Hangzhou Jianghe Introduction
1
Introduction of
Hangzhou Jianghe Hydro-electric Science
& Technology Co., Ltd
ADD:No.102 Xueyuan Road, Hangzhou, Zhejiang, China
TEL:+86-571-81903127
FAX:+86-571-81903127
POSTCODE: 310012
WEBSITE:http://www.hjhe.cn
Hangzhou Jianghe Introduction
2
CONTENT
1. BRIEF INTRODUCTION OF COMPANY ....................................................................... 3
2. REFERENCE LIST OF HYDRAULIC TURBINE AND GNERATOR SETS .............. 6
3. COMPANY QUALIFICATION DOCUMENT ............................................................... 11
4. PRIZE SITUATION AND PATENTS............................................................................... 18
5. RESEARCH AND DEVELOPMENT ABILITY ............................................................. 29
6. THE MAIN MACHINARY FACILITY ........................................................................... 35
Hangzhou Jianghe Introduction
3
1.1. Brief Introduction of company
Hangzhou Jianghe Hydro-electric Science and Technology Co., Ltd is a professional
reformed corporation from Hangzhou Machinery Research Institute, which established in
1956, and belongs to the Ministry of Water Resources.
Our company engages in researching & manufacturing, designing & developing for
construction machinery of water conservancy, hydropower project, and mechanical and
electrical equipment of power stations. We also supply technical consultation, product
inspection, supervision for water conservancy and hydropower project, as well as revising the
relevant national and professional products standards etc.
Taken “gloriously devoting service for society, producing excellent products for clients,
contributing for advance human‟s welfare” as company‟s tenet, our company gears to the
demand of the market, serves customers and promotes the organic combination of scientific
research and productivity which formed one continuous line service system of the process of
R&D, design, manufacture and installation. Compared with other professional manufactories
for manufacturing hydropower equipments, our company has its distinguishing characteristics.
Especially the technique used in the field of low water head power station kept in ahead in
nation. Our company has expanded its business to many areas and have provided turbine
generator-set for Guangxi, Guizhou, Sichuan, Qinghai, Xinjiang, Gansu province etc, and
have cooperated and supplied equipments for Vietnam, Ecuador, Zambia, Pakistan and other
countries. Because the quality of these equipments are excellent, so the clients give so high
praise of them and our company also obtain outstanding success in many water conservancy
&Hydropower projects in our country.
Our company has passed ISO9001:2000 Quality System Certificate Authorized and
Certificate of Engineering Consultation, Certificate of Engineering Design, Certificate of
Hangzhou Jianghe Introduction
4
Approval for Crane Equipment for Hydropower Consultation, Certificate of Supervision for
Water Conservancy Works Consultation, Certificate of Supervision for Equipment
Manufacturing of Water Conservancy Works as well as Certificate of Approval for Import and
Export Enterprises separately approved by the National Commission of Development and
Renovation, the Ministry of Water Resources, and the Ministry of Foreign Trade and
Economic Cooperation.
In our corporation, there are hundreds of professorial senior engineers, senior engineers,
engineers, technicians, and proficiency workers etc. The mainly technician have worked for
many years in designing and manufacturing hydraulic equipments, and they have
accumulated rich experience, data, and researching production, which can catch up with the
international advanced professional level, they also have gained honorifically achievement.
Scope of Main Business:
Mechanical and electrical equipment for power stations.
Concrete batching machinery.
Crane and conveying machinery.
Inspection and measurement of product quality.
Supervision for water conservancy and hydropower engineering construction &
equipment manufacturing.
