WHAT THE MESS ON BEACON HILL

MEANS TO YOU

Big Dig woefully late and over budget

1 state, 2 highway overheads

10+ years without consensus on how to

restore the surface artery

 An empty $1B convention center surrounded

by 1,000 acres of mud & parking lots, and

graced by America¶s ugliest building (the CATvent)

Page 3: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 3/17

NEW LEADERSHIP, NEW VISION

Professional windup of the Big Dig

Streamlined highway management

Great Cities and the Emerald Necklace

Strategic decisions on Hynes Convention

Center and Seaport District

Page 4: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 4/17

PROFESSIONAL WINDUP OF THE

BIG DIG

Top-to-bottom outside audit with full publicdisclosure

 Aggressive oversight based on audit findings

Reporting directly to Governor 

Turnpike Authority removed from management role

100% accountability for Big Dig contractors

Elimination of any remaining wasteful

extravagance

Page 5: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 5/17

STREAMLINED HIGHWAY

MANAGEMENT

The turnpike is a good roadway

Let¶s keep it that way

But Turnpike Authority and Mass Highway

overlap needlessly

Combine the best from both

Consolidate all operations under Mass Highway

Savings go to turnpike toll relief 

Legal pathway already in place

Page 6: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 6/17

GREAT CITIES: THE ISSUE

We need vibrant, livable cities

We are among the most urban of states with 10x

average U.S. population density

But our cities have suffered Day-to-day spending has crowded out long-term

investment in the future

Infrastructure has crumbled

We need a new plan for great cities

Vision has been held hostage to waste, patronage

and Beacon Hill¶s obsession with the status quo

Page 7: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 7/17

GREAT CITIES: THE VISION

Government must work to make city lifeenjoyable, not just bearable

Safe and clean environment

Cultural diversity

Inspirational architecture

Playful open spaces

 A proper role of state government

Critical for growth and prosperity of entire

Commonwealth

Page 8: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 8/17

GREAT CITIES: THE EMERALD

NECKLACE

Surface artery restoration

Historic opportunity to reconnect Boston with its

waterfront

Public space consistent with spirit of The Emerald

Necklace

Show what a great 21st century American city can be

CA surface cannot become

Wind-swept scar; a mirror of Government Center 

Plaza

Hodge-podge of Beacon Hill paybacks

Bleeding cityscape without a maintenance budget

Page 9: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 9/17

COMPLETING THE EMERALD

NECKLACE

Governor must lead

Collaborative process

Take responsibility for funding

State and city

Business

Public and nonprofit contributions

100% open until 100% planned and funded

Page 10: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 10/17

STRATEGIC DECISIONS: HYNES

AND SEAPORT

Beacon Hill has brought us «

Two uneconomical Convention Centers

 A stalled Seaport District

Page 11: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 11/17

CONVENTION CENTER OPTIONS

Dispose Keep

      K     e     e     p

      D      i     s     p     o     s     e

H YNES C.C.

   S   E   A   P   O   R   T   C .   C .

Page 12: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 12/17

CONVENTION CENTER OPTIONS

Dispose Keep

      K     e     e     p

      D      i     s     p     o     s     e

H YNES C.C.

   S   E   A   P   O   R   T   C .   C .

Page 13: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 13/17

SEAPORT DISTRICT OPTIONS

Jumpstart Stall

      K     e     e     p

      D      i     s     p     o     s     e

SEAPORT DEVELOPMENT

   S   E   A   P   O   R   T   C .   C .

Page 14: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 14/17

SEAPORT DISTRICT OPTIONS

Jumpstart Stall

      K     e     e     p

      D      i     s     p     o     s     e

SEAPORT DEVELOPMENT

   S   E   A   P   O   R   T   C .   C .

Page 15: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 15/17

DISPOSE, JUMPSTART

H YNES C.C. SEAPORT DISTRICT

Jumpstart Stall

      D      i     s     p

     o     s     e

      K     e     e     p

      D      i     s     p

     o     s     e

      K     e     e     p

   S   E   A

   P   O   R   T   C .   C

 .Dispose Keep

Page 16: Big Dig and Beyond

8/3/2019 Big Dig and Beyond

http://slidepdf.com/reader/full/big-dig-and-beyond 16/17

STRATEGIC ACTION

Sell Hynes Convention Center  Stop $15M+ annual state budget subsidy

Redirect parking garage profits

Jumpstart The Seaport District

Convene summit meeting of all parties

Reform permitting process

Remove regulatory uncertainties

Enhance public access

Beautify ugly vent shaft

Introduce time-bound financial incentives

Page 17: Big Dig and Beyond