CAMAC SMART installation
![Page 2: Camac smart installation](https://reader034.fdocuments.net/reader034/viewer/2022042509/555b3cead8b42af36d8b45f3/html5/thumbnails/2.jpg)
We must introduce the CAMAC SMART in the scaffold or placing the scaffolding around the SMART .
![Page 3: Camac smart installation](https://reader034.fdocuments.net/reader034/viewer/2022042509/555b3cead8b42af36d8b45f3/html5/thumbnails/3.jpg)
Level the first mast. It is very important for avoiding erection problems
![Page 4: Camac smart installation](https://reader034.fdocuments.net/reader034/viewer/2022042509/555b3cead8b42af36d8b45f3/html5/thumbnails/4.jpg)
Fix the first mast to the scaffold using the anchorage.
![Page 5: Camac smart installation](https://reader034.fdocuments.net/reader034/viewer/2022042509/555b3cead8b42af36d8b45f3/html5/thumbnails/5.jpg)
Install the wire-winder next to the base. We should give 7 rounds for getting tension on the inside springs. Afterwards connect the cable to the machine.
![Page 6: Camac smart installation](https://reader034.fdocuments.net/reader034/viewer/2022042509/555b3cead8b42af36d8b45f3/html5/thumbnails/6.jpg)
Connect the hand control to the machine. It will be used only for installation process.
![Page 7: Camac smart installation](https://reader034.fdocuments.net/reader034/viewer/2022042509/555b3cead8b42af36d8b45f3/html5/thumbnails/7.jpg)
Assemble the second mast, use the screws to fix it. Use the hand control to lift the machine when you need it.
![Page 8: Camac smart installation](https://reader034.fdocuments.net/reader034/viewer/2022042509/555b3cead8b42af36d8b45f3/html5/thumbnails/8.jpg)
Before start up the CAMAC SMART check that all switches are not active or pressed.
Top limit switch
Safety switch
Bottom limit switch
Floor switch
![Page 9: Camac smart installation](https://reader034.fdocuments.net/reader034/viewer/2022042509/555b3cead8b42af36d8b45f3/html5/thumbnails/9.jpg)
Follow the erection by assembling more masts
and one anchorage every 3 meters.
![Page 10: Camac smart installation](https://reader034.fdocuments.net/reader034/viewer/2022042509/555b3cead8b42af36d8b45f3/html5/thumbnails/10.jpg)
Anchorages are fixed on the mast using this plate.
Floor stop. Can be fixed anywhere on the mast.
Its used for fixing the stop positions according the
scaffold levels.