BWTP - Engineering Support (Vedam)

20
VEDAM DESIGN & TECHNICAL CONSULTANCY PVT. LTD. 504-506, Acropolis, Military Road, Marol, Andheri (E), Mumbai-59, INDIA +91-22-67109192 , +91-22- 67257237 [email protected], www.vedamindia.com

description

Vedam, a marine design & consulting firm based in Mumbai, India offers complete engineering support for Installation of Ballast Water Treatment Plant onbaord vessels of all types & sizes. Vedam has been involved in the Ballast water management field for four years and have prepared BWM plan for various shipowners worldwide. Vedam provides match-making, feasibility, design, supervision, class approvals and complete project management to shipowners including equipment selection, shipyard selection, BoQs for associate modifications (structural, piping, electrical, etc) and coordination with all parties for installation of BWT Plant. Vedam provide engineering assistance to various OEMs for installing their system onboard vessels of their clients.

Transcript of BWTP - Engineering Support (Vedam)

Page 1: BWTP - Engineering Support (Vedam)

VEDAM DESIGN & TECHNICAL CONSULTANCY PVT. LTD. 504-506, Acropolis, Military Road,Marol, Andheri (E), Mumbai-59, INDIA

+91-22-67109192 , +91-22- 67257237 [email protected], www.vedamindia.com

Page 2: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Vessel Data Gathering

Installation Location

Piping Design

Electrical Design

Page 3: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Study the vessel design

Gather the as-built data –

◦ Available updated drawings

◦ 3-D Scanning

Vessel Study & Data Gathering

Page 4: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

- For Equipment & PIPING

Single skid installation OR

Multi Location Installation

Deciding Factors – availability of space installation accessibility Minimum modifications (structural, piping, electrical)

Installation Location

Page 5: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Machinery Spaces• Access for maintenance• Additional ventilation for storage of chemicals

Pump Room• Explosion proof systems

Exposed Deck• Explosion proof systems in case of tankers• Increase in GT if enclosed compartment

added New Structural Void tanks

Installation Location

Page 6: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Modification of P&ID Pipe Routing (3D Model)◦ Minimizing pressure loss

Pipe pre fabrication drawings Bill of material Pipe Installation Drawings

Piping Design

Page 7: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Load Calculation Modified 1-Line Diagram Cable ducts routings & penetrations Cable Installation Drawings

Electrical Design

Page 8: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

In Situ pipe fabrication & installation◦ Less engineering required◦ High chances of rework for clash removals◦ High Wastage of material & time◦ High down time for ship

Manual measurement onboard, 3D Routing & pre-fab◦ Less down time of ship◦ Pipes fabricated at workshop – good quality◦ Large amount of engineering time spent onboard for measurement

3D Laser Scan, 3D Routing & pre-fab◦ Less time spent onboard

Methodology

Page 9: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

At docking/Quay side◦ Ship off-hire for the period of retrofit◦ Must in case of in situ fabrication (hot work) & installation

During sailing/operation◦ Pipe can be pre-fabricated using Pre-fabrication drawings from 3D model◦ Installation can be done during operation (cold fitting) with least

interference in normal operation

Execution

Page 10: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Class Approvals◦ Approvals for Retrofit Drawings◦ Coordination for Class survey onboard

Workshop Coordination◦ Technical Specification for retrofit◦ Job work order & Workshop Selection

Supervision◦ Quality inspections (critical for in-situ fabrication)◦ Workshop inspections for pre-fab pipes

Commissioning

Project Management

Page 11: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

5500 DWT MPC◦ Length O.A – 104.000◦ Length B.P - 98.535◦ Breadth - 15.250◦ Depth - 7.450◦ Draft - 5.600

Ballast capacity – 2250 CuM Ballast pumps – 150 CuM/hr @ 2.5Bar

BWMT - PureBallast 2.0, Alfa Laval

Page 12: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Location - Engine Room◦ Being MPC Only space available is ER

Page 13: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Location - Engine Room◦ Unavailability of space in Tank Top◦ Additional Mezzanine Platform Created

Page 14: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Design Deliverables :

◦ Piping – Modified P&ID (Class Approved) Pre-Fabrication drawings Installation Drawings

◦ Platform Fabrication Drawings

◦ ER arrangement plan (Modified)

◦ Updated Electrical 1-line Diagram

Page 15: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Feasibility & Costing

◦ 32,000 Bulk Carrier◦ Ballast Pumps - 2x700 CuM/hr Pumps, ◦ Ballast Capacity - Total 12,000 CuM◦ Equipment with different treatment methods

analysed◦ Capex ranges from approx 800,000 To 1.3M USD◦ Annual Expense ranges from 7,000 To 25,000 USD

Page 16: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Total 60,000 Ships required to be retrofitted in a short period of time.

All existing ships must start retrofitting by 2015.

The price of equipment have drastically reduced in last two years. However, this may see reverse trend post ratification.

Sudden Demand for retrofits :◦ Equipment - High Cost / High Lead time / Non Availability ◦ Long Class approval Time◦ Premium Engineering Hrs

Page 17: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

An ISO 9001-2008 certified

Based in Mumbai, India

Team Size of 50 People (Naval Architects, Marine Engineers, Engineers & Diploma)

Projects in more than 20 Countries.

17

Services includes – Initial Design & Class Drawings Detail Engineering & Production

documentation Ship & Offshore Conversion Design Analysis – Structural, Stability, Mooring Supervision & Surveys

Software Used – FORAN, ANSYS, Zenmoor, Orcaflex, DeepC, Revit, 3DsMax

Page 18: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

Conversion DesignProcess

•Pre-Feasibility Study•Feasibility Study•Concept Design•Structural Design•Machinery and piping Design•Electrical and HVAC Design•Detail Design

•Pre-Feasibility Study•Feasibility Study•Concept Design•Structural Design•Machinery and piping Design•Electrical and HVAC Design•Detail Design

Tanker Conversion:

Single hull to Double Hull

Tanker to Bulk Carrier

Product Tanker to Chemical Carrier

Tanker to FSO

OSV to Diving Support vessel

DP1/2 Conversion. FiFi1/2 Conversions

Training Ship Conversion

Cargo Vessel to Research Vessel Conversion

Deck Barge to Accommodation Barge

Lengthening/Jumboizing of Vessel

Conversion Design

Page 19: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | Inclining Experiment | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals | New Building & Repair Supervision | 

•Crane Installation•Mooring system design

installation•Bulkhead/Tank

Modifications•Pipeline modifications•Accommodation

increase•Equipment Installation

(Pumps/Engines/Cargo Gear/Bow Thruster/etc)

Modification

•Structural Analysis•Mooring Analysis•Stability Analysis•Machinery /Electrical

System Design•Rules compliance

check•Onboard feasibility

check

Processes•Structural Design•Stability Booklets•Class drawings for

approval •Production drawing

for the work shop/retrofitting team

Output

Retrofit Design

Page 20: BWTP - Engineering Support (Vedam)

Marine Consulting | Basic Design | Production Design | Conversion Design | New Building & Repair Supervision | Stability Analysis  |  Structural FEM Analysis  |  Mooring Analysis |  Shipboard Manuals |  Inclining Experiment | 

VEDAM DESIGN & TECHNICAL CONSULTANCY PVT. LTD.

THANK YOU

Vedam

Initial Design

Production

Design

Conversion

Design

Naval Arch

Plans & Calculati

onsMarine

consultancy

Structural

Analysis (FEM)

Supervision and Surveys

Software Services