BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M2)
1 0 + 000.00 8.00 50.00 8.000 400.00
2 0 + 050.00 8.00 50.00 8.000 400.00
3 0 + 100.00 8.00 50.00 8.000 400.00
4 0 + 150.00 8.00 50.00 8.000 400.00
5 0 + 200.00 8.00 50.00 8.000 400.00
6 0 + 250.00 8.00 50.00 8.000 400.00
7 0 + 300.00 8.00 50.00 8.000 400.00
8 0 + 350.00 8.00 50.00 8.000 400.00
9 0 + 400.00 8.00 50.00 8.000 400.00
10 0 + 450.00 8.00 50.00 8.000 400.00
11 0 + 500.00 8.00 50.00 8.000 400.00
12 0 + 550.00 8.00 50.00 8.000 400.00
13 0 + 600.00 8.00 50.00 8.000 400.00
14 0 + 650.00 8.00 50.00 8.000 400.00
15 0 + 700.00 8.00 50.00 8.000 400.00
16 0 + 750.00 8.00 50.00 8.000 400.00
17 0 + 800.00 8.00 50.00 8.000 400.00
18 0 + 850.00 8.00 50.00 8.000 400.00
19 0 + 900.00 8.00 50.00 8.000 400.00
20 0 + 950.00 8.00 50.00 8.000 400.00
21 1 + 000.00 8.00 50.00 8.000 400.00
22 1 + 050.00 8.00 50.00 8.000 400.00
23 1 + 100.00 8.00 50.00 8.000 400.00
24 1 + 150.00 8.00 50.00 8.000 400.00
25 1 + 200.00 8.00 50.00 8.000 400.00
26 1 + 250.00 8.00 50.00 8.000 400.00
27 1 + 300.00 8.00 50.00 8.000 400.00
28 1 + 350.00 8.00 50.00 8.000 400.00
29 1 + 400.00 8.00 50.00 8.000 400.00
30 1 + 450.00 8.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M2)
50.00 8.000 400.00 31 1 + 500.00 8.000
50.00 8.000 400.00 32 1 + 550.00 8.000
50.00 8.000 400.00 33 1 + 600.00 8.000
50.00 8.000 400.00 34 1 + 650.00 8.000
50.00 8.000 400.00 35 1 + 700.00 8.000
50.00 8.000 400.00 36 1 + 750.00 8.000
50.00 8.000 400.00 37 1 + 800.00 8.000
50.00 8.000 400.00 38 1 + 850.00 8.000
50.00 8.000 400.00 39 1 + 900.00 8.000
50.00 8.000 400.00 40 1 + 950.00 8.000
50.00 8.000 400.00 41 2 + 000.00 8.000
50.00 8.000 400.00 42 2 + 050.00 8.000
50.00 8.000 400.00 43 2 + 100.00 8.000
50.00 8.000 400.00 44 2 + 150.00 8.000
50.00 8.000 400.00 45 2 + 200.00 8.000
50.00 8.000 400.00 46 2 + 250.00 8.000
50.00 8.000 400.00 47 2 + 300.00 8.000
50.00 8.000 400.00 48 2 + 350.00 8.000
50.00 8.000 400.00 49 2 + 400.00 8.000
50.00 8.000 400.00 50 2 + 450.00 8.000
50.00 8.000 400.00 51 2 + 500.00 8.000
50.00 8.000 400.00 52 2 + 550.00 8.000
50.00 8.000 400.00 53 2 + 600.00 8.000
50.00 8.000 400.00 54 2 + 650.00 8.000
50.00 8.000 400.00 55 2 + 700.00 8.000
50.00 8.000 400.00 56 2 + 750.00 8.000
50.00 8.000 400.00 57 2 + 800.00 8.000
50.00 8.000 400.00 58 2 + 850.00 8.000
50.00 8.000 400.00 59 2 + 900.00 8.000
50.00 8.000 400.00 60 2 + 950.00 8.000
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M2)
50.00 8.000 400.00 61 3 + 000.00 8.000
50.00 8.000 400.00 62 3 + 050.00 8.000
50.00 8.000 400.00 63 3 + 100.00 8.000
50.00 8.000 400.00 64 3 + 150.00 8.000
50.00 8.000 400.00 65 3 + 200.00 8.000
50.00 8.000 400.00 66 3 + 250.00 8.000
50.00 8.000 400.00 67 3 + 300.00 8.000
50.00 8.000 400.00 68 3 + 350.00 8.000
50.00 8.000 400.00 69 3 + 400.00 8.000
50.00 8.000 400.00 70 3 + 450.00 8.000
50.00 8.000 400.00 71 3 + 500.00 8.000
50.00 8.000 400.00 72 3 + 550.00 8.000
50.00 8.000 400.00 73 3 + 600.00 8.000
50.00 8.000 400.00 74 3 + 650.00 8.000
50.00 8.000 400.00 75 3 + 700.00 8.000
50.00 8.000 400.00 76 3 + 750.00 8.000
50.00 8.000 400.00 77 3 + 800.00 8.000
50.00 8.000 400.00 78 3 + 850.00 8.000
50.00 8.000 400.00 79 3 + 900.00 8.000
50.00 8.000 400.00 80 3 + 950.00 8.000
50.00 8.000 400.00 81 4 + 000.00 8.000
50.00 8.000 400.00 82 4 + 050.00 8.000
50.00 8.000 400.00 83 4 + 100.00 8.000
50.00 8.000 400.00 84 4 + 150.00 8.000
50.00 8.000 400.00 85 4 + 200.00 8.000
50.00 8.000 400.00 86 4 + 250.00 8.000
50.00 8.000 400.00 87 4 + 300.00 8.000
50.00 8.000 400.00 88 4 + 350.00 8.000
50.00 8.000 400.00 89 4 + 400.00 8.000
50.00 8.000 400.00 90 4 + 450.00 8.000
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M2)
50.00 8.000 400.00 91 4 + 500.00 8.000
50.00 8.000 400.00 92 4 + 550.00 8.000
50.00 8.000 400.00 93 4 + 600.00 8.000
50.00 8.000 400.00 94 4 + 650.00 8.000
50.00 8.000 400.00 95 4 + 700.00 8.000
50.00 8.000 400.00 96 4 + 750.00 8.000
50.00 8.000 400.00 97 4 + 800.00 8.000
50.00 8.000 400.00 98 4 + 850.00 8.000
50.00 8.000 400.00 99 4 + 900.00 8.000
50.00 8.000 400.00 100 4 + 950.00 8.000
50.00 8.000 400.00 101 5 + 000.00 8.000
50.00 8.000 400.00 102 5 + 050.00 8.000
50.00 8.000 400.00 103 5 + 100.00 8.000
50.00 8.000 400.00 104 5 + 150.00 8.000
50.00 8.000 400.00 105 5 + 200.00 8.000
50.00 8.000 400.00 106 5 + 250.00 8.000
50.00 8.000 400.00 107 5 + 300.00 8.000
50.00 8.000 400.00 108 5 + 350.00 8.000
50.00 8.000 400.00 109 5 + 400.00 8.000
50.00 8.000 400.00 110 5 + 450.00 8.000
50.00 8.000 400.00 111 5 + 500.00 8.000
50.00 8.000 400.00 112 5 + 550.00 8.000
50.00 8.000 400.00 113 5 + 600.00 8.000
50.00 8.000 400.00 114 5 + 650.00 8.000
50.00 8.000 400.00 115 5 + 700.00 8.000
50.00 8.000 400.00 116 5 + 750.00 8.000
50.00 8.000 400.00 117 5 + 800.00 8.000
50.00 8.000 400.00 118 5 + 850.00 8.000
50.00 8.000 400.00 119 5 + 900.00 8.000
50.00 8.000 400.00 120 5 + 950.00 8.000
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M2)
50.00 8.000 400.00 121 6 + 000.00 8.000
50.00 8.000 400.00 122 6 + 050.00 8.000
50.00 8.000 400.00 123 6 + 100.00 8.000
50.00 8.000 400.00 124 6 + 150.00 8.000
50.00 8.000 400.00 125 6 + 200.00 8.000
50.00 8.000 400.00 126 6 + 250.00 8.000
50.00 8.000 400.00 127 6 + 300.00 8.000
50.00 8.000 400.00 128 6 + 350.00 8.000
50.00 8.000 400.00 129 6 + 400.00 8.000
50.00 8.000 400.00 130 6 + 450.00 8.000
50.00 8.000 400.00 131 6 + 500.00 8.000
50.00 8.000 400.00 132 6 + 550.00 8.000
50.00 8.000 400.00 133 6 + 600.00 8.000
50.00 8.000 400.00 134 6 + 650.00 8.000
50.00 8.000 400.00 135 6 + 700.00 8.000
50.00 8.000 400.00 136 6 + 750.00 8.000
50.00 8.000 400.00 137 6 + 800.00 8.000
50.00 8.000 400.00 138 6 + 850.00 8.000
50.00 8.000 400.00 139 6 + 900.00 8.000
50.00 8.000 400.00 140 6 + 950.00 8.000
50.00 8.000 400.00 141 7 + 000.00 8.000
50.00 8.000 400.00 142 7 + 050.00 8.000
50.00 8.000 400.00 143 7 + 100.00 8.000
50.00 8.000 400.00 144 7 + 150.00 8.000
50.00 8.000 400.00 145 7 + 200.00 8.000
50.00 8.000 400.00 146 7 + 250.00 8.000
50.00 8.000 400.00 147 7 + 300.00 8.000
50.00 8.000 400.00 148 7 + 350.00 8.000
50.00 8.000 400.00 149 7 + 400.00 8.000
50.00 8.000 400.00 150 7 + 450.00 8.000
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M2)
50.00 8.000 400.00 151 7 + 500.00 8.000
50.00 8.000 400.00 152 7 + 550.00 8.000
50.00 8.000 400.00 153 7 + 600.00 8.000
50.00 8.000 400.00 154 7 + 650.00 8.000
50.00 8.000 400.00 155 7 + 700.00 8.000
50.00 8.000 400.00 156 7 + 750.00 8.000
50.00 8.000 400.00 - 157 7 + 800.00 8.000
50.00 8.000 400.00 158 7 + 850.00 8.000
50.00 8.000 400.00 159 7 + 900.00 8.000
50.00 8.000 400.00 160 7 + 950.00 8.000
50.00 8.000 400.00 161 8 + 000.00 8.000
50.00 8.000 400.00 162 8 + 050.00 8.000
50.00 8.000 400.00 163 8 + 100.00 8.000
50.00 8.000 400.00 164 8 + 150.00 8.000
50.00 8.000 400.00 165 8 + 200.00 8.000
50.00 8.000 400.00 166 8 + 250.00 8.000
50.00 8.000 400.00 167 8 + 300.00 8.000
50.00 8.000 400.00 168 8 + 350.00 8.000
50.00 8.000 400.00 169 8 + 400.00 8.000
50.00 8.000 400.00 170 8 + 450.00 8.000
50.00 8.000 400.00 171 8 + 500.00 8.000
50.00 8.000 400.00 172 8 + 550.00 8.000
50.00 8.000 400.00 173 8 + 600.00 8.000
50.00 8.000 400.00 174 8 + 650.00 8.000
50.00 8.000 400.00 175 8 + 700.00 8.000
50.00 8.000 400.00 176 8 + 750.00 8.000
50.00 8.000 400.00 177 8 + 800.00 8.000
50.00 8.000 400.00 178 8 + 850.00 8.000
50.00 8.000 400.00 179 8 + 900.00 8.000
50.00 8.000 400.00 180 8 + 950.00 8.000
50.00 8.000 400.00 181 9 + 000.00 8.000
Jumlah 72,000.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
1 0 + 000.0050.00 -
2 0 + 050.00 0.500 50.00 0.500 25.00
3 0 + 100.00 0.500 19.00 0.250 4.75
4 0 + 119.00 - 9.00 - -
5 0 + 128.00 - 22.00 0.250 5.50
6 0 + 150.00 0.500 50.00 1.000 50.00
7 0 + 200.00 1.500 50.00 1.500 75.01
8 0 + 250.00 1.500 50.00 1.535 76.77
9 0 + 300.00 1.571 36.00 0.785 28.27
10 0 + 336.00 - 7.00 - -
11 0 + 343.00 - 7.00 0.947 6.63
12 0 + 350.00 1.895 2.00 0.947 1.89
13 0 + 352.00 - 12.00 - -
14 0 + 364.00 - 36.00 0.750 27.00
15 0 + 400.00 1.500 50.00 1.500 75.01
16 0 + 450.00 1.500 50.00 1.500 75.01
17 0 + 500.00 1.500 50.00 1.573 78.66
18 0 + 550.00 1.646 50.00 1.573 78.66
19 0 + 600.00 1.500 50.00 1.500 75.00
20 0 + 650.00 1.500 50.00 1.550 77.50
21 0 + 700.00 1.600 25.00 0.800 20.00
22 0 + 725.00 - 5.00 - -
23 0 + 730.00 - 20.00 0.800 16.00
24 0 + 750.00 1.600 50.00 1.550 77.50
25 0 + 800.00 1.500 50.00 1.500 75.00
26 0 + 850.00 1.500 50.00 1.500 75.01
27 0 + 900.00 1.500 50.00 1.500 75.01
28 0 + 950.00 1.500 50.00 1.500 75.01
29 1 + 000.00 1.500 50.00 1.500 75.01
30 1 + 050.00 1.500
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 1.500 75.01 31 1 + 100.00 1.500
50.00 0.750 37.50 32 1 + 150.00 -
6.00 - - 33 1 + 156.00 -
44.00 0.750 33.00 34 1 + 200.00 1.500
50.00 1.500 75.00 35 1 + 250.00 1.500
50.00 1.519 75.95 36 1 + 300.00 1.538
50.00 1.570 78.50 37 1 + 350.00 1.602
50.00 1.301 65.05 38 1 + 400.00 1.000
50.00 1.275 63.75 39 1 + 450.00 1.550
26.00 0.775 20.15 40 1 + 476.00 -
8.00 - - 41 1 + 484.00 -
16.00 0.750 12.00 42 1 + 500.00 1.500
50.00 1.507 75.35 43 1 + 550.00 1.514
50.00 1.864 93.20 44 1 + 600.00 2.214
50.00 2.214 110.70 45 1 + 650.00 2.214
40.00 1.107 44.28 46 1 + 690.00 -
6.00 - - 47 1 + 696.00 -
4.00 1.254 5.02 48 1 + 700.00 2.508
50.00 2.361 118.05 49 1 + 750.00 2.214
50.00 1.886 94.28 50 1 + 800.00 1.557
50.00 1.529 76.43 51 1 + 850.00 1.500
50.00 1.500 75.00 52 1 + 900.00 1.500
50.00 1.500 75.00 53 1 + 950.00 1.500
34.00 0.750 25.50 54 1 + 984.00 -
8.00 - - 55 1 + 992.00 -
8.00 0.872 6.98 56 2 + 000.00 1.744
50.00 1.687 84.33 57 2 + 050.00 1.629
50.00 1.922 96.08 58 2 + 100.00 2.214
50.00 1.483 74.15 59 2 + 150.00 0.752
50.00 0.863 43.15 60 2 + 200.00 0.974
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 0.976 48.80 61 2 + 250.00 0.978
50.00 0.989 49.43 62 2 + 300.00 0.999
50.00 1.341 67.05 63 2 + 350.00 1.683
50.00 1.956 97.80 64 2 + 400.00 2.229
45.00 1.115 50.15 65 2 + 445.00 -
4.00 - - 66 2 + 449.00 -
1.00 - - 67 2 + 450.00 -
50.00 0.250 12.50 68 2 + 500.00 0.500
50.00 0.500 25.00 69 2 + 550.00 0.500
50.00 1.034 51.70 70 2 + 600.00 1.568
10.00 0.784 7.84 71 2 + 610.00 -
4.30 - - 72 2 + 614.30 -
35.70 1.085 38.72 73 2 + 650.00 2.169
50.00 2.170 108.51 74 2 + 700.00 2.171
48.00 1.086 52.11 75 2 + 748.00 -
2.00 0.250 0.50 76 2 + 750.00 0.500
48.00 0.250 12.00 77 2 + 798.00 -
2.00 - - 78 2 + 800.00 -
50.00 0.610 30.50 79 2 + 850.00 1.220
50.00 1.813 90.63 80 2 + 900.00 2.405
50.00 2.060 102.98 81 2 + 950.00 1.714
50.00 1.290 64.50 82 3 + 000.00 0.866
50.00 1.467 73.35 83 3 + 050.00 2.068
50.00 1.458 72.90 84 3 + 100.00 0.848
50.00 0.982 49.08 85 3 + 150.00 1.115
50.00 0.990 49.48 86 3 + 200.00 0.864
50.00 0.782 39.10 87 3 + 250.00 0.700
50.00 1.190 59.50 88 3 + 300.00 1.680
50.00 1.803 90.13 89 3 + 350.00 1.925
50.00 1.889 94.43 90 3 + 400.00 1.852
50.00 1.740 86.98 91 3 + 450.00 1.627
50.00 1.650 82.50 92 3 + 500.00 1.673
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
92 3 + 500.007.00
1.673 0.837 5.86
93 3 + 507.00 -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
7.00 - - 94 3 + 514.00 -
36.00 0.250 9.00 95 3 + 550.00 0.500
50.00 1.287 64.33 96 3 + 600.00 2.073
50.00 2.375 118.73 97 3 + 650.00 2.676
50.00 1.876 93.78 98 3 + 700.00 1.075
50.00 1.031 51.55 99 3 + 750.00 0.987
50.00 1.123 56.15 100 3 + 800.00 1.259
50.00 0.880 43.98 3 + 850.00 0.500
101 50.00 1.380 68.98 3 + 900.00 2.26
102 50.00 - 3 + 950.00 0.950
103 50.00 1.132 56.60 4 + 000.00 1.314
104 50.00 0.907 45.35 4 + 050.00 0.500
105 5.00 0.250 1.25 4 + 055.00 -
106 8.40 - - 4 + 063.40 -
107 36.60 0.642 23.48 4 + 100.00 1.283
108 50.00 0.998 49.90 4 + 150.00 0.713
109 50.00 1.207 60.33 4 + 200.00 1.700
110 50.00 1.351 67.53 4 + 250.00 1.001
111 50.00 0.899 44.93 4 + 300.00 0.796
112 50.00 1.026 51.28 4 + 350.00 1.255
113 50.00 1.200 60.00 4 + 400.00 1.145
114 50.00 1.041 52.03 4 + 450.00 0.936
115 50.00 1.110 55.48 4 + 500.00 1.283
116 50.00 1.059 52.93 4 + 550.00 0.834
117 50.00 1.162 58.08 4 + 600.00 1.489
118 50.00 1.405 70.23 4 + 650.00 1.320
119 50.00 1.733 86.63 4 + 700.00 2.145
120 50.00 1.323 66.13 4 + 750.00 0.500
121 50.00 1.086 54.30 4 + 800.00 1.672
122 50.00 1.282 64.10 4 + 850.00 0.892
123 50.00 1.092 54.60 4 + 900.00 1.292
124 50.00 1.303 65.13 4 + 950.00 1.313
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
4 + 950.00 1.313
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
125 50.00 0.907 45.33 5 + 000.00 0.500
126 50.00 0.556 27.78 5 + 050.00 0.611
127 50.00 1.025 51.25 5 + 100.00 1.439
128 50.00 1.041 52.05 5 + 150.00 0.643
129 50.00 0.749 37.43 5 + 200.00 0.854
130 50.00 0.677 33.85 5 + 250.00 0.500
131 50.00 1.183 59.15 5 + 300.00 1.866
132 50.00 1.928 96.38 5 + 350.00 1.989
133 50.00 2.185 109.25 5 + 400.00 2.381
134 50.00 2.128 106.40 5 + 450.00 1.875
135 50.00 1.683 84.13 5 + 500.00 1.490
136 50.00 1.795 89.73 5 + 550.00 2.099
137 50.00 1.333 66.65 5 + 600.00 0.567
138 50.00 0.753 37.63 5 + 650.00 0.938
139 50.00 0.719 35.95 5 + 700.00 0.500
140 50.00 1.358 67.88 5 + 750.00 2.215
50.00 1.565 78.23 141 5 + 800.00 0.914
50.00 0.828 41.40 142 5 + 850.00 0.742
50.00 1.257 62.85 143 5 + 900.00 1.772
50.00 1.616 80.80 144 5 + 950.00 1.460
50.00 1.522 76.10 145 6 + 000.00 1.584
50.00 1.336 66.78 146 6 + 050.00 1.087
50.00 1.816 90.80 147 6 + 100.00 2.545
50.00 2.719 135.93 148 6 + 150.00 2.892
50.00 2.193 109.63 149 6 + 200.00 1.493
50.00 1.376 68.80 150 6 + 250.00 1.259
50.00 1.203 60.13 151 6 + 300.00 1.146
50.00 0.966 48.30 152 6 + 350.00 0.786
50.00 0.643 32.15 153 6 + 400.00 0.500
50.00 0.500 25.00 154 6 + 450.00 0.500
50.00 0.942 47.08 155 6 + 500.00 1.383
50.00 1.119 55.93 156 6 + 550.00 0.854
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
156 6 + 550.00 0.854
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 0.960 47.98 157 6 + 600.00 1.065
50.00 1.092 54.58 158 6 + 650.00 1.118
50.00 0.809 40.45 159 6 + 700.00 0.500
50.00 0.662 33.10 160 6 + 750.00 0.824
50.00 1.034 51.70 161 6 + 800.00 1.244
50.00 1.195 59.73 162 6 + 850.00 1.145
50.00 1.372 68.58 163 6 + 900.00 1.598
50.00 1.424 71.20 164 6 + 950.00 1.250
50.00 2.012 100.58 165 7 + 000.00 2.773
50.00 2.566 128.28 166 7 + 050.00 2.358
50.00 2.319 115.95 167 7 + 100.00 2.280
50.00 1.859 92.93 168 7 + 150.00 1.437
50.00 1.397 69.85 169 7 + 200.00 1.357
50.00 1.357 67.85 170 7 + 250.00 1.357
50.00 1.658 82.90 171 7 + 300.00 1.959
50.00 1.307 65.33 172 7 + 350.00 0.654
50.00 1.009 50.45 173 7 + 400.00 1.364
50.00 1.074 53.68 174 7 + 450.00 0.783
50.00 0.779 38.93 175 7 + 500.00 0.774
50.00 0.637 31.85 176 7 + 550.00 0.500
50.00 0.500 25.00 177 7 + 600.00 0.500
50.00 0.500 25.00 178 7 + 650.00 0.500
30.00 0.250 7.50 179 7 + 680.00 -
20.00 - - 180 7 + 700.00 -
50.00 0.250 12.50 181 7 + 750.00 0.500
50.00 1.504 75.18 182 7 + 800.00 2.507
50.00 1.504 75.18 183 7 + 850.00 0.50
50.00 0.500 25.00 184 7 + 900.00 0.500
50.00 0.500 25.00 185 7 + 950.00 0.500
50.00 0.972 48.60 186 8 + 000.00 1.444
15.00 0.722 10.83 187 8 + 015.00 -
5.00 - - 188 8 + 020.00 -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
188 8 + 020.0030.00
- 0.200 6.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
189 8 + 050.00 0.400 50.00 1.314 65.70
190 8 + 100.00 2.228 50.00 2.222 111.08
191 8 + 150.00 2.215 50.00 2.215 110.75
192 8 + 200.00 2.215 50.00 2.215 110.75
193 8 + 250.00 2.215 50.00 2.215 110.75
194 8 + 300.00 2.215 50.00 2.215 110.75
195 8 + 350.00 2.215 50.00 2.095 104.75
196 8 + 400.00 1.975 50.00 2.593 129.63
197 8 + 450.00 3.210 50.00 2.635 131.75
198 8 + 500.00 2.060 50.00 1.718 85.90
199 8 + 550.00 1.376 50.00 1.986 99.30
200 8 + 600.00 2.596 50.00 2.233 111.65
201 8 + 650.00 1.870 50.00 1.656 82.80
202 8 + 700.00 1.442 50.00 1.379 68.95
203 8 + 750.00 1.316 50.00 1.334 66.70
204 8 + 800.00 1.352 50.00 1.675 83.73
205 8 + 850.00 1.997 50.00 2.012 100.58
206 8 + 900.00 2.026 50.00 1.999 99.95
207 8 + 950.00 1.972 50.00 1.860 92.98
208 9 + 000.00 1.747 50.00 0.874 43.68
209
jumlah 11,807.65
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
1 0 + 000.0050.00 -
2 0 + 050.0050.00 - -
3 0 + 100.0050.00 - -
4 0 + 150.0050.00 - -
5 0 + 200.0050.00 - -
6 0 + 250.0050.00 - -
7 0 + 300.0050.00 - -
8 0 + 350.0050.00 - -
9 0 + 400.0050.00 - -
10 0 + 450.0050.00 - -
11 0 + 500.0050.00 - -
12 0 + 550.0050.00 0.525 26.25
13 0 + 600.00 1.050 50.00 0.525 26.25
14 0 + 650.0050.00 - -
15 0 + 700.0050.00 - -
16 0 + 750.0050.00 - -
17 0 + 800.0050.00 - -
18 0 + 850.0050.00 - -
19 0 + 900.0050.00 - -
20 0 + 950.0050.00 - -
21 1 + 000.0050.00 - -
22 1 + 050.0050.00 - -
23 1 + 100.0050.00 - -
24 1 + 150.0050.00 - -
25 1 + 200.0050.00 - -
26 1 + 250.0050.00 - -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
27 1 + 300.0050.00 - -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
27 1 + 300.0050.00 - -
