Bangkok MRTA Purple Line Project

2
THE PURPLE LINE PROJECT THE PURPLE LINE PROJECT Locations Laem Chabang Port, Th. Bang Yai, Bangkok, Th. Project Duration 6 Months Quantity Motor Carriage x42 Trailer Carriage x21 Dimensions Motor Carriage (m) L22xW3.1xH3.9 Trailer Carriage (m) L21xW3.1xH3.9 Weight Motor Carriage 40.67 T Trailer Carriage 33.27 T Total Tonnage 2406.8 T SCOPE CEA Project Logistics Thailand have been contracted to undertake a very high profile project for the Mass Rapid Transit Authority of Thailand. The Purple Line project consists of 21 train sets with three carriages in each set. Throughout the six month contract each carriage will arrive by sea from Yokohama in Japan to Laem Chabang Port, and will be delivered to the MRTA depot in Bangkok where they will be prepared to enter service on the new Purple Line. CEA PROVIDE Port Supervision to receive cargo alongside the vessel under the hook Customs Clearance of carriages & equipment Transportation of carriages & equipment to the CEA Free Trade Zone Unloading & Storage at the CEA Free Trade Zone Loading the carriages onto CEA Hydraulic Trailers Inland Transportation to the MRTA depot in Bang Yai, Bangkok Unloading the carriages & equipment at the Bang Yai depot using specialised 15 Tonne jacks. CASE STUDY CS015 The Purple Line Project 1/2

description

Case study about our recent Purple Line Project for the MRTA in Thailand. The project will last 6 months and will see 63 train carriages being delivered to Laem Chabang Port and transported by CEA Project Logistics to Bangkok.

Transcript of Bangkok MRTA Purple Line Project

Page 1: Bangkok MRTA Purple Line Project

THE PURPLE LINE PROJECTTH

E PURPLE LIN

E PROJEC

T

Locations

Laem Chabang Port, Th. Bang Yai, Bangkok, Th.

Project Duration

6 Months

Quantity

Motor Carriage x42 Trailer Carriage x21

Dimensions

Motor Carriage (m) L22xW3.1xH3.9 Trailer Carriage (m) L21xW3.1xH3.9

Weight

Motor Carriage 40.67 T Trailer Carriage 33.27 T

Total Tonnage 2406.8 T

SCOPECEA Project Logistics Thailand have been contracted to undertake a very high profile project for theMass Rapid Transit Authority of Thailand.The Purple Line project consists of 21 train sets with three carriages in each set. Throughout the six month contract each carriage will arrive by sea from Yokohama in Japan to Laem Chabang Port, and will be delivered to the MRTA depot in Bangkok where they will be prepared to enter service on the new Purple Line.

CEA PROVIDE• Port Supervision to receive cargo alongside

the vessel under the hook

• Customs Clearance of carriages & equipment

• Transportation of carriages & equipment to the CEA Free Trade Zone

• Unloading & Storage at the CEA Free Trade Zone

• Loading the carriages onto CEA Hydraulic Trailers

• Inland Transportation to the MRTA depot in Bang Yai, Bangkok

• Unloading the carriages & equipment at the Bang Yai depot using specialised 15 Tonne jacks.

CASE STUDY CS015The Purple Line Project 1/2

Page 2: Bangkok MRTA Purple Line Project

THE

PURP

LE L

INE

PRO

JEC

T

CEA PROJECT LOGISTICS

41/13 M1 AO-UDOM ROAD

TUNGSUNGKHLA

SRI RACHA

CHONBURI 20230

THAILAND

+66 38 354 019

www.ceaprojects.com

CASE STUDY CS015The Purple Line Project 2/2

CEA & STEVEDORE TEAMS TOOLBOX TALK

CARRIAGE LOWERED ON TO TRAILER

TMN PROGRESS ARRIVES FROM YOKOHAMA

CARRIAGE SECURED TO TRAILER

THE FIRST CARRIAGE IS LIFTED FROM THE VESSEL TMN PROGRESS AT LAEM CHABANG PORT

LEAVING THE PORT ESCORT TO THE CEA FREE TRADE ZONE

The MRTA Purple Line is a 23-kilometer elevated heavy rail transit system with 16 elevated stations situated along the route. The Line will have an initial usage of 200,000 passengers a day, which is expected to increase to 290,000 passengers a day by 2022.

IN STORAGE AT THE CEA FREE TRADE ZONE UNLOADING AT BANG YAI IN BANGKOK