Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent Notes Rates for excavation works shall include: Removal of site obstacles, rocks, trees and small concrete of store blocks building in the site. Removal of all debris and surplus from site. Excavation for foundation, trenches, etc. Shall be to the actual dimensions shown on Drawings, and to be measured from Natural Ground Levels or reduced levels. Allowance for working space is not applicable; unless it is clearly specified in the special excavated materials approved by the Eng. In layers not exceeding 20 cm in thickness, leveling, watering and compacting to not less 95% of modified dry density. 1.01 Excavation for leveling the site: (MC) Excavation from natural ground levels to reduced levels in any kind of soil, including rocks, concrete or asphalt, etc. to the required depths and dimensions as in the drawings. Price includes removal of surplus, back filling of suitable excavated materials in layers of 20 c thick, watering and compacting to 95% according to modified AASHTO Density Test T80 as per drawing and engineer's approval. MC 6658 3,5 23303 Total of page(10) 23303 10

Transcript of Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities...

Page 1: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Attil Hospital Project Bill of Quantities

Table(1) Excavation and Backfill

Rate Amount No Description Unit Qty

Us$ Cent Us$ Cent Notes Rates for excavation works shall include:

• Removal of site obstacles, rocks, trees and small concrete of store blocks building in the site.

• Removal of all debris and surplus from site.

• Excavation for foundation, trenches, etc. Shall be to the actual dimensions shown on Drawings, and to be measured from Natural Ground Levels or reduced levels.

• Allowance for working space is not applicable; unless it is clearly specified in the special excavated materials approved by the Eng. In layers not exceeding 20 cm in thickness, leveling, watering and compacting to not less 95% of modified dry density.

1.01 Excavation for leveling the site: (MC) Excavation from natural ground levels to reduced levels in any kind of soil, including rocks, concrete or asphalt, etc. to the required depths and dimensions as in the drawings. Price includes removal of surplus, back filling of suitable excavated materials in layers of 20 c thick, watering and compacting to 95% according to modified AASHTO Density Test T­80 as per drawing and engineer's approval.

MC 6658 3,5 ­­­­ 23303

Total of page(10) 23303

­10­

Page 2: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (1)

Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

1.02

piles

Excavation for foundations (MD) Excavation for foundations, trenches, etc .in any kind of soil including rocks to the dimensions and levels shown in the drawings. Price includes back filling with excavated soil if suitable, removal of extra and unsuitable soil. Back filling shall be in layers of 20 cm thick, watering and compaction to 95% to comply with modified AASHTO F.D.T(T­80) as per drawing and engineer's approval

M.D 1209 9 ­­­­­ 10881

1.03 Imported fill (MC) Imported Granular Fill: Import and fill with selected imported Approved fill; to the required levels as and where directed by the engineer . Tilling shall be in layers not to exceed 20 cm . Thick. Price includes leveling, watering and compacting to 95% field density complying with Modified AASHTO Density Test T­80

MC 600 7 ­­­­ 4200

1.04 Base course(MC) Supply and well compact base course layer with an average thickness of 15cm. Price includes leveling, watering and compacting to 95% according to the field density test for both the sub grade and the base coarse. Price also includes soil leveling, watering and compacting as per drawing and engineer's approval.

MC 1225 8 ­­­­­ 9800

Total of pages (11) 24881

­11­

Page 3: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (1)

Excavation and Back fill

Price Description Us $ Cent

Total of page (10) 23303 ­­­­­­ Total of page (11) 24881 ­­­­­­

Total Exclude (V.A.T) 48184 ­­­­­­

­12­

Page 4: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (2)

Concrete Works Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

Concrete works: Price of plain and reinforced concrete shall include:

• Supply and cast form work, vibrating and curing of concrete .

• Steel reinforcement for all reinforced concrete works, in any diameter according to the drawings.

• Testing concrete according to the standards.

• All work man ship and materials required, according to the drawings and specifications.

2.01 Plain Concrete(MC) Plain cast in place concrete (Blinding) Grade B150 with an average thickness of not less that 10cm. And a minimum cement content of 200 Kg/m3 under foundations, pile caps, tie beams walls and elsewhere as per drawing and engineer's approval .