28 1 + 350.0050.00 - -
29 1 + 400.0050.00 - -
30 1 + 450.0050.00 - -
31 1 + 500.0050.00 - -
32 1 + 550.0050.00 - -
33 1 + 600.0050.00 - -
34 1 + 650.0050.00 - -
35 1 + 700.0050.00 - -
36 1 + 750.0050.00 - -
37 1 + 800.0050.00 - -
38 1 + 850.0050.00 - -
39 1 + 900.0050.00 - -
40 1 + 950.0050.00 - -
41 2 + 000.0050.00 - -
42 2 + 050.0050.00 - -
43 2 + 100.0050.00 - -
44 2 + 150.0050.00 - -
45 2 + 200.0050.00 - -
46 2 + 250.0050.00 - -
47 2 + 300.0050.00 - -
48 2 + 350.0050.00 - -
49 2 + 400.0050.00 - -
50 2 + 450.0050.00 - -
51 2 + 500.0050.00 - -
52 2 + 550.0050.00 - -
53 2 + 600.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
53 2 + 600.0050.00 - -
54 2 + 650.0050.00 - -
55 2 + 700.0050.00 - -
56 2 + 750.0050.00 - -
57 2 + 800.0050.00 - -
58 2 + 850.0050.00 - -
59 2 + 900.0050.00 - -
60 2 + 950.0050.00 - -
61 3 + 000.0050.00 - -
62 3 + 050.0050.00 - -
63 3 + 100.0050.00 - -
64 3 + 150.0050.00 - -
65 3 + 200.0050.00 - -
66 3 + 250.0050.00 - -
67 3 + 300.0050.00 - -
68 3 + 350.0050.00 - -
69 3 + 400.0050.00 - -
70 3 + 450.0050.00 - -
71 3 + 500.0050.00 - -
72 3 + 550.0050.00 - -
73 3 + 600.0050.00 - -
74 3 + 650.0050.00 - -
75 3 + 700.0050.00 - -
76 3 + 750.0050.00 - -
77 3 + 800.0050.00 - -
78 3 + 850.0050.00 - -
79 3 + 900.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
79 3 + 900.0050.00 -
80 3 + 950.0050.00 - -
81 4 + 000.0050.00 - -
82 4 + 050.0050.00 - -
83 4 + 100.0050.00 - -
84 4 + 150.0050.00 - -
85 4 + 200.0050.00 - -
86 4 + 250.0050.00 - -
87 4 + 300.0050.00 - -
88 4 + 350.0050.00 - -
89 4 + 400.0050.00 - -
90 4 + 450.0050.00 0.525 26.25
91 4 + 500.00 1.050 50.00 0.525 26.25
92 4 + 550.0050.00 - -
93 4 + 600.0050.00 - -
94 4 + 650.0050.00 - -
95 4 + 700.0050.00 - -
96 4 + 750.0050.00 - -
97 4 + 800.0050.00 - -
98 4 + 850.0050.00 - -
99 4 + 900.0050.00 - -
100 4 + 950.0050.00 - -
101 5 + 000.0050.00 - -
102 5 + 050.0050.00 - -
103 5 + 100.0050.00 - -
104 5 + 150.0050.00 - -
105 5 + 200.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
105 5 + 200.0050.00 - -
106 5 + 250.0050.00 - -
107 5 + 300.0050.00 - -
108 5 + 350.0050.00 - -
109 5 + 400.0050.00 - -
110 5 + 450.0050.00 - -
111 5 + 500.0050.00 - -
112 5 + 550.0050.00 - -
113 5 + 600.0050.00 - -
114 5 + 650.0050.00 - -
115 5 + 700.0050.00 - -
116 5 + 750.0050.00 - -
117 5 + 800.0050.00 - -
118 5 + 850.0050.00 - -
119 5 + 900.0050.00 - -
120 5 + 950.0050.00 - -
121 6 + 000.0050.00 - -
122 6 + 050.0050.00 - -
123 6 + 100.0050.00 - -
124 6 + 150.0050.00 - -
125 6 + 200.0050.00 - -
126 6 + 250.0050.00 - -
127 6 + 300.0050.00 - -
128 6 + 350.0050.00 - -
129 6 + 400.0050.00 - -
130 6 + 450.0050.00 - -
131 6 + 500.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
131 6 + 500.0050.00 - -
132 6 + 550.0050.00 - -
133 6 + 600.0050.00 - -
134 6 + 650.0050.00 - -
135 6 + 700.0050.00 - -
136 6 + 750.0050.00 - -
137 6 + 800.0050.00 - -
138 6 + 850.0050.00 - -
139 6 + 900.0050.00 - -
140 6 + 950.0050.00 - -
141 7 + 000.0050.00 - -
142 7 + 050.0050.00 - -
143 7 + 100.0050.00 - -
144 7 + 150.0050.00 - -
145 7 + 200.0050.00 - -
146 7 + 250.0050.00 - -
147 7 + 300.0050.00 - -
148 7 + 350.0050.00 - -
149 7 + 400.0050.00 - -
150 7 + 450.0050.00 - -
151 7 + 500.0050.00 - -
152 7 + 550.0050.00 - -
153 7 + 600.0050.00 - -
154 7 + 650.0050.00 - -
155 7 + 700.0050.00 - -
156 7 + 750.0050.00
- -
157 7 + 800.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
157 7 + 800.0050.00 -
158 7 + 850.0050.00 - -
159 7 + 900.0050.00 - -
160 7 + 950.0050.00 - -
161 8 + 000.0050.00 - -
162 8 + 050.0050.00 - -
163 8 + 100.0050.00 - -
164 8 + 150.0050.00 - -
165 8 + 200.0050.00 - -
166 8 + 250.0050.00 - -
167 8 + 300.0050.00 - -
168 8 + 350.0050.00 0.525 26.25
169 8 + 400.00 1.050 50.00 0.525 26.25
170 8 + 450.0050.00 - -
171 8 + 500.0050.00 - -
172 8 + 550.0050.00 - -
173 8 + 600.0050.00 - -
174 8 + 650.0050.00 - -
175 8 + 700.0050.00 - -
176 8 + 750.0050.00 - -
177 8 + 800.0050.00 - -
178 8 + 850.0050.00 - -
179 8 + 900.0050.00 - -
180 8 + 950.0050.00 - -
181 9 + 000.0050.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
1 0 + 000.00 0.50 50.00 -
2 0 + 050.00 2.483 50.00 3.168 158.38
3 0 + 100.00 3.852 19.00 1.926 36.59
4 0 + 119.00 - 9.00 - -
5 0 + 128.00 - 22.00 1.626 35.77
6 0 + 150.00 3.252 50.00 3.049 152.45
7 0 + 200.00 2.846 50.00 2.612 130.60
8 0 + 250.00 2.378 50.00 1.807 90.35
9 0 + 300.00 1.236 36.00 0.618 22.25
10 0 + 336.00 - 7.00 - -
11 0 + 343.00 - 7.00 0.717 5.02
12 0 + 350.00 1.434 2.00 0.717 1.43
13 0 + 352.00 - 12.00 - -
14 0 + 364.00 - 36.00 1.252 45.07
15 0 + 400.00 2.504 50.00 2.577 128.83
16 0 + 450.00 2.649 50.00 2.369 118.43
17 0 + 500.00 2.088 50.00 1.886 94.28
18 0 + 550.00 1.683 50.00 2.132 106.58
19 0 + 600.00 2.580 50.00 2.367 118.35
20 0 + 650.00 2.154 50.00 2.231 111.55
21 0 + 700.00 2.308 25.00 1.154 28.85
22 0 + 725.00 - 5.00 - -
23 0 + 730.00 - 20.00 1.064 21.27
24 0 + 750.00 2.127 50.00 1.826 91.28
25 0 + 800.00 1.524 50.00 2.115 105.75
26 0 + 850.00 2.706 50.00 2.310 115.50
27 0 + 900.00 1.914 50.00 2.000 99.98
28 0 + 950.00 2.085 50.00 2.371 118.53
29 1 + 000.00 2.656 50.00 2.482 124.08
30 1 + 050.00 2.307 50.00 2.021 101.03
31 1 + 100.00 1.734 50.00 0.867 43.35
32 1 + 150.00 - 6.00 - -
33 1 + 156.00 - 44.00 0.775 34.10
34 1 + 200.00 1.550
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 1.959 97.95 35 1 + 250.00 2.368
50.00 2.371 118.53 36 1 + 300.00 2.373
50.00 2.392 119.60 37 1 + 350.00 2.411
50.00 2.106 105.28 38 1 + 400.00 1.800
50.00 1.996 99.80 39 1 + 450.00 2.192
26.00 1.096 28.50 40 1 + 476.00 -
8.00 - - 41 1 + 484.00 -
16.00 1.007 16.10 42 1 + 500.00 2.013
50.00 2.232 111.58 43 1 + 550.00 2.450
50.00 2.546 127.28 44 1 + 600.00 2.641
50.00 2.535 126.73 45 1 + 650.00 2.428
40.00 1.214 48.56 46 1 + 690.00 -
6.00 - - 47 1 + 696.00 -
4.00 0.616 2.46 48 1 + 700.00 1.232
50.00 1.862 93.08 49 1 + 750.00 2.491
50.00 2.215 110.75 50 1 + 800.00 1.939
50.00 1.950 97.48 51 1 + 850.00 1.960
50.00 1.961 98.03 52 1 + 900.00 1.961
50.00 1.862 93.08 53 1 + 950.00 1.762
34.00 0.881 29.95 54 1 + 984.00 -
8.00 - - 55 1 + 992.00 -
8.00 1.097 8.77 56 2 + 000.00 2.193
50.00 1.737 86.85 57 2 + 050.00 1.281
50.00 0.641 32.03 58 2 + 100.00 -
50.00 0.847 42.33 59 2 + 150.00 1.693
50.00 0.997 49.83 60 2 + 200.00 0.300
50.00 0.386 19.28 61 2 + 250.00 0.471
50.00 0.417 20.85 62 2 + 300.00 0.363
50.00 0.487 24.33 63 2 + 350.00 0.610
50.00 0.509 25.45 64 2 + 400.00 0.408
45.00 0.204 9.18 65 2 + 445.00 -
4.00 - - 66 2 + 449.00 -
1.00 - - 67 2 + 450.00 -
50.00 0.467 23.33 68 2 + 500.00 0.933
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 0.725 36.23 69 2 + 550.00 0.516
50.00 1.047 52.33 70 2 + 600.00 1.577
10.00 0.789 7.89 71 2 + 610.00 -
4.30 - - 72 2 + 614.30 -
35.70 0.113 4.02 73 2 + 650.00 0.225
50.00 0.844 42.18 74 2 + 700.00 1.462
48.00 0.731 35.09 75 2 + 748.00 -
2.00 0.370 0.74 76 2 + 750.00 0.739
48.00 0.370 17.74 77 2 + 798.00 -
2.00 - - 78 2 + 800.00 -
50.00 1.149 57.43 79 2 + 850.00 2.297
50.00 1.701 85.03 80 2 + 900.00 1.104
50.00 1.795 89.73 81 2 + 950.00 2.485
50.00 1.581 79.03 82 3 + 000.00 0.676
50.00 0.481 24.05 83 3 + 050.00 0.286
50.00 0.531 26.53 84 3 + 100.00 0.775
50.00 0.703 35.13 85 3 + 150.00 0.630
50.00 0.701 35.05 86 3 + 200.00 0.772
50.00 0.732 36.58 87 3 + 250.00 0.691
50.00 1.124 56.20 88 3 + 300.00 1.557
50.00 0.779 38.93 89 3 + 350.00 -
50.00 - - 90 3 + 400.00 -
50.00 - - 91 3 + 450.00 -
50.00 - - 92 3 + 500.00 -
7.00 - - 93 3 + 507.00 -
7.00 - - 94 3 + 514.00 -
36.00 - - 95 3 + 550.00 -
50.00 - - 96 3 + 600.00 -
50.00 0.952 47.60 97 3 + 650.00 1.904
50.00 1.670 83.50 98 3 + 700.00 1.436
50.00 0.718 35.90 99 3 + 750.00 -
50.00 0.275 13.75 100 3 + 800.00 0.550
50.00 0.669 33.45 101 3 + 850.00 0.788
50.00 0.560 27.98
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
102 3 + 900.00 0.33 50.00 -
103 3 + 950.00 0.924 50.00 0.645 32.25
104 4 + 000.00 0.366 50.00 0.646 32.28
105 4 + 050.00 0.925 5.00 0.463 2.31
106 4 + 055.00 - 8.40 - -
107 4 + 063.40 - 36.60 0.371 13.58
108 4 + 100.00 0.742 50.00 1.061 53.05
109 4 + 150.00 1.380 50.00 0.866 43.28
110 4 + 200.00 0.351 50.00 0.591 29.53
111 4 + 250.00 0.830 50.00 0.753 37.65
112 4 + 300.00 0.676 50.00 1.150 57.48
113 4 + 350.00 1.623 50.00 1.528 76.38
114 4 + 400.00 1.432 50.00 1.411 70.53
115 4 + 450.00 1.389 50.00 1.287 64.33
116 4 + 500.00 1.184 50.00 1.221 61.05
117 4 + 550.00 1.258 50.00 1.039 51.95
118 4 + 600.00 0.820 50.00 0.917 45.85
119 4 + 650.00 1.014 50.00 1.191 59.53
120 4 + 700.00 1.367 50.00 1.306 65.28
121 4 + 750.00 1.244 50.00 1.124 56.20
122 4 + 800.00 1.004 50.00 1.133 56.63
123 4 + 850.00 1.261 50.00 1.116 55.80
124 4 + 900.00 0.971 50.00 0.775 38.75
125 4 + 950.00 0.579 50.00 0.821 41.05
126 5 + 000.00 1.063 50.00 0.955 47.73
127 5 + 050.00 0.846 50.00 0.656 32.80
128 5 + 100.00 0.466 50.00 0.650 32.50
129 5 + 150.00 0.834 50.00 1.047 52.35
130 5 + 200.00 1.260 50.00 1.053 52.65
131 5 + 250.00 0.846 50.00 0.608 30.38
132 5 + 300.00 0.369 50.00 0.510 25.50
133 5 + 350.00 0.651 50.00 0.634 31.70
134 5 + 400.00 0.617 50.00 0.805 40.23
135 5 + 450.00 0.992 50.00 0.938 46.88
136 5 + 500.00 0.883
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 0.517 25.85 137 5 + 550.00 0.151
50.00 0.609 30.45 138 5 + 600.00 1.067
50.00 0.742 37.08 139 5 + 650.00 0.416
50.00 0.783 39.13 140 5 + 700.00 1.149
50.00 1.086 54.30 141 5 + 750.00 1.023
50.00 1.409 70.45 142 5 + 800.00 1.795
50.00 1.400 70.00 143 5 + 850.00 1.005
50.00 1.331 66.55 144 5 + 900.00 1.657
50.00 0.829 41.43 145 5 + 950.00 -
50.00 1.060 53.00 146 6 + 000.00 2.120
50.00 1.060 53.00 147 6 + 050.00 -
50.00 - - 148 6 + 100.00 -
50.00 - - 149 6 + 150.00 -
50.00 - - 150 6 + 200.00 -
50.00 0.555 27.75 151 6 + 250.00 1.110
50.00 1.434 71.68 152 6 + 300.00 1.757
50.00 1.721 86.05 153 6 + 350.00 1.685
50.00 1.692 84.60 154 6 + 400.00 1.699
50.00 1.686 84.30 155 6 + 450.00 1.673
50.00 1.175 58.73 156 6 + 500.00 0.676
50.00 1.151 57.55 157 6 + 550.00 1.626
50.00 1.410 70.48 158 6 + 600.00 1.193
50.00 1.077 53.83 159 6 + 650.00 0.960
50.00 1.160 57.98 160 6 + 700.00 1.359
50.00 1.163 58.13 161 6 + 750.00 0.966
50.00 0.649 32.45 162 6 + 800.00 0.332
50.00 0.407 20.33 163 6 + 850.00 0.481
50.00 0.765 38.25 164 6 + 900.00 1.049
50.00 0.886 44.30 165 6 + 950.00 0.723
50.00 1.015 50.75 166 7 + 000.00 1.307
50.00 1.381 69.03 167 7 + 050.00 1.454
50.00 1.355 67.73 168 7 + 100.00 1.255
50.00 1.155 57.75 169 7 + 150.00 1.055
50.00 1.296 64.78 170 7 + 200.00 1.536
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 1.426 71.28 171 7 + 250.00 1.315
50.00 1.241 62.03 172 7 + 300.00 1.166
50.00 1.186 59.28 173 7 + 350.00 1.205
50.00 1.031 51.55 174 7 + 400.00 0.857
50.00 0.729 36.45 175 7 + 450.00 0.601
50.00 0.740 36.98 176 7 + 500.00 0.878
50.00 0.934 46.68 177 7 + 550.00 0.989
50.00 0.899 44.95 178 7 + 600.00 0.809
50.00 0.830 41.50 179 7 + 650.00 0.851
30.00 0.426 12.77 180 7 + 680.00 -
20.00 - - 181 7 + 700.00 -
50.00 0.509 25.43 182 7 + 750.00 1.017
50.00 1.021 51.03 183 7 + 800.00 1.024
50.00 1.088 54.38 184 7 + 850.00 1.151
50.00 1.597 79.85 185 7 + 900.00 2.043
50.00 1.646 82.28 186 7 + 950.00 1.248
50.00 1.478 73.90 187 8 + 000.00 1.708
15.00 0.854 12.81 188 8 + 015.00 -
5.00 - - 189 8 + 020.00 -
30.00 0.441 13.23 190 8 + 050.00 0.882
50.00 1.537 76.85 191 8 + 100.00 2.192
50.00 2.253 112.63 192 8 + 150.00 2.313
50.00 2.206 110.28 193 8 + 200.00 2.098
50.00 2.162 108.08 194 8 + 250.00 2.225
50.00 2.176 108.78 195 8 + 300.00 2.126
50.00 2.415 120.75 196 8 + 350.00 2.704
50.00 1.352 67.60 197 8 + 400.00 -
50.00 1.013 50.63 198 8 + 450.00 2.025
50.00 1.925 96.23 199 8 + 500.00 1.824
50.00 2.322 116.10 200 8 + 550.00 2.820
50.00 2.614 130.70 201 8 + 600.00 2.408
50.00 2.115 105.73 202 8 + 650.00 1.821
50.00 1.676 83.78 203 8 + 700.00 1.530
50.00 2.081 104.05 204 8 + 750.00 2.632
50.00 2.464 123.18 205 8 + 800.00 2.295
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 2.058 102.88 206 8 + 850.00 1.820
50.00 1.222 61.08 207 8 + 900.00 0.623
50.00 0.474 23.68 208 8 + 950.00 0.324
50.00 0.162 8.10 209 9 + 000.00 -
50.00 - -
Jumlah 10,810.92
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
1 0 + 000.0050.00 -
2 0 + 050.00 - 50.00 - -
3 0 + 100.00 - 50.00 - -
4 0 + 150.00 - 50.00 0.323 16.13
5 0 + 200.00 0.645 50.00 0.968 48.38
6 0 + 250.00 1.290 50.00 1.290 64.50
7 0 + 300.00 1.290 50.00 1.290 64.50
8 0 + 350.00 1.290 50.00 1.358 67.88
9 0 + 400.00 1.425 50.00 1.358 67.88
10 0 + 450.00 1.290 50.00 1.290 64.50
11 0 + 500.00 1.290 50.00 1.358 67.88
12 0 + 550.00 1.425 50.00 1.493 74.63
13 0 + 600.00 1.560 50.00 1.425 71.25
14 0 + 650.00 1.290 50.00 1.290 64.50
15 0 + 700.00 1.290 50.00 1.358 67.88
16 0 + 750.00 1.425 50.00 1.358 67.88
17 0 + 800.00 1.290 50.00 1.290 64.50
18 0 + 850.00 1.290 50.00 1.308 65.38
19 0 + 900.00 1.325 50.00 1.308 65.38
20 0 + 950.00 1.290 50.00 1.172 58.58
21 1 + 000.00 1.053 50.00 1.172 58.58
22 1 + 050.00 1.290 50.00 1.358 67.88
23 1 + 100.00 1.425 50.00 0.713 35.63
24 1 + 150.00 - 50.00 0.629 31.43
25 1 + 200.00 1.257 50.00 1.257 62.85
26 1 + 250.00 1.257 50.00 1.361 68.05
27 1 + 300.00 1.465
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 1.257 62.85 28 1 + 350.00 1.049
50.00 0.787 39.33 29 1 + 400.00 0.524
50.00 0.847 42.33 30 1 + 450.00 1.169
50.00 1.169 58.45 31 1 + 500.00 1.169
50.00 0.585 29.23 32 1 + 550.00 -
50.00 - - 33 1 + 600.00 -
50.00 - - 34 1 + 650.00 -
50.00 0.922 46.10 35 1 + 700.00 1.844
50.00 0.922 46.10 36 1 + 750.00 -
50.00 0.699 34.95 37 1 + 800.00 1.398
50.00 1.344 67.20 38 1 + 850.00 1.290
50.00 1.290 64.50 39 1 + 900.00 1.290
50.00 1.274 63.68 40 1 + 950.00 1.257
50.00 1.447 72.33 41 2 + 000.00 1.636
50.00 1.622 81.10 42 2 + 050.00 1.608
50.00 0.804 40.20 43 2 + 100.00 -
50.00 - - 44 2 + 150.00 -
50.00 - - 45 2 + 200.00 -
50.00 0.369 18.45 46 2 + 250.00 0.738
50.00 0.804 40.20 47 2 + 300.00 0.870
50.00 0.435 21.75 48 2 + 350.00 -
50.00 - - 49 2 + 400.00 -
50.00 - - 50 2 + 450.00 -
50.00 - - 51 2 + 500.00 -
50.00 - - 52 2 + 550.00 -
50.00 0.712 35.58 53 2 + 600.00 1.423
50.00 0.712 35.58 54 2 + 650.00 -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
54 2 + 650.00 -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 0.773 38.65 55 2 + 700.00 1.546
50.00 2.046 102.30 56 2 + 750.00 2.546
50.00 1.273 63.65 57 2 + 800.00 -
50.00 0.732 36.58 58 2 + 850.00 1.463
50.00 0.732 36.58 59 2 + 900.00 -
50.00 - - 60 2 + 950.00 -
50.00 - - 61 3 + 000.00 -
50.00 - - 62 3 + 050.00 -
50.00 1.112 55.58 63 3 + 100.00 2.223
50.00 1.982 99.08 64 3 + 150.00 1.740
50.00 1.674 83.70 65 3 + 200.00 1.608
50.00 1.449 72.45 66 3 + 250.00 1.290
50.00 0.645 32.25 67 3 + 300.00 -
50.00 - - 68 3 + 350.00 -
50.00 - - 69 3 + 400.00 -
50.00 - - 70 3 + 450.00 -
50.00 - - 71 3 + 500.00 -
50.00 - - 72 3 + 550.00 -
50.00 - - 73 3 + 600.00 -
50.00 - - 74 3 + 650.00 -
50.00 0.733 36.63 75 3 + 700.00 1.465
50.00 0.733 36.63 76 3 + 750.00 -
50.00 - - 77 3 + 800.00 -
50.00 - - 78 3 + 850.00 -
50.00 - - 79 3 + 900.00 -
50.00 - 80 3 + 950.00 -
50.00 - - 81 4 + 000.00 -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
81 4 + 000.0050.00
- - -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
82 4 + 050.00 - 50.00 0.369 18.45
83 4 + 100.00 0.738 50.00 1.041 52.03
84 4 + 150.00 1.343 50.00 0.672 33.58
85 4 + 200.00 - 50.00 - -
86 4 + 250.00 - 50.00 - -
87 4 + 300.00 - 50.00 0.870 43.50
88 4 + 350.00 1.740 50.00 1.740 87.00
89 4 + 400.00 1.740 50.00 1.861 93.03
90 4 + 450.00 1.981 50.00 1.795 89.73
91 4 + 500.00 1.608 50.00 2.032 101.58
92 4 + 550.00 2.455 50.00 1.228 61.38
93 4 + 600.00 - 50.00 - -
94 4 + 650.00 - 50.00 - -
95 4 + 700.00 - 50.00 - -
96 4 + 750.00 - 50.00 - -
97 4 + 800.00 - 50.00 - -
98 4 + 850.00 - 50.00 - -
99 4 + 900.00 - 50.00 - -
100 4 + 950.00 - 50.00 - -
101 5 + 000.00 - 50.00 - -
102 5 + 050.00 - 50.00 - -
103 5 + 100.00 - 50.00 - -
104 5 + 150.00 - 50.00 - -
105 5 + 200.00 - 50.00 - -
106 5 + 250.00 - 50.00 - -
107 5 + 300.00 - 50.00 0.674 33.70
108 5 + 350.00 1.348 50.00 1.232 61.58
109 5 + 400.00 1.115
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
109 5 + 400.00 1.115
50.00 0.947 47.33 110 5 + 450.00 0.778
50.00 0.389 19.45 111 5 + 500.00 -
50.00 - - 112 5 + 550.00 -
50.00 0.435 21.75 113 5 + 600.00 0.870
50.00 0.435 21.75 114 5 + 650.00 -
50.00 - - 115 5 + 700.00 -
50.00 - - 116 5 + 750.00 -
50.00 - - 117 5 + 800.00 -
50.00 - - 118 5 + 850.00 -
50.00 - - 119 5 + 900.00 -
50.00 - - 120 5 + 950.00 -
50.00 - - 121 6 + 000.00 -
50.00 - - 122 6 + 050.00 -
50.00 - - 123 6 + 100.00 -
50.00 - - 124 6 + 150.00 -
50.00 - - 125 6 + 200.00 -
50.00 - - 126 6 + 250.00 -
50.00 0.479 23.93 127 6 + 300.00 0.957
50.00 0.848 42.38 128 6 + 350.00 0.738
50.00 0.369 18.45 129 6 + 400.00 -
50.00 - - 130 6 + 450.00 -
50.00 - - 131 6 + 500.00 -
50.00 - - 132 6 + 550.00 -
50.00 - - 133 6 + 600.00 -
50.00 - - 134 6 + 650.00 -
