BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY REGULATORY COMMISSION, CHANDIGARH PETITION NO. OF 2020 IN THE MATTER OF: GVK Power (Goindwal Sahib) Limited Petitioner Versus Punjab State Power Corporation Limited Respondent INDEX S.No. Particulars Page Nos. 1. Application for Annual Performance Review of 2 x 270 MW Goindwal Sahib Thermal Power Plant at Goindwal Sahib, Punjab for the FY 2019-20 in terms Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2014 along with supporting affidavit 1 – 22 2. Annexure P – 1: A copy of the certificate issued by a Chartered Accountant dated 24.09.2020 23 3. Annexure P – 2 (Colly): Copies of the tariff forms as per the PSERC Tariff Regulations 2014 24 – 79 GVK Power (Goindwal Sahib) Limited Petitioner Through J. Sagar Associates Advocates for the Petitioner B-303, 3rd Floor, Ansal Plaza Hudco Place, August Kranti Marg New Delhi – 110 049 Date: 28.09.2020 Place: Hyderabad

Transcript of BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Page 1: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY REGULATORY COMMISSION, CHANDIGARH

PETITION NO. OF 2020

IN THE MATTER OF:

GVK Power (Goindwal Sahib) Limited … Petitioner

Versus

Punjab State Power Corporation Limited … Respondent

INDEX

S.No. Particulars Page Nos.

1. Application for Annual Performance Review of 2 x 270 MW

Goindwal Sahib Thermal Power Plant at Goindwal Sahib,

Punjab for the FY 2019-20 in terms Punjab State Electricity

Regulatory Commission (Terms and Conditions for

Determination of Generation, Transmission, Wheeling and

Retail Supply Tariff) Regulations, 2014 along with supporting

affidavit

1 – 22

2. Annexure P – 1: A copy of the certificate issued by a

Chartered Accountant dated 24.09.2020

23

3. Annexure P – 2 (Colly): Copies of the tariff forms as per the

PSERC Tariff Regulations 2014

24 – 79

GVK Power (Goindwal Sahib) Limited Petitioner

Through

J. Sagar AssociatesAdvocates for the Petitioner

B-303, 3rd Floor, Ansal PlazaHudco Place, August Kranti Marg

New Delhi – 110 049

Date: 28.09.2020 Place: Hyderabad

Page 2: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

1

BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY

REGULATORY COMMISSION, CHANDIGARH

PETITION NO. OF 2020

IN THE MATTER OF:

GVK Power (Goindwal Sahib) Limited

Plot No.10, Paigah House,

Sardar Patel Road,

Secunderabad – 500003 …Petitioner

Versus

Punjab State Power Corporation Limited

The Mall, Patiala (Punjab) …Respondent

Application for Annual Performance Review of 2X270 MW Goindwal Sahib

Thermal Power Plant at Goindwal Sahib, Punjab for the FY 2019-20 in

terms Punjab State Electricity Regulatory Commission (Terms and

Conditions for Determination of Generation, Transmission, Wheeling and

Retail Supply Tariff) Regulations, 2014” (PSERC MYT Regulations 2014).

Most respectfully showeth the petition as follows: -

I. Conspectus

1. The present Petition has been filed in terms of Regulation 11 of the PSERC

(Terms and Conditions for Determination of Generation, Transmission, Wheeling

and Retail Supply Tariff) Regulations, 2014 (“PSERC Tariff Regulations 2014”)

seeking Annual Performance Review for FY 2019-20 (“APR”).

2. GVK Power (Goindwal Sahib) Limited (“Petitioner/GVK”) is a company

incorporated under the provisions of Companies Act 1956 and a generating

company as per Section 2(28) of the Electricity Act, 2003 (“Electricity Act”) with

the object of engaging in the business of establishing, maintaining and operating

Page 3: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

2

a 2X270MW (540 MW) coal based thermal power station at Goindwal Sahib in

the State of Punjab (“Project”). For the generation, sale and purchase of

electricity from the Project, an Amended and Restated Power Purchase

Agreement, dated 25.06.2009 (“PPA”) was entered into between the Petitioner

and the Punjab State Power Corporation Limited (“the Respondent/PSPCL”).

Under the terms of the PPA, the entire power generated by the Petitioner from

the Project shall be sold exclusive to the Respondent, including the full capacity

of the Project.

3. This Hon’ble Commission has vide Order dated 05.08.2020 in Petition No.

69 of 2017 has determined the Annual Revenue Requirement for FY 2017-18 and

FY 2018-19. Furthermore. the true- up of FY 2017-18 and FY 2018-19 has been

done by the Hon’ble Commission vide its order dated 17.09.2020 in Petition No.

34 of 2019. In this context, it is submitted that the Petitioner is in the process of

challenging the Order dated 05.08.2020 before the Hon’ble Appellate Tribunal

for Electricity (“Hon’ble Tribunal”) and reserves its rights in this regard.

II. Regulatory Provision of filing APR Petition

4. Regulation 11 of PSERC Tariff Regulations 2014 deals with application for

APR as under:

“11.1. The Applicant shall make an application for Annual Performance

Review and tariff resetting not less than 120 days before the close of each

year of the control period.

11.2. The distribution licensee also carrying out the generation business

shall ensure that the application contains segregated accounts and records

of performance of generation and distribution businesses.

11.3. The Applicant shall publish its application filed for Annual

Performance Review as required by Conduct of Business Regulations. The

Applicant shall also display the application on its official website.

Page 4: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

3

11.4. The Annual Performance Review shall include the details of actual

capital expenditure, details of income tax paid and actual operational and

cost data to enable the Commission to monitor the implementation of its

order including comparison of actual performance with the approved

forecasts (and reasons for deviations). In addition, the Applicant shall also

submit Annual Statement of its performance of generation business

(indicating the cost data - plant-wise, and performance parameters - unit-

wise), transmission business or distribution business, as the case may be,

including a copy of its latest audited accounts.

11.5. The Applicant shall provide any other information, as may be asked for

by the Commission with a view to assess the reasons and extent of any

variation in the performance from the approved forecast and the need for

tariff resetting.

11.6. In the application, Applicant shall submit information for the purpose

of calculating expected tariff and expenditure along with information on

financial and operational performance for the previous year(s). The

information for the previous year(s) shall be based on audited accounts and

in case audited accounts for the previous year(s) are not available, audited

accounts for the latest previous year shall be filed along with unaudited

accounts (provisional accounts) for all the succeeding years.

11.7. The scope of the Annual Performance Review shall be a comparison of

the performance of the Applicant with the approved forecast of ARR along

with the performance targets specified by the Commission.

11.8. The Commission shall review the application made under the

preceding clauses based on the same principles as approved in the MYT

Order on original application for determination of ARR and Tariff and upon

completion of such review, either approve the proposed modification(s)

Page 5: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

4

with such changes as it deems appropriate, or reject the application for

reasons to be recorded in writing.”

5. It is submitted that the Petitioner was unable to file the APR petition

during the time period stipulated in the PSERC Tariff Regulations 2014. It is

prayed that this Hon’ble Commission may be pleased to condone the delay in

filing the petition.

III. Plant Performance During FY 2019-20

6. The plant performance during the FY 2019-20 has been as follows:

Table 1 Plant Operational Parameters

Particular Unit FY 2019-20

Plant Capacity MW 540

PLF % 27.73%

Plant Availability % 99.31%

Station Heat Rate Kcal/kWh 2358

Gross Generation MU 1311.52

Auxiliary Consumption % 9.26%

Net Generation MU 1190

7. It is submitted that the plant is expected to achieve a PLF of 27.73% as the

entire power generated from the plant is sold to PSPCL and therefore the

generation is as per the instructions issued by PSPCL from time to time.

8. It is further submitted that the Station Heat Rate (“SHR”) and Auxiliary

Consumption are on the higher side as compared to the normative parameters

provided by Hon’ble Central Electricity Regulatory Commission (“Hon’ble

CERC”). The reason for deviation is on account of part load operations of the

plant for most of the year based on dispatch instructions. Therefore, the

normative parameters on auxiliary consumptions and the SHR could not be

Page 6: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

5

achieved and it is prayed that this Hon’ble Commission may allow SHR and

Auxiliary Consumption on actuals.

9. The normative parameters of operation for the FY 2019-20 are as follows:

Table 2 Other Operational Parameters

Particular Unit FY 2019-20

Secondary Fuel Oil

Consumption ml/kWh 0.89

Transit Losses % 1.6

The petitioner humbly pleads the Hon’ble Commission to approve the above

operating parameters for FY 2019-20.

A. Capital Expenditure

10. The petitioner submits that it has incurred a capital expenditure of Rs.

0.698 Crores in FY 2019-20 on account of setting up Coal Testing laboratory

pursuant to this Hon’ble Commission’s Order dated 06.03.2019 in Petition No. 68

of 2017. The said expenses have already been approved by this Hon’ble

Commission by way of Order dated 30.07.2020 in Petition No.70 of 2019 and

that the same may be considered for the purposes of the present Petition.

B. Annual Fixed Charges

B1. Depreciation:

11. It is submitted that Regulation 21 of the PSERC Tariff Regulations,

2014, as amended by Notification dated 03.02.2016, provides for calculation

of Depreciation in respect of Coal Based Thermal Generating Plants which is

reproduced hereunder:

“21. For the purpose of tariff, depreciation shall be computed in the

following manner:

Page 7: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

6

21.1. The value base for the purpose of depreciation shall be the capital

cost of the assets admitted by the Commission:

Provided that land other than the land held under lease and the land for

reservoir in case of hydro generating station shall not be a depreciable

asset and its cost shall be excluded from the capital cost while computing

depreciable value of the asset;

Provided further that depreciation shall be calculated after deduction of

consumer contributions, capital subsidies/ Government grants.

Provided further that Govt. grants and consumer contribution shall also

be recognized as defined under Indian Accounting Standard 20 (IND AS

20) notified by the Ministry of Corporate Affairs.

21.2. The cost of the asset shall include additional capitalization.

21.3. The cost shall include foreign currency funding converted to

equivalent rupees at the exchange rate prevalent on the date when

foreign currency shall actually be availed but not later than the date of

commercial operation.

21.4. Depreciation for generation and transmission assets shall be

calculated annually as per straight line method over the useful life of the

asset at the rate of depreciation specified by the Central Electricity

Regulatory Commission from time to time.

21.5. Depreciation for distribution assets and other assets not specified

by CERC shall be at the rates notified by the Commission:

Provided that the total depreciation during the life of the asset shall not

exceed 90% of the original cost;

Provided that the remaining depreciable value as on 31st March of the

year closing after a period of 12 years from date of commercial

Page 8: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

7

operation/ put in use of the asset shall be spread over the balance useful

life of the assets;

Provided further that in case of hydro generating stations, the salvage

value shall be as provided in the agreement signed by the developers

with the State Government for creation of the site.

21.6. Depreciation shall be chargeable from the first year of commercial

operation/asset is put in use. In case of commercial operation of the

asset/put in use of asset for part of the year, depreciation shall be

charged on pro rata basis.”

12. In terms of the foregoing, the depreciation for FY 2019-20 works out as

under:

Table 3 Depreciation for FY 2019-20 (Rs. Cr.)

Particulars Amount

(Rs. Crore)

Opening Capital Cost 3,072.11

Less: Undischarged liabilities included in above -

Opening Capital Cost excluding undischarged liabilities 3,072.11

Additional capitalization during the year 0.70

Less: Undischarged liabilities included in additional

capitalization -

Add: Liabilities discharged during the year -

Closing Capital Cost 3,072.81

Average Capital Cost 3,072.46

Freehold land 96.75

Rate of depreciation 4.77%

Remaining depreciable value 2,678.14

Depreciation (annualised) 146.55

Page 9: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

8

Particulars Amount

(Rs. Crore)

Depreciation (for the period) 146.55

Cumulative depreciation at the end of the period 579.03

13. Pertinently, it is submitted that this Hon’ble Commission by way of Order

dated 05.08.2020 in Petition No. 69 of 2017 has allowed depreciation as Rs.

142.83 Crores. The petitioner prays that the Hon’ble Commission may be pleased

to approve the depreciation for the FY 2019-20 as Rs. 146.55 Crore.

B2. Debt- Equity Ratio and Return on Equity

14. Regulations 19 and 20 of PSERC Tariff Regulations, 2014 provide for

Debt Equity Ratio and Return on Equity which are as under:

19.1. Existing Projects - In case of the capital expenditure projects having

Commercial Operation Date prior to the effective date, the debt-equity ratio

shall be as allowed by the Commission for determination of tariff for the

period prior to the effective date:

Provided that the Commission shall not consider the increase in equity as a

result of revaluation of assets (including land) for the purpose of computing

return on equity.

19.2. New Projects – For capital expenditure projects declared under

commercial operation on or after the effective date:

a. A Normative debt-equity ratio of 70:30 shall be considered for the

purpose of determination of Tariff;

b. In case the actual equity employed is in excess of 30%, the amount of

equity for the purpose of tariff determination shall be limited to

30%, and the balance amount shall be considered as normative loan;

Page 10: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

9

c. In case, the actual equity employed is less than 30%, the actual debt-

equity ratio shall be considered;

d. The premium, if any raised by the Applicant while issuing share

capital and investment of internal accruals created out of free

reserve, shall also be reckoned as paid up capital for the purpose of

computing return on equity subject to the normative debt-equity

ratio of 70:30, provided such premium amount and internal accruals

are actually utilized for meeting capital expenditure of the

Applicant’s business.

19.3. Renovation and Modernization: Any approved capital expenditure

incurred on Renovation and Modernization including the approval in the

Capital Investment plan shall be considered to be financed at normative

debt-equity ratio of 70:30. If the actual equity employed is less than 30%

then the actual debt equity ratio shall be considered.

[…]

20. Return on Equity shall be computed at the rate of 15.5% on the paid-

up equity capital determined in accordance with regulation 19:

Provided that assets funded by consumer contributions, capital

subsidies/Govt. grants shall not form part of the capital base for the

purpose of calculation of Return on Equity.”

15. It is submitted that the actual equity invested in the project amounts to

Rs. 1251 Crores which is more than the 30% of the Capital Cost of Rs. 3058.37

Crores, as approved by this Hon’ble Commission by way of Order dated

17.01.2020 in Petition 54 of 2017. Hence a normative debt equity ratio of 70:30

has been considered for calculation of Return on Equity.

Page 11: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

10

Table 4 Return on Equity for FY 2019-20 (Rs. Cr.)

Particulars Amount incurred

during FY 2019 – 20

Opening Gross Block (excluding

undischarged liabilities) (a) 3,072.11

Equity percentage in Opening Gross Block (b) 30.0%

Normative Opening Equity (= a x b) (c) 921.63

Normative Equity addition @ 30% due to

additional capitalization during the year (d) 0.21

Normative Equity addition considered for

ROE computation (e) 0.21

Normative Closing Equity (= c + e) (f) 921.84

Average Equity (= Average of c and f) (g) 921.74

Normative Rate of ROE as per PSERC

2014 Tariff Regulations (h) 15.50%

Return on Equity (= h x g) 142.87

16. The petitioner humbly prays the Hon’ble Commission to approve Rs.

142.87 Crores as the Return on Equity for FY 2019-20 as follows:

B3. Interest on Loan

17. It is submitted that Regulation 24 of the PSERC Tariff Regulations, 2014

provides for Interest and Finance Charges on Loan Capital as under:

“24.1. For existing loan capital, interest and finance charges on loan capital

shall be computed on the outstanding loans, duly taking into account the

actual rate of interest and the schedule of repayment as per the terms and

conditions of relevant agreements. The rate of interest shall be the actual

Page 12: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

11

rate of interest paid/payable (other than working capital loans) on loans by

the licensee or the State Bank of India Advance Rate as on April 1 of the

relevant year, whichever is less.

24.2. Interest and finance charges on the actual loan capital for new

investments shall be computed on the loans, duly taking into account the

actual rate of interest and the schedule of repayment as per the terms and

conditions of relevant agreements. The rate of interest shall be the actual

rate of interest paid/payable (other than working capital loans) on loans by

the licensee or the State Bank of India Advance Rate as on April 1 of the

relevant year, whichever is less.

24.3. The repayment for each year of the tariff period shall be deemed to be

equal to the depreciation allowed for the corresponding year. In case of de-

capitalisation of assets, the repayment shall be adjusted by taking into

account cumulative depreciation made to the extent of de-capitalisation.

24.4. The Commission shall allow obligatory taxes on interest, finance

charges (including guarantee fee payable to the Government) and any

exchange rate difference arising from foreign currency borrowings, as

finance cost.

24.5. The interest on excess equity treated as loan shall be serviced at the

weighted average interest rate of actual loan taken from the lenders.”

18. It is submitted that the interest payable by the Petitioner towards Long

Term Loans has been calculated on the outstanding loan amounts and

prevailing interest rates on the said amounts on the basis of the Completed

Capital Cost of the Project as determined by this Hon’ble Commission by way

of Order dated 17.01.2020 in Petition No. 54 of 2017. The interest expenses

have been computed taking into account repayment towards outstanding

loan amounts and applicable interest rates in line with the PSERC Tariff

Regulations, 2014.

Page 13: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

12

19. In terms of the PSERC Tariff Regulations, 2014, the computation of

interest on term loans is based on the following:

(a) The opening gross normative loan on the Completed Capital Cost as

approved by this Hon’ble Commission.

(b) The rate of interest has been considered at the actual applicable

advance rate of State Bank of India as on 01.04.2019.

(c) The repayment during the year has been considered equal to the

depreciation allowed for that year.

20. It is submitted that GVK has considered 70% of the capital cost as

normative loan for the purpose of calculation of interest on loan. The actual rate

of interest of the term loans has been 13.22% for the FY 2019-20. The SBI

Benchmark rate as on 01.04.2019 was 13.7% which is higher than the actual rate

of interest. Hence the petitioner has considered actual rate of interest of 13.22%

for the calculation of Interest on Loan.

Table 5 Interest on Loan for FY 2019-20 (Rs. Cr.)

S. No Particulars Interest for

2019-20

1 Gross Normative Loan – Opening 2,150.48

2

Cumulative Repayment up to Previous Year

(Cumulative Depreciation up to previous

year)

432.49

3 Net Loan Opening 1,717.99

4

Less: Repayment During the Year

(Considering Depreciation as Principal

Repayment)

146.55

5 Loan Addition due to Additional

Capitalization during the year (= Actual 0.49

Page 14: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

13

Additional Capitalization - Normative Equity

Addition considered for ROE computation)

6 Net Loan Closing 1,571.93

7 Average Loan 1,644.96

8 Weighted Average Rate of Interest on Loan

(Normative) 13.22%

9 Interest on Loan 217.50

21. However, it is submitted that during the FY 2019-20, GVK had paid a sum

of Rs. 98.32 Crores towards the interest on long term borrowings and thus prays

that the Hon’ble Commission may be pleased to consider the amount paid

towards the loan for the purpose of determination of Annual Fixed Cost for FY

2019-20. A copy of the certificate issued by a Chartered Accountant is annexed

hereto and marked as Annexure P-1.

B4. Operation and Maintenance Expenses

22. It is submitted that Regulation 26 of the PSERC Tariff Regulations, 2014

provides for the Operation & Maintenance expenses along with its subsequent

amendment vide 03.02.2016 is reproduced hereunder:

26.1. The O&M expenses for the nth year of the Control Period shall be

approved based on the formula shown below:

O&Mn = (R&Mn + EMPn + A&Gn) x (1-Xn)

Where,

R&Mn – Repair and Maintenance Costs of the Applicant for the nth year;

EMPn – Employee Cost of the Applicant for the nth year;

A&Gn – Administrative and General Costs of the Applicant for the nth year;

The above components shall be computed in the manner specified below:

(i) R&Mn + A&Gn = K*GFA*(WPIn/WPIn-1)

Where,

Page 15: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

14

‘K’ is a constant (expressed in %) governing the relationship between R&M

and A&G expenses and Gross Fixed Assets (GFA) for the nth year. The value

of “K” will be specified by the Commission in the MYT order.

‘GFA’ is the average value of the Gross Fixed Assets of the nth year.

‘WPIn’ means the average rate (on monthly basis) of Wholesale Price Index

(all commodities) over the year for the nth year.

(ii) EMPn = (EMPn-1)*(INDEX n/INDEX n-1)

INDEXn - Inflation Factor to be used for indexing the Employee Cost.

This will be a combination of the Consumer Price Index (CPI) and the

Wholesale Price Index (WPI) of nth year and shall be calculated as under: -

INDEXn = 0.50*CPIn + 0.50*WPIn

‘WPIn’ means the average rate (on monthly basis) of Wholesale Price Index

(all commodities) over the year for the nth year.

‘CPIn’ means the average rate (on monthly basis) of Consumer Price Index

(Industrial workers) over the year for the nth year.”

23. The petitioner submits that it has incurred an amount of Rs. 15.12 Crore

towards the employee cost for the FY 2019-20.

