Attachment 5- Upgrade of Existing Intersections (Activity ...
Transcript of Attachment 5- Upgrade of Existing Intersections (Activity ...
GHD | Report for Roads and Maritime Services - Nambucca Heads to Urunga Pacific Highway Upgrade, 21/22398
Attachment 5- Upgrade of Existing
Intersections (Activity 5b) – Ballards
Road Works Design Package (TW3)
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
131:
40:46
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3001
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
LOCALITY SKETCHNOT TO SCALE
PROJECT
NAMBUCCAHEADS
HYLANDPARK
VALLABEACHVALLA
NAMBUCCASTATE FOREST
NEWRYSTATE FOREST
TARKEETHSTATE FOREST URUNGA
MYLESTOMFERNMOUNTWEEKES
BOLLANOLLASTATE FOREST
TEEWINGA
TASMANSEA
EXIST
.
PAC
NORT
HCO
AST
RAIL W
AY
RALEIGH
IFIC
BELLINGEN HWY
ROADS AND MARITIME SERVICES
NAMBUCCA AND BELLINGEN SHIRE COUNCILS
H10 PACIFIC HIGHWAY UPGRADENAMBUCCA HEADS TO URUNGA
TEMPORARY TRAFFIC MANAGEMENT - TW3
COVER SHEET
PRELIMINARY DETAILED DESIGN
BALLARDS ROAD
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
COVER SHEETTEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3001AO AO
TO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
131:
40:54
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3002
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
DRAWING INDEX
DRAWING NO. DRAWING NAME
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
DRAWING INDEXTEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3002AO AO
TO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
NH2U-DM-TW-3001 TEMPORARY TRAFFIC MANAGEMENT - TW3 COVER SHEETNH2U-DM-TW-3002 TEMPORARY TRAFFIC MANAGEMENT - TW3 DRAWING INDEXNH2U-DM-TW-3003 TEMPORARY TRAFFIC MANAGEMENT - TW3 NOTESNH2U-DM-TW-3004 TEMPORARY TRAFFIC MANAGEMENT - TW3 LEGENDNH2U-DM-TW-3011 TEMPORARY TRAFFIC MANAGEMENT - TW3 DRAINAGE DETAILS SHEET 1NH2U-DM-TW-3012 TEMPORARY TRAFFIC MANAGEMENT - TW3 TYPICAL DETAILS SHEET 1NH2U-DM-TW-3015 TEMPORARY TRAFFIC MANAGEMENT - TW3 TYPICAL SECTIONS SHEET 1NH2U-DM-TW-3016 TEMPORARY TRAFFIC MANAGEMENT - TW3 TYPICAL SECTIONS SHEET 2NH2U-DM-TW-3101 TEMPORARY TRAFFIC MANAGEMENT - TW3 BALLARDS ROAD INTERSECTION GENERAL ARRANGEMENT - SHEET 1NH2U-DM-TW-3102 TEMPORARY TRAFFIC MANAGEMENT - TW3 BALLARDS ROAD INTERSECTION GENERAL ARRANGEMENT - SHEET 2NH2U-DM-TW-3103 TEMPORARY TRAFFIC MANAGEMENT - TW3 BALLARDS ROAD INTERSECTION GENERAL ARRANGEMENT - SHEET 3NH2U-DM-TW-3111 TEMPORARY TRAFFIC MANAGEMENT - TW3 BALLARDS ROAD INTERSECTION SIGNS AND LINEMARKING - SHEET 1NH2U-DM-TW-3112 TEMPORARY TRAFFIC MANAGEMENT - TW3 BALLARDS ROAD INTERSECTION SIGNS AND LINEMARKING - SHEET 2NH2U-DM-TW-3113 TEMPORARY TRAFFIC MANAGEMENT - TW3 BALLARDS ROAD INTERSECTION SIGNS AND LINEMARKING - SHEET 3NH2U-DM-TW-3201 TEMPORARY TRAFFIC MANAGEMENT - TW3 LONGITUDINAL SECTION - MC50 BALLARDS RD