50.00 - - 135 6 + 700.00 -
50.00 - -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
136 6 + 750.0050.00
- - -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 - - 137 6 + 800.00 -
50.00 - - 138 6 + 850.00 -
50.00 - - 139 6 + 900.00 -
50.00 - - 140 6 + 950.00 -
50.00 - - 141 7 + 000.00 -
50.00 - - 142 7 + 050.00 -
50.00 - - 143 7 + 100.00 -
50.00 - - 144 7 + 150.00 -
50.00 - - 145 7 + 200.00 -
50.00 - - 146 7 + 250.00 -
50.00 0.802 40.08 147 7 + 300.00 1.603
50.00 0.802 40.08 148 7 + 350.00 -
50.00 - - 149 7 + 400.00 -
50.00 - - 150 7 + 450.00 -
50.00 - - 151 7 + 500.00 -
50.00 - - 152 7 + 550.00 -
50.00 - - 153 7 + 600.00 -
50.00 - - 154 7 + 650.00 -
50.00 - - 155 7 + 700.00 -
50.00 - - 156 7 + 750.00 -
50.00 0.734 36.70 157 7 + 800.00 1.47
50.00 0.734 36.70 158 7 + 850.00 -
50.00 0.674 33.70 159 7 + 900.00 1.348
50.00 0.674 33.70 160 7 + 950.00 -
50.00 1.038 51.90 161 8 + 000.00 2.076
50.00 1.407 70.35 162 8 + 050.00 0.738
50.00 0.369 18.45 163 8 + 100.00 -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
163 8 + 100.00 -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 - - 164 8 + 150.00 -
50.00 - - 165 8 + 200.00 -
50.00 - - 166 8 + 250.00 -
50.00 - - 167 8 + 300.00 -
50.00 - - 168 8 + 350.00 -
50.00 - - 169 8 + 400.00 -
50.00 - - 170 8 + 450.00 -
50.00 - - 171 8 + 500.00 -
50.00 - - 172 8 + 550.00 -
50.00 - - 173 8 + 600.00 -
50.00 - - 174 8 + 650.00 -
50.00 - - 175 8 + 700.00 -
50.00 - - 176 8 + 750.00 -
50.00 - - 177 8 + 800.00 -
50.00 - - 178 8 + 850.00 -
50.00 - - 179 8 + 900.00 -
50.00 - - 180 8 + 950.00 -
50.00 - - 181 9 + 000.00 -
50.00
Jumlah 4,212.10
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
1 0 + 000.0050.00 -
2 0 + 050.0050.00 - -
3 0 + 100.0050.00 - -
4 0 + 150.0050.00 - -
5 0 + 200.0050.00 - -
6 0 + 250.0050.00 - -
7 0 + 300.0050.00 - -
8 0 + 350.0050.00 - -
9 0 + 400.0050.00 - -
10 0 + 450.0050.00 - -
11 0 + 500.0050.00 - -
12 0 + 550.0050.00 0.525 26.25
13 0 + 600.00 1.050 50.00 0.525 26.25
14 0 + 650.0050.00 - -
15 0 + 700.0050.00 - -
16 0 + 750.0050.00 - -
17 0 + 800.0050.00 - -
18 0 + 850.0050.00 - -
19 0 + 900.0050.00 - -
20 0 + 950.0050.00 - -
21 1 + 000.0050.00 - -
22 1 + 050.0050.00 - -
23 1 + 100.0050.00 - -
24 1 + 150.0050.00 - -
25 1 + 200.0050.00 - -
26 1 + 250.0050.00 - -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
27 1 + 300.0050.00 - -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
27 1 + 300.0050.00 - -
28 1 + 350.0050.00 - -
29 1 + 400.0050.00 - -
30 1 + 450.0050.00 - -
31 1 + 500.0050.00 - -
32 1 + 550.0050.00 - -
33 1 + 600.0050.00 - -
34 1 + 650.0050.00 - -
35 1 + 700.0050.00 - -
36 1 + 750.0050.00 - -
37 1 + 800.0050.00 - -
38 1 + 850.0050.00 - -
39 1 + 900.0050.00 - -
40 1 + 950.0050.00 - -
41 2 + 000.0050.00 - -
42 2 + 050.0050.00 - -
43 2 + 100.0050.00 - -
44 2 + 150.0050.00 - -
45 2 + 200.0050.00 - -
46 2 + 250.0050.00 - -
47 2 + 300.0050.00 - -
48 2 + 350.0050.00 - -
49 2 + 400.0050.00 - -
50 2 + 450.0050.00 - -
51 2 + 500.0050.00 - -
52 2 + 550.0050.00 - -
53 2 + 600.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
53 2 + 600.0050.00 - -
54 2 + 650.0050.00 - -
55 2 + 700.0050.00 - -
56 2 + 750.0050.00 - -
57 2 + 800.0050.00 - -
58 2 + 850.0050.00 - -
59 2 + 900.0050.00 - -
60 2 + 950.0050.00 - -
61 3 + 000.0050.00 - -
62 3 + 050.0050.00 - -
63 3 + 100.0050.00 - -
64 3 + 150.0050.00 - -
65 3 + 200.0050.00 - -
66 3 + 250.0050.00 - -
67 3 + 300.0050.00 - -
68 3 + 350.0050.00 - -
69 3 + 400.0050.00 - -
70 3 + 450.0050.00 - -
71 3 + 500.0050.00 - -
72 3 + 550.0050.00 - -
73 3 + 600.0050.00 - -
74 3 + 650.0050.00 - -
75 3 + 700.0050.00 - -
76 3 + 750.0050.00 - -
77 3 + 800.0050.00 - -
78 3 + 850.0050.00 - -
79 3 + 900.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
79 3 + 900.0050.00 -
80 3 + 950.0050.00 - -
81 4 + 000.0050.00 - -
82 4 + 050.0050.00 - -
83 4 + 100.0050.00 - -
84 4 + 150.0050.00 - -
85 4 + 200.0050.00 - -
86 4 + 250.0050.00 - -
87 4 + 300.0050.00 - -
88 4 + 350.0050.00 - -
89 4 + 400.0050.00 - -
90 4 + 450.0050.00 0.525 26.25
91 4 + 500.00 1.050 50.00 0.525 26.25
92 4 + 550.0050.00 - -
93 4 + 600.0050.00 - -
94 4 + 650.0050.00 - -
95 4 + 700.0050.00 - -
96 4 + 750.0050.00 - -
97 4 + 800.0050.00 - -
98 4 + 850.0050.00 - -
99 4 + 900.0050.00 - -
100 4 + 950.0050.00 - -
101 5 + 000.0050.00 - -
102 5 + 050.0050.00 - -
103 5 + 100.0050.00 - -
104 5 + 150.0050.00 - -
105 5 + 200.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
105 5 + 200.0050.00 - -
106 5 + 250.0050.00 - -
107 5 + 300.0050.00 - -
108 5 + 350.0050.00 - -
109 5 + 400.0050.00 - -
110 5 + 450.0050.00 - -
111 5 + 500.0050.00 - -
112 5 + 550.0050.00 - -
113 5 + 600.0050.00 - -
114 5 + 650.0050.00 - -
115 5 + 700.0050.00 - -
116 5 + 750.0050.00 - -
117 5 + 800.0050.00 - -
118 5 + 850.0050.00 - -
119 5 + 900.0050.00 - -
120 5 + 950.0050.00 - -
121 6 + 000.0050.00 - -
122 6 + 050.0050.00 - -
123 6 + 100.0050.00 - -
124 6 + 150.0050.00 - -
125 6 + 200.0050.00 - -
126 6 + 250.0050.00 - -
127 6 + 300.0050.00 - -
128 6 + 350.0050.00 - -
129 6 + 400.0050.00 - -
130 6 + 450.0050.00 - -
131 6 + 500.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
131 6 + 500.0050.00 - -
132 6 + 550.0050.00 - -
133 6 + 600.0050.00 - -
134 6 + 650.0050.00 - -
135 6 + 700.0050.00 - -
136 6 + 750.0050.00 - -
137 6 + 800.0050.00 - -
138 6 + 850.0050.00 - -
139 6 + 900.0050.00 - -
140 6 + 950.0050.00 - -
141 7 + 000.0050.00 - -
142 7 + 050.0050.00 - -
143 7 + 100.0050.00 - -
144 7 + 150.0050.00 - -
145 7 + 200.0050.00 - -
146 7 + 250.0050.00 - -
147 7 + 300.0050.00 - -
148 7 + 350.0050.00 - -
149 7 + 400.0050.00 - -
150 7 + 450.0050.00 - -
151 7 + 500.0050.00 - -
152 7 + 550.0050.00 - -
153 7 + 600.0050.00 - -
154 7 + 650.0050.00 - -
155 7 + 700.0050.00 - -
156 7 + 750.0050.00
- -
157 7 + 800.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
157 7 + 800.0050.00 -
158 7 + 850.0050.00 - -
159 7 + 900.0050.00 - -
160 7 + 950.0050.00 - -
161 8 + 000.0050.00 - -
162 8 + 050.0050.00 - -
163 8 + 100.0050.00 - -
164 8 + 150.0050.00 - -
165 8 + 200.0050.00 - -
166 8 + 250.0050.00 - -
167 8 + 300.0050.00 - -
168 8 + 350.0050.00 0.525 26.25
169 8 + 400.00 1.050 50.00 0.525 26.25
170 8 + 450.0050.00 - -
171 8 + 500.0050.00 - -
172 8 + 550.0050.00 - -
173 8 + 600.0050.00 - -
174 8 + 650.0050.00 - -
175 8 + 700.0050.00 - -
176 8 + 750.0050.00 - -
177 8 + 800.0050.00 - -
178 8 + 850.0050.00 - -
179 8 + 900.0050.00 - -
180 8 + 950.0050.00 - -
181 9 + 000.0050.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
1 0 + 000.0050.00 -
2 0 + 050.00 0.873 50.00 1.277 63.87
3 0 + 100.00 1.682 50.00 0.841 42.05
4 0 + 150.0050.00 - -
5 0 + 200.0050.00 - -
6 0 + 250.0050.00 - -
7 0 + 300.0050.00 - -
8 0 + 350.0050.00 - -
9 0 + 400.0050.00 - -
10 0 + 450.0050.00 - -
11 0 + 500.0050.00 0.525 26.25
12 0 + 550.00 1.050 50.00 0.525 26.25
13 0 + 600.0050.00 - -
14 0 + 650.0050.00 - -
15 0 + 700.0050.00 - -
16 0 + 750.0050.00 - -
17 0 + 800.0050.00 - -
18 0 + 850.0050.00 - -
19 0 + 900.0050.00 - -
20 0 + 950.0050.00 - -
21 1 + 000.0050.00 - -
22 1 + 050.0050.00 - -
23 1 + 100.0050.00 - -
24 1 + 150.0050.00 - -
25 1 + 200.0050.00 - -
26 1 + 250.0050.00 - -
27 1 + 300.0050.00 - -
28 1 + 350.0050.00 - -
29 1 + 400.0050.00 - -
30 1 + 450.0050.00 - -
31 1 + 500.0050.00 - -
32 1 + 550.0050.00 - -
33 1 + 600.0050.00 - -
34 1 + 650.0050.00 - -
35 1 + 700.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 - - 36 1 + 750.00
50.00 - - 37 1 + 800.00
50.00 - - 38 1 + 850.00
50.00 - - 39 1 + 900.00
50.00 - - 40 1 + 950.00
50.00 - - 41 2 + 000.00
50.00 - - 42 2 + 050.00
50.00 - - 43 2 + 100.00
50.00 0.421 21.04 44 2 + 150.00 0.842
50.00 0.421 21.04 45 2 + 200.00
50.00 - - 46 2 + 250.00
50.00 - - 47 2 + 300.00
50.00 - - 48 2 + 350.00
50.00 - - 49 2 + 400.00
50.00 - - 50 2 + 450.00
50.00 - - 51 2 + 500.00
50.00 - - 52 2 + 550.00
50.00 - - 53 2 + 600.00
50.00 - - 54 2 + 650.00
50.00 - - 55 2 + 700.00
50.00 - - 56 2 + 750.00
50.00 - - 57 2 + 800.00
50.00 - - 58 2 + 850.00
50.00 - - 59 2 + 900.00
50.00 - - 60 2 + 950.00
50.00 - - 61 3 + 000.00
50.00 - - 62 3 + 050.00
50.00 - - 63 3 + 100.00
50.00 - - 64 3 + 150.00
50.00 - - 65 3 + 200.00
50.00 0.509 25.45 66 3 + 250.00 1.018
50.00 0.509 25.45 67 3 + 300.00
50.00 - - 68 3 + 350.00
50.00 - - 69 3 + 400.00
50.00 - - 70 3 + 450.00
50.00 - - 71 3 + 500.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 - - 72 3 + 550.00
50.00 - - 73 3 + 600.00
50.00 - - 74 3 + 650.00
50.00 - - 75 3 + 700.00
50.00 - - 76 3 + 750.00
50.00 - - 77 3 + 800.00
50.00 - - 78 3 + 850.00
50.00 - - 79 3 + 900.00
50.00 - 80 3 + 950.00
50.00 - - 81 4 + 000.00
50.00 - - 82 4 + 050.00
50.00 - - 83 4 + 100.00
50.00 - - 84 4 + 150.00
50.00 - - 85 4 + 200.00
50.00 - - 86 4 + 250.00
50.00 - - 87 4 + 300.00
50.00 - - 88 4 + 350.00
50.00 - - 89 4 + 400.00
50.00 0.525 26.25 90 4 + 450.00 1.050
50.00 0.525 26.25 91 4 + 500.00
50.00 - - 92 4 + 550.00
50.00 - - 93 4 + 600.00
50.00 - - 94 4 + 650.00
50.00 - - 95 4 + 700.00
50.00 - - 96 4 + 750.00
50.00 - - 97 4 + 800.00
50.00 - - 98 4 + 850.00
50.00 - - 99 4 + 900.00
50.00 - - 100 4 + 950.00
50.00 - - 101 5 + 000.00
50.00 - - 102 5 + 050.00
50.00 - - 103 5 + 100.00
50.00 - - 104 5 + 150.00
50.00 - - 105 5 + 200.00
50.00 - - 106 5 + 250.00
50.00 - - 107 5 + 300.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 - - 108 5 + 350.00
50.00 - - 109 5 + 400.00
50.00 - - 110 5 + 450.00
50.00 - - 111 5 + 500.00
50.00 - - 112 5 + 550.00
50.00 - - 113 5 + 600.00
50.00 - - 114 5 + 650.00
50.00 - - 115 5 + 700.00
50.00 - - 116 5 + 750.00
50.00 - - 117 5 + 800.00
50.00 - - 118 5 + 850.00
50.00 - - 119 5 + 900.00
50.00 - - 120 5 + 950.00
50.00 - - 121 6 + 000.00
50.00 - - 122 6 + 050.00
50.00 - - 123 6 + 100.00
50.00 - - 124 6 + 150.00
50.00 - - 125 6 + 200.00
50.00 - - 126 6 + 250.00
50.00 - - 127 6 + 300.00
50.00 - - 128 6 + 350.00
50.00 - - 129 6 + 400.00
50.00 - - 130 6 + 450.00
50.00 - - 131 6 + 500.00
50.00 - - 132 6 + 550.00
50.00 - - 133 6 + 600.00
50.00 - - 134 6 + 650.00
50.00 - - 135 6 + 700.00
50.00 - - 136 6 + 750.00
50.00 - - 137 6 + 800.00
50.00 - - 138 6 + 850.00
50.00 - - 139 6 + 900.00
50.00 - - 140 6 + 950.00
50.00 - - 141 7 + 000.00
50.00 - - 142 7 + 050.00
50.00 - - 143 7 + 100.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
50.00 - - 144 7 + 150.00
50.00 - - 145 7 + 200.00
50.00 - - 146 7 + 250.00
50.00 - - 147 7 + 300.00
50.00 - - 148 7 + 350.00
50.00 - - 149 7 + 400.00
50.00 - - 150 7 + 450.00
50.00 - - 151 7 + 500.00
50.00 - - 152 7 + 550.00
50.00 - - 153 7 + 600.00
50.00 - - 154 7 + 650.00
50.00 - - 155 7 + 700.00
50.00 - - 156 7 + 750.00
50.00 - - 157 7 + 800.00
50.00 - 158 7 + 850.00
50.00 - - 159 7 + 900.00
50.00 - - 160 7 + 950.00
50.00 - - 161 8 + 000.00
50.00 - - 162 8 + 050.00
50.00 - - 163 8 + 100.00
50.00 - - 164 8 + 150.00
50.00 - - 165 8 + 200.00
50.00 - - 166 8 + 250.00
50.00 - - 167 8 + 300.00
50.00 - - 168 8 + 350.00 -
50.00 0.416 20.81 169 8 + 400.00 0.832
50.00 0.696 34.81 170 8 + 450.00 0.560
50.00 1.186 59.32 171 8 + 500.00 1.813
50.00 1.468 73.39 172 8 + 550.00 1.123
50.00 0.562 28.08 173 8 + 600.00 -
50.00 0.656 32.79 174 8 + 650.00 1.312
50.00 1.256 62.80 175 8 + 700.00 1.200
50.00 1.302 65.08 176 8 + 750.00 1.403
50.00 1.173 58.67 177 8 + 800.00 0.944
50.00 0.944 47.18 178 8 + 850.00 0.944
50.00 0.472 23.59 179 8 + 900.00
50.00 - - 180 8 + 950.00
50.00 - - 181 9 + 000.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG AREA RATA2 VOLUME
KET( M ) ( M2 ) ( M2 ) ( M3 )
181 9 + 000.00
Jumlah 810.40
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 4.2.2
JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )
SATUAN PEMBAYARAN : M3
NO STATION
PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
1 0 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420 50.00 0.42 21.00
2 0 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420 50.00 0.42 21.00
3 0 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420 19.00 0.21 3.99
4 0 + 119.00 - - - - - - - - - 9.00 - -
5 0 + 128.00 - - - - - - - - - 22.00 0.21 4.62
6 0 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420 50.00 0.41 20.50
7 0 + 200.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
8 0 + 250.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
9 0 + 300.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 36.00 0.20 7.20
10 0 + 336.00 - - - - - - - - - 7.00 - -
11 0 + 343.00 - - - - - - - - - 7.00 0.20 1.40
12 0 + 350.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 2.00 0.20 0.40
13 0 + 352.00 - - - - - - - - - 12.00 - -
14 0 + 364.00 - - - - - - - - - 36.00 0.20 7.20
15 0 + 400.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
16 0 + 450.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
17 0 + 500.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
18 0 + 550.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
19 0 + 600.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
20 0 + 650.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
21 0 + 700.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 25.00 0.20 5.00
22 0 + 725.00 - - - - - - - - - 5.00 - -
23 0 + 730.00 - - - - - - - - - 20.00 0.20 4.00
24 0 + 750.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
25 0 + 800.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
26 0 + 850.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
27 0 + 900.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
28 0 + 950.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
29 1 + 000.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
30 1 + 050.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
31 1 + 100.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.20 10.00
32 1 + 150.00 - - - - - - - - - 6.00 - -
33 1 + 156.00 - - - - - - - - - 44.00 0.20 8.80
34 1 + 200.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
35 1 + 250.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
36 1 + 300.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
37 1 + 350.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
38 1 + 400.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00
39 1 + 450.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 26.00 0.20 5.20
40 1 + 476.00 - - - - - - - - -
AREA RATA2
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
RATA2 LEBAR KIRI&KANAN
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 4.2.2
JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )
SATUAN PEMBAYARAN : M3
NO STATION
PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
AREA RATA2
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
RATA2 LEBAR KIRI&KANAN
8.00 - - 41 1 + 484.00 - - - - - - - - -
16.00 0.20 3.20 42 1 + 500.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 43 1 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 44 1 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 45 1 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
40.00 0.21 8.40 46 1 + 690.00 - - - - - - - - -
6.00 - - 47 1 + 696.00 - - - - - - - - -
4.00 0.21 0.84 48 1 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 49 1 + 750.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 50 1 + 800.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 51 1 + 850.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 52 1 + 900.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 53 1 + 950.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
34.00 0.20 6.80 54 1 + 984.00 - - - - - - - - -
8.00 - - 55 1 + 992.00 - - - - - - - - -
8.00 0.20 1.60 56 2 + 000.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 57 2 + 050.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 58 2 + 100.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 59 2 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 60 2 + 200.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 61 2 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 62 2 + 300.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 63 2 + 350.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 64 2 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
45.00 0.21 9.45 65 2 + 445.00 - - - - - - - - -
4.00 - - 66 2 + 449.00 - - - - - - - - -
1.00 0.21 0.21 67 2 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 68 2 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 69 2 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 70 2 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
10.00 0.21 2.10 71 2 + 610.00 - - - - - - - - -
4.30 - - 72 2 + 614.30 - - - - - - - - -
35.70 0.21 7.50 73 2 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 74 2 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
48.00 0.21 10.08 75 2 + 748.00 - - - - - - - - -
2.00 - - 76 2 + 750.00 - - - - - - - - -
48.00 - - 77 2 + 798.00 - - - - - - - - -
