CALENDARIO DE ADQUISICION PROPIETARIO : GOBIERNO REGIONAL DE SAN MARTIN OBRA : MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE SAPOSOA UBICACIÓN : SAN MARTIN - HUALLAGA - SAPOSOA CONTRATISTA : CONSORCIO ALIANZA Item Materiales Indice Und Cant P.U. Parcial SET-11 1.00 CEMENTO PORTLAND TIPO I (42.5 Kg.) 0% 1.01 CEMENTO PORTLAND TIPO I (42.5 Kg.) 21 BLS 66,276.37 21.00 24.78 1,642,328.45 0.00 2.00 ACERO PARA CONSTRUCCION 0.00 2.01 BRIDA Ho DUCTIL PARA SOLDAR-ROMPE AGUA GLB 1 34083 40,217.94 40,217.94 0.00 2.02 GLG 1 52477.9 61,923.92 61,923.92 0.00 2.03 CARRITO DE DILATACION UND 4 500 590.00 2,360.00 0.00 2.04 ELEMENTOS DE FIJACION D=7/8" UND 4 2300 2,714.00 10,856.00 0.00 2.05 PENDOLA DE ACERO LISO DE 3/8" M 104.8635 130 153.40 16,086.06 0.00 2.06 SOPORTE METALICO TIPO ABRAZADERA GLG 1 59349.72 70,032.67 70,032.67 0.00 2.07 ACERO CORRUGADO FY=4200 KG/CM2 KG 84172.3827 3.2 3.78 317,834.92 0.00 2.08 ALAMBRE NEGRO RECOCIDO Nº 8 (4.19MM) KG 1178.8648 2.58 3.04 3,588.94 0.00 2.09 ALAMBRE NEGRO RECOCIDO Nº 16 (1.65MM) KG 4456.3775 2.58 3.04 13,567.00 0.00 2.10 ALAMBRE DE PUAS GALVANIZADO # 16 M 7371.5355 4.2 4.96 36,533.33 0.00 2.11 CABLE DE ACERO T/BOA 6 X 19 ALMA ACERO 7/8" M 151.19 150 177.00 26,760.63 0.00 2.12 CLAVOS CON CABEZA (TAMAÑO PROMEDIO) KG 551.3785 4.5 5.31 2,927.82 0.00 2.13 CLAVO C/CABEZA PARA MADERA (PROMEDIO) KG 2511.4841 4.5 5.31 13,335.98 0.00 2.14 PERNO I/TUERCA+ARAND 1/2" PASANTE-ENCOFR. UND 57.32 2 2.36 135.28 0.00 2.15 PERNO DE ACERO INC. TUERCA PARA BRIDA GLB 144 1.5 1.77 254.88 0.00 2.16 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 80MM UND 56 2 2.36 132.16 0.00 2.17 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 100MM UND 280 2.5 2.95 826.00 0.00 2.18 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 150MM UND 192 3 3.54 679.68 0.00 Precio Inc. IGV TRANSICIONES, TAPONES, NIPLES Y ABRAZADERAS DE ACERO

Transcript of CALENDARIO Adquisición Materiales

Page 1: CALENDARIO Adquisición Materiales

CALENDARIO DE ADQUISICION DE MATERIALES ACTUALIZADO A LA FECHA DE INICIO DE LA OBRA

PROPIETARIO : GOBIERNO REGIONAL DE SAN MARTINOBRA : MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y ALCANTARILLADO

DE LA LOCALIDAD DE SAPOSOAUBICACIÓN : SAN MARTIN - HUALLAGA - SAPOSOACONTRATISTA : CONSORCIO ALIANZA

Item Materiales Indice Und Cant P.U. Parcial SET-11 Sep-11 Oct-11

1.00 CEMENTO PORTLAND TIPO I (42.5 Kg.) 0% 0% 0%1.01 CEMENTO PORTLAND TIPO I (42.5 Kg.) 21 BLS 66,276.37 21.00

24.78 1,642,328.45 0.00 0.00 0.00 2.00 ACERO PARA CONSTRUCCION

0.00 0.00 0.00 2.01 BRIDA Ho DUCTIL PARA SOLDAR-ROMPE AGUA GLB 1 34083

40,217.94 40,217.94 0.00 0.00 0.00 2.02 GLG 1 52477.9

61,923.92 61,923.92 0.00 0.00 0.00 2.03 CARRITO DE DILATACION UND 4 500

590.00 2,360.00 0.00 0.00 0.00 2.04 ELEMENTOS DE FIJACION D=7/8" UND 4 2300

2,714.00 10,856.00 0.00 0.00 0.00 2.05 PENDOLA DE ACERO LISO DE 3/8" M 104.8635 130

153.40 16,086.06 0.00 0.00 0.00 2.06 SOPORTE METALICO TIPO ABRAZADERA GLG 1 59349.72

70,032.67 70,032.67 0.00 0.00 0.00 2.07 ACERO CORRUGADO FY=4200 KG/CM2 KG 84172.3827 3.2

3.78 317,834.92 0.00 0.00 0.00 2.08 ALAMBRE NEGRO RECOCIDO Nº 8 (4.19MM) KG 1178.8648 2.58

3.04 3,588.94 0.00 0.00 0.00 2.09 ALAMBRE NEGRO RECOCIDO Nº 16 (1.65MM) KG 4456.3775 2.58

3.04 13,567.00 0.00 0.00 0.00 2.10 ALAMBRE DE PUAS GALVANIZADO # 16 M 7371.5355 4.2

4.96 36,533.33 0.00 0.00 0.00 2.11 CABLE DE ACERO T/BOA 6 X 19 ALMA ACERO 7/8" M 151.19 150

177.00 26,760.63 0.00 0.00 0.00 2.12 CLAVOS CON CABEZA (TAMAÑO PROMEDIO) KG 551.3785 4.5

5.31 2,927.82 0.00 0.00 0.00 2.13 CLAVO C/CABEZA PARA MADERA (PROMEDIO) KG 2511.4841 4.5

5.31 13,335.98 0.00 0.00 0.00 2.14 PERNO I/TUERCA+ARAND 1/2" PASANTE-ENCOFR. UND 57.32 2

2.36 135.28 0.00 0.00 0.00 2.15 PERNO DE ACERO INC. TUERCA PARA BRIDA GLB 144 1.5

1.77 254.88 0.00 0.00 0.00 2.16 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 80MM UND 56 2

2.36 132.16 0.00 0.00 0.00 2.17 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 100MM UND 280 2.5

2.95 826.00 0.00 0.00 0.00 2.18 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 150MM UND 192 3

3.54 679.68 0.00 0.00 0.00

Precio Inc. IGV

TRANSICIONES, TAPONES, NIPLES Y ABRAZADERAS DE ACERO

Page 2: CALENDARIO Adquisición Materiales

2.19 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 200MM UND 504 3.54.13 2,081.52 0.00 0.00 0.00

2.20 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 250MM UND 1380 44.72 6,513.60 0.00 0.00 0.00

2.21 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 300MM UND 264 4.55.31 1,401.84 0.00 0.00 0.00

2.22 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 350MM UND 48 6.637.82 375.52 0.00 0.00 0.00

