PROPOSED4000 MW ULTRA MEGA POWER PROJECT
AT
KAKWARA, BANKA DISTRICT, BIHAR
FOR
APPOINTMENT OF TECHNICAL CONSULTANT
FOR
SITE FEASIBILITY STUDY, ACQUISITION OF LAND,CONDUCTING VARIOUS TECHNICAL STUDIES AND
OBTAINING CLEARANCES
BIDDER
DESEIN PRIVATE LIMITEDCons!"#n$ En$#n%%&s, D%s%#n Hos%, G&%'"%& K'#!'s( ) II, N%* D%!(# ) ++0 04P(on% No- . /+++4+/+400, 1/1+231, F'5 No- . /+++1/1+2/2, 1/1+/6
E7'#! . #n8o9:%s%#n-;o7
, W%< s#"% . ***-:%s%#n-;o7
DATE . +2THJULY, 10+6 TIME . +6.00 (&s =IST> ONWARD
PRESENTATION
mailto:[email protected]:[email protected] -
7/23/2019 Banka UMPP
2/30
2
CAPACITY
DESEIN IS INDIA?S LEADING ENGINEERING POWER
PLANT CONSULTANCY WITH TRACK RECORD OF 60 YEARS-
DESEIN PROVIDES TOTAL ENGINEERING, PROCUREMENT,
CONSTRUCTION @ COMMISSIONING SUPERVISION FOR
UNIT SIE UTO 00 MW FOR BOTH SUPERCRITICAL @
SUBCRITICAL-
POWER PLANT DESIGN IS DRIVEN BY IT?S EPERTISE @
EPERIENCE OF THE THERMAL CYCLE- DESEIN
CONCEPTUALIES THE COMPLETE LIFE CYCLE OF THE
PROJECT PROJECT FEASIBILITY, DETAILED ENGINEERING,
OPERATION @ MAINTENANCE AND RENOVATION @MODERNIATION-
DESEIN HAS WORKED ON DIFFERENT FUELS SUCH AS
COAL, GAS, LIGNITE, WASHERY REJECTS AND
RENEWABLES-
-
7/23/2019 Banka UMPP
3/30
3
CAPACITY
Con":
A SINGLE WINDOW SERVICE PROVIDER TO POWERUTILITIES
DRAWING MANAGEMENT SYSTEM PROVIDING ARCHIVAL,
STORAGE @ MANAGEMENT OF DRAWINGS
LATEST COMMUNICATION FACILITIES FOR
CORRESPONDENCE, TRANSFER OF TECHNICAL DATA
AND DRAWINGS ETC.
ISO /00+.100 CERTIFIED COMPANY SINCE 1004,
CERTIFICATE NO- +0/1 DATE 0-+1-10+2,
CIN. U34//DL+/30PTC006434
ACCREDITED WITH. QCINABET VIDE MoEF, O-M- No- J
++0+2331004IA II =I> DATED 20-0/-10++ FOR CAT-A, UNDER S-No- +6 OF LIST A?
-
7/23/2019 Banka UMPP
4/30
4
STRENGTHS
ETENSIVE DOMESTIC AND INTERNATIONAL EPERIENCE
ENGINEERING,PROCUREMENT @ CONSTRUCTION CAPABILITIES
TURNKEY ASSIGNMENTS FOR CONSORTIUM
LARGE MULTIDISCIPLINARY INFRASTRUCTURE PROJECTS
GLOBAL STRATEGIC ALLIANCES
STRONG TEAM SKILLS IN ALL DISCIPLINES INCLUDING
ENVIRONMENT
REGISTERED WITH VARIOUS NATIONAL AND INTERNATIONAL
AGENCIES
MODERN ENGINEERING OFFICE WITH LATEST FACILITIES
-
7/23/2019 Banka UMPP
5/30
5
WORK ENVIRONMENT
EQUIPPED WITH STATEOFTHEART MAIN SOFTWARE TOOLS SUCH AS.
