BSI Standards Publication 2019. 12. 13.¢  BS 5975:2019...

download BSI Standards Publication 2019. 12. 13.¢  BS 5975:2019 ¢â‚¬â€‌ Tracked changes compares BS 5975:2019 with

of 21

  • date post

    28-Feb-2021
  • Category

    Documents

  • view

    6
  • download

    4

Embed Size (px)

Transcript of BSI Standards Publication 2019. 12. 13.¢  BS 5975:2019...

  • BS 5975:2019 — Tracked changes compares BS 5975:2019

    with BS 5975:2008+A1:2011

    Code of practice for temporary works procedures and the permissible stress design of falsework

    BSI Standards Publication

    This is a preview of "BS 5975:2019 - TC". Click here to purchase the full version from the ANSI store.

    https://webstore.ansi.org/Standards/BSI/BS59752019TC?source=preview

  • TRACKED CHANGES

    IMPORTANT — PLEASE NOTE This is a tracked changes copy and uses the following colour coding:

    Test example 1

    Test example 2 — indicates added text (in green)

    — indicates removed text (in red)

    — indicates added graphic figure or table

    — indicates removed graphic figure or table

    About tracked changes

    This document is a combined PDF containing a “tracked changes” version of BS 5975, which compares BS 5975:2019 with BS 5975:2008+A1:2011.

    The original version of BS 5975:2019, appended at the end of this document, should be considered the version of record for this publication.

    © The British Standards Institution 2019 Published by BSI Standards Limited 2019

    ISBN 978 0 539 05133 9

    Amendments/corrigenda issued since publication Date Text affected

    This is a preview of "BS 5975:2019 - TC". Click here to purchase the full version from the ANSI store.

    https://webstore.ansi.org/Standards/BSI/BS59752019TC?source=preview

  • 06/12/2018 Version comparison - BSI Essentials: 9001

    https://iso9001online.bsigroup.com/auth/5A8GKBSHYS7A/iso9001/Home/Page?type=Mapping 1/10

    Code of practice for temporary works procedures and the permissible stress design of falsework Version comparison

    This version comparison compares where new and revised clauses are located between BS 5975:2019 and BS 5975:2008+A1:2011.

    BS 5975:2019 to BS 5975:2008+A1:2011

    BS 5975:2019

    BS 5975:2008+A1:2011

    Foreword Foreword

    Introduction NEW

    Section 1: General Section 1: General

    1 Scope 1 Scope

    2 Normative references 2 Normative references

    3 Terms and definitions 3 Terms and definitions

    4 Abbreviations and symbols 4 Abbreviations and symbols

    5 Overview of temporary works procedures and training NEW

    5.1 Overview of procedures NEW

    5.2 Training NEW

    DELETED 5 Legislation

    DELETED 5.1 General

    DELETED 5.2 The Health and Safety at Work, etc. Act 1974

    DELETED 5.3 The Management of Health and Safety at Work Regulations 1999

    DELETED 5.4 The Personal Protective Equipment at Work Regulations 1992

    DELETED 5.5 Work at Height Regulations 2005 as amended by the Work at Height (Amendment) Regulations 2007

    DELETED 5.6 The Lifting Operations and Lifting Equipment Regulations 1998

    This is a preview of "BS 5975:2019 - TC". Click here to purchase the full version from the ANSI store.

    https://webstore.ansi.org/Standards/BSI/BS59752019TC?source=preview

  • DELETED 5.7 The Provision and Use of Work Equipment Regulations 1998 (as amended)

    DELETED 5.8 Construction (Design and Management) Regulations 2007

    Section 2: Procedural control of temporary works Section 2: Procedural control of temporary works

    6 Procedures 6 Procedures

    6.1 Introduction to procedural control NEW

    6.2 Temporary works register NEW

    DELETED 6.1 General

    DELETED 6.2 Control of procedures

    DELETED 6.3 Roles and responsibilities of organizations

    7 Clients’ procedures NEW

    7.1 General (Commercial/public clients) NEW

    7.2 Clients appointing contractors other than PCs NEW

    7.3 Client's DI NEW

    7.4 Domestic clients NEW

    DELETED 7 Appointment of the temporary works co- ordinator and the temporary works supervisor

    DELETED 7.1 Appointment of the temporary works co- ordinator

    DELETED 7.2 Responsibilities of the temporary works co- ordinator

    DELETED 7.3 Appointment of the temporary works supervisor(s)

    DELETED 7.4 Responsibilities of the temporary works supervisor(s)

    8 Designers’ procedures NEW

    8.1 General NEW

    8.2 Designers' DI NEW

    8.3 Permanent works designers NEW

    8.4 Temporary works designers NEW

    8.5 Principal designers NEW

    DELETED 8 Design brief

    This is a preview of "BS 5975:2019 - TC". Click here to purchase the full version from the ANSI store.

