CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic...

29
CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM 2/26/2014 1 Joan Sollenberger, Chief, Office of Strategic Development HQ Division of Traffic Operations Nick Compin PhD, Chief, Advanced System Development Branch HQ Division of Traffic Operations

Transcript of CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic...

Page 1: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

CALTRANS’ CALIFORNIA CONNECTED CORRIDORS

PROGRAM

2/26/2014

1

Joan Sollenberger, Chief, Office of Strategic Development HQ Division of Traffic Operations

Nick Compin PhD, Chief, Advanced System Development Branch HQ Division of Traffic Operations

Page 2: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

System Completion

and Expansion

Operational Improvements

Intelligent Transportation SystemsTraveler Information

Traffic control / Incident Management

Smart Land UseDemand Management

Value Pricing

Maintenance and Preservation

System Monitoring and Evaluation

Prevention and Safety

ICM California Overview 2

Executive Summary

Integrated Corridor Management (ICM)

Connected Corridors Program

Connected Corridors Pilot – D7

Discussion

Page 3: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Executive Summary

Federal and State programs encourage demonstrable transportation network improvements in safety, performance, reliability and environmental sustainability.

Caltrans Transportation System Management (TSM) includes:

Proactive, real time supply management Proactive demand management

Goal: Caltrans to lead - 50 “ICM” segments in California over the next 10 years.

3

Page 4: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Executive Summary

Connected Corridors Pilot – The first Caltrans-lead ICM effort.

Connected Corridors Program – The multi organizational statewide program.

Next Step: Connected Corridors – Positions Caltrans for autonomous/connected vehicles, social network coordination, and more.

4

Page 5: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

ICM – Integrated Corridor Management

Existing ICM Components/Efforts - existing management systems already support the ICM concept, particularly ITS applications

Keys to ICM - integrating existing ITS elements & systems and management efforts

5

Page 6: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

California’s Progress Towards ICM … 6

2004 Transportation Management System (TMS) Master Plan

$20B Proposition 1B transportation bond of 2006 $4.5B for Corridor Mobility Improvement (CMIA) Corridor System Management Plans (CSMPs) required on all CMIA corridors

CSMPs developed for over 50 freeway corridors

31 using microscopic traffic simulation to assess impacts of improvements

Simulations and scientific assessments point to ITS elements as being among most cost effective investments

Recent Initiatives California Transportation Investment Priorities (CTIP) Caltrans Strategic Plan Update Demand for science/performance based reasoning for project selection Requirement to consider technology as a cost effective investment strategy

Page 7: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Caltrans System Management Goals 7

1. Create a system management culture

2. Performance‐based framework for all Transportation System Management (TSM) work activities and funding prioritization

3. Establish a well‐maintained and high‐performing Transportation Management System (TMS) infrastructure that supports real‐time traffic management

4. Cooperatively develop and implement real‐time (active) traffic management to optimize flow, safety and aid regions and the State to meet greenhouse gas reduction (GHG) targets from transportation

5. Renew consensus on and adhere to critical statewide standards

Page 8: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

System Management Vision

Systems Tools and Functions

Data & Information

Decision & Business Process

Resources

Capital Process

System Management

Separated Integrated

Historical Real-Time

Reactive Proactive/Predictive

Static Assignment Dynamic Assignment

Planning Design Operations

Planning & Design with Ops and Maint.

Current State Future State

8

Page 9: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

ICM Projects – World Wide

Corridor Corridor Type Lead Agencies

Activities

I-15 San Diego Suburban SANDAG • ConOps and System Requirements developed in 2008 • Simulation evaluation in 2009-2010 • System launched in spring 2013 • Currently in evaluation phase

US-75 Dallas Suburban/urban

DART • ConOps and System Requirements developed in 2008 • Simulation evaluation in 2009-2010 • System launched in spring 2013 • Currently in evaluation phase

I-80 Bay Area Suburban/urban

MTC / Caltrans

• ConOps developed in 2010 • Project groundbreaking in October 2012 • Project expected to be completed summer 2015

I-95 / I-395 Virginia

Rural, Suburban & Urban

Virginia DOT

• ConOps development initiated in 2012 • Currently developing deployment plan & partnerships

M1 Freeway, Melbourne (Australia)

Suburban/urban VicRoads • Deployment of traffic management and traveler information systems along the freeway and freeway ramps