DOC IMAGE? SOFTWARE FOR DOCUMENT MANAGEMENT
LOTUS NOTES FOR MESSAGING MAILING
INTEGRATION OF WORK THROUGH LOCAL AREA NETWORK
EACH DISCIPLINE EQUIPPED WITH REQUISITE SOFTWARE TOOLS
PDS PDMS
AUTOPLANT
SOLIDWORKS 10+0
REVIT STRUCTURALS
CIVIL ) 2D CAESAR ) II
GT PRO GT MASTER
ISC ) ST2
AERMOD
PRIMAVERA
STAAD ) PRO
SECTION WIARD
CAD RC
MAP GUIDE
NISA
AUTO CAD 10+6
MICRO STATION
MS O88#;%
STAAD PRO ) V#
STEAM PRO STEAM MASTER
LIBSYS
SB SLOPE 2
-
7/23/2019 Banka UMPP
6/30
6
T&n% Con"&';"#n$ En$#n%%n$, P&o;&%7%n" @
Cons"&;"#on
I:%n"#8#n$ N%* Oo&"n#"#%s
B#::#n$ Fo& P'"% P&o%;"s
H'n:!#n$ A!! As%;"s o8 P'"%Po*%& P&o%;"s, In;!:#n$A&o'!s F&o7 V'osS"'""o& Bo:#%s
P&o;&%7%n" So&"
P&o%;" Mon#"on$
F#n'n;#'! S"&;"n$
INDEPENDENT POWER PROJECTS
CONSTRUCTION OF POWER PLANTS
NEW POWER PROJECTS
F%'s#
-
7/23/2019 Banka UMPP
7/307
ROLE IN POWER SECTOR
ENVIRONMENTAL IMPACT ASSESSMENT STUDIES FOR
MORE THAN 0 PROJECTS ) 0,23/ MW
COMPLETE ENGINEERING FOR MORE THAN 26,114 MW
UP TO 00 MW UNIT CAPACITY
FEASIBILITY REPORTDETAILED PROJECT REPORT
FOR MORE THAN 10/ PROJECTS ) +,++,/4+ MW
EPC CONTRACTING FOR6 MAJOR PROJECTS =160 MW"o 0 MW>
OPERATION @ MAINTENANCE FOR 10 POWER
PROJECTS
-
7/23/2019 Banka UMPP
8/308
EMPANELLMENT
-
7/23/2019 Banka UMPP
9/309
ACCREDITATION =QCINABET>
-
7/23/2019 Banka UMPP
10/30
SUPERCRITICAL PROJECTS =10060 ONWARDS>
10
S.No. Client
Assignments
/ Projects Major Study Components/ Features
ToR/NoC
Obtained
C
Obtained
!. PFC "td. #$$$ M%Sasan &MPP'Mad(yaPrades()
Feasibility Report* Project Report'+an,able)* -A Studies*Topograp(ical Surey* Arearainage Study* Socio0conomic
Surey and 1eo0Tec(nical-nestigation
!2.$3.$3 45.!!.$3
4 PFC "td. #$$$ M%Tilaiya &MPP'6(ar,(and)
Feasibility Report* Project Report'+an,able)* -A and S-A Studies*Topograp(ical Surey* Area
rainage Study and 1eo0Tec(nical-nestigation.
4$.$5.$7 $7.$#.$8
5. PFCConsul0ting "td.
!98$ '5:33$)M% Tal;andiSabo TPP'Punjab)
Feasibility Report* Project Report'+an,able)* -A and S-A Studies*Topograp(ical Surey* Arearainage Study and 1eo0Tec(nical
-nestigation.
!#.!4.$7 !!.$7.$8
PROJECTS HANDLED COMPLETED
-
7/23/2019 Banka UMPP
11/30
SUPERCRITICAL PROJECTS Con":
11
S.No. ClientAssignments
/ Projects
Major Study Components/ FeaturesToR
Obtained
C
Obtained#. PFC
Consul0ting "td.
#$$$ M%Odis(a&MPP
'Odis(a )
Feasibility Report* Project Report'+an,able)* -A and S-A Studies*Topograp(ical Surey* Area rainageStudy and 1eo0Tec(nical-nestigation.
4$.$2.$9 TEAM MEMBERS =TM> TO BE DEPLOYED
-
7/23/2019 Banka UMPP
13/30
COMPOSITION OF TEAM
13
S.No. Name
Designati
on
Qualifcatio
n
Area o
Specialization
Position/Experienc
e=. Mr.
Mu>es"5.S"arma
Manager P:D!Ecolog& (Enironment#
EnironmentManagement
+M / 7rs.
13. Mr. N. Ali Sr.Manager
. +ec".!Ciil#
Ciil relate)actiities
+M / 12rs.
11.Mr.C.Mis"ra
Sr.Engineer.
.E.!Mec".#
DP' ( Po8er+ari?
+M / =rs.
1. Mr. D.Dasgupta
Consultant
. E.!Metallurg
Enironmental
Enginnering
+M / 63rs.
12.Mr. S. C.