INTERSECTION SHEET 1NH2U-DM-TW-3202 TEMPORARY TRAFFIC MANAGEMENT - TW3 LONGITUDINAL SECTION - MC60 BALLARDS RD INTERSECTION SHEET 2NH2U-DM-TW-3301 TEMPORARY TRAFFIC MANAGEMENT - TW3 CROSS SECTIONS - MC50 BALLARDS RD INTERSECTION SHEET 1NH2U-DM-TW-3302 TEMPORARY TRAFFIC MANAGEMENT - TW3 CROSS SECTIONS - MC50 BALLARDS RD INTERSECTION SHEET 2NH2U-DM-TW-3303 TEMPORARY TRAFFIC MANAGEMENT - TW3 CROSS SECTIONS - MC50 BALLARDS RD INTERSECTION SHEET 3NH2U-DM-TW-3304 TEMPORARY TRAFFIC MANAGEMENT - TW3 CROSS SECTIONS - MC50 BALLARDS RD INTERSECTION SHEET 4NH2U-DM-TW-3305 TEMPORARY TRAFFIC MANAGEMENT - TW3 CROSS SECTIONS - MC50 BALLARDS RD INTERSECTION SHEET 5NH2U-DM-TW-3306 TEMPORARY TRAFFIC MANAGEMENT - TW3 CROSS SECTIONS - MC50 BALLARDS RD INTERSECTION SHEET 6NH2U-DM-TW-3307 TEMPORARY TRAFFIC MANAGEMENT - TW3 CROSS SECTIONS - MC50 BALLARDS RD INTERSECTION SHEET 7NH2U-DM-TW-3308 TEMPORARY TRAFFIC MANAGEMENT - TW3 CROSS SECTIONS - MC50 BALLARDS RD INTERSECTION SHEET 8NH2U-DM-TW-3309 TEMPORARY TRAFFIC MANAGEMENT - TW3 CROSS SECTIONS - MC50 BALLARDS RD INTERSECTION SHEET 9NH2U-DM-TW-3310 TEMPORARY TRAFFIC MANAGEMENT - TW3 CROSS SECTIONS - MC60 BALLARDS RD INTERSECTION SHEET 1
GENERAL NOTES
1. THE CONSTRUCTION TEAM IS RESPONSIBLE FOR CONFIRMING THEEXACT LOCATION OF ALL EXISTING AND RELOCATED PUBLIC UTILITYPLANT (PUP) PRIOR TO COMMENCEMENT OF ANY WORKS. THECONSTRUCTION TEAM SHALL CARRY OUT THE ROADWORKS IN SUCH AMANNER TO AVOID ANY DAMAGE TO EXISTING PUP.
2. THE EXISTING SERVICES INFORMATION SHOWN ON THE DRAWINGS HASBEEN COMPILED FROM SURVEY INFORMATION AND INFORMATIONSUPPLIED BY THE CONTRACTOR.
3. CONNECTION OF TEMPORARY TRAFFIC WORKS TO EXISTING PAVEMENTTO BE CONSTRUCTED BY SAWCUTTING AND WIDENING AS SHOWN ONPAVEMENT DETAILS DRG. NO. 3012.
4. THE CONSTRUCTION TEAM SHALL ENSURE THAT MEDIANS, TEMPORARYPAVEMENTS, CROSSOVER AND RAMPS ARE KEPT FREE DRAININGDURING THEIR CONSTRUCTION AND USE.
5. ALL PORTABLE SAFETY BARRIER UNITS THAT ARE NOT FLAREDOUTSIDE THE CLEAR ZONE, SHALL HAVE AN END TREATMENT WHICHSATISFIES RMS STANDARDS.
6. ALL PORTABLE SAFETY BARRIER UNITS TO BE INSTALLED INACCORDANCE WITH MANUFACTURER'S SPECIFICATION. WHERE TRITONBARRIERS ARE SPECIFIED AND ARE INTENDED TO ACT AS ACONTAINMENT SYSTEM, THEY SHALL BE FILLED WITH WATER, AS PERTHE MANUFACTURER'S SPECIFICATIONS.
7. THE CONSTRUCTION TEAM IS TO ENSURE WORKERS DO NOT ENTERWITHIN THE MANUFACTURER'S SPECIFIED DEFLECTION ZONE BEHINDANY SPECIFIED BARRIER.
8. THE CONSTRUCTION TEAM SHALL ASSESS AND MANAGEAPPROPRIATELY THE INTERFACE BETWEEN ALL ROAD USERS(PEDESTRIANS, CYCLISTS AND MOTORISTS) AND THE SITE OPERATIONSINCLUDING ACCESS AND EGRESS.
9. ADEQUATE PAVEMENT WIDTH (OR SEALED VERGE) BEHIND ALLPORTABLE SAFETY BARRIERS IS TO BE PROVIDED IN ACCORDANCEWITH MANUFACTURER'S SPECIFICATIONS TO ALLOW SAFE DEFLECTIONSHOULD THEY BE STRUCK.
