LOGO Instructor: Prof Vincent Yun Shang Chiou Student: Nguyen Duc Anh M9913801 Jing Jin g -g e g e C er amics Museum C er amics Museum Building Energy Analy sis - Assignment 6 Equest-Model

Transcript of BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

Page 1: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 1/53

LOGO

Instructor: Prof Vincent Yun Shang Chiou

Student: Nguyen Duc Anh – M9913801

JingJin g --g eg e Cer a mics MuseumCer a mics Museum

Building Energy Analysis - Assignment 6

Equest-Model

Page 2: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 2/53

Perspective

Page 3: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 3/53

Contents

Model implement1

Simulation result2

Post –retrofit simulation3

Energy Saving Analysis4

Conclusion5

Page 4: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 4/53

General InformationGeneral Information

Building type : Museum

Weather file : TWN Taipei 46698

Electric Utility : - custom

Gas Utility : - none

Number of season : typical use through the

Year

Electric Utility charges : Don’t know

Page 5: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 5/53

Model structureModel structure

Building shell components :

- Envelope 1: The permanentexhibition area

- Envelope 2: The contemporaryexhibition area ( Natural Lighting)

Air-side system Types:- HVAC System 1 : Envelope 1

- HVAC System 2 : Envelope 2

Page 6: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 6/53

General Shell InformationGeneral Shell Information

Building type : Museum

Building area : 80000 ft2

Number of floor

- Above Grade : 3

- Below Grade : 1

Building footprint

Wide Length 1 Length2

Cm 6550 1705 2944

Feet 214.90 55.94 96.59

12020.87 20056.26

Page 7: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 7/53

Building FootprintBuilding Footprint

Plan North : East

Floor Height :

Floor to Floor:18 Ft

Floor to Ceil : 15 Ft

cm 540 450

feet 17.82 14.86

Page 8: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 8/53

Zoning patternZoning pattern

Plan North : East

Floor Conditional Height : 15 Ft

Zone conditioned: 76 Ft ( Permanent Exh )

12 Ft ( Cond Hall)

Zone unconditioned : 12 Ft ( Un-cond Stair)

cm 370 450

feet 12.13 14.86

Page 9: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 9/53

Building Envelope ConstructionsBuilding Envelope Constructions

Roof : 6 in. Concrete

Finish : Gravel

Wall : Brick wall

Ground floor : Over Parking Garage

cm 370 450

feet 12.13 14.86

Page 10: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 10/53

Page 11: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 11/53

Section and Elevation

Façade Dimension Total

Cm 540 460 420 340 240 2280

Feet 16459.2 14020.8 12801.6 10363.2 7315.2 44500.8

Façade Dimension Total

Cm 270 900 360 180 120 1740

Feet 8229.6 27432 10972.8 5486.4 3657.6 52120.8

Façade Dimension Total

Cm 115 1205 1320

Feet 3505.2 36728.4 40233.6

Page 12: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 12/53

Exterior WindowExterior Window

Type of Window : Single Low – E

It occupied 33% of the totalFaçade in each floor , so wecan simply by add one windowin each floor with the heightof 1800 mm, and run alongthe façade of building

Window blind: Roller shade –Translucent

100 % Closed in West and East

cm 9 18 9 18

Ft 3.54 7.09 3.54 7.09

Page 13: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 13/53

Roof skylightsRoof skylights

cm 9 18 9 18

Ft 3.54 7.09 3.54 7.09

Page 14: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 14/53

Time schedule

Opening hours:Tuesday to Friday 9:30 to 17:00Saturday and Sunday 9:30 AM to 18:00Museum closed every Monday(except on national holidays)

Chinese New Year's Day and Eve

Page 15: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 15/53

Activity Area AllocationActivity Area Allocation

Basement 1, Ground,MAbove,Top

FloorLobby (Main Entry and Assembly)