MC 80 100 ­­­­ 8000

2.02 Reinforced concrete grade B300 the price including steel and work .

MC 662 145 ­­­­ 95990

Total of pages (13) 103990 ­­­­

­13­

Page 5: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill Of Quantities Table (2)

Concrete works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

2.03 Reinforce Concrete(MC) Reinforced cast in place concrete Grade B 300 with minimum cement content of 350 kg/m3 for caps. Ground beams, column necks, walls under tie beams level and tie beams. The price to include steel reinforcement as per drawings and painting surfaces with hot asphalt grade 75/25 MC 245 135 ­­­­­ 33075 ­­­­­

2.04 Reinforce Concrete (MC) Reinforced cast in place concrete Grade B300 with minimum cement content of 35kg/m3 for columns, stairs, reinforced concrete walls and where needed above tie beams level. The price to include steel reinforcement as per drawings. MC 500 135 ­­­­­ 67500 ­­­­­

2.05 Reinforced concrete for slabs (MC) Reinforced cast in place concrete of grade B300 with minimum cement content of 350kg/m3 for reinforced concrete suspended slabs(25cm thick). Price to include concrete hollow blocks for ribs of (40x20x17cm) and steel reinforcement as per drawings. MC 1083 155 ­­­­­ 167865 ­­­­­

2.06 Ditto solid slabs for ground slabs price it include steel reinforcement as per drawings

MC 90 140 ­­­­­ 12600 ­­­­­

Total of page (14) 281040 ­­­­­

­14­

Page 6: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (2)

Concrete Works

Price Description Us $ Cent

Total of page (13) 103990 ­­­­­­ Total of page (14) 281040 ­­­­­­

Total Exclude (V.A.T) 385030 ­­­­­­ .

­15­

Page 7: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (3)

Roofing and Expansion Joints

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

3.01 Rainwater Slope (MC) Plain concrete casts in place Grade B200 screed to roof not less that 30 mm in the lower point as shown in the detailed drawings with smooth surface finish and proper treatment at gutter inlets and corner and preparation for receiving roofing membrane works as per drawings, specifications and engineer's approval. MC 90 110 ­­­­­ 9900 ­­­­

3.02 Roofing membrane (MS) Supply and install roofing membrane of bitumen rolls 4.5mm. polyester reinforced and covered with a layer of crushed white stone. Price to include 100mm overlapping, one primer coat and special treatment at gutter inlets and corners all as per drawings and specifications. MS 870 10 ­­­­­ 8700 ­­­­

Total of page (16) 18600 ­­­­

­16­

Page 8: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (3)

Roofing and Expansion Joints

Price Description Us $ Cent

Total of page (16) 18600 ­­­­­­ ­­­­­­

Total Exclude (V.A.T) 18600 ­­­­­­

Structural Works

Price Description Us $ Cent

Table (1) 48184 ­­­­­ Table (2) 385030 ­­­­­­ Table (3) 18600 ­­­­­ Total 451814 ­­­­­­­

­17­

Page 9: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (4)

Stone and Bricks Masonry

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

Stone and Brick Works : Prices for stone works shall include :

• Supply and install white stone of first quality free of any defects or cracks with minimum thickness of 5cm and a height of 25 cm. Supply and install cement. Aggregate. Water (concrete) and 10cm block.

• Cleaning external stone surface and pointing by using white cement.

• Using reinforced concrete for lintels and intersections of slabs and cantilevers.

• All special pieces like corners. Jambs and the like mortar, stainless steel dowels, hanger and fabricated steel wire mesh as specified in drawings and specifications.

4.01 Stone Walls Supply and build stone walls including concrete Grade B200 and 10cm block backing with total thickness of 30cm as per drawings and specifications (from Jama'een or Equivalent faced mlataash and mataba) . Samples shall be submitted for the Engineer's approval and shall be in compliance with the specification. MS 1800 35 ­­­­ 63000 ­­­­­

4.02 Supply and build stone cladding (mlataash and mataba) for reinforced concrete elements including reinforcement mesh and joining concrete needed for joining between stones and the reinforced concrete elements as per Drawings and Specifications. Prices not to include concrete walls. MS 90 45 ­­­­­ 4050 ­­­­

Total of Page (18) 67050

­18­

Page 10: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (4)

Stone and Bricks Masonry

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

4.03 Ditto, but stone copping with minimum thickness of 5cm. For toping parapet walls as shown in the drawings. MR 128 30 ­­­­­ 3840 ­­­­­ Price for block masonry walls shall include:

• Supply and build, cement, water, bricks and aggregate .

• Mortar layer horizontally and vertically between blocks.

• All types and locations of building blocks.

Reinforced concrete for lintels all over the length of the wall B 200 . Reinforced concrete for any beams through block walls B 200. Closing all openings and cleaning both surfaces.

