_________________________________________________________________________Bi-Annual Environmental Monitoring Report
Project Number: 2727-PAK-Tranche-II(January-June, 2012)
Islamic Republic of Pakistan:Power Distribution Enhancement Investment Project
Financed by the Asian Development Bank
Prepared by: Javed Mehmood, Assistant Manager (Env) PMU,
HESCO, Hyderabad-Pakistan
For, Hyderabad Electric Supply CompanyPakistan Electric Power Company (PEPCO)
-
8/12/2019 Bi Annual Evn Mon Repot
2/16
2
Table of Contents
Subject Page No.
Part I: Introduction
1.1 Basic Data 4
1.2 Introduction 5
1.3 Scope & Status of Work 6
Part II: Environmental Monitoring 7
Part III: Environmental Management
3.1 Submission of EIA/IEE reports 8
3.2 Findings/Observations 8
3.3 Corrective Actions 9
3.4 Consultation & Complaints 9
EIA Submission Letter To Sindh EPA Annex- I
Letters To Sindh EPA Annex- II
Env. & Social Complaint Register Annex-III
-
8/12/2019 Bi Annual Evn Mon Repot
3/16
3
Abbreviations
ADB Asian Development Bank
AHs Affected households
APs Affected persons
BPI British Power International
CED Chief Engineer Development
E& SS Environmental and Social Safeguard
EIA Environment Impact AssessmentEPA Environmental Protection Agency
HESCO Hyderabad Electric Supply Company
GRC Grievance Redress Committee
GOP Government of Pakistan
IEE Initial Environmental Examination
ITC Increase in transformer capacity=augmentation
Km kilometer
KV kilo-Volt
MOWP Ministry of Water and Power
PEPCO Pakistan Electric Power Company
PIC Project Implementation Consultant
PDE Power Distribution Enhancement
PMU Project Management Unit
PDEMFF Power Distribution Enhancement Multi Tranche Financing Facility
-
8/12/2019 Bi Annual Evn Mon Repot
4/16
4
Part I: Introduction
1.1 Basic Data of Tranche-II
a. ADB Loan No. 2727-PAK
b. Project Title Power Distribution Enhancement
Investment Project Tranche-2
c. Borrower Islamic Republic of Pakistan
d. Executing Agency Pakistan Electric Power Company(PEPCO)
e. Implementing Agency Hyderabad Electric Power Company Ltd.
f. Total Project Cost US$ 35.35 Million
j. Loan Signing Date January 28, 2011
k. Date of Effectiveness October, 5, 2011
m. Date of Physical
CompletionMarch 31, 2015
-
8/12/2019 Bi Annual Evn Mon Repot
5/16
5
1.2 Introduction
1. Hyderabad Electric Supply Company Ltd. HESCO is a Public Limited Utility
Company, established in 1998 under Companies Ordinance 1984 and is
responsible for distribution of Electric Power within its territorial jurisdiction
in entire Sindh except Karachi.
2. HESCO through GoP has undergone a Project Financing agreement with
Asian Development Bank for:
a) Strengthening the capacity of Power Distribution and Transmission
networks
b)To meet the increasing electricity demand in the selected areas more
efficiently
c) To upgrade the existing power infrastructure.
3. Overall the proposed MFF has been designed to address both investment
and institutional aspects in electric power sector. Development Objectives/
Project Purpose will be fully achieved after completion of the proposed
Sub-projects.
4. So far no construction activity has started at any of the subprojects in
Tranche-II.
5. Mr. Javed Mahmood Assistant Manager (P&S) PMU under General Manager
(Development) HESCO, is assigned to look after the matters of Assistant
Manager (Env), has prepared this report. Whereas, Mr. Ali Khan Jamali
Assistant Manager (Admn) and Mr. Faiz Muhammad Domki Additional
Deputy Manager (Electrical Engineer) are working as Assistant Manager
(Social Impact) and Deputy Manager (Environment & Social Safeguard)
PMU, HESCO respectively.
6. PD (GSC), Contractor(s) and other related staff has been provided
orientation on Environmental Management & Implementation of ADB
guideline and rules/regulations of Government of Pakistan.