2.23 CONTENEDOR METALICO P/ALMACEN UND 10 320377.60 3,776.00 0.00 0.00 0.00

2.24 UND 4 7588.50 354.00 0.00 0.00 0.00

2.25 TEE HO. DÚCTIL PN 10 DN 200 X 50 UND 1 525619.50 619.50 0.00 0.00 0.00

2.26 CODO 90º HIERRO DÚCTIL BRIDADO DN 150 UND 5 170200.60 1,003.00 0.00 0.00 0.00

2.27 UND 5 60007,080.00 35,400.00 0.00 0.00 0.00

2.28 MARCO DE FIERRO FUNDIDO DIAMETRO 0.60M UND 248 147173.46 43,018.08 0.00 0.00 0.00

2.29 MARCO Y TAPA DE FO.FDO. P/REGISTRO VALVULA UND 124 3035.40 4,389.60 0.00 0.00 0.00

2.30 UND 1 350413.00 413.00 0.00 0.00 0.00

2.31 TAPA DE CONCRETO ARMADO PERFIL FF 60 X 60 P/BUZON UND 248 5362.54 15,509.92 0.00 0.00 0.00

2.32 UND 2037 4553.10 108,164.70 0.00 0.00 0.00

2.33 TUBERIA DE HFD K-9 DN 80MM M 8.17 110129.80 1,060.47 0.00 0.00 0.00

2.34 TUBERIA DE HFD K-9 DN 100MM M 2.525 150177.00 446.93 0.00 0.00 0.00

2.35 TUBERIA DE HFD K-9 DN 200MM M 94.1935 287338.66 31,899.57 0.00 0.00 0.00

2.36 TUBERIA DE HFD K-9 DN 250MM M 190.0041 350413.00 78,471.69 0.00 0.00 0.00

2.37 TUBERIA DE HFD K-9 DN 300MM M 13.4003 473.46558.68 7,486.52 0.00 0.00 0.00

2.38 TUBERIA DE HFD K-9 DN 350MM M 1.1742 548646.64 759.28 0.00 0.00 0.00

2.39 TUBERIA DE HFD K-9 DN 150MM M 22.624 218257.24 5,819.80 0.00 0.00 0.00

2.40 UNION DE DESMONTAJE AUTOPORTANTE DN 80MM UND 2 480566.40 1,132.80 0.00 0.00 0.00

2.41 UNION DE DESMONTAJE AUTOPORTANTE DN 150MM UND 3 550649.00 1,947.00 0.00 0.00 0.00

2.42 UNION DE DESMONTAJE AUTOPORTANTE DN 250MM UND 7 12501,475.00 10,325.00 0.00 0.00 0.00

2.43 UNION FLEXIBLE TIPO DRESSER DN 150 UND 2 210247.80 495.60 0.00 0.00 0.00

2.44 UNION DE DESMONTAJE TIPO DRESSER PN 25 DN 200MM UND 3 310365.80 1,097.40 0.00 0.00 0.00

2.45 CANASTILLA DE BRONCE TIPO ROSACADA DN 50MM UND 1 7082.60 82.60 0.00 0.00 0.00

VENTILACION CON TUBERIA DE FIERRO PINTADO DN 150mm

SISTEMA DE RETENCION DE SOLIDOS (REJILLAS), INCLUYE REJAS Y SIST. DE IZAJE - SEGUN DETALLE

MARCO Y TAPA PLANCHA LAC DE 0.90 x 1.50m E= 1/4" CON MECANISMO DE SEGURIDAD

CAJA DE CONCRETO PARA REGISTRO DESAGUE 0.30 x 0.60M

Page 3: CALENDARIO Adquisición Materiales

2.46 CANASTILLA DE BRONCE TIPO ROSACADA DN 100MM UND 1 95112.10 112.10 0.00 0.00 0.00

2.47 REDUCCION Ho DUCTIL BRIDADA DN 200 A 100 UND 1 420495.60 495.60 0.00 0.00 0.00

2.48 UND 4 275.46325.04 1,300.17 0.00 0.00 0.00

2.49 CODO Ho. DUCTIL 1/4 2 BRIDAS PN 10 DN 200MM UND 3 458.48541.01 1,623.02 0.00 0.00 0.00

2.50 CODO 90º Ho. DUCTIL BRIDADO DN 250MM UND 6 731862.58 5,175.48 0.00 0.00 0.00

2.51 CODO 90º HIERRO DÚCTIL BRIDADO DN 300 UND 6 10031,183.54 7,101.24 0.00 0.00 0.00

2.52 TEE H.DUCTIL BB. PN 10 DN 200 MM x 200 MM UND 1 673794.14 794.14 0.00 0.00 0.00

2.53 TEE H.DUCTIL BB. PN 10 DN 250 MMx 250 MM UND 4 11891,403.02 5,612.08 0.00 0.00 0.00

2.54 CODO Ho. DUCTIL 1/8 2 BRIDAS PN 10 DN 150MM UND 3 272320.96 962.88 0.00 0.00 0.00

2.55 CODO 45º Ho. DUCTIL BRIDADO DN 200MM UND 4 402474.36 1,897.44 0.00 0.00 0.00

2.56 CODO 45º Ho. DUCTIL BRIDADO DN 250MM UND 10 788929.84 9,298.40 0.00 0.00 0.00

2.57 CODO 45° HIERRO DUCTIL BRIDADO DN 300MM UND 4 10051,185.90 4,743.60 0.00 0.00 0.00

2.58 TEE H.DUCTIL BB. PN 10 DN 250 MMx 100 MM UND 2 9701,144.60 2,289.20 0.00 0.00 0.00

2.59 TEE H.DUCTIL BB. PN 10 DN 300 MMx 250 MM UND 1 10231,207.14 1,207.14 0.00 0.00 0.00

2.60 CAJA DE CONCRETO P/MEDIDOR DE AGUA 1/2" y 3/4" UND 2100 1517.70 37,170.00 0.00 0.00 0.00

3.00 TUBERIA DE PVC0.00 0.00 0.00 0.00 0.00

3.01 M 12408 10.3812.25 151,978.15 0.00 0.00 0.00

3.02 M 10911.408 15.7818.62 203,174.78 0.00 0.00 0.00

3.03 M 394.7372 24.7329.18 11,518.98 0.00 0.00 0.00

3.04 M 2307.5088 38.2645.15 104,176.64 0.00 0.00 0.00

3.05 M 427.9754 48.6457.40 24,563.73 0.00 0.00 0.00

3.06 M 522.6014 19.6823.22 12,136.06 0.00 0.00 0.00

3.07 M 437.441 47.2155.71 24,368.88 0.00 0.00 0.00

3.08 M 108.0264 56.0666.15 7,146.03 0.00 0.00 0.00

3.09 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 63MM L=6.00M M 1488.35 2.913.43 5,110.70 0.00 0.00 0.00

3.10 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 90MM L=6.00M M 274.2375 2.913.43 941.68 0.00 0.00 0.00

3.11 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 110MM L=6.00M M 8951.1953 8.7610.34 92,526.72 0.00 0.00 0.00

TRANSICION DE FIERRO FUNDIDO BRIDA-CAMPANA P/AGUA DN 250MM

TUBERIA DE PVC UF NORMA 4435 SN 2 (SERIE 25) DN 160 mm

TUBERIA DE PVC UF NORMA 4435 SN 2 (SERIE 25) DN 200 mm

TUBERIA DE PVC UF NORMA 4435 SN 2 (SERIE 25) DN 250 mm

TUBERIA DE PVC UF NORMA 4435 SN 2 (SERIE 25)DN 300 mm

TUBERIA DE PVC UF NORMA 4435 SN 2 (SERIE 25)DN 350 mm

TUBERIA DE PVC UF NORMA 4435 SN 4 (SERIE 20) DN 200 mm

TUBERIA DE PVC UF NORMA 4435 SN 4 (SERIE 20)DN 300 mm

TUBERIA DE PVC UF NORMA ISO 4435 SN 8 (SERIE 16.7) DN 300 mm

Page 4: CALENDARIO Adquisición Materiales

3.12 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 160MM L=6.00M M 2747.1748 18.4121.72 59,679.08 0.00 0.00 0.00

3.13 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 200MM L=6.00M M 833.8262 28.9134.11 28,444.98 0.00 0.00 0.00

3.14 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 250MM L=6.00M M 3353.268 44.9953.09 178,018.96 0.00 0.00 0.00

3.15 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 315MM L=6.00M M 4918.3942 69.0181.43 400,513.69 0.00 0.00 0.00

