Buildings with low
carbon dioxide emissionBuilding renovation for reducingenergy demand.
-
8/19/2019 Buildings Poland in English
2/53
What is energy-ecientconstruction?
Energy-ecient construction ischaracterized by the kind of designtechnology and construction that makes itpossible to gain high comfort of living and lowenergy consumption, which means low cost ofexploitation. This is gained by the reduction
of energy needed for heating and hot water,and the reduction of electrical energy usedfor lightning and ventilation.
-
8/19/2019 Buildings Poland in English
3/53
What is energy-ecientconstruction?
The reduction of heating energy is gained bythe usage of the right insulation of the wholebuilding, which means the insulation of walls,slab roofs, foundations, cellar ceilings andoors, window frames with high insulationparameters, elimination and avoidance of all
thermal bridges, the preservation of the hightightness and regaining of the heat thatescapes the building either with the heatedair through ventilation, or through wastewater
sewerage.
-
8/19/2019 Buildings Poland in English
4/53
The percentage of heat loss ofthe building is illustrated in the
picture below.
Źródo! http!""www.ucn.pl"
-
8/19/2019 Buildings Poland in English
5/53
Źródo!www.dasa.com
-
8/19/2019 Buildings Poland in English
6/53
What is thermo-modernisation?
#owadays there is a tendency to design andbuild buildings by using energy$e%cienttechnology, however, the older buildings withhigh heat losses re&uirethermomodernisation.
Thermomodernisation stands for allchanges in the structure of a building and theheating system that lead to the reduction ofheat loss.
-
8/19/2019 Buildings Poland in English
7/53
Energy audit
The correct energy audit of a building iscrucial in any successful thermomodernisation
investment.'n energy audit is an analysis of the givenstate of energy ows and evaluation ofpossible savings, but also the choice of optimaltechnical solutions allowing for the reduction ofenergy loss.
An energy audit is the basis of maingthe right decision as to what ste!s should
be taen in a s!eci"c case.
-
8/19/2019 Buildings Poland in English
8/53
Thermomodernisation
Exem!lary thermomodernisationim!rovements to be made in buildings#
$ external walls insulation$ insulation of slab roofs, attic ceilings$ cellar ceiling insulation$ replacement of window and door frames
$ modernization of heating system$ modernization of water heating installation$ modernization of ventilation system
-
8/19/2019 Buildings Poland in English
9/53
$eating system modernisation includes#
$ modernisation of thermal centers (thereplacement of boilers for burning solid fuelsfor those with )eco$pea coal) of the *th classor gas boilers+,$ the replacement of heaters and pipes, wires
insulation,$ the installation of thermostatic valves andweather compensations,$ usage of renewable resources
Thermomodernisation
-
8/19/2019 Buildings Poland in English
10/53
Thermomodernisation bene"ts#$ energy$savings
$ heating costs reduction$ reduction of air pollution$ improvements in buildings aesthetics andconvenience
Thermomodernisation
-
8/19/2019 Buildings Poland in English
11/53
The above procedures can be implementedfully or one by one depending on technical
state of the building and owners -nancial
-
8/19/2019 Buildings Poland in English
12/53
ver the last decadethe thermomodernisation of
numerable public andresidential buildings has
been carried out in /abka$
0dró1.
-
8/19/2019 Buildings Poland in English
13/53
The thermomodernisation of buildingsowned or co-owned by %aba-&dr'(munici!ality in the )unici!al $ousing*e!artment in %aba-&dr'(.
2n the years 3445 $ 3466 thethermomodernisation of 64 buildings was
carried out. The works were -nanced by owners-nancial resources and bank loans withthermomodernisation bene-t.
The thermomodernisation includedstyrofoam insulation of external walls, slabroofs insulation, the replacement ofwindow and door frames in staircases and
cellars.
-
8/19/2019 Buildings Poland in English
14/53
7urthermore, in the years 3468$3469 thecentral heating modernisation of twobuildings was done!
$ old gas boilers were replaced forcondensing boilers with high e%ciency,weather compensations and thermostatic
valves in staircases and ats wereinstalled.
Thanks to the renovations the heatingcosts were reduced by approx. 94:.
-
8/19/2019 Buildings Poland in English
15/53
The thermomodernisation of buildingsowned or co-owned by %aba-&dr'(munici!ality in the )unici!al $ousing
*e!artment in %aba-&dr'(.
-
8/19/2019 Buildings Poland in English
16/53
The thermomodernisation of buildingsowned or co-owned by %aba-&dr'(munici!ality in the )unici!al $ousing
*e!artment in %aba-&dr'(.
-
8/19/2019 Buildings Poland in English
17/53
The thermomodernisation of buildingsowned or co-owned by %aba-&dr'(munici!ality in the )unici!al $ousing
*e!artment in %aba-&dr'(.
-
8/19/2019 Buildings Poland in English
18/53
The thermomodernisation of buildingsowned or co-owned by %aba-&dr'(munici!ality in the )unici!al $ousing
*e!artment in %aba-&dr'(.
-
8/19/2019 Buildings Poland in English
19/53
The thermomodernisation of buildingsowned or co-owned by %aba-&dr'(munici!ality in the )unici!al $ousing
*e!artment in %aba-&dr'(.
-
8/19/2019 Buildings Poland in English
20/53
The thermomodernisation of buildingsowned or co-owned by %aba-&dr'(munici!ality in the )unici!al $ousing
*e!artment in %aba-&dr'(.
-
8/19/2019 Buildings Poland in English
21/53
The thermomodernisation of buildingsowned by %aba-&dr'( munici!ality.
6. indergartens and schools
-
8/19/2019 Buildings Poland in English
22/53
+imnasium ,o.
