bpiii cenvpp rgel mapbook pr Maps7and8 - Manitoba · C o ns tru c iE v m e alP Riel Ground...

3
oks Creek Diversion Poplar Rd 31E Edgewood Rd 32E Cedar Lake Rd 62N NW-18-11-6-E NE-18-11-6-E SW-18-11-6-E SE-18-11-6-E NW-7-11-6-E NE-7-11-6-E NW-17-11-6-E NW-9-11-6-E NE-9-11-6-E NE-8-11-6-E NE-17-11-6-E SW-17-11-6-E SE-17-11-6-E NW-16-11-6-E NW-8-11-6-E NE-16-11-6-E SW-16-11-6-E SE-16-11-6-E RGEL-Aqua-100 RGEL-Aqua-101 Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro, ProvMB, NRCAN Date Created: February 04, 2015 Version: Draft ± 1:10,000 0 225 450 112.5 Metres Bipole III Transmission Project Construction Environmental Protection Plan Riel Ground Electrode Line 7 MAP ESS Feature ! ( Water Crossing Water Crossing Project Infrastructure Riel Ground Electrode Line Land Base Parcel Fabric Road (Other)

Transcript of bpiii cenvpp rgel mapbook pr Maps7and8 - Manitoba · C o ns tru c iE v m e alP Riel Ground...

Page 1: bpiii cenvpp rgel mapbook pr Maps7and8 - Manitoba · C o ns tru c iE v m e alP Riel Ground Electrode Line MAP 7 ESS Feature!(Water Crossing Water Crossing ... • Riparian Buffers

Cook

s Cre

ek D

iversi

on

Poplar Rd 31E

Edgewood Rd 32ECedar Lake Rd 62N

Springfield Rd 63N

NW-18-11-6-E

NE-18-11-6-E

SW-18-11-6-E

SE-18-11-6-E

NW-7-11-6-ENE-7-11-6-E

NW-17-11-6-E

NW-9-11-6-E

NE-9-11-6-ENE-8-11-6-E

NE-17-11-6-E

SW-17-11-6-E

SE-17-11-6-E

NW-16-11-6-E

NW-8-11-6-E

NE-16-11-6-E

SW-16-11-6-E

SE-16-11-6-E

RGEL

-Aqu

a-100

RGEL-Aqua-101

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: February 04, 2015 Version: Draft

±

1:10,000

0 225 450112.5Metres

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Riel Ground Electrode Line7MAP

ESS Feature!( Water Crossing

Water Crossing

Project InfrastructureRiel Ground Electrode Line

Land BaseParcel FabricRoad (Other)

Page 2: bpiii cenvpp rgel mapbook pr Maps7and8 - Manitoba · C o ns tru c iE v m e alP Riel Ground Electrode Line MAP 7 ESS Feature!(Water Crossing Water Crossing ... • Riparian Buffers

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name

RGEL RGEL-Aqua-101

Unnamed drain

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Use existing trails, roads or cut lines whenever possible as access routes • 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing.

ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing

RGEL RGEL-Aqua-102

Unnamed drain 663843 5533280

Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:

• Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • No instream work or fording from April 1 to June 30

MAP NUMBER: 8

Page 3: bpiii cenvpp rgel mapbook pr Maps7and8 - Manitoba · C o ns tru c iE v m e alP Riel Ground Electrode Line MAP 7 ESS Feature!(Water Crossing Water Crossing ... • Riparian Buffers

Dundee Garson Rd 33E

Edgewood Rd 32E

Springfield Rd 63N

Oakwood Rd 64NSW-29-11-6-E

NW-17-11-6-E

SE-29-11-6-E

SE-20-11-6-E

SE-27-11-6-E

NE-17-11-6-E

NW-22-11-6-ENE-20-11-6-E

SW-20-11-6-E

NW-16-11-6-E

SW-27-11-6-E

SE-21-11-6-E

NW-21-11-6-E

NE-21-11-6-E

SW-21-11-6-E

NW-15-11-6-ENE-16-11-6-E NE-15-11-6-E

NE-22-11-6-E

SW-22-11-6-E

NW-20-11-6-E

SW-28-11-6-E

SE-22-11-6-E

SE-28-11-6-E

RGEL-Aqua-101 RGEL-Aqua-102

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: February 04, 2015 Version: Draft

±

1:10,000

0 225 450112.5Metres

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Riel Ground Electrode Line8MAP

ESS Feature!( Water Crossing

Water Crossing

Project InfrastructureRiel Ground Electrode Line

Riel Ground Electrode Site

Land BaseParcel FabricRoad (Other)