3.16 TUBERIA PVC ISO 4422 CLASE 10 U.F. DN 110MM L=6.00M M 7.8074 11.4213.48 105.21 0.00 0.00 0.00

3.17 TUBERIA PVC ISO 4422 CLASE 10 U.F. DN 160MM L=6.00M M 98.88 24.0828.41 2,809.62 0.00 0.00 0.00

3.18 TUBERIA PVC ISO 4422 CLASE 10 U.F. DN 200MM L=6.00M M 49.44 37.4844.23 2,186.55 0.00 0.00 0.00

3.19 TUBERIA PVC ISO 4422 CLASE 10 U.F. DN 315MM L=6.00M M 1580.3187 89.6105.73 167,083.94 0.00 0.00 0.00

3.20 M 28.4692 1.461.72 49.05 0.00 0.00 0.00

3.21 M 69.5868 6.858.08 562.47 0.00 0.00 0.00

3.22 M 94.3171 3.323.92 369.50 0.00 0.00 0.00

3.23 M 3.3475 1416.52 55.30 0.00 0.00 0.00

3.24 TUBERIA PVC-U SAL LIVIANA DN 80 M 13650 4.565.38 73,447.92 0.00 0.00 0.00

3.25 TUBERIA DE PVC SP PN 10 DN 15 MM M 13650 1.11.30 17,717.70 0.00 0.00 0.00

3.26 TUBERIA DE PVC SP PN 10 DN 40 MM M 3.2445 3.854.54 14.74 0.00 0.00 0.00

3.27 ANILLO DE CAUCHO PARA TUBERIA GLB 1 47309.9555,825.74 55,825.74 0.00 0.00 0.00

3.28 ACCESORIOS DE PVC GLB 1 327008.28385,869.77 385,869.77 0.00 0.00 0.00

3.29 GEOMEMBRANAS: PVC, HDPE, ESPECIALES M2 47043.472 12.2514.46 680,013.39 0.00 0.00 0.00

4.00 AGREGADO GRUESO0.00 0.00 0.00 0.00 0.00

4.01 ARENA GRUESA M3 5698.5255 33.940.00 227,952.42 0.00 0.00 0.00

4.02 ARENA FINA M3 562.2394 5059.00 33,172.12 0.00 0.00 0.00

4.03 HORMIGON M3 735.6857 5463.72 46,877.89 0.00 0.00 0.00

4.04 PIEDRA CHANCADA DE 1/2"- 1" M3 6616.977 90106.20 702,722.96 0.00 0.00 0.00

5.00 MADERA NACIONAL P/ ENCOFRADO0.00 0.00 0.00 0.00 0.00

5.01 MADERAS ASERRADAS 43 P2 17688.2341 3.54.13 73,052.41 0.00 0.00 0.00

5.02 MADERA TORNILLO P2 22097.1356 3.94.60 101,691.02 0.00 0.00 0.00

5.03 MADERA NACIONAL P/ENCOFRADO UND 1 2023.60 23.60 0.00 0.00 0.00

TUBERIA PVC ISO 4422 CLASE 7.5 SIMPLE PRESION 1 1/2" L=5.00M

TUBERIA PVC ISO 4422 CLASE 7.5 SIMPLE PRESION 2 1/2" L=5.00M

TUBERIA PVC ISO 4422 CLASE 10 SIMPLE PRESION 2" L=5.00M

TUBERIA PVC ISO 4422 CLASE 10 SIMPLE PRESION 4" L=5.00M

Page 5: CALENDARIO Adquisición Materiales

5.04 REGLETA GRADUADA UND 17.8323 3946.02 820.64 0.00 0.00 0.00

5.05 POSTES DE MADERA UND 338 1214.16 4,786.08 0.00 0.00 0.00

5.06 PLANCHAS DE TRIPLAY PZA 191.115 3237.76 7,216.50 0.00 0.00 0.00

5.07 TRIPLAY DE 4´X 8´X 19MM M2 92.0239 3844.84 4,126.35 0.00 0.00 0.00

#REF! DÓLAR0.00 0.00 0.00 0.00 0.00

#REF! 29 UND 2 5443.56,423.33 12,846.66 0.00 0.00 0.00

#REF! 29 UND 2 1390116,403.18 32,806.36 0.00 0.00 0.00

#REF! 29 UND 3 8507.2510,038.56 30,115.67 0.00 0.00 0.00

#REF! 29 UND 2 29758.5635,115.10 70,230.20 0.00 0.00 0.00

#REF! VALVULA DE PASO TERMOPLASTICA D= 1/2" 29 UND 8 7.58.85 70.80 0.00 0.00 0.00

#REF! 29 UND 4 6576.70 306.80 0.00 0.00 0.00

#REF! VALVULA DE PASO TERMOPLASTICA DE 2" 29 UND 7 1517.70 123.90 0.00 0.00 0.00

#REF! UND 4 6576.70 306.80 0.00 0.00 0.00

#REF! UND 4 150177.00 708.00 0.00 0.00 0.00

#REF! UND 1 52.7962.29 62.29 0.00 0.00 0.00

#REF! UND 3 100118.00 354.00 0.00 0.00 0.00

#REF! UND 13 5564.90 843.70 0.00 0.00 0.00

#REF! VÁLVULA CPTA.BB, HO.DÚCTIL ISO 5996 DN 80 UND 1 350413.00 413.00 0.00 0.00 0.00

#REF! UND 3 360424.80 1,274.40 0.00 0.00 0.00

#REF! UND 1 9891,167.02 1,167.02 0.00 0.00 0.00

#REF! UND 8 272.05321.02 2,568.15 0.00 0.00 0.00

#REF! UND 85 360 424.80 36,108.00 0.00 0.00 0.00

ELECTROBOMBA SUMERGIBLE Q=3.04 l/s, ADT=13.20 m., POT=2.41 hp

ELECTROBOMBA SUMERGIBLE Q=21.31 l/s, ADT=11.26 m., POT=5.5 kw

ELECTROBOMBA SUMERGIBLE Q=28.1 l/s, ADT=6.12 m., POT=3 hp

ELECTROBOMBA SUMERGIBLE Q=42.90 l/s, ADT=29 m., POT=30 kw

VALVULA COMPUERTA DE BRONCE DE 1 1/2" TIPO ESFERICA

VALVULA COMPUERTA DE BRONCE DE 2 1/2" TIPO ESFERICA

VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 4"

VALVULA COMPUERTA DE BRONCE TIPO ROSCADA DN 40 MM

VALVULA COMPUERTA DE BRONCE TIPO ROSCADA DN 50 MM

COMPUERTA PARA CANAL, TIPO TARJETA DE PVC 0.325X0.325, E=22MM

VALVULA COMPUERTA H.DUCTIL CC JUNTA ELASTOMERICA VASTAGO DE ACERO DN 100/110 MM

VALVULA COMPUERTA H.DUCTIL CC JUNTA ELASTOMERICA VASTAGO DE ACERO DN 200 MM

VALVULA CPTA H.DUCTIL. BB JUNTA ELASTOMERI.VASTAGO DE ACERO DN 50 MM

VALVULA CPTA H.DUCTIL. BB JUNTA ELASTOMERI.VASTAGO DE ACERO DN 100 MM

Page 6: CALENDARIO Adquisición Materiales

CALENDARIO DE ADQUISICION DE MATERIALES ACTUALIZADO A LA FECHA DE INICIO DE LA OBRA

Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 TOTAL S/.

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 7: CALENDARIO Adquisición Materiales

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 8: CALENDARIO Adquisición Materiales

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 9: CALENDARIO Adquisición Materiales

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 10: CALENDARIO Adquisición Materiales

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 11: CALENDARIO Adquisición Materiales

11

CALENDARIO DE ADQUISICION DE MATERIALES ACTUALIZADO A LA FECHA DE INICIO DE LA OBRA(SEGÚN EXPEDIENTE TECNICO CONTRACTUAL)

PROPIETARIO : GOBIERNO REGIONAL DE SAN MARTINOBRA : MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y ALCANTARILLADO

DE LA LOCALIDAD DE SAPOSOAUBICACIÓN : SAN MARTIN - HUALLAGA - SAPOSOACONTRATISTA : CONSORCIO ALIANZA

Item Materiales Indice Und Cant P.U. Parcial Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 TOTAL S/.