Function Area (m2) Electric consumption

Stairs 154 508

Hall around 198 973Stairs 272 1202

Lift 96 200

Hall 242 3584

Total 962 6467

Total ( feet2) 10351.1 0.605

Basement 1, Ground,MAbove,Top Floor

Exhibit display area/Museum

Function Area (m2) Electric consumption

Ceramic Hallway 317 2154

Information terminal 187 1326

Gallery Hall 370 3808

Galery 1 + Galery 5 536 4000

Galery 2 + Galery 6 536 3740

Galery 3 + Galery 7 536 3062

Galery 4 + Galery 8 536 2042

Total 3018 20132

Total ( feet2) 32473.7 0.630

Basement 1,Ground,MAbove,Top Floor

Rest room

Function Area (m2)Electric

consumption

Rest room 96 276

Rest room 96 276

Total 192 552

Total ( feet2) 2065.9 0.263

Page 16: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 16/53

Activity Area AllocationActivity Area Allocation

Basement 1, Ground,MAbove,Top Floor

Galery space 3018Lobby (Main Entry and

Assembly) 1102

Rest room 192

Mechanical 3088

Galery

space41%

Lobby (Main

Entry andAssembly)

15%

Rest room2%

Mechanical

42%

Envelope 1 Percentage of 

Area

Page 17: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 17/53

Interior LightingInterior Lighting

Basement 1, Ground,MAbove,Top Floor

Galery space 0.63Lobby (Main Entry and

Assembly) 0.60

Rest room 0.26

Mechanical 0

Galery

space41%

Lobby (Main

Entry andAssembly)

15%

Rest room2%

Mechanical

42%

Envelope 1 Percentage of 

Area

Page 18: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 18/53

General Shell InformationGeneral Shell Information

Position : West of Reference

Building area : 24000 ft2

Number of floor

- Above Grade : 2

- Below Grade : 0

- Due to Equest only allow 1

specific floor height , so we candefine the below grade floor, but

instead we have 2 above grade

floor.

cm 540 450

feet 17.82 14.86

Page 19: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 19/53

Building FootprintBuilding Footprint

Plan North : North

Floor Height :

Floor to Floor:23 Ft

Floor to Ceil : 21 Ft

Zoning : 100 % Condition ,

Multi Function

cm 1420 1705

feet 46.6 55.94

Page 20: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 20/53

Building Envelope ConstructionsBuilding Envelope Constructions

Roof : Metal Frame

Finish : Steel Galvanized

Wall :Aluminum

Ground floor : Over Parking Garage

Page 21: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 21/53

Building Interior ConstructionsBuilding Interior Constructions

Ceiling Int finish : Dry wall

Wall type : Air - none

floor : Ceramic stone tile

Rigid Insulation : polystirence

Page 22: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 22/53

Exterior WindowExterior Window

Type of Window : Single Low – E

It occupied 90% of the totalFaçade in each floor , so wecan simply by add one windowin each floor with the heightof 4800 mm, and run alongthe façade of building

Window blind: None

cm 48

Ft 18.90

Page 23: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 23/53

Roof skylightsRoof skylights

Page 24: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 24/53

Time schedule

Opening hours:Tuesday to Friday 9:30 to 17:00Saturday and Sunday 9:30 AM to 18:00Museum closed every Monday(except on national holidays)Chinese New Year's Day and Eve