24. The petitioner submits that a competent salary hike is necessary for

retention of employees. Further, Note 6 to Regulation 26 of PSERC Tariff

Regulations 2014 provides that an increase in employee cost on account of pay

revision etc. would be considered separately by the Hon’ble Commission.

Therefore, it is prayed that the Hon’ble Commission may be pleased to approve

the Employee Expenses claimed above.

25. The petitioner further submits that the A&G and R&M Expenses for the FY

2019-20 are as follows:

Page 16: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

15

Table 6 A&G and R&M Expenses for FY 2019-20 (Rs. Cr.)

Particular Expenses in FY 2019-20

A&G Expenses 46.84

R&M Expenses 33.71

Total 80.54

26. The petitioner thus prays the Hon’ble Commission to approve the O&M

Expenses of Rs. 95.66 Crore for the FY 2019-20.

B5. Interest on Working Capital

27. It is submitted that Regulation 34 of the PSERC Tariff Regulations, 2014

provides for components of Interest on Working Capital in respect of Coal Based

Thermal Generating Plants which is reproduced hereunder:

“34.1. Components of Working Capital

a. Coal-based Thermal Generating Plants: The Working Capital shall

cover the following:

i. Fuel Cost for 2 months corresponding to the normative

annual plant availability factor;

ii. Operation and maintenance (O&M) Expenses for 1 month;

iii. Maintenance spares @ 15% of the O&M expenses;

iv. Receivables equivalent to two (2) months of fixed and

variable charges for sale of electricity calculated on the

normative annual plant availability factor.

28. The petitioner submits that it has calculated the Working Capital in line

with the above regulations as follows:

Table 7 Working Capital for FY 2019-20 (Rs. Cr.)

S. No. Particulars FY 2019-20

A For Coal Based Generating Stations

Page 17: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

16

1 Cost of Fuel for 2 months corresponding to

Normative Annual Plant Availability Factor. 272.93

2 O&M expenses for 1 month 7.97

3

Receivables equivalent to 2 months of fixed &

variable charges for sale of electricity

calculated on the normative annual plant

availability factor

383.62

4 Maintenance Spares (@15% of O&M

Expenses) 14.35

Total 678.87

B Working Capital 12.25%

29. In terms of Regulation 25.1 of PSERC Tariff Regulations 2014, Rate of

interest on working capital it is under:

“The rate of interest on working capital shall be equal to the actual rate of

interest paid on working capital loans by the licensee/generating

company/SLDC or the State Bank of India Advance Rate as on April 1 of the

relevant year, whichever is less. The interest on working capital shall be

payable on normative basis notwithstanding that the licensee/generating

company/SLDC has not taken working capital loan from any outside agency

or has exceeded the working capital loan amount worked out on the

normative figures. In case, the licensee/generating company/SLDC has not

availed any working capital loan during the year, the rate of interest shall

be weighted average of the interest rates on working capital loan of the

previous three years

30. It is submitted that the actual rate of interest on working capital loan has

been 12.25% which is lower than the prevalent SBI rate of 13.7% on 01.04.2019.

Hence the interest rate of 12.25% has been considered for the purpose of

calculation of interest rate on working capital calculated above.

Page 18: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

17

Table 8 Interest on Working Capital for FY 2019-20 (Rs. Cr.)

Particular Amount incurred for FY

2019-20

Total Working Capital 678.87

Rate in Interest on Working Capital 12.25%

Interest 83.16

C. Fuel Cost

31. The weighted average GCV of coal on ARB basis has been considered for

calculation of fuel cost for the year FY 2019-20

Table 9 GCV and Price of Fuel for FY 2019-20 (Rs. Cr.)

32. On the basis of the parameters tabulated above the fuel cost for FY 2019-

20 has been worked out as follows and the Hon’ble Commission be pleased to

approve the same:

Table 10 Fuel Cost for FY 2019-20 (Rs. Cr.)

Particular Unit Amount FY 2019-20

GCV of Coal Kcal/kg 3358

Price of Coal Rs./MT 5871

GCV of Oil Kcal/L 9019

Price of Oil Rs./Kl 44949

Particular Cost for FY 2019-20

Cost of Coal 538.52

Cost of Secondary Fuel 5.27

Total Fuel Cost 543.79

Net Generation (MU) 1190

Energy Charge (Rs. /kWh) 4.57

Page 19: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

18

D. Other Income

33. The other income for the FY 2019-20 is as follows and that the same may

graciously be approved by the Hon’ble Commission:

Table 11 Other Income for FY 2019-20 (Rs. Cr.)

Particular Income during FY 2019-20

Interest on Bank FD 2.57

Interest on Delayed Payments 19.01

Sale of Scrap 0.05

Total 21.59

E. Aggregate Revenue Requirement

34. Based on the above submissions the Net Revenue Requirement is as

follows:

Table 12 Aggregate Revenue Requirement for FY 2019-20 (Rs. Cr.)

S. No Particular Cost incurred for FY

2019 – 20

1 Fuel Cost

a) Primary Fuel Cost 538.52

b) Secondary Fuel Cost 5.27

2 SLDC Fees & Charges

3 O&M expenses (Gross) 95.66

a) R&M Expenses

b) Employee Expenses

c) A&G Expenses

4 Depreciation 146.55

5 Interest on Loans 217.50

6 Interest on Working Capital 83.16

Page 20: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

19

7 Prior Period Expense

8 Extraordinary Items

9 Other Debts and Write-offs

10 Income Tax 0.00

11 Less: Expenses capitalised

a) Interest Charges Capitalized

b) R&M Expenses Capitalized

c) A&G Expense Capitalized

d) Employee Expenses Capitalized

Subtotal (a+b+c+d) 0.00

Subtotal Expenditure

(1+2+3+4+5+6+7+8+9+10-11) 1086.67

C Return on Equity 142.87

D Non Tariff and other Income 21.64

E Annual Revenue Requirement (B+C-D) 1207.90

35. The copies of the tariff forms as per the PSERC Tariff Regulations 2014

are annexed hereto and marked as Annexure P – 2 (Colly)

36. It is further submitted that the Statutory Auditor for the Petitioner herein

as well as for Mumbai International Airport Limited (“MIAL”), another group

Company, is the same. Due to an ongoing investigation by the relevant

authorities in connection to certain issues pertaining to MIAL, the Statutory

Auditor could not issue the audit report for the Petitioner. In this regard, GVK

humbly prays that the Hon’ble Commission may be pleased to consider the

amounts based on the submissions herein. GVK undertakes to forthwith submit

the Audited Certificate of Accounts as and when the same have been duly signed

/ certified by the Statutory Auditor.

IV. Prayer

Page 21: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

20

37. In view of the foregoing submissions, it is prayed that this Hon’ble

Commission:

(a) Approve this Annual Performance Review for FY 2019-20 as detailed in

the present Petition.

(b) Pass any such further order as this Hon’ble Commission may deem

necessary in the interest of justice.

GVK Power (Goindwal Sahib) Ltd./Petitioner

Through

J. Sagar AssociatesAdvocates for the Petitioner

B-303, 3rd Floor, Ansal Plaza,Hudco Place, August Kranti Marg,

New Delhi - 110049 Place: Hyderabad Date: 28.09.2020

Page 22: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

BEFORE THE PUNJAB STATE ELECTRICITY REGULATORY COMMISSION

AT CHANDIGARH

PETITION NO. OF 2020

IN THE MATTER OF:

Application for Annual Performance Review of 2X270 MW Goindwal Sahib Thermal

Power Plant at Coindwal Sahib, Punjab for the FY 2019-20 in terms Punjab State

Electricity Regulatory Commission {Terms and Conditions for Determination of

Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2014"

IN THE MATTER OF:

GVK Power (Goindwal Sahib) Limited Paigarh House, 156 - 159, Sardar Patel Road, Secunderabad - 540 003

Versus

Punjab State Power Corporation Limited The Mall, Patiala (Punjab)

AFFIDAVIT

... Petitioner

I, P. Rama Mohana Rao, son of P. Krishna Murthy, aged about 61 years, resident of E-

308, First Lane, Czech Colony, Sanath Nagar, Hyderabad - 500018, working as

Assistant Vice President (Finance) with the Petitioner Company, do solemnly affirm

and state as follows:-

1. I say that I am duly authorized and competent to affirm this Affidavit for and

on behalf of the GVK Power (Goindwal Sahib) Ltd. and I am acquainted with the facts

and circumstances of the present case. I state that I have read and understood the

contents of the accompanying Petition.

2. I state that the facts stated in the accompanying Petition are true and correct

i�O KHA,11 to the best of my knowledge based on the records maintained by the Petitioner and

��- '�1.J t the legal submissions made therein are based upon information received by me �� -� � NOTAR'/ ·� believed to be true. The present Petition has been drafted pursuant to my;

�,c.�n \\j4_ 4:3:'07 i'js uctions and its contents are true and correct.

I, � �� ���� - ---� � ,� I state that the Annexures, if any, annexed to the Petitioner are true copies of

� 'l(;lef b G ,1., .. �.:_0• the respective originals.

For GVK POWER (GOlr:;.P'A �LS 1-l 5' �

QA..J .S-'d S1gnr.1tory

21

Page 23: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

4. I say that no similar petition, writ petition, suit or appeal regarding the

matter in respect of which the present Petition has been preferred or is pending

before any Court or any other authority.

Fo' GVK. POWER (GOINDWAL C:AH B t -C

o"/ DEPONENT

VERIFICATION

I, the deponent above named, do hereby verify that the contents of my above

affidavit are true and correct, no part of it is false and nothing material has been

concealed therefrom.

Verified at on this day of , 2020.

ForGVK POWER (GOINDWtL SAf-18} L�

Q"-/ I S• '1 to•y

DEPONENT

22

Page 24: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

SARANGA PANI & CO

CHARTERED ACCOUNTANTS

CERTIFICATE

1-1-719, Gandhi Nagar,Hyderabad - 500 080, TelanganaTel: 040 - 27671515, Cell: 9989991515E-mail : [email protected]

We have verified the books of Accounts of M/s. GVK Power (Goindwal Sahib) Limited having

Registered office at Plot No. 10, Paigah Colony, Sardar Patel Road, Secunderabad and certify

that an a mount of Rs. 98.32 Crores has been paid towards interest on long term borrowings

during the FY 2019-20.

UDIN: 20073178AAAAMl7879

Place Hyderabad

Date 23.09.2020

For SARANGA PANI & CO

Chartered Accountants FRN : 05000305

!

C. SarangaP�

ani Proprietor

(M. No. 0731 8)

ANNEXURE P - 1 23

Page 25: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

S. No. PARTICULARS

C1 Balance SheetC2 Cash Flow StatementC3 Return on EquityC4 Employee ExpensesC5 Employee StrengthC6 Administration & General ExpensesC7 Fixed Assets and Provision for DepreciationC8 Expenses of SLDC Fees and ChargesC9 Current Assets and LiabilitiesC10 Loan Master of all LoansC11 Year-wise Capital ExpenditureC12 Capital Works in ProgressC13 Interest and Finance Charges C14 Net Prior Period ExpensesC15 Extraordinary ItemsC16 Share Capital, Reserves and SurplusC17 Details of Income TaxC18 Details of Expenses CapitalizedC19 Statement of Assets not in use C20 Grants Towards Cost of Capital AssetsC21 Debits, Write-offs and any Other Items

INDEX

1. Electronic Copy of the Petition (in Word format) and detailed calculation as per these formats (in Excel format) and any other information submitted shall also be furnished in the electronic form.

2. Formats may be suitably amended where ever required, and additional formats may be designed by the Generation Company/Licensee/SLDC for any additional information to be submitted alongwith the Petition.

ANNEXURE P - 2(Colly) 24

Page 26: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

1

(Rs.

Cro

re)

Ac

tua

lP

roje

cti

on

s20

18-

1920

19-

20

I.S

OU

RC

ES

OF

FU

ND

S

A)

Sh

are

ho

lder

s’ F

un

ds

a) S

hare

Ca

pita

l (E

quity

)1,

265

.20

1,26

5.2

0

b) S

hare

App

licat

ion

Mon

ey-

c) R

ese

rve

s an

d S

urp

lus

(2,1

86.0

8)

(2

,692

.25)

B)

Sp

ecia

l Ap

pro

pri

atio

n t

ow

ard

s P

roje

ct

Co

st

C)

Lo

an

Fu

nd

s

a) S

ecu

red

Loa

ns

4

,055

.64

3

,802

.56

b) W

orki

ng C

apita

l Lo

ans

5

08.7

3

5

84

.59

b) U

nse

cure

d Lo

ans

D)

Oth

er

so

urc

es o

f F

un

ds

a) C

api

tal c

ontr

ibu

tions

from

Con

sum

ers

b) C

ons

um

ers

Se

curit

y D

epos

its

c) C

api

tal S

ubs

idie

s/ G

ran

ts

d) A

ny o

ther

sor

uce

of F

und

s

e) L

ong

Te

rm P

rovi

sio

ns

0

.18

0.29

TO

TA

L S

OU

RC

ES

OF

FU

ND

S3

,64

3.6

6

2,

960

.38

II.A

PP

LIC

AT

ION

OF

FU

ND

S

A)

Fix

ed A

sset

s

a) G

ross

Blo

ck

4

,445

.60

4

,449

.08

b) C

api

tal W

ork

in P

rog

ress

-

c) N

et B

lock

3,8

13.7

0

3,6

04

.12

B)

Inve

stm

ents

0.0

0

0.00

C)

Lo

ng

Ter

m L

oa

ns

& A

dva

nc

es

1

7.21

1

7.1

0

D)

Cu

rren

t A

sse

ts, L

oa

ns

and

Ad

van

ces

8

21.

31

8

74.5

8

E)

Le

ss:

Cu

rren

t L

iab

iliti

es

and

Pro

vis

ion

s

1

,008

.56

1

,535

.42

F)

Net

Cu

rren

t A

sse

ts

(

187.

25)

(

660.

84)

TO

TA

L A

PP

LIC

AT

ION

OF

FU

ND

S

3

,643

.66

2

,96

0.3

8

Not

e:T

he

abo

ve in

form

atio

n r

eq

uir

es c

erti

fica

tio

n f

rom

th

e s

tatu

tory

au

dit

ors

.

S. N

o.

Pa

rtic

ula

rsR

efer

ence

F

orm

Bal

ance

Sh

eet

25

Page 27: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

2

(Rs.

Cro

re)

Act

ual

Pro

ject

ion

2018

-19

2019

-20

IN

et F

un

ds

fro

m O

per

atio

ns:

Pro

fit

Bef

ore

Tax

(A

)(6

67.9

1)

(506

.21)

AD

D:

Deb

its to

Rev

enue

Acc

ount

not

req

uiri

ng C

ash

Out

flow

: (i)

Dep

reci

atio

n21

2.85

21

3.07

(ii)

Inte

rest

Pai

d71

5.27

77

0.03

iii)

Oth

ers

75.2

7

27

.39

S

ub

To

tal (

B)

1,00

3.39

1,01

0.49

Le

ss:

(i) C

redi

ts to

Rev

enue

Acc

ount

no

t inv

lovi

ng C

ash

Rec

eipt

s:-

(ii)

Sub

sidy

and

Gra

nts

-

(iii)

Inco

me

Tax

pay

men

t dur

ing

the

year

-

Su

b T

ota

l (C

)-

N

et In

crea

se/(

Dec

reas

e) in

Wor

king

Cap

ital:

Incr

ease

/(D

ecre

ase)

in C

urre

nt A

sset

s:a)

Inve

ntor

ies

24.9

6

17

9.93

b) R

ecei

vabl

es a

gain

st S

ale

of P

ower

246.

28

272.

25

c)

Loa

ns a

nd A

dvan

ces

-

-

d)

Oth

er C

urre

nt A

sses

ts(2

3.20

)

(7

8.52

)

Su

b T

ota

l (D

1)24

8.03

45

2.18

Incr

ease

/(D

ecre

ase)

in C

urre

nt L

iabi

litie

s:a)

Bor

row

ings

for

Wor

king

Cap

ital

-

b) O

ther

Cur

rent

Lia

bilit

ies

22.6

8

(7

4.64

)

Su

b T

ota

l (D

2)22

.68

(74.

64)

In

com

e T

ax P

aid

(D

3)2.

33

3.70

Net

Incr

ease

/(D

ecre

ase)

in W

orki

ng C

apita

l

(D=

D1-

D2-

D3)

227.

68

530.

53

Net

Fu

nd

s fr

om

Ear

nin

gs

(A

+B

-C+

D)

107.

80

(26.

24)

S. N

o.

Par

ticu

lars

Ref

. Fo

rm

No

.

Cas

h F

low

Sta

tem

ent

26

Page 28: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Act

ual

Pro

ject

ion

2018

-19

2019

-20

S. N

o.

Par

ticu

lars

Ref

. Fo

rm

No

.

IIN

et F

un

ds

fro

m In

vest

men

tC

ontr

ibut

ions

, Gra

nts

and

Sub

sidi

es to

war

ds C

ost

of C

apita

l Ass

ets

(E)

Sec

urity

Dep

osit

from

Con

sum

ers

(F)

Pro

ceed

s fr

om d

ispo

sal o

f F

ixed

Ass

ets

(G)

Net

Incr

ease

/(D

ecre

ase)

in In

vest

men

ts (

H)

(0.1

6)

21.5

4

Tot

al F

unds

fro

m In

vest

men

t (E

+F

+G

-H)

0.16

21

.54

IIIN

et F

un

ds

fro

m F

inan

cin

g

Exi

stin

g B

orro

win

gsa)

Ter

m L

oans

-

-

b)

Equ

ity-

Fre

sh B

orro

win

gs:

(a)

Sta

te L

oans

(b)

For

eign

Cur

renc

y Lo

ans/

Cre

dito

rs(c

) O

ther

Bor

row

ings

(W

C)

64.8

2

75

.86

S

ub-t

otal

(I)

64.8

2

75

.86

R

epay

men

ts o

f P

rinc

ipal

:(a

) E

xstin

g T

erm

Loa

ns20

.58

253.

09

(b

) In

tere

st P

aid

176.

92

175.

29

S

ub T

otal

(J)

197.

50

428.

37

N

et F

unds

fro

m F

inan

cing

(I-

J)(1

32.6

9)

(352

.51)

IVIn

crea

se/(

Dec

reas

e) in

Eq

uit

y C

apit

al-

VT

ota

l Fu

nd

s av

aila

ble

fo

r C

apit

al E

xpen

dit

ure

(I

+II+

III+

IV)

(24.

72)

(357

.22)

VI

Fu

nd

s U

tilis

ed o

n C

apit

al E

xpen

dit

ure

:(a

) O

n P

roje

cts

0.88

3.

37

(b

) R

elea

sed

Ass

ets

re-i

ssue

d to

wor

ks(c

) In

tang

ible

Ass

ets

(d)

Def

ered

Cos

tsT

otal

of

VI

0.88

3.

37

VII

Net

Incr

ease

/(D

ecre

ase)

in C

ash

& B

ank

Bal

ance

(V

- V

I)(2

5.61

)

(3

60.5

9)

VIII

Op

enin

g C

ash

& B

ank

Bal

ance

s24

6.86

22

1.25

IXC

losi

ng

Cas

h &

Ban

k B

alan

ces

(VII+

VIII

)22

1.25

(1

39.3

4)

27

Page 29: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

3

(Rs

in c

rore

)

Act

ual

Pro

ject

ion

2018

-19

2019

-20

AO

pti

on

1:

1E

quity

em

ploy

ed o

n A

sset

s in

use

(as

per

the

debt

eq

uity

rat

io a

ppro

ved

by C

omm

issi

on 7

0:30

) as

on

the

beg

inni

ng o

f th

e ye

ar

922

922

2A

vera

ge E

quity

em

ploy

ed in

ass

ets

com

mis

sion

ed

duri

ng th

e ye

ar (

as

per

the

norm

ativ

e de

bt e

quity

ra

tio)*

-

-

3E

qu

ity

Cap

ital

( A

1+A

2)

922

922

BO

pti

on

2:

1G

ross

Fix

ed A

sset

s a

Gro

ss F

ixed

Ass

ets

(Ope

ning

Bal

ance

)

4

,445

4

,446

b

Gro

ss F

ixed

Ass

ets

(Clo

sing

Bal

ance

)

4

,446

4

,446

c

Ave

rage

GF

A

4

,445

4

,446

2Le

ss :

Ope

ning

Bal

ance

of

Acc

umul

ated

D

epre

ciat

ion

(Ope

ning

Bal

ance

)

286

358

3Le

ss :

Ave

rage

Dep

reci

atio

n du

ring

the

Yea

r

147

156

4Le

ss :

App

rove

d ou

tsta

ndin

g Lo

an f

or F

ixed

Ass

ets

4,0

56

3,8

03

5Le

ss :

Ave

rage

of

Gra

nts/

Sub

sidy

/Con

trib

utio

n fo

r F

ixed

Ass

ets

-

-

6E

quity

Cap

ital i

n U

se [1

+2-

3-4-

5-6]

5

29

8

46

CR

etu

rn o

n E

qu

ity*

* (r

efer

Ap

pen

dix

- I

Fo

rm-C

3)

14

2.83

14

2.87

* T

o be

pro

vide

d fo

r th

e ye

ars

in th

e co

ntro

l per

iod.