1.00 CEMENTO PORTLAND TIPO I (42.5 Kg.) 21 930.26 930.26 371,523.83 930.26 631,924.65 630,507.64 930.26 930.26 930.26 930.26 1,860.52 - - 1.01 CEMENTO PORTLAND TIPO I (42.5 Kg.) BLS 66,276.37 21.00

24.78 1,642,328.45 930.26 930.26 371,523.83 930.26 631,924.65 630,507.64 930.26 930.26 930.26 930.26 1,860.52 - 1,642,328.45 2.00 ACERO PARA CONSTRUCCION

3 1,101.00 1,101.00 522,279.94 1,101.00 420,578.92 115,718.77 - - - - - - -

2.01 BRIDA Ho DUCTIL PARA SOLDAR-ROMPE AGUA GLB 1.00 34,083.0040,217.94 40,217.94 41.70 41.70 13,776.25 41.70 20,061.64 6,254.95 - - - - - - - 40,217.94

2.02 TRANSICIONES, TAPONES, NIPLES Y ABRAZADERAS DE ACERO GLG 1.00 52,477.9061,923.92 61,923.92 64.21 64.21 21,211.42 64.21 30,889.08 9,630.81 - - - - - - - 61,923.92

2.03 CARRITO DE DILATACION UND 4.00 500.00590.00 2,360.00 2.45 2.45 808.39 2.45 1,177.22 367.04 - - - - - - - 2,360.00

2.04 ELEMENTOS DE FIJACION D=7/8" UND 4.00 2,300.002,714.00 10,856.00 11.26 11.26 3,718.61 11.26 5,415.22 1,688.39 - - - - - - - 10,856.00

2.05 PENDOLA DE ACERO LISO DE 3/8" M 104.86 130.00153.40 16,086.06 16.68 16.68 5,510.12 16.68 8,024.10 2,501.81 - - - - - - - 16,086.06

2.06 SOPORTE METALICO TIPO ABRAZADERA GLG 1.00 59,349.7270,032.67 70,032.67 72.61 72.61 23,988.99 72.61 34,933.91 10,891.93 - - - - - - - 70,032.67

2.07 ACERO CORRUGADO FY=4200 KG/CM2 KG 84,172.38 3.203.78 317,834.92 329.54 329.54 267,414.56 329.54 49,431.73 - - - - - - - - 317,834.92

2.08 ALAMBRE NEGRO RECOCIDO Nº 8 (4.19MM) KG 1,178.86 2.583.04 3,588.94 3.72 3.72 1,229.35 3.72 1,790.24 558.17 - - - - - - - 3,588.94

2.09 ALAMBRE NEGRO RECOCIDO Nº 16 (1.65MM) KG 4,456.38 2.583.04 13,567.00 14.07 14.07 4,647.24 14.07 6,767.53 2,110.03 - - - - - - - 13,567.00

2.10 ALAMBRE DE PUAS GALVANIZADO # 16 M 7,371.54 4.204.96 36,533.33 37.88 37.88 12,514.13 37.88 18,223.67 5,681.90 - - - - - - - 36,533.33

2.11 CABLE DE ACERO T/BOA 6 X 19 ALMA ACERO 7/8" M 151.19 150.00177.00 26,760.63 27.75 27.75 9,166.58 27.75 13,348.82 4,161.99 - - - - - - - 26,760.63

2.12 CLAVOS CON CABEZA (TAMAÑO PROMEDIO) KG 551.38 4.505.31 2,927.82 3.04 3.04 1,002.90 3.04 1,460.46 455.35 - - - - - - - 2,927.82

2.13 CLAVO C/CABEZA PARA MADERA (PROMEDIO) KG 2,511.48 4.505.31 13,335.98 13.83 13.83 4,568.11 13.83 6,652.30 2,074.10 - - - - - - - 13,335.98

2.14 PERNO I/TUERCA+ARAND 1/2" PASANTE-ENCOFR. UND 57.32 2.002.36 135.28 0.14 0.14 46.34 0.14 67.48 21.04 - - - - - - - 135.28

2.15 PERNO DE ACERO INC. TUERCA PARA BRIDA GLB 144.00 1.501.77 254.88 0.26 0.26 87.31 0.26 127.14 39.64 - - - - - - - 254.88

2.16 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 80MM UND 56.00 2.002.36 132.16 0.14 0.14 45.27 0.14 65.92 20.55 - - - - - - - 132.16

2.17 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 100MM UND 280.00 2.502.95 826.00 0.86 0.86 282.94 0.86 412.03 128.46 - - - - - - - 826.00

2.18 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 150MM UND 192.00 3.003.54 679.68 0.70 0.70 232.82 0.70 339.04 105.71 - - - - - - - 679.68

2.19 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 200MM UND 504.00 3.504.13 2,081.52 2.16 2.16 713.00 2.16 1,038.31 323.73 - - - - - - - 2,081.52

2.20 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 250MM UND 1,380.00 4.004.72 6,513.60 6.75 6.75 2,231.17 6.75 3,249.13 1,013.04 - - - - - - - 6,513.60

2.21 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 300MM UND 264.00 4.505.31 1,401.84 1.45 1.45 480.19 1.45 699.27 218.02 - - - - - - - 1,401.84

2.22 PERNO DE ACERO INC. TUERCA PARA BRIDA DN 350MM UND 48.00 6.637.82 375.52 0.39 0.39 128.63 0.39 187.32 58.40 - - - - - - - 375.52

2.23 CONTENEDOR METALICO P/ALMACEN UND 10.00 320.00377.60 3,776.00 3.92 3.92 1,293.43 3.92 1,883.56 587.27 - - - - - - - 3,776.00

2.24 VENTILACION CON TUBERIA DE FIERRO PINTADO DN 150mm UND 4.00 75.0088.50 354.00 0.37 0.37 121.26 0.37 176.58 55.06 - - - - - - - 354.00

2.25 TEE HO. DÚCTIL PN 10 DN 200 X 50 UND 1.00 525.00619.50 619.50 0.64 0.64 212.20 0.64 309.02 96.35 - - - - - - - 619.50

2.26 CODO 90º HIERRO DÚCTIL BRIDADO DN 150 UND 5.00 170.00200.60 1,003.00 1.04 1.04 343.57 1.04 500.32 155.99 - - - - - - - 1,003.00

2.27 UND 5.00 6,000.007,080.00 35,400.00 36.70 36.70 12,125.91 36.70 17,658.34 5,505.64 - - - - - - - 35,400.00

2.28 MARCO DE FIERRO FUNDIDO DIAMETRO 0.60M UND 248.00 147.00173.46 43,018.08 44.60 44.60 14,735.41 44.60 21,458.41 6,690.45 - - - - - - - 43,018.08

2.29 MARCO Y TAPA DE FO.FDO. P/REGISTRO VALVULA UND 124.00 30.0035.40 4,389.60 4.55 4.55 1,503.61 4.55 2,189.63 682.70 - - - - - - - 4,389.60

2.30 UND 1.00 350.00413.00 413.00 0.43 0.43 141.47 0.43 206.01 64.23 - - - - - - - 413.00

2.31 TAPA DE CONCRETO ARMADO PERFIL FF 60 X 60 P/BUZON UND 248.00 53.0062.54 15,509.92 16.08 16.08 5,312.77 16.08 7,736.71 2,412.20 - - - - - - - 15,509.92

2.32 CAJA DE CONCRETO PARA REGISTRO DESAGUE 0.30 x 0.60M UND 2,037.00 45.0053.10 108,164.70 112.15 112.15 37,050.73 112.15 53,955.05 16,822.47 - - - - - - - 108,164.70

2.33 TUBERIA DE HFD K-9 DN 80MM M 8.170.00 0.00 1.10 1.10 363.25 1.10 528.98 164.93 - - - - - - - 1,060.47

2.34 TUBERIA DE HFD K-9 DN 100MM M 2.53 150.00177.00 446.93 0.46 0.46 153.09 0.46 222.94 69.51 - - - - - - - 446.93

2.35 TUBERIA DE HFD K-9 DN 200MM M 94.19 287.00338.66 31,899.57 33.07 33.07 10,926.88 33.07 15,912.24 4,961.23 - - - - - - - 31,899.57

Precio Inc. IGV

SISTEMA DE RETENCION DE SOLIDOS (REJILLAS), INCLUYE REJAS Y SIST. DE IZAJE - SEGUN DETALLE

MARCO Y TAPA PLANCHA LAC DE 0.90 x 1.50m E= 1/4" ON MECANISMO DE SEGURIDAD

Page 12: CALENDARIO Adquisición Materiales

12

CALENDARIO DE ADQUISICION DE MATERIALES ACTUALIZADO A LA FECHA DE INICIO DE LA OBRA(SEGÚN EXPEDIENTE TECNICO CONTRACTUAL)

PROPIETARIO : GOBIERNO REGIONAL DE SAN MARTINOBRA : MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y ALCANTARILLADO

DE LA LOCALIDAD DE SAPOSOAUBICACIÓN : SAN MARTIN - HUALLAGA - SAPOSOACONTRATISTA : CONSORCIO ALIANZA

Item Materiales Indice Und Cant P.U. Parcial Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 TOTAL S/.Precio Inc. IGV

2.36 TUBERIA DE HFD K-9 DN 250MM M 190.00 350.00413.00 78,471.69 81.36 81.36 26,879.69 81.36 39,143.49 12,204.42 - - - - - - - 78,471.69

