BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and...

22
BINP for FAIR BINP for FAIR Yu.Shatunov Yu.Shatunov Moscow Moscow 17-18 May 2006 17-18 May 2006

Transcript of BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and...

Page 1: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

BINP for FAIRBINP for FAIR

Yu.ShatunovYu.Shatunov

MoscowMoscow17-18 May 200617-18 May 2006

Page 2: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

Research and Development Contractbetween GSI and BINP

1. Kickers for synchrotrons and storage rings2. Septum magnets for synchrotrons and storage rings 3. Technical design of ER and interaction region for collider mode

including modification for AIC/NUSTAR 4. Luminosity monitor and electron spectrometer for ELISE/NUSTAR 5. Pbar-Target and Collection 6. Ultra Cold Electron Target for NESR7. Prototype High Voltage Section for the NESR Electron Cooler 8. Resistive coil magnets for FAIR 9. Production of vacuum chambers for SIS18 quadrupoles (addressed in

EU-FP 6 Construction contract No. 515876)10. Study for High radiation resistant magnets for Super-FRS (R&D

contract No. RU/03533872/SE-05007 is already placed)11. Prototype Design for the RF-Cavities at SIS100 /300 (Continuation of

the study with purchase order No. 4500054244)

Subject and Objectives of the Contract

Page 3: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

BINP for FAIR

• Super-FRS target high radiation resistant magnets• Electron-ions collider (eA) e-linac electron spectrometer P_bar-ions collisions• Electron colling:

NESR (e-coller, e-target); e-cooler for P_bar –A collider,

HESR e-cooler• Kickers for synchrotrons and storage rings• Septum for synchrotrons and storage rings• Superferric dipole and quads for CR • RF for SIS-100 (300)• Polarized P-P_bar collider at HESR

Page 4: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

target,magnets

EICAIC

SIS-100(300)

pulse dipoleseptums, kickers

RF

e-cool

P-P_barcollider

SIS-18

vacuumchamber

CR quads

e-cool

Page 5: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

Layout and Design Parameters of the Super-FRS

• The main technical challenges are at the Pre-Separator

• The physical performance of the new facility can be directly deduced from the experience with the FRS

Design Parameters

1500R

Tm20Bρ

%2.5p

Δp

mrad20φ

mrad,40φ

mradmmπ40εε

ion

max

y

x

yx

Page 6: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

First stage of Super-FRS

productiontarget

ΔBρ/Bρ beamQ Q SQ

Page 7: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

High power target based on liquid lead alloy technology

• Operating temperature range (300-400°C) provides annealing of radiation damages in all corresponding subsystems.

• It provides cheap and reliable solution for bearings and rotation feed-through in high radiation area.

•Shaft cooling unit

(tested on 75 kW beam power)

Page 8: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

High radiation resistant dipole magnet

Power ~ 120 kWWeight~ 90 t

Cu

MO

Page 9: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

High radiation resistant sextupole magnet

Page 10: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

e-A collider

Page 11: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

Spectrometer dp/p = 2 10-4

Full tracking simulation including detectors

10% of full(azimuthal) anglecoverage

sphericalabberations

e

A

(magnets cost 1.5 MEuro)

Page 12: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Page 13: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Page 14: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Page 15: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

Quads for CR

CR septum quadrupole CR superferric quadrupole (wide)

Page 16: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

Superconducting septums for SIS-100

1T Lambertson magnet 3T septum magnet (fast)

Page 17: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

Simulations based on TR-Nov-2005 report.

SIS 100 extr/emrg kicker 2D simulations.

BINP proposal.

Ceramic

vacuum chamber

Ferrite8C11

Busbars

nonhomogeneous field

more homogeneous

field

Magnetic field, A/m, 0-10e5

Page 18: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

SIS 100 extr/emrg kicker 3D simulations.

Magnetic field, A/m, 0-10e5

Page 19: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

Design of RF-station for SIS-100 (10-th harmonic)

Frequency range 1.1-2.7 MHRF voltage 19 kV Ferrite type 400 NN-2 Number of ferrite for unit 68Number of unit 29Cost per unit 0.5 Euro

Page 20: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

Conceptual Design for a PolarizedProton-Antiproton Collider Facility at HESR

5 6 7 8 9 10 11 12 13 14 150

1 1031

2 1031

3 1031

4 1031

5 1031

6 1031

Kinetic Energy, GeV

Lu

min

osi

ty, c

m^(

-2)s

^(-1

)

Page 21: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

Layout of the P-P_bar collider

1212 bunches

Page 22: BINP for FAIR Yu.Shatunov Moscow 17-18 May 2006. Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.

…… for BINP

• Super-FRS target 0.5 high radiation resistant magnet 1.3• Electron-ions collider (eA) e-linac + ring 4.5 + 3.5 electron spectrometer (magnets) 1.5 P_bar-ions collisions 2.0

• Electron cooling:

NESR (e-cooler, e-target) 4.0 e-cooler for P_bar –A collider, 0.5

HESR e-cooler 5-7• Kickers for synchrotrons and storage rings 0.2/per unit• Septum for synchrotrons and storage rings• Superferric dipole and quads for CR • RF for SIS-100 (300) 0.5/per unit• Polarized P-P_bar collider at HESR + 17.0

M€