For

cur

rent

an

d pr

evio

us y

ears

, thi

s w

ill b

e ba

sed

on v

alue

s ap

prov

ed b

y th

e C

omm

issi

on.

** T

o be

bas

ed o

n ra

te a

pplic

able

as

per

regu

latio

ns a

nd

calc

ulat

ed o

n m

inim

um o

f eq

uity

com

pute

d fo

rm o

ptio

n 1

and

2.

Ret

urn

on

Eq

uit

y

S. N

oP

arti

cula

rs

Co

ntr

ol P

erio

d

28

Page 30: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Appe

ndix

- I F

orm

-C3

RETU

RN O

N E

QU

ITY

Proj

ectio

n20

19-2

0Ap

prov

ed P

roje

ct C

ost

3,07

2.11

Ad

d: A

dditi

onal

Cap

italiz

atio

n as

per

inve

stm

ent P

lan

0.70

Clos

ing

Proj

ect C

ost

3,07

2.81

Debt

(70%

)2,

150.

96

Equi

ty (

30%

)92

1.84

Eq

uity

Con

side

red

for C

ompu

ting

ROE

921.

84

Tota

l Equ

ity In

vest

ed1,

265.

20

Rate

of R

etur

n15

.50%

Retu

rn o

n Eq

uity

142.

89

Estim

ate

2019

-20

Ope

ning

Gro

ss B

lock

(exc

ludi

ng u

ndis

char

ged

liabi

litie

s)(a

)3,

072.

11

Equi

ty p

erce

ntag

e in

Ope

ning

Gro

ss B

lock

(b)

30.0

%

Nor

mat

ive

Ope

ning

Equ

ity (=

a x

b)

(c)

921.

63

Nor

mat

ive

Equi

ty a

dditi

on @

30%

due

to a

dditi

onal

cap

italiz

atio

n du

ring

the

year

(d)

0.21

Actu

al E

quity

add

ition

dur

ing

the

year

(as

per A

nnua

l Acc

ount

s) (e

) N

orm

ativ

e Eq

uity

add

ition

con

side

red

for R

OE

com

puta

tion

(=M

inim

um o

f 'd'

and

'e')

(f)0.

21

Nor

mat

ive

Clos

ing

Equi

ty (=

c +

f)(g

)92

1.84

Aver

age

Equi

ty (=

Ave

rage

of c

and

g)

(h)

921.

74

Nor

mat

ive

Rate

of R

OE

as p

er P

SERC

201

4 Ta

riff R

egul

atio

ns(i)

15.5

0%

Retu

rn o

n Eq

uity

(= h

x i)

142.

87

Not

e:RO

E ha

s bee

n co

mpu

ted

on n

orm

ativ

e ba

sis in

acc

orda

nce

with

Nor

mat

ive

Ope

ning

Equ

ity a

s per

Reg

. 19.

1 of

PSE

RC 2

014

Part

icul

ars

Part

icul

ars

29

Page 31: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

4

(Rs.

Cro

re)

Act

ual

Est

imat

eF

Y 2

018-

19F

Y 2

019-

20A

Em

plo

yee

Co

st (

Oth

er t

han

co

vere

d in

'C'&

'D')

1S

alar

ies

11.5

0

13.8

3

2

Dea

rnes

s A

llow

ance

(D

A)

3O

ther

Allo

wan

ces

4In

teri

m R

elie

f / W

age

Rev

isio

n5

Ove

rtim

e6

Bon

us7

Gen

erat

ion

Ince

ntiv

e8

Any

Oth

er It

em (

spec

ify)

Su

b T

ota

l

1

1.50

13.

83

BO

ther

Co

sts

1M

edic

al E

xpen

ses

Rei

mbu

rsem

ent

2T

rave

lling

Allo

wan

ce(C

onve

yanc

e A

llow

ance

)3

Leav

e T

rave

l Ass

ista

nce

0.08

0.

08

4

Pay

men

t Und

er W

orkm

an's

Com

pens

atio

n A

ct5

Ele

ctric

ity C

once

ssio

n to

Em

ploy

ees

6O

ther

Sta

ff W

elfa

re E

xpen

ses

0.10

0.

16

7

Any

Oth

er It

em (

spec

ify)

Su

b T

ota

l

0.1

8

0

.24

C1

Ap

pre

nti

ce a

nd

Oth

er T

rain

ing

Exp

ense

sD

Co

ntr

ibu

tio

n t

o T

erm

inal

Ben

efit

s1

Ear

ned

Leav

e E

ncas

hmen

t0.

24

0.16

2P

rovi

dent

Fun

d C

ontr

ibut

ion

0.59

0.

68

3

Pro

visi

on f

or P

F F

und

4P

ensi

on5

Gra

tuity

0.15

0.

20

6

Ex-

grat

ia7

Any

Oth

er It

em (

spec

ify)

Su

b T

ota

l0.

99

1.05

EG

ran

d T

ota

l (A

+B

+C

+D

)12

.67

15

.12

FE

mpl

oyee

Exp

ense

s C

apita

lized

-

-

GN

et E

mp

loye

e E

xpen

ses

(E)-

(F)

12.6

7

15.1

2

1. T

he a

bove

info

rmat

ion

is to

be

prov

ided

Gen

erat

ing

Sta

tion-

wis

e an

d in

co

nsol

idat

ed f

orm

in c

ase

of G

ener

atio

n B

usin

ess,

whe

ther

car

ried

out b

y D

istr

ibut

ion

Lice

nsee

or

by a

ny G

ener

atin

g C

ompa

ny o

r by

BB

MB

.2.

The

abo

ve in

form

atio

n is

to b

e pr

ovid

ed in

con

solid

ated

for

m in

cas

e of

T

rans

mis

sion

Lic

ense

e an

d D

istr

ibut

ion

Lice

nsee

.

No

te :

Em

plo

yee

Exp

ense

s

S.N

oP

arti

cula

rsC

on

tro

l Per

iod

30

Page 32: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

5

Wo

rkin

g S

tren

gth

A

t T

he

Beg

inn

ing

O

f T

he

Yea

r

San

ctio

ned

S

tren

gth

At

Th

e B

egin

nin

g O

f T

he

Yea

r

Wo

rkin

g S

tren

gth

A

t T

he

Beg

inn

ing

O

f T

he

Yea

r

San

ctio

ned

S

tren

gth

At

Th

e B

egin

nin

g O

f T

he

Yea

r

Tec

hn

ical

115

142

115

142

1C

lass

I2

Cla

ss II

3C

lass

III

4C

lass

IVN

on

- T

ech

nic

al28

3128

311

Cla

ss I

2C

lass

II3

Cla

ss II

I4

Cla

ss IV

To

tal

143

173

143

173

Em

plo

yee

Str

eng

th

S.N

o.

Par

ticu

lars

Co

ntr

ol P

erio

dE

stim

ate

FY

201

9-20

FY

201

8-19

Co

ntr

ol P

erio

dA

ctu

al

31

Page 33: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

6

(Rs.

Cro

re)

Act

ual

Act

ual

Rev

ised

20

17-1

820

18-1

920

19-2

01

0

.03

0

.06

0.

08

26.

03

2.8

5

7.

44

3 40.

21

0.0

8

0.

13

5 6 7 8 90.

74

0.9

8

1.

08

10V

ehic

les

Run

ning

Exp

ense

s P

etro

l and

Oil

0.03

Hiri

ng o

f V

ehic

les

0.18

0.38

0.42

122.

47

3.

02

3.

71

9.70

7.36

12.8

6

1

0.00

3

0.00

3

0.00

4

2

0.05

0

.06

0.21

30.

06

0.0

5

40.

001

0.00

1 0.

00

5

13.3

3

4

.35

1

0.10

6

1.21

-

3.

90

7 83.

63

1.1

2

1.

35

0.02

0.

003

0.01

0.

22

0.2

2

0.

31

0.70

0

.85

1.11

0.

03

0.0

2

0.

07

0.00

0.

002

0.28

0

.37

0.34

0.

25

1.1

8

1.

87

3.12

3

.10

3.05

9

0.75

0

.14

0.34

23

.66

11

.49

22

.66

Oth

er

Adm

inis

trat

ive

Exp

Mem

bers

hip

& S

ubsc

ript

ion

Dis

pen

sary

Exp

ense

sC

ante

en E

xpen

ses

Coa

l Tes

ting

Cha

rges

Ash

Han

dlin

g C

harg

es

Rat

es a

nd

Tax

esG

uest

Hou

se M

aint

ena

nce

Hor

ticul

ture

Exp

ense

s, G

reen

bel

t Mai

nten

ance

Off

ice

Mai

nten

ance

Rev

enue

Sta

mp

Exp

ense

s A

ccou

nt

Ele

ctri

city

Exp

ense

sW

ater

Cha

rges

Ent

erta

inm

ent C

harg

es

Mis

cella

neo

us E

xpen

ses

(spe

cify

det

ails

):

Con

veya

nce

and

Tra

velli

ng E

xpen

ses

Tel

epho

ne, P

osta

ge, T

eleg

ram

& T

elex

Cha

rges

Ince

ntiv

e &

Aw

ard

to E

mpl

oyee

s/O

utsi

ders

Con

sulta

ncy

Cha

rge

sT

echn

ical

Fee

sO

the

r P

rofe

ssio

nal C

harg

es

Lice

nse

and

Reg

istr

atio

n F

ees

11V

ehic

le E

xpen

ses

(O

ther

Tha

n T

ruck

s an

d D

eliv

ery

Van

s)

Su

b-T

ota

l 'B

' (1

To

9)

Sec

urity

/ S

ervi

ce C

harg

es P

aid

to O

utsi

de A

genc

ies

Su

b T

ota

l 'A

' (1

to 1

2)

B. Other Charges

Fee

and

Sub

scri

ptio

n fo

r B

ooks

an

d P

erio

dica

lsP

rint

ing

and

Sta

tione

ry E

xpen

ses

Adv

ertis

emen

t Exp

ense

s (O

ther

than

Pur

chas

e R

elat

ed)

Exh

ibiti

on &

D

emo.

Con

trib

utio

ns/D

onat

ions

to O

utsi

de In

stitu

tes

/ Ass

ocia

tions

A.

Leas

e/ R

ent

Insu

ranc

e

Ad

min

istr

atio

n &

Gen

eral

Exp

ense

s

S.N

oP

arti

cula

rsC

on

tro

l Per

iod

32

Page 34: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Act

ual

Act

ual

Rev

ised

20

17-1

820

18-1

920

19-2

0S

.No

Par

ticu

lars

Co

ntr

ol P

erio

d

4.42

8

.16

1

1.20

0.06

0

.07

0.12

1 2 3 4 5 6 7 8 9

-

-

-

0.00

5

-

0.

01

Gra

nd

To

tal (

A T

o G

)T

ota

l Ch

arg

es37

.85

27

.08

46

.84

Cap

ital

Wo

rks

(-)

Rev

enu

e E

xpen

ses

37

.85

27

.08

46

.84

No

te :

1.

The

abo

ve in

form

atio

n is

to b

e pr

ovid

ed G

ene

ratin

g S

tatio

n-w

ise

and

in c

onso

lidat

ed f

orm

in

case

of

Gen

era

tion

Bus

ines

s, w

heth

er c

arri

ed o

ut b

y D

istr

ibut

ion

Lice

nsee

or

by a

ny G

ener

atin

g C

ompa

ny o

r by

BB

MB

.

F.

Dir

ecti

on

An

d S

up

ervi

sio

n C

har

ges

G.

An

nu

al Ii

cen

se f

ee a

nd

tar

iff

det

erm

inat

ion

fee

pay

able

to

PS

ER

C

2. T

he a

bove

info

rmat

ion

is to

be

prov

ided

in c

onso

lidat

ed f

orm

in c

ase

of T

rans

mis

sion

Li

cens

ee a

nd D

istr

ibut

ion

Lice

nsee

.

D.

Au

dit

or'

s F

ee

E. Material Related Expenses

Fre

ight

on

Cap

ital E

quip

men

tsP

urch

ase

Rel

ated

Adv

ertis

emen

t Exp

ense

sV

ehic

le R

unn

ing

Exp

ense

s T

ruck

/ D

eliv

ery

Van

Veh

icle

Hiri

ng E

xpen

ses

Tru

ck /

Del

iver

y V

anO

the

r F

reig

htT

rans

it In

sura

nce

Oct

roi

Inci

dent

al S

tore

s E

xpen

ses

Fab

rica

tion

Cha

rges

Su

b T

ota

l 'E

' (1

To

9)

H.

To

tal C

har

ges

Ch

arg

eab

le T

o

C.

Leg

al F

ee/C

har

ges

33

Page 35: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Appe

ndix

-1 F

orm

No.

C6G

VK P

OW

ER (G

OIN

DAL

SAH

IB) L

TDEs

clat

ion

of In

dex

S.N

oPe

riod

WPI

CPI

2015

-16

2016

-17

2017

-18

2018

-19

2019

-20

1Av

erag

e (A

pril-

2014

to M

ar-1

5)18

1.19

250.

83

G

ross

Fix

ed A

sset

s44

41.0

044

41.0

044

41.0

044

49.0

82

Aver

age

(Apr

il-20

15 to

Mar

-16)

176.

675

265.

00

Av

g va

lue

of G

FA44

41.0

044

41.0

044

41.0

044

45.0

43

Aver

age

(Apr

il-20

16 to

Mar

-17)

183.

20

27

5.92

WPI

Inde

x3.

693%

3.69

3%3.

693%

3.69

3%In

dex

15.0

00%

15.0

00%

K fa

ctor

(Adj

ustd

to In

dx)

3.14

%3.

25%

3.38

%

Mon

thW

hole

sale

Pric

e In

dex

( All

Com

mod

ities

)Co

nsum

er P

rice

Inde

xEm

ploy

ee c

osts

14.3

815

.58

17.9

220

.61

Mar

-17

185.

80

27

5A

& G

and

R &

M12

5.43

139.

4014

4.55

150.

02Fe

b-17

185.

50

27

4To

tal O

& M

Exp

ense

s13

9.81

154.

9816

2.47

170.

63Ja

n-17

185.

10

27

4D

ec-1

618

3.30

275

Nov

-16

183.

50

27

7O

ct-1

618

3.60

278

Sep-

1618

3.20

277

Aug-

1618

3.30

278

Jul-1

618

4.20

280

Jun-

1618

2.90

277

May

-16

180.

20

27

5Ap

r-16

177.

80

27

1M

ar-1

617

5.30

268

Feb-

1617

4.10

267

Jan-

1617

5.40

269

Dec

-15

176.

80

26

9N

ov-1

517

7.50

270

Oct

-15

176.

90

26

9Se

p-15

176.

50

26

6Au

g-15

176.

50

26

4Ju

l-15

177.

60

26

3Ju

n-15

179.

10

26

1M

ay-1

517

8.00

258

Info

rmat

ion

rega

rdin

g W

hole

sale

Pri

ce In

ded(

All C

omm

oditi

es) &

Con

sum

er P

rice

Inde

x

34

Page 36: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Mon

thW

hole

sale

Pric

e In

dex

( All

Com

mod

ities

)Co

nsum

er P

rice

Inde

x

Apr-

1517

6.40

256

Mar

-15

176.

10

25

4Fe

b-15

175.

60

25

3Ja

n-15

177.

30

25

4D

ec-1

417

8.70

253

Nov

-14

181.

20

25

3O

ct-1

418

3.70

253

Sep-

1418

5.00

253

Aug-

1418

5.90

253

Jul-1

418

5.00

252

Jun-

1418

3.00

246

May

-14

182.

00

24

4Ap

r-14

180.

80

24

2

Sour

ceht

tp:/

/eai

ndus

try.

nic.

inht

tp:/

/lab

ourb

urea

unew

.gov

.in

WPI

& C

PI In

flatio

n fr

om B

ase

FY 2

015-

16 to

FY

2016

-17

S.N

oPa

rtic

ular

sW

PICP

I1

Aver

age

(Apr

il-20

14 to

Mar

-15)

181.

19

25

0.83

2Av

erag

e (A

pril-

2015

to M

ar-1

6)17

6.67

526

5.00

3Av

erag

e (A

pril-

2016

to M

ar-1

7)18

3.20

275.

92

WPI

CPI

Infla

tion-

2015

-16

-2.4

93%

5.64

8%In

flatio

n-20

16-1

73.

693%

4.11

9%IN

DEX

n=(0

.5*C

PIn+

0.5*

WPI

n) 2

016-

173.

906%

IND

EXn-

1=(0

.5*C

PIn-

1+0.

5*W

PIn-

1) 2

015-

161.

578%

35

Page 37: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

At

the

star

t o

f th

e Y

ear

Ad

dit

ion

d

uri

ng

th

e Y

ear

D

edu

ctio

n

To

tal

Dep

reci

able

b

ase

Dep

reci

ati

on

At

the

end

o

f th

e Y

ear

At

the

star

t o

f th

e Y

ear

Ad

dit

ion

d

uri

ng

th

e Y

ear

D

edu

cti

on

To

tal

Dep

reci

able

b

ase

Dep

reci

-at

ion

At

the

end

o

f th

e Y

ear

Sta

rt o

f th

e Y

ear

Ad

dit

ion

D

uri

ng

Y

ear

Ad

just

men

ts &

D

edu

cti

on

Dep

reci

atio

n

1La

nd o

wne

d u

nde

r fu

ll tit

le

2La

nd h

eld

und

er le

ase

a)F

or in

vest

men

t in

land

b)F

or c

ost o

f cl

earin

g si

te

c)La

nd

for

rese

rvoi

r in

cas

e of

hy

dro

gen

erat

ing

plan

t3

Ass

ets

Pur

cha

sed

New

a)P

lan

t and

mac

hine

ry in

ge

ner

atin

g st

atio

ns

i)H

ydro

-ele

ctric

ii)S

team

-ele

ctric

NH

RS

& W

aste

H

eat R

ecov

ery

Boi

lers

/ P

lan

tsiii

)D

iese

l ele

ctric

& g

as

plan

t

b)C

oolin

g to

wer

s an

d ci

rcul

atin

g w

ate

r sy

stem

s

c)H

ydra

ulic

wor

ks f

orm

ing

part

of

hydr

o-el

ectr

ic s

yste

m in

clud

ing:

i)D

ams,

spi

llway

s w

eirs

, can

als,

re

info

rced

con

cret

e flu

mes

&

siph

ons

ii)

Rei

nfor

ced

con

cret

e pi

pelin

es

and

sur

ge ta

nks

, ste

el p

ipe

line

s,

slui

ce g

ates

, ste

el s

urge

(ta

nks

) hy

drau

lic c

ontr

ol v

alve

s an

d o

the

r hy

drau

lic w

orks

As

per

Ap

ped

ix-1

d)B

uild

ing

& c

ivil

engi

nee

ring

wor

ks

of a

per

man

ent c

hara

cter

, not

m

entio

ned

abo

ve:

i)O

ffic

es &

sho

wro

oms

ii)C

onta

inin

g th

erm

o-el

ectr

ic

gen

erat

ing

plan

t

iii)

Con

tain

ing

hydr

o-el

ectr

ic

gen

erat

ing

plan

t

iv)

Tem

pora

ry e

rect

ion

such

as

woo

den

str

uctu

res

v)R

oad

s ot

her

tha

n ku

tcha

roa

ds

vi)

Oth

ers

Fo

rm C

7F

ixed

Ass

ets

& P

rovi

sio

n f

or

Dep

rec

iati

on

(₹ c

rore

)

S. N

oP

arti

cula

rs

Am

ou

nt

(₹

cro

re)

(A)

Co

ntr

ibu

tio

n

fro

m

Su

bsi

die

s/

Gra

nts

/ B

enef

icia

ries

' C

on

trib

uti

on

/ C

on

sum

ers

(B

)

Val

ue

of

Ass

et

elig

ible

fo

r d

epre

cia

tio

n

(A

-B)

Pre

vio

us

Yea

rC

urr

ent

Yea

r C

on

tro

l Per

iod

201

2-13

Fix

ed A

sset

s, e

xclu

din

g C

on

sum

er C

on

trib

uti

on

F

ixe

d A

sse

ts, e

xclu

din

g C

on

sum

er

Fix

ed A

sset

s, e

xcl

Co

nsu

mer

Rat

e o

f D

epre

cia

tio

n

(%)

