Instructor: Prof Vincent Yun Shang Chiou
Student: Nguyen Duc Anh – M9913801
JingJin g --g eg e Cer a mics MuseumCer a mics Museum
Building Energy Analysis - Assignment 6
Equest-Model
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 2/53
Perspective
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 3/53
Contents
Model implement1
Simulation result2
Post –retrofit simulation3
Energy Saving Analysis4
Conclusion5
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 4/53
General InformationGeneral Information
Building type : Museum
Weather file : TWN Taipei 46698
Electric Utility : - custom
Gas Utility : - none
Number of season : typical use through the
Year
Electric Utility charges : Don’t know
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 5/53
Model structureModel structure
Building shell components :
- Envelope 1: The permanentexhibition area
- Envelope 2: The contemporaryexhibition area ( Natural Lighting)
Air-side system Types:- HVAC System 1 : Envelope 1
- HVAC System 2 : Envelope 2
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 6/53
General Shell InformationGeneral Shell Information
Building type : Museum
Building area : 80000 ft2
Number of floor
- Above Grade : 3
- Below Grade : 1
Building footprint
Wide Length 1 Length2
Cm 6550 1705 2944
Feet 214.90 55.94 96.59
12020.87 20056.26
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 7/53
Building FootprintBuilding Footprint
Plan North : East
Floor Height :
Floor to Floor:18 Ft
Floor to Ceil : 15 Ft
cm 540 450
feet 17.82 14.86
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 8/53
Zoning patternZoning pattern
Plan North : East
Floor Conditional Height : 15 Ft
Zone conditioned: 76 Ft ( Permanent Exh )
12 Ft ( Cond Hall)
Zone unconditioned : 12 Ft ( Un-cond Stair)
cm 370 450
feet 12.13 14.86
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 9/53
Building Envelope ConstructionsBuilding Envelope Constructions
Roof : 6 in. Concrete
Finish : Gravel
Wall : Brick wall
Ground floor : Over Parking Garage
cm 370 450
feet 12.13 14.86
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 10/53
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 11/53
Section and Elevation
Façade Dimension Total
Cm 540 460 420 340 240 2280
Feet 16459.2 14020.8 12801.6 10363.2 7315.2 44500.8
Façade Dimension Total
Cm 270 900 360 180 120 1740
Feet 8229.6 27432 10972.8 5486.4 3657.6 52120.8
Façade Dimension Total
Cm 115 1205 1320
Feet 3505.2 36728.4 40233.6
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 12/53
Exterior WindowExterior Window
Type of Window : Single Low – E
It occupied 33% of the totalFaçade in each floor , so wecan simply by add one windowin each floor with the heightof 1800 mm, and run alongthe façade of building
Window blind: Roller shade –Translucent
100 % Closed in West and East
cm 9 18 9 18
Ft 3.54 7.09 3.54 7.09
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 13/53
Roof skylightsRoof skylights
cm 9 18 9 18
Ft 3.54 7.09 3.54 7.09
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 14/53
Time schedule
Opening hours:Tuesday to Friday 9:30 to 17:00Saturday and Sunday 9:30 AM to 18:00Museum closed every Monday(except on national holidays)
Chinese New Year's Day and Eve
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 15/53
Activity Area AllocationActivity Area Allocation
Basement 1, Ground,MAbove,Top
FloorLobby (Main Entry and Assembly)
Function Area (m2) Electric consumption
Stairs 154 508
Hall around 198 973Stairs 272 1202
Lift 96 200
Hall 242 3584
Total 962 6467
Total ( feet2) 10351.1 0.605
Basement 1, Ground,MAbove,Top Floor
Exhibit display area/Museum
Function Area (m2) Electric consumption
Ceramic Hallway 317 2154
Information terminal 187 1326
Gallery Hall 370 3808
Galery 1 + Galery 5 536 4000
Galery 2 + Galery 6 536 3740
Galery 3 + Galery 7 536 3062
Galery 4 + Galery 8 536 2042
Total 3018 20132
Total ( feet2) 32473.7 0.630
Basement 1,Ground,MAbove,Top Floor
Rest room
Function Area (m2)Electric
consumption
Rest room 96 276
Rest room 96 276
Total 192 552
Total ( feet2) 2065.9 0.263
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 16/53
Activity Area AllocationActivity Area Allocation
Basement 1, Ground,MAbove,Top Floor
Galery space 3018Lobby (Main Entry and
Assembly) 1102
Rest room 192
Mechanical 3088
Galery
space41%
Lobby (Main
Entry andAssembly)
15%
Rest room2%
Mechanical
42%
Envelope 1 Percentage of
Area
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 17/53
Interior LightingInterior Lighting
Basement 1, Ground,MAbove,Top Floor
Galery space 0.63Lobby (Main Entry and
Assembly) 0.60
Rest room 0.26
Mechanical 0
Galery
space41%
Lobby (Main
Entry andAssembly)
15%
Rest room2%
Mechanical
42%
Envelope 1 Percentage of
Area
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 18/53
General Shell InformationGeneral Shell Information
Position : West of Reference
Building area : 24000 ft2
Number of floor
- Above Grade : 2
- Below Grade : 0
- Due to Equest only allow 1
specific floor height , so we candefine the below grade floor, but
instead we have 2 above grade
floor.