10. TRAFFIC CONTROL IS TO BE IN ACCORDANCE WITH THE RMS TRAFFICCONTROL AT WORK SITES MANUAL AND AS1742.3.
11. ALL SIGNS ARE TO BE SIZE "C" WITH CLASS 1 RETROREFLECTIVESHEETING UNLESS OTHERWISE SPECIFIED.
12. EXISTING SIGNAGE CONFLICTING WITH THIS TEMPORARY TRAFFICWORKS PLAN ARE TO BE COVERED OR REMOVED. PARTICULARATTENTION SHALL BE GIVEN TO SIGNAGE ASSOCIATED WITH SPEEDCONTROL AND CHANGES IN CARRIAGEWAY WIDTH, SUCH ASOVERTAKING LANES.
13. EXISTING PAVEMENT MARKINGS CONFLICTING WITH THIS TEMPORARYTRAFFIC WORKS PLAN ARE TO BE REMOVED BY BLASTING ,GRINDINGOR SEALING OVER. PARTICULAR ATTENTION SHALL BE GIVEN TODIRECTIONAL PAVEMENT ARROWS.
14. A VEHICLE MOVEMENT PLAN SHALL BE PREPARED FOR CONSTRUCTIONVEHICLE ENTRY/EXIT AT EACH SITE.
15. INTERSECTION AND DIRECTION SIGNS SHALL BE RELOCATED WHERENECESSARY TO BE VISIBLE AT ALL TIMES.
16. ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT CURRENTWORKPLACE HEALTH AND SAFETY LEGISLATION.
17. SITE ACCESS GATES ARE TO BE CLOSED AFTER HOURS OR WHEN NOTIN USE.
18. REFLECTIVE DELINEATORS ARE TO BE INSTALLED ON ALL NEWPAVEMENT MARKINGS AND BARRIERS IN ACCORDANCE WITH RMSGUIDELINES.
19. CLEAR VEGETATION AS DIRECTED BY TRAFFIC MANAGER ANDENVIRONMENT MANAGER TO MAINTAIN SIGHT LINES AT HORIZONTALCURVES, DRIVEWAYS AND INTERSECTIONS.
20. EXISTING DRAINAGE PATHS TO BE MAINTAINED AT ALL TIMES.21. VMS SIGNS TO BE PROVIDED FOR ONE WEEK PRIOR AND TWO WEEKS
AFTER OPENING ON THE PACIFIC HIGHWAY EITHER SIDE OF EACHINTERSECTION TO ALERT DRIVERS OF CHANGES TO INTERSECTIONCONFIGURATIONS.
SPECIFICATIONS
UTILITY INFORMATION SHOWN ON THE PLANS DOES NOTDEPICT ANY MORE THAN THE PRESENCE OF A SERVICE,BASED ON AVAILABLE DOCUMENTARY EVIDENCE. THEPRESENCE OF A UTILITY SERVICE, ITS SIZE AND LOCATIONSHOULD BE CONFIRMED BY FIELD INSPECTION, PRIOR TO THECOMMENCEMENT OF ROADWORKS AND THE RELEVANTUTILITY PLANS OBTAINED BY DIALING 1100 OR FAX 1300 652077 (DIAL BEFORE YOU DIG). CAUTION SHOULD BE EXERCISEDWHEN WORKING IN THE VICINITY OF ALL UTILITY SERVICES.
1. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE FOLLOWING SPECIFICATION LIST WHEREAPPLICABLE.