4.04 Supply and build concrete hollow block walls grade 35 and 20cm thick as shown, in the drawings. Price also to include galvanized metal ties and angles MS 16000 1.90 ­­­­ 30400 ­­­­­

4.05 Ditto, but 10 cm. Thick as shown in the drawings. MS Total of Page (19) 34240 ­­­­

­19­

Page 11: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table ( 4 )

Stone and Bricks Masonry

Price Description Us $ Cent

Total of page (18) 67050 ­­­­­­ Total of page (19) 34240 ­­­­­­

Total Exclude (V.A.T) 101290 ­­­­­­

­20­

Page 12: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (5) Plastering

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

Plastering Prices include:

• Supply and build cement, water and aggregate.

• Expanded metal lath, angle beads and plaster stops at opening edges.

• Adding mixture (PG2) according to the manufacture catalogues.

• Cleaning all walls and parts that required to be plastered.

The price shall also include for running rules, all narrow width for taking out joint on block walls or backing concrete face for key, for making good to frames around pipes and other fittings, plastering to jambs and reveals of openings, side of columns, window sills­all of which shall be measured as plastering . Plastering all area shall be measured net including openings which are less that 0.25m2

5.01 MS Two coats of cement and sand plaster over one slurry coat to walls and ceilings and where required including metal lath, angle beads, plaster stops and all required as per specifications and drawings. MS 16000 3 ­­­­­­ 48000 ­­­­­

Total of Page (21) 48000 ­­­­

­21­

Page 13: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (5) Plastering

Price Description Us $ Cent

Total of page (21) 48000 ­­­­­

Total Exclude (V.A.T) 48000 ­­­­­­­

­22­

Page 14: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (6)

Tiling , Floor and Marble works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

6.01 Tiles (MS) Supply and install pre­cast terrazzo tiles (30x30x2.7 cm) with Italian marble chipping size (3­4). Price to include skirting of same color . Bedding and jointing in cement and sand mortar, pointing and grounding with white cement, required sand fill grinding and polishing on site .

MS 3300 13,5 ­­­­­ 44550 ­­­­­

6.02 (MS) Supply and install non­slip ceramic floor tiles (20x20x0.6cm) Spanish made or equivalent , first class and free of defects. Price includes concrete filling( grade10) pointing with white cement , cleaning on sit and required sand fill . All works to be done according to the drawings and specifications, color to be decided and approved by the Engineer.

MS 240 15 ­­­­­ 3600 ­­­­­

6.03 (MS) Supply and install white porcelain glazed wall tiles, Spanish made or equivalent, first class (30x20x0.6cm) and free of all defects, price includes bedding in cement mortar, grouting and two coats of plaster. All works to be done according to drawings and specifications, color to be decided and approved by the Engineer. MS 800 20 ­­­­­ 16000 ­­­­­

Total of gage (23) 64150 ­­­­

­23­

Page 15: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (6)

Tiling, Floor and Marble works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

60.4 Marble work (MR) Supply and install local marble for steps and treads of stairs. Treads of 3cm thick , riser of 2cm thick bedding in cement mortar. Price to include grouting and polishing to faces at seen edges. Note: The tread and riser shall be measured and priced as a single unit. MR 120 35 ­­­­ 4200 ­­­­­

6.05 (M R) Supply and install local marble shirting 2 cm thick and 8cm high over the step nosing , bedding in cement mortar for floor and stair landing . Price to include grouting and polishing .

MS 200 15 ­­­­­ 3000 ­­­­

6.06 (MS) Supply and install local marble 3cm thick for windowsills bedding in cement mortar. Price to include grouting and polishing of faces and seen edges as per drawings . MS 150 35 ­­­­­ 5250 ­­­­­

Total of pages (24) 12450 ­­­­­

­24­

Page 16: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (6)

Tiling, Floor and Marble works Price Description

Us $ Cent Total of page (23) 64150 ­­­­­ Total of page (24) 12450 ­­­­­

Total Exclude (V.A.T) 76600 ­­­­­­

­25­

Page 17: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table ( 7 ) Painting

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

Notes: Price of painted surfaces shall include

• Supply of materials in sealed packages.

• Preparations, Workmanship, sample, protection of surfaces and making good the damaged ones.

7.01 Oil Paint (MS) Supply and apply 3 coats of oil paint of color and make approved by the engineer. Price shall include application of putty and smoothing of surface before and after each coat of the putty. Price shall include also the primer coat of approved paint and 2 coats of under coat.