    https://webstore.ansi.org/Standards/BSI/BS59752019TC?source=preview

  • 9 Contractors’ procedures NEW

    9.1 Organizational interfaces 6.4 Organizational interfaces

    9.2 Contractors' DI NEW

    9.3 Responsibilities NEW

    9.4 Principal contractor NEW

    9.5 Contractors other than PC NEW

    9.6 Third-party employed contractor NEW

    DELETED 9 Design

    DELETED 9.1 General

    DELETED 9.2 Design check

    DELETED 9.3 Avoidance of progressive collapse

    DELETED 9.4 Choice of temporary works solution

    DELETED 9.5 Selection of materials and components

    10 Supplier/manufacturer procedures NEW

    10.1 Suppliers of temporary works equipment NEW

    10.2 Suppliers’ DI NEW

    10.3 Suppliers’ procedures NEW

    10.4 Verification of design information NEW

    10.5 Provision of information NEW

    10.6 Provision of design data NEW

    10.7 Provision of information for the safe use of equipment NEW

    10.8 Standard solutions NEW

    DELETED 10 Co-ordination and supervision of work on site

    11 Temporary works co-ordinator NEW

    11.1 General NEW

    11.2 The PC's TWC NEW

    11.3 The TWC (other than the PC's TWC) NEW

    This is a preview of "BS 5975:2019 - TC". Click here to purchase the full version from the ANSI store.

    https://webstore.ansi.org/Standards/BSI/BS59752019TC?source=preview

  • DELETED 11 Checking on site

    DELETED 11.1 General

    DELETED 11.2 When to check

    12 Temporary works supervisor NEW

    12.1 General NEW

    12.2 Role of the TWS NEW

    12.3 Duties of the TWS NEW

    DELETED 12 Alterations

    13 Design of temporary works NEW

    13.1 General NEW

    13.2 Design brief NEW

    13.3 Design guidance NEW

    13.4 Choice of temporary works NEW

    13.5 Selection of materials and components NEW

    13.6 Design output NEW

    13.7 Design check NEW

    13.8 Resolution of queries raised by the design checker NEW

    13.9 Alterations NEW

    13.10 Standard solutions NEW

    DELETED 13 Loading (bringing) the temporary works (into service)

    14 Site considerations NEW

    14.1 Co-ordination, supervision and checking of work on site NEW

    14.2 Loading and unloading temporary works NEW

    14.3 Dismantling NEW

    DELETED 14 Dismantling

    Section 3: Falsework Section 3: Falsework

    15 General 15 General

    This is a preview of "BS 5975:2019 - TC". Click here to purchase the full version from the ANSI store.

    https://webstore.ansi.org/Standards/BSI/BS59752019TC?source=preview

  • 16 Materials 16 Materials

    16.1 General considerations 16.1 General considerations

    16.2 Testing and inspection 16.2 Testing and inspection

    16.3 Steelwork (other than scaffold tube) 16.3 Steelwork (other than scaffold tube)

    16.4 Timber 16.4 Timber

    16.5 Concrete and concrete components 16.5 Concrete and concrete components

    16.6 Brickwork and blockwork 16.6 Brickwork and blockwork

    16.7 Other materials 16.7 Other materials

    16.8 Steel scaffold tubes, couplers and other fittings

    16.8 Steel scaffold tubes, couplers and other fittings

    16.9 Manufactured components for falsework 16.9 Manufactured components for falsework

    17 Loads applied to falsework 17 Loads applied to falsework

    17.1 General 17.1 General

    17.2 Weights of materials 17.2 Weights of materials

    17.3 Self-weights 17.3 Self-weights

    17.4 Imposed loads 17.4 Imposed loads

    17.5 Environmental loads 17.5 Environmental loads

    18 Foundations and ground conditions 18 Foundations and ground conditions

    18.1 General 18.1 General

    18.2 Site investigation for falsework foundations 18.2 Site investigation for falsework foundations

    18.3 Testing of soils 18.3 Testing of soils

    18.4 Allowable bearing pressures 18.4 Allowable bearing pressures

    18.5 Modification factors applied to presumed bearing pressures

    18.5 Modification factors applied to presumed bearing pressures

    18.6 Simple foundations on sands and gravels 18.6 Simple foundations on sands and gravels

    18.7 Simple foundations on cohesive soils 18.7 Simple foundations on cohesive soils

    18.8 Heavy vibrations 18.8 Heavy vibrations

    18.9 Fill material 18.9 Fill material

    18.10 Piles 18.10 Piles

    This is a preview of "BS 5975:2019 - TC". Click here to purchase the full version from the ANSI store.

    https://webstore.ansi.org/Standards/BSI/BS59752019TC?source=preview

  • 18.11 Protection of the foundation area 18.11 Protection of the foundation area

    19 Design of falsework 19 Design of falsework

    19.1 Preamble