ROADWORKS SPECIFICATION
RMS D&C G10 TRAFFIC MANAGEMENTRMS D&C R11 STORMWATER DRAINAGERMS D&C R15 KERBS & GUTTERSRMS D&C R16 PRECAST REINFORCED CONCRETE BOX CULVERTSRMS D&C R23 PLASTIC FLEXIBLE PIPESRMS D&C R24 PRECAST CONCRETE ARCHESRMS D&C R31 VERTICAL WICK DRAINSRMS D&C R33 TRENCH DRAINSRMS D&C R37 INTRA-PAVEMENT DETAILSRMS D&C R38 EDGE DRAINSRMS D&C R40 HORIZONTAL DRAINSRMS D&C R44 EARTHWORKS (CUT, FILL, IMPORTED FILL AND IMPORTED SELECTED MATERIAL)RMS D&C R49 CONSTRUCTION OF VERGESRMS D&C R50 STABILISATION OF EARTHWORKSRMS D&C R53 CONCRETE (FOR GENERAL USE) MORTAR AND GROUTRMS D&C R55 ROCK FILLED GABION AND MATTRESSESRMS D&C R58 CONSTRUCTION OF REINFORCED SOIL NAIL WALLSRMS D&C R63 GEOTEXTILES (SEPARATION AND FILTRATION)RMS D&C R64 SOIL NAILINGRMS D&C R67 HIGH STRENGTH GEOSYNTHETIC REINFORCEMENTRMS D&C R68 SHOTCRETE WORKS WITHOUT STEEL FIBRESRMS D&C R71 UNBOUND PAVEMENT COURSE (NORMAL DUTY)RMS D&C R73 HEAVILY BOUND PAVEMENT COURSE (PLANT MIXED USING SLOW SETTING BINDERS)RMS D&C R75 IN SITU PAVEMENT RECYCLING BY DEEP-LIFT CEMENTITIOUS STABILISATIONRMS D&C R82 LEAN-MIX CONCRETE SUBBASERMS D&C R83 JOINTED CONCRETE BASERMS D&C R84 CONTINUOUSLY REINFORCED CONCRETE BASERMS D&C R106 SPRAYED BITUMINOUS SURFACING (WITH CUTBACK BITUMEN)RMS D&C R107 SPRAYED BITUMINOUS SURFACING (WITH POLYMER MODIFIED BINDER)RMS D&C R109 BITUMINOUS SLURRY SURFACINGRMS D&C R111 SPRAYED BITUMINOUS SURFACING (WITH BITUMEN EMULSION)RMS D&C R116 ASPHALT (DENSE GRADED AND OPEN GRADED)RMS D&C R119 OPEN GRADED ASPHALTRMS D&C R121 STONE MASTIC ASPHALTRMS D&C R131 GUIDE POSTSRMS D&C R132 SAFETY BARRIER SYSTEMSRMS D&C R141 PAVEMENT MARKINGRMS D&C R142 RAISED PAVEMENT MARKINGRMS D&C R143 SIGN POSTINGRMS D&C R145 PAVEMENT MARKING (PERFORMANCE BASED)RMS D&C R151 STREET LIGHTINGRMS D&C R152 EMERGENCY TELEPHONESRMS D&C R173 GENERAL CONCRETE PAVINGRMS D&C R174 LANDSCAPE MAINTENANCERMS D&C R176 NATIVE SEED COLLECTIONRMS D&C R178 VEGETATIONRMS D&C R179 LANDSCAPE PLANTINGRMS D&C R201 FENCINGRMS D&C R221 DYNAMIC REPLACEMENTRMS D&C R223 DEEP SOIL MIXING USING DRY MIX METHODRMS D&C R224 WET DEEP SOIL MIXINGRMS D&C R225 CONCRETE INJECTION COLUMNSRMS D&C R271 DESIGN AND CONSTRUCTION OF NOISE WALLSTSI-SP-003 COMMUNICATIONS PROTOCOL FOR ROADSIDE DEVICESTSI-SP-008 GENERAL REQUIREMENTS FOR THE DESIGN, INSTALLATION, COMMISSIONING AND
MAINTENANCE OF VARIABLE MESSAGE SIGNSTSI-SP-017-DCM SPECIFICATION FOR THE CONSTRUCTION OF UNDERGROUND CABLEWAYS
2. ALL CONSTRUCTION MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONFOR THE WORKS TOGETHER WITH THE REQUIREMENT OF ALL RELEVANT CODES OF PRACTICE REFERREDTO THEREIN AND THE REQUIREMENTS OF ALL STATUTORY AUTHORITIES WHERE APPLICABLE.