Hangzhou Jianghe Introduction
5
1.2 List of main leader, expert and chief engineer
No. Position in the
project Name Age Title Position hold
1 Project General
Manager
Liu
Changlu 50
Professorial
Senior
Engineer
General Manager
2 Design project chief Yu
Jianfeng 51
Professorial
Senior
Engineer
General Engineer
3 Design Director Ji‟jin
Qiang 63
Japanese
Specialist Senior Consultant
4 Generator Chief
Engineer
Chen
Liwei 40
Senior
Engineer
Vice-General
Manager
5 Generator
Designer
Zhu
Chuanying 40
Senior
Engineer
Generator
Department
Secretary
6 Turbine Chief
Engineer
Chen
Kangming 41
Senior
Engineer
Vice-General
Manager
7 Turbine Designer Chen
Jinlin 32
Senior
Engineer
Turbine
Department
Secretary
8 Quality Control
Chief
Ge
Guixiang 63 Technician
QC Department
Secretary
9 Site in charge Yang
Qiwen 55 Engineer
After-service
Department
Secretary
10 Produce Chief Wu
Junsheng 44 Engineer Factory Director
Hangzhou Jianghe Introduction
6
2. Reference List of Hydraulic Turbine and Generator Sets
Reference List of Francis Type
No. Name of Power Station Number
of units
Unit
capacity Head Discharge
Runner
diameter
Running
time
(MW) (m) (m3/s) (m) (year)
1 Iceland Bailanda Power Station 4 55.3 228 27 2.15 1998
2 Korea HAPCHEON Power Station 2 50 110.5 51.3 2.73 2001
3 Zhejiang Hunan Tower Power
Stataion 2# 5 50 117 56.37 2.55 Building
4 Vietnam Huong Dien Power Station 3 27 46.37 64.8 2.70 2013.12
5 Huangtankou Power Station 2 26 28 108 3.80 2000.1
6 Yunnan Yuguo Power Station 2 25 115.6 24.2 2.00 Building
7 Xinjiang Kalabeili Power Station 3 24.06 58.3 45.7 2.58 Building
8 Heilongjiang Xigou Power Station 2 21 154.6 15.1 1.40 Building
9 Xinjiang Xiaoshankou Power Station 3 20 34.5 64.74 3.00 2012.1
10 Guizhou Yangjiayuan Power Station 2 20 41 54.36 2.58 2010.05
11 GuizhouYuanmanguan Power Station 2 20 54 42 2.25 2009.05
12 Sichuan Xiaoxing Power Station 2 12 163 8.4 1.18 2007.09
13 Guangxi Xialiujia Power Station 2 9.8 92 12.3 1.20 2005.12
14 Japan Tsugaru Power Station 1 9 42 24.7 1.73 2012.11
15 Japan Umamichi Power Station 1 5 53 11.5 1.15 2012.12
16 Zhejiang Qiaodun Power Station 2 2 33.5 6.9 1.00 2012.12
Hangzhou Jianghe Introduction
7
17 Zambia Musonda Power Station6#、7#
2 2.1 29.2 8.48 1.10 Building
18 Jiangxi Kekou Power Station 2 2 27 8.25 1.20 Building
19 Jiangxi Tielu Power Station 3 1.8 62 3.23 0.60 Building
20 Vietnam Shuiwo Power Station 1 1.25 135 1.22 0.50 2002.06
21 Zambia Musonda Power Station 1#、2#
2 1.25 29.4 5.04 0.81 Building
22 Zambia Musonda Power Station 3#、
4#、5# 2 1.1 29.4 4.49 0.81 Building
23 Vietnam Gushan Power Station 2 0.7 47.3 1.81 0.60 2002.08
Reference List of Kaplan Type
No. Name of Power Station
Number
of units
Unit
capacity Head Discharge
Runner
diameter
Running
time
(MW) (m) (m3/s) (m) (year)
1 Guangxi Dahua Power Station 1 114 22 587 9.00 1998
2 Guangxi Letan Power Station 1 60 18.2 500 8.00 2003
3 Ningxia Tangqu Power Station 1 30 15.9 216 5.50 2002
4 Fujian Yongkou Power Station 2 25 19.5 145 4.45 1999
5 Guangxi Liujia Power Station 1 11.5 21 63.1 3.00 2008.04
6 Fujian Longjinhe Power Station 1 7 20.1 48.5 2.70 2004.03
7 Guizhou Lujiadong Power Station 1 7 11.5 70.5 .40 2011.11
Hangzhou Jianghe Introduction
8
8 Guizhou Liguan Power Station 2 6.5 18.5 41 2.20 2002.08
9 Guangxi Dayun Power Station 2 5.5 11 58.3 3.05 2011.08
10 Sichuan Wulidian Power Station 3 4.5 7.5 68.25 3.60 2011.12
11 Qinghai Jiading Power Station 3 4 10 46.5 2.85 2010.05
Reference List of Impulse Type
No. Name of Power Station Number
of units
Unit
capacity Head Discharge
Runner
diameter
Running
time
(MW) (m) (m
3/s) (m) (year)
Yunnan Yili river Power Station
2 2 4 255 1.78 2008.11 Sichuan Menkanriver Power Station
3 2 4 480 0.95 2011.6 Sichuan Shangsong river Power Station
Hangzhou Jianghe Introduction
9