2.00 0.21 0.42 78 2 + 800.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 79 2 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 80 2 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 4.2.2
JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )
SATUAN PEMBAYARAN : M3
NO STATION
PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
AREA RATA2
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
RATA2 LEBAR KIRI&KANAN
50.00 0.42 21.00 81 2 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 82 3 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 83 3 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 84 3 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 85 3 + 150.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 86 3 + 200.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 87 3 + 250.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 88 3 + 300.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 89 3 + 350.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 90 3 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 91 3 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 92 3 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
7.00 0.21 1.47 93 3 + 507.00 - - - - - - - - -
7.00 - - 94 3 + 514.00 - - - - - - - - -
36.00 0.21 7.56 95 3 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 96 3 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 97 3 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 98 3 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 99 3 + 750.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 100 3 + 800.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 101 3 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 102 3 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 103 3 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 104 4 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 105 4 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
5.00 0.21 1.05 106 4 + 055.00 - - - - - - - - -
8.40 - - 107 4 + 063.40 - - - - - - - - -
36.60 0.20 7.32 108 4 + 100.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 109 4 + 150.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 110 4 + 200.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 111 4 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 112 4 + 300.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 113 4 + 350.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 114 4 + 400.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 115 4 + 450.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 116 4 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 117 4 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 118 4 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 119 4 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 120 4 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 4.2.2
JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )
SATUAN PEMBAYARAN : M3
NO STATION
PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
AREA RATA2
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
RATA2 LEBAR KIRI&KANAN
50.00 0.42 21.00 121 4 + 750.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 122 4 + 800.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 123 4 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 124 4 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 125 4 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 126 5 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 127 5 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 128 5 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 129 5 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 130 5 + 200.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 131 5 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 132 5 + 300.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 133 5 + 350.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 134 5 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 135 5 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 136 5 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 137 5 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 138 5 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 139 5 + 650.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 140 5 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 141 5 + 750.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 142 5 + 800.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 143 5 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 144 5 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 145 5 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 146 6 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 147 6 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 148 6 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 149 6 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 150 6 + 200.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 151 6 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 152 6 + 300.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.40 20.00 153 6 + 350.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 154 6 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 155 6 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 156 6 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00157 6 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 158 6 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 159 6 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 160 6 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 4.2.2
JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )
SATUAN PEMBAYARAN : M3
NO STATION
PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
AREA RATA2
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
RATA2 LEBAR KIRI&KANAN
50.00 0.42 21.00 161 6 + 750.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 162 6 + 800.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 163 6 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 164 6 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 165 6 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 166 7 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 167 7 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 168 7 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 169 7 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 170 7 + 200.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 171 7 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 172 7 + 300.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 173 7 + 350.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 174 7 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 175 7 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 176 7 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 177 7 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 178 7 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 179 7 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
30.00 0.21 6.30 180 7 + 680.00 - - - - - - - - -
20.00 - - 181 7 + 700.00 - - - - - - - - -
50.00 0.21 10.50 182 7 + 750.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 183 7 + 800.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 184 7 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 185 7 + 900.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
50.00 0.41 20.50 186 7 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.41 20.50 187 8 + 000.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400
15.00 0.20 3.00 188 8 + 015.00 - - - - - - - - -
5.00 - - 189 8 + 020.00 - - - - - - - - -
30.00 0.21 6.30 190 8 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 191 8 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 192 8 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 193 8 + 200.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 194 8 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 195 8 + 300.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 196 8 + 350.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 197 8 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 198 8 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 199 8 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 200 8 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 4.2.2
JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )
SATUAN PEMBAYARAN : M3
NO STATION
PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
AREA RATA2
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
ATAS ( M )
BAWAH ( M
)
RATA -RATA ( M )
RATA2 LEBAR KIRI&KANAN
50.00 0.42 21.00 201 8 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 202 8 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 203 8 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 204 8 + 750.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 205 8 + 800.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 206 8 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 207 8 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.42 21.00 208 8 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420
50.00 0.21 10.50 209 9 + 000.00 - 0.200 -
JUMLAH 1,540.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.5a
JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG LEBAR VOLUME
KET( M ) ( M2 )
1 0 + 000.00 6.00 6.000 6.000 50.00 300.00
2 0 + 050.00 6.00 6.000 6.000 50.00 300.00
3 0 + 100.00 6.00 6.00 6.000 19.00 300.00
4 0 + 119.00 4.00 4.000 4.000 9.00 200.00
5 0 + 128.00 4.00 4.000 4.000 22.00 200.00
6 0 + 150.00 6.00 6.000 6.000 50.00 300.00
7 0 + 200.00 6.00 6.000 6.000 50.00 300.00
8 0 + 250.00 6.00 6.000 6.000 50.00 300.00
9 0 + 300.00 6.00 6.000 6.000 36.00 300.00
10 0 + 336.00 4.00 4.000 4.000 7.00 200.00
11 0 + 343.00 4.00 4.000 4.000 7.00 200.00
12 0 + 350.00 6.00 6.000 6.000 2.00 300.00
13 0 + 352.00 4.00 4.000 4.000 12.00 200.00
14 0 + 364.00 4.00 4.000 4.000 36.00 200.00
15 0 + 400.00 6.00 6.000 6.000 50.00 300.00
16 0 + 450.00 6.00 6.000 6.000 50.00 300.00
17 0 + 500.00 6.00 6.000 6.000 50.00 300.00
18 0 + 550.00 6.00 6.000 6.000 50.00 300.00
19 0 + 600.00 6.00 6.000 6.000 50.00 300.00
20 0 + 650.00 6.00 6.000 6.000 50.00 300.00
21 0 + 700.00 6.00 6.000 6.000 25.00 300.00
22 0 + 725.00 4.00 4.000 4.000 5.00 200.00
23 0 + 730.00 4.00 4.000 4.000 20.00 200.00
24 0 + 750.00 6.00 6.000 6.000 50.00 300.00
25 0 + 800.00 6.00 6.000 6.000 50.00 300.00
26 0 + 850.00 6.00 6.000 6.000 50.00 300.00
27 0 + 900.00 6.00 6.000 6.000 50.00 300.00
28 0 + 950.00 6.00 6.000 6.000 50.00 300.00
29 1 + 000.00 6.00 6.000 6.000 50.00 300.00
30 1 + 050.00 6.00 6.000 6.000 50.00 300.00
31 1 + 100.00 6.00 6.000 6.000 50.00 300.00
32 1 + 150.00 4.00 4.000 4.000 6.00 200.00
ATAS ( M )
BAWAH ( M )
RATA -RATA ( M )
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.5a
JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG LEBAR VOLUME
KET( M ) ( M2 ) ATAS
( M ) BAWAH
( M ) RATA -RATA
( M )
33 1 + 156.00 4.00 4.000 4.000 44.00 200.00
34 1 + 200.00 6.00 6.000 6.000 50.00 300.00
35 1 + 250.00 6.00 6.000 6.000 50.00 300.00
36 1 + 300.00 6.00 6.000 6.000 50.00 300.00
37 1 + 350.00 6.00 6.000 6.000 50.00 300.00
38 1 + 400.00 6.00 6.000 6.000 50.00 300.00
39 1 + 450.00 6.00 6.000 6.000 26.00 300.00
40 1 + 476.00 4.00 4.000 4.000 8.00 200.00
41 1 + 484.00 4.00 4.000 4.000 16.00 200.00
42 1 + 500.00 6.00 6.000 6.000 50.00 300.00
43 1 + 550.00 6.00 6.000 6.000 50.00 300.00
44 1 + 600.00 6.00 6.000 6.000 50.00 300.00
45 1 + 650.00 6.00 6.000 6.000 40.00 300.00
46 1 + 690.00 4.00 4.000 4.000 6.00 200.00
47 1 + 696.00 4.00 4.000 4.000 4.00 200.00
48 1 + 700.00 6.00 6.000 6.000 50.00 300.00
49 1 + 750.00 6.00 6.000 6.000 50.00 300.00
50 1 + 800.00 6.00 6.000 6.000 50.00 300.00
51 1 + 850.00 6.00 6.000 6.000 50.00 300.00
52 1 + 900.00 6.00 6.000 6.000 50.00 300.00
53 1 + 950.00 6.00 6.000 6.000 34.00 300.00
54 1 + 984.00 4.00 4.000 4.000 8.00 200.00
55 1 + 992.00 4.00 4.000 4.000 8.00 200.00
56 2 + 000.00 5.00 6.000 5.500 50.00 275.00
57 2 + 050.00 5.00 6.000 5.500 50.00 275.00
58 2 + 100.00 5.00 6.000 5.500 50.00 275.00
59 2 + 150.00 5.00 6.000 5.500 50.00 275.00
60 2 + 200.00 5.00 6.000 5.500 50.00 275.00
61 2 + 250.00 5.00 6.000 5.500 50.00 275.00
62 2 + 300.00 5.00 6.000 5.500 50.00 275.00
63 2 + 350.00 5.00 6.000 5.500 50.00 275.00
64 2 + 400.00 5.00 6.000 5.500 45.00 275.00
65 2 + 445.00 4.00 4.000 4.000 4.00 200.00
66 2 + 449.00 4.00 4.000 4.000 1.00 200.00
67 2 + 450.00 6.00 6.000 6.000 50.00 300.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.5a
JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG LEBAR VOLUME
KET( M ) ( M2 ) ATAS
( M ) BAWAH
( M ) RATA -RATA
( M )
68 2 + 500.00 6.00 6.000 6.000 50.00 300.00
69 2 + 550.00 6.00 6.000 6.000 50.00 300.00
70 2 + 600.00 6.00 6.000 6.000 10.00 300.00
71 2 + 610.00 6.00 6.000 6.000 4.30 300.00
72 2 + 614.30 4.00 4.000 4.000 35.70 200.00
73 2 + 650.00 4.00 4.000 4.000 50.00 200.00
74 2 + 700.00 6.00 6.000 6.000 48.00 300.00
75 2 + 748.00 6.00 6.000 6.000 2.00 300.00
76 2 + 750.00 6.00 6.000 6.000 48.00 300.00
77 2 + 798.00 6.00 6.000 6.000 2.00 300.00
78 2 + 800.00 6.00 6.000 6.000 50.00 300.00
79 2 + 850.00 6.00 6.000 6.000 50.00 300.00
80 2 + 900.00 6.00 6.00 6.000 50.00 300.00
81 2 + 950.00 6.00 6.000 6.000 50.00 300.00
82 3 + 000.00 6.00 6.000 6.000 50.00 300.00
83 3 + 050.00 6.00 6.000 6.000 50.00 300.00
84 3 + 100.00 6.00 6.000 6.000 50.00 300.00
85 3 + 150.00 6.00 6.000 6.000 50.00 300.00
86 3 + 200.00 6.00 6.000 6.000 50.00 300.00
87 3 + 250.00 6.00 6.000 6.000 50.00 300.00
88 3 + 300.00 6.00 6.000 6.000 50.00 300.00
89 3 + 350.00 6.00 6.000 6.000 50.00 300.00
90 3 + 400.00 6.00 6.000 6.000 50.00 300.00
91 3 + 450.00 6.00 6.000 6.000 50.00 300.00
92 3 + 500.00 6.00 6.000 6.000 7.00 300.00
93 3 + 507.00 4.00 4.000 4.000 7.00 200.00
94 3 + 514.00 4.00 4.000 4.000 36.00 200.00
95 3 + 550.00 6.00 6.000 6.000 50.00 300.00
96 3 + 600.00 6.00 6.000 6.000 50.00 300.00
97 3 + 650.00 6.00 6.000 6.000 50.00 300.00
98 3 + 700.00 6.00 6.000 6.000 50.00 300.00
99 3 + 750.00 6.00 6.000 6.000 50.00 300.00
100 3 + 800.00 6.00 6.000 6.000 50.00 300.00
101 3 + 850.00 6.00 6.000 6.000 50.00 300.00
102 3 + 900.00 6.00 6.000 6.000
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.5a
JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG LEBAR VOLUME
KET( M ) ( M2 ) ATAS
( M ) BAWAH
( M ) RATA -RATA
( M )
50.00 300.00 103 3 + 950.00 6.00 6.000 6.000
50.00 300.00 104 4 + 000.00 6.00 6.000 6.000
50.00 300.00 105 4 + 050.00 6.00 6.000 6.000
5.00 300.00 106 4 + 055.00 4.00 4.000 4.000
8.40 200.00 107 4 + 063.40 4.00 4.000 4.000
36.60 200.00 108 4 + 100.00 6.00 6.000 6.000
50.00 300.00 109 4 + 150.00 6.00 6.000 6.000
50.00 300.00 110 4 + 200.00 6.00 6.000 6.000
50.00 300.00 111 4 + 250.00 6.00 6.000 6.000
50.00 300.00 112 4 + 300.00 6.00 6.000 6.000
50.00 300.00 113 4 + 350.00 6.00 6.000 6.000
50.00 300.00 114 4 + 400.00 6.00 6.000 6.000
50.00 300.00 115 4 + 450.00 6.00 6.000 6.000
50.00 300.00 116 4 + 500.00 6.00 6.000 6.000
50.00 300.00 117 4 + 550.00 6.00 6.000 6.000
50.00 300.00 118 4 + 600.00 6.00 6.000 6.000
50.00 300.00 119 4 + 650.00 6.00 6.000 6.000
50.00 300.00 120 4 + 700.00 6.00 6.000 6.000
50.00 300.00 121 4 + 750.00 6.00 6.000 6.000
50.00 300.00 122 4 + 800.00 6.00 6.000 6.000
50.00 300.00 123 4 + 850.00 6.00 6.000 6.000
50.00 300.00 124 4 + 900.00 6.00 6.000 6.000
50.00 300.00 125 4 + 950.00 6.00 6.000 6.000
50.00 300.00 126 5 + 000.00 6.00 6.000 6.000
50.00 300.00 127 5 + 050.00 6.00 6.000 6.000
50.00 300.00 128 5 + 100.00 6.00 6.000 6.000
50.00 300.00 129 5 + 150.00 6.00 6.000 6.000
50.00 300.00 130 5 + 200.00 6.00 6.000 6.000
50.00 300.00 131 5 + 250.00 6.00 6.000 6.000
50.00 300.00 132 5 + 300.00 6.00 6.000 6.000
50.00 300.00 133 5 + 350.00 6.00 6.000 6.000
50.00 300.00 134 5 + 400.00 6.00 6.000 6.000
50.00 300.00 135 5 + 450.00 6.00 6.000 6.000
50.00 300.00 136 5 + 500.00 6.00 6.000 6.000
50.00 300.00 137 5 + 550.00 6.00 6.000 6.000
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.5a
JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG LEBAR VOLUME
KET( M ) ( M2 ) ATAS
( M ) BAWAH
( M ) RATA -RATA
( M )
50.00 300.00 138 5 + 600.00 6.00 6.000 6.000
50.00 300.00 139 5 + 650.00 6.00 6.000 6.000
50.00 300.00 140 5 + 700.00 6.00 6.000 6.000
50.00 300.00 141 5 + 750.00 6.00 6.000 6.000
50.00 300.00 142 5 + 800.00 6.00 6.000 6.000
50.00 300.00 143 5 + 850.00 6.00 6.000 6.000
50.00 300.00 144 5 + 900.00 6.00 6.000 6.000
50.00 300.00 145 5 + 950.00 6.00 6.000 6.000
50.00 300.00 146 6 + 000.00 6.00 6.000 6.000
50.00 300.00 147 6 + 050.00 6.00 6.000 6.000
50.00 300.00 148 6 + 100.00 6.00 6.000 6.000
50.00 300.00 149 6 + 150.00 6.00 6.000 6.000