M42 Freeway, Birmingham (UK)

Suburban UK Hwy. Agency

• Deployment of traffic management and traveler information systems along the freeway and freeway ramps

9

Page 10: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

ICM Tools - Examples

Enhanced traffic monitoring systems

Enhanced communication

Freeway operations

Arterial operations

Enhanced traveler information

Decision support system

10

RSS for Media(Events, Link Data)

ALERT System

Public Website

Interactive Voice Response (IVR)

My511 Mobile App

Links to Social Medias

Express Lanes

• Not used• Action Plan 1• Action Plan 2

Transit

• Action Plan 1• Action Plan 2

Traveler Information

• Action Plan 1• Action Plan 2• Action Plan 3• Action Plan 4

Traffic Signal Timing

• Action Plan 1• Action Plan 2• Action Plan 3• Action Plan 4

Ramp Metering

• Action Plan 1• Action Plan 2• Action Plan 3• Action Plan 4

Page 11: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Enable coordination of existing transportation infrastructure and vehicles

Deliver improved corridor performance (safety, mobility, reliability)

Improve accountability

Evolve Caltrans to real-time operations and management

Enhance regional , local and private sector partnerships

California Connected Corridors Pilot 11

Page 12: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Integration 12

Coordination to collaboration between various agencies and jurisdictions that transcends institutional boundaries.

Institutional Integration

Operational Integration

Technical Integration

Multi-agency and cross-network operational strategies to manage the total capacity and demand of the corridor.

Sharing and distribution of information, and system operations and control functions to support the immediate analysis and response.

Page 13: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

State, Regional and Local Partnerships 13

Connected Corridors Pilot – Overview Caltrans/PATH/Regional collaborative effort to select the most

suitable corridor Corridor’s Infrastructure readiness

Least impacted by planned construction

Cities’ relative infrastructure/ technological advancement

Significant Congestion

Number of Incidents and Events

Parallel arterials

Top Priority Corridors for Investment – I-110 and I-210 in Los Angeles and the SR-57/SR-91/ I-5 triangle in Orange County

Page 14: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

14

Jurisdictional Environment

Orange Grove Blvd

Walnut St

Colorado Blvd Huntington Dr

Foothill Blvd

Route 66 / Alosta Ave

Arrow Hwy

Gladstone St

Freeway Interchange

Freeway

Arterial

Corson St

E Maple St

Sant

a A

nita

A

ve

Ros

emea

d Bl

vd

Azu

sa A

ve

Segment 1 Segment 2 Segment 3 Pasadena Arcadia / Monrovia

Duarte Azusa / Glendora / Citrus

Irwindale / San Dimas

Page 15: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

15

Freeway Control – Ramp Metering

Metered Interchange Partially Metered Interchange

Unmetered Interchange

Freeway Arterial

Metering installed / not operational

Vernon A

ve

Lake

Ave

2001 SWARM Test Area

2009/2010 SWARM Test Area

Baseline Ave

To

Page 16: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

16

Freeway Control – HOV/HOT Lanes

Metered Interchange Partially Metered Interchange

Unmetered Interchange

Freeway

Arterial Metering installed / not operational

Existing HOV Lane Existing HOT Lane

HOV Lane in Design Stage HOV Lane Under Construction

HOV Lane in Planning Stage

HOT Lanes Opened February 2013

Page 17: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

17

Arterial Control – Signal Density

Orange Grove Blvd

Colorado Blvd Huntington Dr

Foothill Blvd

Route 66 / Alosta Ave

Arrow Hwy

Gladstone St

Freeway Interchange

Freeway

Arterial N Not to

scale

Sant

a A

nita

A

ve

Ros

emea

d Bl

vd

Azu

sa A

ve

Segment 1 Segment 2 Segment 3 Pasadena Arcadia / Monrovia

Duarte Azusa / Glendora / Citrus

Irwindale / San Dimas

Alle

n

Hill

Lake

Los

Robl

es

Fair

Oak

s

Alta

dena

Sier

ra M

adre

Vill

a

Myr

tl

Mou

ntai

n

Buen

a V

ista

Citr

us

Gra

nd

San

Dim

as C

anyo

n

San

Dim

as A

ve

Lone

Hill

Am

elia

Bald

win

Page 18: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

18

Transit Services – Light Rail & Bus Lines

Metro Silver Line

Metro Gold Line

Metro Gold Line Extension (Phase 2a)