36

Page 38: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

At

the

star

t o

f th

e Y

ear

Ad

dit

ion

d

uri

ng

th

e Y

ear

D

edu

ctio

n

To

tal

Dep

reci

able

b

ase

Dep

reci

ati

on

At

the

end

o

f th

e Y

ear

At

the

star

t o

f th

e Y

ear

Ad

dit

ion

d

uri

ng

th

e Y

ear

D

edu

cti

on

To

tal

Dep

reci

able

b

ase

Dep

reci

-at

ion

At

the

end

o

f th

e Y

ear

Sta

rt o

f th

e Y

ear

Ad

dit

ion

D

uri

ng

Y

ear

Ad

just

men

ts &

D

edu

cti

on

Dep

reci

atio

n

S. N

oP

arti

cula

rs

Am

ou

nt

(₹

cro

re)

(A)

Co

ntr

ibu

tio

n

fro

m

Su

bsi

die

s/

Gra

nts

/ B

enef

icia

ries

' C

on

trib

uti

on

/ C

on

sum

ers

(B

)

Val

ue

of

Ass

et

elig

ible

fo

r d

epre

cia

tio

n

(A

-B)

Pre

vio

us

Yea

rC

urr

ent

Yea

r C

on

tro

l Per

iod

201

2-13

Fix

ed A

sset

s, e

xclu

din

g C

on

sum

er C

on

trib

uti

on

F

ixe

d A

sse

ts, e

xclu

din

g C

on

sum

er

Fix

ed A

sset

s, e

xcl

Co

nsu

mer

Rat

e o

f D

epre

cia

tio

n

(%)

e)

Tra

nsfo

rmer

s, tr

ansf

orm

er (

kios

k)

sub-

stat

ion

equ

ipm

ent &

oth

er

fixed

ap

para

tus

(incl

udin

g pl

ant

foun

dat

ions

)

i)T

rans

form

ers

(incl

udin

g

foun

dat

ions

) ha

ving

a r

atin

g of

10

0 k

ilo v

olt a

mpe

res

and

over

ii)O

the

rs

f)S

witc

hgea

r, in

clud

ing

cabl

e co

nne

ctio

nsg)

Ligh

tnin

g ar

rest

ors:

i)S

tatio

n ty

peii)

Po

le ty

peiii

)S

ynch

rono

us c

ond

ense

rh)

Bat

terie

s

i)U

nder

grou

nd

cabl

e in

clud

ing

join

t bo

xes

and

dis

conn

ecte

d b

oxe

sA

s p

er A

pp

edix

-1j)

Cab

le d

uct s

yste

m

k)O

verh

ead

lines

incl

udin

g

supp

ort

s:

i)Li

nes

on f

abric

ated

ste

el

ope

ratin

g a

t nom

ina

l vol

tag

es

high

er th

an 6

6 k

V

ii)Li

nes

on s

teel

sup

por

ts o

per

atin

g at

nom

inal

vol

tag

es h

ighe

r th

an

13.2

kV

bu

t no

t exc

eedi

ng 6

6 k

V

iii)

Line

s on

ste

el o

r re

info

rced

co

ncre

te s

uppo

rts

iv)

Line

s on

trea

ted

woo

d su

ppor

tsl)

Met

ers

m)

Se

lf pr

opel

led

vehi

cles

n)A

ir co

ndi

tion

ing

plan

ts:

i)S

tatic

ii)P

ort

able

o)O

the

rsi)

Off

ice

furn

iture

and

fitt

ings

ii)O

ffic

e eq

uipm

ents

37

Page 39: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

At

the

star

t o

f th

e Y

ear

Ad

dit

ion

d

uri

ng

th

e Y

ear

D

edu

ctio

n

To

tal

Dep

reci

able

b

ase

Dep

reci

ati

on

At

the

end

o

f th

e Y

ear

At

the

star

t o

f th

e Y

ear

Ad

dit

ion

d

uri

ng

th

e Y

ear

D

edu

cti

on

To

tal

Dep

reci

able

b

ase

Dep

reci

-at

ion

At

the

end

o

f th

e Y

ear

Sta

rt o

f th

e Y

ear

Ad

dit

ion

D

uri

ng

Y

ear

Ad

just

men

ts &

D

edu

cti

on

Dep

reci

atio

n

S. N

oP

arti

cula

rs

Am

ou

nt

(₹

cro

re)

(A)

Co

ntr

ibu

tio

n

fro

m

Su

bsi

die

s/

Gra

nts

/ B

enef

icia

ries

' C

on

trib

uti

on

/ C

on

sum

ers

(B

)

Val

ue

of

Ass

et

elig

ible

fo

r d

epre

cia

tio

n

(A

-B)

Pre

vio

us

Yea

rC

urr

ent

Yea

r C

on

tro

l Per

iod

201

2-13

Fix

ed A

sset

s, e

xclu

din

g C

on

sum

er C

on

trib

uti

on

F

ixe

d A

sse

ts, e

xclu

din

g C

on

sum

er

Fix

ed A

sset

s, e

xcl

Co

nsu

mer

Rat

e o

f D

epre

cia

tio

n

(%)

iii)

Inte

rna

l wiri

ngs

incl

udi

ng f

ittin

gs

and

ap

para

tus

iv)

Str

eet L

igh

t fitt

ings

p)A

ppa

ratu

s le

t on

hir

e:i)

Oth

er

than

mot

ors

ii)M

oto

rsq)

Com

mun

icat

ion

equi

pmen

t

i)R

adio

an

d hi

gher

fre

quen

cy

carr

ier

syst

ems

As

per

Ap

ped

ix-1

ii)T

elep

hone

line

s an

d te

lep

hon

esr)

I.T E

quip

men

ts

s)A

ny o

ther

Ass

ets

not c

over

ed

abo

ve (

spec

ify)

To

tal

No

te

3. R

ate

of d

epr

ecia

tion

for

the

ass

ets

afte

r a

per

iod

of 1

2 y

ears

fro

m th

e da

te o

f co

mm

erci

al o

per

atio

n is

to b

e pr

ovid

ed a

s pe

r

1. T

he a

bov

e in

form

atio

n is

to b

e p

rovi

ded

Ge

nera

ting

Sta

tion

-wis

e an

d in

con

solid

ated

for

m in

cas

e of

Ge

nera

tion

Bus

ine

ss,

whe

the

r ca

rrie

d o

ut b

y D

istr

ibut

ion

Lic

ense

e o

r by

an

y G

ene

ratin

g C

ompa

ny o

r by

BB

MB

. 2.

The

ab

ove

info

rmat

ion

is to

be

pro

vide

d in

con

solid

ated

for

m in

cas

e of

Tra

nsm

issi

on L

icen

see

an

d D

istr

ibut

ion

Lic

ense

e.

38

Page 40: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

1La

nd o

wne

d u

nde

r fu

ll tit

le

2La

nd h

eld

und

er le

ase

a)F

or in

vest

men

t in

land

b)F

or c

ost o

f cl

earin

g si

te

c)La

nd

for

rese

rvoi

r in

cas

e of

hy

dro

gen

erat

ing

plan

t3

Ass

ets

Pur

cha

sed

New

a)P

lan

t and

mac

hine

ry in

ge

ner

atin

g st

atio

ns

i)H

ydro

-ele

ctric

ii)S

team

-ele

ctric

NH

RS

& W

aste

H

eat R

ecov

ery

Boi

lers

/ P

lan

tsiii

)D

iese

l ele

ctric

& g

as

plan

t

b)C

oolin

g to

wer

s an

d ci

rcul

atin

g w

ate

r sy

stem

s

c)H

ydra

ulic

wor

ks f

orm

ing

part

of

hydr

o-el

ectr

ic s

yste

m in

clud

ing:

i)D

ams,

spi

llway

s w

eirs

, can

als,

re

info

rced

con

cret

e flu

mes

&

siph

ons

ii)

Rei

nfor

ced

con

cret

e pi

pelin

es

and

sur

ge ta

nks

, ste

el p

ipe

line

s,

slui

ce g

ates

, ste

el s

urge

(ta

nks

) hy

drau

lic c

ontr

ol v

alve

s an

d o

the

r hy

drau

lic w

orks

d)B

uild

ing

& c

ivil

engi

nee

ring

wor

ks

of a

per

man

ent c

hara

cter

, not

m

entio

ned

abo

ve:

i)O

ffic

es &

sho

wro

oms

ii)C

onta

inin

g th

erm

o-el

ectr

ic

gen

erat

ing

plan

t

iii)

Con

tain

ing

hydr

o-el

ectr

ic

gen

erat

ing

plan

t

iv)

Tem

pora

ry e

rect

ion

such

as

woo

den

str

uctu

res

v)R

oad

s ot

her

tha

n ku

tcha

roa

ds

vi)

Oth

ers

Fo

rm C

7

S. N

oP

arti

cula

rsA

t th

e s

tart

of

the

Ye

ar

Ad

dit

io

n

du

rin

g

the

Yea

r

D

edu

cti

on

To

tal

D

epre

ciab

le

bas e

Dep

reci

atio

n

At

the

end

of

the

Yea

r

At

the

star

t o

f th

e Y

ear

Ad

dit

ion

d

uri

ng

th

e Y

ear

D

edu

cti

on

To

tal

Dep

reci

able

b

ase

Dep

reci

atio

n

At

the

end

o

f th

e Y

ear

At

the

star

t o

f th

e Y

ear

Ad

dit

io

n

du

rin

g t

he

Yea

r

D

edu

cti

on

To

tal

Dep

reci

able

b

ase

Dep

reci

atio

n

At

the

end

o

f th

e Y

ear

As

per

Ap

ped

ix-1

Fix

ed A

sset

s &

Pro

visi

on

fo

r D

epre

cia

tio

n(₹

cro

re)

Fix

ed A

sset

s, e

xclu

din

g C

on

sum

er

Co

ntr

ol P

erio

d1s

t ye

ar

2nd

yea

r3

rd y

ear

Fix

ed A

sset

s, e

xclu

din

g C

on

sum

er

Fix

ed

Ass

ets

, ex

clu

din

g C

on

sum

er

39

Page 41: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

S. N

oP

arti

cula

rs

e)

Tra

nsfo

rmer

s, tr

ansf

orm

er (

kios

k)

sub-

stat

ion

equ

ipm

ent &

oth

er

fixed

ap

para

tus

(incl

udin

g pl

ant

foun

dat

ions

)

i)T

rans

form

ers

(incl

udin

g

foun

dat

ions

) ha

ving

a r

atin

g of

10

0 k

ilo v

olt a

mpe

res

and

over

ii)O

the

rs

f)S

witc

hgea

r, in

clud

ing

cabl

e co

nne

ctio

nsg)

Ligh

tnin

g ar

rest

ors:

i)S

tatio

n ty

peii)

Po

le ty

peiii

)S

ynch

rono

us c

ond

ense

rh)

Bat

terie

s

i)U

nder

grou

nd

cabl

e in

clud

ing

join

t bo

xes

and

dis

conn

ecte

d b

oxe

s

j)C

able

duc

t sys

tem

k)O

verh

ead

lines

incl

udin

g

supp

ort

s:

i)Li

nes

on f

abric

ated

ste

el

ope

ratin

g a

t nom

ina

l vol

tag

es

high

er th

an 6

6 k

V

ii)Li

nes

on s

teel

sup

por

ts o

per

atin

g at

nom

inal

vol

tag

es h

ighe

r th

an

13.2

kV

bu

t no

t exc

eedi

ng 6

6 k

V

iii)

Line

s on

ste

el o

r re

info

rced

co

ncre

te s

uppo

rts

iv)

Line

s on

trea

ted

woo

d su

ppor

tsl)

Met

ers

m)

Se

lf pr

opel

led

vehi

cles

n)A

ir co

ndi

tion

ing

plan

ts:

i)S

tatic

ii)P

ort

able

o)O

the

rsi)

Off

ice

furn

iture

and

fitt

ings

ii)O

ffic

e eq

uipm

ents

At

the

sta

rt o

f th

e Y

ear

Ad

dit

io

n

du

rin

g

the

Yea

r

D

edu

cti

on

To

tal

D

epre

ciab

le

bas e

Dep

reci

atio

n

At

the

end

of

the

Yea

r

At

the

star

t o

f th

e Y

ear

Ad

dit

ion

d

uri

ng

th

e Y

ear

D

edu

cti

on

To

tal

Dep

reci

able

b

ase

Dep

reci

atio

n

At

the

end

o

f th

e Y

ear

At

the

star

t o

f th

e Y

ear

Ad

dit

io

n

du

rin

g t

he

Yea

r

D

edu

cti

on

To

tal

Dep

reci

able

b

ase

Dep

reci

atio

n

At

the

end

o

f th

e Y

ear

Fix

ed A

sset

s, e

xclu

din

g C

on

sum

er

Co

ntr

ol P

erio

d1s

t ye

ar

2nd

yea

r3

rd y

ear

Fix

ed A

sset

s, e

xclu

din

g C

on

sum

er

Fix

ed

Ass

ets

, ex

clu

din

g C

on

sum

er

As

per

Ap

ped

ix-1

40

Page 42: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

S. N

oP

arti

cula

rs

iii)

Inte

rna

l wiri

ngs

incl

udi

ng f

ittin

gs

and

ap

para

tus

iv)

Str

eet L

igh

t fitt

ings

p)A

ppa

ratu

s le

t on

hir

e:i)

Oth

er

than

mot

ors

ii)M

oto

rsq)

Com

mun

icat

ion

equi

pmen

t

i)R

adio

an

d hi

gher

fre

quen

cy

carr

ier

syst

ems

ii)T

elep

hone

line

s an

d te

lep

hon

esr)

I.T E

quip

men

ts

s)A

ny o

ther

Ass

ets

not c

over

ed

abo

ve (

spec

ify)

To

tal

At

the

sta

rt o

f th

e Y

ear

Ad

dit

io

n

du

rin

g

the

Yea

r

D

edu

cti

on

To

tal

D

epre

ciab

le

bas e

Dep

reci

atio

n

At

the

end

of

the

Yea

r

At

the

star

t o

f th

e Y

ear

Ad

dit

ion

d

uri

ng

th

e Y

ear

D

edu

cti

on

To

tal

Dep

reci

able

b

ase

Dep

reci

atio

n

At

the

end

o

f th

e Y

ear

At

the

star

t o

f th

e Y

ear

Ad

dit

io

n

du

rin

g t

he

Yea

r

D

edu

cti

on

To

tal

Dep

reci

able

b

ase

Dep

reci

atio

n

At

the

end

o

f th

e Y

ear

Fix

ed A

sset

s, e

xclu

din

g C

on

sum

er

Co

ntr

ol P

erio

d1s

t ye

ar

2nd

yea

r3

rd y

ear

Fix

ed A

sset

s, e

xclu

din

g C

on

sum

er

Fix

ed

Ass

ets

, ex

clu

din

g C

on

sum

er

As

per

Ap

ped

ix-1

No

te :

3. R

ate

of d

epr

ecia

tion

for

the

ass

ets

afte

r a

per

iod

of 1

2 y

ears

fro

m th

e da

te o

f co

mm

erci

al

1. T

he a

bov

e in

form

atio

n is

to b

e p

rovi

ded

Ge

nera

ting

Sta

tion

-wis

e an

d in

con

solid

ated

for

m in

ca

se o

f G

ener

atio

n B

usi

ness

, whe

the

r ca

rrie

d o

ut b

y D

istr

ibut

ion

Lic

ense

e o

r by

any

Gen

erat

ing

2. T

he a

bov

e in

form

atio

n is

to b

e p

rovi

ded

in c

onso

lidat

ed f

orm

in c

ase

of T

rans

mis

sion

Lic

ense

e

41

Page 43: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Appe

ndix

-1 F

orm

C7

(Rs

in c

rore

)(R

s in

cro

re)

(Rs

in c

rore

)(R

s in

cro

re)

Com

puta

tion

of D

epre

ciat

ion

(for

FY

2018

-19

Trui

ng U

p)

S.N

oPa

rtic

ular

sAs

sets

Val

ue a

t th

e be

ginn

ing

of th

e Ye

ar

Valu

e of

Ass

ets

adde

d /

Dis

pose

d of

f du

ring

the

year

Asse

t Val

ue a

t th

e En

d of

the

Year

Rate

of D

epD

epre

ciat

ion

Char

ges

Accu

mul

ated

D

epS.

No

Part

icul

ars

Asse

ts V

alue

at

the

begi

nnin

g of

the

Year

Valu

e of

Ass

ets

adde

d /

Dis

pose

d of

f du

ring

the

year

Asse

t Val

ue a

t th

e En

d of

the

Year

Rate

of D

ep (a

s pe

r CER

C 20

14-

19 T

ariff

Re

gula

tions

)

Dep

reci

atio

n Ch

arge

s(N

orm

ativ

e;

base

d on

rate

s sp

ecifi

ed b

y CE

RC)

Accu

mul

ated

D

epPa

rtic

ular

sAm

ount

(Rs.

Cro

re)

1La

nd96

.75

-

96.7

5

0.

00%

-

1Fr

eeho

ld la

nd96

.75

-

96.7

5

0.

00%

Ope

ning

Cap

ital C

ost

3,07

1.27

2

Plan

t & M

achi

nery

2,57

0.66

-

2,57

0.66

5.28

%13

5.73

45

4.10

2

Plan

t and

equ

ipm

ent

2,44

7.66

0.84

2,44

8.50

5.28

%Le

ss: U

ndis

char

ged

liabi

litie

s in

clud

ed in

abo

ve-

3Bu

ildin

gs59

3.29

-

59

3.29

3.

34%

19.8

2

60

.30

3Ca

pita

l Spa

res

12.9

0

-

12

.90

5.28

%O

peni

ng C

apita

l Cos

t exc

ludi

ng u

ndis

char

ged

liabi

litie

s3,

071.

27

Tota

l3,

260.

70

-

3,

260.

70

15

5.55

51

4.39

4

Build

ings

48

6.29

-

48

6.29

3.

34%

Addi

tiona

l cap

italiz

atio

n du

ring

the

year

0.84

5

Com

pute

rs0.

63

-

0.

63

15

.00%

Less

: Und

isch

arge

d lia

bilit

ies

incl

uded

in a

dditi

onal

cap

italiz

atio

n-

6O

ffic

e eq

uipm

ent

1.12

-

1.12

6.33

%Ad

d: L

iabi

litie

s di

scha

rged

dur

ing

the

year

-

7

Furn

iture

and

fixt

ures

1.23

-

1.23

6.33

%Cl

osin

g Ca

pita

l Cos

t3,

072.

11

8Ve

hicl

es0.

63

-

0.

63

9.

50%

Aver

age

Capi

tal C

ost

3,07

1.69

9

Com

pute

r sof

twar

e0.

12

-

0.

12

15

.00%

Free

hold

land

96.7

5

10

Righ

t to

Use

Rai

lway

Lin

e23

.94

-

23.9

4

0.

00%

Rate

of d

epre

ciat

ion

4.77

%To

tal

3,07

1.27

0.84

3,07

2.11

4.77

%14

6.51

43

2.49

Re

mai

ning

dep

reci

able

val

ue2,

677.

44

Dep

reci

atio

n (a

nnua

lised

)14

6.51

Dep

reci

atio

n (f

or th

e pe

riod)

146.

51

Cu

mul

ativ

e de

prec

iatio

n at

the

end

of th

e pe

riod

432.

49

(Rs

in c

rore

)(R

s in

cro

re)

Com

puta

tion

of D

epre

ciat

ion

(for

FY

2019

-20

APR)

S.N

oPa

rtic

ular

sAs

sets

Val

ue a

t th

e be

ginn

ing

of th

e Ye

ar

Valu

e of

Ass

ets

adde

d /

Dis

pose

d of

f du

ring

the

year

Asse

t Val

ue a

t th

e En

d of

the

Year

Rate

of D

epD

epre

ciat

ion

Char

ges

Accu

mul

ated

D

epS.

No

Part

icul

ars

Asse

ts V

alue

at

the

begi

nnin

g of

the

Year

Valu

e of

Ass

ets

adde

d /

Dis

pose

d of

f du

ring

the

year

Asse

t Val

ue a

t th

e En

d of

the

Year

Rate

of D

ep (a

s pe

r CER

C 20

14-

19 T

ariff

Re

gula

tions

)

Dep

reci

atio

n Ch

arge

s(N

orm

ativ

e;

base

d on

rate

s sp

ecifi

ed b

y CE

RC)

Accu

mul

ated

D

epPa

rtic

ular

sAm

ount

(Rs.

Cro

re)

1La

nd96

.75

-

96.7

5

0.

00%

-

1Fr

eeho

ld la

nd96

.75

-

96.7

5

0.

00%

Ope

ning

Cap

ital C

ost

3,07

2.11

2

Plan

t & M

achi

nery

2,57

0.66

-

2,57

0.66

5.28

%13

5.73

58

9.83

2

Plan

t and

equ

ipm

ent

2,44

8.50

0.70

2,44

9.20

5.28

%Le

ss: U

ndis

char

ged

liabi

litie

s in

clud

ed in

abo

ve-

3Bu

ildin

gs59

3.29

-

59

3.29

3.