0ainConsultant
AM@E!C"em.#
-
7/23/2019 Banka UMPP
14/3014
SITE LOCATION MAP
-
7/23/2019 Banka UMPP
15/3015
SCOPE OF WORK
PROPONENT
BIDDER
ACQUISITION OF LAND ANDTECHNICAL STUDIES =PLANT,
TOWNSHIP, ASH DISPOSAL AND
VARIOUS CORRIDORS>
STATUTORY CLEARANCES=AS APPLICABLE>
SITE MOBILISATION, PFR @ FORM+, ToR FROM MoEF@CC BASELINE DATA GENERATION TOPOGRAPHICAL SURVEY AREA DRAINAGE STUDY GEOTECHNICAL INVESTIGATION, SOCIOECONOMIC STUDY PROJECT INFORMATION REPORT EIA STUDIES DETAILED PROJECT REPORT, LAND ACQUISITION COMPREHENSIVE SIA, R@R PLAN AND
CSR PLAN
GTS BENCH MARK
AIRPORTS AUTHORITY OF INDIA
MINISTRY OF DEFENCE
ARCHAEOLOGICAL SURVEY OF INDIA
MINERALOGICAL MAP
SATELLITE IMAGERY
NHAISH FOR APPROACH ROAD
GRAM SABHA
CHANGE IN LANDUSE
PUBLIC HEARING
ENVIRONMENTAL CLEARANCE
FOREST CLEARANCE S"'$% I
TOOLS @ TECHNIQUES
-
7/23/2019 Banka UMPP
16/30
TOOLS @ TECHNIQUES
DETAIL STUDIES WITHIN SCOPE OF WORK WILLBE CARRIED OUT AS PER TECHNICALSPECIFICATIONS-
BASED ON DATAINFORMATION COLLECTED, ASITE SELECTION MATRI WILL BE PREPARED-
RANKING OF ALL POTENTIAL SITES WILL
FOLLOW SUIT FOR THE PURPOSE OFEVALUATION-
MAJOR SETTLEMENTS, HOUSEHOLD NUMBERS,LAND USE CATEGORIES AS PER REVENUE DATAAND EISTING INDUSTRIES WILL BE INCLUDED
IN ASSESSMENT-
A PREFEASIBILITY REPORT CONTAINING SITESELECTION, BRIEF PROJECT DETAILS ANDENVIRONMENTAL CONCERNS-
16
-
7/23/2019 Banka UMPP
17/3017
ASSIGNMENT EECUTION SEQUENCE
OBTAINING SITE DETAILS AND ALTERNATE SITES IDENTIFIED
OBTAINING REPORTS DOCUMENTS AVAILABLE WITH CLIENT
DETAILING WORK PLAN AND INCLUDING BROAD
DEPLOYMENT SCHEDULE
RECONNAISSANCE SURVEY OF SITE, SURROUNDING
AREAS, ALTERNATE SITES, WATER AND OTHER CORRIDORS
IN TERMS OF TECHNICAL, ENVIRONMENTAL AND SOCIAL
ASPECTS-
THE STUDY AREA WILL COVER BOTH CORE AND BUFFER
ONES AROUND THE PROJECT SITE=S>-
TASK +00 KICK OFF MEETING WITH PFCCL.
-
7/23/2019 Banka UMPP
18/3018
ASSIGNMENT EECUTION SEQUENCE
COLLECTION OF SECONDARY DATA ON LAND USE
PATTERN, SETTLEMENTS, ROADRAIL CONNECTIVITY,
METEOROLOGY, GEOLOGY, CENSUS DATA ETC-
PRELIMINARY DISCUSSION WITH LOCAL OFFICIALSAND PEOPLE ON THE PROPOSED PROJECT AND ITS
IMPLICATION AT THE LOCAL AND DISTRICT LEVELS-
PREPARATION OF PREFEASIBILITY REPORT AND
FORM+ AND SUBMISSION TO MOEF@CC FOR
OBTAINING TOR-
TASK +00 KICK OFF MEETING WITH PFCCL. Con":
-
7/23/2019 Banka UMPP
19/3019
TASK 100 BASELINE STUDY
SITE SURVEY AND PREPARATION OF LAYOUT FOR POWER
PLANT AND VARIOUS CORRIDORS. ENVIRONMENTAL MONITORING =METEOROLOGY, AIR,
SURFACE @ GROUND WATER, NOISE, SOIL ETC-> SOCIO ) ECONOMIC SURVEY LAND USE PATTERN, DETAILS OF LAND OWNERSHIP ETC-
TOPOGRAPHICAL SURVEY AREA DRAINAGE STUDY GEO TECHNICAL SURVEY, SOIL INVESTIGATION ETC- ECOLOGICAL AND OTHER RELEVANT STUDIES-
THE ABOVE STUDIES WILL BE CARRIED OUT AT THE POWER
PLANT SITE AND ITS VARIOUS CORRIDORS-
A SECOND TEAM WILL CARRY OUT STUDY OF THE COALBLOCK=S> LAND AS PER DETAILS PROVIDED BY THE CLIENT-
MEANWHILE SATELLITE IMAGERY OF PROJECT SITE ANDCOAL BLOCK SITE WILL BE PROCURED-
ASSIGNMENT EECUTION SEQUENCE
-
7/23/2019 Banka UMPP
20/3020
TASK 200 LAND ACQUISITION PLAN =PROJECT SITE>
PREPARATION AND SUBMISSION OF LAND ACQUISITIONAPPLICATION FOR.