Transit Station

Foothill Transit 690 Foothill Transit 492

Silver Streak (Bus Rapid)

Foothill Transit 498 (Express) Foothill Transit 699 (Express) Foothill Transit 499 (Express)

Bus Lines

Page 19: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

19

Park & Ride/Changeable Message Signs

P 965 P 50

P 1153

P 160

P 610

$ 30

P 366

P 239

Existing Metro Rail Park-and-ride Lots

Other Park-and-ride Lots

P 965 Metro Silver Line Metro Gold Line

$ 30 Number of Fee-based Parking Spaces within Total Number of Available Spaces

P 338 P 326

P 300

P 125 P 200 P 200

Metro Gold Line Extension (Phase 2a) Transit Station

$ 290

$ 63 $ 50

Planned Metro Rail Park-and-ride Lots P 965

Foothill Transit 690 Foothill Transit 492

Silver Streak (Bus Rapid)

Foothill Transit 498 (Express) Foothill Transit 699 (Express) Foothill Transit 499 (Express)

Bus Lines Changeable Message Sign

P 40

P 128

P 102

P 70

P 50 P 200

P 600

P 190

P 750

P 150

P 55

P 88

P 239 P 100

P 2095

P 100

P 10

P 150

P 300

P 238

Page 20: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Congestion Analysis 20

Annual Vehicle Hours of Delay Freeway Travel Times Observed Speeds Peaking – AM and PM Peak Periods Intersection V/C Ratios

Truck Volumes – on the mainline and at fwy to fwy Interchanges Location of Warehouses and Distribution Centers

Page 21: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Incidents 21

Incidents Location Frequencies Rates Time of Day, Day of Week, Month of Year Duration

Page 22: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

ITS Element Health 22

Signals Cameras Changeable Message Signs (CMS) Highway Advisory Radio (HAR) Detectors On-Ramp Off-Ramp Mainline

Page 23: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Important Notes 23

Pilot Site selection not official, but we are working on it.

No official announcement yet

However, current partners believe there is a good chance of cities and county participation, assuming a balanced, corridor-wide approach is taken

Page 24: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Moving Forward 24

Look Ahead Tasks Partnership being reinforced; CT/PATH/Regional/Local/Modal

Continue Corridor’s Needs Assessment (freeway, arterials, transit, rail, other modes)

Begin the System Engineering Process in Collaboration with our Partners

Other Initiatives Consistent with the Paradigm Shift Operations re-org to Support Corridor Management

D7 Organizing for Corridor Management Pilot

D-7 Dynamic Corridor Congestion Management (DCCM) Project

DP-08-R1

DD-70-R1

Page 25: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

What Makes Connected Corridors Different?

Caltrans Leadership (DOT)

New Organizational Paradigm

Statewide Program

Building Upon Recent Successes in ICM

New Technologies

New Data

New Models

25

Page 26: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Summary

Initial efforts going well

Caltrans assuming responsibility for corridor wide transportation management

Integration with Federal and State efforts proceeding

Caltrans capable of world leadership in active traffic management

However, still early on in our efforts

26

Page 27: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Planning for Operations 27

TCRs & CSMPs

1. System Management

5. Operational Improvements/strategies

3. Incident Management 2. Arterial Management

4. Traveler Information

State Highway System

Concept of Operations

ITS/Operational Improvement Plan/ Ramp Metering Development Plan, etc.

SHOPP programming, Regional Transportation Plan, & other local agency plans

PIDs, Programming, Project Development & Construction, Performance Measurement

6. Alternative Modes

District System Management Plan

Operations Planning Process

Operations Concept

Page 28: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

Planning for Operations 28

Transportation Corridor Report

(TCR) Guidelines

District System Management Plan (DSMP) Guidelines

Operations Concept or Concept of Operations (ConOps)

System management needs Identified

Capability Maturity Model

(CMM)

Self-Assessment tool used to determine ability to manage transportation networks.

Page 29: CALTRANS’ CALIFORNIA CONNECTED CORRIDORS PROGRAM · 2/26/2014  · Static Assignment Dynamic Assignment Planning Design Operations Planning & Design with Ops and Maint. ... Foothill

29

Thank you….