34%

19.8

2

80

.11

3Ca

pita

l Spa

res

12.9

0

-

12

.90

5.28

%O

peni

ng C

apita

l Cos

t exc

ludi

ng u

ndis

char

ged

liabi

litie

s3,

072.

11

Tota

l3,

260.

70

-

3,

260.

70

15

5.55

66

9.94

4

Build

ings

48

6.29

-

48

6.29

3.

34%

Addi

tiona

l cap

italiz

atio

n du

ring

the

year

0.70

5

Com

pute

rs0.

63

-

0.

63

15

.00%

Less

: Und

isch

arge

d lia

bilit

ies

incl

uded

in a

dditi

onal

cap

italiz

atio

n-

6O

ffic

e eq

uipm

ent

1.12

-

1.12

6.33

%Ad

d: L

iabi

litie

s di

scha

rged

dur

ing

the

year

-

7

Furn

iture

and

fixt

ures

1.23

-

1.23

6.33

%Cl

osin

g Ca

pita

l Cos

t3,

072.

81

8Ve

hicl

es0.

63

-

0.

63

9.

50%

Aver

age

Capi

tal C

ost

3,07

2.46

9

Com

pute

r sof

twar

e0.

12

-

0.

12

15

.00%

Free

hold

land

96.7

5

10

Righ

t to

Use

Rai

lway

Lin

e23

.94

-

23.9

4

0.

00%

Rate

of d

epre

ciat

ion

4.77

%To

tal

3,07

2.11

0.70

3,07

2.81

4.77

%14

6.55

57

9.03

Re

mai

ning

dep

reci

able

val

ue2,

678.

14

Dep

reci

atio

n (a

nnua

lised

)14

6.55

Dep

reci

atio

n (f

or th

e pe

riod)

146.

55

Cu

mul

ativ

e de

prec

iatio

n at

the

end

of th

e pe

riod

579.

03

2018

-19

(Est

imat

ed)

2019

-20

APR

Ref

er ta

ble

on th

e rig

ht ti

tled

' Co

mpu

tatio

n of

Dep

reci

atio

n (f

or F

Y 20

18-1

9 Tr

uing

Up)

'

Ref

er ta

ble

on th

e rig

ht ti

tled

' Co

mpu

tatio

n of

Dep

reci

atio

n (f

or F

Y 20

18-1

9 Tr

uing

Up)

'

Actu

al 2

018-

1920

18-1

9 (E

stim

ated

)

42

Page 44: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

8

Co

ntr

acte

d

Cap

acit

y/

En

erg

y (M

W/M

U)

Rat

e (₹

/MW

or

Pai

se/U

nit

)

Am

ou

nt

(₹

cro

re)

Co

ntr

acte

d

Cap

acit

y/

En

erg

y (M

W/M

U)

Rat

e (₹

/MW

or

Pai

se/U

nit

)

Am

ou

nt

(₹ c

rore

)

Co

ntr

acte

d

Cap

acit

y/

En

erg

y (M

W/M

U)

Rat

e (₹

/MW

or

Pai

se/U

nit

)

Am

ou

nt

(₹

cro

re)

Co

ntr

acte

d

Cap

acit

y/

En

erg

y (M

W/M

U)

Rat

e (₹

/MW

o

r P

aise

/Un

it)

Am

ou

nt

(₹ c

rore

)

Co

ntr

acte

d

Cap

acit

y/

En

erg

y (M

W/M

U)

Rat

e (₹

/MW

or

Pai

se/U

nit

)

Am

ou

nt

(₹

cro

re)

Not

App

licab

le

Ist

Yea

r2n

d Y

ear

3rd

Yea

r

Exp

ense

s fo

r S

LD

C F

ees

& C

har

ges

S. N

oP

arti

cula

rs

Pre

vio

us

Yea

rC

urr

ent

Yea

rC

on

tro

l Per

iod

Co

ntr

ol P

erio

d

43

Page 45: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

9

(Rs.

cro

re)

Act

ual

3rd

yea

r20

18-1

920

19-2

0

AC

urr

ent

Ass

ets,

Lo

ans

and

Ad

van

ces

Sun

dry

Deb

tors

447.

46

17

5.21

Inve

ntor

ies

53.9

7

213.

43

Loan

s an

d A

dvan

ces

65.4

5

65.4

5

Oth

er C

urre

nt A

sses

t94

.59

19

.82

Cas

h an

d B

ank

Bal

ance

s22

1.25

462.

10

TO

TA

L O

F 'A

'88

2.73

936.

00

BC

urr

ent

Lia

bili

ties

an

d P

rovi

sio

ns

IC

urre

nt L

iabi

litie

s

Sec

urity

Dep

osits

fro

m C

onsu

mer

s

Pow

er P

urch

ase

Liab

ilitie

s

Sta

ff R

elat

ed L

iabi

litie

s 1.

031.

03

Liab

ilitie

s to

war

ds S

uppl

iers

260.

4219

5.92

Inte

rest

acc

rued

but

not

due

5.

032.

50

Inte

rest

acc

rued

and

due

85

2.24

1449

.51

Oth

er C

urre

nt L

iabi

litie

s51

4.44

586.

98

IIP

rovi

sion

s0.

55

0.

61

Tot

al o

f 'B

' (I+

II)

1633

.71

2236

.55

CN

ET

CU

RR

EN

T A

SS

ET

S (

= A

- B

)(7

50.9

8)

(1

,300

.55)

1. T

he a

bove

info

rmat

ion

is t

o be

pro

vide

d G

ener

atin

g S

tatio

n-w

ise

and

in c

onso

lidat

ed f

orm

in c

ase

of G

ener

atio

n B

usin

ess,

whe

ther

car

ried

out

by D

istr

ibut

ion

Lice

nsee

or

by

any

Gen

erat

ing

Com

pany

or

by B

BM

B.

2. T

he a

bove

info

rmat

ion

is t

o be

pro

vide

d in

con

solid

ated

fo

rm in

cas

e of

Tra

nsm

issi

on L

icen

see

and

Dis

trib

utio

n Li

cens

ee.

No

te :

Cu

rren

t A

sset

s &

Lia

bili

ties

S.N

o.

Par

ticu

lars

Co

ntr

ol P

erio

d

44

Page 46: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

10

(Rs.

Cro

re)

(Rs.

Cro

re)

Lo

an M

aste

r F

or

All

Lo

ans

Par

ticu

lars

Op

enin

g

Bal

ance

Rep

aym

ents

Ad

dit

ion

sC

losi

ng

B

alan

ce O

pen

ing

B

alan

ceR

epay

men

tsA

dd

itio

ns

Clo

sin

g

Bal

ance

Sec

ure

d L

oan

s

RT

L-I

2,39

6.15

-

-

2,39

6.15

2,

396.

15

-

-

2,

396.

15

RT

L-II

496.

32

-

-

496.

32

49

6.32

-

-

49

6.32

RT

L-III

470.

49

-

-

470.

49

47

0.49

-

-

47

0.49

RT

L-III

137.

68

-

-

137.

68

13

7.68

-

-

13

7.68

-

T

ota

l3,

500.

65

-

-

3,

500.

65

3,50

0.65

-

-

3,50

0.65

-

-

-

-

-

-

-

-

As p

er F

inan

cial

Sta

tem

ent

3,50

0.65

-

-

3,50

0.65

3,

500.

65

-

-

3,

500.

65

No

tes:

1. S

ourc

e of

Loa

n m

eans

the

agen

cy f

rom

who

m th

e lo

an h

as b

een

take

n, s

uch

as P

FC

, RE

C, A

DB

etc

.2.

Am

ount

rep

ayab

le is

bas

ed o

n th

e sc

hedu

le o

f re

paym

ent.

3. B

ase

rate

mea

ns th

e ba

se s

uch

as P

LR, L

IBO

R e

tc. o

ver

whi

ch a

mar

gin

is to

be

adde

d.

4. M

argi

n m

eans

the

poin

ts o

ver

and

abov

e th

e flo

atin

g ra

te.

5. A

t tim

es c

aps/

floor

are

put

at w

hich

the

flotin

g ra

tes

are

froz

en.

If s

uch

a co

nditi

on e

xist

s, s

peci

fy th

e lim

its.

6. M

orat

oriu

m p

erio

d re

fers

to th

e pe

riod

dur

ing

whi

ch lo

an s

ervi

cing

liab

ility

is n

ot r

equi

red.

7. R

epay

men

t per

iod

mea

ns th

e nu

mbe

r of

yea

rs in

whi

ch th

e lo

an is

req

uire

d to

be

repa

id s

uch

as 1

0 ye

ars,

12

year

s et

c.8.

Rep

aym

ent f

requ

ency

ref

ers

to th

e in

terv

al a

t whi

ch th

e de

bt s

ervi

cing

is to

be

done

suc

h as

qua

rter

ly, h

alf y

earl

y, y

earl

y et

c.

2018

-19

Est

imat

ed20

19-2

0A

ctu

alC

on

tro

l Per

iod

45

Page 47: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

11

Cu

mu

lati

ve e

xpen

dit

ure

ti

ll b

egin

nin

g o

f th

e Y

ear

Cap

ex

du

rin

g t

he

Yea

r

To

tal

Cap

ex

till

en

d o

f th

e Y

ear

Inte

rnal

Acc

rual

(f

rom

fre

e re

serv

es a

nd

su

rplu

s)

Eq

uit

y In

fuse

d*

Cap

ital

S

ub

sid

ies/

g

ran

ts

com

po

nen

t (a

s ap

pli

cab

le)

Co

nsu

mer

C

on

trib

uti

on

co

mp

on

ent

(as

app

lica

ble

)

Lo

an

Not

A

pplic

able

No

tes:

Yea

r-w

ise

Cap

ital

Exp

end

itu

re

Det

ails

of

Cap

ital

Exp

end

itu

re-s

chem

e-w

ise

So

urc

e o

f F

inan

cin

g f

or

Cap

ex D

uri

ng

th

e Y

ear

Nam

e o

f sc

hem

e/

Pro

ject

Nat

ure

of

Pro

ject

(S

elec

t ap

pro

pri

ate

Co

de)

Yea

r o

f S

tart

Eq

uit

y co

mp

on

ent

of

Cap

ex i

n

1. I

n ca

se o

f di

stri

butio

n sc

hem

es s

tart

ing

duri

ng t

he c

ontr

ol p

erio

d, in

form

atio

n m

ust b

e pr

ovid

ed o

nly

for

such

sch

emes

whi

ch a

re in

clud

ed in

the

appr

oved

Cap

ital I

nves

tmen

t P

lan.

2. P

rovi

de b

reak

up

of G

over

nmen

t and

Pri

vate

sha

re.

3. C

odes

for

sel

ectin

g N

atur

e of

wor

k :

a. E

HV

Sch

emes

b. D

istr

ibut

ion

sche

mes

4. I

n ca

se o

f ge

nera

ting

com

pany

, th

e ab

ove

deta

ils a

re

to b

e pr

ovid

ed fo

r ea

ch g

ener

atin

g st

atio

n of

ge

nera

ting

com

pany

.

No

te :

1. T

he a

bove

info

rmat

ion

is to

be

prov

ided

Gen

erat

ing

Sta

tion-

wis

e an

d in

con

solid

ated

for

m in

cas

e of

Gen

erat

ion

Bus

ines

s, w

heth

er c

arri

ed o

ut

by D

istr

ibut

ion

Lice

nsee

or

by a

ny G

ener

atin

g C

ompa

ny o

r by

BB

MB

.

2. T

he a

bove

info

rmat

ion

is to

be

prov

ided

in c

onso

lidat

ed fo

rm in

cas

e of

Tra

nsm

issi

on L

icen

see

and

Dis

trib

utio

n Li

cens

ee.

e. S

CA

DA

/DM

S e

tc.

f. M

isce

llane

ous

46

Page 48: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

(Rs.

Cro

re)

(Rs.

Cro

re)

Ad

dit

ion

sC

apit

alis

atio

nA

dju

stm

ents

Clo

sin

g

Bal

ance

Ad

dit

ion

sC

apit

alis

atio

nA

dju

stm

ents

Clo

sin

g

Bal

ance

Ad

dit

ion

sC

apit

alis

atio

nA

dju

stm

ents

Clo

sin

g

Bal

ance

Ad

dit

ion

sC

apit

alis

atio

nA

dju

stm

ents

Clo

sin

g

Bal

ance

12

1617

1415

1213

1415

1617

1819

1617

1819

1G

PG

SL

230

230

0.00

00

0.00

0.00

0.00

TO

TA

L

2017

-18

Fo

rm C

12

No

te :

Pro

ject

ion

Cap

ital

Wo

rks

in P

rog

ress

1st

Yea

rA

ctu

al20

17-1

8P

roje

ctio

n2n

d Y

ear

Act

ual

2018

-19

1. T

he a

bove

info

rmat

ion

is to

be

prov

ided

Gen

erat

ing

Sta

tion-

wis

e an

d in

con

solid

ated

for

m in

cas

e of

Gen

erat

ion

Bus

ines

s, w

heth

er c

arri

ed o

ut b

y D

istr

ibut

ion

Lice

nsee

or

by a

ny G

ener

atin

g C

ompa

ny o

r by

BB

MB

. 2.

The

abo

ve in

form

atio

n is

to b

e pr

ovid

ed in

con

solid

ated

form

in c

ase

of T

rans

mis

sion

Lic

ense

e an

d D

istr

ibut

ion

Lice

nsee

.

2018

-19

S.

No

.P

arti

cula

rs

1st

Yea

r2n

d Y

ear

47

Page 49: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

13

(Rs.

Cro

re)

2017

-18

2017

-18

2018

-19

2018

-19

Pro

ject

ion

Act

ual

(re

fer

No

te b

elo

w)

Pro

ject

ion

Act

ual

(re

fer

No

te

bel

ow

)I

Exi

stin

g L

oan

sA

Sec

ure

d L

oan

s1

Inte

rest

am

ount

as

per

encl

osed

426

.14

25

5.52

-

2

36.8

1 5

Su

b T

ota

l

4

26.1

4

255.

52

-

236

.81

BU

nse

cure

d L

oan

s1

Loan

12

Loan

23

Loan

34

Loan

45

Su

b T

ota

l

IIN

ew L

oan

sA

Sec

ure

d L

oan

s1

Loan

12

Loan

23

Loan

34

Loan

45

Su

b T

ota

l

BU

nse

cure

d L

oan

s1

Loan

12

Loan

23

Loan

34

Loan

45

Su

b T

ota

l

IIIO

ther

Inte

rest

& F

inan

ce C

har

ges

1C

ost o

f ra

isin

g F

inan

ce /

Ban

k C

harg

es2

Inte

rest

on

Sec

urity

Dep

osit

3P

enal

Inte

rest

Cha

rges

4Le

ase

Ren

tals

5S

ub

To

tal

S. N

o.

Lo

an S

ou

rce

1st

year

2nd

yea

r

Inte

rest

an

d F

inan

ce C

har

ges

Inte

rest

Du

e

Co

ntr

ol P

erio

d

48

Page 50: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

13

(Rs.

Cro

re)

S. N

o.

Lo

an S

ou

rce

1st

year

2nd

yea

r

Inte

rest

an

d F

inan

ce C

har

ges

Inte

rest

Du

e

Co

ntr

ol P

erio

d

DG

ran

d T

ota

l of

Inte

rest

& F

inan

ce C

har

ges

(I.A

.5 +

I.B

.5 +

II.A

.5 +

II.B

.5 +

III

.5)

426.

14

255.

52

-

23

6.81

EL

ess:

Inte

rest

& F

inan

ce C

har

ges

Cap

ital

ised

-

-

-

-

FN

et In

tere

st &

Fin

ance

Ch

arg

es

(D -

E)

426.

1425

5.52

0.00

236.

81

2. T

he a

bove

info

rmat

ion

is to

be

prov

ided

in c

onso

lidat

ed f

orm

in c

ase

of T

rans

mis

sion

Lic

ense

e an

d D

istr

ibut

ion

Lice

nsee

.

No

te :

R

efer

App

endi

x-1

For

m C

13 f

or c

ompu

tatio

n of

inte

rest

on

loan

.

1. T

he a

bove

info

rmat

ion

is to

be

prov

ided

Gen

erat

ing

Sta

tion-

wis

e an

d in

con

solid

ated

for

m in

cas

e of

Gen

erat

ion

Bus

ines

s, w

heth

er c

arrie

d ou

t by

Dis

trib

utio

n Li

cens

ee

or b

y an

y G

ener

atin

g C

ompa

ny o

r by

BB

MB

.

49

Page 51: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Appe

ndix

-1 F

orm

C13

Calu

clat

ion

of In

tere

st o

n N

orm

ativ

e Lo

an(R

s. In

Cro

res)

2018

-19

2019

-20

Actu

al

(Ref

er N

ote

belo

w)

Proj

ectio

n

1G

ross

Nor

mat

ive

Loan

- O

peni

ng

2,1

49.8

9

2,1

50.4

8

2Cu

mul

ativ

e Re

paym

ent u

p to

Pre

viou

s Ye

ar

(Cum

ulat

ive

Dep

reci

atio

n up

to p

revi

ous

year

)

2

85.9

8

4

32.4

9

3N

et L

oan

Ope

ning

1

,863

.91

1

,717

.99

4Le

ss: R

epay

men

t Dur

ing

the

Year

(C

onsi

derin

g D

epre

ciat

ion

as P

rinci

pal R

epay

men

t)

1

46.5

1

1

46.5

5

5Lo

an A

dditi

on d

ue to

Add

ition

al C

apita

lizat

ion

durin

g th

e ye

ar (=

Act

ual A

dditi

onal

Cap

italiz

atio

n -

Nor

mat

ive

Equi

ty A

dditi

on c

onsi

dere

d fo

r RO

E co

mpu

tatio

n)

0.

59

0.49

6N

et L

oan

Clos

ing

1

,717

.99

1

,571

.93

7Av

erag

e Lo

an

1,7

90.9

5

1,6

44.9

6 8

Wei

ghte

d Av

erag

e Ra

te o

f Int

eres

t on

Loan

(Nor

mat

ive)

13.2

2%13

.22%

9In

tere

st o

n Lo

an

2

36.8

1

2

17.5

0

Calc

ulat

ion

of A

ctua

l Wei

ghte

d A

vera

ge In

tere

st R

ate

on L

oan:

2018

-19

(Act

ual)

2019

-20

Estim

ated

Ope

ning

Loa

n (a

s pe

r Ann

ual A

ccou

nts)

:TL

1

2,3

96.1

5

2,3

96.1

5 TL

2

4

96.3

2

4

96.3

2 TL

3

4

70.4

9

4

70.4

9 TL

4

1

37.6

8

1

37.6

8

Tota

l

3,5

00.6

5

3,5

00.6

5

S.N

oPa

rtic

ular

s

50

Page 52: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Calc

ulat

ion

of A

ctua

l Wei

ghte

d A

vera

ge In

tere

st R

ate

on L

oan:

2018

-19

(Act

ual)

2019

-20

Estim

ated

Clos

ing

Loan

(as

per A

nnua

l Acc

ount

s):

TL1

2

,396

.15

2

,396

.15

TL2

496

.32

496

.32

TL3

470

.49

470

.49

TL4

137

.68

137

.68

-

-

-

To

tal

3

,500

.65

3

,500

.65

Aver

age

Loan

:TL

1

2,3

96.1

5

2,3

96.1

5 TL

2

4

96.3

2

4

96.3

2 TL

3

4

70.4

9

4

70.4

9 TL

4

1

37.6

8

1

37.6

8

-

-

To

tal

3

,500

.65

3

,500

.65

Inte

rest

on

loan

(as

per A

nnua

l Acc

ount

s)

4

62.8

7

4

62.8

7 Ac

tual

Wei

ghte

d A

vera

ge In

tere

st R

ate

on L

oan

13.2

2%13

.22%

Not

e:

1. O

peni

ng lo

an h

as b

een

cons

ider

ed o

n no

rmat

ive

basi

s as

per

Reg

. 19.

1 of

PSE

RC 2

014

Tarif

f Reg

ulat

ions

.2.

Loa

n re

paym

ent i

s co

nsid

ered

as

norm

ativ

e ba

sis

bein

g eq

ual t

o th

e De

prec

iatio

n fo

r the

yea

r as

per R

eg. 2

4.3

of th

e PS

ERC

2014

Tar

iff R

egul

atio

ns.

3. L

oan

addi

tion

is t

aken

as

norm

ativ

e ba

sis

as p

er R

eg. 1

8.5(

a) o

f PSE

RC 2

014

Tarif

f Reg

ulat

ions

.4.

Act

ual W

eigh

ted

aver

age

inte

rest

rate

on

loan

has

bee

n co

mpu

ted

as ra

tio o

f the

act

ual i

nter

est p

aid

to th

e ac

tual

ave

rage

lo

an.