MS 1500 20 ­­­­ 30000 ­­­­

7.02 Emulsion (MS) Supply and apply emulsion, PVC­ based paint for interior walls. Paint shall be of high quality well­known brand and shall be applied on smooth and well finished surfaces in minimum of three coats over one coat of primer. Price shall include all works as per drawing and specifications . MS 6000 5 ­­­­­ 30000 ­­­­

7.03 Polycide(MS) Ditto, but 'Polycide' for ceiling. MS 3000 5 ­­­­­ 15000 ­­­­­ Total of gage (26) 75000 ­­­­­

­26­

Page 18: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (7)

Painting Price Description

Us $ Cent Total of gage (26) 75000 ­­­­­­­­

Total Exclude (V.A.T) 75000 ­­­­­­

­27­

Page 19: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table ( 8 )

Carpentry Works Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

Supply & fix flush wooden doors 4.5cm with frames & sub­frames panel solid core 13x4.5cm. Hard wood edge strip with plywood veneer both sides 5mm thick, frames width shall be according to the wall thickness plus 4­6 cm for plastering purposes. Architrave hardwood (4.5x1.5cm) Price also to include ironmongery, kick plates stainless steel 10cm height (U shape) both sides for bathroom and toilet doors, door stoppers, glass 4mm thick for vision panel, cylindrical locks ( Wally or equivalent) and painting three coats of oil paint in addition to primer coat .

8.01 A: Doors type (D 03) , size (0.9x2.20) B: Doors type (D 05), size (1.00x2.20)

No No

50220

170 180

­­­­­­ ­­­­­­

8500 39600

­­­­­ ­­­­­

8.02 Supply and install Bottom Wooden Kitchen and laboratory Cabinet, Cabinet's top shall be of first choice granite, (color to be desided by the Engineer) 30 mm think with polished surface and seen edges. Cabinet sides Elevations, Partition, Shelves and Drawers front­ side shall be of 20mm think Block wood (late), covered with 0.9mm thick lineated Plastic Veneer on both faces .Black board seen edges shall be framed with Hard wood (zan) bands size (18*10)mm. Edges of Drawer's sides shall be covered with 12*10)mm. Hard wood(zan) frame. Rear sides of cabinets and drawer's bottom shall be of 5mm, thick Veneer covered with L.P.V. Price to include cabinet flooring Terrazzo tiles30*30*2.7), and Ceramic skining (30*10*1.5)cm, ironinongery, handles, two coats of lacquer paint over one primer coat and all the accessories as per drawing and specifications. Height (90)cm. Width (60)cm. MR 30 160 ­­­­­ 4800 ­­­­­

Total of page (28) 52900 ­­­­­

­28­

Page 20: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (8)

Carpentry Works

Price Description Us $ Cent

Total of Page (28) 52900 ­­­­­­

Total Exclude (V.A.T) 52900 ­­­­­­

­29­

Page 21: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table (9)

Steel and Aluminum Works Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

9.01 Supply, fix and operating sliding windows of aluminum section (7000) or equivalent, powdered painted not less than 60 micron, two and a half runs for vertical and horizontal partitions. Price to include 6mm glass, gaskets, ironmongery, locks, double weather strips, external &internal silicon filling around frame, and all other accessories needed to complete work according to drawings an specifications. MS 480 150 ­­­­­ 72000 ­­­­­­

Total of page(30) 72000 ­­­­

­30­

Page 22: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table ( 9 )

Steel and Aluminum Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

9.02 Ditto, but aluminum hinged windows as in the drawings (Section 4000). Windows (W6) size(0.5x1.04) MS 30 170 ­­­­­ 5100 ­­­­

9.03 Supply and fix steel doors from steel tubes section (80x40) with double 1.5mm thick steel sheets; Price to include ironmongery, cylindrical locks (Wally), handless, 6mm glazing, protection grilles section, painting in three coats in addition to two primer coat and shop drawings for approval. MS 100 34,5 ­­­­­ 3450 ­­­­­

9.04 Ms Supply and install window protection steel bar(20x20 cm) as detailed in the drawings including fixation, accessories, welding, grinding& smoothing . Price also to include oil painting three coats in addition to two primer coats, color approved by the engineer.

