Bike2Worksdf
-
Upload
akhlaqur-rahman-rahi -
Category
Documents
-
view
5 -
download
2
description
Transcript of Bike2Worksdf
Sheet1DayFromToDay RideSum UpDay SumComment1Johor Bahru 0 PointPontian District 51.851.8126Unboxing bike, Tunning, Gear up will take at at least 2 Hour which is a challenge and only can over come if we reach Johor Bahru on the same night. We can even spend rest of the night at airport and reach zero point in the early morning then only can meet this targetPontian District Benur26.678.4BenurBatu Pahat47.61262Batu PahatMalacca1032291033MalaccaNegeri Sembilan 84313139There is no option to drop this distance. We need to start very early morning so that we can finish in timeNegeri Sembilan Putrajaya553684PutrajayaKuala Lumpur4541345I have intentionally dropped the distance because of meeting axiata guys and to roam around the city5Kuala LumpurTanjung Malim 89502896Tanjung Malim Perek1236251237PerekTaiping85.9710.985.98TaipingPenang Island119.1830119.19Lankawi By Ferri from Penang Island0040First Ferry starts at 8:15AM from penang, Take kinda 1 hour and more. So roughly we will reach by 10:30AM. Having Breakfast at Ferry ghat and deport by 11:00AM (Considering Buffer), Ride around 40KM so that we can at least see some beauty of lankawi and ended up with seeing sunset at beachLankawi Island Trip and reached to Kuala Perlis4087010Kuala PerlisPadang Besar 0 Point44.9959.889.8We need to come back to lankawi by evening, wrap bike and all gears.Padang Besar 0 PointLankawi Airport44.911Fly to Kuala Lumpur and then KL to Dhaka on the same day. If we have time then then may try city roaming else need to spend idle time at airportNA
Sheet2
Sheet3