3. THE MAINTENANCE FOR TEMPORARY TRAFFIC WORKS IS TO BE IN ACCORDANCE RMS D&C G10.
MATERIALS SPECIFICATION
RMS D&C 3051 UNBOUND AND MODIFIED BASE AND SUBBASE MATERIALS FOR SURFACEROAD PAVEMENTS
RMS D&C 3061 BOUND AND UNBOUND MATERIAL FOR PAVEMENT REPAIRSRMS D&C 3071 SELECTED MATERIAL FOR FORMATIONRMS D&C 3151 COVER AGGREGATE FOR SPRAYED BITUMINOUS SURFACINGRMS D&C 3152 AGGREGATES FOR ASPHALTRMS D&C 3153 RECLAIMED ASPHALT PAVEMENT MATERIALRMS D&C 3202 WAX EMULSION CONCRETE CURING COMPOUNDRMS D&C 3204 PREFORMED JOINT FILLERS FOR CONCRETE ROAD PAVEMENTS AND
STRUCTURESRMS D&C 3211 PORTLAND AND BLENDED CEMENTSRMS D&C 3222 NO-FINES CONCRETERMS D&C 3252 POLYMER MODIFIED BINDERRMS D&C 3253 BITUMEN FOR PAVEMENTSRMS D&C 3254 BITUMEN EMULSIONRMS D&C 3256 COMMINUTED SCRAP RUBBERRMS D&C 3258 AGGREGATE PRECOATING AGENT (FOR BITUMEN)RMS D&C 3259 BITUMEN ADHESION AGENT (FOR BITUMEN)RMS D&C 3261 CUTBACK BITUMENRMS D&C 3268 AGGREGATE PRECOATING AGENT (FOR POLYMER MODIFIED BITUMEN)RMS D&C 3269 BITUMEN ADHESION AGENT (FOR POLYMER MODIFIED BITUMEN)RMS D&C 3351 ROAD MARKING PAINTRMS D&C 3352 FLUORESCENT PLASTIC TRAFFIC CONESRMS D&C 3353 GLASS BEADS (FOR APPLICATION TO ROAD MARKING MATERIALS)RMS D&C 3354 ADHESIVES FOR RAISED PAVEMENT MARKER INSTALLATIONRMS D&C 3356 WATERBORNE ROAD MARKING PAINTRMS D&C 3357 THERMOPLASTIC ROAD MARKING MATERIAL)RMS D&C 3359 PROFILE THERMOPLASTIC ROAD MARKING MATERIALRMS D&C 3360 TWO PART COLD APPLIED ROAD MARKING MATERIALRMS D&C 3368 SKID RESISTANT FRICTION COATING FOR TEMPORARY STEEL ROAD PLATESRMS D&C 3385 BARRIER BOARDSRMS D&C 3400 MANUFACTURE AND DELIVERY OF ROAD SIGNSRMS D&C 3411 SUPPLY OF GUIDE POSTS - TIMBERRMS D&C 3412 SUPPLY OF GUIDE POSTS - NON-TIMBERRMS D&C 3552 DRAINAGE PIPE (CORRUGATED PERFORATED PLASTIC)RMS D&C 3553 SEAMLESS TUBULAR FILTER FABRICRMS D&C 3555 DRAINAGE PIPE (SLOTTED FIBRE-REINFORCED CONCRETE)RMS D&C 3556 STRIP FILTER (GEOCOMPOSITE PLASTIC)RMS D&C 3580 AGGREGATE FILTER MATERIALS FOR SUBSURFACE DRAINAGERMS D&C 3651 PAINTS AND THINNERS FOR STEELWORKRMS D&C 3851 STEEL TAPERED LIGHTING COLUMNSRMS D&C P3074A DESIGN, SUPPLY AND DELIVERY OF SOLAR POWERED, TRAILER MOUNTED,
VARIABLE MESSAGE SIGNS (VMS)
N.T.S.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
131:
41:02
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3003
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGERPRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
NOTESTEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3003AO AO
TO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
SIGN POST
SIGN POST DOUBLE SIDED
SPIKEDUMPY PEGBOUNDARY PEG
HAZARDOUS SITE
BORE HOLE
BUILDING FLOOR LEVEL
EDGE OF GARDEN
TREE TRUNK
PEG
BRIDGE PIER COLUMN POINT
RETAINING WALLSTAIRS
FENCEFENCE POST GUIDE POST
HEADSTONE
LARGE SIGN
MAILBOX
MX SURVEY MARK
PM, SSM OR CONTROL MARK
TREE FOLIAGE
SURVEY LEGEND
PUMP
TEST PIT
UNDERGROUND TANK POINTTOP OF RAIL
GUARD FENCE
GATE
GENERAL
GULLY PIT
SUBSOIL DRAIN OUTLET
DRAINAGE PIT
TABLE DRAIN
JUNCTION MANHOLE
HEADWALLINVERT LEVEL AND SIZE
KERB INLET
UNIDENTIFIED POLE
UNIDENTIFIED SERVICE
BATTER DRAIN
DISH DRAIN
DRAINAGE
PIPE AND SIZE
WATER COURSE
OBVERT LEVEL
SUBSOIL FLUSH JOINTCONCRETE JUNCTION BOX
WATER LEVEL POINT
LIGHT AND POWER TRANSFORMER
STAY ANCHOR POLE
RELOCATED TELEPHONE LINE
EXISTING TELEPHONE LINE
ABANDONED OPTICAL FIBRE
RELOCATED TRANSMISSION LINE
EXISTING TRANSMISSION LINE
LIGHTING CABLE
LIGHT POLE
POWER POLE
LIGHT AND POWER POLE
OPTICAL FIBRE CABLE MARKER
OPTICAL FIBRE PITMAIN PIT
TELEPHONE CABLE MARKER
ELECTRICITY
LIGHT WITH OUTREACH
COMMUNICATIONS
SEPTIC TANK
MANHOLE COVER
TAP
METER
STOP VALVE
EXISTING MAIN
AIR VALVEHYDRANT
MAIN MARKER
SEWER
WATER
WIRE ROPE SAFETY BARRIERG4 SAFETY BARRIEREDGE OF PAVEMENTRETAINING WALLPORTABLE CONCRETE BARRIER
DESIGN LEGENDGENERAL
TEMPORARY WORKS CONTROL LINE, TP &CHAINAGE MARK
WATERFILLED BARRIER
TEMPORARY CONSTRUCTION PARAWEB FENCINGEXISTING PAVEMENT
PROPOSED PAVEMENT (TYPE T1)
PROPERTYPROJECT BOUNDARY
LOCAL ROAD CORRIDOR BOUNDARY
CLEARING LIMITS
SERVICES CORRIDOR BOUNDARYEXISTING TITLE BOUNDARY
IN 55.785
SD15.298
OB 49.453
450 Dia
WL 59.453
BP
SK
TP 13
DP
BP
FL 12.12
129.201
?P
EP
JB
WM
RELOCATED MAINABANDONED MAIN
450
?