-
8/19/2019 Buildings Poland in English
23/53
rimary /chool no. 0
-
8/19/2019 Buildings Poland in English
24/53
rimary /chool no. 1
-
8/19/2019 Buildings Poland in English
25/53
rimary /chool ,o. 2
-
8/19/2019 Buildings Poland in English
26/53
;rimary habówka
-
8/19/2019 Buildings Poland in English
27/53
;rimary
-
8/19/2019 Buildings Poland in English
28/53
;rimary
-
8/19/2019 Buildings Poland in English
29/53
0. 34nie5a6
73/now8ae69 cinema
-
8/19/2019 Buildings Poland in English
30/53
1. 'mphitheater
-
8/19/2019 Buildings Poland in English
31/53
The thermomodernisation ofmultitenant buildings carried
out by $ousing :oo!erative in%aba-&dr'(.
2n the years 344?$344@,
thermomodernisation of 84 multitenantbuildings was carried out. The modernisation included A externalwalls insulation, ceiling and slab roofsinsulation and the replacement of windowand door frames.
Barlier, the >ooperative carried out themodernisation of all central heating
boilers. The modernisation included the
-
8/19/2019 Buildings Poland in English
32/53
The thermomodernisation ofmultitenant buildings carried out by
$ousing :oo!erative in %aba-&dr'(.
7urthermore, the Cousing >ooperative built anindividual gas boiler$house for the shoppingcenter and a new building in order to avoidlarge energy loss due to transportation fromthe boiler$house in neighbouring residentialarea.
The thermomodernisation of the ma1ority ofmultitenant houses was also carried outtogether with the replacement of thermal
centers.
-
8/19/2019 Buildings Poland in English
33/53
The thermomodernisation ofmultitenant buildings carriedout by $ousing :oo!erative in
%aba-&dr'(
-
8/19/2019 Buildings Poland in English
34/53
The thermomodernisation ofmultitenant buildings carriedout by $ousing :oo!erative in
%aba-&dr'(.
-
8/19/2019 Buildings Poland in English
35/53
The thermomodernisation ofmultitenant buildings carriedout by $ousing :oo!erative in
%aba-&dr'(.
-
8/19/2019 Buildings Poland in English
36/53
The thermomodernisation ofmultitenant buildings carriedout by $ousing :oo!erative in
%aba-&dr'(.
-
8/19/2019 Buildings Poland in English
37/53
2n sanatorium buildingsA Thuberculosis
and Dung Eiseases 2nstitute, holidayresorts and the hospital the heatingmodernisation was carried out, whichincluded the replacement of solid fuels
boiler for gas ones.
-
8/19/2019 Buildings Poland in English
38/53
-
8/19/2019 Buildings Poland in English
39/53
3%abc;a
-
8/19/2019 Buildings Poland in English
40/53
;avilion F2 of the Tuberculosis and Dung
Eiseases 2nstitute (formerly calledG#azareth)+ is an example of a fullthermomodernisation that includes theinstallation of modern air conditioning
and ventilation system with heatrecovery.
-
8/19/2019 Buildings Poland in English
41/53
A sanatorium building = Tuberculosisand ung *iseases @nstitute
-
8/19/2019 Buildings Poland in English
42/53
The thermomodernisation o
other !ublic facilities
-
8/19/2019 Buildings Poland in English
43/53
:om!rehensive /chool ,o.
-
8/19/2019 Buildings Poland in English
44/53
%ailway /tation7housing the ublic ibrary9
-
8/19/2019 Buildings Poland in English
45/53
olice /tation
-
8/19/2019 Buildings Poland in English
46/53
ire Brigade /tation
Th th d i ti f th
-
8/19/2019 Buildings Poland in English
47/53
The thermomodernisation of other!ublic buildingsG;rimavera)
Th th d i ti f th
-
8/19/2019 Buildings Poland in English
48/53
The thermomodernisation of other!ublic buildings>ardiology Cospital /abka
-
8/19/2019 Buildings Poland in English
49/53
The thermomodernisation of other!ublic buildings
-
8/19/2019 Buildings Poland in English
50/53
The intentions of %aba-&dr'(in the "eld of further reduction of!olluttion emissions from
buildings.
n the 3*th of #ovember 346* the >ity>ouncil in /abka$0dró1 introduced the lan of
ow-carbon Economy for %aba-&dr'()unici!ality. The document gives the opportunity forplanning the necessary actions which willlead, over a few years, to considerableimprovement in the &uality of air in /abka$0dró1. The document also makes it possible togain grants from outside institutions for thenecessary actions connected with the
replacements of energy resources, the
The intentions of %aba &dr'(
-
8/19/2019 Buildings Poland in English
51/53
The intentions of %aba-&dr'(in the "eld of further reduction of!olluttion emissions from
buildings.
/ecently /abka$0dró1 Hunicipality has
submitted an application to Foivodship 7und
for Bnvironmental ;rotection and Iater
Hanagement, a programme of low emission
called GJ'IJ'), which will enable us to
receive funds for changing energy resourcesand installing solar panels for heating water.
J'IJ' programme is going to be
implemented from the 0nd uarter of 0CD
The intentions of %aba &dr'(
-
8/19/2019 Buildings Poland in English
52/53
The intentions of %aba-&dr'(in the "eld of further reduction of!olluttion emissions from
buildings.
Horeover, as part of programme G/yK)(GDynx)+ introduced by Foivodship 7und for
Bnvironmental ;rotection and IaterHanagement in Jrakow, individual concernedowners will be able, through application, toreceive funds for house thermomodernisation.
-
8/19/2019 Buildings Poland in English
53/53
Than you foryour attention F
)aria ,owacaG )/c
)unici!al $ousing)anagment eaderin %aba-&dr'(