2.37 TUBERIA DE HFD K-9 DN 300MM M 13.40 473.46558.68 7,486.52 7.76 7.76 2,564.43 7.76 3,734.45 1,164.35 - - - - - - - 7,486.52

2.38 TUBERIA DE HFD K-9 DN 350MM M 1.17 548.00646.64 759.28 0.79 0.79 260.09 0.79 378.75 118.09 - - - - - - - 759.28

2.39 TUBERIA DE HFD K-9 DN 150MM M 22.62 218.00257.24 5,819.80 6.03 6.03 1,993.51 6.03 2,903.05 905.13 - - - - - - - 5,819.80

2.40 UNION DE DESMONTAJE AUTOPORTANTE DN 80MM UND 2.00 480.00566.40 1,132.80 1.17 1.17 388.03 1.17 565.07 176.18 - - - - - - - 1,132.80

2.41 UNION DE DESMONTAJE AUTOPORTANTE DN 150MM UND 3.00 550.00649.00 1,947.00 2.02 2.02 666.93 2.02 971.21 302.81 - - - - - - - 1,947.00

2.42 UNION DE DESMONTAJE AUTOPORTANTE DN 250MM UND 7.00 1,250.001,475.00 10,325.00 10.71 10.71 3,536.72 10.71 5,150.35 1,605.81 - - - - - - - 10,325.00

2.43 UNION FLEXIBLE TIPO DRESSER DN 150 UND 2.00 210.00247.80 495.60 0.51 0.51 169.76 0.51 247.22 77.08 - - - - - - - 495.60

2.44 UNION DE DESMONTAJE TIPO DRESSER PN 25 DN 200MM UND 3.00 310.00365.80 1,097.40 1.14 1.14 375.90 1.14 547.41 170.67 - - - - - - - 1,097.40

2.45 CANASTILLA DE BRONCE TIPO ROSACADA DN 50MM UND 1.00 70.0082.60 82.60 0.09 0.09 28.29 0.09 41.20 12.85 - - - - - - - 82.60

2.46 CANASTILLA DE BRONCE TIPO ROSACADA DN 100MM UND 1.00 95.00112.10 112.10 0.12 0.12 38.40 0.12 55.92 17.43 - - - - - - - 112.10

2.47 REDUCCION Ho DUCTIL BRIDADA DN 200 A 100 UND 1.00 420.00495.60 495.60 0.51 0.51 169.76 0.51 247.22 77.08 - - - - - - - 495.60

2.48 UND 4.00 275.46325.04 1,300.17 1.35 1.35 445.36 1.35 648.56 202.21 - - - - - - - 1,300.17

2.49 CODO Ho. DUCTIL 1/4 2 BRIDAS PN 10 DN 200MM UND 3.00 458.48541.01 1,623.02 1.68 1.68 555.95 1.68 809.60 252.42 - - - - - - - 1,623.02

2.50 CODO 90º Ho. DUCTIL BRIDADO DN 250MM UND 6.00 731.00862.58 5,175.48 5.37 5.37 1,772.81 5.37 2,581.65 804.92 - - - - - - - 5,175.48

2.51 CODO 90º HIERRO DÚCTIL BRIDADO DN 300 UND 6.00 1,003.001,183.54 7,101.24 7.36 7.36 2,432.46 7.36 3,542.26 1,104.43 - - - - - - - 7,101.24

2.52 TEE H.DUCTIL BB. PN 10 DN 200 MM x 200 MM UND 1.00 673.00794.14 794.14 0.82 0.82 272.02 0.82 396.14 123.51 - - - - - - - 794.14

2.53 TEE H.DUCTIL BB. PN 10 DN 250 MMx 250 MM UND 4.00 1,189.001,403.02 5,612.08 5.82 5.82 1,922.36 5.82 2,799.44 872.83 - - - - - - - 5,612.08

2.54 CODO Ho. DUCTIL 1/8 2 BRIDAS PN 10 DN 150MM UND 3.00 272.00320.96 962.88 1.00 1.00 329.82 1.00 480.31 149.75 - - - - - - - 962.88

2.55 CODO 45º Ho. DUCTIL BRIDADO DN 200MM UND 4.00 402.00474.36 1,897.44 1.97 1.97 649.95 1.97 946.49 295.10 - - - - - - - 1,897.44

2.56 CODO 45º Ho. DUCTIL BRIDADO DN 250MM UND 10.00 788.00929.84 9,298.40 9.64 9.64 3,185.07 9.64 4,638.26 1,446.15 - - - - - - - 9,298.40

2.57 CODO 45° HIERRO DUCTIL BRIDADO DN 300MM UND 4.00 1,005.001,185.90 4,743.60 4.92 4.92 1,624.87 4.92 2,366.22 737.76 - - - - - - - 4,743.60

2.58 TEE H.DUCTIL BB. PN 10 DN 250 MMx 100 MM UND 2.00 970.001,144.60 2,289.20 2.37 2.37 784.14 2.37 1,141.91 356.03 - - - - - - - 2,289.20

2.59 TEE H.DUCTIL BB. PN 10 DN 300 MMx 250 MM UND 1.00 1,023.001,207.14 1,207.14 1.25 1.25 413.49 1.25 602.15 187.74 - - - - - - - 1,207.14

2.60 CAJA DE CONCRETO P/MEDIDOR DE AGUA 1/2" y 3/4" UND 2,100.00 15.0017.70 37,170.00 38.54 38.54 12,732.21 38.54 18,541.25 5,780.92 - - - - - - - 37,170.00

3.00 TUBERIA DE PVC 720.00 0.00 2,789.53 2,789.53 936,776.87 2,789.53 1,315,170.53 418,429.84 11,664.10 - - - - - -

3.01 TUBERIA DE PVC UF NORMA 4435 SN 2 (SERIE 25) DN 160 mm M 12,408.00 10.3812.25 151,978.15 157.58 157.58 52,917.44 157.58 74,292.46 23,636.62 658.89 - - - - - - 151,978.15

3.02 TUBERIA DE PVC UF NORMA 4435 SN 2 (SERIE 25) DN 200 mm M 10,911.41 15.7818.62 203,174.78 210.66 210.66 70,743.66 210.66 99,319.25 31,599.05 880.85 - - - - - - 203,174.78

3.03 TUBERIA DE PVC UF NORMA 4435 SN 2 (SERIE 25) DN 250 mm M 394.74 24.7329.18 11,518.98 11.94 11.94 4,010.81 11.94 5,630.90 1,791.51 49.94 - - - - - - 11,518.98

3.04 TUBERIA DE PVC UF NORMA 4435 SN 2 (SERIE 25)DN 300 mm M 2,307.51 38.2645.15 104,176.64 108.01 108.01 36,273.38 108.01 50,925.34 16,202.22 451.65 - - - - - - 104,176.64

3.05 TUBERIA DE PVC UF NORMA 4435 SN 2 (SERIE 25)DN 350 mm M 427.98 48.6457.40 24,563.73 25.47 25.47 8,552.87 25.47 12,007.65 3,820.31 106.49 - - - - - - 24,563.73

3.06 TUBERIA DE PVC UF NORMA 4435 SN 4 (SERIE 20) DN 200 mm M 522.60 19.6823.22 12,136.06 12.58 12.58 4,225.67 12.58 5,932.55 1,887.48 52.62 - - - - - - 12,136.06

3.07 TUBERIA DE PVC UF NORMA 4435 SN 4 (SERIE 20)DN 300 mm M 437.44 47.2155.71 24,368.88 25.27 25.27 8,485.03 25.27 11,912.40 3,790.00 105.65 - - - - - - 24,368.88

3.08 TUBERIA DE PVC UF NORMA ISO 4435 SN 8 (SERIE 16.7) DN 300 mm M 108.03 56.0666.15 7,146.03 7.41 7.41 2,488.19 7.41 3,493.24 1,111.40 30.98 - - - - - - 7,146.03

3.09 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 63MM L=6.00M M 1,488.35 2.913.43 5,110.70 5.30 5.30 1,779.50 5.30 2,498.29 794.85 22.16 - - - - - - 5,110.70

3.10 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 90MM L=6.00M M 274.24 2.913.43 941.68 0.98 0.98 327.88 0.98 460.33 146.46 4.08 - - - - - - 941.68