Reference List of Bulb Type
No. Name of Power Station Number
of units
Unit
capacity Head Discharge
Runner
diameter
Running
time
(MW) (m) (m3/s) (m) (year)
1 Guangxi Jinjitan Power Station 3 25 11 244.5 5.40 2006.03
2 Guangxi Jinniuping Power Station 3 20 9 253.4 5.60 2007.05
3 Guangxi Wangcun Power Station 3 20 9.2 247.5 5.40 2013.11
4 Guizhou Congjiang Darong Power
Station 2 18 12.8 156.9 Building
5 Fujian Mowu Power Station 2 16.5 7.35 260.6 Building
6 Zhejiang Wuliting Power Station 3 14 7.1 225.2 5.40 2006.07
7 Fujian Gaosha Power Station 2 12.5 10 142.2 2007.1
8 Guangxi Bagong Power Station 2 10.5 12 98.8 3.75 2013.01
9 Sichuan Wuguishi Power Station 3 10 8 142.6 4.40 2010.06
10 Guangxi Xi„an Power Station 2 10 8.3 124.3 4.00 2009.01
11
2 8 8.8 103.6 3.55 2006.01 Fujian Honghu Power Station
12 Guangxi Sancha Power Station 3 7 8 161.2 4.80 2008.05
Hangzhou Jianghe Introduction
10
13 Guangxi Liyutan Power Station 2 6.3 6.5 112 4.00 2006.1
14 Guangxi Liding Power Station 2 5.5 8 79 3.30 2004.02
15 Fujian Xiasakou Power Station 2 5 4.57 125.6 4.30 2007.07
16
Guangxi Longxi Power Station
2 5 5.2 110.2 4.00 2007.05
17
Guangxi Jiangmen Power Station
2 5 8.5 76 3.30 2008.05
18 Turkey ALAMAN Power Station 6 2.5 9.7 31 1.80 2000.12
19 Zhejiang Gaohu Power Station 1 2 11.8 20.1 1.80 2004.06
20 Hunan Tieshanzhui Power Station 3 1.6 2.6 31 2.00 2001.07
21 Fujian Yangdun Power Station 1 2.75 4.04 74.86 3.55 2011.1
22 Fujian Dongguan Power Station 3 1.6 5.6 47.6 2.90 2003.05
23 Zhejiang Jiangxia Tidal Power Station
4 0.7 3 34 2.50 2007.11
Hangzhou Jianghe Introduction
11
3. Company qualification document
3.1 Organizational structure
Hangzhou Jianghe Introduction
12
3.2 License of the Business Corporation
Hangzhou Jianghe Introduction
13
BUSINESS LICENSE
(Duplicate copy)
Registration No.: 330100000151368 (1/1)
Enterprise Name: Hangzhou Jianghe Hydro-electric Science and Technology Co., Ltd
Type of Company: Limited Liability Company
Address: Six floor, Building two, No. 102, Xueyuan Road, Xihu Districr, Hangzhou City
Legal Representative: Liu Changlu
Registered Capital: RMB 60,000,000
Date of Establishment: 24th
May, 2014
Valid from: 24th
May, 2014 to 23rd
May, 2041
Business Scope: manufacture: hydropower, electromechanical equipment and automatic system
equipment (the above scope can operate under the approved validity term). Service: irrigation works,
hydropower, electromechanical equipment and automatic system technical development, design,
equipment installation projects contracting, irrigation works and hydropower projects contracting and
relevant technical consulting, technical development and technical service. Wholesale and retail sale,
electromechanical products, mechanical components, metal materials. All the other legal items do not
need to apply for approval. (The above business scope excludes the items prohibited, limited and
permitted to manage by the laws and rules of the country)
Registration authority:
15th
June, 2014
Hangzhou Jianghe Introduction
14
3.3 Tax Registration Certificate
Hangzhou Jianghe Introduction
15
TAX REGISTRATION CERTIFICATE
(Duplicate)
Tax No.: 330100574382087
Enterprise Name: Hangzhou Jianghe Hydro-electric Science and Technology Co., Ltd
Legal Representative: Liu Changlu
Address: Six floor, Building two, No. 102, Xueyuan Road, Xihu Districr, Hangzhou City
Type of Company: Limited Liability Company
Business Scope: manufacture: hydropower, electromechanical equipment and automatic system equipment (the
above scope can operate under the approved validity term). Service: irrigation works, hydropower,
electromechanical equipment and automatic system technical development, design, equipment installation projects
contracting, irrigation works and hydropower projects contracting and relevant technical consulting, technical