MS 480 35 ­­­­­­ 16800 ­­­­­

9.05 Supply and install steel staircase hand rails as shown in drawings including oil painting. MR 100 35 ­­­­­ 3500 ­­­­ Total of page (31) 28850 ­­­­­

­31­

Page 23: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Table ( 9 )

Steel and Aluminum Works

Price Description Us $ Cent

Total of page (30) 72000 ­­­­­­­ Total of page (31) 28850 ­­­­­­­

Total Exclude (V.A.T.) 100850

Building Finishing

Price Description Us $ Cent

Table (4) 101290 ­­­­­ Table (5) 48000 ­­­­­ Table (6) 76600 ­­­­­­ Table (7) 75000 ­­­­­­ Table (8) 52900 ­­­­­­ Table (9) 100850 ­­­­­­ Total 454640 ­­­­­­

­32­

Page 24: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Structural Works

Price Description Us $ Cent

Total table ( 1) " Excavation and Back fill" 48184 ­­­­­­­ Total table ( 2 ) " Concrete Works" 385030 ­­­­­­­ Total table ( 3 ) " Roofing and Expansion Joints" 18600 ­­­­­­­ Total table ( 4 ) 'Stone and Bricks Masonry" 101290 ­­­­­­­ Total table ( 5 ) " Plastering" 48000 ­­­­­­­ Total table ( 6 ) " Tiling, Floor and Marble Works" 76600 ­­­­­­­ Total table ( 7 ) " Painting" 75000 ­­­­­­­ Total table ( 8 ) " Carpentry Works " 52900 ­­­­­­­ Total table ( 9 ) "Steel and Aluminum Works " 100850 ­­­­­­­

Grad total (EXCLUDE V.A.T) 906454 ­­­­­­­ Grand Total to be carried to page No.50

­33­

Page 25: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Table (10) Bill of Quantities Mechanical Works

The Contractor's total price for price for works shall include: Submitting shop drawings for Engineer approval and the supply of as built drawings, equipment's operation and maintenance catalogues and spare parts lists, after execution, and completion of all works. The supply of water for testing and operating the complete system handing , over and maintenance , and guarantee period of one year.

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

10.01 NO Supply , install, and commissioning of water closet from ( ROCA) or approved equal , complete with : Cistem and valves, fittings, solid seat and cover. Price includes 1/2" flexible pipe and all accessories for complete installation as shown in drawings, and in accordance to engineering supervision and specifications.

L.M 1100 ­­­­­­

10.02 NO Supply and installation and commissioning of wash basin wall mounted from ($OCA) or approved equal . Size is 560x450mm, complete with Chrome mixer " simple GROHE" or approved equal subject to engineer. Approval, supports, waste outlet, tail piece ,P­trap chrome plated, drain , Mirror size 600x400 with stainless steel frame and accessories, all as shown in drawings, and in accordance to supervising engineer instructions and specifications. NO 28 70 ­­­­­ 1960 ­­­­­­

10.03 NO Supply and Installation and commissioning of single bowel kitchen sink, Stainless Steel from (ROCA) or approved equal. Complete with : chrome plated mixer(GROHE) for kitchen sinks, and lab supports, waste outlet, tail piece, P­trip chrome plated , drain pipe up to floor drain and all required parts for water supply line as shown in the drawings and specifications . Single sink size (60x120) . NO 12 250 ­­­­­­ 3000 ­­­­­

Total of page (34) 6060 ­­­­­­

­ 34­

Page 26: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Mechanical Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

10.04 NO Supply, and install 4" UPVC floor Drain. Price to include siphon, double chrome plated cover one grated and one closed, and all other fittings needed to comply with specifications. NO ­­­­­

10.05 NO Supply and build manholes Price shall include materials ( concrete, blocks, fittings, plastering and cast iron cover medium duty of weight not less than 50 kg) with all necessary works according to the drawings and specification. Manhole internal size 60x60cm .

NO 20 78 ­­­­­ 1560 ­­­­­

10.06 Supply and Install Vertical Drainage Venting Stacks. Of UPVC pipes with Diameters and Details shown on Draws. Price to include all fittings, Jointing and fixing , hangers, painting, air vents and all required in Drawings and specifications. A) Dim. 4" UPVC.

MR 310 4 ­­­­­ 1240 ­­­

10.07 NO Supply, and Install ( clean­ out) , of Drainage Network . In size and location shown in the drawings and where necessary, including fittings, workmanship and all needed to complete work. NO 145 5 ­­­­ 725 ­­­­­­ Total of page (35) 3525 ­­­­­

­35­

Page 27: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Mechanical Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

10.08 NO Supply, and install Galvanized Steel Water Tank . Steel thickness not less than 1.5 mm. including well painted steel stand, automatic float valves, valves, fittings, vents, water tight cover, lock and all necessary works to complete works as per Specifications and Draws. 2000 Liters cold water tanks

NO 10 150 ­­­­­­ 1500 ­­­­­­

10.09 NO Supply , and Install Domestic Water Distribution Networks ( for drinking & sanitary use) of well – known first class Make Galvanized steel Pipes Call B. Price to include workshop drawings, coordinated drawings, all fittings, valves, vents, sleeves, bends, hangers, insulation & covering and all necessary works to complete as per drawings and specification. Starting from main connection to on roof tanks ending with indoor outlets ( taps and /or valves. ) Including External Distribution Net, sanitary unit Drinking Basin, (with all fittings and pressure Taps) all as per Drawings and specification.