50.00 300.00 150 6 + 200.00 6.00 6.000 6.000
50.00 300.00 151 6 + 250.00 6.00 6.000 6.000
50.00 300.00 152 6 + 300.00 6.00 6.000 6.000
50.00 300.00 153 6 + 350.00 6.00 6.000 6.000
50.00 300.00 154 6 + 400.00 6.00 6.000 6.000
50.00 300.00 155 6 + 450.00 6.00 6.000 6.000
50.00 300.00 156 6 + 500.00 6.00 6.000 6.000
50.00 300.00 157 6 + 550.00 6.00 6.00 6.000
50.00 300.00 158 6 + 600.00 6.00 6.000 6.000
50.00 300.00 159 6 + 650.00 6.00 6.000 6.000
50.00 300.00 160 6 + 700.00 6.00 6.000 6.000
50.00 300.00 161 6 + 750.00 6.00 6.000 6.000
50.00 300.00 162 6 + 800.00 6.00 6.000 6.000
50.00 300.00 163 6 + 850.00 6.00 6.000 6.000
50.00 300.00 164 6 + 900.00 6.00 6.000 6.000
50.00 300.00 165 6 + 950.00 6.00 6.000 6.000
50.00 300.00 166 7 + 000.00 6.00 6.000 6.000
50.00 300.00 167 7 + 050.00 6.00 6.000 6.000
50.00 300.00 168 7 + 100.00 6.00 6.000 6.000
50.00 300.00 169 7 + 150.00 6.00 6.000 6.000
50.00 300.00 170 7 + 200.00 6.00 6.000 6.000
50.00 300.00 171 7 + 250.00 6.00 6.000 6.000
50.00 300.00 172 7 + 300.00 6.00 6.000 6.000
50.00 300.00 173 7 + 350.00 6.00 6.000 6.000
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.5a
JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)
SATUAN PEMBAYARAN : M2
NO STATIONPANJANG LEBAR VOLUME
KET( M ) ( M2 ) ATAS
( M ) BAWAH
( M ) RATA -RATA
( M )
50.00 300.00 174 7 + 400.00 6.00 6.000 6.000
50.00 300.00 175 7 + 450.00 6.00 6.000 6.000
50.00 300.00 176 7 + 500.00 6.00 6.000 6.000
50.00 300.00 177 7 + 550.00 6.00 6.000 6.000
50.00 300.00 178 7 + 600.00 6.00 6.000 6.000
50.00 300.00 179 7 + 650.00 6.00 6.000 6.000
30.00 300.00 180 7 + 680.00 6.00 6.000 6.000
20.00 300.00 181 7 + 700.00 6.00 6.000 6.000
50.00 300.00 182 7 + 750.00 6.00 6.000 6.000
50.00 300.00 183 7 + 800.00 6.00 6.000 6.000
50.00 300.00 184 7 + 850.00 6.00 6.000 6.000
50.00 300.00 185 7 + 900.00 6.00 6.000 6.000
50.00 300.00 186 7 + 950.00 6.00 6.000 6.000
50.00 300.00 187 8 + 000.00 6.00 6.000 6.000
15.00 300.00 188 8 + 015.00 4.00 4.000 4.000
5.00 200.00 189 8 + 020.00 4.00 4.000 4.000
30.00 200.00 190 8 + 050.00 6.00 6.000 6.000
50.00 300.00 191 8 + 100.00 6.00 6.000 6.000
50.00 300.00 192 8 + 150.00 6.00 6.000 6.000
50.00 300.00 193 8 + 200.00 6.00 6.000 6.000
50.00 300.00 194 8 + 250.00 6.00 6.000 6.000
50.00 300.00 195 8 + 300.00 6.00 6.000 6.000
50.00 300.00 196 8 + 350.00 6.00 6.000 6.000
50.00 300.00 197 8 + 400.00 6.00 6.000 6.000
50.00 300.00 198 8 + 450.00 6.00 6.000 6.000
50.00 300.00 199 8 + 500.00 6.00 6.000 6.000
50.00 300.00 200 8 + 550.00 6.00 6.000 6.000
50.00 300.00 201 8 + 600.00 6.00 6.000 6.000
50.00 300.00 202 8 + 650.00 6.00 6.000 6.000
50.00 300.00 203 8 + 700.00 6.00 6.000 6.000
50.00 300.00 204 8 + 750.00 6.00 6.000 6.000
50.00 300.00 205 8 + 800.00 6.00 6.000 6.000
50.00 300.00 206 8 + 850.00 6.00 6.000 6.000
50.00 300.00 207 8 + 900.00 6.00 6.000 6.000
50.00 300.00 208 8 + 950.00 6.00 6.000 6.000
50.00 300.00 209 9 + 000.00 6.00 6.000 6.000
50.00 300.00
JUMLAH 59,875.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.6a
JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
1 0 + 000.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
2 0 + 050.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
3 0 + 100.00 6.00 6.00 6.000 0.040 0.240 19.00 0.24 4.56
4 0 + 119.00 4.00 4.000 4.000 0.040 0.240 9.00 0.24 2.16
5 0 + 128.00 4.00 4.000 4.000 0.040 0.240 22.00 0.24 5.28
6 0 + 150.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
7 0 + 200.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
8 0 + 250.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
9 0 + 300.00 6.00 6.000 6.000 0.040 0.240 36.00 0.24 8.64
10 0 + 336.00 4.00 4.000 4.000 0.040 0.240 7.00 0.24 1.68
11 0 + 343.00 4.00 4.000 4.000 0.040 0.240 7.00 0.24 1.68
12 0 + 350.00 6.00 6.000 6.000 0.040 0.240 2.00 0.24 0.48
13 0 + 352.00 4.00 4.000 4.000 0.040 0.240 12.00 0.24 2.88
14 0 + 364.00 4.00 4.000 4.000 0.040 0.240 36.00 0.24 8.64
15 0 + 400.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
16 0 + 450.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
17 0 + 500.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
18 0 + 550.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
19 0 + 600.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
20 0 + 650.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
21 0 + 700.00 6.00 6.000 6.000 0.040 0.240 25.00 0.24 6.00
22 0 + 725.00 4.00 4.000 4.000 0.040 0.240 5.00 0.24 1.20
23 0 + 730.00 4.00 4.000 4.000 0.040 0.240 20.00 0.24 4.80
24 0 + 750.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
25 0 + 800.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
26 0 + 850.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
27 0 + 900.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
28 0 + 950.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
29 1 + 000.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
30 1 + 050.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
31 1 + 100.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
32 1 + 150.00 4.00 4.000 4.000 0.040 0.240 6.00 0.24 1.44
33 1 + 156.00 4.00 4.000 4.000 0.040 0.240 44.00 0.24 10.56
34 1 + 200.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
35 1 + 250.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
36 1 + 300.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
37 1 + 350.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
38 1 + 400.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
39 1 + 450.00 6.00 6.000 6.000 0.040 0.240 26.00 0.24 6.24
40 1 + 476.00 4.00 4.000 4.000 0.040 0.240
ATAS ( M )
BAWAH ( M )
RATA -RATA ( M )
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.6a
JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
ATAS ( M )
BAWAH ( M )
RATA -RATA ( M )
8.00 0.24 1.92 41 1 + 484.00 4.00 4.000 4.000 0.040 0.240
16.00 0.24 3.84 42 1 + 500.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 43 1 + 550.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 44 1 + 600.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 45 1 + 650.00 6.00 6.000 6.000 0.040 0.240
40.00 0.24 9.60 46 1 + 690.00 4.00 4.000 4.000 0.040 0.240
6.00 0.24 1.44 47 1 + 696.00 4.00 4.000 4.000 0.040 0.240
4.00 0.24 0.96 48 1 + 700.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 49 1 + 750.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 50 1 + 800.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 51 1 + 850.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 52 1 + 900.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 53 1 + 950.00 6.00 6.000 6.000 0.040 0.240
34.00 0.24 8.16 54 1 + 984.00 4.00 4.000 4.000 0.040 0.240
8.00 0.24 1.92 55 1 + 992.00 4.00 4.000 4.000 0.040 0.240
8.00 0.24 1.92 56 2 + 000.00 5.00 6.000 5.500 0.040 0.240
50.00 0.24 12.00 57 2 + 050.00 5.00 6.000 5.500 0.040 0.240
50.00 0.24 12.00 58 2 + 100.00 5.00 6.000 5.500 0.040 0.240
50.00 0.24 12.00 59 2 + 150.00 5.00 6.000 5.500 0.040 0.240
50.00 0.24 12.00 60 2 + 200.00 5.00 6.000 5.500 0.040 0.240
50.00 0.24 12.00 61 2 + 250.00 5.00 6.000 5.500 0.040 0.240
50.00 0.24 12.00 62 2 + 300.00 5.00 6.000 5.500 0.040 0.240
50.00 0.24 12.00 63 2 + 350.00 5.00 6.000 5.500 0.040 0.240
50.00 0.24 12.00 64 2 + 400.00 5.00 6.000 5.500 0.040 0.240
45.00 0.24 10.80 65 2 + 445.00 4.00 4.000 4.000 0.040 0.240
4.00 0.24 0.96 66 2 + 449.00 4.00 4.000 4.000 0.040 0.240
1.00 0.24 0.24 67 2 + 450.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 68 2 + 500.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 69 2 + 550.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 70 2 + 600.00 6.00 6.000 6.000 0.040 0.240
10.00 0.24 2.40 71 2 + 610.00 6.00 6.000 6.000 0.040 0.240
4.30 0.24 1.03 72 2 + 614.30 4.00 4.000 4.000 0.040 0.240
35.70 0.24 8.57 73 2 + 650.00 4.00 4.000 4.000 0.040 0.240
50.00 0.24 12.00 74 2 + 700.00 6.00 6.000 6.000 0.040 0.240
48.00 0.24 11.52 75 2 + 748.00 6.00 6.000 6.000 0.040 0.240
2.00 0.24 0.48 76 2 + 750.00 6.00 6.000 6.000 0.040 0.240
48.00 0.24 11.52 77 2 + 798.00 6.00 6.000 6.000 0.040 0.240
2.00 0.24 0.48 78 2 + 800.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 79 2 + 850.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.6a
JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
ATAS ( M )
BAWAH ( M )
RATA -RATA ( M )
80 2 + 900.00 6.00 6.00 6.000 0.040 0.240 50.00 0.24 12.00
81 2 + 950.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
82 3 + 000.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00
83 3 + 050.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 84 3 + 100.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 85 3 + 150.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 86 3 + 200.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 87 3 + 250.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 88 3 + 300.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 89 3 + 350.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 90 3 + 400.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 91 3 + 450.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 92 3 + 500.00 6.00 6.000 6.000 0.040 0.240
7.00 0.24 1.68 93 3 + 507.00 4.00 4.000 4.000 0.040 0.240
7.00 0.24 1.68 94 3 + 514.00 4.00 4.000 4.000 0.040 0.240
36.00 0.24 8.64 95 3 + 550.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 96 3 + 600.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 97 3 + 650.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 98 3 + 700.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 99 3 + 750.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 100 3 + 800.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 101 3 + 850.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 102 3 + 900.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 103 3 + 950.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 104 4 + 000.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 105 4 + 050.00 6.00 6.000 6.000 0.040 0.240
5.00 0.24 1.20 106 4 + 055.00 4.00 4.000 4.000 0.040 0.240
8.40 0.24 2.02 107 4 + 063.40 4.00 4.000 4.000 0.040 0.240
36.60 0.24 8.78 108 4 + 100.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 109 4 + 150.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 110 4 + 200.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 111 4 + 250.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 112 4 + 300.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 113 4 + 350.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 114 4 + 400.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 115 4 + 450.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 116 4 + 500.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 117 4 + 550.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 118 4 + 600.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 119 4 + 650.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 120 4 + 700.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.6a
JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
ATAS ( M )
BAWAH ( M )
RATA -RATA ( M )
121 4 + 750.0050.00
6.00 6.000 6.000 0.040 0.240 0.24 12.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.6a
JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
ATAS ( M )
BAWAH ( M )
RATA -RATA ( M )
50.00 0.24 12.00 122 4 + 800.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 123 4 + 850.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 124 4 + 900.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 125 4 + 950.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 126 5 + 000.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 127 5 + 050.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 128 5 + 100.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 129 5 + 150.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 130 5 + 200.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 131 5 + 250.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 132 5 + 300.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 133 5 + 350.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 134 5 + 400.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 135 5 + 450.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 136 5 + 500.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 137 5 + 550.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 138 5 + 600.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 139 5 + 650.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 140 5 + 700.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 141 5 + 750.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 142 5 + 800.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 143 5 + 850.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 144 5 + 900.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 145 5 + 950.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 146 6 + 000.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 147 6 + 050.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 148 6 + 100.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 149 6 + 150.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 150 6 + 200.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 151 6 + 250.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 152 6 + 300.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 153 6 + 350.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 154 6 + 400.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 155 6 + 450.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 156 6 + 500.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 157 6 + 550.00 6.00 6.00 6.000 0.040 0.240
50.00 0.24 12.00 158 6 + 600.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 159 6 + 650.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 160 6 + 700.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 161 6 + 750.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 162 6 + 800.00 6.00 6.000 6.000 0.040 0.240
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.6a
JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
ATAS ( M )
BAWAH ( M )
RATA -RATA ( M )
50.00 0.24 12.00 163 6 + 850.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 164 6 + 900.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 165 6 + 950.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 166 7 + 000.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 167 7 + 050.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 168 7 + 100.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 169 7 + 150.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 170 7 + 200.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 171 7 + 250.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 172 7 + 300.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 173 7 + 350.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 174 7 + 400.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 175 7 + 450.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 176 7 + 500.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 177 7 + 550.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 178 7 + 600.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 179 7 + 650.00 6.00 6.000 6.000 0.040 0.240
30.00 0.24 7.20 180 7 + 680.00 6.00 6.000 6.000 0.040 0.240
20.00 0.24 4.80 181 7 + 700.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 182 7 + 750.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 183 7 + 800.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 184 7 + 850.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 185 7 + 900.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 186 7 + 950.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 187 8 + 000.00 6.00 6.000 6.000 0.040 0.240
15.00 0.24 3.60 188 8 + 015.00 4.00 4.000 4.000 0.040 0.240
5.00 0.24 1.20 189 8 + 020.00 4.00 4.000 4.000 0.040 0.240
30.00 0.24 7.20 190 8 + 050.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 191 8 + 100.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 192 8 + 150.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 193 8 + 200.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 194 8 + 250.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 195 8 + 300.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 196 8 + 350.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 197 8 + 400.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 198 8 + 450.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 199 8 + 500.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 200 8 + 550.00 6.00 6.000 6.000 0.040 0.240
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.3.6a
JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
ATAS ( M )
BAWAH ( M )
RATA -RATA ( M )