development and technical service. Wholesale and retail sale, electromechanical products, mechanical components,
metal materials. All the other legal items do not need to apply for approval. (The above business scope excludes the
items prohibited, limited and permitted to manage by the laws and rules of the country)
Approval authority: Industrial and commercial bureau of Zhejiang Hangzhou City
License-issuing authority:
04th
August, 2014
Hangzhou Jianghe Introduction
16
3.4 ISO 9001 Quality Management System Certification
Hangzhou Jianghe Introduction
17
Hangzhou Jianghe Introduction
18
4. Prize Situation
16 items national and provincial scientific research projects, scientific research funds total about 80
million RMB.
Was awarded the first prize for provincial level 2 items, second prize 1 item ;Zhejiang science second
prize 1 item, third prize 1 item
Won the domestic "first sets" 2 items in zhejiang province
Prepared national and industry standards 26 items
Patents, software Copyrights 21 items
Hangzhou Jianghe Introduction
19
4.1. No.6 water bulb turbine generator set of Wenling Jiangxia Tentative Tidal Power Station is
undertaken by our company, which is one of the national “863” projects. The new knowledge and
technology of bulb turbine has successfully passed the national test and put into operation. In 2010,
with the Three Gorges Project, the project got the prize of Dayu water conservancy science and
technology first award, which is the highest award by the ministry of water resources.
Honor certificates
Certificate of Award
Award winning: Technology Research and Development of New Tide Generating Units
Reward Level: First Prize
Winner: Hangzhou Jianghe Hydropower Science and Technology Co., Ltd
Certificate No.: DYJ20100306-D02
Hangzhou Jianghe Introduction
20
4.2. In October 2012, our company‟s water turbine generator key technique of energy-saving and
material-reducing has got the prize, Dayu water conservancy science and technology third award,
which is issued by the ministry of water resources.
Hangzhou Jianghe Introduction
21
4.3. In January 2013, Fujian Yangdun power station‟s pit type water turbine generator set got the
Water resources Institution Kunlun technology first prize, which is produced by our company.
Hangzhou Jianghe Introduction
22
KunLun Science and Technology Award of Comprehensive Development Bureau
Certificate of Award
To commend those units which make outstanding contributions in the promotion of scientific and
technological work of Comprehensive Development Bureau, Hereby present the certificate as an
encouragement.
Achievement: A type of units for researching low-head hydropower station——large-scale tubular
shaft hydraulic turbine-generator units
Winner:Hangzhou Jianghe Hydro-electric Science and Technology Co., Ltd
Reward Level: First Prize
Certificate No.: KJJ20120101
Comprehensive Development Bureau of Ministry of Water Resources
January, 2013
Hangzhou Jianghe Introduction
23
4.4 Patent certificate
Hangzhou Jianghe Introduction
24
Certificate No. 1392538
Patent Certificate for Utility Models
Title of invention: A type of stator bar fastening structure
Author of invention: Zhu Chunying, Wang Yujuan
Patent number: ZL 2009 2 0121458.7
Application date: June 4, 2009
Patentee: Hangzhou Machinery Research Institute of Ministry of Water Resources
Hangzhou Jianghe Electrical Equipment Engineering Co., Ltd
Authorized publication patent date: April 21, 2010
This utility model passed our bureau‟s review in accordance with the Patent Law of the People's
Republic of China, decided to grant of a patent, awarded the certificate and be registered in the patent
register. The patent came into force from the date of authorization announcement.
