![Page 1: AVON MEADOWS COMMUNITY WETLAND NATURE ...btckstorage.blob.core.windows.net/site7561/GREEN HAY...AVON MEADOWS HAY CUT Cut 3rd thJuly, Turned 5th July, Baled and removed 8 July. Fine](https://reader033.fdocuments.net/reader033/viewer/2022060410/5f103f3b7e708231d4482a63/html5/thumbnails/1.jpg)
AVON MEADOWS COMMUNITY WETLAND NATURE RESERVE
PERSHORE, WORCESTERSHIRE
GRASSLAND ENHANCEMENT PROJECT
OBJECTIVE: To enhance the species diversity of the selected Middle Meadow. Currently
MG4c/MG9b with approx. 16-18 species per sq m; aim for solid MG4c or even MG4b with 20+
species per sq m
Method: Green hay strewing in July 2017 followed by supplemental seed spreading in September
![Page 2: AVON MEADOWS COMMUNITY WETLAND NATURE ...btckstorage.blob.core.windows.net/site7561/GREEN HAY...AVON MEADOWS HAY CUT Cut 3rd thJuly, Turned 5th July, Baled and removed 8 July. Fine](https://reader033.fdocuments.net/reader033/viewer/2022060410/5f103f3b7e708231d4482a63/html5/thumbnails/2.jpg)
DONOR: LAZY MEADOW, HAMPTON, EVESHAM.
Floodplain Meadow with the Merrybrook along one boundary. True MG4b arguably should be SSSI.
![Page 3: AVON MEADOWS COMMUNITY WETLAND NATURE ...btckstorage.blob.core.windows.net/site7561/GREEN HAY...AVON MEADOWS HAY CUT Cut 3rd thJuly, Turned 5th July, Baled and removed 8 July. Fine](https://reader033.fdocuments.net/reader033/viewer/2022060410/5f103f3b7e708231d4482a63/html5/thumbnails/3.jpg)
AVON MEADOWS HAY CUT
Cut 3rd July, Turned 5th July, Baled and removed 8th July. Fine and hot weather throughout.
Total 136 x 350kg bales = 48 Tons compared with 80 Tons 2016 and 40 Tons 2015 from approx. 12ha
SOUTH MEADOW
MIDDLE MEADOW
NORTH MEADOW
![Page 4: AVON MEADOWS COMMUNITY WETLAND NATURE ...btckstorage.blob.core.windows.net/site7561/GREEN HAY...AVON MEADOWS HAY CUT Cut 3rd thJuly, Turned 5th July, Baled and removed 8 July. Fine](https://reader033.fdocuments.net/reader033/viewer/2022060410/5f103f3b7e708231d4482a63/html5/thumbnails/4.jpg)
BALING AND REMOVAL
Baling North
Meadow
Loading North
Meadow
And Away across
Middle Meadow
![Page 5: AVON MEADOWS COMMUNITY WETLAND NATURE ...btckstorage.blob.core.windows.net/site7561/GREEN HAY...AVON MEADOWS HAY CUT Cut 3rd thJuly, Turned 5th July, Baled and removed 8 July. Fine](https://reader033.fdocuments.net/reader033/viewer/2022060410/5f103f3b7e708231d4482a63/html5/thumbnails/5.jpg)
PREPARATION:
Light harrowing with 15ft spring-tine harrow 1oth July
![Page 6: AVON MEADOWS COMMUNITY WETLAND NATURE ...btckstorage.blob.core.windows.net/site7561/GREEN HAY...AVON MEADOWS HAY CUT Cut 3rd thJuly, Turned 5th July, Baled and removed 8 July. Fine](https://reader033.fdocuments.net/reader033/viewer/2022060410/5f103f3b7e708231d4482a63/html5/thumbnails/6.jpg)
GREEN HAY STREWING ON MIDDLE MEADOW:
Actual area on Middle Meadow = 115x70m = 8,000sq m.
Area cut on Lazy Meadow = 120x22m = 2,640sq m (i.e. 1:3 ratio)
Arrival on-site at Lazy Meadow just after 9:00am
CUTTING: (BCS Commander type tractor with Bellon Mit 80cm twin disc rotary mower attachment)
Started just after 9:30. Total time taken 1hr
![Page 7: AVON MEADOWS COMMUNITY WETLAND NATURE ...btckstorage.blob.core.windows.net/site7561/GREEN HAY...AVON MEADOWS HAY CUT Cut 3rd thJuly, Turned 5th July, Baled and removed 8 July. Fine](https://reader033.fdocuments.net/reader033/viewer/2022060410/5f103f3b7e708231d4482a63/html5/thumbnails/7.jpg)
BALING: Same Tractor as for cutting with but CAEB Internetional Mini Baler attachment producing
52cm x 55cm round bales weighing some 25kgs each as green hay. Total of 46 bales produced in 1½
hrs.
First Load of 24 bales ready to go at 12:00 noon.
![Page 8: AVON MEADOWS COMMUNITY WETLAND NATURE ...btckstorage.blob.core.windows.net/site7561/GREEN HAY...AVON MEADOWS HAY CUT Cut 3rd thJuly, Turned 5th July, Baled and removed 8 July. Fine](https://reader033.fdocuments.net/reader033/viewer/2022060410/5f103f3b7e708231d4482a63/html5/thumbnails/8.jpg)
STREWING AT MIDDLE MEADOW: 13th July
1st load arrives 12:15
Rolling out the bales and spreading 8 volunteers working.
2nd load positioned
![Page 9: AVON MEADOWS COMMUNITY WETLAND NATURE ...btckstorage.blob.core.windows.net/site7561/GREEN HAY...AVON MEADOWS HAY CUT Cut 3rd thJuly, Turned 5th July, Baled and removed 8 July. Fine](https://reader033.fdocuments.net/reader033/viewer/2022060410/5f103f3b7e708231d4482a63/html5/thumbnails/9.jpg)
All finished by 14:15.