50.00 0.24 12.00 201 8 + 600.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 202 8 + 650.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 203 8 + 700.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 204 8 + 750.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 205 8 + 800.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 206 8 + 850.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 207 8 + 900.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 208 8 + 950.00 6.00 6.000 6.000 0.040 0.240
50.00 0.24 12.00 209 9 + 000.00 6.00 6.000 6.000 0.040 0.240
JUMLAH 2,160.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.1
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
KIRI ( M )
KANAN ( M )
LEBAR TOTAL
( M ) 1 0 + 000.00 1.00 1.00 2.000 0.150 0.30
50.00 0.30 15.00 2 0 + 050.00 1.00 1.00 2.000 0.150 0.30
50.00 0.34 16.88 3 0 + 100.00 1.25 1.25 2.500 0.150 0.38
19.00 0.19 3.56 4 0 + 119.00 - - - 0.150 -
9.00 - - 5 0 + 128.00 - - - 0.150 -
22.00 0.19 4.13 6 0 + 150.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 7 0 + 200.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 8 0 + 250.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 9 0 + 300.00 1.25 1.250 2.500 0.150 0.38
36.00 0.19 6.75 10 0 + 336.00 - - - 0.150 -
7.00 - - 11 0 + 343.00 - - - 0.150 -
7.00 0.19 1.31 12 0 + 350.00 1.25 1.250 2.500 0.150 0.38
2.00 0.19 0.38 13 0 + 352.00 - - - 0.150 -
12.00 - - 14 0 + 364.00 - - - 0.150 -
36.00 0.19 6.75 15 0 + 400.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 16 0 + 450.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 17 0 + 500.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 18 0 + 550.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 19 0 + 600.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 20 0 + 650.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 21 0 + 700.00 1.25 1.250 2.500 0.150 0.38
25.00 0.19 4.69 22 0 + 725.00 - - - 0.150 -
5.00 - - 23 0 + 730.00 - - - 0.150 -
20.00 0.19 3.75 24 0 + 750.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 25 0 + 800.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 26 0 + 850.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 27 0 + 900.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 28 0 + 950.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 29 1 + 000.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 30 1 + 050.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 31 1 + 100.00 1.25 1.250 2.500 0.150 0.38
50.00 0.19 9.38 32 1 + 150.00 - - - 0.150 -
6.00 - - 33 1 + 156.00 - - - 0.150 -
44.00 0.19 8.25 34 1 + 200.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 35 1 + 250.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 36 1 + 300.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 37 1 + 350.00 1.25 1.250 2.500 0.150 0.38
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.1
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
KIRI ( M )
KANAN ( M )
LEBAR TOTAL
( M ) 37 1 + 350.0050.00
1.25 1.250 2.500 0.150 0.38 0.38 18.75
38 1 + 400.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
39 1 + 450.00 1.25 1.250 2.500 0.150 0.38 26.00 0.19 4.88
40 1 + 476.00 - - - 0.150 -
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.1
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
KIRI ( M )
KANAN ( M )
LEBAR TOTAL
( M ) 8.00 - -
41 1 + 484.00 - - - 0.150 - 16.00 0.15 2.40
42 1 + 500.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
43 1 + 550.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
44 1 + 600.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
45 1 + 650.00 1.00 1.000 2.000 0.150 0.30 40.00 0.15 6.00
46 1 + 690.00 - - - 0.150 - 6.00 - -
47 1 + 696.00 - - - 0.150 - 4.00 0.19 0.75
48 1 + 700.00 1.25 1.250 2.500 0.150 0.38 50.00 0.34 16.88
49 1 + 750.00 1.00 1.000 2.000 0.150 0.30 50.00 0.34 16.88
50 1 + 800.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
51 1 + 850.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
52 1 + 900.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
53 1 + 950.00 1.25 1.250 2.500 0.150 0.38 34.00 0.19 6.38
54 1 + 984.00 - - - 0.150 - 8.00 - -
55 1 + 992.00 - - - 0.150 - 8.00 0.19 1.50
56 2 + 000.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
57 2 + 050.00 1.25 1.250 2.500 0.150 0.38 50.00 0.34 16.88
58 2 + 100.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
59 2 + 150.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
60 2 + 200.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
61 2 + 250.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
62 2 + 300.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
63 2 + 350.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
64 2 + 400.00 1.00 1.000 2.000 0.150 0.30 45.00 0.15 6.75
65 2 + 445.00 - - - 0.150 - 4.00 - -
66 2 + 449.00 - - - 0.150 - 1.00 0.15 0.15
67 2 + 450.00 1.00 1.000 2.000 0.150 0.30 50.00 0.34 16.88
68 2 + 500.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
69 2 + 550.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
70 2 + 600.00 1.25 1.250 2.500 0.150 0.38 10.00 0.19 1.88
71 2 + 610.00 - - - 0.150 - 4.30 - -
72 2 + 614.30 - - - 0.150 - 35.70 0.19 6.69
73 2 + 650.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
74 2 + 700.00 1.25 1.250 2.500 0.150 0.38 48.00 0.38 18.00
75 2 + 748.00 1.25 1.250 2.500 0.150 0.38 2.00 0.19 0.38
76 2 + 750.00 - - - 0.150 - 48.00 - -
77 2 + 798.00 - - - 0.150 - 2.00 0.19 0.38
78 2 + 800.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
79 2 + 850.00 1.25 1.250 2.500 0.150 0.38 50.00 0.40 19.88
80 2 + 900.00 1.40 1.400 2.800 0.150 0.42 50.00 0.42 21.00
81 2 + 950.00 1.40 1.400 2.800 0.150 0.42
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.1
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
KIRI ( M )
KANAN ( M )
LEBAR TOTAL
( M ) 50.00 0.42 21.00
82 3 + 000.00 1.40 1.400 2.800 0.150 0.42
50.00 0.40 19.88
83 3 + 050.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75
84 3 + 100.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75
85 3 + 150.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75
86 3 + 200.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75
87 3 + 250.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 88 3 + 300.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 89 3 + 350.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 90 3 + 400.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 91 3 + 450.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 92 3 + 500.00 1.25 1.250 2.500 0.150 0.38
7.00 0.19 1.31 93 3 + 507.00 - - - 0.150 -
7.00 - - 94 3 + 514.00 - - - 0.150 -
36.00 0.19 6.75 95 3 + 550.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 96 3 + 600.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 97 3 + 650.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 98 3 + 700.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 99 3 + 750.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 100 3 + 800.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 101 3 + 850.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 102 3 + 900.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 103 3 + 950.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 104 4 + 000.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 105 4 + 050.00 1.25 1.250 2.500 0.150 0.38
5.00 0.19 0.94 106 4 + 055.00 - - - 0.150 -
8.40 - - 107 4 + 063.40 - - - 0.150 -
36.60 0.19 6.86 108 4 + 100.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 109 4 + 150.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 110 4 + 200.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 111 4 + 250.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 112 4 + 300.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.1
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
KIRI ( M )
KANAN ( M )
LEBAR TOTAL
( M ) 113 4 + 350.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 114 4 + 400.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 115 4 + 450.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 116 4 + 500.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 117 4 + 550.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 118 4 + 600.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 119 4 + 650.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 120 4 + 700.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 121 4 + 750.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 122 4 + 800.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 123 4 + 850.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 124 4 + 900.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 125 4 + 950.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 126 5 + 000.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 127 5 + 050.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 128 5 + 100.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 129 5 + 150.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 130 5 + 200.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 131 5 + 250.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 132 5 + 300.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 133 5 + 350.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 134 5 + 400.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 135 5 + 450.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 136 5 + 500.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 137 5 + 550.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 138 5 + 600.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 139 5 + 650.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 140 5 + 700.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 141 5 + 750.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 142 5 + 800.00 1.25 1.250 2.500 0.150 0.38
50.00 0.40 19.88 143 5 + 850.00 1.40 1.400 2.800 0.150 0.42
50.00 0.42 21.00 144 5 + 900.00 1.40 1.400 2.800 0.150 0.42
50.00 0.42 21.00 145 5 + 950.00 1.40 1.400 2.800 0.150 0.42
50.00 0.42 21.00 146 6 + 000.00 1.40 1.400 2.800 0.150 0.42
50.00 0.42 21.00 147 6 + 050.00 1.40 1.400 2.800 0.150 0.42
50.00 0.42 21.00 148 6 + 100.00 1.40 1.400 2.800 0.150 0.42
50.00 0.42 21.00 149 6 + 150.00 1.40 1.400 2.800 0.150 0.42
50.00 0.42 21.00 150 6 + 200.00 1.40 1.400 2.800 0.150 0.42
50.00 0.42 21.00 151 6 + 250.00 1.40 1.400 2.800 0.150 0.42
50.00 0.40 19.88 152 6 + 300.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 153 6 + 350.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 154 6 + 400.00 1.25 1.250 2.500 0.150 0.38
50.00 0.38 18.75 155 6 + 450.00 1.25 1.250 2.500 0.150 0.38
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.1
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
KIRI ( M )
KANAN ( M )
LEBAR TOTAL
( M ) 155 6 + 450.00 1.25 1.250 2.500 0.150 0.38
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.1
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
KIRI ( M )
KANAN ( M )
LEBAR TOTAL
( M ) 50.00 0.38 18.75
156 6 + 500.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
157 6 + 550.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
158 6 + 600.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
159 6 + 650.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
160 6 + 700.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
161 6 + 750.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
162 6 + 800.00 1.25 1.250 2.500 0.150 0.38 50.00 0.40 19.88
163 6 + 850.00 1.40 1.400 2.800 0.150 0.42 50.00 0.42 21.00
164 6 + 900.00 1.40 1.400 2.800 0.150 0.42 50.00 0.42 21.00
165 6 + 950.00 1.40 1.400 2.800 0.150 0.42 50.00 0.40 19.88
166 7 + 000.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
167 7 + 050.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
168 7 + 100.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
169 7 + 150.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
170 7 + 200.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
171 7 + 250.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
172 7 + 300.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
173 7 + 350.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
174 7 + 400.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
175 7 + 450.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
176 7 + 500.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
177 7 + 550.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
178 7 + 600.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75
179 7 + 650.00 1.25 1.250 2.500 0.150 0.38 30.00 0.19 5.63
180 7 + 680.00 - - - 0.150 - 20.00 - -
181 7 + 700.00 - - - 0.150 - 50.00 0.19 9.38
182 7 + 750.00 1.25 1.250 2.500 0.150 0.38 50.00 0.34 16.88
183 7 + 800.00 1.00 1.000 2.000 0.150 0.30 50.00 0.34 16.88
184 7 + 850.00 1.25 1.250 2.500 0.150 0.38 50.00 0.34 16.88
185 7 + 900.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
186 7 + 950.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
187 8 + 000.00 1.00 1.000 2.000 0.150 0.30 15.00 0.15 2.25
188 8 + 015.00 - - - 0.150 - 5.00 - -
189 8 + 020.00 - - - 0.150 - 30.00 0.15 4.50
190 8 + 050.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
191 8 + 100.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
192 8 + 150.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
193 8 + 200.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
194 8 + 250.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
195 8 + 300.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00
196 8 + 350.00 1.00 1.000 2.000 0.150 0.30
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.1
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
KIRI ( M )
KANAN ( M )
LEBAR TOTAL
( M ) 50.00 0.30 15.00
197 8 + 400.00 1.00 1.000 2.000 0.150 0.30 50.00 0.32 15.75
198 8 + 450.00 1.10 1.100 2.200 0.150 0.33 50.00 0.33 16.50
199 8 + 500.00 1.10 1.100 2.200 0.150 0.33 50.00 0.33 16.50
200 8 + 550.00 1.10 1.100 2.200 0.150 0.33 50.00 0.33 16.50
201 8 + 600.00 1.10 1.100 2.200 0.150 0.33 50.00 0.33 16.50
202 8 + 650.00 1.10 1.100 2.200 0.150 0.33 50.00 0.33 16.50
203 8 + 700.00 1.10 1.100 2.200 0.150 0.33
204 8 + 750.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50
205 8 + 800.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50
206 8 + 850.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50
207 8 + 900.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50
208 8 + 950.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50
209 9 + 000.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50
JUMLAH 3,099.92
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.2
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )
1 0 + 000.00 1.00 1.00 2.000 0.200 0.40 50.00 0.40 20.00
2 0 + 050.00 1.00 1.00 2.000 0.200 0.40 50.00 0.45 22.50
3 0 + 100.00 1.25 1.25 2.500 0.200 0.50 19.00 0.25 4.75
4 0 + 119.00 - - - 0.200 - 9.00 - -
5 0 + 128.00 - - - 0.200 - 22.00 0.25 5.50
6 0 + 150.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
7 0 + 200.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
8 0 + 250.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
9 0 + 300.00 1.25 1.250 2.500 0.200 0.50 36.00 0.25 9.00
10 0 + 336.00 - - - 0.200 - 7.00 - -
11 0 + 343.00 - - - 0.200 - 7.00 0.25 1.75
12 0 + 350.00 1.25 1.250 2.500 0.200 0.50 2.00 0.25 0.50
13 0 + 352.00 - - - 0.200 - 12.00 - -
14 0 + 364.00 - - - 0.200 - 36.00 0.25 9.00
15 0 + 400.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
16 0 + 450.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
17 0 + 500.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
18 0 + 550.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
19 0 + 600.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
20 0 + 650.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
21 0 + 700.00 1.25 1.250 2.500 0.200 0.50 25.00 0.25 6.25
22 0 + 725.00 - - - 0.200 - 5.00 - -
23 0 + 730.00 - - - 0.200 - 20.00 0.25 5.00
24 0 + 750.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
25 0 + 800.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
26 0 + 850.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
27 0 + 900.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
28 0 + 950.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
29 1 + 000.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
30 1 + 050.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
31 1 + 100.00 1.25 1.250 2.500 0.200 0.50 50.00 0.25 12.50
32 1 + 150.00 - - - 0.200 - 6.00 - -
33 1 + 156.00 - - - 0.200 - 44.00 0.25 11.00
34 1 + 200.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
35 1 + 250.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
KIRI ( M )
KANAN ( M )
LEBAR TOTAL
( M )
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.2
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI
( M ) KANAN ( M )
LEBAR TOTAL