The period of the patent is ten years from the application date. The patentee should pay an annual fee
in accordance with the Articles of the Patent Law and its implementation. The annual fee should be
paid before June 4th in every year. Those patents, that did not pay the annual fee, will be terminated
from the date of annual fee expiration.
The patent certificate records the law status of the time when the patent was registered. Transfer,
pledge, invalid, termination, recovery, and the patentee's name, nationality, address changes and other
matters records in the patent register.
Certificate No. 1392588
Hangzhou Jianghe Introduction
25
4.5 Patent Certificate for Utility Models
Hangzhou Jianghe Introduction
26
Patent Certificate for Utility Models
Title of invention: A type of stator bar fastening structure
Author of invention: Zhu Chunying, Fan Cun
Patent number: ZL 2009 2 0122455.3
Application date: June 4, 2009
Patentee: Hangzhou Machinery Research Institute of Ministry of Water Resources
Hangzhou Jianghe Electrical Equipment Engineering Co., Ltd
Authorized publication patent date: April 14, 2010
This utility model passed our bureau‟s review in accordance with the Patent Law of the People's
Republic of China, decided to grant of a patent, awarded the certificate and be registered in the patent
register. The patent came into force from the date of authorization announcement.
The period of the patent is ten years from the application date. The patentee should pay an annual fee
in accordance with the Articles of the Patent Law and its implementation. The annual fee should be
paid before June 4th in every year. Those patents, that did not pay the annual fee, will be terminated
from the date of annual fee expiration.
The patent certificate records the law status of the time when the patent was registered. Transfer,
pledge, invalid, termination, recovery, and the patentee's name, nationality, address changes and other
matters records in the patent register.
Director: Tian Lipu
State Intellectual Property of the People‟s Republic of China
April 14, 2010
Hangzhou Jianghe Introduction
27
4.6 Invention Patent Certificate
Hangzhou Jianghe Introduction
28
Invention Patent Certificate
Title of invention: A type of bidirectional six conditions tidal units
Author of invention: Zhou Zhengming, Liu Changlu, Yu Jianfeng, Chen Yuqing, Chen Liwei, Chen
Kangming
Patent number: ZL 2008 1 0120451.3
Application date: September 4, 2008
Patentee: Hangzhou Machinery Research Institute of Ministry of Water Resources
Hangzhou Jianghe Electrical Equipment Co., Ltd
Authorized publication patent date: June 15, 2011
This invention passed our bureau‟s review in accordance with the Patent Law of the People's
Republic of China, decided to grant of a patent, awarded the certificate and be registered in the patent
register. The patent came into force from the date of authorization announcement.
The period of the patent is twenty years from the application date. The patentee should pay an annual
fee in accordance with the Articles of the Patent Law and its implementation. The annual fee should
be paid before September 4th in every year. Those patents, that did not pay the annual fee, will be
terminated from the date of annual fee expiration.
The patent certificate records the law status of the time when the patent was registered. Transfer,
pledge, invalid, termination, recovery, and the patentee's name, nationality, address changes and other
matters records in the patent register.
Director: Tian Lipu
State Intellectual Property of the People‟s Republic of China
June 15, 2011
Hangzhou Jianghe Introduction
29
5. Research and development ability
In these hydropower generator equipments of researching, designing, manufacturing, installing
areas, Hangzhou Jianghe Hydro-electric Science and Technology Co., Ltd has a professional team,
which is formed with rich experience talents and experts. To assimilate the advanced technique at
home and abroad,company has cooperated with Tsinghua university, Zhejiang university, Japan
Waseda university and East Asia university to research and develop new technique successively, such
as the CFD investigation of turbine runner blade, the temperature field analysis of set heat dissipation,
the set & attachment inflexibility and intensity analysis, etc.
The CFD analysis of unit
Hangzhou Jianghe Introduction
30
The unit temperature field analysis
Hangzhou Jianghe Introduction
31
The unit equipment inflexibility and intensity analysis
Hangzhou Jianghe Introduction
32
The unit model
Hangzhou Jianghe Introduction
33
The unit equipment interference analysis
Hangzhou Jianghe Introduction
34
Hangzhou Jianghe Introduction
35
6. The main machinery facility
The main processing facilities are furnished in Fuchunjiang town. Our company can manufacture
parts of unit, assemble and many electric products. At the same time, there are perfect equipments for
testing and detecting, and advanced techniques in our company.