3.11 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 110MM L=6.00M M 8,951.20 8.7610.34 92,526.72 95.94 95.94 32,216.98 95.94 45,230.43 14,390.35 401.14 - - - - - - 92,526.72

3.12 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 160MM L=6.00M M 2,747.17 18.4121.72 59,679.08 61.88 61.88 20,779.72 61.88 29,173.31 9,281.67 258.73 - - - - - - 59,679.08

TRANSICION DE FIERRO FUNDIDO BRIDA-CAMPANA P/AGUA DN 250MM

Page 13: CALENDARIO Adquisición Materiales

13

CALENDARIO DE ADQUISICION DE MATERIALES ACTUALIZADO A LA FECHA DE INICIO DE LA OBRA(SEGÚN EXPEDIENTE TECNICO CONTRACTUAL)

PROPIETARIO : GOBIERNO REGIONAL DE SAN MARTINOBRA : MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y ALCANTARILLADO

DE LA LOCALIDAD DE SAPOSOAUBICACIÓN : SAN MARTIN - HUALLAGA - SAPOSOACONTRATISTA : CONSORCIO ALIANZA

Item Materiales Indice Und Cant P.U. Parcial Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 TOTAL S/.Precio Inc. IGV

3.13 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 200MM L=6.00M M 833.83 28.9134.11 28,444.98 29.49 29.49 9,904.29 29.49 13,904.94 4,423.95 123.32 - - - - - - 28,444.98

3.14 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 250MM L=6.00M M 3,353.27 44.9953.09 178,018.96 184.58 184.58 61,984.62 184.58 87,022.16 27,686.65 771.79 - - - - - - 178,018.96

3.15 TUBERIA PVC ISO 4422 CLASE 7.5 U.F. DN 315MM L=6.00M M 4,918.39 69.0181.43 400,513.69 415.27 415.27 139,455.31 415.27 195,785.71 62,290.46 1,736.40 - - - - - - 400,513.69

3.16 TUBERIA PVC ISO 4422 CLASE 10 U.F. DN 110MM L=6.00M M 7.81 11.4213.48 105.21 0.11 0.11 36.63 0.11 51.43 16.36 0.46 - - - - - - 105.21

3.17 TUBERIA PVC ISO 4422 CLASE 10 U.F. DN 160MM L=6.00M M 98.88 24.0828.41 2,809.62 2.91 2.91 978.28 2.91 1,373.44 436.97 12.18 - - - - - - 2,809.62

3.18 TUBERIA PVC ISO 4422 CLASE 10 U.F. DN 200MM L=6.00M M 49.44 37.4844.23 2,186.55 2.27 2.27 761.34 2.27 1,068.87 340.07 9.48 - - - - - - 2,186.55

3.19 TUBERIA PVC ISO 4422 CLASE 10 U.F. DN 315MM L=6.00M M 1,580.32 89.60105.73 167,083.94 173.24 173.24 58,177.14 173.24 81,676.72 25,985.97 724.38 - - - - - - 167,083.94

3.20 TUBERIA PVC ISO 4422 CLASE 7.5 SIMPLE PRESION 1 1/2" L=5.00M M 28.47 1.461.72 49.05 0.05 0.05 17.08 0.05 23.98 7.63 0.21 - - - - - - 49.05

3.21 TUBERIA PVC ISO 4422 CLASE 7.5 SIMPLE PRESION 2 1/2" L=5.00M M 69.59 6.858.08 562.47 0.58 0.58 195.85 0.58 274.96 87.48 2.44 - - - - - - 562.47

3.22 TUBERIA PVC ISO 4422 CLASE 10 SIMPLE PRESION 2" L=5.00M M 94.32 3.323.92 369.50 0.38 0.38 128.66 0.38 180.62 57.47 1.60 - - - - - - 369.50

3.23 TUBERIA PVC ISO 4422 CLASE 10 SIMPLE PRESION 4" L=5.00M M 3.35 14.0016.52 55.30 0.06 0.06 19.26 0.06 27.03 8.60 0.24 - - - - - - 55.30

3.24 TUBERIA PVC-U SAL LIVIANA DN 80 M 13,650.00 4.565.38 73,447.92 76.15 76.15 25,573.91 76.15 35,904.02 11,423.09 318.43 - - - - - - 73,447.92

3.25 TUBERIA DE PVC SP PN 10 DN 15 MM M 13,650.00 1.101.30 17,717.70 18.37 18.37 6,169.15 18.37 8,661.06 2,755.57 76.81 - - - - - - 17,717.70

3.26 TUBERIA DE PVC SP PN 10 DN 40 MM M 3.24 3.854.54 14.74 0.02 0.02 5.13 0.02 7.21 2.29 0.06 - - - - - - 14.74

3.27 ANILLO DE CAUCHO PARA TUBERIA GLB 1.00 47,309.9555,825.74 55,825.74 57.88 57.88 19,438.03 57.88 27,289.66 8,682.38 242.03 - - - - - - 55,825.74

3.28 ACCESORIOS DE PVC GLB 1.00 327,008.28385,869.77 385,869.77 400.09 400.09 134,356.43 400.09 188,627.22 60,012.95 1,672.91 - - - - - - 385,869.77

3.29 GEOMEMBRANAS: PVC, HDPE, ESPECIALES M2 47,043.47 12.2514.46 680,013.39 705.07 705.07 236,774.63 705.07 332,415.35 105,760.05 2,948.16 - - - - - - 680,013.39

4.00 AGREGADO GRUESO 120.00 0.00 1,047.97 1,047.97 328,401.29 1,047.97 671,844.45 1,047.97 1,047.97 1,047.97 1,047.97 1,047.97 2,095.93 - -

4.01 ARENA GRUESA M3 5,698.53 33.9040.00 227,952.42 236.35 236.35 74,065.49 236.35 151,523.42 236.35 236.35 236.35 236.35 236.35 472.70 - - 227,952.42

4.02 ARENA FINA M3 562.24 50.0059.00 33,172.12 34.39 34.39 10,778.17 34.39 22,050.01 34.39 34.39 34.39 34.39 34.39 68.78 - - 33,172.12

4.03 HORMIGON M3 735.69 54.0063.72 46,877.89 48.61 48.61 15,231.40 48.61 31,160.44 48.61 48.61 48.61 48.61 48.61 97.22 - - 46,877.89

4.04 PIEDRA CHANCADA DE 1/2"- 1" M3 6,616.98 90.00106.20 702,722.96 728.61 728.61 228,326.24 728.61 467,110.58 728.61 728.61 728.61 728.61 728.61 1,457.22 - - 702,722.96

5.00 MADERA NACIONAL P/ ENCOFRADO 130.00 0.00 198.78 198.78 66,523.21 198.78 99,390.00 22,952.40 1,260.76 198.78 198.78 198.78 397.56 - -

5.01 MADERAS ASERRADAS P2 17,688.23 3.504.13 73,052.41 75.74 75.74 25,348.25 75.74 37,871.93 8,745.87 480.41 75.74 75.74 75.74 151.49 - - 73,052.41

5.02 MADERA TORNILLO P2 22,097.14 3.904.60 101,691.02 105.44 105.44 35,285.48 105.44 52,718.80 12,174.49 668.74 105.44 105.44 105.44 210.87 - - 101,691.02

5.03 MADERA NACIONAL P/ENCOFRADO UND 1.00 20.0023.60 23.60 0.02 0.02 8.19 0.02 12.23 2.83 0.16 0.02 0.02 0.02 0.05 - - 23.60

5.04 REGLETA GRADUADA UND 17.83 39.0046.02 820.64 0.85 0.85 284.75 0.85 425.44 98.25 5.40 0.85 0.85 0.85 1.70 - - 820.64

5.05 POSTES DE MADERA UND 338.00 12.0014.16 4,786.08 4.96 4.96 1,660.71 4.96 2,481.21 572.99 31.47 4.96 4.96 4.96 9.92 - - 4,786.08

5.06 PLANCHAS DE TRIPLAY PZA 191.12 32.0037.76 7,216.50 7.48 7.48 2,504.03 7.48 3,741.19 863.96 47.46 7.48 7.48 7.48 14.96 - - 7,216.50

5.07 TRIPLAY DE 4´X 8´X 19MM M2 92.02 38.0044.84 4,126.35 4.28 4.28 1,431.79 4.28 2,139.19 494.01 27.14 4.28 4.28 4.28 8.56 - - 4,126.35