( M ) 36 1 + 300.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 37 1 + 350.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 38 1 + 400.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 39 1 + 450.00 1.25 1.250 2.500 0.200 0.50
26.00 0.25 6.50 40 1 + 476.00 - - - 0.200 -
8.00 - - 41 1 + 484.00 - - - 0.200 -
16.00 0.20 3.20 42 1 + 500.00 1.00 1.000 2.000 0.200 0.40
50.00 0.40 20.00 43 1 + 550.00 1.00 1.000 2.000 0.200 0.40
50.00 0.40 20.00 44 1 + 600.00 1.00 1.000 2.000 0.200 0.40
50.00 0.40 20.00 45 1 + 650.00 1.00 1.000 2.000 0.200 0.40
40.00 0.20 8.00 46 1 + 690.00 - - - 0.200 -
6.00 - - 47 1 + 696.00 - - - 0.200 -
4.00 0.25 1.00 48 1 + 700.00 1.25 1.250 2.500 0.200 0.50
50.00 0.45 22.50 49 1 + 750.00 1.00 1.000 2.000 0.200 0.40
50.00 0.45 22.50 50 1 + 800.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 51 1 + 850.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 52 1 + 900.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 53 1 + 950.00 1.25 1.250 2.500 0.200 0.50
34.00 0.25 8.50 54 1 + 984.00 - - - 0.200 -
8.00 - - 55 1 + 992.00 - - - 0.200 -
8.00 0.25 2.00 56 2 + 000.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 57 2 + 050.00 1.25 1.250 2.500 0.200 0.50
50.00 0.45 22.50 58 2 + 100.00 1.00 1.000 2.000 0.200 0.40
50.00 0.40 20.00 59 2 + 150.00 1.00 1.000 2.000 0.200 0.40
50.00 0.40 20.00 60 2 + 200.00 1.00 1.000 2.000 0.200 0.40
50.00 0.40 20.00 61 2 + 250.00 1.00 1.000 2.000 0.200 0.40
50.00 0.40 20.00 62 2 + 300.00 1.00 1.000 2.000 0.200 0.40
50.00 0.40 20.00 63 2 + 350.00 1.00 1.000 2.000 0.200 0.40
50.00 0.40 20.00 64 2 + 400.00 1.00 1.000 2.000 0.200 0.40
45.00 0.20 9.00 65 2 + 445.00 - - - 0.200 -
4.00 - - 66 2 + 449.00 - - - 0.200 -
1.00 0.20 0.20 67 2 + 450.00 1.00 1.000 2.000 0.200 0.40
50.00 0.45 22.50 68 2 + 500.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 69 2 + 550.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.2
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI
( M ) KANAN ( M )
LEBAR TOTAL
( M ) 70 2 + 600.00 1.25 1.250 2.500 0.200 0.50
10.00 0.25 2.50 71 2 + 610.00 - - - 0.200 -
4.30 - - 72 2 + 614.30 - - - 0.200 -
35.70 0.25 8.93 73 2 + 650.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 74 2 + 700.00 1.25 1.250 2.500 0.200 0.50
48.00 0.50 24.00 75 2 + 748.00 1.25 1.250 2.500 0.200 0.50
2.00 0.25 0.50 76 2 + 750.00 - - - 0.200 -
48.00 - - 77 2 + 798.00 - - - 0.200 -
2.00 0.25 0.50 78 2 + 800.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 79 2 + 850.00 1.25 1.250 2.500 0.200 0.50
50.00 0.53 26.50 80 2 + 900.00 1.40 1.400 2.800 0.200 0.56
50.00 0.56 28.00 81 2 + 950.00 1.40 1.400 2.800 0.200 0.56
50.00 0.56 28.00
82 3 + 000.00 1.40 1.400 2.800 0.200 0.56
50.00 0.53 26.50
83 3 + 050.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00
84 3 + 100.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00
85 3 + 150.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00
86 3 + 200.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 87 3 + 250.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 88 3 + 300.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 89 3 + 350.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 90 3 + 400.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 91 3 + 450.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 92 3 + 500.00 1.25 1.250 2.500 0.200 0.50
7.00 0.25 1.75 93 3 + 507.00 - - - 0.200 -
7.00 - - 94 3 + 514.00 - - - 0.200 -
36.00 0.25 9.00 95 3 + 550.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 96 3 + 600.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 97 3 + 650.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 98 3 + 700.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 99 3 + 750.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 100 3 + 800.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 101 3 + 850.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 102 3 + 900.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 103 3 + 950.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 104 4 + 000.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 105 4 + 050.00 1.25 1.250 2.500 0.200 0.50
5.00 0.25 1.25 106 4 + 055.00 - - - 0.200 -
8.40 - - 107 4 + 063.40 - - - 0.200 -
36.60 0.25 9.15 108 4 + 100.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 109 4 + 150.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 110 4 + 200.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.2
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI
( M ) KANAN ( M )
LEBAR TOTAL
( M ) 50.00 0.50 25.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.2
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI
( M ) KANAN ( M )
LEBAR TOTAL
( M ) 111 4 + 250.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 112 4 + 300.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 113 4 + 350.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 114 4 + 400.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 115 4 + 450.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 116 4 + 500.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 117 4 + 550.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 118 4 + 600.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 119 4 + 650.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 120 4 + 700.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 121 4 + 750.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 122 4 + 800.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 123 4 + 850.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 124 4 + 900.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 125 4 + 950.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 126 5 + 000.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 127 5 + 050.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 128 5 + 100.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 129 5 + 150.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 130 5 + 200.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 131 5 + 250.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 132 5 + 300.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 133 5 + 350.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 134 5 + 400.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 135 5 + 450.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 136 5 + 500.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 137 5 + 550.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 138 5 + 600.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 139 5 + 650.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 140 5 + 700.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 141 5 + 750.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 142 5 + 800.00 1.25 1.250 2.500 0.200 0.50
50.00 0.53 26.50 143 5 + 850.00 1.40 1.400 2.800 0.200 0.56
50.00 0.56 28.00 144 5 + 900.00 1.40 1.400 2.800 0.200 0.56
50.00 0.56 28.00 145 5 + 950.00 1.40 1.400 2.800 0.200 0.56
50.00 0.56 28.00 146 6 + 000.00 1.40 1.400 2.800 0.200 0.56
50.00 0.56 28.00 147 6 + 050.00 1.40 1.400 2.800 0.200 0.56
50.00 0.56 28.00 148 6 + 100.00 1.40 1.400 2.800 0.200 0.56
50.00 0.56 28.00 149 6 + 150.00 1.40 1.400 2.800 0.200 0.56
50.00 0.56 28.00 150 6 + 200.00 1.40 1.400 2.800 0.200 0.56
50.00 0.56 28.00 151 6 + 250.00 1.40 1.400 2.800 0.200 0.56
50.00 0.53 26.50 152 6 + 300.00 1.25 1.250 2.500 0.200 0.50
50.00 0.50 25.00 153 6 + 350.00 1.25 1.250 2.500 0.200 0.50
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.2
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI
( M ) KANAN ( M )
LEBAR TOTAL
( M ) 50.00 0.50 25.00
154 6 + 400.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
155 6 + 450.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
156 6 + 500.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
157 6 + 550.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
158 6 + 600.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
159 6 + 650.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
160 6 + 700.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
161 6 + 750.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
162 6 + 800.00 1.25 1.250 2.500 0.200 0.50 50.00 0.53 26.50
163 6 + 850.00 1.40 1.400 2.800 0.200 0.56 50.00 0.56 28.00
164 6 + 900.00 1.40 1.400 2.800 0.200 0.56 50.00 0.56 28.00
165 6 + 950.00 1.40 1.400 2.800 0.200 0.56 50.00 0.53 26.50
166 7 + 000.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
167 7 + 050.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
168 7 + 100.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
169 7 + 150.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
170 7 + 200.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
171 7 + 250.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
172 7 + 300.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
173 7 + 350.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
174 7 + 400.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
175 7 + 450.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
176 7 + 500.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
177 7 + 550.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
178 7 + 600.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00
179 7 + 650.00 1.25 1.250 2.500 0.200 0.50 30.00 0.25 7.50
180 7 + 680.00 - - - 0.200 - 20.00 - -
181 7 + 700.00 - - - 0.200 - 50.00 0.25 12.50
182 7 + 750.00 1.25 1.250 2.500 0.200 0.50 50.00 0.45 22.50
183 7 + 800.00 1.00 1.000 2.000 0.200 0.40 50.00 0.45 22.50
184 7 + 850.00 1.25 1.250 2.500 0.200 0.50 50.00 0.45 22.50
185 7 + 900.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00
186 7 + 950.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00
187 8 + 000.00 1.00 1.000 2.000 0.200 0.40 15.00 0.20 3.00
188 8 + 015.00 - - - 0.200 - 5.00 - -
189 8 + 020.00 - - - 0.200 - 30.00 0.20 6.00
190 8 + 050.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00
191 8 + 100.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00
192 8 + 150.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00
193 8 + 200.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00
194 8 + 250.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00
195 8 + 300.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00
196 8 + 350.00 1.00 1.000 2.000 0.200 0.40
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.2
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI
( M ) KANAN ( M )
LEBAR TOTAL
( M ) 196 8 + 350.00 1.00 1.000 2.000 0.200 0.40
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 5.2
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME
KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI
( M ) KANAN ( M )
LEBAR TOTAL
( M ) 50.00 0.40 20.00
197 8 + 400.00 1.00 1.000 2.000 0.200 0.40 50.00 0.42 21.00
198 8 + 450.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
199 8 + 500.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
200 8 + 550.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
201 8 + 600.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
202 8 + 650.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
203 8 + 700.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
204 8 + 750.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
205 8 + 800.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
206 8 + 850.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
207 8 + 900.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
208 8 + 950.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00
209 9 + 000.00 1.10 1.100 2.200 0.200 0.44
JUMLAH 4,133.23
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.1.1
JENIS PEKERJAAN : Lapis Rsap Pengikat
SATUAN PEMBAYARAN : Liter
NO STATION
PANJANG LEBAR PENYERAPAN LUAS VOLUME
KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )
1 0 + 000.00 6.00 0.85 5.10 50.00 5.10 255.00
2 0 + 050.00 6.00 0.85 5.10 50.00 5.10 255.00
3 0 + 100.00 6.00 0.85 5.10 19.00 4.25 80.75
4 0 + 119.00 4.00 0.85 3.40 9.00 3.40 30.60
5 0 + 128.00 4.00 0.85 3.40 22.00 4.25 93.50
6 0 + 150.00 6.00 0.85 5.10 50.00 5.10 255.00
7 0 + 200.00 6.00 0.85 5.10 50.00 5.10 255.00
8 0 + 250.00 6.00 0.85 5.10 50.00 5.10 255.00
9 0 + 300.00 6.00 0.85 5.10 36.00 4.25 153.00
10 0 + 336.00 4.00 0.85 3.40 7.00 3.40 23.80
11 0 + 343.00 4.00 0.85 3.40 7.00 4.25 29.75
12 0 + 350.00 6.00 0.85 5.10 2.00 4.25 8.50
13 0 + 352.00 4.00 0.85 3.40 12.00 3.40 40.80
14 0 + 364.00 4.00 0.85 3.40 36.00 4.25 153.00
15 0 + 400.00 6.00 0.85 5.10 50.00 5.10 255.00
16 0 + 450.00 6.00 0.85 5.10 50.00 5.10 255.00
17 0 + 500.00 6.00 0.85 5.10 50.00 5.10 255.00
18 0 + 550.00 6.00 0.85 5.10 50.00 5.10 255.00
19 0 + 600.00 6.00 0.85 5.10 50.00 5.10 255.00
20 0 + 650.00 6.00 0.85 5.10 50.00 5.10 255.00
21 0 + 700.00 6.00 0.85 5.10 25.00 4.25 106.25
22 0 + 725.00 4.00 0.85 3.40 5.00 3.40 17.00
23 0 + 730.00 4.00 0.85 3.40 20.00 4.25 85.00
24 0 + 750.00 6.00 0.85 5.10 50.00 5.10 255.00
25 0 + 800.00 6.00 0.85 5.10 50.00 5.10 255.00
26 0 + 850.00 6.00 0.85 5.10 50.00 5.10 255.00
27 0 + 900.00 6.00 0.85 5.10 50.00 5.10 255.00
28 0 + 950.00 6.00 0.85 5.10 50.00 5.10 255.00
29 1 + 000.00 6.00 0.85 5.10 50.00 5.10 255.00
30 1 + 050.00 6.00 0.85 5.10 50.00 5.10 255.00
31 1 + 100.00 6.00 0.85 5.10 50.00 4.25 212.50
32 1 + 150.00 4.00 0.85 3.40 6.00 3.40 20.40
33 1 + 156.00 4.00 0.85 3.40 44.00 4.25 187.00
34 1 + 200.00 6.00 0.85 5.10 50.00 5.10 255.00
35 1 + 250.00 6.00 0.85 5.10 50.00 5.10 255.00
36 1 + 300.00 6.00 0.85 5.10 50.00 5.10 255.00
37 1 + 350.00 6.00 0.85 5.10 50.00 5.10 255.00
RATA2 ( LTR/M )
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.1.1
JENIS PEKERJAAN : Lapis Rsap Pengikat
SATUAN PEMBAYARAN : Liter
NO STATION
PANJANG LEBAR PENYERAPAN LUAS VOLUME
KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )
RATA2 ( LTR/M )
38 1 + 400.00 6.00 0.85 5.10 50.00 5.10 255.00
39 1 + 450.00 6.00 0.85 5.10 26.00 4.25 110.50
40 1 + 476.00 4.00 0.85 3.40 8.00 3.40 27.20
41 1 + 484.00 4.00 0.85 3.40 16.00 4.25 68.00
42 1 + 500.00 6.00 0.85 5.10 50.00 5.10 255.00
43 1 + 550.00 6.00 0.85 5.10 50.00 5.10 255.00
44 1 + 600.00 6.00 0.85 5.10 50.00 5.10 255.00
45 1 + 650.00 6.00 0.85 5.10 40.00 4.25 170.00
46 1 + 690.00 4.00 0.85 3.40 6.00 3.40 20.40
47 1 + 696.00 4.00 0.85 3.40 4.00 4.25 17.00
48 1 + 700.00 6.00 0.85 5.10 50.00 5.10 255.00
49 1 + 750.00 6.00 0.85 5.10 50.00 5.10 255.00
50 1 + 800.00 6.00 0.85 5.10 50.00 5.10 255.00
51 1 + 850.00 6.00 0.85 5.10 50.00 5.10 255.00
52 1 + 900.00 6.00 0.85 5.10 50.00 5.10 255.00
53 1 + 950.00 6.00 0.85 5.10 34.00 4.25 144.50
54 1 + 984.00 4.00 0.85 3.40 8.00 3.40 27.20
55 1 + 992.00 4.00 0.85 3.40 8.00 3.83 30.60
56 2 + 000.00 5.00 0.85 4.25 50.00 4.25 212.50
57 2 + 050.00 5.00 0.85 4.25 50.00 4.25 212.50
58 2 + 100.00 5.00 0.85 4.25 50.00 4.25 212.50
59 2 + 150.00 5.00 0.85 4.25 50.00 4.25 212.50
60 2 + 200.00 5.00 0.85 4.25 50.00 4.25 212.50
61 2 + 250.00 5.00 0.85 4.25 50.00 4.25 212.50
62 2 + 300.00 5.00 0.85 4.25 50.00 4.25 212.50
63 2 + 350.00 5.00 0.85 4.25 50.00 4.25 212.50
64 2 + 400.00 5.00 0.85 4.25 45.00 3.83 172.13
65 2 + 445.00 4.00 0.85 3.40 4.00 3.40 13.60
66 2 + 449.00 4.00 0.85 3.40 1.00 4.25 4.25
67 2 + 450.00 6.00 0.85 5.10 50.00 5.10 255.00
68 2 + 500.00 6.00 0.85 5.10 50.00 5.10 255.00
69 2 + 550.00 6.00 0.85 5.10 50.00 5.10 255.00
70 2 + 600.00 6.00 0.85 5.10 10.00 5.10 51.00
71 2 + 610.00 6.00 0.85 5.10 4.30 4.25 18.28
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.1.1
JENIS PEKERJAAN : Lapis Rsap Pengikat
SATUAN PEMBAYARAN : Liter
NO STATION
PANJANG LEBAR PENYERAPAN LUAS VOLUME
KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )
RATA2 ( LTR/M )
72 2 + 614.30 4.00 0.85 3.40 3.40 121.38 35.70
73 2 + 650.00 4.00 0.85 3.40 4.25 212.50 50.00
74 2 + 700.00 6.00 0.85 5.10 5.10 244.80 48.00
75 2 + 748.00 6.00 0.85 5.10 5.10 10.20 2.00
76 2 + 750.00 6.00 0.85 5.10 5.10 244.80 48.00
77 2 + 798.00 6.00 0.85 5.10 5.10 10.20 2.00
78 2 + 800.00 6.00 0.85 5.10 5.10 255.00 50.00
79 2 + 850.00 6.00 0.85 5.10 5.10 255.00 50.00
80 2 + 900.00 6.00 0.85 5.10 5.10 255.00 50.00
81 2 + 950.00 6.00 0.85 5.10 5.10 255.00 50.00
82 3 + 000.00 6.00 0.85 5.10 5.10 255.00
50.00
83 3 + 050.00 6.00 0.85 5.10 5.10 255.00
50.0084 3 + 100.00 6.00 0.85 5.10 5.10 255.00
50.0085 3 + 150.00 6.00 0.85 5.10 5.10 255.00
50.0086 3 + 200.00 6.00 0.85 5.10 5.10 255.00
50.0087 3 + 250.00 6.00 0.85 5.10 5.10 255.00
50.0088 3 + 300.00 6.00 0.85 5.10 5.10 255.00
50.0089 3 + 350.00 6.00 0.85 5.10 5.10 255.00
50.0090 3 + 400.00 6.00 0.85 5.10 5.10 255.00
50.0091 3 + 450.00 6.00 0.85 5.10 5.10 255.00
50.0092 3 + 500.00 6.00 0.85 5.10 4.25 29.75
7.0093 3 + 507.00 4.00 0.85 3.40 3.40 23.80
7.0094 3 + 514.00 4.00 0.85 3.40 4.25 153.00
36.0095 3 + 550.00 6.00 0.85 5.10 5.10 255.00
