Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona...

14
Bill Seed Lean Construction Institute itec.cat/lean

Transcript of Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona...

Page 1: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

Bill SeedLean Construction Institute

itec.cat/lean

Page 2: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

Customers

Clients

Owners

LAST PLANNER,

FOUNDATION FOR

IMPROVEMENT

William R (Bill) Seed

Chairman, Lean Construction Institute

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 3: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

LAST PLANNER SYSTEM

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 4: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

MEETING MANAGEMENT

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 5: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

PROJECT HEALTH

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 6: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

VISIBLE METRICS

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 7: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

A3 COLLABORATION

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 8: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

A3 LEARNING AND DECISION MAKING

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 9: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

VISIBLE CONSTRAINT LOG

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 10: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

POLY PARTY CONTRACTING

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 11: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

CONSOLIDATED COMMUNICATION

DASHBOARD

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 12: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

SUTTER HEALTH SYSTEM COMMENTS

At Sutter, on our best projects, the way work

gets described, gets planned, gets tracked,

gets reported, gets estimated, gets billed,

gets programmed, gets designed,

gets modeled, gets fabricated, gets installed,

gets commissioned has all been radically

changed. That doesn’t leave much process

wise that’s remained intact.

“pick anything and start there, it’s all a mess”

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 13: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

(2

5.6

ILPD Team Validated

Estimate

Current Working Estimate

(CWE)

internal Estimate

internal Estimate +

Contingency

Project Timeline

M

M

M

ILPD

Kickoff ContractFTC Set Facility

Complete

Project TimelineProject Timeline

M

M

M

Easier Better Faster Cheaper

Earlier definition of

the project

schedule and final

cost by permit

time, reducing RFI

and field changes

Greater insight

into trade partner

operations, skill

sets and

capabilities

Increased visibility

and assignment

of risk

Less chaos on the

job

Partners as owner

advocates – ex.

track switches,

ride steel,

wetland

mitigation

Eliminated

value

engineering

scope

cutting

Higher overall

morale in the

field and in

the office

Increased

future value

of partner

supply chain

knowledge

Add back

decisions

were made

earlier – ex.

added

Restaurant

renovation

and

Concierge

lounge

Improved

partner cash

flow through

faster

change

reconciliatio

n and settling

of cost

Smarter,

selective use

of overtime

Saved

contingency,

which

increased

predictability

Project TimelineProject Timeline

Graph not to scale Graph not to scale Graph not to scale

Graph not to scale Graph not to scale

M

(21.5%)

M

M

M

Unspent

Contingency

Owner Savings

M

M

MMM

(7.75%)

M

M

M

M

M

13.2%)

M

M

M

M

M

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean

Page 14: Bill Seed - sites.itec.cat · A3 COLLABORATION Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean. A3 LEARNING AND DECISION MAKING ... schedule and final

INTANGIBLES/CAN’T YET MONETIZE

Lean LPS · 05/2016 · Lean Construction Barcelona by ITeC · itec.cat/lean