Page 25: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 25/53

Activity Area AllocationActivity Area Allocation

Basement 1, Ground Floor

Exhibit display area/Museum

Function Area (m2) Electric consumption

Sun light Galery 490 3860

(Feet 2) 5228.3 0.738

% 22.27273Restaurant 246 3882

(Feet 2) 2624.82 1.479

% 11.18182

Stair + Lobby 135 508

Stair + Lobby 135 508

Total 270 1016

(Feet 2) 2880.9 0.353

% 12.27273

Page 26: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 26/53

Activity Area AllocationActivity Area Allocation

Basement 1, Ground Floor

Sun light Galery 656

Restaurant 268

Stair + Lobby 278

Technical 998

Sun light

Galery30%

Restauran

t12%

Stair +Lobby13%

Technical45%

Envelope 2

Percantage of Area

Page 27: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 27/53

Interior LightingInterior Lighting

Basement 1, Ground Floor

Sun light Galery 0.738

Restaurant 1.479

Stair + Lobby 0.353

Technical 0

Page 28: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 28/53

HVAC System DefinitionHVAC System Definition

Cooling Source: Chilled Water

Heating Source: No heating

System Type : Standard VAV

Page 29: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 29/53

HVAC System DefinitionHVAC System Definition

C temp F temperature

20 68

23 73.4

Average

Ceiling Temperature 22.5

Wall Temperature 22.68

Floor temperature 21.23

Window Temperature 24

Air outlet Temperature 20.25

Lighting Temperature 29.93

Page 30: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 30/53

Perspective

Page 31: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 31/53

Interior Perspective

Page 32: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 32/53

- The electric consumption is highest in June ,July

August and Sep. The total energy consumption

In July is 103 000 kWh. ( Compared with 84000 inmeasurement statistics)

- From March to November : Space Cooling occupymore than 50% energy consumption in the building

- The energy for lighting is account for 10% energy

consumption a month, equal to energy for pump.

- Ventilation fan account for 13% energy consumption

Simulation 1 : Electric consumption by monthSimulation 1 : Electric consumption by month

2010 604140

2009 620940Model 680011

Page 33: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 33/53

Simulation1 – Percentage of Energy Consumption byFunction

Page 34: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 34/53

Monthly electric day load by fileMonthly electric day load by fileMonthly electric day load by fileMonthly electric day load by file

Page 35: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 35/53

Energy Consumption by Hour

Page 36: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 36/53

Simulation 1 : Energy Consumption by Month

1 2 3 4 5 6 7 8 9 10 11 12

Monthy Energy comsumption in 2010 44580 30900 31860 41100 35880 45540 57540 75900 77220 67560 56880 46560

Monthy Energy comsumption in 2009 39180 23640 39840 35940 40320 43620 59340 83880 75960 76860 55800 46560

2010 604140

2009 620940

Model 680011

Page 37: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 37/53

Energy Consumption by Month(Measurement)

1 2 3 4 5 6 7 8 9 10 11 12

Monthy Energy comsumption in 2010 44580 30900 31860 41100 35880 45540 57540 75900 77220 67560 56880 46560

Monthy Energy comsumption in 2009 39180 23640 39840 35940 40320 43620 59340 83880 75960 76860 55800 46560

44580

3090031860

41100

35880

45540

57540

7590077220

67560

56880

0

39180

23640

39840 3594040320 43620

59340

838807596076860

5580046560

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

1 2 3 4 5 6 7 8 9 10 11 12

Energy Consumption by Month

(kWh)

2010 2009

Page 38: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 38/53

Simulation 2 : Some renovation in Building EnvelopeSimulation 2 : Some renovation in Building EnvelopeConstructionsConstructions

Roof :Add some exterior insulation

Finish : Steel Galvanized

Wall : Add Insulation andpolystyrene

Ground floor : Make more Insulation

In both exterior and interior

Page 39: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 39/53

Simulation 2 : Reduce roof skylineSimulation 2 : Reduce roof skyline

Roof Skyline: Decrease the density of skyline window

Add some Insulation and material has low u-value to deacrese solar conduction and solar radiation

Page 40: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 40/53

Simulation2 - Energy Consumption by Month

Simulation 1 680011

Simulation 2 630310

- The electric consumption is highest in Jule ,August but it decreasedsignificantly from 103000 to 95000 due to the heating exchange is

smaller than present situation

The total energy consumption in all the year is 630310 kWh in , so it is

deacreased near 50000 kW than present situation case

Page 41: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 41/53

- The electric consumption for ventilation fan is higherdue to too much space was the open space inmuseum. And exchange air between indoor spaceand outdoor space