cm 540 450
feet 17.82 14.86
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 19/53
Building FootprintBuilding Footprint
Plan North : North
Floor Height :
Floor to Floor:23 Ft
Floor to Ceil : 21 Ft
Zoning : 100 % Condition ,
Multi Function
cm 1420 1705
feet 46.6 55.94
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 20/53
Building Envelope ConstructionsBuilding Envelope Constructions
Roof : Metal Frame
Finish : Steel Galvanized
Wall :Aluminum
Ground floor : Over Parking Garage
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 21/53
Building Interior ConstructionsBuilding Interior Constructions
Ceiling Int finish : Dry wall
Wall type : Air - none
floor : Ceramic stone tile
Rigid Insulation : polystirence
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 22/53
Exterior WindowExterior Window
Type of Window : Single Low – E
It occupied 90% of the totalFaçade in each floor , so wecan simply by add one windowin each floor with the heightof 4800 mm, and run alongthe façade of building
Window blind: None
cm 48
Ft 18.90
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 23/53
Roof skylightsRoof skylights
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 24/53
Time schedule
Opening hours:Tuesday to Friday 9:30 to 17:00Saturday and Sunday 9:30 AM to 18:00Museum closed every Monday(except on national holidays)Chinese New Year's Day and Eve
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 25/53
Activity Area AllocationActivity Area Allocation
Basement 1, Ground Floor
Exhibit display area/Museum
Function Area (m2) Electric consumption
Sun light Galery 490 3860
(Feet 2) 5228.3 0.738
% 22.27273Restaurant 246 3882
(Feet 2) 2624.82 1.479
% 11.18182
Stair + Lobby 135 508
Stair + Lobby 135 508
Total 270 1016
(Feet 2) 2880.9 0.353
% 12.27273
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 26/53
Activity Area AllocationActivity Area Allocation
Basement 1, Ground Floor
Sun light Galery 656
Restaurant 268
Stair + Lobby 278
Technical 998
Sun light
Galery30%
Restauran
t12%
Stair +Lobby13%
Technical45%
Envelope 2
Percantage of Area
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 27/53
Interior LightingInterior Lighting
Basement 1, Ground Floor
Sun light Galery 0.738
Restaurant 1.479
Stair + Lobby 0.353
Technical 0
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 28/53
HVAC System DefinitionHVAC System Definition
Cooling Source: Chilled Water
Heating Source: No heating
System Type : Standard VAV
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 29/53
HVAC System DefinitionHVAC System Definition
C temp F temperature
20 68
23 73.4
Average
Ceiling Temperature 22.5
Wall Temperature 22.68
Floor temperature 21.23
Window Temperature 24
Air outlet Temperature 20.25
Lighting Temperature 29.93
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 30/53
Perspective
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 31/53
Interior Perspective
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 32/53
- The electric consumption is highest in June ,July
August and Sep. The total energy consumption
In July is 103 000 kWh. ( Compared with 84000 inmeasurement statistics)
- From March to November : Space Cooling occupymore than 50% energy consumption in the building
- The energy for lighting is account for 10% energy
consumption a month, equal to energy for pump.