-
8/12/2019 Bi Annual Evn Mon Repot
6/16
-
8/12/2019 Bi Annual Evn Mon Repot
7/16
7
Part II Environmental Monitoring
7. GSC & Contractor(s) will be continuously apprised to monitor
Environmental aspects during the implementation of Tranche-II
subprojects. No major civil work has been started at subproject sites.
Environmental Management Plan (EMP) has been made part of bidding
documents and contractor(s) are bound to comply with Environmental
Management Plan (EMP) and during execution each project will be
monitored to check the compliance with EMP. Environmental Social
Monitor (ESM) will fill checklists / monitoring proforma which will be duly
signed by SDO (GSC)/ ESI on fortnight basis. The record of above
parameters will be kept as specified in bidding documents.
-
8/12/2019 Bi Annual Evn Mon Repot
8/16
8
Part III Environmental Management
3.1 Submission of EIA /IEE Reports
8. Initial Environmental Examination (IEE) Reports were prepared by
PEPCO Consultant M/S British Power International (BPI) and received by
HESCO through PEPCO in November / December 2010.
9. These reports were reviewed, converted from IEE format to EIA to
comply with the local statutory requirements/ law.
10. Approval of these EIAs was accorded by worthy CEO, HESCO,
and then uploaded on HESCOs official website (www.hesco.gov.pk).
11. EIAs have also been submitted to EPA Sindh for EnvironmentalApproval (Annex-I). Though EPA has been approached from time to
time vide letters (Annex-II)but approval is still under process which
will be obtained as soon as possible.
12. The Environmental Monitoring and Management Plan (EMMP)
enlisted in EIA Reports have been made part of the bidding documents
of civil works (Turnkey Project).
3.2 Findings/Observations13. Findings/ Observations noted during the site visit. Its detail is as
follows:
a) Land for 132 KV Jacobabad-II new grid stations has been purchased
on willing-seller, willing-buyer basis.
b)No potential significant environmental impacts associated with the
subprojects has been recorded as construction work has not been
started.
c) There will be some environmental impacts during execution work ofsubprojects which will be mitigated by implementing EMP.
d)Suitable control measures will be required in project area to minimize/
mitigate environmental impacts, disruption, contamination of
surroundings arising out due to construction material/ chemicals
handling/ storage and disposal of construction waste.
-
8/12/2019 Bi Annual Evn Mon Repot
9/16
9
3.3 Corrective action plans
14. Since there is no commencement of any civil work at subproject
sites, therefore, no Non-Compliance (NC), Observation neither
reported nor corrective action (CA) taken at project sites.
3.4 Consultation and Complaints
15. Environmental Social Complaint Register (Annex-IV) will be placed on each
active subproject site. So far, No affected person/ household has logged any
Complaint in PMU Office.
Implementation Report on EIA/IEE Mitigation Requirements
Reference Requirement Action to date
Action
Required /Comment
Compliance ofEIA/IEE Reportduring Executionof Project Civil
Work
Inclusion of EIA/IEE Reports inBidding documents
EIA/ IEE Reports havebeen included/ madepart of the BiddingDocuments
DONE
Compliance ofEnvironmentMonitoring &Management Planduring executionof Project Civil
Work
Inclusion of EMMPin Biddingdocuments
EMMP Documentshave been included/made part of theBidding documents
DONE
-
8/12/2019 Bi Annual Evn Mon Repot
10/16
-
8/12/2019 Bi Annual Evn Mon Repot
11/16
Environmental & Social Complaint R
Sr.No.
Detail of Complaint (Name / Address /Telephone No.
Date Complaint / Grie
-
8/12/2019 Bi Annual Evn Mon Repot
12/16
Environmental & Social Complaint R
Suggested
MitigationMeasures
ImplementationResponsibility
Date ofImplementation of
SuggestedMitigation
Measures
Implementation
Status ofMitigations
Measures
-
8/12/2019 Bi Annual Evn Mon Repot
13/16
-
8/12/2019 Bi Annual Evn Mon Repot
14/16
-
8/12/2019 Bi Annual Evn Mon Repot
15/16
-
8/12/2019 Bi Annual Evn Mon Repot
16/16