6.00 DÓLAR 290.00 0.00 764.00 764.00 370,126.03 764.00 247,124.99 110,405.76 764.00 764.00 764.00 764.00 1,528.00 - -

6.01 ELECTROBOMBA SUMERGIBLE Q=3.04 l/s, ADT=13.20 m., POT=2.41 hp UND 2.00 5,443.50

6,423.33 12,846.66 13.36 13.36 6,473.34 13.36 4,322.11 1,930.95 13.36 13.36 13.36 13.36 26.72 - - 12,846.66 6.02 ELECTROBOMBA SUMERGIBLE Q=21.31 l/s, ADT=11.26 m., POT=5.5 kw UND 2.00 13,901.00

16,403.18 32,806.36 34.12 34.12 16,530.90 34.12 11,037.32 4,931.04 34.12 34.12 34.12 34.12 68.24 - - 32,806.36 6.03 ELECTROBOMBA SUMERGIBLE Q=28.1 l/s, ADT=6.12 m., POT=3 hp UND 3.00 8,507.25

10,038.56 30,115.67 31.32 31.32 15,175.08 31.32 10,132.06 4,526.61 31.32 31.32 31.32 31.32 62.65 - - 30,115.67 6.04 ELECTROBOMBA SUMERGIBLE Q=42.90 l/s, ADT=29 m., POT=30 kw UND 2.00 29,758.56

35,115.10 70,230.20 73.05 73.05 35,388.52 73.05 23,628.13 10,556.12 73.05 73.05 73.05 73.05 146.10 - - 70,230.20 6.05 VALVULA DE PASO TERMOPLASTICA D= 1/2" UND 8.00 7.50

8.85 70.80 0.07 0.07 35.68 0.07 23.82 10.64 0.07 0.07 0.07 0.07 0.15 - - 70.80 6.06 VALVULA COMPUERTA DE BRONCE DE 1 1/2" TIPO ESFERICA UND 4.00 65.00

76.70 306.80 0.32 0.32 154.59 0.32 103.22 46.11 0.32 0.32 0.32 0.32 0.64 - - 306.80

Page 14: CALENDARIO Adquisición Materiales

14

CALENDARIO DE ADQUISICION DE MATERIALES ACTUALIZADO A LA FECHA DE INICIO DE LA OBRA(SEGÚN EXPEDIENTE TECNICO CONTRACTUAL)

PROPIETARIO : GOBIERNO REGIONAL DE SAN MARTINOBRA : MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y ALCANTARILLADO

DE LA LOCALIDAD DE SAPOSOAUBICACIÓN : SAN MARTIN - HUALLAGA - SAPOSOACONTRATISTA : CONSORCIO ALIANZA

Item Materiales Indice Und Cant P.U. Parcial Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 TOTAL S/.Precio Inc. IGV

6.07 VALVULA DE PASO TERMOPLASTICA DE 2" UND 7.00 15.00 17.70 123.90 0.13 0.13 62.43 0.13 41.68 18.62 0.13 0.13 0.13 0.13 0.26 - - 123.90 6.08 VALVULA COMPUERTA DE BRONCE DE 2 1/2" TIPO ESFERICA UND 4.00 65.00

76.70 306.80 0.32 0.32 154.59 0.32 103.22 46.11 0.32 0.32 0.32 0.32 0.64 - - 306.80 6.09 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 4" UND 4.00 150.00

177.00 708.00 0.74 0.74 356.76 0.74 238.20 106.42 0.74 0.74 0.74 0.74 1.47 - - 708.00 6.10 VALVULA COMPUERTA DE BRONCE TIPO ROSCADA DN 40 MM UND 1.00 52.79

62.29 62.29 0.06 0.06 31.39 0.06 20.96 9.36 0.06 0.06 0.06 0.06 0.13 - - 62.29 6.11 VALVULA COMPUERTA DE BRONCE TIPO ROSCADA DN 50 MM UND 3.00 100.00 118.00 354.00 0.37 0.37 178.38 0.37 119.10 53.21 0.37 0.37 0.37 0.37 0.74 - - 354.00 6.12 UND 13.00 55.00

64.90 843.70 0.88 0.88 425.13 0.88 283.85 126.81 0.88 0.88 0.88 0.88 1.76 - - 843.70 6.13 VÁLVULA CPTA.BB, HO.DÚCTIL ISO 5996 DN 80 UND 1.00 350.00 413.00 413.00 0.43 0.43 208.11 0.43 138.95 62.08 0.43 0.43 0.43 0.43 0.86 - - 413.00 6.14 UND 3.00 360.00

424.80 1,274.40 1.33 1.33 642.16 1.33 428.76 191.55 1.33 1.33 1.33 1.33 2.65 - - 1,274.40 6.15 UND 1.00 989.00

1,167.02 1,167.02 1.21 1.21 588.05 1.21 392.63 175.41 1.21 1.21 1.21 1.21 2.43 - - 1,167.02 6.16 UND 8.00 272.05

321.02 2,568.15 2.67 2.67 1,294.07 2.67 864.02 386.01 2.67 2.67 2.67 2.67 5.34 - - 2,568.15 6.17 UND 85.00 360.00

424.80 36,108.00 37.56 37.56 18,194.57 37.56 12,148.12 5,427.30 37.56 37.56 37.56 37.56 75.11 - - 36,108.00 6.18 UND 18.00 1,330.16

1,569.59 28,252.60 29.39 29.39 14,236.29 29.39 9,505.26 4,246.58 29.39 29.39 29.39 29.39 58.77 - - 28,252.60 6.19 UND 10.00 990.00

1,168.20 11,682.00 12.15 12.15 5,886.48 12.15 3,930.27 1,755.89 12.15 12.15 12.15 12.15 24.30 - - 11,682.00 6.20 UND 13.00 1,761.00

2,077.98 27,013.74 28.10 28.10 13,612.04 28.10 9,088.46 4,060.37 28.10 28.10 28.10 28.10 56.19 - - 27,013.74 6.21 UND 1.00 2,590.00

3,056.20 3,056.20 3.18 3.18 1,540.00 3.18 1,028.22 459.37 3.18 3.18 3.18 3.18 6.36 - - 3,056.20 6.22 UND 1.00 859.78

1,014.54 1,014.54 1.06 1.06 511.22 1.06 341.33 152.49 1.06 1.06 1.06 1.06 2.11 - - 1,014.54 6.23 VALVULA CHECK HORIZONTAL DE BRONCE DE 2 1/2" UND 2.00 198.36

234.06 468.13 0.49 0.49 235.89 0.49 157.50 70.36 0.49 0.49 0.49 0.49 0.97 - - 468.13 6.24 VALVULA CHECK TIPO ROSCADA DE BRONCE DN 40 MM UND 2.00 59.50

70.21 140.42 0.15 0.15 70.76 0.15 47.24 21.11 0.15 0.15 0.15 0.15 0.29 - - 140.42 6.25 UND 2.00 650.00

767.00 1,534.00 1.60 1.60 772.97 1.60 516.10 230.57 1.60 1.60 1.60 1.60 3.19 - - 1,534.00 6.26 UND 5.00 1,200.00

1,416.00 7,080.00 7.36 7.36 3,567.56 7.36 2,381.98 1,064.18 7.36 7.36 7.36 7.36 14.73 - - 7,080.00 6.27 UND 2.00 2,600.00

3,068.00 6,136.00 6.38 6.38 3,091.89 6.38 2,064.39 922.29 6.38 6.38 6.38 6.38 12.76 - - 6,136.00 6.28 VALVULA MARIPOSA T/ WAFER BRIDADA DN 150 UND 2.00 1,150.00

1,357.00 2,714.00 2.82 2.82 1,367.57 2.82 913.09 407.93 2.82 2.82 2.82 2.82 5.65 - - 2,714.00 6.29 VALVULA MARIPOSA T/ WAFER BRIDADA DN 200 UND 6.00 1,390.00

1,640.20 9,841.20 10.24 10.24 4,958.91 10.24 3,310.96 1,479.21 10.24 10.24 10.24 10.24 20.47 - - 9,841.20 6.30 VALVULA MARIPOSA T/WAFER BRIDADA DN 250 UND 8.00 1,890.00

2,230.20 17,841.60 18.56 18.56 8,990.26 18.56 6,002.60 2,681.73 18.56 18.56 18.56 18.56 37.11 - - 17,841.60 6.31 VALVULA MARIPOSA T/WAFER BRIDADA DN 350 UND 5.00 3,350.00

