Decommissioning

under

Licence to

Decommission

Release from

licensing

under

Licence to

Abandon

Page 9: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

9

Page - 9

2. Licensing process independent of reactor technology or size

• Estimated licensing time

~ 9 years from the initial trigger to the operating licence

• In addition to design and operational requirements, guides explain the licensing process in Canada

Page 10: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

10

2. Vendor Design Review - test of readiness

• VDR is a high level review of design to evaluate whether there are fundamental barriers to licensing in Canada

– Tool to determine whether the vendor is ready for potential deployment in Canada

– Standardized process

– Requires design to be essentially complete

• Outcomes help the vendor have discussions with potential customers and the regulator on the path forward

• Vendor Design Review is optional and not part of licensing

Page 11: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

11

2. Vendor Design Review outcomes

• Several designs have gone through the all or some stages of review – ACR, EC6, AP1000, EPR, ATMEA

• No fundamental barriers for licensing of considered designs in Canada

– That is, no safety challenges that could not be resolved based on the current knowledge and technology

Page 12: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

12

2. VDR – examples of potential challenges

• Reflection of lessons learned from the Fukushima Daiichi accident

• Beyond Design Basis Accidents (BDBA) and Severe Accidents (SA) prevention and mitigation

• Classification of Structures, Systems and Components

• Application of Single Failure Criteria

• Containment Leak Rate and Filtered Venting provisions

• Robustness against malevolent acts, physical and cyber security

• Digital control systems, sharing of instrumentation and measurements

Page 13: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

13 13

2. Being prepared for safety challenges

• New reactors would not be licensed for construction with any substantive safety issues outstanding • Substantive issues – are those which may require multi-year effort to

achieve satisfactory resolution

• Regulatory requirements and acceptance criteria should be developed in anticipation of substantive issues or safety challenges • Need to identify potential safety challenges

Page 14: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

14

2. Where challenges lie

• The reactors in Canada are re-licensed every 5 years based on the outcomes of regulatory assessments

– Reactors are safe to operate – safety challenges are understood

• Safety requirements are in place for new NPP

– at least, for the traditional technologies

• Largest challenges for new NPP are not related to safety but

– Economics

– Public acceptance

– Regulatory readiness, for novel technologies

Page 15: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

15

3. Emerging safety challenges

• Some safety challenges are relatively novel – Malevolent acts

– Cyber security

– Counterfeit, fraudulent or suspect items

– Digitalization of plant control

– Loss of know-how in countries with established programs

– Acquiring expertise, in countries starting to develop nuclear energy

• Not the focus of this discussion

Page 16: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

16

3. Focus on Defence in Depth

• CNSC perspective on Principle of DiD and

– Assessment of DiD

– Design Extension Conditions

– Emergency Mitigating Equipment

– Engagement with IAEA

Page 17: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

17

IAEA Summary Report on Fukushima Daiichi Accident

• “The defence in depth concept remains valid, but implementation of the concept needs to be strengthened at all levels by adequate independence, redundancy, diversity and protection against internal and external hazards. There is a need to focus not only on accident prevention, but also on improving mitigation measures.”

Page 18: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

18

3. Three key messages CNSC takes away

• Re-balancing capability for prevention and for mitigation

– Design features to deal with DEC

– SAMG

– Increased understanding of safety margins in DEC

• Attention to external hazards

– Quantification of site specific hazards

– PSA

• Refinement of regulatory requirements

Page 19: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

19

3. CNSC requirements for DiD

• REGDOC-2.5.2, Design of Reactor Facilities: Nuclear Power Plants

– This documents sets requirements for New NPP

– Used as guidance in conduct of Periodic Safety Reviews

• Based on IAEA NS-R-2 and SSR-2/1 and reflects Canadian best practices

The concept of defence in depth shall be applied to all organizational, behavioural, and design-related safety and security activities to ensure they are subject to overlapping provisions. The levels of defence in depth shall be independent to the extent practicable.

Page 20: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

20

3. Assessment of DiD

• Guidance on performing a systematic assessment of DiD is given in IAEA safety reports series No. 46, Assessment of Defence in Depth for Nuclear Power Plants

– Logical and comprehensive approach

– Very cumbersome in application

• Effort to strengthen DiD principle should be accompanied by effort to develop an approach for evaluation

• CNSC currently undertakes a project to develop a simplified assessment approach

Page 21: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

21

3. Design Extension Conditions

• High level requirements in REGDOC-2.5.2, Design of Reactor Facilities: Nuclear Power Plants

– The design authority shall identify the set of design-extension conditions (DECs) ... These DECs shall be used to further improve the safety of the NPP by enhancing the plant's capabilities to withstand accidents that are … more severe than DBAs …

