    _________________________________________________________________________Bi-Annual Environmental Monitoring Report

    Project Number: 2727-PAK-Tranche-II(January-June, 2012)

    Islamic Republic of Pakistan:Power Distribution Enhancement Investment Project

    Financed by the Asian Development Bank

    Prepared by: Javed Mehmood, Assistant Manager (Env) PMU,

    HESCO, Hyderabad-Pakistan

    For, Hyderabad Electric Supply CompanyPakistan Electric Power Company (PEPCO)

  • 8/12/2019 Bi Annual Evn Mon Repot

    2/16

    2

    Table of Contents

    Subject Page No.

    Part I: Introduction

    1.1 Basic Data 4

    1.2 Introduction 5

    1.3 Scope & Status of Work 6

    Part II: Environmental Monitoring 7

    Part III: Environmental Management

    3.1 Submission of EIA/IEE reports 8

    3.2 Findings/Observations 8

    3.3 Corrective Actions 9

    3.4 Consultation & Complaints 9

    EIA Submission Letter To Sindh EPA Annex- I

    Letters To Sindh EPA Annex- II

    Env. & Social Complaint Register Annex-III

  • 8/12/2019 Bi Annual Evn Mon Repot

    3/16

    3

    Abbreviations

    ADB Asian Development Bank

    AHs Affected households

    APs Affected persons

    BPI British Power International

    CED Chief Engineer Development

    E& SS Environmental and Social Safeguard

    EIA Environment Impact AssessmentEPA Environmental Protection Agency

    HESCO Hyderabad Electric Supply Company

    GRC Grievance Redress Committee

    GOP Government of Pakistan

    IEE Initial Environmental Examination

    ITC Increase in transformer capacity=augmentation

    Km kilometer

    KV kilo-Volt

    MOWP Ministry of Water and Power

    PEPCO Pakistan Electric Power Company

    PIC Project Implementation Consultant

    PDE Power Distribution Enhancement

    PMU Project Management Unit

    PDEMFF Power Distribution Enhancement Multi Tranche Financing Facility

  • 8/12/2019 Bi Annual Evn Mon Repot

    4/16

    4

    Part I: Introduction

    1.1 Basic Data of Tranche-II

    a. ADB Loan No. 2727-PAK

    b. Project Title Power Distribution Enhancement

    Investment Project Tranche-2

    c. Borrower Islamic Republic of Pakistan

    d. Executing Agency Pakistan Electric Power Company(PEPCO)

    e. Implementing Agency Hyderabad Electric Power Company Ltd.

    f. Total Project Cost US$ 35.35 Million

    j. Loan Signing Date January 28, 2011

    k. Date of Effectiveness October, 5, 2011

    m. Date of Physical

    CompletionMarch 31, 2015

  • 8/12/2019 Bi Annual Evn Mon Repot

    5/16

    5

    1.2 Introduction

    1. Hyderabad Electric Supply Company Ltd. HESCO is a Public Limited Utility

    Company, established in 1998 under Companies Ordinance 1984 and is

    responsible for distribution of Electric Power within its territorial jurisdiction

    in entire Sindh except Karachi.

    2. HESCO through GoP has undergone a Project Financing agreement with

    Asian Development Bank for:

    a) Strengthening the capacity of Power Distribution and Transmission

    networks

    b)To meet the increasing electricity demand in the selected areas more

    efficiently

    c) To upgrade the existing power infrastructure.

    3. Overall the proposed MFF has been designed to address both investment

    and institutional aspects in electric power sector. Development Objectives/

    Project Purpose will be fully achieved after completion of the proposed

    Sub-projects.

    4. So far no construction activity has started at any of the subprojects in

    Tranche-II.

    5. Mr. Javed Mahmood Assistant Manager (P&S) PMU under General Manager

    (Development) HESCO, is assigned to look after the matters of Assistant

    Manager (Env), has prepared this report. Whereas, Mr. Ali Khan Jamali

    Assistant Manager (Admn) and Mr. Faiz Muhammad Domki Additional

    Deputy Manager (Electrical Engineer) are working as Assistant Manager

    (Social Impact) and Deputy Manager (Environment & Social Safeguard)

    PMU, HESCO respectively.

    6. PD (GSC), Contractor(s) and other related staff has been provided

    orientation on Environmental Management & Implementation of ADB

    guideline and rules/regulations of Government of Pakistan.