LS LS ­­­­­ 1000 ­­­­­

10.10 Supply and lay External Sewer To Connect with In site Drainage System. Price to include Trench excavation , trench bottom leveling and preparation , bedding in concrete, supply of pipes, back filling with selected material, jointing all fittings, testing, cleaning and all related works to complete as per Drawings and Specifications. A) Diameter 8" UPVC pipes

MR 60 20 ­­­­­ 1200 ­­­

Total of page (36) 3700

­ 36–

Page 28: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Mechanical Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

10.11 Main Water Connection Locate and provide water supply connection to existing main water supply, including providing water meter with all fitting, strainer, checker valve, stop valve and required manhole with cover. (pipe work measured elsewhere) and paying all charges in connection therewith.

LS LS 500 ­­­­­­

10.12 Supply and install Kitchen. Copper gas pipes in diameter & length shown in the drawings Price to include valves, kitchen, fittings, supports protection painting of exposed pipes, insulation, gas cylinders manifold to different supply points valves and all related works as per drawings & spec.

LS LS 1000 ­­­­­­­

10.13 Supply and install gas Cylinders for Kitchen. Use (12kg) price to include automatic regulators, pressure gauge, isolating valves , testing & commissioning & all related works as per drawings and specification. NO 8 100 ­­­­­­ 800 ­­­­­ ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­ ­­­­­ ­­­ ­­­­ ­­­­­ ­­­­­ ­­­­­­­ Total of page (37) 2300 ­­­­­­­

­37­

Page 29: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Mechanical Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

10.14 Roof Drains (MR) Supply , install and commissioning of UPVC rain water roof drain including connections. A) Rain water drain size 3" MR 50 15 ­­­­ 750 ­­­­­

10.15 LS Supply and build septic tank. Price to include excavation . concrete, reinforced concrete, broken stones, gravel back­filling , cast iron cover and all necessary works per drawings and specification.

LS LS 1000 ­­­­­­

10.16 Solar Collectors : Supply installation and commissioning of (2) two solar collectors of (0.90x1.9 m), 1000 litter galvanized steel tank and (1) one hot water cylinder of 200 liter capacity, double jacket type complete with electrical heating element of 3.0 K.W price shall include installing on roof , metal base painted with primary coating and then with final black paint, and connecting to pipes network on roof with all necessary fittings as shown in drawings and according to specification and approval of supervisor engineer.

NO 120 190 ­­­ 22800 ­­­­­­

­­­­­­­­­­­­­­­­­­­­­­­ ­­­­­­­ ­­­­ ­­­­ ­­­­­­ ­­­­­­ ­­­­­­ Total of page (38) 24550 ­­­­­

­ 38–

Page 30: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

TABLE (10) Bill of Quantities Mechanical Works

Price Description Us $ Cent

Total of page (34) 6060 ­­­­­ Total of page (35) 3525 ­­­­­ Total of page (36) 3700 ­­­­­ Total of page (37) 2300 ­­­­­ Total of page (38) 24550 ­­­­­

Total exclude (V.A.T) 40135 ­­­­­

­39­

Page 31: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

TABLE (11) Bill of Quantities Electrical Works

The Contractor's total price for works shall include: Submitting shop drawings for Engineer approval and the supply of as built drawings, equipment's operation and maintenance catalogues and spare parts lists, after execution, and completion of all works .

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

Notes Described below are an inseparable part of the tender documents . Contractor should take that into consideration, while preparing his cost estimates, and apply that during installation. Contractor should install and constrict all works according to plans and specification, tender documents, and conditions of the Electricity Co. Contractor should also test and submit the electrical works to the electricity Co. Power connection and meter fees are a part of this tender.

11,01 NO. Supply , install, and connect Distribution Board (DB1) . Including plastic enclosure, miniature breakers, siemens type or equal , bas bars, and all accessories feeder from (KWHMP) as per drawings and specifications. LS 1 4500 ­­­­­­

11.02 NO Supply , install and Connect Lighting Point including , conduits, wires. Switches and all accessories up to the (DB1) as per drawings and specification. NO 960 8 ­­­­­­­ 7680 ­­­­­

Total of page (40) 12180 ­­­­­­­

­ 40­

Page 32: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Electrical Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

11.03 NO Supply, install and Connect the following Socket Outlets. Type Gawiss or equal. Including wires conduits all accessories up to DB1 as per drawings and specifications.