SK17105.769
126.446
SF
ABANDONED TRANSMISSION LINE
EXISTING OPTICAL FIBRE
ABANDONED TELEPHONE LINE
RELOCATED OPTICAL FIBRE
OFC
OFP
TSP
TC
WH
PUMP
BH 13
NEW SIGN FACE
80
EXISTING SIGN AND POST TO BE REMOVED
EXISTING SIGN TO REMAIN
EXISTING SIGN TO BE RELOCATED
NEW POSITION OF RELOCATED SIGN AND POST1R
1
NEW SIGN FACE INSTALLED ON EXISTING POSTS.F.O.
EXISTING SIGN FACE
EXISTING SIGN TO BE REMOVED ORCOVERPLATE REQUIRED80
NEW SIGN FACE INSTALLED ON NEW POST
SIGNS & LINEMARKING LEGEND
DRAINAGE LEGEND
CRASH CUSHION(QUADGUARD CZ OR RMS APPROVED EQUIVALENT)
E ELECTRICITY
T TELSTRA
SERVICE CONFLICTS
S SEWER
G GAS
W WATER
(AS SPECIFIED ON PLAN)
DRAIN TAG
"D" DENOTES DRAIN DEPTH (M)"S" DENOTES DRAIN SIDE SLOPE (1:S)"W" DENOTES DRAIN BASE WIDTH (M)
TYPES OF DRAIN(C) DENOTES CONCRETE(V) DENOTES VEGETATED(R) DENOTES ROCK PROTECTION(M) DENOTES STEEL-WIRE MATTRESS LINED
FOR DRAIN TYPES REFER TO TYPICALDETAIL DRAWINGS
"W"
"D"
Culvert 5E
Type 1(R)W=2.0 S=2.0 D=0.5
1
"S"
TYPICAL LABEL DESCRIPTIONS
DRAIN / CATCH DRAIN ( AS SPECIFIED)
INTERFACE DRAIN
TRENCH DRAIN
CULVERT - TRANSVERSE
CULVERT - LONGITUDINAL (Ø450 UNO)
GULLY INLET/JUNCTION BOX
INTERFACE DRAIN CLEANOUT
ACCESS CHAMBER
HEADWALL/WINGWALL
SCOUR PROTECTION (ROCK PROTECTION)
TYPE OF DRAIN
LONGITUDINAL STORMWATER STRUCTURE LABEL
"A" DENOTES LINE NUMBER
"1" DENOTES STRUCTURE NUMBER
1/100A0.0321ha
DENOTES DRAINAGE STRUCTURE, NETWORKAND LINE NUMBERSDENOTES CATCHMENT AREA
CULVERT LABEL - TRANSVERSE DRAINAGE
PERMANENT ROAD GEOMETRY
1A
UTILITIES
CROSS SECTIONSFINAL DESIGN
TEMPORARY WORKS CURRENT STAGE DESIGN
TEMPORARY WORKS PREVIOUS STAGE DESIGN
TEMPORARY WORKS NEXT STAGE DESIGNEXISTING SURFACE
PROPOSED WATER MAIN
PROPOSED ELECTRICITY LINE
PROPOSED TELEPHONE LINE
DIVIDING BARRIER LINE (BB)
DIVIDING SEPARATION LINE (S1)
EDGE LINE (E3)
CONTINUITY LINE (C1)
EDGE LINE (E1)
UNBROKEN LANE LINE (L3)
TEMPORARY LIGHTING (INDICATIVE LOCATION ONLY)
OUTSIDE OF TRAFFIC ISLAND (E4)
OUTSIDE OF PAINTED MEDIAN (E5)
PAVEMENT ARROW (RA2(L))PAVEMENT ARROW (RA2(R))PAVEMENT ARROW (RA5(L))PAVEMENT ARROW (RA5(R))
PROPOSED PAVEMENT (TYPE T2)
DIVIDING BARRIER LINE (BB1)
N.T.S.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
131:
41:11
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3004
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGERPRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
LEGENDTEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3004AO AO
TO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
1SS
1
VEGETATED
D
75mm TOPSOIL ANDHYDROMULCH
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
131:
41:20
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3011
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
A
TD01A
TYPICAL DETAILHYDROMULCH LINED V-DRAIN TYPE 1(M)
PRELIMINARY DETAILED DESIGN
CF
23/08/13 AF
TI
SHEET 1DRAINAGE DETAILS
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
SUBSTANTIAL DETAILED DESIGN
1NH2U-DG-TW-3011AO AO
TO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
24/07/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-0007.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-0008.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-0026.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-0027.