  • 8/12/2019 Bi Annual Evn Mon Repot

    6/16

  • 8/12/2019 Bi Annual Evn Mon Repot

    7/16

    7

    Part II Environmental Monitoring

    7. GSC & Contractor(s) will be continuously apprised to monitor

    Environmental aspects during the implementation of Tranche-II

    subprojects. No major civil work has been started at subproject sites.

    Environmental Management Plan (EMP) has been made part of bidding

    documents and contractor(s) are bound to comply with Environmental

    Management Plan (EMP) and during execution each project will be

    monitored to check the compliance with EMP. Environmental Social

    Monitor (ESM) will fill checklists / monitoring proforma which will be duly

    signed by SDO (GSC)/ ESI on fortnight basis. The record of above

    parameters will be kept as specified in bidding documents.

  • 8/12/2019 Bi Annual Evn Mon Repot

    8/16

    8

    Part III Environmental Management

    3.1 Submission of EIA /IEE Reports

    8. Initial Environmental Examination (IEE) Reports were prepared by

    PEPCO Consultant M/S British Power International (BPI) and received by

    HESCO through PEPCO in November / December 2010.

    9. These reports were reviewed, converted from IEE format to EIA to

    comply with the local statutory requirements/ law.

    10. Approval of these EIAs was accorded by worthy CEO, HESCO,

    and then uploaded on HESCOs official website (www.hesco.gov.pk).

    11. EIAs have also been submitted to EPA Sindh for EnvironmentalApproval (Annex-I). Though EPA has been approached from time to

    time vide letters (Annex-II)but approval is still under process which

    will be obtained as soon as possible.

    12. The Environmental Monitoring and Management Plan (EMMP)

    enlisted in EIA Reports have been made part of the bidding documents

    of civil works (Turnkey Project).

    3.2 Findings/Observations13. Findings/ Observations noted during the site visit. Its detail is as

    follows:

    a) Land for 132 KV Jacobabad-II new grid stations has been purchased

    on willing-seller, willing-buyer basis.

    b)No potential significant environmental impacts associated with the

    subprojects has been recorded as construction work has not been

    started.

    c) There will be some environmental impacts during execution work ofsubprojects which will be mitigated by implementing EMP.

    d)Suitable control measures will be required in project area to minimize/

    mitigate environmental impacts, disruption, contamination of

    surroundings arising out due to construction material/ chemicals

    handling/ storage and disposal of construction waste.

  • 8/12/2019 Bi Annual Evn Mon Repot

    9/16

    9

    3.3 Corrective action plans

    14. Since there is no commencement of any civil work at subproject

    sites, therefore, no Non-Compliance (NC), Observation neither

    reported nor corrective action (CA) taken at project sites.

    3.4 Consultation and Complaints

    15. Environmental Social Complaint Register (Annex-IV) will be placed on each

    active subproject site. So far, No affected person/ household has logged any

    Complaint in PMU Office.

    Implementation Report on EIA/IEE Mitigation Requirements

    Reference Requirement Action to date

    Action

    Required /Comment

    Compliance ofEIA/IEE Reportduring Executionof Project Civil

    Work

    Inclusion of EIA/IEE Reports inBidding documents

    EIA/ IEE Reports havebeen included/ madepart of the BiddingDocuments

    DONE

    Compliance ofEnvironmentMonitoring &Management Planduring executionof Project Civil

    Work

    Inclusion of EMMPin Biddingdocuments

    EMMP Documentshave been included/made part of theBidding documents

    DONE

  • 8/12/2019 Bi Annual Evn Mon Repot

    10/16

  • 8/12/2019 Bi Annual Evn Mon Repot

    11/16

    Environmental & Social Complaint R

    Sr.No.

    Detail of Complaint (Name / Address /Telephone No.

    Date Complaint / Grie

  • 8/12/2019 Bi Annual Evn Mon Repot

    12/16

    Environmental & Social Complaint R

    Suggested

    MitigationMeasures

    ImplementationResponsibility

    Date ofImplementation of

    SuggestedMitigation

    Measures

    Implementation

    Status ofMitigations

    Measures

  • 8/12/2019 Bi Annual Evn Mon Repot

    13/16

  • 8/12/2019 Bi Annual Evn Mon Repot

    14/16

  • 8/12/2019 Bi Annual Evn Mon Repot

    15/16

  • 8/12/2019 Bi Annual Evn Mon Repot

    16/16