BP Andy Inglis Overview 2009
Transcript of BP Andy Inglis Overview 2009
-
8/7/2019 BP Andy Inglis Overview 2009
1/17
Andy InglisChief Executive, Exploration & ProductionHouston, 27 th May 2009
-
8/7/2019 BP Andy Inglis Overview 2009
2/17
2
Cautionary StatementForward Looking Statements - Cautionary StatementThis presentation and the associated slides and discussion contain forward looking statements, particularly thoseregarding capital expenditure, production growth and costs. By their nature, forward-looking statements involverisks and uncertainties because they relate to events and depend on circumstances that will or may occur in thefuture. Actual results may differ from those expressed in such statements, depending on a variety of factors,including the timing of bringing new fields on stream; future levels of industry product supply; demand and pricing;operational problems; general economic conditions; political stability and economic growth in relevant areas of theworld; changes in laws and governmental regulations; exchange rate fluctuations; development and use of newtechnology; changes in public expectations and other changes in business conditions; the actions of competitors;natural disasters and adverse weather conditions; wars and acts of terrorism or sabotage; and other factorsdiscussed elsewhere in this presentation.
Reconciliations to GAAP - This presentation may also contain financial information which is not presented inaccordance with generally accepted accounting principles (GAAP). A quantitative reconciliation of any suchinformation to the most directly comparable financial measure calculated and presented in accordance with GAAPcan be found on our website at www.bp.com
Cautionary Note to US Investors - The United States Securities and Exchange Commission permits oil and gascompanies, in their filings with the SEC, to disclose only proved reserves that a company has demonstrated byactual production or formation tests to be economically and legally producible under existing economic andoperating conditions. We use certain terms in this presentation, such as resources and non-proved reserves,that the SECs guidelines strictly prohibit us from including in our filings with the SEC. U.S. investors are urged toconsider closely the disclosures in our Form 20-F, SEC File No. 1-06262, available from us at 1 St Jamess Square,London SW1Y 4PD. You can also obtain this form from the SEC by calling 1-800-SEC-0330.
May 2009
-
8/7/2019 BP Andy Inglis Overview 2009
3/17
3
Alaska
Canada
NorthAmerica Gas
Gulf of
MexicoTrinidad &TobagoAndean
Angola
NorthAfrica
North Sea
Russia
Azerbaijan
Egypt
Middle East
& Pakistan
Asia Pacific
Southern Cone
(1) Resources at end-2008 on a combined basis of subsidiaries and equity-accounted entities, excluding TNK-BP
Conventional oil
Deepwater oil
Water flood viscousand heavy oil
Conventional gas
LNG gas
Unconventional gas
Global organisation and resource base
Non-proved: 28.0 bn boe
Proved: 14.6 bn boe
Excluding TNK-BP (1)
13 years
26 years
Proved: 3.6 bn boe
Non-proved: 15.4 bn boe
TNK-BP
45 years
10years
-
8/7/2019 BP Andy Inglis Overview 2009
4/17
4
Resource and reserve growth model:
The Hopper
Resources and reserves on a combined basis of subsidiaries and equity-accounted entities.
43.4 bn boe
End 2008
18.1bn boe
1.4bn boeTotal resources : production 44 yrs
25.9 bn boe
Start 2001
15.2 bn boe
1.2bn boeTotal resources: production 34 yrs
Non-proved resources
Proved reserves
PRODUCTION
Prospect
Inventory
ExplorationDiscoveries
DiscoveredResource Access
Field Extensions andImproved Recovery
Exploration Access
-
8/7/2019 BP Andy Inglis Overview 2009
5/17
5
Technology flagshipsEach has potential to deliver 1billion+ boe increase in reserves
Inherently Reliable FacilitiesMonitor, predict and managecorrosion to increase operatingefficiency
Pushing Reservoir LimitsAdvanced gas injection andwaterflood technologies
Field of the Future TMDeliver 100mboed through real timereservoir, wells and facility management
Effective Reservoir AccessFour-fold increase in reservoircontact area per well
Unconventional GasProve 12tcf tight gasresource
Beyond Sand ControlDeliver capital expendituresavings and incrementalproduction / resources
Unconventional OilProgress 2 billion boe heavyoil resource
Gulf of Mexico PaleogeneProgress 2 billion boe viasustained high pressurewell tests
Advanced Seismic ImagingLocate and enable access tonew resources
Subsea Well Intervention/Deepwater FacilitiesImprove subsea recoveryfactors