- Ventilation fan account for 13% energy consumption
Simulation 1 : Electric consumption by monthSimulation 1 : Electric consumption by month
2010 604140
2009 620940Model 680011
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 33/53
Simulation1 – Percentage of Energy Consumption byFunction
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 34/53
Monthly electric day load by fileMonthly electric day load by fileMonthly electric day load by fileMonthly electric day load by file
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 35/53
Energy Consumption by Hour
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 36/53
Simulation 1 : Energy Consumption by Month
1 2 3 4 5 6 7 8 9 10 11 12
Monthy Energy comsumption in 2010 44580 30900 31860 41100 35880 45540 57540 75900 77220 67560 56880 46560
Monthy Energy comsumption in 2009 39180 23640 39840 35940 40320 43620 59340 83880 75960 76860 55800 46560
2010 604140
2009 620940
Model 680011
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 37/53
Energy Consumption by Month(Measurement)
1 2 3 4 5 6 7 8 9 10 11 12
Monthy Energy comsumption in 2010 44580 30900 31860 41100 35880 45540 57540 75900 77220 67560 56880 46560
Monthy Energy comsumption in 2009 39180 23640 39840 35940 40320 43620 59340 83880 75960 76860 55800 46560
44580
3090031860
41100
35880
45540
57540
7590077220
67560
56880
0
39180
23640
39840 3594040320 43620
59340
838807596076860
5580046560
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
1 2 3 4 5 6 7 8 9 10 11 12
Energy Consumption by Month
(kWh)
2010 2009
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 38/53
Simulation 2 : Some renovation in Building EnvelopeSimulation 2 : Some renovation in Building EnvelopeConstructionsConstructions
Roof :Add some exterior insulation
Finish : Steel Galvanized
Wall : Add Insulation andpolystyrene
Ground floor : Make more Insulation
In both exterior and interior
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 39/53
Simulation 2 : Reduce roof skylineSimulation 2 : Reduce roof skyline
Roof Skyline: Decrease the density of skyline window
Add some Insulation and material has low u-value to deacrese solar conduction and solar radiation
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 40/53
Simulation2 - Energy Consumption by Month
Simulation 1 680011
Simulation 2 630310
- The electric consumption is highest in Jule ,August but it decreasedsignificantly from 103000 to 95000 due to the heating exchange is
smaller than present situation
The total energy consumption in all the year is 630310 kWh in , so it is
deacreased near 50000 kW than present situation case
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 41/53
- The electric consumption for ventilation fan is higherdue to too much space was the open space inmuseum. And exchange air between indoor spaceand outdoor space
- The energy used for space cooling is decreasedsignificantly
- Pumps and Aux is still keep their function butdecreased slightly due to decreased the waterconsumption for air-conditional system
Simulation2 - Energy Consumption by Month
Space cooling
Simu 1 Simu 237495 34506
Ventilation Fan
Simu 1 Simu 2
9660 8766
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 42/53
Simulation 3 solutionSimulation 3 solution
Window: Decrease the density of window
Add some Insulation and material has low u-value window to decrese solar conduction and solarradiation
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 43/53
Simulation 3 solutionSimulation 3 solution
Decrease the area of Sunlight gallery as small as possible
Use some fan in the border to prevent the air temperature loss in space between Gallery and Stair
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 44/53
Simulation3 - Energy Consumption by Month
Simulation 1 680011
Simulation 2 610260
- The electric consumption is highest in July ,August but it decreasedsignificantly from 103000 to 88000 due to the heating exchange is
smaller than present situation
The total energy consumption in all the year is 610260 kWh in , so it
decreases near 70000 kW than situation case
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 45/53
- The electric consumption for ventilation fan is higherdue to too much space was the open space inmuseum. And exchange air between indoor spaceand outdoor space
- The energy used for space cooling is decreasedsignificantly
- Pumps and Aux is still keep their function butdecreased slightly due to decreased the waterconsumption for air-conditional system
Simulation3Simulation3 -- Electric consumption by monthElectric consumption by month
Space cooling
Simu 1 Simu 237495 26641
Ventilation Fan
Simu 1 Simu 2
9660 16531
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 46/53
Lighting fixture
There are too much lightinghere. We can reduce lighting inthis area.
This w indow can open more toreceive natural lighting
Task lighting in this area is notnecessary. We can turn it off to
save energy
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 47/53
Lighting fixture
There are too much lightinghere even in w indow w here wecan open to receive naturallighting
The density of lighting is toohigh . We can reduce it.
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 48/53
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 49/53
Simulation 4 solutionSimulation 4 solution
There is over lighting in the area of Restaurant , and in the sunlight exhibition
We can take advantages from natural lighting in the out side and decrease the lighting inthis area. It is big like in restaurant now, it is 2 times than normal different space
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 50/53
Simulation4 - Energy Consumption by Month
Simulation 1 680011
Simulation 2 600690
- The electric consumption is highest in July ,August but it decreasedsignificantly from 103000 to 88000 due to the heating exchange is
smaller than present situation
The total energy consumption in all the year is 600690 kWh in , so it
decreases near 80000 kW than situation case
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 51/53
- The electric consumption for ventilation fan is higherdue to too much space was the open space inmuseum. And exchange air between indoor spaceand outdoor space
- The energy used for space cooling is decreasedsignificantly
- Pumps and Aux is still keep their function butdecreased slightly due to decreased the waterconsumption for air-conditional system
Simulation4Simulation4 -- Electric consumption by monthElectric consumption by month
Space cooling
Simu 4 Simu 3
26525 26641
Ventilation Fan
Simu 4 Simu 3
17105 16531
Area Lighting
Simu 4 Simu 3
6080 6531
8/6/2019 BAE Assignment 06 Jing-Ge Ceramics Museum EquestModel Anh.nd-m9913801
http://slidepdf.com/reader/full/bae-assignment-06-jing-ge-ceramics-museum-equestmodel-anhnd-m9913801 52/53
Conclusion
- The electric consumption is highest in July ,August due to so largeamount of energy is used for space cooling
- There are some method to reduce the energy consumption in thebuilding by separate the space, use the low u-valuematerial, decrease the skylight window and close the window todecrease the solar radiation and solar conduction
- The electric fixtures is quite consume less money than otherconsumption source, so it will not contribute much to energyconsumption in the building
- With all above method, the building still work well , but the energyconsumption will less in enormous amount than before