EXISTING SURFACE
40 AC14 (AR450)
300 MIN. HEAVILY BOUND BASE
300 MIN. SMZ (CBR 30%)
SUBGRADE (CBR 5%)
NEW TEMPORARY PAVEMENTTYPE T1 (NOM.)
EXISTING PAVEMENT
PAVEMENT WIDENING
150NOM.
SAW
CU
T
PROFILE EXISTING ASPHALT AT JOINT(NOM. 150 WIDE)FINAL WIDTH TO BE DETERMINED ON SITEIMMEDIATELY PRIOR TO ASPHALTING TOENSURE A CLEAN EDGE IS OBTAINED
150 WIDE BITUTHENE STRIP
BITUMEN TACK COAT, 0.2l/m² (CL320)
NO FINES CONCRETE INTERFACE DRAIN WRAPPEDIN GEOTEXTILE WITH 65 DIAMETER TYPE 1 CLASS400 PERFORATED PLASTIC DRAINAGE PIPE(INTERFACE DRAIN)
300
50
300mm MIN. HEAVILY BOUND BASE
40mm AC14 (AR450)
300mm MIN. SMZ (CBR 30%)
SUBGRADE (CBR 5%)
BITUMEN TACK COAT, 0.2l/m² (CL320)
0.5m MIN.VERGE
4:1
1.0mROUNDING
1.2m MIN.SHOULDER
BATTER
HINGE POINT
CROSSFALL
ROUNDING
EXISTING SURFACE
500 (MIN)100mm AC14 (AR450)
EXISTING WIRE ROPEGUARDRAIL POST TO BEREMOVED
FILL VOID WITH HIGH STRENGTHHIGH FLOW GROUT TO 100mmFROM FSL
PROFILE EXISTING PAVEMENT ANDCONCRETE FOOTING 100mm DEEPAND 500mm WIDE.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
131:
41:30
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3012
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
A
B
TJ01B
LONGITUDINAL PAVEMENT JOINTEXISTING PAVEMENT / TEMPORARY PAVEMENT
T1B
TYPICAL DETAILTEMPORARY PAVEMENT - TYPE T1
TD04A
TYPICAL DETAILVERGE ROUNDING
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
SHEET 1TYPICAL DETAILS
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3012AO AO
TO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
26/07/13
23/08/13 C
TD03A
TYPICAL DETAILREPAIR EXISTING WIRE ROPE FOOTING
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-3003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-3004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-3011.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-3012.
TYPICAL CROSS SECTIONSTN 300 MC50
PACIFIC HIGHWAY (BALLARDS ROAD)
TYPICAL CROSS SECTIONSTN 400 MC50
PACIFIC HIGHWAY (BALLARDS ROAD)
1.5mEX SHLD
MC
50
1.2mSHLD
NORTHBOUND
3.5mEX SB LANE
1.2mEX SHLD EXISTING
SURFACE
SOUTHBOUND
3.9mEX MEDIAN
3.5mLANE
3.5mACCEL. LANE
3.5mEX NB LANE
3.5mEX NB LANE
FINAL DESIGNSURFACE
0.45mBUFFER
REMOVE EXISTINGG4 GUARDRAIL
REMOVE EXISTING WIREROPE GUARDRAIL.
3.5mLANE
1.5mSHLD
3.5mTURN LANE
WORKS AREA
REPAIR EXISTING WIRE ROPE GUARDRAILFOOTING AND MAKE TRAFFICABLE.REFER TD03 DRG. NO. 3012 FOR DETAILS.