• 3 pin 16 Amp sockets. • Ditto, but waterproof • Telephone outlet up to junction box

NO NO NO

9610240

40504

­­­­­ ­­­­­ ­­­­­

3840 500 960

­­­­ ­­­­ ­­­­

11.04 EARTHING SYSTEM L.S Supply, install and connect a complete Earthing system of (two OHM) ground resistance, including the connection of this system to the DB1 by suitable cable and including plates, rods, excavation, back filling of all pits to obtain the required resistance, and including and inspection pit with medium duty cast iron cover, and all the accessories as per drawing and specifications. Grounding Resistance is to measured at DB1 LS LS 1000 ­­­­ Total of page (41) 6300 ­­­­­

­41 –

Page 33: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities Electrical Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

11.05 Main Electrical Connection Locate, Supply Install and Connect include, PVC pipes and required manholes with covers, & all necessary works. As per drawing specifications and municipality instructions.

• Supply and construct elec. Manholes and all the accessories as per drawing and specifications.

• PVC Pipe Ø 3 "

NO

MR

5

20

200

15

­­­­

­­­­

1000

300

­­­­­­

­­­­­­ 11.06 Ditto but for telephone system and to supply a

connection between L.V.B & T . P . • Supply and construct tel. Manhole and

all the accessories as per drawing and specifications.

• PVC Pipe Ø 3" • PVC Pipe Ø 11/4 "

NO

MR MR

10

2030

15

2020

­­­­­

­­­­ ­­­­

150

400 600

­­­­

­­­­ ­­­­

Total of page(42) 2450 ­­­­­­

­42­

Page 34: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

TABLE (11) Bill of Quantities Electrical Works

Price Description

Total of page (40) 12180 ­­­­­ Total of page (41) 6300 ­­­­­ Total of page(42) 2450 ­­­­­

Total exclude (V.A.T ) 20930 ­­­­­

­43 –

Page 35: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

TABLE (12) Bill of Quantities External Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

Excavation. Excavation for foundation trenches, .. Etc. shall be the actual dimensions shown on Drawings, and to be measured from Natural Ground Level or Reduced level. 1­ Allowance for working space is not

applicable: unless it is clearly specified in the special Conditions.

2­ Excavation for foundation of retaining walls is to be measured from lower Reduced level , or from lower Natural Ground level (as stated in bill no. 1 )

3­ Each layer of backing shall be tested separately at the contractor expense and then the next layer can be applied.

12.01 MC Excavation for foundations of retaining and boundary walls: in any kind of soil including rocks, to the dimensions and levels shown in the drawings. Price to include back filling with excavated soil if suitable or substituting it with selected approved important soil. Back filling shall be on layers of 200mm thick with watering and compacting to (95%) to complete with modified AASHTO F.D.T( T­ 90 MC 80 2,5 ­­­­­­ 200 ­­­­­­

12.02 MS Supply and well compact hard core or base course pitching 20 cm thick. Price to include soil leveling average 15 cm. thick, watering and compacting to 95% according to F.D. Test (CT­80) MS 300 11 ­­­­­­ 3300 ­­­­ Total of page(44) 3500

­ 44­

Page 36: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities External Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

12.03 Imported Fill (MC) Import and fill with selected important approved fill as and where directed by the engineer , and for quantities that are over those indicated in items12.01 above, to the required levels and dimensions shown in the drawings and approved by the Engineer. Filling shall be applied on layers not to exceed 20 cm thick . Price to include leveling, watering and compacting to reach 95% Field density, in compliance with Modified AASHTO D.T

MC 560 2,5 ­­­­­­ 1400 ­­­­­

12.04 MS Plain cast in Place concrete grade B 200. Including curing, and all related works. Blinding (10 cm) under Foundations walls , external stairs and where needed MS 90 25 ­­­­­­ 2250 ­­­­­­

12.05 MC Plain cast in Place Concrete Grade B 200 Including form work , curing, and all related works for boundary walls as per drawings and specifications . MC 37 35 ­­­­­ 1295 ­­­­­ Total of page (45) 4945

­45­

Page 37: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities External Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