5. W

eigh

ted

Aver

age

Inte

rest

rate

on

loan

for c

ompu

tatio

n of

inte

rest

has

bee

n co

nsid

ered

as

per R

eg. 2

4.2

of th

e PS

ERC

2014

Ta

riff R

egul

atio

ns.

51

Page 53: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

14

(Rs.

Cro

re)

Pro

ject

ion

Act

ual

Pro

ject

ion

Act

ual

2017

-18

2017

-18

2018

-19

2018

-19

AIn

com

e R

elat

ing

to

Pre

vio

us

Per

iod

1

Inte

rest

inco

me

rela

ting

to p

rior

per

iod

-

-

-

-

2In

com

e T

ax r

elat

ing

to p

rior

per

iod

-

-

-

-

3E

xces

s P

rovi

sion

for

Dep

reci

atio

n-

-

-

-

4

Exc

ess

Pro

visi

on fo

r In

tere

st a

nd F

inan

ce C

harg

es-

-

-

-

5

Rec

eipt

s fr

om C

onsu

mer

s -

-

-

-

6

Oth

er E

xces

s P

rovi

sion

s-

-

-

-

7

Oth

er In

com

e-

-

-

-

S

ub

To

tal A

-

-

-

-

BE

xpen

dit

ure

Rel

atin

g t

o P

revi

ou

s P

erio

d1

Pow

er P

urch

ase

-

-

-

-

2O

pera

ting

Exp

ense

s-

-

-

-

3

Exc

ise

Dut

y on

Gen

erat

ion

-

-

-

-

4E

mpl

oyee

Cos

t-

-

-

-

5

Dep

reci

atio

n-

-

-

-

6

Inte

rest

and

Fin

ance

Cha

rges

-

-

-

-

7A

&G

Exp

ense

s-

-

-

-

8

With

draw

al o

f R

even

ue D

eman

d-

-

-

-

9

Mat

eria

l Rel

ated

-

-

-

-

10

Oth

ers

-

-

-

-

Su

b-T

ota

l B

-

-

-

-

Net

Pri

or

Per

iod

Cre

dit

/(C

har

ges

) :

A-B

-

-

-

-

1. T

he a

bove

info

rmat

ion

is to

be

prov

ided

Gen

erat

ing

Sta

tion-

wis

e an

d in

con

solid

ated

for

m in

cas

e of

Gen

erat

ion

Bus

ines

s, w

heth

er c

arri

ed o

ut b

y D

istr

ibut

ion

Lice

nsee

or

by a

ny G

ener

atin

g C

ompa

ny o

r by

BB

MB

.

2. T

he a

bove

info

rmat

ion

is to

be

prov

ided

in c

onso

lidat

ed fo

rm in

cas

e of

Tra

nsm

issi

on L

icen

see

and

Dis

trib

utio

n Li

cens

ee.

No

te :

Net

Pri

or

Per

iod

Exp

ense

s / I

nco

me

S.N

o.

Par

ticu

lars

Co

ntr

ol P

erio

d

52

Page 54: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

15

Pre

vio

us

Yea

rC

urr

ent

Yea

rA

ctu

alE

stim

ated

1st

Yea

r2n

d Y

ear

3rd

Yea

r

1E

xtra

ordi

nary

Cre

dits

(inc

ludi

ng s

ubsi

dies

aga

nst

loss

es d

ue to

nat

ural

dis

aste

rs)

TO

TA

L C

RE

DIT

S

2E

xtra

ordi

nary

Deb

its (

incl

udin

g su

bsid

ies

agai

nst

loss

es d

ue to

nat

ural

dis

aste

rs)

Not

App

licab

leT

OT

AL

DE

BIT

S

Gra

nd

To

tal

No

te :

1. T

he a

bove

info

rmat

ion

is to

be

prov

ided

Gen

erat

ing

Sta

tion-

wis

e an

d in

con

solid

ated

for

m in

cas

e of

Gen

erat

ion

Bus

ines

s,

whe

ther

car

ried

out b

y D

istr

ibut

ion

Lice

nsee

or

by a

ny G

ener

atin

g C

ompa

ny o

r by

BB

MB

.

2. T

he a

bove

info

rmat

ion

is to

be

prov

ided

in c

onso

lidat

ed f

orm

in c

ase

of T

rans

mis

sion

Lic

ense

e an

d D

istr

ibut

ion

Lice

nsee

.

Ext

rao

rdin

ary

Item

s(₹

cro

re)

S.N

o.

Par

ticu

lars

Co

ntr

ol P

erio

dP

roje

ctio

n

53

Page 55: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

S.

No

.P

art

icu

lars

Op

enin

g

Bal

an

ceA

dd

itio

ns

du

rin

g

the

ye

ar

Wit

hd

raw

als

(Pu

rpo

se t

o b

e in

dic

ated

)

Clo

sin

g

Bal

an

ce

AS

HA

RE

CA

PIT

AL

1E

quity

Cap

ital

1265

.20

0.

00

0.00

12

65.2

0

BR

ES

ER

VE

S1

Gen

eral

Res

erve

2C

apita

l Res

erve

3O

the

r R

eser

ves

Su

b T

ota

l o

f R

ese

rves

CS

UR

PL

US

1S

urpl

us-1

518.

13

-667

.95

0.00

-218

6.08

Su

b T

ota

l o

f S

urp

lus

DN

et W

ort

h (

A +

B +

C)

-252

.93

-667

.95

0.00

-920

.89

(Rs

. Cro

re)

S.

No

.P

art

icu

lars

Op

enin

g

Bal

an

ceA

dd

itio

ns

du

rin

g

the

ye

ar

Wit

hd

raw

als

(Pu

rpo

se t

o b

e in

dic

ated

)

Clo

sin

g

Bal

an

ce

AS

HA

RE

CA

PIT

AL

1E

quity

Cap

ital

1,2

65.2

0

-

-

1,26

5.2

0

BR

ES

ER

VE

S1

Gen

eral

Res

erve

2C

apita

l Res

erve

3O

the

r R

eser

ves

Su

b T

ota

l o

f R

ese

rves

CS

UR

PL

US

1S

urp

lus

-218

6.08

50

6.17

(2,6

92.2

5)

S

ub

To

tal

of

Su

rplu

s

DN

et W

ort

h (

A +

B +

C)

-920

.89

506.

170.

00-1

427.

06

CO

NT

RO

L P

ER

IOD

Fo

rm C

16

Sh

are

Cap

ital

, Res

erv

es a

nd

Su

rplu

s

(Rs

. Cro

re)

FY

201

9-20

(P

roje

cti

on

)

(Rs

. Cro

re)

FY

201

8-19

(A

ctu

al)

Page

no3

1

54

Page 56: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

17

(Rs.

Cro

re)

Pro

ject

ion

Act

ual

Pro

ject

ion

Act

ual

2017

-18

2017

-18

2018

-19

2018

-19

1P

rovi

sion

mad

e/P

ropo

sed

for

the

Yea

r38

.74

-

38.7

6

-

2D

etai

ls a

s pe

r R

etur

n fil

ed f

or th

e Y

ear

-

-

-

-

3A

s A

sses

sed

for

the

Yea

r-

-

-

-

4C

redi

t/Deb

it of

Ass

essm

ent Y

ear

(Giv

e D

etai

ls)

38.7

40.

0038

.76

0.00

To

tal

Inco

me

Tax

Pro

visi

on

s

S. N

o.

Par

ticu

lars

Co

ntr

ol P

erio

d

55

Page 57: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

18

(Rs.

Cro

re)

Pro

ject

ion

Act

ual

Pro

ject

ion

Act

ual

Est

imat

e20

17-1

820

17-1

820

18-1

920

18-1

920

19-2

01

Inte

rest

& F

inan

ce c

harg

es C

apita

lised

-

-

-

-

-

2E

xpen

ditu

re D

urin

g C

onst

rutio

n P

erio

d

-

-

-

-

-

3A

ny O

ther

Exp

ense

s

-

-

-

-

-

Gra

nd

To

tal

-

-

-

-

-

No

te :

1.

The

abo

ve in

form

atio

n is

to b

e pr

ovid

ed G

ener

atin

g S

tatio

n-w

ise

and

in c

onso

lidat

ed

form

in c

ase

of G

ener

atio

n B

usin

ess,

whe

ther

car

ried

out b

y D

istr

ibut

ion

Lice

nsee

or

by

any

Gen

erat

ing

Com

pany

or

by B

BM

B.

2. T

he a

bove

info

rmat

ion

is to

be

prov

ided

in c

onso

lidat

ed f

orm

in c

ase

of T

rans

mis

sion

Li

cens

ee a

nd D

istr

ibut

ion

Lice

nsee

.

Det

ails

of

Exp

ense

s C

apit

alis

ed

S.N

o.

Par

ticu

lars

Co

ntr

ol P

erio

d

56

Page 58: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

19

S. N

o.

Dat

e o

f A

cqu

isit

ion

/Inst

alla

tio

n

His

tori

cal

Co

st/C

ost

of

Acq

uis

itio

n

Dat

e o

f w

ith

dra

wal

fro

m

op

erat

ion

s

Acc

um

ula

ted

D

epre

ciat

ion

on

dat

e o

f w

ith

dra

wal

Wri

tten

do

wn

val

ue

on

dat

e o

f w

ith

dra

wal

NA

S. N

o.

Dat

e o

f A

cqu

isit

ion

/Inst

alla

tio

n

His

tori

cal

Co

st/C

ost

of

Acq

uis

itio

n

Dat

e o

f w

ith

dra

wal

fro

m

op

erat

ion

s

Acc

um

ula

ted

D

epre

ciat

ion

on

dat

e o

f w

ith

dra

wal

Wri

tten

do

wn

val

ue

on

dat

e o

f w

ith

dra

wal

NA

S. N

o.

Dat

e o

f A

cqu

isit

ion

/Inst

alla

tio

n

His

tori

cal

Co

st/C

ost

of

Acq

uis

itio

n

Dat

e o

f w

ith

dra

wal

fro

m

op

erat

ion

s

Acc

um

ula

ted

D

epre

ciat

ion

on

dat

e o

f w

ith

dra

wal

Wri

tten

do

wn

val

ue

on

dat

e o

f w

ith

dra

wal

NA

1st

year

Sta

tem

ent

of

Ass

ets

No

t in

Use

(₹

cro

re)

Pre

vio

us

Yea

r

CU

RR

EN

T Y

EA

R

CO

NT

RO

L P

ER

IOD

PR

OJE

CT

ION

S

57

Page 59: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

S. N

o.

Dat

e o

f A

cqu

isit

ion

/Inst

alla

tio

n

His

tori

cal

Co

st/C

ost

of

Acq

uis

itio

n

Dat

e o

f w

ith

dra

wal

fro

m

op

erat

ion

s

Acc

um

ula

ted

D

epre

ciat

ion

on

dat

e o

f w

ith

dra

wal

Wri

tten

do

wn

val

ue

on

dat

e o

f w

ith

dra

wal

NA

S. N

o.

Dat

e o

f A

cqu

isit

ion

/Inst

alla

tio

n

His

tori

cal

Co

st/C

ost

of

Acq

uis

itio

n

Dat

e o

f w

ith

dra

wal

fro

m

op

erat

ion

s

Acc

um

ula

ted

D

epre

ciat

ion

on

dat

e o

f w

ith

dra

wal

Wri

tten

do

wn

val

ue

on

dat

e o

f w

ith

dra

wal

NA

2nd

yea

r

3rd

yea

r

No

te :

1. T

he a

bove

info

rmat

ion

is to

be

prov

ided

Gen

erat

ing

Sta

tion-

wis

e an

d in

con

solid

ated

for

m in

cas

e of

Gen

erat

ion

B

usin

ess,

whe

ther

car

ried

out b

y D

istr

ibut

ion

Lice

nsee

or

by a

ny G

ener

atin

g C

ompa

ny o

r by

BB

MB

.

2. T

he a

bove

info

rmat

ion

is to

be

prov

ided

in c

onso

lidat

ed f

orm

in c

ase

of T

rans

mis

sion

Lic

ense

e an

d D

istr

ibut

ion

Lice

nsee

.

58

Page 60: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

20

Bal

ance

at

the

beg

inn

ing

o

f th

e ye

ar

Ad

dit

ion

s d

uri

ng

th

e Y

ear

Bal

ance

at

the

end

of

the

Yea

r

Bal

ance

at

the

beg

inn

ing

o

f th

e ye

ar

Ad

dit

ion

s d

uri

ng

th

e Y

ear

Bal

ance

at

the

end

of

the

Yea

r

Bal

ance

at

the

beg

inn

ing

o

f th

e ye

ar

Ad

dit

ion

s d

uri

ng

th

e Y

ear

Bal

ance

at

the

end

of

the

Yea

r

Bal

ance

at

the

beg

inn

ing

o

f th

e ye

ar

Ad

dit

ion

s d

uri

ng

th

e Y

ear

Bal

ance

at

th

e en

d

of

the

Yea

r

Bal

ance

at

th

e b

egin

nin

g

of

the

year

Ad

dit

ion

s d

uri

ng

th

e Y

ear

Bal

ance

at

th

e en

d

of

the

Yea

r

1G

rant

Tow

ards

Cos

t Of C

apita

l Ass

ets

2S

ubsi

dies

Tow

ards

Cos

t Of C

apita

l Ass

et

3B

ene

ficia

ries

Con

trib

utio

n T

owar

ds C

ost o

f C

apita

l Ass

et T

ota

l

2018

-19

2019

-20

No

te :

Gra

nts

To

war

ds

Co

st o

f C

apit

al A

sset

s(R

s. In

cro

re)

S.N

oP

arti

cula

rs

Pre

vio

us

Yea

rC

urr

ent

Yea

rC

on

tro

l Per

iod

Act

ual

sE

stim

ated

Pro

ject

ion

s

Not

App

licab

le

1. T

he a

bov

e in

form

atio

n is

to b

e pr

ovid

ed G

ener

atin

g S

tatio

n-w

ise

and

in c

onso

lidat

ed fo

rm in

cas

e of

Gen

erat

ion

Bus

ines

s, w

heth

er c

arrie

d ou

t by

Dis

trib

utio

n Li

cens

ee o

r by

any

Gen

erat

ing

Com

pany

or

by B

BM

B.

2. T

he a

bov

e in

form

atio

n is

to b

e pr

ovid

ed in

con

solid

ated

form

in c

ase

of T

rans

mis

sion

Lic

ense

e an

d D

istr

ibut

ion

Lice

nsee

.

2016

-17

2017

-18

59

Page 61: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm C

21

(Rs.

Cro

re)

Pro

ject

ion

Act

ual

Pro

ject

ion

Act

ual

2017

-18

2017

-18

2018

-19

2018

-19

1M

ater

ial C

ost V

aria

nce

2M

isce

llane

ous

Loss

es a

nd W

ritte

n O

ff

3B

ad D

ebt W

ritte

n O

ff

4C

ost o

f T

radi

ng &

Man

ufac

turi

ng A

ctiv

ities

5N

et P

rior

Per

iod

Cre

dit/C

harg

es

6S

ub T

otal

-

-

7Le

ss C

harg

ebal

e to

Cap

ital E

xpen

ses

8N

et C

harg

eabl

e to

Rev

enue

-

-

1. T

he a

bove

info

rmat

ion

is to

be

prov

ided

Gen

erat

ing

Sta

tion-

wis

e an

d in

con

solid

ated

for

m in

cas

e of

Gen

erat

ion

Bus

ines

s, w

heth

er c

arrie

d ou

t by

Dis

trib

utio

n Li

cens

ee o

r by

any

Gen

erat

ing

Com

pany

or

by B

BM

B.

2. T

he a

bove

info

rmat

ion

is to

be

prov

ided

in c

onso

lidat

ed f

orm

in c

ase

of T

rans

mis

sion

Lic

ense

e an

d D

istr

ibut

ion

No

te :

Deb

its,

Wri

te-o

ffs

and

An

y O

ther

Item

s

S. N

oP

arti

cula

rsC

on

tro

l Per

iod

60

Page 62: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

S. N

oP

AR

TIC

UL

AR

S

G1

Pro

fit &

Los

s A

ccou

ntG

2A

nnua

l Rev

enue

Req

uire

men

tG

3S

umm

ary

of G

ener

atio

n C

ost

G4

Pla

nt C

hara

cter

istic

s (T

herm

al)

G4

(A)

Sal

ient

Fea

ture

s of

Hyd

roel

ectr

ic P

roje

ct

G5

Des

ign

Ene

rgy

and

Pea

king

Cap

abili

ty (

Mon

th w

ise)

- R

OR

with

P

onda

ge/S

tora

ge T

ype

New

Sta

tions

G

6N

orm

ativ

e P

aram

eter

s C

onsi

dere

d fo

r T

ariff

Com

puta

tions

(T

herm

al)

G6(

A)

Det

ails

of

CO

D, T

ype

of H

ydro

Sta

tion,

Nor

mat

ive

Ann

ual P

lant

Ava

ilabi

lity

Fac

tor

(NA

PA

F)

& O

ther

Nor

mat

ive

Par

amet

ers

Con

side

red

for

Tar

iff

Cal

cula

tion

G7

Mai

nten

ance

Sch

edul

e of

The

rmal

Pow

er S

tatio

nsG

8G

ener

atio

n D

etai

ls: F

uel a

nd V

aria

ble

Cos

tG

9R

&M

Exp

ense

sG

10W

orki

ng C

apita

l Req

uire

men

tG

11D

etai

led

info

rmat

ion

of F

uel f

or c

ompu

tatio

n of

Ene

rgy

Cha

rges

G12

Inve

stm

ent D

etai

lsG

13In

com

e fr

om In

vest

men

ts a

nd N

on-T

ariff

Inco

me

G14

Exi

stin

g an

d P

ropo

sed

Tar

iff S

ched

ule

G15

Rev

enue

fro

m S

ale

of P

ower

(at

Exi

stin

g T

ariff

s)G

16R

even

ue f

rom

Sal

e of

Pow

er (

at P

ropo

sed

Tar

iffs)

No

te:

IND

EX

form

ats

(in E

xcel

for

mat

) an

d an

y ot

her

info

rmat

ion

subm

itted

sha

ll al

so b

e fu

rnis

hed

in th

e

2. F

orm

ats

may

be

suita

bly

amen

ded

whe

re e

ver

requ

ired

, and

add

ition

al f

orm

ats

may

be

desi

gned

for

any

add

ition

al in

form

atio

n to

be

subm

itted

alo

ngw

ith th

e P

etiti

on.

61

Page 63: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

1

(Rs.

Cro

re)

Act

ual

3rd

Yea

r 20

18-1

920

19-2

0A

Rev

enu

e

1R

even

ue f

rom

sal

e of

pow

erG

131,

515.

64

1,

209.

58

2N

on-T

ariff

and

Oth

er In

com

eG

100.

27

To

tal R

even

ue

or

Inco

me

1,51

5.91

1,20

9.58

BE

xpen

dit

ure

1F

uel C

ost

G3

(a)

Pri

mar

y F

uel C

ost

1,10

6.3

1

53

8.52

(b)

Sec

onda

ry F

uel C

ost

6.05

5.27

2S

LDC

Fee

s an

d C

harg

eC

8

3O

pera

tions

& M

aint

enan

ce E

xpen

ses

95.6

6

a) R

epai

rs a

nd M

aint

enan

ce E

xpen

ses

G9

25.8

6

b) E

mpl

oyee

Cos

tsC

412

.67

c) A

dm

inis

trat

ion

and

Gen

eral

Exp

ense

s (r

efer

N

ote

belo

w)

C6

104.

81

4P

rior

Per

iod

Exp

ense

sC

14

5E

xtra

ordi

nary

Item

sC

156

Less

: Tot

al E

xpen

ses

Cap

italiz

ed (

-)C

18

To

tal E

xpen

dit

ure

1,25

5.70

639.

46

CP

BD

ITA

(A

-B)

260.

21

570.

13

DD

epre

ciat

ion

& A

mo

rtiz

atio

nC

7

1D

epre

ciat

ion

210.

45

146.

55

2A

mor

tizat

ion

2.40

EP

BIT

(C

-D1-

D2)

47.3

6

42

3.58

FT

ota

l In

tere

st a

nd

Fin

ance

Ch

arg

es

1In

tere

st o

n Lo

anC

1365

0.18

21

7.50

2In

tere

st o

n W

orki

ng C

apita

lG

764

.82

83.1

6

3F

inan

ce C

harg

esC

130.

28

6.

92

GP

rofi

t/L

oss

bef

ore

Tax

(E

-F1-

F2-

F3)

(667

.91)

11

5.99

HIn

com

e T

axC

17(0

.02)

-

IP

rofi

t/L

oss

aft

er T

ax (

G-H

)(6

67.9

0)

115.