• Standard CSA N290.16 will provide more specific requirements related to BDBA

Page 22: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

22

3. Canadian standard N290.16 (in development)

• Sets Canadian requirements for both existing and new reactors

• Clarifies terminology (for example “BDBA” versus “DEC”)

– Based on the Plant State diagram – next slide

• Describes functional requirements for different types of systems used in BDBA

• Defines objectives and requirements for analysis and management of BDBA

Page 23: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

23

3. Plant states, according to CNSC

Page 24: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

24

3. Design principles for DEC

• Design basis not to be compromised

• Features necessary for accident management to be provided

• Containment performance requirements to be specified for DEC

• Complementary design features, fixed and portable

Page 25: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

25

3. Design principles for DEC

• Interfaces / connection points to be designed to the highest safety class of interfacing systems

• Portable SSC shall have an approved design process and specific criteria

– Includes inspection, testing and maintenance requirements

• DEC SSC to be assessed for survivability and habitability

– Reasonable confidence in functionality of SSC under harsh conditions

Page 26: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

26

3. Assessment principles for DEC and BDBA

• Objective – evaluate design ability to withstand challenges posed by DEC, to reasonable degree of confidence

• Use of best estimate method and integration with PSA

• PSA – main, but not the only, source for identification of DEC

• Uncertainties to be considered

• Ongoing hazard assessment, recognizing that site hazard change over time, especially man-made

Page 28: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

28

3. Emergency Mitigating Equipment

• Design requirements for EME to be developed, supported and documented

– Could be commercial grade

• New NPP could employ the concept of additional mobile equipment to strengthen independence of safety provisions

Page 29: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

29

3. CNSC engagement in refinement of DID concept

• NEA/CNRA STG Green booklet on DiD – final stages of preparation

• IAEA SSR-2/1 and TECDOC “Considerations on the Application of the IAEA Safety Requirements for Design of Nuclear Power Plants”

– Active Canadian participation

– Few notable differences in interpretation of high level requirements

Page 30: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

30

3. DiD aspects where differences persist

• Definition of Design Basis and cascading effects on interpretation of Design Basis Accidents, Safety Systems, design and analysis rules, etc

• Splitting of Level 3 of DiD (and/or sometimes Level 4)

• Place of DEC relative to the Design Basis

• Scope of events included in DEC

Page 31: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

31

3. Design Basis vs Design Extension

• In Canadian framework, DB and DEC are distinct part of the overall “Plant Design Envelope”

• Different rules apply – less conservative for DEC

• Bringing some DEC (no significant core damage) into level 3 DiD creates confusion by having different rules within same level

• Having DEC in levels 3a and 4 requires independent two sets of independent equipment for DEC

• Consideration of DEC as part of Design Basis along with DBA leads to confusion in terminology

Page 32: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

32

4. Small Modular Reactors

Stress-test of the regulatory framework, including identification and resolution of safety challenges

Page 33: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

33

Page - 33

4. What makes SMR different

• Large variety of technologies

– Loop-based, integrated or pool-type LWR

– Sodium, lead, gas cooled

• Novel features

– Factory fuelled

– Remote operation

• Features may challenge existing licensing approaches

Page 34: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

34

Page - 34

4. “SMR” safety requirements

• Requirements should be founded on well-understood, technology neutral scientific bases

• Risk-informing specific requirements is inevitable given the wide variety of SMR

• Graded application of requirements under different circumstances and risk scenarios becomes essential

Page 35: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

35

4. Example: autonomous operation of reactors

• Technology allows remote operatoin of a facility, but needed:

– better understand the state of the art and its safety case

– examine public acceptability (i.e. develop a position and plan to show how confidence will be developed)

– review existing requirements, codes and standards for applicability

– assess whether any additional requirements (i.e., security, human factors, emergency response, etc) needed

– understand sensitivity to external hazards

Page 36: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

36

5. To sum up

• Canada is actively involved with IAEA in development of requirements and guides

• Canada cooperates with several international frameworks examining challenges that future NPP will face – MDEP

– SMR regulatory forum

– INPRO

– Gen IV Forum

• Early identification of potential challenges and common approach helps resolution

Page 37: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

37

5. To sum up – readiness for New NPP

• Canadian regulatory framework has been updated and ready to face challenges posed by new nuclear construction

• Level of safety already achieved by the current NPP is high but opportunities exist for safety improvements

– Safety is not the biggest challenge

• New technologies are likely to bring novel challenges

Page 38: Canadian Regulatory Perspective on Safety Challenges … · Canadian Regulatory Perspective on Safety Challenges for New NPP ... These DECs shall be used to further improve the ...

38

nuclearsafety.gc.ca

Questions are welcome