50.0096 3 + 600.00 6.00 0.85 5.10 5.10 255.00
50.0097 3 + 650.00 6.00 0.85 5.10 5.10 255.00
50.0098 3 + 700.00 6.00 0.85 5.10 5.10 255.00
50.0099 3 + 750.00 6.00 0.85 5.10 5.10 255.00
50.00100 3 + 800.00 6.00 0.85 5.10 5.10 255.00
50.00101 3 + 850.00 6.00 0.85 5.10 5.10 255.00
50.00102 3 + 900.00 6.00 0.85 5.10 5.10 255.00
50.00103 3 + 950.00 6.00 0.85 5.10 5.10 255.00
50.00104 4 + 000.00 6.00 0.85 5.10 5.10 255.00
50.00105 4 + 050.00 6.00 0.85 5.10 4.25 21.25
5.00106 4 + 055.00 4.00 0.85 3.40 3.40 28.56
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.1.1
JENIS PEKERJAAN : Lapis Rsap Pengikat
SATUAN PEMBAYARAN : Liter
NO STATION
PANJANG LEBAR PENYERAPAN LUAS VOLUME
KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )
RATA2 ( LTR/M )
8.40107 4 + 063.40 4.00 0.85 3.40 4.25 155.55
36.60108 4 + 100.00 6.00 0.85 5.10 5.10 255.00
50.00109 4 + 150.00 6.00 0.85 5.10 5.10 255.00
50.00110 4 + 200.00 6.00 0.85 5.10 5.10 255.00
50.00111 4 + 250.00 6.00 0.85 5.10 5.10 255.00
50.00112 4 + 300.00 6.00 0.85 5.10 5.10 255.00
50.00113 4 + 350.00 6.00 0.85 5.10 5.10 255.00
50.00114 4 + 400.00 6.00 0.85 5.10 5.10 255.00
50.00115 4 + 450.00 6.00 0.85 5.10 5.10 255.00
50.00116 4 + 500.00 6.00 0.85 5.10 5.10 255.00
50.00117 4 + 550.00 6.00 0.85 5.10 5.10 255.00
50.00118 4 + 600.00 6.00 0.85 5.10 5.10 255.00
50.00119 4 + 650.00 6.00 0.85 5.10 5.10 255.00
50.00120 4 + 700.00 6.00 0.85 5.10 5.10 255.00
50.00121 4 + 750.00 6.00 0.85 5.10 5.10 255.00
50.00122 4 + 800.00 6.00 0.85 5.10 5.10 255.00
50.00123 4 + 850.00 6.00 0.85 5.10 5.10 255.00
50.00124 4 + 900.00 6.00 0.85 5.10 5.10 255.00
50.00125 4 + 950.00 6.00 0.85 5.10 5.10 255.00
50.00126 5 + 000.00 6.00 0.85 5.10 5.10 255.00
50.00127 5 + 050.00 6.00 0.85 5.10 5.10 255.00
50.00128 5 + 100.00 6.00 0.85 5.10 5.10 255.00
50.00129 5 + 150.00 6.00 0.85 5.10 5.10 255.00
50.00130 5 + 200.00 6.00 0.85 5.10 5.10 255.00
50.00131 5 + 250.00 6.00 0.85 5.10 5.10 255.00
50.00132 5 + 300.00 6.00 0.85 5.10 5.10 255.00
50.00133 5 + 350.00 6.00 0.85 5.10 5.10 255.00
50.00134 5 + 400.00 6.00 0.85 5.10 5.10 255.00
50.00135 5 + 450.00 6.00 0.85 5.10 5.10 255.00
50.00136 5 + 500.00 6.00 0.85 5.10 5.10 255.00
50.00137 5 + 550.00 6.00 0.85 5.10 5.10 255.00
50.00138 5 + 600.00 6.00 0.85 5.10 5.10 255.00
50.00139 5 + 650.00 6.00 0.85 5.10 5.10 255.00
50.00140 5 + 700.00 6.00 0.85 5.10 5.10 255.00
50.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.1.1
JENIS PEKERJAAN : Lapis Rsap Pengikat
SATUAN PEMBAYARAN : Liter
NO STATION
PANJANG LEBAR PENYERAPAN LUAS VOLUME
KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )
RATA2 ( LTR/M )
141 5 + 750.00 6.00 0.85 5.10 5.10 255.00 50.00
142 5 + 800.00 6.00 0.85 5.10 5.10 255.00 50.00
143 5 + 850.00 6.00 0.85 5.10 5.10 255.00 50.00
144 5 + 900.00 6.00 0.85 5.10 5.10 255.00 50.00
145 5 + 950.00 6.00 0.85 5.10 5.10 255.00 50.00
146 6 + 000.00 6.00 0.85 5.10 5.10 255.00 50.00
147 6 + 050.00 6.00 0.85 5.10 5.10 255.00 50.00
148 6 + 100.00 6.00 0.85 5.10 5.10 255.00 50.00
149 6 + 150.00 6.00 0.85 5.10 5.10 255.00 50.00
150 6 + 200.00 6.00 0.85 5.10 5.10 255.00 50.00
151 6 + 250.00 6.00 0.85 5.10 5.10 255.00 50.00
152 6 + 300.00 6.00 0.85 5.10 5.10 255.00 50.00
153 6 + 350.00 6.00 0.85 5.10 5.10 255.00 50.00
154 6 + 400.00 6.00 0.85 5.10 5.10 255.00 50.00
155 6 + 450.00 6.00 0.85 5.10 5.10 255.00 50.00
156 6 + 500.00 6.00 0.85 5.10 5.10 255.00 50.00
157 6 + 550.00 6.00 0.85 5.10 5.10 255.00 50.00
158 6 + 600.00 6.00 0.85 5.10 5.10 255.00 50.00
159 6 + 650.00 6.00 0.85 5.10 5.10 255.00 50.00
160 6 + 700.00 6.00 0.85 5.10 5.10 255.00 50.00
161 6 + 750.00 6.00 0.85 5.10 5.10 255.00 50.00
162 6 + 800.00 6.00 0.85 5.10 5.10 255.00 50.00
163 6 + 850.00 6.00 0.85 5.10 5.10 255.00 50.00
164 6 + 900.00 6.00 0.85 5.10 5.10 255.00 50.00
165 6 + 950.00 6.00 0.85 5.10 5.10 255.00 50.00
166 7 + 000.00 6.00 0.85 5.10 5.10 255.00 50.00
167 7 + 050.00 6.00 0.85 5.10 5.10 255.00 50.00
168 7 + 100.00 6.00 0.85 5.10 5.10 255.00 50.00
169 7 + 150.00 6.00 0.85 5.10 5.10 255.00 50.00
170 7 + 200.00 6.00 0.85 5.10 5.10 255.00 50.00
171 7 + 250.00 6.00 0.85 5.10 5.10 255.00 50.00
172 7 + 300.00 6.00 0.85 5.10 5.10 255.00 50.00
173 7 + 350.00 6.00 0.85 5.10 5.10 255.00 50.00
174 7 + 400.00 6.00 0.85 5.10 5.10 255.00 50.00
175 7 + 450.00 6.00 0.85 5.10 5.10 255.00 50.00
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.1.1
JENIS PEKERJAAN : Lapis Rsap Pengikat
SATUAN PEMBAYARAN : Liter
NO STATION
PANJANG LEBAR PENYERAPAN LUAS VOLUME
KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )
RATA2 ( LTR/M )
176 7 + 500.00 6.00 0.85 5.10 5.10 255.00 50.00
177 7 + 550.00 6.00 0.85 5.10 5.10 255.00 50.00
178 7 + 600.00 6.00 0.85 5.10 5.10 255.00 50.00
179 7 + 650.00 6.00 0.85 5.10 5.10 153.00 30.00
180 7 + 680.00 6.00 0.85 5.10 5.10 102.00 20.00
181 7 + 700.00 6.00 0.85 5.10 5.10 255.00 50.00
182 7 + 750.00 6.00 0.85 5.10 5.10 255.00 50.00
183 7 + 800.00 6.00 0.85 5.10 5.10 255.00 50.00
184 7 + 850.00 6.00 0.85 5.10 5.10 255.00 50.00
185 7 + 900.00 6.00 0.85 5.10 5.10 255.00 50.00
186 7 + 950.00 6.00 0.85 5.10 5.10 255.00 50.00
187 8 + 000.00 6.00 0.85 5.10 4.25 63.75 15.00
188 8 + 015.00 4.00 0.85 3.40 3.40 17.00 5.00
189 8 + 020.00 4.00 0.85 3.40 4.25 127.50 30.00
190 8 + 050.00 6.00 0.85 5.10 5.10 255.00 50.00
191 8 + 100.00 6.00 0.85 5.10 5.10 255.00 50.00
192 8 + 150.00 6.00 0.85 5.10 5.10 255.00 50.00
193 8 + 200.00 6.00 0.85 5.10 5.10 255.00 50.00
194 8 + 250.00 6.00 0.85 5.10 5.10 255.00 50.00
195 8 + 300.00 6.00 0.85 5.10 5.10 255.00 50.00
196 8 + 350.00 6.00 0.85 5.10 5.10 255.00 50.00
197 8 + 400.00 6.00 0.85 5.10 5.10 255.00 50.00
198 8 + 450.00 6.00 0.85 5.10 5.10 255.00 50.00
199 8 + 500.00 6.00 0.85 5.10 5.10 255.00 50.00
200 8 + 550.00 6.00 0.85 5.10 5.10 255.00 50.00
201 8 + 600.00 6.00 0.85 5.10 5.10 255.00 50.00
202 8 + 650.00 6.00 0.85 5.10 5.10 255.00 50.00
203 8 + 700.00 6.00 0.85 5.10 5.10 255.00 50.00
204 8 + 750.00 6.00 0.85 5.10 5.10 255.00 50.00
205 8 + 800.00 6.00 0.85 5.10 5.10 255.00 50.00
206 8 + 850.00 6.00 0.85 5.10 5.10 255.00 50.00
207 8 + 900.00 6.00 0.85 5.10 5.10 255.00 50.00
208 8 + 950.00 6.00 0.85 5.10 5.10 255.00 50.00
209 9 + 000.00 6.00 0.85 5.10 -
JUMLAH 44,805.5
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 6.1.2
JENIS PEKERJAAN : Lapis Perekat
SATUAN PEMBAYARAN : Liter
NO STATIONPANJANG LEBAR PENYERAPAN LUAS VOLUME
KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr ) RATA2
( LTR/M )
50.00 5.10 255.00 191 8 + 100.00 6.00 0.85 5.10
50.00 5.10 255.00 192 8 + 150.00 6.00 0.85 5.10
50.00 5.10 255.00 193 8 + 200.00 6.00 0.85 5.10
50.00 5.10 255.00 194 8 + 250.00 6.00 0.85 5.10
50.00 5.10 255.00 195 8 + 300.00 6.00 0.85 5.10
50.00 5.10 255.00 196 8 + 350.00 6.00 0.85 5.10
50.00 5.10 255.00 197 8 + 400.00 6.00 0.85 5.10
50.00 5.10 255.00 198 8 + 450.00 6.00 0.85 5.10
50.00 5.10 255.00 199 8 + 500.00 6.00 0.85 5.10
50.00 5.10 255.00 200 8 + 550.00 6.00 0.85 5.10
50.00 5.10 255.00 201 8 + 600.00 6.00 0.85 5.10
50.00 5.10 255.00 202 8 + 650.00 6.00 0.85 5.10
50.00 5.10 255.00 203 8 + 700.00 6.00 0.85 5.10
50.00 5.10 255.00 204 8 + 750.00 6.00 0.85 5.10
50.00 5.10 255.00 205 8 + 800.00 6.00 0.85 5.10
50.00 5.10 255.00 206 8 + 850.00 6.00 0.85 5.10
50.00 5.10 255.00 207 8 + 900.00 6.00 0.85 5.10
50.00 5.10 255.00 208 8 + 950.00 6.00 0.85 5.10
50.00 5.10 255.00 209 9 + 000.00 6.00 0.85 5.10
JUMLAH 36,634.1
0 0 1
50 50 2
50 100 3
50 150 4
50 200 5
50 250 6
50 300 7
50 350 8
50 400 9
50 450 10
50 500 11
50 550 12
50 600 13
50 650 14
50 700 15
50 750 16
50 800 17
50 850 18
50 900 19
50 950 20
50 1000 21
50 1050 22
50 1100 23
50 1150 24
50 1200 25
50 1250 26
50 1300 27
50 1350 28
50 1400 29
50 1450 30
50 1500 31
50 1550 32
50 1600 33
50 1650 34
50 1700 35
50 1750 36
50 1800 37
50 1850 38
50 1900 39
50 1950 40
50 2000 41
50 2050 42
50 2100 43
50 2150 44
50 2200 45
50 2250 46
50 2300 47
50 2350 48
50 2400 49
50 2450 50
50 2500 51
50 2550 52
50 2600 53
50 2650 54
50 2700 55
50 2750 56
50 2800 57
50 2850 58
50 2900 59
25 2925 60
25 2950 61
50 3000 62
50 3050 63
50 3100 64
50 3150 65
50 3200 66
50 3250 67
50 3300 68
50 3350 69
50 3400 70
50 3450 71
50 3500 72
50 3550 73
50 3600 74
50 3650 75
50 3700 76
27 3727 77
50 3777 78
50 3827 79
50 3877 80
30 3907 81
30 3937 82
30 3967 83
30 3997 84
50 4047 85
50 4097 86
50 4147 87
35 4182 88
35 4217 89
50 4267 90
50 4317 91
50 4367 92
50 4417 93
50 4467 94
50 4517 95
50 4567 96
50 4617 97
50 4667 98
50 4717 99
50 4767 100
50 4817 101
50 4867 102
50 4917 103
50 4967 104
50 5017 105
50 5067 106
50 5117 107
50 5167 108
50 5217 109
50 5267 110
50 5317 111
50 5367 112
25 5392 113
25 5417 114
50 5467 115
50 5517 116
50 5567 117
50 5617 118
50 5667 119
50 5717 120
50 5767 121
50 5817 122
50 5867 123
50 5917 124
50 5967 125
50 6017 126
50 6067 127
50 6117 128
50 6167 129
50 6217 130
50 6267 131
50 6317 132
50 6367 133
50 6417 134
50 6467 135
50 6517 136
30 6547 137
30 6577 138
50 6627 139
50 6677 140
50 6727 141
50 6777 142
50 6827 143
50 6877 144
50 6927 145
55 6982 146
50 7032 147
50 7082 148
50 7132 149
70 7202 150
50 7252 151
50 7302 152
50 7352 153
50 7402 154
50 7452 155
50 7502 156
50 7552 157
50 7602 158
50 7652 159
50 7702 160
50 7752 161
60 7812 162
45 7857 163
50 7907 164
50 7957 165
50 8007 166
50 8057 167
25 8082 168
50 8132 169
50 8182 170
50 8232 171
50 8282 172
35 8317 173
50 8367 174
50 8417 175
50 8467 176
50 8517 177
20 8537 178
30 8567 179
50 8617 180
50 8667 181
50 8717 182
50 8767 183
50 8817 184
50 8867 185
25 8892 186
25 8917 187
50 8967 188
50 9017 189
50 9067 190
50 9117 191
25 9142 192
40 9182 193
50 9232 194
50 9282 195
50 9332 196
50 9382 197
50 9432 198
50 9482 199
50 9532 200
50 9582 201
25 9607 202
50 9657 203
50 9707 204
50 9757 205
50 9807 206
50 9857 207
50 9907 208
35 9942 209
50 9992 210
50 10042 211
50 10092 212
50 10142 213
50 10192 214
50 10242 215
50 10292 216
50 10342 217
50 10392 218
25 10417 219
50 10467 220
25 10492 221
25 10517 222
50 10567 223
60 10627 224
50 10677 225
50 10727 226
50 10777 227
50 10827 228
50 10877 229
50 10927 230
50 10977 231
50 11027 232
50 11077 233
50 11127 234
50 11177 235
50 11227 236
50 11277 237
30 11307 238
20 11327 239
50 11377 240
25 11402 241
25 11427 242
50 11477 243
50 11527 244
40 11567 245
50 11617 246
50 11667 247
50 11717 248
50 11767 249
50 11817 250
50 11867 251
50 11917 252
30 11947 253
50 11997 254
50 12047 255
50 12097 256
50 12147 257
50 12197 258
50 12197 259
50 12297 260
50 12347 261
50 12397 262
50 12447 263
50 12497 264
50 12547 265
50 12597 266
50 12647 267
20 12667 268
50 12717 269
50 12767 270
50 12817 271
50 12867 272
50 12917 273
50 12967 274
50 13017 275
25 13042 276
50 13092 277
50 13142 278
50 13192 279
25 13217 280
50 13267 281
25 13292 282
25 13317 283
50 13367 284
50 13417 285
30 13447 286
50 13497 287
50 13547 288
50 13597 289
50 13647 290
50 13697 291
50 13747 292
20 13767 293
20 13787 294
50 13837 295
50 13887 296
50 13937 297
60 13997 298
20 14017 299
50 14067 300
50 14117 301
50 14167 302
50 14217 303
50 14267 304
50 14317 305
40 14357 306
50 14407 307
50 14457 308
50 14507 309
50 14557 310
50 14607 311
50 14657 312
30 14687 313
50 14737 314
50 14787 315
20 14807 316
50 14857 317
50 14907 318
50 14957 319
50 15007 320
50 15057 321
50 15107 322
50 15157 323
50 15207 324
50 15257 325
50 15307 326
50 15357 327
50 15407 328
50 15457 329
50 15507 330
50 15557 331
50 15607 332
50 15657 333
50 15707 334
40 15747 335
70077835
BACK UP DATA
KEGIATAN : PERENCANAAN TEKNIS JALAN DAN JEMBATAN
NO. PAKET KONTRAK : PR - JLJB/20/2013
NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6
PROP/KAB/KODYA : ACEH / ACEH SELATAN
ITEM PEMBAYARAN NO : 2.1
JENIS PEKERJAAN : Galian Untuk Drainase, Saluran
SATUAN PEMBAYARAN : M3
NO STATIONPANJANG GALIAN SAL SALURAN PASIR URUG
KET.
( M ) ( M2 ) ( M2 ) ( M2 ) ( M2 ) ( M2 ) ( M2 )
1 22 + 770.00 - - - 0.22 0.94 0.22 50.00
2 22 + 820.00 1.43 - 1.39 1.92 1.67 0.47 50.00
3 22 + 870.00 - 1.98 - 1.87 5.40 0.54 50.00
4 22 + 920.00 - 2.76 - 1.92 4.20 0.65 50.00
5 22 + 970.00 1.73 7.30 1.39 1.69 2.70 0.77 50.00
6 23 + 020.00 - 0.44 - 0.34 0.57 50.00
7 23 + 070.00 - - - 1.30 12.70 0.36 50.00
8 23 + 120.00 1.73 6.60 1.09 2.30 - 0.20 50.00
9 23 + 170.00 1.73 1.23 1.09 1.45 3.16 0.29 50.00
10 23 + 220.00 - 2.70 2.30 2.46 0.21 50.00
11 23 + 270.00 1.73 1.07 1.09 1.45 3.85 0.29 50.00
12 23 + 320.00 - 2.10 0.80 4.08 0.78 50.00
13 23 + 370.00 - 3.60 0.90 3.56 0.30 50.00
14 23 + 420.00 - 1.90 3.84 0.29 50.00
15 23 + 470.00 - 2.40 0.90 3.70 0.15 50.00
16 23 + 520.00 1.73 2.80 1.09 0.85 3.20 0.25 50.00
17 23 + 570.00 1.73 2.46 1.09 2.96 1.89 0.37 50.00
18 23 + 620.00 - 0.84 0.85 2.79 0.25 50.00
19 23 + 670.00 1.73 - 1.09 1.90 4.73 0.15 50.00
20 23 + 720.00 1.73 5.69 1.09 0.85 3.89 0.15 50.00
21 23 + 770.00 3.46 - 2.18 - 2.70 0.15 50.00
22 23 + 820.00 3.46 0.73 2.18 2.67 0.25 50.00
23 23 + 870.00 3.46 1.17 2.18 0.85 4.27 0.29 50.00
24 23 + 920.00 1.43 1.20 1.09 5.57 0.15 50.00
25 23 + 970.00 1.73 0.57 1.09 0.85 2.42 0.25 50.00
26 24 + 020.00 1.73 1.98 1.09 1.30 4.17 0.39 50.00
27 24 + 070.00 1.73 1.55 1.09 1.70 2.78 0.35 50.00
28 24 + 120.00 1.73 2.15 1.09 1.90 8.66 0.44 50.00
29 24 + 170.00 1.73 1.93 1.09 1.30 5.99 0.29 50.00
30 24 + 220.00 1.73 4.06 1.09 2.30 3.47 0.39 50.00
31 24 + 270.00 1.73 2.36 1.09 4.58 0.44 50.00
32 24 + 320.00 1.73 10.25 1.09 0.60 - 0.15 50.00
33 24 + 370.00 1.73 12.31 1.09 - - 0.15 50.00
34 24 + 420.00 - 1.79 1.30 4.94 0.39 50.00
35 24 + 470.00 1.73 3.65 1.09 - 1.71 0.15 50.00
36 24 + 520.00 3.46 2.75 2.18 0.85 0.88 0.25 50.00
37 24 + 570.00 3.46 9.74 2.18 0.80 - 0.15 50.00
GALIAN BIASA
TALUD / PASANGAN
BATU
TIMBUNAN BIASA
39 24 + 670.0050.00
3.46 3.70 2.18 - - 0.15 50.00
40 24 + 720.00 3.46 18.39 2.18 0.90 - 0.15 50.00
41 24 + 770.00 3.46 13.93 2.18 - - 0.15 50.00
42 24 + 820.00 3.46 3.80 2.18 - 2.82 0.15 50.00
43 24 + 870.00 3.46 3.28 2.18 - - 0.15 50.00
44 24 + 920.00 3.46 12.57 2.18 0.85 0.83 0.25 50.00
45 24 + 970.00 3.46 3.90 2.18 0.40 0.15 50.00
46 25 + 020.00 3.46 1.16 2.18 - 0.31 0.15 50.00
47 25 + 070.00 3.46 12.73 2.18 1.45 1.51 0.29 50.00
48 25 + 120.00 3.46 9.01 2.18 1.96 3.35 0.32 50.00
49 25 + 170.00 3.46 2.93 2.18 - - 0.15 50.00
50 25 + 220.00 3.46 14.10 2.18 - - 0.15 50.00
51 25 + 270.00 3.46 15.73 2.18 - 0.55 50.00
52 25 + 320.00 3.46 15.48 2.18 1.50 - 0.15 50.00
53 25 + 370.00 3.46 14.42 2.18 - - 0.15 50.00
54 25 + 420.00 3.46 3.37 2.18 10.48 0.41 50.00
55 25 + 470.00 3.46 6.46 2.18 0.96 - 0.37 50.00
56 25 + 520.00 3.46 8.73 2.18 0.85 1.06 0.25 50.00
57 25 + 570.00 3.46 0.96 2.18 - 2.04 0.15 50.00
58 25 + 620.00 3.46 17.13 2.18 1.92 - 0.67 50.00
59 25 + 670.00 3.46 6.40 2.18 1.96 2.91 0.32 50.00
60 25 + 720.00 3.46 13.65 2.18 - - 0.15 50.00
61 25 + 770.00 3.46 1.89 2.18 1.60 2.67 0.15 50.00
62 25 + 820.00 - 2.42 - 1.81 6.70 0.42 50.00
63 25 + 870.00 - 12.32 - 1.91 - 0.50 50.00
64 25 + 920.00 - 5.79 1.09 0.85 1.04 0.25 50.00
65 25 + 970.00 2.86 2.68 2.18 4.91 0.47 50.00
66 26 + 020.00 3.46 8.73 2.18 - - 0.15 50.00
67 26 + 070.00 3.46 10.04 2.18 1.80 - 0.15 50.00
68 26 + 120.00 3.46 12.41 2.18 - - 0.15 50.00
69 26 + 170.00 3.46 10.26 2.18 0.96 9.35 0.15 50.00
70 26 + 220.00 3.46 2.67 2.18 1.96 21.65 0.54 50.00
71 26 + 270.00 3.46 2.09 2.18 0.10 28.29 0.51 50.00
72 26 + 320.00 3.46 6.25 2.18 0.13 16.08 0.84 50.00
73 26 + 370.00 3.46 2.61 2.18 0.07 8.65 0.50 50.00
74 26 + 420.00 3.46 1.58 2.18 - 1.25 0.15 50.00
75 26 + 470.00 3.46 1.77 2.18 2.81 8.58 0.42 50.00
76 26 + 520.00 3.46 2.26 2.18 - 0.63 0.15 50.00
77 26 + 570.00 3.46 1.63 2.18 0.30 6.80 0.37 50.00
78 26 + 620.00 3.46 3.98 2.18 1.96 3.84 0.32 50.00
79 26 + 670.00 3.46 1.68 2.18 1.96 7.91 0.32 50.00
80 26 + 720.00 3.46 - 2.18 - 1.84 0.15 50.00
81 26 + 770.00 3.46 2.68 2.18 1.45 2.36 0.29 50.00
82 26 + 820.00 3.46 11.29 2.18 - - 0.15 50.00
83 26 + 870.00 3.46 1.47 2.18 1.70 2.65 6.35 50.00
84 26 + 920.00 3.46 - 2.18 - 2.14 0.15 50.00
85 26 + 970.00 3.46 5.45 2.18 - 0.50 0.15 50.00
86 27 + 020.00 3.46 11.19 2.18 0.85 0.30 0.25 50.00
87 27 + 070.00 3.46 1.59 2.18 1.70 2.64 0.35
87 27 + 070.0050.00
3.46 1.59 2.18 1.70 2.64 0.35
88 27 + 120.00 3.46 8.76 2.18 1.96 3.60 0.41 50.00
89 27 + 170.00 3.46 13.16 2.18 1.96 3.07 0.32 50.00
90 27 + 220.00 3.46 10.52 2.18 4.99 0.37 50.00
91 27 + 270.00 3.46 5.87 2.18 1.96 3.87 0.32 50.00
92 27 + 320.00 3.46 12.83 2.18 1.96 3.14 0.32 50.00
93 27 + 370.00 3.46 10.94 2.18 2.96 3.89 0.37 50.00
94 27 + 420.00 3.46 3.69 2.18 0.96 5.63 0.37 50.00
95 27 + 470.00 3.46 9.61 2.18 2.96 4.23 0.37 43.00
96 27 + 513.00 3.46 16.52 2.18 2.96 2.83 0.37 25.00
97 27 + 538.00 3.46 14.10 2.18 3.83 0.41 32.00
98 27 + 570.00 3.46 19.10 2.18 3.32 1.41 50.00
99 27 + 620.00 3.46 14.86 2.18 1.45 2.22 0.29 50.00
100 27 + 670.00 3.46 11.73 2.18 0.02 5.81 0.41 50.00
101 27 + 720.00 3.46 10.60 2.18 11.79 0.58 50.00
102 27 + 770.00 3.46 6.20 2.18 1.96 7.66 0.32