POWER PLANT AND CORRIDORS FOR WATER AND ASH
PIPELINE, SERVICEAPPROACH ROADS ETC-
SUBMISSION TO DISTRICT ADMINISTRATION FOR
NOTIFICATION OF SECTION++ UNDERRIGHT TO FAIR
COMPENSATION AND TRANSPARENCY IN LAND
ACQUISITION, REHABILITATION AND RESETTLEMENT
ACT, 10+2-
ASSIGNMENT EECUTION SEQUENCE
-
7/23/2019 Banka UMPP
21/3021
TASK 400 COAL BLOCK=S> LAND IDENTIFICATION
PROCUREMENT OF DOCUMENT OF THE TOTAL CAPTIVE
COAL BLOCK=S> LAND
TO IDENTIFY COAL BLOCK=S> LAND HAVING SUFFICIENT
COAL TO LAST AT LEAST 6 YEARS FROM THE COD OF +ST
UNIT AT NORMATIVE CAPACITY, AND
TO PROCURE ITS DECLARATION FROM THE CENTRAL
GOVERNMENT UNDER SECTION/ OF THE CBA
=ACQUISITION @ DEVELOPMENT> ACT +/63
ASSIGNMENT EECUTION SEQUENCE
O Q
-
7/23/2019 Banka UMPP
22/3022
TASK 600 RAIL CORRIDOR STUDY =COAL TRANSPORT>
FEASIBILITY STUDY FOR TRANSPORTATION OF COALBY RAIL FROM THE CAPTIVE COAL BLOCK=S>, WILL
BE UNDERTAKEN-
AFTER SELECTION OF RAIL CORRIDOR, TO SUBMITAPPLICATION FOR LAND ACQUISITION TO DISTRICT
ADMINISTRATION FOR NOTIFICATION UNDER
SECTION++ UNDER LAND ACQUISITION,
REHABILITATION AND RESETTLEMENT ACT, 10+2
ASSIGNMENT EECUTION SEQUENCE
ASSIGNMENT EECUTION SEQUENCE
-
7/23/2019 Banka UMPP
23/3023
TASK 00 FOREST CLEARANCE
FOR ANY FOREST LAND IN THE AREA, STUDY WILL BECARRIED OUT IN CONSULTATION WITH THE CONCERNED
DFO AND OTHER FOREST OFFICIALS, AS REQUIRED
UNDER THE FOREST CONSERVATION ACT,+/0-
FOREST DIVERSION PROPOSAL WILL BE PREPARED FOR
ONLINE SUBMISSION TO THE FOREST DEPARTMENT-
ASSIGNMENT EECUTION SEQUENCE
ASSIGNMENT EECUTION SEQUENCE
-
7/23/2019 Banka UMPP
24/3024
TASK 300 DRAFT RAPID EIAEMP REPORT
PREPARATION OF PROJECT INFORMATION REPORT ONCOMPLETION OF SURVEY WORK-
AFTER ONE SEASON BASELINE STUDY AND ASSESSMENT
OF POTENTIAL ENVIRONMENTAL AND SOCIAL IMPACTSOF THE PROPOSED UMPP RAPID EIA AND EMP REPORT
WILL BE SUBMITTED TO THE SPCB FOR PUBLIC HEARING-
THE STUDY WILL COVER POWER PLANT LAND, ASH AND
WATER PIPELINE CORRIDORS AND FUEL TRANSPORTATION
CORRIDORS-
A COMPREHENSIVE SIA, R@R PLAN AND CSR PLAN WILL
ALSO BE PREPARED AND SUBMITTED-
ASSIGNMENT EECUTION SEQUENCE
ASSIGNMENT EECUTION SEQUENCE
-
7/23/2019 Banka UMPP
25/3025
TASK 00 PUBLIC HEARING
ASSISTANCE WILL BE PROVIDED TO THE CLIENT INCONDUCTING PUBLIC HEARING
BASED ON OBSERVATIONSUGGESTION IN THE PUBLIC
HEARING THE DRAFT EIA REPORT WILL BE FINALISED
