Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

download Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

of 66

Transcript of Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    1/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 56 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    2/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 57 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    3/66

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    4/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 59 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    5/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 60 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    6/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 61 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    7/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 62 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    8/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 63 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    9/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 64 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    10/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 65 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    11/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 66 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    12/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 67 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    13/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 68 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    14/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 69 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    15/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 70 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    16/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 71 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    17/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 72 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    18/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 73 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    19/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 74 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    20/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 75 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    21/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 76 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    22/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 77 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    23/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 78 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    24/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 79 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    25/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 80 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    26/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 81 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    27/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 82 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    28/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 83 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    29/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 84 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    30/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 85 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    31/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 86 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    32/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 87 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    33/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 88 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    34/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 89 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    35/66

    Piping HydroTest Package 2

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 90 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    36/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 91 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    37/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 92 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    38/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 93 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    39/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 94 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    40/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 95 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    41/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 96 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    42/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 97 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    43/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 98 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    44/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 99 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    45/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 100 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    46/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 101 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    47/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 102 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    48/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 103 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    49/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 104 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    50/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 105 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    51/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 106 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    52/66

    Piping HydroTest Package 3

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 107 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    53/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 108 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    54/66

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    55/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal ConnectivityPhase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)Page 110 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    56/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 111 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    57/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 112 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    58/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 113 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    59/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 114 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    60/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 115 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    61/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 116 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    62/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 117 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    63/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 118 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    64/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 119 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    65/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 120 of 158

  • 8/19/2019 Attachment 6 - Piping Test Package (Manifold 204, 205) (Pages 56 to 121) - A4A0Z7

    66/66

    Piping HydroTest Package 4

    Enbridge Pipelines Inc.

    Eastern Access Edmonton Terminal Connectivity

    Phase 2 (TC2)

    Leave to Open Application

     Attachment 6 - Piping Test Package (Manifold 204/205)

    Page 121 of 158