PIT SEAM VOL. OB (BCM) VOL. Coal Coal (MT) SR
S1 14,349,028.61 222,377.19 266,852.63
S2 844,671.30 1,013,605.56 14,349,028.61 1,067,048.49 1,280,458.19 11.21
K 61,850,839.56 1,464,846.03 1,757,815.24 L 782,681.60 939,217.92 L1 82,748.72 99,298.46 L2 512,394.85 614,873.82 M 929,995.30 1,115,994.36 N 546,767.00 656,120.40 O 1,686,982.16 2,024,378.59 P 349,688.84 419,626.61 Q 923,864.94 1,108,637.93
61,850,839.56 7,279,969.44 8,735,963.33 7.08
J1 5,576,635.30 17,004.10 20,404.92
J 1,979.50 2,375.40 K 2,281.90 2,738.28 L 23,120.80 27,744.96 M 235,064.60 282,077.52 N1 228,793.10 274,551.72 N 251,607.90 301,929.48
N2 1,731.70 2,078.04 5,576,635.30 761,583.60 913,900.32 6.10
A 4,124,323.90 156,937.70 188,325.24
B 117,802.30 141,362.76
C 93,757.60 112,509.12 4,124,323.90 368,497.60 442,197.12 9.33
TOTAL 85,900,827.37 11,372,518.96 7.55
Total Measured Coal 11,372,518.96
Total Mined Coal 10,235,267.06
Cadangan Batubara dan Volume Overburden
PT. ALFARA DELTA PERSADA
PIT W1
PIT W2
PIT M
PIT S
-