。
Our factory occupies 40 acre of land, and the total building area is more than 11000m2. The
equipment workshop is 84m×27m, the lifting ability traveling crane is 100t/32t.
6.1 The main machinery facility
No Name Type Capacity
1 Φ12.5m Numerically twin
columns vertical lathe
CK58125 Φ12500mm,H4000, Q150t
2 Φ5.0m Numerically twin
columns vertical lathe
C5350C Φ5000mm, H3150, Q30t
3 Φ3.40m Numerically twin
columns vertical lathe
C5235J1 Φ3400mm, H2000, Q30t
4 Φ1.6m Numerically twin
columns vertical lathe
C5216J1 Φ1600mm, H1500, Q20t
5 Φ3.2m lying lathe
C61320 Φ3200mm, L12000mm,Q60t
6 Φ3.15m lying lathe
C61315A Φ3150mm, L12000mm,Q35t
7 Φ0.8m lying lathe
C6180 Φ800mm, L2000mm, Q2.5t
8 numerically-controlled
milling and boring
T6920 18.0m×4.8m, Φ200mm
9
numerically-controlled
milling and boring T680 4.0m×2.0m, Φ200mm
10 numerically-controlled
processing center
TK42200
3.25m×2.7m
2.0m×1.6 m
11 Brace drilling machine
Z30100 Φ100
Hangzhou Jianghe Introduction
36
6.2 Manufacturing machine for electric product
1. stator coil manufacturing
(1) CNC thermal pressure Equipment of Generator Coil
(2) Electrical Test (tan) Automatic Determination with Voltage 30KV(130F below)
2. Magnetic Pole Manufacturing
Temperature Automatic Controller for inter-level Insulation and solidarity
3. High Voltage Testing Equipment
6.3 Manufacturing machine for structural equipment
1. :Alternative and Directive electric welding machine AX8---500
2.:Automatic ARC welding machine N2-1-1000
3.:Argon ARC welding machine NSA-300-1
4.: Adjustable electric arc Gouging machine ZXHG 90KVA
5.: Three-roller curling plate device 50mm, B3000mm
6.4 Crane equipment
1. :The biggest bridge crane 100/32t, Span 27m
2. Bridge crane 32/10t, Span 18m
6.5 Mainly nondestructive testing equipment
1.Ultrasonic flaw detector USK7 testing range : 10--2500mm
2. Ultrasonic flaw detector flaw detector testing range ECHOPE-230 10--1200mm
3. Magnetic particle detector NQ-3000 AT、AC 0 -- 3000A
Hangzhou Jianghe Introduction
37
6.6 Factory and productss
⑴ warehouse
⑵ The equipment workshop, lifting ability 100t
Hangzhou Jianghe Introduction
38
⑶ electrical workshop
produce coil
pressure test of coil
Hangzhou Jianghe Introduction
39
⑷ 12.5m numerically vertical lathe
Hangzhou Jianghe Introduction
40
⑸ 8m numerically vertical lathe
Hangzhou Jianghe Introduction
41
⑹ 18m x 4.8m 3D numerically-controlled milling and boring machine
⑺ 3.2m x 12m lathe (manufacture the bulb turbine main shaft)
Hangzhou Jianghe Introduction
42
⑻ 3.25m × 2.7m (2m × 1.6m) numerically controlled processing center
milling runner vane milling guide vane
Hangzhou Jianghe Introduction
43
⑼ 100 brace drilling machine
⑽ main shaft
Hangzhou Jianghe Introduction
44
⑾ finished product of runner
Hangzhou Jianghe Introduction
45
⑿ pre-assembling in factory
Hangzhou Jianghe Introduction
46
(13)producing process of other equipments in factory
Hangzhou Jianghe Introduction
47
Hangzhou Jianghe Introduction
48
(14) assembly in site
Hangzhou Jianghe Introduction
49
Hangzhou Jianghe Introduction
50
Hangzhou Jianghe Introduction
51