bpiii cenvpp rgel mapbook pr Maps7and8 - Manitoba · C o ns tru c iE v m e alP Riel Ground...
Transcript of bpiii cenvpp rgel mapbook pr Maps7and8 - Manitoba · C o ns tru c iE v m e alP Riel Ground...
Cook
s Cre
ek D
iversi
on
Poplar Rd 31E
Edgewood Rd 32ECedar Lake Rd 62N
Springfield Rd 63N
NW-18-11-6-E
NE-18-11-6-E
SW-18-11-6-E
SE-18-11-6-E
NW-7-11-6-ENE-7-11-6-E
NW-17-11-6-E
NW-9-11-6-E
NE-9-11-6-ENE-8-11-6-E
NE-17-11-6-E
SW-17-11-6-E
SE-17-11-6-E
NW-16-11-6-E
NW-8-11-6-E
NE-16-11-6-E
SW-16-11-6-E
SE-16-11-6-E
RGEL
-Aqu
a-100
RGEL-Aqua-101
Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: February 04, 2015 Version: Draft
±
1:10,000
0 225 450112.5Metres
Bipole III Transmission ProjectConstruction Environmental Protection Plan
Riel Ground Electrode Line7MAP
ESS Feature!( Water Crossing
Water Crossing
Project InfrastructureRiel Ground Electrode Line
Land BaseParcel FabricRoad (Other)
ESS Group: Water Crossing
Sec-Seg ID ESS ID ESS Name
RGEL RGEL-Aqua-101
Unnamed drain
Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:
• Use existing trails, roads or cut lines whenever possible as access routes • 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing.
ESS Group: Water Crossing
Sec-Seg ID ESS ID ESS Name Easting Northing
RGEL RGEL-Aqua-102
Unnamed drain 663843 5533280
Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:
• Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.
• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • No instream work or fording from April 1 to June 30
MAP NUMBER: 8
Dundee Garson Rd 33E
Edgewood Rd 32E
Springfield Rd 63N
Oakwood Rd 64NSW-29-11-6-E
NW-17-11-6-E
SE-29-11-6-E
SE-20-11-6-E
SE-27-11-6-E
NE-17-11-6-E
NW-22-11-6-ENE-20-11-6-E
SW-20-11-6-E
NW-16-11-6-E
SW-27-11-6-E
SE-21-11-6-E
NW-21-11-6-E
NE-21-11-6-E
SW-21-11-6-E
NW-15-11-6-ENE-16-11-6-E NE-15-11-6-E
NE-22-11-6-E
SW-22-11-6-E
NW-20-11-6-E
SW-28-11-6-E
SE-22-11-6-E
SE-28-11-6-E
RGEL-Aqua-101 RGEL-Aqua-102
Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: February 04, 2015 Version: Draft
±
1:10,000
0 225 450112.5Metres
Bipole III Transmission ProjectConstruction Environmental Protection Plan
Riel Ground Electrode Line8MAP
ESS Feature!( Water Crossing
Water Crossing
Project InfrastructureRiel Ground Electrode Line
Riel Ground Electrode Site
Land BaseParcel FabricRoad (Other)