FOR SUBMISSION TO MOEF @ CC
TASK /00 COMPREHENSIVE EIA, SIA ETC-
AFTER FIELD MONITORING FOR THREE SEASONS A
COMPREHENSIVE EIA REPORT WILL BE PREPARED
ALONG WITH A CUMULATIVE IMPACT ASSESSMENT
REPORT, IF REQUIRED-
ASSIGNMENT EECUTION SEQUENCE
ASSIGNMENT EECUTION SEQUENCE
-
7/23/2019 Banka UMPP
26/30
26
TASK +000 DETAILED PROJECT REPORT
THE POWER ENGINEERS OF THE STUDY TEAM WILL
WORK OUT VARIOUS OPTIONS IN CONSULTATION WITH
THE CLIENT AND FINALISE THE PROJECT COMPONENTS-
DETAILED PROJECT REPORT =DPR> WILL THEN BE
PREPARED AND SUBMITTED TO THE CLIENT-
THE DPR WILL PROVIDE TARIFF CALCULATION, LOAN
EQUITY RATIO, IRR, IDC ETC- TO ESTABLISH THE
VIABILITY OF THE PROJECT-
ASSIGNMENT EECUTION SEQUENCE
TASK ++00 ENVIRONMENTAL CLEARANCE AFTER OBTAINING OTHER STATUTORY CLEARANCES THE
EIA EMP REPORT WILL BE SUBMITTED TO MOEF @ CC-
PRESENTATION BEFORE THE EAC WILL BE MADE FOR
OBTAINING ENVIRONMENTAL CLEARANCE-
ASSIGNMENT EECUTION SEQUENCE
-
7/23/2019 Banka UMPP
27/30
27
TASK +100 PROJECT @ COAL BLOCK=S> LAND ALLOCATION
OBTAINING AWARD OF THE POWER PLANT, CORRIDORS,
APPROACH ROADS ETC- IN FAVOUR OF THE SPV UNDER
SECTION+/ AND SECTION12 OF L-A AND R@R ACT, 10+2,
OR UNDER ANY OTHER RELEVANT ACT-
PROCURING DECLARATIONS OF THE GOVT- UNDER SECTION
/ OF CBA =ACQUISITION @ DEVELOPMENT> ACT +/63, FOR
THE CAPTIVE COAL BLOCK=S> LAND TO OPERATE THE POWER
STATION FOR AT LEAST FIVE YEARS FROM THE COD OF +ST
UNIT AT NORMATIVE AVAILABILITY-
ASSIGNMENT EECUTION SEQUENCE
EECUTION PLAN
-
7/23/2019 Banka UMPP
28/30
28
EECUTION PLAN
AFTER THE KICKOFF MEETING WORK PLAN WILL BE
FINALISED-
ARRANGEMENTS WILL BE MADE FOR
RECONNAISSANCE SURVEY AS WELL AS OPENING
OF SITE OFFICE AT KAKWARA OR BANKA INCONSULTATION WITH PFCCL-
PLANNING AND MANAGEMENT OF OPERATIONS WILL
BE CARRIED OUT FROM THE HEAD OFFICE IN DELHI-
FOR THE TASKS IDENTIFIED SEPARATE TEAMS WILL
BE DEPLOYED WITH TIME FRAMES TO COMPLETE
THEM-
EECUTION PLAN
-
7/23/2019 Banka UMPP
29/30
29
EECUTION PLAN
MONITORING AND SURVEY DATA GENERATED AND
SECONDARY DATA COLLECTED WILL BE COLLATED
AND ANALYSED IN DELHI-
DOCUMENTATION AND GENERATION OF VARIOUS
DRAWINGS, MAPS, REPORTS WILL TAKE PLACE INDELHI-
ALL THROUGH THE STUDY, THE TEAM LEADER
MEMBERS WILL HAVE REGULAR INTERACTION WITH
THE PFCCL TO ENSURE THAT THE STUDY
PROGRESSES AS PER THE PLAN FOR TIMELY
COMPLETION-
Con":