99

N

ote

:T

he a

bov

e in

form

atio

n re

quir

es c

ertif

icat

ion

from

the

stat

utor

y au

dito

rs.

A&

G e

xpen

ses

incl

ude

expe

nses

und

er h

eads

'Liq

uida

ted

Dam

ages

' and

'Pen

alty

EM

D d

educ

tion'

. How

ever

, the

sai

d ex

pens

es a

re n

ot c

laim

ed a

s pa

rt o

f AR

R.

Pro

fit

& L

os

s A

cco

un

t

S. N

o.

Par

ticu

lars

Ref

eren

ce F

orm

62

Page 64: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

2

(Rs.

Cro

re)

Act

ual

Est

imat

ed20

18-

1920

19-

20

AR

ecei

pts

1R

even

ue fr

om S

ale

of P

ow

er a

t C

urre

nt T

ariff

G12

1,51

5.6

4

1,20

9.58

2

Gro

ss G

ener

atio

n (

MU

)G

52,

436

1,

312

3

Aux

iliar

y C

onsu

mp

tion

(M

U)

G5

233

12

1

4

Net

Gen

era

tion

(MU

)G

52,

203

1,

190

BE

xpen

dit

ure

1F

uel C

ost

a)P

rim

ary

Fue

l Cos

tG

311

16.

8353

8.52

b)S

econ

dary

Fue

l Cos

tG

37.

29

5.27

2S

LDC

Fee

s &

Cha

rges

C8

3O

&M

exp

ense

s (G

ross

)65

.61

95.6

6

a) R

&M

Exp

ense

sG

6

b) E

mpl

oyee

Exp

ens

esC

4

c) A

&G

Exp

ense

sC

6

4D

epre

ciat

ion

C7

146

.51

146.

55

5In

tere

st o

n Lo

ans

C13

236

.81

217.

50

6In

tere

st o

n W

orki

ng C

apita

lG

789

.28

83.1

6

7P

rior

Per

iod

Exp

ens

eC

14

8E

xtra

ordi

nary

Ite

ms

C15

9O

ther

Deb

ts a

nd W

rite

-offs

C21

10In

com

e T

ax

C17

0.0

00.

00

11L

ess:

Exp

ense

s ca

pita

lised

C18

a) In

tere

st C

harg

es C

apita

lized

b) R

&M

Exp

ense

s C

apita

lized

c) A

&G

Exp

ense

Cap

italiz

ed

d) E

mpl

oyee

Exp

ens

es C

apita

lized

Su

bto

tal

(a+

b+

c+d

)0.

00

0.00

Su

bto

tal

Exp

end

itu

re (

1+2+

3+4+

5+6+

7+8+

9+10

-11)

166

2.32

1086

.67

CR

etur

n on

Eq

uity

C3

142

.83

142.

87

DN

on T

ariff

an

d ot

her

Inco

me

G10

0.27

21.6

4

EA

nn

ual

Rev

enu

e R

equ

irem

ent

(B+

C-D

)18

04.8

812

07.9

0

FS

urp

lus(

+)

/ Sh

ort

fall

(-)

(A1-

E)

- B

efo

re T

arif

f R

evis

ion

-289

.24

1.6

9

An

nu

al R

even

ue

Req

uir

emen

t

S.

No

.P

arti

cula

rsR

ef. F

orm

N

o.

63

Page 65: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

3

Act

ual

Pro

ject

ion

2018

-19

2019

-20

AN

et G

ener

atio

nM

U22

0311

90.0

8B

Fix

ed C

ost

1O

&M

Exp

ense

sR

s. C

rore

6

5.61

9

5.66

a)

Rep

airs

and

Mai

nten

ance

Exp

ense

sR

s. C

rore

2

5.86

3

3.71

b)

Em

ploy

ee C

ost

Rs.

Cro

re

12.

67

15.

12

c) A

dmin

istr

atio

n an

d G

ener

al E

xpen

ses

Rs.

Cro

re

27.

08

46.

84

2D

epre

ciat

ion

Rs.

Cro

re

146.

51

146.

55

3In

tere

st C

harg

es o

n W

orki

ng C

apita

lR

s. C

rore

8

9.28

8

3.16

4In

tere

st a

nd F

inan

ce C

harg

es o

n Lo

an

Cap

ital

Rs.

Cro

re

236.

81

217.

50

5R

etru

n on

Equ

ity (

RoE

)R

s. C

rore

14

2.83

14

2.87

6

All

Sta

tuto

ry L

evie

s an

d T

axes

, if

any

Rs.

Cro

re7

*Oth

er E

xpen

ses

Rs.

Cro

re

8Le

ss: N

on-T

ariff

and

Oth

er In

com

e (i

f an

y)R

s. C

rore

0.2

7 21

.6

Rs.

Cro

re

681.

30

664.

16

Rs/

kWh

1.8

6

1.8

2 C

Var

iab

le C

ost

Rs.

Cro

re

1,

116.

83

538.

52

Rs/

kWh

5.0

7

4.5

3 R

s. C

rore

7.2

9

5.2

7 R

s/kW

h

0

.03

0

.04

Rs.

Cro

re

1,

124.

11

543.

79

Rs/

kWh

5.1

0

4.5

7 R

s. C

rore

1,80

5.42

1,20

7.95

R

s/kW

h

6

.96

6

.38

Note:

Prim

ary

and S

econ

dar

y Fu

el C

osts

as

furn

ished

in t

his

Form

-G3 a

re t

he

actu

al c

ost

s of

fuel

con

sum

ed a

s per

Annual

Acc

ounts

.

Su

mm

ary

of

Gen

erat

ion

Co

st

9T

ota

l Fix

ed C

ost

S. N

o.

Par

ticu

lars

Un

it

DT

ota

l Gen

erat

ion

Co

st

1P

rim

ary

Fue

l Cos

t (re

fer

Not

e be

low

)

2S

econ

dary

Fue

l Cos

t (re

fer

Not

e be

low

)

3T

ota

l Var

iab

le C

ost

64

Page 66: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Nam

e o

f th

e P

etit

ion

er

Nam

e o

f th

e G

ener

atin

g S

tati

on

Un

it(s

) / B

lock

(s)

/ Par

amte

rsU

nit

-IU

nit

-II

Inst

alle

d C

apac

ity

(MW

) 27

027

0

Sch

edu

le C

OD

as

per

Inv

estm

ent

Ap

pro

val

20

.05.

2013

20.1

1.20

13

Act

ual C

OD

/Dat

e of

Tak

en O

ver

(as

appl

icab

le)

06.0

4.20

1616

.04.

2016

Pit

Hea

d or

Non

Pit

Hea

d N

on P

it H

ead

Non

Pit

Hea

d

Nam

e of

the

Boi

ler

Man

ufac

ture

B

HE

LB

HE

L

Nam

e of

Tur

bine

Gen

erat

or M

anuf

actu

re

BH

EL

BH

EL

Mai

n S

team

Pre

ssu

re a

t T

urb

ine

inle

t (k

g/C

m2)

abs1

. 15

015

0

Mai

n S

team

Tem

per

atu

re a

t T

urb

ine

inle

t (0

C)1

537

537

Reh

eat

Ste

am P

ress

ure

at

Tu

rbin

e in

let

(kg

/Cm

2)1

38.2

38.2

Reh

eat

Ste

am T

emp

erat

ure

at

Tu

rbin

e in

let

(0C

)153

753

7

Mai

n S

team

flo

w a

t T

urb

ine

inle

t u

nd

er M

CR

co

nd

itio

n (

ton

s/h

r)2

823.

8182

3.81

Mai

n S

team

flo

w a

t T

urb

ine

inle

t u

nd

er V

WO

co

nd

itio

n (

ton

s/h

r)2

865

865

Un

it G

ross

ele

ctri

cal o

utp

ut

un

der

MC

R/R

ated

co

nd

itio

n (

MW

)227

027

0

Un

it G

ross

Ele

ctri

cal o

utp

ut

un

der

VW

O c

on

dit

ion

(M

W)2

283.

528

3.5

Gu

ran

teed

Des

ign

Gro

ss T

urb

ine

Cyc

le H

eat

Rat

e (k

Cal

/kW

h)3

1943

1943

Co

nd

itio

ns

on

wh

ich

des

ign

tu

rbin

e cy

cle

hea

t ra

te g

uar

ante

ed

CW

Tem

pera

ture

33o

CC

W T

empe

ratu

re 3

3oC

% M

CR

100

100

% M

akeu

p W

ater

Con

sum

ptio

n

Des

ign

Cap

acity

of

Mak

eup

Wat

er S

yste

m33

000

3300

0

Des

ign

Cap

acity

of

Inle

t Coo

ling

Sys

tem

3230

032

300

Des

ign

Coo

ling

Wat

er T

empe

ratu

re (

0C

) 33

33

Bac

k P

ress

ure

0.10

50.

105

Ste

am f

low

at s

uper

hea

ter

outle

t und

er B

MC

R c

ondi

tion

(ton

s/hr

) 86

586

5

Ste

am P

ress

ure

at s

uper

hea

ter

outle

t und

er B

MC

R c

ondi

tion

) (k

g/C

m2)

156

156

Ste

am T

empe

ratu

re a

t sup

er h

eate

r ou

tlet u

nder

BM

CR

con

ditio

n (0

C)

540±

5 oC

540±

5 oC

Ste

am T

empe

ratu

re a

t Reh

eate

r ou

tlet a

t BM

CR

con

ditio

n (0

C)

540±

5 oC

540±

5 oC

Des

ign/

Gua

rant

eed

Boi

ler

Eff

icie

ncy

(%)4

87.4

887

.48

Des

ign

Fue

l with

and

with

out B

lend

ing

of d

omes

tic/im

port

ed C

oal

142.

40 T

onne

/ hr

142.

40 T

onne

/ hr

Fo

rm G

4

Pla

nt

Ch

arac

teri

stic

s (T

her

mal

)

65

Page 67: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

4

Pla

nt

Ch

arac

teri

stic

s (T

her

mal

)T

ype

of

Co

olin

g T

ow

erID

CT

IDC

T

Typ

e o

f C

oo

ling

Sys

tem

5C

lose

d C

ircui

t Coo

ling

Clo

sed

Circ

uit C

oolin

g

Typ

e o

f B

oile

r F

eed

Pu

mp

6 M

otor

Driv

enM

otor

Dri

ven

Fu

el D

etai

ls

Pri

mar

y F

uel

Coa

lC

oal

Sec

onda

ry F

uel

LDO

/ HF

OLD

O/ H

FO

Alte

rnat

e F

uels

S

pec

ial F

eatu

res/

Sit

e S

pec

ific

Fea

ture

s8

Sp

ecia

l Tec

hn

olo

gic

al F

eatu

res

9

En

viro

nm

enta

l Reg

ula

tio

n r

elat

ed f

eatu

res

10

An

y o

ther

sp

ecia

l fea

ture

s

1. A

t Tur

bine

MC

R c

ondi

tion

2. W

ith 0

% (

Nil)

mak

e up

and

des

ign

Coo

ling

Wat

er T

empe

ratu

re

Not

e 3

: The

Ter

ms

- M

CR

, BM

CR

, HH

V, P

erfo

rman

ce c

oal,

are

as d

efin

ed in

CE

A T

echn

ical

Sta

ndar

ds f

or C

onst

ruct

ion

of E

lect

ric

Pla

nts

and

Ele

ctri

c Li

nes

Reg

ulat

ions

-

2010

not

ified

by

the

Cen

tral

Ele

ctric

ity A

utho

rity

.

7. C

oal o

r na

tura

l gas

or

Nap

tha

or li

gnite

etc

.

8. A

ny s

ite s

peci

fic f

eatu

re s

uch

as M

erry

- G

o- R

ound

, Vic

inity

to s

ea, I

ntak

e/M

akeu

p w

ater

sys

tem

etc

. Scr

ubbe

rs e

tc. S

peci

fy a

ll su

ch f

eatu

res

9. A

ny s

peci

al T

echn

olog

ical

fea

ture

like

Adv

ance

d C

lass

FA

Tec

hnol

ogy

in G

as T

urbi

nes

etc.

10

. Env

ironm

enta

l Reg

ulat

ion

rela

ted

feat

ures

like

FG

D, E

SP

etc

.,

Not

e 1

: In

case

of

devi

atio

n fr

om s

peci

fied

cond

ition

s in

Reg

ulat

ion,

cor

rect

ion

curv

e of

man

ufac

ture

r m

ay a

lso

be s

ubm

itted

. N

ote

2 : H

eat B

alan

ce D

iagr

am h

as to

be

subm

itted

alo

ng w

ith a

bove

info

rmat

ion

in c

ase

of n

ew s

tatio

ns.

6. M

otor

dri

ven,

Ste

am tu

rbin

e dr

iven

etc

.

3. A

t TM

CR

out

put b

ased

on

gros

s ge

nera

tion,

0%

(N

il) m

akeu

p an

d de

sign

Coo

ling

wat

er te

mpe

ratu

re.

4. W

ith P

erfo

rman

ce c

oal b

ased

on

Hig

her

Hea

ting

Val

ue (

HH

V)

of f

uel a

nd a

t BM

CR

) ou

tput

.

5. C

lose

d ci

rcui

t coo

ling,

onc

e th

roug

h co

olin

g, s

ea c

oolin

g, n

atur

al d

raft

coo

ling,

indu

ced

draf

t coo

ling

etc.

66

Page 68: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

5

Nam

e o

f th

e P

etit

ion

er

:G

VK

PO

WE

R (

GO

IND

WA

L S

AH

IB)

LTD

Nam

e o

f th

e G

ener

atin

g S

tati

on

:G

VK

PO

WE

R (

GO

IND

WA

L S

AH

IB)

LTD

Gen

erat

ing

Co

mp

any

:G

VK

PO

WE

R (

GO

IND

WA

L S

AH

IB)

LT

D

Th

erm

al G

ener

atin

g S

tati

on

Mo

nth

Des

ign

En

erg

y*

(MU

)D

esig

ned

Pea

kin

g

Cap

abili

ty (

MW

)*

Apr

ilI II III

May

I II III

June

I II III

July

I II III

Aug

ust

I II IIIN

ot

Ap

plic

able

Sep

tem

ber

I II III

Oct

ober

I II III

Nov

embe

rI II III

Dec

embe

rI II III

Janu

ary

I II III

Feb

ruar

y I II III

Mar

chI II III

Tot

al

*As

per

DP

R/T

EC

of C

EA

dat

ed...

......

......

......

..

No

te:

Spe

cify

the

num

ber

of P

eaki

ng H

orus

for

whi

ch s

tatio

n ha

s be

en d

esig

ned.

Des

ign

En

erg

y an

d P

eaki

ng

Cap

abili

ty (

Mo

nth

wis

e) -

RO

R w

ith

Po

nd

age/

Sto

rag

e T

ype

New

Sta

tio

ns

Nam

e o

f H

yd

ro-E

lect

ric

Gen

erat

ing

Sta

tio

n

:

Inst

alle

d C

apac

ity

: N

um

ber

of

Un

its

x M

W ;

2 x

270

67

Page 69: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Nam

e o

f th

e P

etit

ion

er:

GV

K P

OW

ER

(G

OIN

DW

AL

SA

HIB

) LT

D

Nam

e o

f th

e G

ener

atin

g S

tati

on

GV

K P

OW

ER

(G

OIN

DW

AL

SA

HIB

) LT

D

Par

ticu

lars

Un

it

2018

-19

2019

-20

Rat

e of

Ret

urn

on E

quity

%

15.5

15.5

Tar

get A

vaila

bilit

y%

8585

Aux

iliar

y E

nerg

y C

onsu

mpt

ion

%9

9

Gro

ss S

tatio

n H

eat R

ate

kCal

/kW

h23

2123

21

Spe

cific

Fue

l Oil

Con

sum

ptio

n m

l/kW

h0.

50.

5

Cos

t of

Coa

l for

WC

in

Mon

th2

2

Cos

t of

Mai

n S

econ

dary

Fue

l Oil

for

WC

1in

Mon

th2

2

Fue

l Cos

t for

WC

2in

Mon

th

Liqu

id F

uel S

tock

for

WC

2 in

Mon

th

O&

M E

xpen

ses

for

WC

in

Mon

th1

1

Mai

nten

ance

Spa

res

for

WC

%

of

O&

M15

%15

%

Rec

eiva

bles

for

WC

in

Mon

th2

2

Sto

rage

Cap

acity

of

Pri

mar

y F

uel

MT

3,80

,000

3,80

,000

Ble

ndin

g ra

tio o

f do

mes

tic c

oal/i

mpo

rted

coa

l

No

te :

1. F

or C

oal b

ased

gen

erat

ing

stat

ions

.

Fo

rm G

6

No

rmat

ive

Par

amet

ers

Co

nsi

der

ed f

or

Tar

iff

Co

mp

uta

tio

ns

(T

her

mal

)

Yea

r E

nd

ing

Mar

ch -

17

2. F

or G

as T

urbi

ne/C

ombi

ned

Cyc

le g

ener

atin

g S

tatio

ns d

uly

taki

ng in

to a

ccou

nt th

e m

ode

of o

pera

tion

on g

as f

uel a

nd li

quid

fue

l.

68

Page 70: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

7

Year

201

7-18

S.N

o.

Pla

nt/

Un

itP

erio

dD

ays

Typ

e o

f M

ain

ten

ance

1G

VK

Pow

er (

Goi

ndw

al S

ahib

)

Uni

t-I

15.0

9.20

17 to

28.

09.2

017

14BF

P O

verh

aul

Uni

t-II

14.0

8.20

17 to

23.

08.2

017

10TG

Bea

ring

1,2,

3,4

& 7

insp

ectio

n

Year

201

8-19

S.N

o.

Pla

nt/

Un

itP

erio

dD

ays

Typ

e o

f M

ain

ten

ance

1G

VK

Pow

er (

Goi

ndw

al S

ahib

)

Uni

t-I

Nil

Nil

Uni

t-II

28.0

6.20

18 to

10.

07.2

018

13TE

End

oil

catc

her a

nd s

eal b

ody

insp

ectio

n w

ork

Mai

nte

nan

ce S

ched

ule

of

Th

erm

al P

ow

er S

tati

on

s(F

or

Pre

vio

us

Yea

r, C

urr

ent

Yea

r an

d a

ll Y

ears

of

Co

ntr

ol Y

ears

)

69

Page 71: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

8

Ind

igen

ou

sIm

po

rted

PA

NA

M

Oth

er

(sp

ecif

y)In

dig

eno

us

Imp

ort

edP

AN

AM

O

ther

(sp

ecif

y)In

dig

eno

us

Imp

ort

edP

AN

AM

O

ther

(sp

ecif

y)

12

34

56

78

910

1112

1314

1516

1718

1920

2122

2324

2526

2728

2930

3132

33

Yea

r: 2

018-

19 (

Act

ua

l):

GV

K P

ow

er

(Go

ind

wa

l Sa

hib

)54

0

51.6

7%2,

436

9.56

%22

03.0

066

.22%

2314

.87

3,39

6

0.68

16

,60,

491

0

00

2.43

%0

00

41,3

55

00

017

,01,

846

1,

596

0.

655

1039

665

621,

116.

83

45

658

7.28

5

1,

124.

11

5.10

Yea

r: 2

019-

20 (

Est

ima

ted

):

GV

K P

ow

er

(Go

ind

wa

l Sa

hib

)54

0

27.7

3%1,

311.

52

9.

26%

1190

.08

99.3

1%23

10.1

3,35

8

0.69

9,

02,2

64

0

00

1.63

%0

00

14,9

51

00

09,

17,2

14

1,

173

0.

894

9019

5871

538.

52

4494

95.

270

543.

79

4.

57

No

te:

0

#RE

F!

2. U

tilit

y to

pro

vid

e th

e a

bo

ve d

eta

ils f

or

the

pre

vio

us

yea

r, c

urr

ent

yea

r a

nd

en

tire

co

ntr

ol p

erio

d.

H

ow

ever

, th

e G

ener

ati

on

an

d A

valia

bili

ty F

act

or

det

ails

are

to

be

pro

vid

ed f

or

(n-3

), (

n-2

) a

nd

(n

-1)

yea

rs a

lso

.3.

Wh

ere

pa

ram

eter

s fo

r d

iffe

ren

t u

nit

s o

f a

pla

nt

are

dif

fere

nt,

th

e a

bo

ve in

form

ati

on

sh

all

be

sub

mit

ted

un

it w

ise.

4.

Fo

r a

ll th

e n

ew p

lan

ts c

om

mis

sio

ned

on

or

aft

er e

ffec

tive

da

te, t

he

ab

ove

info

rma

tio

n s

ha

ll b

e p

rovi

ded

un

it w

ise.

5.

Th

e p

ara

met

ers

reg

ard

ing

co

al a

re t

o b

e se

pa

rate

ly p

rovi

ded

fo

r in

dig

neo

us

coa

l, im

po

rted

co

al,

wa

shed

co

al e

tc.