12.06 Supply and Fix Polystyrene Filler Boards ( Expansion Joint filler ) 50s mm. thick painted with cold asphalt on all face price include mastic 20x20 mm. MS 130 6 ­­­­­­ 780 ­­­­­­

12.07 Supply and Install P.V.C Pipes for Weep Holes Fixed in retaining walls as per drawings and specification ( 3 inch. Diameter 5.3 mm thick) Price to include gravel filter. MR 20 5 ­­­­ 100 ­­­­­

12.08 Supply and install ; Grade '22' Concrete Pre­ cast Tiles. For side walks and external ramps of handicapped. Price to include bedding in cement mortar, grouting, sand fill and pointing ( with sand and cement ). Size (40*40) cm. MS 120 15 ­­­­­ 1800 ­­­­

12.09 Supply and Build; Grade '25' Concrete Pre­cast Curbstone. Size (100x25x15cm ) exposed height 20cm . L.M ­­­ ­­­­ ­­­­ 1600 ­­­­­ Total page(46) 4280

­46­

Page 38: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities External Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

12.10 Supply and well compact screen Wadi Grave or granular fill for Sub­ base. Thickness shall be 15cm . after compacting to 100% according to Modified AASHTO Density Test ( CT180) . Price to include leveling compaction and watering of sub­grade. MS 500 1 ­­­­ 500 ­­­­­

12.11 Supply and well compact granular crushed stone for base course. Thickness shall be 15 cm after compacting to 100% according to modified AASHTO Density Test (CT180) Price to include leveling compacting and watering . MS 500 2 ­­­­­ 1000 ­­­­­­

12.13 Supply and apply liquid asphalt Prim Coat(Grd. MC70 ). 1.2 kg . per square meter, approximate. Applied with the thinner on dry, smooth and clean surface. MS 900 0.5 ­­­­­ 450 ­­­­­

12.14 Supply and Apply Asphalt 1/2 " , By using Finisher in accordance with general specifications. 1­ Wearing course (5) cm . thick , after compacting . MS 500 12 ­­­­­ 6000 ­­­­­ Total of page(47) 7950 ­­­­­

­47­

Page 39: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Bill of Quantities External Works

Rate Amount No Description Unit Qty Us$ Cent Us $ Cent

12.15 Supply and Fix stepped Flag posts., Of 2.5 meter high stepped Galvanized steel pipes (2.5, ,2 & 1.5 ) inch in diameter, with fixing plate, anchors and anchors bolts, flag hanging bullies and rob catches . Price to include excavation and all concrete works as per drawings,. NO 1 500 ­­­­­­ 500 ­­­­­

Total of page (48) 500 ­­­­­

­48­

Page 40: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

TABLE (12)

Bill of Quantities External Works

Price Description US $ Cent

Total of page (44) 3500 ­­­­­­­ Total of page (45) 4945 ­­­­­­­ Total of page (46) 4280 ­­­­­­­ Total of page (47) 7950 ­­­­­­­ Total of page (48) 500 ­­­­­­­

Total Exclude (V.A.T) 21175 ­­­­­­­

­ 49 ­

Page 41: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

Total Bill of Quantities

Total Price Description US $

Cent Structural works ( from page (33) 906454 ­­­­­­ Mechanical works ( from page (39) 40135 ­­­­­­ Electrical Works ( from page (43) 20930 ­­­­­­ External Works ( from page (49) 21175 ­­­­­­

Total (Attil Hospital) ­ (EXCLUDE V.A.T) 988694 ­­­­­­

Total Bill of Quantities

Total Price Description Us $ Cent

STRUCTURAL WORKS (PAGE 17) 451814 ­­­­­ BUILDING FINISHING (PAGE 32) 454640 ­­­­­ MECHANICAL WORK (PAGE 39 ) 40135 ­­­­­ ELECTRICAL WORKS (PAGE 43) 20930 ­­­­­­­ EXTERNAL WORKS (PAGE 49) 21175 ­­­­­­­ TOTAL ( ATTIL HOSPITAL – EXCLUDE V.A.T) 988694 ­­­­­­­

­50­

Page 42: Attil Hospital Project Bill of Quantities Table(1) · Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Rate Amount No Description Unit Qty Us$ Cent Us$ Cent

TABLE (13)

Furniture NO Description

Account Price $

Total Price $

1­ Computers 14 1000 14000 2­ Offices ( tables) 40 100 4000 3­ Cupboards 240 100 24000 4­ Chairs for Offices 50 50 2500 5­ Chair for all parts 600 7 4200 6­ Counter for reception 2 650 1300

Total 50000

­ 51­