3,953.00 19,765.00 20.56 20.56 9,959.45 20.56 6,649.70 2,970.83 20.56 20.56 20.56 20.56 41.12 - - 19,765.00 6.32 VALVULA DE AIRE AUTOMATICA TRIPLE EFECTO BRIDADA PN 16 DN 50 UND 14.00 6,581.00

7,765.58 108,718.12 113.08 113.08 54,782.32 113.08 36,576.94 16,341.15 113.08 113.08 113.08 113.08 226.16 - - 108,718.12 6.33 UND 1.00 2,267.00

2,675.06 2,675.06 2.78 2.78 1,347.94 2.78 899.99 402.08 2.78 2.78 2.78 2.78 5.56 - - 2,675.06 6.34 UND 8.00 5,493.00

6,481.74 51,853.92 53.93 53.93 26,128.83 53.93 17,445.65 7,794.03 53.93 53.93 53.93 53.93 107.87 - - 51,853.92 6.35 UND 11.00 3,063.76

3,615.24 39,767.60 41.36 41.36 20,038.62 41.36 13,379.35 5,977.37 41.36 41.36 41.36 41.36 82.73 - - 39,767.60 6.36 UND 6.00 1,721.00

2,030.78 12,184.68 12.67 12.67 6,139.78 12.67 4,099.39 1,831.45 12.67 12.67 12.67 12.67 25.35 - - 12,184.68 6.37 UND 2.00 1,144.76

1,350.82 2,701.63 2.81 2.81 1,361.33 2.81 908.93 406.08 2.81 2.81 2.81 2.81 5.62 - - 2,701.63 6.38 UND 2.00 1,549.36

1,828.24 3,656.49 3.80 3.80 1,842.48 3.80 1,230.18 549.60 3.80 3.80 3.80 3.80 7.61 - - 3,656.49

COMPUERTA PARA CANAL, TIPO TARJETA DE PVC 0.325X0.325, E=22MM

VALVULA COMPUERTA H.DUCTIL CC JUNTA ELASTOMERICA VASTAGO DE ACERO DN 100/110 MM

VALVULA COMPUERTA H.DUCTIL CC JUNTA ELASTOMERICA VASTAGO DE ACERO DN 200 MM

VALVULA CPTA H.DUCTIL. BB JUNTA ELASTOMERI.VASTAGO DE ACERO DN 50 MM

VALVULA CPTA H.DUCTIL. BB JUNTA ELASTOMERI.VASTAGO DE ACERO DN 100 MM

VALVULA CPTA H.DUCTIL. BB JUNTA ELASTOMERI.VASTAGO DE ACERO DN 150 MM

VALVULA CPTA H.DUCTIL. BB JUNTA ELASTOMERI.VASTAGO DE ACERO DN 200 MM

VALVULA CPTA H.DUCTIL. BB JUNTA ELASTOMERI.VASTAGO DE ACERO DN 250 MM

VALVULA CPTA H.DUCTIL. BB JUNTA ELASTOMERI.VASTAGO DE ACERO DN 300 MM

VÁLVULA DE PURGA DN 50, EN TUBERIA 80 (INC. ELEMENTOS DE REGISTRO)

VALVULA DE RETENCION (SWING CHECK) DISCO DE ACERO/NEOPRENE HD, DN 80mm BRIDADA PN 10

VALVULA DE RETENCION (SWING CHECK) DISCO DE ACERO/NEOPRENE HD, DN 150mm BRIDADA PN 10

VALVULA DE RETENCION (SWING CHECK) DISCO DE ACERO/NEOPRENE HD, DN 200 BRIDADA PN 10

VALVULA DE AIRE DN 50 TRIPLE EFECTO EN TUBERIA DN 80 (INCLUY. CAMARA)

VALVULA DE AIRE DN 50 TRIPLE EFECTO EN TUBERIA DN 250 (INCLUY. CAMARA)

VALVULA DE PURGA DN 50, EN TUBERIA DN 315 (INCLUYE ELEMENTOS DE REGISTRO)

VALVULA DE PURGA DN50, EN TUBERIA DN250 (INCLUY. ELEMENTOS DE REGISTRO)

VÁLVULA DE PURGA DN50, EN TUBERIA DN 110 (INCLUY. ELEMENTOS DE REGISTRO)

VÁLVULA DE PURGA DN50, EN TUBERIA DN 200 (INCLUY. ELEMENTOS DE REGISTRO)

Page 15: CALENDARIO Adquisición Materiales

15

CALENDARIO DE ADQUISICION DE MATERIALES ACTUALIZADO A LA FECHA DE INICIO DE LA OBRA(SEGÚN EXPEDIENTE TECNICO CONTRACTUAL)

PROPIETARIO : GOBIERNO REGIONAL DE SAN MARTINOBRA : MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y ALCANTARILLADO

DE LA LOCALIDAD DE SAPOSOAUBICACIÓN : SAN MARTIN - HUALLAGA - SAPOSOACONTRATISTA : CONSORCIO ALIANZA

Item Materiales Indice Und Cant P.U. Parcial Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 TOTAL S/.Precio Inc. IGV

6.39 UND 3.00 4,664.42

5,504.02 16,512.05 17.17 17.17 8,320.31 17.17 5,555.29 2,481.88 17.17 17.17 17.17 17.17 34.35 - - 16,512.05 6.40 VALVULA DE ALIVIO BB DN 80 MM CONTROL PILOTO UND 1.00

0.00 0.00 3.93 3.93 1,902.70 3.93 1,270.39 567.56 3.93 3.93 3.93 3.93 7.85 - - 3,776.00 6.41 VALVULA DE ALIVIO BB DN 100 MM CONTROL PILOTO UND 1.00 3,945.00

4,655.10 4,655.10 4.84 4.84 2,345.67 4.84 1,566.15 699.70 4.84 4.84 4.84 4.84 9.68 - - 4,655.10 6.42 UND 2,100.00 55.00

64.90 136,290.00 141.76 141.76 68,675.60 141.76 45,853.18 20,485.40 141.76 141.76 141.76 141.76 283.51 - - 136,290.00 6.43 MEDIDOR T/TUBULAR BRIDADO DN 250 MM UND 1.00 8,552.05 10,091.42 10,091.42 10.50 10.50 5,085.00 10.50 3,395.14 1,516.82 10.50 10.50 10.50 10.50 20.99 - - 10,091.42 6.44 MEDIDOR T/TUBULAR BRIDADO DN 300 MM UND 1.00 8,552.05 10,091.42 10,091.42 10.50 10.50 5,085.00 10.50 3,395.14 1,516.82 10.50 10.50 10.50 10.50 20.99 - - 10,091.42 6.45 CANASTILLA DE ACERO BRIDADA DN 300 MM UND 2.00 1,500.00 1,770.00 3,540.00 3.68 3.68 1,783.78 3.68 1,190.99 532.09 3.68 3.68 3.68 3.68 7.36 - - 3,540.00 6.46 CANASTILLA DE SUCCION DE PVC DE 2" UND 2.00 45.00 53.10 106.20 0.11 0.11 53.51 0.11 35.73 15.96 0.11 0.11 0.11 0.11 0.22 - - 106.20 6.47 COMPUERTA PARA CANAL, TIPO TARJETA DE PVC 0.59X0.375, E=22MM UND 1.00 50.00

59.00 59.00 0.06 0.06 29.73 0.06 19.85 8.87 0.06 0.06 0.06 0.06 0.12 - - 59.00 6.48 COMPUERTA FIERRO CON VOLANTE 0.60x0.60M UND 1.00 800.00

944.00 944.00 0.98 0.98 475.68 0.98 317.60 141.89 0.98 0.98 0.98 0.98 1.96 - - 944.00 6.49 COMPUERTA PARA CANAL, TIPO TARJETA DE PVC 0.75X0.325, E=22MM UND 1.00 55.00

64.90 64.90 0.07 0.07 32.70 0.07 21.83 9.75 0.07 0.07 0.07 0.07 0.14 - - 64.90

VÁLVULA DE PURGA DN50, EN TUBERIA DN 150 (INCLUY. ELEMENTOS DE REGISTRO)

MEDIDOR PARA CONEXIÓN DOMICILIARIA DN 15 MM TIPO CHORRO MULTIPLE