Tra

nsi

t L

oss

of

Co

al (

wh

ere

ever

ap

plic

ab

le)

(%)

Wei

gh

ted

A

vera

ge

Oil

Co

st

(₹/k

l)

Net

G

ener

ati

on

(M

U)

To

tal C

oa

l Co

st (

₹ cr

ore

)

1. C

oa

l co

st a

s fu

rnis

hed

in t

his

Fo

rm-G

8 is

on

th

e b

asi

s o

f p

rocu

rem

ent

du

rin

g t

he

yea

r, w

her

eas

in t

he

Pro

fit

an

d L

oss

Sta

tem

ent

of

the

An

nu

al

Acc

ou

nts

, co

st o

f co

al c

on

sum

ed is

pro

vid

ed t

aki

ng

into

acc

ou

nt

the

inve

nto

ry a

s w

ell.

Wei

gh

ted

A

vera

ge

Ca

lori

fic

valu

e o

f o

il (k

Ca

l/lit

re)

Tra

nsi

t L

oss

of

Co

al (

wh

ere

ever

ap

plic

ab

le)

(MT

)

To

tal Q

ua

nti

ty o

f C

oa

l ( M

T)

Qu

an

tity

of

Oil

(KL

)S

tati

on

H

eat

Ra

te

(kca

l/kW

h)

Wei

gh

ted

A

vera

ge

GC

V o

f re

ceiv

ed

Co

al

(kca

l/kg

)

Sp

ecif

ic

Co

nsu

mp

tio

n o

f C

oa

l (kg

/kW

h)

Ava

ilab

ility

F

act

or

(%)

To

tal O

il C

ost

(₹

cro

re)

Qu

an

tity

of

Co

al R

ecei

ved

(M

T)

Wei

gh

ted

A

vera

ge

Co

al C

ost

(₹

/MT

)

Sp

ecif

ic O

il C

on

sum

pti

on

(m

l/kW

h)

Gen

erat

ion

Det

ails

: F

uel

an

d V

aria

ble

Co

st

S.

No

So

urc

eP

lan

t C

ap

aci

ty

(MW

)

Pla

nt

Lo

ad

F

act

or

(%)

En

erg

y D

eta

ilsF

uel

Det

ails

Va

ria

ble

Ch

arg

es (

refe

r N

ote

bel

ow

)

Gro

ss

Gen

era

tio

n

(MU

)

Au

xilia

ry

Co

nsu

mp

tio

n (

%)

To

tal F

uel

C

ost

(₹

cro

re)

To

tal F

uel

/ V

ari

ab

le

Co

st

(pa

ise/

kWh

)

70

Page 72: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

9

(Rs.

Cro

re)

Act

ual

3rd

Yea

r 20

18-1

920

19-2

01

Pla

nt a

nd M

achi

nery

1.48

2.52

- B

oile

r

- T

urbi

ne

- G

ener

ator

- O

ther

s (s

peci

fy)

1.06

1.44

2B

uild

ings

0.30

0.21

3C

ivil

Wor

ks4

Hyd

raul

ic W

orks

5Li

nes,

Cab

le N

etw

orks

etc

.6

Veh

icle

s0.

01

7F

urni

ture

and

Fix

ture

s0.

008

Off

ice

Equ

ipm

ents

0.12

9S

tatio

n S

uppl

ies

10A

ny o

ther

item

(sp

ecify

)

Con

trac

t lab

our

13.6

1

15.1

1C

onsu

mab

les,

Sto

res

and

Spa

res

9.42

14.2

9

11T

otal

R&

M E

xpen

ses

(1

to 1

0)25

.86

33.7

1

12R

&M

Exp

ense

s C

apita

lized

13N

et R

&M

Exp

ense

s (1

1-12

)25

.86

33

.71

No

te :

1. T

he a

bove

info

rmat

ion

is to

be

prov

ided

Gen

erat

ing

Sta

tion-

wis

e an

d in

con

solid

ated

for

m in

cas

e of

Gen

erat

ion

Bus

ines

s,

whe

ther

car

ried

out b

y D

istr

ibut

ion

Lice

nsee

or

by a

ny

Rep

air

& M

ain

ten

ance

Exp

end

itu

re

S. N

oP

arti

cula

rs

71

Page 73: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

10

(Rs.

Cro

re)

Act

ual

(Ref

er N

ote

b

elo

w)

Pro

ject

ion

s

2018

-10

2019

-20

AF

or

Co

al B

ased

Gen

erat

ing

Sta

tio

ns

1C

ost o

f F

uel f

or 2

mon

ths

corr

espo

ndin

g to

Nor

mat

ive

Ann

ual P

lant

Ava

ilabi

lity

Fac

tor.

3

01.4

2

2

72.9

3 2

O&

M e

xpen

ses

for

1 m

onth

5.47

7.

97

3R

ecei

vabl

es e

quiv

alen

t to

2 m

onth

s of

fix

ed &

var

iabl

e ch

arge

s fo

r sa

le o

f el

ectr

icity

cal

cula

ted

on th

e no

rmat

ive

annu

al p

lant

ava

ilabi

lity

fact

or

4

12.1

2

3

83.6

2

4M

aint

enan

ce S

pare

s (@

15%

of

O&

M E

xpen

ses)

9.84

14.

35

To

tal

728

.85

678

.87

BO

pen

-Cyc

le G

as T

urb

ine/

Co

mb

ined

Cyc

le G

ener

atin

g S

tati

on

s1

Cos

t of

Fue

l for

1 m

onth

cor

resp

ondi

ng to

Nor

mat

ive

Ann

ual P

lant

Ava

ilabl

ity F

acto

r2

Cos

t of

Liqu

id F

uel f

or 1

/2 m

onth

cor

resp

ondi

ng to

Nor

mat

ive

Ann

ual P

lant

Ava

ilabl

ity F

acto

r

3R

ecei

vabl

es e

quiv

alen

t to

2 m

onth

s of

fix

ed &

var

iabl

e ch

arge

s co

rres

pond

ing

to N

orm

ativ

e A

nnua

l P

lant

Ava

ilabi

lity

Fac

tor

4O

&M

Exp

ense

s fo

r 1

mon

th5

Mai

nten

ance

Spa

res

(@30

% o

f O

&M

Exp

ense

s)T

ota

lC

Hyd

ro B

ased

Gen

erat

ing

Sta

tio

ns

1O

&M

exp

ense

s 1

mon

th2

Rec

eiva

bles

equ

ival

ent t

o 2

mon

ths

of f

ixed

cos

t3

Mai

nten

ance

Spa

res

(@15

% o

f O

&M

Exp

ense

s)T

ota

l

7

28.8

5

6

78.8

7

DW

ork

ing

Cap

ital

12.2

5%12

.25%

FIn

tere

st o

n W

ork

ing

Cap

ital

*89

.28

83.1

6

*Th

e In

tere

st r

ate

for

this

pu

rpo

se s

hal

l be

the

rate

as

spec

ifie

d in

Reg

ula

tio

n 3

4.2.

No

te :

1. T

he a

bove

info

rmat

ion

is to

be

prov

ided

Gen

erat

ing

Sta

tion-

wis

e an

d in

con

solid

ated

for

m in

cas

e of

Gen

erat

ion

Bus

ines

s, w

heth

er c

arri

ed

out b

y D

istr

ibut

ion

Lice

nsee

or

by a

ny G

ener

atin

g C

ompa

ny o

r by

BB

MB

.

Wo

rkin

g C

apit

al R

equ

irem

ents

S. N

o.

Par

ticu

lars

Inte

rest

on

Wor

king

Cap

ital i

s co

mpu

ted

on n

orm

ativ

e ba

sis

as p

er th

e T

ariff

Reg

ulat

ions

.

72

Page 74: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Ap

pen

dix

-I F

orm

G10

Sl.

No

.P

arti

cula

rsU

nit

2018

-19

2019

-20

1G

ross

Gen

erat

ion

at N

orm

ativ

e P

AF

MU

4021

4021

2G

ross

Sta

tion

Hea

t Rat

e (n

orm

ativ

e)kC

al/k

Wh

2321

2321

3S

peci

fic F

uel O

il C

onsu

mpt

ion

(nor

mat

ive)

ml/k

Wh

0.5

0.5

4W

eigh

ted

Ave

rage

Cal

orifi

c V

alue

of

Oil

Kca

l/lit

1039

690

195

Hea

t Con

trib

utio

n fr

om O

ilkC

al/k

Wh

5.20

56

Hea

t Con

trib

utio

n fr

om C

oal

kCal

/kW

h23

1623

167

Wei

ghte

d A

vera

ge G

CV

of

Coa

lkC

al/k

g33

9633

588

Wei

ghte

d A

vera

ge C

oal C

ost

Rs/

MT

6562

5871

9W

eigh

ted

Ave

rage

Oil

Cos

tR

s/K

L45

658

4494

9

10C

oal c

ost c

orre

spon

ding

to g

ross

gen

erat

ion

at

Nor

mat

ive

PA

FR

s C

rore

1799

1629

11O

il co

st c

orre

spon

ding

to g

ross

gen

erat

ion

at

Nor

mat

ive

PA

FR

s C

rore

99

Co

mp

uta

tio

n o

f co

st o

f co

al a

nd

oil

on

No

rmat

ive

bas

is f

or

gen

erat

ion

co

rres

po

nd

ing

to

th

e n

orm

ativ

e an

nu

al p

lan

t av

aila

bili

ty f

acto

r

73

Page 75: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

11

Act

ual

Est

imat

ed 2

018-

19

201

9-20

1Q

uant

ity o

f C

oal s

uppl

ied

by th

e C

oal

Com

pany

MT

17,0

1,84

6

11,6

9,83

7

2A

djus

tmen

ts (

+/-

), if

any

, in

quan

tity

supp

lied

by th

e C

oal C

ompa

nyM

T-

-

3C

oal s

uppl

ied

by th

e C

oal C

ompa

ny (

1+2)

MT

17,0

1,84

6

11,6

9,83

7

4N

orm

ativ

e T

rans

it &

Han

dlin

g Lo

sses

, whe

re

ever

app

licab

le (

For

Coa

l bas

ed P

roje

cts)

MT

41,3

55

19,0

30

5N

et C

oal S

uppl

ied

(3-4

)M

T16

,60,

491

11

,50,

807

6

Am

ount

cha

rged

by

the

Coa

l C

ompa

nyR

s.3,

81,1

6,68

,923

2,31

,96,

88,4

05

7A

djus

tmen

t (+

/-)

in a

mou

nt c

harg

ed m

ade

by

Coa

l Com

pany

Rs.

-

-

8T

otal

am

ount

cha

rged

(6+

7)R

s.3,

81,1

6,68

,923

2,31

,96,

88,4

05

9

Tra

nspo

rtat

ion

char

ges

(rai

l / s

hip

/ roa

d)R

s.7,

35,6

6,27

,682

4,54

,87,

58,3

15

10A

djus

tmen

ts(+

/-)

in a

mou

nt c

harg

ed b

y T

rans

port

Com

pany

Rs.

-

-

11D

emm

urag

e ch

arge

s, if

any

Rs.

-

-

12C

ost o

f di

esel

in tr

ansp

ortin

g co

al th

roug

h M

GR

sys

tem

, if

appl

icab

leR

s.-

-

13T

otal

Tra

nspo

rtat

ion

char

ges

(9+

10+

11+

12)

Rs.

7,35

,66,

27,6

82

4,

54,8

7,58

,315

14T

otal

am

ount

(in

clud

ing

tran

spor

tatio

n) (

8+13

)R

s.11

,16,

82,9

6,60

4

6,

86,8

4,46

,720

15Lo

cal A

rea

Dev

elop

men

t Tax

Rs.

16U

nloa

ding

Cha

rges

Rs.

17D

uty,

if a

nyR

s.18

Tot

al f

uel c

harg

es (

14+

15+

16+

17)

Rs.

11,1

6,82

,96,

604

6,86

,84,

46,7

20

19

Wei

ghte

d av

erag

e ra

te (

18/1

)R

s./M

T6,

562

5,

871

20

Wei

ghte

d av

erag

e G

CV

of

coal

Kca

l/kg

3,39

6

3,35

8

*Sim

ilar

Det

ails

sh

all b

e su

bm

itte

d f

or

oth

er f

uel

s

S. N

o.

Par

ticu

lars

Un

it

Det

aile

d In

form

atio

n R

egar

din

g F

uel

Fo

r C

om

pu

tati

on

Of

En

erg

y C

har

ges

74

Page 76: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

12

Sl.

No

.D

esc

rip

tio

n o

f in

vest

me

nt

Bal

ance

at

the

beg

inn

ing

of

the

yea

rF

urt

her

Inve

stm

ents

d

uri

ng

th

e ye

ar

Inve

stm

ents

rea

lise

d

du

rin

g t

he

yea

rB

alan

ce a

t th

e e

nd

o

f th

e ye

ar

Rem

arks

1

2

N

ot A

ppl

icab

le

3

To

tal

Sl.

No

.D

esc

rip

tio

n o

f in

vest

me

nt

Bal

ance

at

the

beg

inn

ing

of

the

yea

rF

urt

her

Inve

stm

ents

d

uri

ng

th

e ye

ar

Inve

stm

ents

rea

lise

d

du

rin

g t

he

yea

rB

alan

ce a

t th

e e

nd

o

f th

e ye

ar

Rem

arks

1

F

DR

with

Axi

s B

ank

Ltd

- M

arg

in M

oney

-

-

-

2

F

DR

with

HD

FC

Ban

k (P

unja

b S

ales

Tax

) 0.

02

(0.0

0)

0.

019

3

In

vest

men

ts in

Mut

ual

Fun

d -

IDB

I Ultr

a S

hor

t Te

rm F

und

-

-

-

To

tal

0.0

2

(0

.00

)

0.02

Sl.

No

.D

esc

rip

tio

n o

f in

vest

me

nt

Bal

ance

at

the

beg

inn

ing

of

the

yea

rF

urt

her

Inve

stm

ents

d

uri

ng

th

e ye

ar

Inve

stm

ents

rea

lise

d

du

rin

g t

he

yea

rB

alan

ce a

t th

e e

nd

o

f th

e ye

ar

Rem

arks

1

2

N

ot A

ppl

icab

le3

To

tal

Sl.

No

.D

esc

rip

tio

n o

f in

vest

me

nt

Bal

ance

at

the

beg

inn

ing

of

the

yea

rF

urt

her

Inve

stm

ents

d

uri

ng

th

e ye

ar

Inve

stm

ents

rea

lise

d

du

rin

g t

he

yea

rB

alan

ce a

t th

e e

nd

o

f th

e ye

ar

Rem

arks

1

F

DR

with

Axi

s B

ank

Ltd

- M

arg

in M

oney

-

-

-

2

F

DR

with

HD

FC

Ban

k (P

unja

b S

ales

Tax

) 0.

02

(0.0

0)

0.

02

3

Inve

stm

ents

in M

utu

al F

und

- ID

BI U

ltra

Sh

ort T

erm

Fun

d

-

-

-

T

ota

l0.

02

(0.0

0)

0.

02

FY

20

17-1

8 -

Pro

jec

tio

n

FY

20

18-1

9 -

Pro

jec

tio

n

Inve

stm

ents

Det

ails

CO

NT

RO

L P

ER

IOD

(Rs

in c

rore

)

FY

20

17-1

8 -

Act

ual

(Rs

in c

rore

)

FY

20

18-1

9 -

Act

ual

75

Page 77: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

13

Rs.

Cro

re

Act

ual

Pro

ject

ion

2018

-19

2019

-20

AIn

com

e fr

om

Inve

stm

ent

1In

tere

st o

n fix

ed d

epos

its0.

22

2.

57

2In

tere

st f

rom

Ban

ks o

ther

than

Fix

ed D

epos

its-

3In

tere

st In

com

e fr

om o

ther

Inve

stm

ents

-

Su

b-T

ota

l0.

22

2.

57

BO

ther

No

n T

arif

f In

com

e

1In

tere

st o

n lo

ans

and

Adv

ance

s to

sta

ff-

-

2G

ain

(Los

s) o

n S

ale

of F

ixed

Ass

ets

-

-

3In

com

e/F

ee/C

olle

ctio

n ag

ains

t sta

ff w

elfa

re a

ctiv

ities

-

-

4R

even

ue f

rom

sur

char

ges

for

late

pay

men

t-

19

.01

5N

et r

ecov

ery

from

pen

alty

on

coal

liai

son

agen

ts-

-

6In

com

e-E

xces

s P

rovi

sion

Wri

tten

Bac

k-

7S

ale

of f

ly a

sh-

8S

ale

of s

crap

0.04

0.05

Su

b-T

ota

l0.

04

19

.01

To

tal

0.27

21.5

9

S. N

oP

arti

cula

rs

In

com

e fr

om

Inv

estm

ents

an

d o

ther

No

n-T

arif

f In

com

e

76

Page 78: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

14

Act

ual

2018

-19

2019

-20

1F

ixed

Cha

rges

Rs

in c

rore

681

.30

664

.16

2E

nerg

y C

harg

espa

ise/

kWh

5.10

4.

57

Not

e: T

his

is to

be

prov

ided

for

eac

h po

wer

pla

nt o

f th

e ge

nera

ting

com

pany

.

Exi

stin

g a

nd

Pro

po

sed

Tar

iff

Sc

hed

ule

S. N

oP

arti

cula

rsU

nit

Pre

vio

us

77

Page 79: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

15

Allo

cate

d

Cap

acit

y

An

nu

al

Fix

ed

Ch

arg

es

Rat

e o

f E

ner

gy

Ch

arg

esE

ner

gy

So

ldF

ixed

C

har

ges

En

erg

y C

har

ges

Ince

nti

ve/

Dis

-in

cen

tive

Fu

el

Co

st

Ad

just

men

t A

mo

un

t

To

tal C

har

ges

MW

(₹ c

rore

)p

aise

/un

itM

UR

s in

cro

reR

s in

cro

reR

s in

cr

ore

Rs

in

cro

reR

s in

cro

re

1D

isco

m

540.

00

681.

30

5.1

0

2,2

03.

00

68

1.30

1,

124

.11

-

-

1

,80

5.42

T

ota

l

Allo

cate

d

Cap

acit

y

An

nu

al

Fix

ed

Ch

arg

es

Rat

e o

f E

ner

gy

Ch

arg

esE

ner

gy

So

ldF

ixed

C

har

ges

En

erg

y C

har

ges

Ince

nti

ve/

Dis

-in

cen

tive

Fu

el

Co

st

Ad

just

men

t A

mo

un

t

To

tal C

har

ges

MW

(₹ c

rore

)p

aise

/un

itM

UR

s in

cro

reR

s in

cro

reR

s in

cr

ore

Rs

in

cro

reR

s in

cro

re

1D

isco

m

540.

00

664.

16

4.5

7

1,1

90.

08

66

4.16

543.

79

-

1

,20

7.95

T

ota

l

Rev

enu

e fr

om

Sal

e o

f P

ow

er (

at e

xist

ing

tar

iffs

)

Co

nsu

mer

201

9-20

S. N

o

S. N

oC

on

sum

er

201

8-19

- A

ctu

al

78

Page 80: BEFORE THE HON’BLE PUNJAB STATE ELECTRICITY …

Fo

rm G

16

Allo

cate

d

Cap

acit

y

An

nu

al

Fix

ed

Ch

arg

es

Rat

e o

f E

ner

gy

Ch

arg

es

En

erg

y S

old

Fix

ed

Ch

arg

esE

ner

gy

Ch

arg

esT

ota

l C

har

ges

MW

Rs

in

cro

rep

aise

/un

itM

UR

s in

cr

ore

Rs

in

cro

reR

s in

cr

ore

12

1718

1920

2122

23

1D

isco

m54

066

4

4.5

7 11

90

664

54

412

08

To

tal

540

664

4.57

1190

664

544

1208

Allo

cate

d

Cap

acit

y

An

nu

al

Fix

ed

Ch

arg

es

Rat

e o

f E

ner

gy

Ch

arg

es

En

erg

y S

old

Fix

ed

Ch

arg

esE

ner

gy

Ch

arg

esT

ota

l C

har

ges

MW

Rs

in

cro

rep

aise

/un

itM

UR

s in

cr

ore

Rs

in

cro

reR

s in

cr

ore

12

1011

1213

1415

16

1D

isco

m54

0

681

.30

5

.10

2,2

03.0

0

681

.30

1,1

24.1

1 1

,805

.42

To

tal

540

6

81.3

0

5.1

0 2

,203

.00

6

81.3

0 1

,124

.11

1,8

05.4

2

S. N

oC

on

sum

er

2018

-19

- A

ctu

al

Rev

enu

e fr

om

Sal

e o

f P

ow

er (

at P

rop

ose

d T

arif

fs)

S. N

oC

on

sum

er

2019

-20

- E

stim

ated

79