Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management

Transcript of Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center...

Page 1: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterCase Study

John Ismert & Frank Ellis

Auraria Higher Education Center

Facilities Management

Page 2: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education Center

• Built in 1976-77• 18 campus buildings• 1,700,000 square feet of

office and classroom space

Page 3: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterProject Scenario

• Campus built 20 years ago• Fast-track construction project• All the equipment is beginning to

wear out at once• Energy efficient systems have

progressed a lot in 20 years• Time for some major retrofit work

Page 4: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterMain Cooling Plants

• North Classroom Chiller Plant

• P.E. Building Chiller Plant• Plaza Building Chiller

Plant• North Chiller Plant

– serves Science, Arts and Library buildings

• South Chiller Plant– serves Central, West, South,

and Technology buildings

Page 5: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterHeating & Hot Water System

• Purchased steam from Public Service Company in Denver for heating

• Hot water generated from heat exchange with steam system

• Typical of late 1970s with escalating gas prices• Studied replacement options but decided to

keep steam system– would have needed 60+ gas boilers– able to negotiate lower steam cost

Page 6: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterElectricity Use in North Chiller Plant

• Monthly cooling and non-cooling electricity consumption 1995

• Monthly electricity demand 1995

0

20

40

60

80

100

120

140

160

180

200

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Energy Consumption (1000 kWH)

cooling consumption non-cooling consumption

0

100

200

300

400

500

600

700

800

900

1000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Demand (KW)

Page 7: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterProject Challenges

• More work than can be done under the budget available

• Must fit into a 10 year self-funded project

• Coordination of systems between all campus buildings

• Need to restore cooling capabilities before the summer of 1997

Page 8: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education Center Campus Improvements Made

• New efficient chillers and cooling tower in North Chiller Plant

• New direct digital controls in 7 buildings • Air side improvements in many buildings• Lighting improvements• Fume hood efficiency improvements

Page 9: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterNorth Chiller Plant

• Original Chillers– Two 550 ton centrifugal electric chillers– R-12 refrigerant (CFC)– 0.78 kW/ton efficiency

• New Chillers– Two 550 ton centrifugal electric chillers– R-134a refrigerant (HFC)– 0.48 kW/ton efficiency

• Undersized cooling tower replaced– single-cell, induced draft tower

Page 10: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterNorth Chiller Plant Energy Savings

Page 11: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education Center Direct Digital Controls

• Added to 7 campus buildings• New fiber optic network• More aggressive energy conservation strategies

– tighten chilled water and hot water resets– tighter run times– changed evaporative cooling & chilled water

sequencing

• Monitored water meters for sprinklers & cooling towers for more accurate sewer credit

Page 12: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterAir Side Improvements

• Science building– 2 new air handling units – new coils on 4 old air handling units– new VFD drives and motors for supply air fans– replaced variable air volume boxes

• Art building– replaced evaporative cooler media

• PE building– failing heat storage wheel replaced with heat exchanger

Page 13: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterLighting Improvements

• High efficiency T-8 lamps• Rapid start electronic ballasts• Compact fluoruescents in place of

incandescents• Exit lamps replaced with long life lamps• 10,682 fixtures modified in 13 buildings• Light levels maintained or improved

Page 14: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterFume Hood Improvements

• Over 50 fume hoods retrofitted– North Classroom and Science buildings

• Proximity sensors installed and attached to 2-position dampers– reduce air flow from 100 fpm to 60 fpm at night

or when no one is near the hoods

• Integrated operation of building make-up and exhaust air and fume hood ventilation

Page 15: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterEstimated Project Finances

• Other improvements help pay for chiller plant work

Purchase &Installation

Cost

Rebates andCredit

Deductions

AnnualEnergySavings

PaybackPeriod(years)

North Chiller &Cooling Tower

549,700 63,000 rebate35,000 R-12

25,600 17.6

Direct DigitalControls

577,500 --- 49,40020,000 sewer

8.3

Air SideImprovements

74,000 17,000 13,900 4.1

LightingImprovements

590,800 86,000 rebate40,000 ICP

142,000 3.3

Fume Hoods 279,800 9,000 52,400 5.2

Total 2,071,800 250,000 303,300 6.0Service Contract --- --- - 49,300 7.2

Page 16: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterFinancing Structure of Project

• Ten year bond from AHEC• $2 million worth of improvements• $175,000 demand side management rebates• $40,000 ICP grant, $35,000 R-12 credit• Annual utility savings of ~ $300,000• 7.2 year overall project payback period with

performance contracting service provided

Page 17: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterProject Timeline

Page 18: Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.

Auraria Higher Education CenterProject Results

• Utility savings of about $300,000 annually• Took advantage of DSM rebate programs• More comfortable learning environment• Increased energy awareness level at AHEC• Newer, more efficient state-of-the-art systems• Reduced dependence on CFC’s