-
8/7/2019 BP Andy Inglis Overview 2009
6/17
6
ProduceDevelop
Driving excellence at each stage of the
lifecycle
Production
Time
EXPLORE DEVELOP PRODUCE
Explore
Identify Test Leadership Leverage
-
8/7/2019 BP Andy Inglis Overview 2009
7/17
7
Exploration: identifying the right basin
-
8/7/2019 BP Andy Inglis Overview 2009
8/17
8
Exploration: consistent delivery
0
10
20
30
4050
60
70
80
90
100
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
Number of wells
0
10
20
30
40
50
60
70
80
E xpl or at i on s uc c es s r at e ( %
)
Total wells Play test wells Exploration success
-
8/7/2019 BP Andy Inglis Overview 2009
9/17
9
Exploration: Gulf of Mexico Deepwater
Basin mastery
Basin
Mississippi Fan
F l o r i d a E s c a r p m
e n t
Shelf
Mississippi Delta
Slope
0
10
20
30
40
Gulf of Mexico Shelf
Gulf of Mexico Deepwater
C
umulative Resources Billion boe
200 80060040001985
2000
1996
1000
Industry Cumulative Finding Curve
Number of Discoveries
-
8/7/2019 BP Andy Inglis Overview 2009
10/17
10
Driving excellence at each stage of the
lifecycle
ProduceDevelop
Production
Time
EXPLORE DEVELOP PRODUCE
Explore
Select Define Execute
-
8/7/2019 BP Andy Inglis Overview 2009
11/17
11
Targeting capital efficiency
Cost Structure Unit x Efficiency x Price=
# Wells
Complexity of wells
$ / mboed
Manhours
Unit of Activity Reservoir
understanding Cross discipline
integration
Days / 10k
Non productive Time
Manhour / ton
# of days execution
Manhour / ton
Efficiency Centralised organisation
(Spars, D&C, Subsea) FEL (Front End Loading) Systems and processes Standardisation
Rig rate ($ / day)$ / service
$ / ton materials
$ / ton materials
$ / day vessel
$ / manhour
Supply Chain Global leverage Competitive bidding Global relationships ->
performance and quality
20
40
60
80
100
0
D&C costs usingSpar Rig
D&C costs(Drilling &
Completions) using
Mobile OffshoreDrilling Unit
Subsea
Engineering andProject Mgmt
Spar
Costs (%)
-
8/7/2019 BP Andy Inglis Overview 2009
12/17
12
Standardisation: Design one Build many
Dorado 2009Gulf of
Mexico
King South 2009 Isabella - 2011Atlantis North Flank 2009
Egypt
Train 1 Supply 2008 Train 2 Supply Ph1 2010+ Train 2 Supply Ph2 2010+
Trinidad
Cannonball 2006 Cashima 2008Red Mango 2007 Savonette -2009
Angola
G. Plutonio - 2007 Bk31 PSVM 2010+ Bk31 Central 2010+ Bk31 South 2010+ Bk18 West 2010+
Azerbaijan
Central Azeri - 2004 West Azeri - 2005 East Azeri 2006 Deepwater Guneshli - 2008
-
8/7/2019 BP Andy Inglis Overview 2009
13/17
13
Driving excellence at each stage of the
lifecycle
ProduceDevelop
Production
Time
EXPLORE DEVELOP PRODUCE
Explore
Safe Reliable Efficient
-
8/7/2019 BP Andy Inglis Overview 2009
14/17
14
Produce: safe and reliable operations
Operating
ManagementSystem
Gulf of Mexico Personnel Safety
Recordable Injury Frequency (12 month rollin
g)
1Q07
2Q07
3Q07
4Q07
1Q08
2Q08
3Q08
4Q08
1Q09
0.20
0.40
0.60
0.80
Apr 2009 0.36
Jan 2008 0.69
-
8/7/2019 BP Andy Inglis Overview 2009
15/17
15
Produce: improving operating efficiency
RESERVOIR
Wells Facilities Export
IPC (Installed Production Capacity) =Entire system fully optimized at full rate
with no planned or unplanned losses
Actual ProductionIPC
Ops Efficiency =
$
Gulf of Mexico Choke Model
97.4% 97.8% 99.8% 95.1%
Ops Efficiency
Gulf of Mexico Operating Efficiency(excl weather and planned outages)
90
91
92
93
94
95
96
92.8
2006
92.6
2007
94.0
2008Operating Efficiency (%) 95.1
2009 - YTD
93.1
Thunder HorseGulf of Mexico SPU
-
8/7/2019 BP Andy Inglis Overview 2009
16/17
16
Agenda
Andy InglisChief Executive, Exploration & Production
Summary, questions and feedback5:15pm
Advanced Collaborative Environment (ACE)3:30pm
Mini Deep Dives Advanced Seismic Unconventional Gas Pushing Reservoir Limits Paleogene
2:00pm
Jackie MutschlerTechnology Vice President, Research &Technology
Technology1:00pm
Afternoon 1:00pm 6:15pm
Andy HopwoodStrategic Performance Unit Leader,North America Gas
North America Gas11:15am
Neil ShawStrategic Performance Unit Leader,Gulf of Mexico
Deep Water Gulf of Mexico10:15am
Mike Daly
Head of Exploration & Access
Exploration8:45am
Andy InglisChief Executive, Exploration & Production
Introduction7:45am
Morning 7:45am 12:15pm
-
8/7/2019 BP Andy Inglis Overview 2009
17/17
17
Todays presenters
Jackie Mutschler
Technology Vice PresidentResearch & Technology
Andy Inglis
Chief ExecutiveExploration & Production
Neil Shaw
Strategic PerformanceUnit LeaderGulf of Mexico
Mike Daly
Head of Exploration& Access
Andy Hopwood
Strategic PerformanceUnit LeaderNorth America Gas