- The energy used for space cooling is decreasedsignificantly

- Pumps and Aux is still keep their function butdecreased slightly due to decreased the waterconsumption for air-conditional system

Simulation2 - Energy Consumption by Month

Space cooling

Simu 1 Simu 237495 34506

Ventilation Fan

Simu 1 Simu 2

9660 8766

Page 42: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 42/53

Simulation 3 solutionSimulation 3 solution

Window: Decrease the density of window

Add some Insulation and material has low u-value window to decrese solar conduction and solarradiation

Page 43: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 43/53

Simulation 3 solutionSimulation 3 solution

Decrease the area of Sunlight gallery as small as possible

Use some fan in the border to prevent the air temperature loss in space between Gallery and Stair

Page 44: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 44/53

Simulation3 - Energy Consumption by Month

Simulation 1 680011

Simulation 2 610260

- The electric consumption is highest in July ,August but it decreasedsignificantly from 103000 to 88000 due to the heating exchange is

smaller than present situation

The total energy consumption in all the year is 610260 kWh in , so it

decreases near 70000 kW than situation case

Page 45: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 45/53

- The electric consumption for ventilation fan is higherdue to too much space was the open space inmuseum. And exchange air between indoor spaceand outdoor space

- The energy used for space cooling is decreasedsignificantly

- Pumps and Aux is still keep their function butdecreased slightly due to decreased the waterconsumption for air-conditional system

Simulation3Simulation3 -- Electric consumption by monthElectric consumption by month

Space cooling

Simu 1 Simu 237495 26641

Ventilation Fan

Simu 1 Simu 2

9660 16531

Page 46: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 46/53

Lighting fixture

There are too much lightinghere. We can reduce lighting inthis area.

This w indow can open more toreceive natural lighting

Task lighting in this area is notnecessary. We can turn it off to

save energy

Page 47: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 47/53

Lighting fixture

There are too much lightinghere even in w indow w here wecan open to receive naturallighting

The density of lighting is toohigh . We can reduce it.

Page 48: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 48/53

Page 49: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 49/53

Simulation 4 solutionSimulation 4 solution

There is over lighting in the area of Restaurant , and in the sunlight exhibition

We can take advantages from natural lighting in the out side and decrease the lighting inthis area. It is big like in restaurant now, it is 2 times than normal different space

Page 50: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 50/53

Simulation4 - Energy Consumption by Month

Simulation 1 680011

Simulation 2 600690

- The electric consumption is highest in July ,August but it decreasedsignificantly from 103000 to 88000 due to the heating exchange is

smaller than present situation

The total energy consumption in all the year is 600690 kWh in , so it

decreases near 80000 kW than situation case

Page 51: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 51/53

- The electric consumption for ventilation fan is higherdue to too much space was the open space inmuseum. And exchange air between indoor spaceand outdoor space

- The energy used for space cooling is decreasedsignificantly

- Pumps and Aux is still keep their function butdecreased slightly due to decreased the waterconsumption for air-conditional system

Simulation4Simulation4 -- Electric consumption by monthElectric consumption by month

Space cooling

Simu 4 Simu 3

26525 26641

Ventilation Fan

Simu 4 Simu 3

17105 16531

Area Lighting

Simu 4 Simu 3

6080 6531

Page 52: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 52/53

Conclusion

- The electric consumption is highest in July ,August due to so largeamount of energy is used for space cooling

- There are some method to reduce the energy consumption in thebuilding by separate the space, use the low u-valuematerial, decrease the skylight window and close the window todecrease the solar radiation and solar conduction

- The electric fixtures is quite consume less money than otherconsumption source, so it will not contribute much to energyconsumption in the building

- With all above method, the building still work well , but the energyconsumption will less in enormous amount than before

Page 53: BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801

http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 53/53