PORTABLE CONCRETE BARRIER.REFER RMS MODEL DRG.MD.R132.D01.B
2.2mEX SHLD
MC
50
1.2mSHLD
NORTHBOUND
3.5mLANE
2.0mSHLD
3.5mEX SB LANE
2.9mEX SHLD
EXISTINGSURFACE
SOUTHBOUND
3.1mEX TURN LANE
3.5mLANE
3.5mTURN LANE
3.5mACCEL. LANE
3.5mEX NB LANE
3.5mEX NB LANE
FINAL DESIGNSURFACE
0.45mBUFFER
WORKS AREA
PAVEMENT JOINT. REFER TJ01DRG. NO. 3012 FOR DETAILS.
PAVEMENT TYPE T1 REFER DRG. NO.3012 FOR PAVEMENT DETAILS.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
131:
41:39
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3015
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 1 2 3 4m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
SHEET 1TYPICAL SECTIONS
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3015AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
26/07/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-3003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-3004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-3011.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-3012.
TYPICAL CROSS SECTIONSTN 50 MC60
(BALLARDS ROAD)
MC
60
3.5mLANE
3.5mLANE
1.2mSHLD
0.5mVERGE
0.5mVERGE
1.2mSHLD
EXISTINGSURFACE FINAL DESIGN
SURFACE
3:1 4:1
PAVEMENT TYPE T1 REFERDRG. NO. 3012 FORPAVEMENT DETAILS.
HYDROMULCH LINED V DRAIN TYPE 1(M)REFER TD01 DRG. NO. 3011. PAVEMENT TYPE T1 REFER
DRG. NO. 3012 FORPAVEMENT DETAILS.
PAVEMENT JOINT. REFER TJ01DRG. NO. 3012 FOR DETAILS.
4.7mEX LANE
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
131:
41:47
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3016
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 1 2 3 4m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
SHEET 2TYPICAL SECTIONS
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3016AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
26/07/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-3003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-3004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-3011.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-3012.
IN
IN 450Dia
450Dia
14.162
14.465
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XX
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XX
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
OZ
OZ
OZ
OZ
OZ
OZ
OZ
PROPOSED LINEMARKING TO JOINNEATLY TO EXISTING AT STATION 140.
CONTROL LINE MC50
PACIFIC HIGHWAY SOUTHBOUND
PACIFIC HIGHWAY NORTHBOUND
EXISTING PROPERTYACCESS TO REMAIN.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
131:
55:53
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3101
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
JOIN
SS
HEE
T2
AF
23/08/13 AF
TI
GENERAL ARRANGEMENT - SHEET 1BALLARDS ROAD INTERSECTION
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3101AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-3003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-3004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-3011.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-3012.
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
T
T
T
T
OC
OC
OC
OC
OC
OC
OC
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
XXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
X
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXX
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
T
T
T
T
OC
OC
OC
OC
OC
OC
OC
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
XXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
X
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXX
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
E
E
E
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
REMOVE EXISTING G4 GUARDRAIL NORTH OFSTN 250 AND CONNECT TO 'SPECIAL' JJ HOOKSTYPE F PRECAST BARRIER WITH CAST INANCHOR ASSEMBLY AS PER RMS MODELDRGS. MD.R132.C05.A AND MD.R132.H01.B.
CONTROL LINE MC50
80m DECELERATIONLANE AND TAPER.
130m ACCELERATIONLANE AND TAPER.
TJ010016
85m DECELERATIONLANE AND TAPER.
150m ACCELERATIONLANE AND TAPER.
CONTROL LINE MC60
PACIFIC HIGHWAY SOUTHBOUND
BALLARDS
ROAD
3.0m WIDE 30m LONGRUNOUT AREA.
PACIFIC HIGHWAY NORTHBOUND
INTERFACE DRAIN AND OUTLETSAT 50m SPACING. REFER RMSMODEL DRG. MD.R33.A02.A.
CONSTRUCT NEW TEMPORARYPAVEMENT TYPE T1. REFERDRG. NO. 3012 FOR DETAILS.
TYPE 1(M)W = 0 S = 4:1 D = 0.5
JOIN NEATLY TO EXISTING PAVEMENT.
REMOVE EXISTING WIRE ROPEGUARDRAIL. REPAIR FOOTINGSAND CONCRETE ANCHOR BLOCKSAND MAKE TRAFFICABLE. REFERTD03 DRG. NO. 3012 FOR DETAILS.
INTERFACE DRAIN AND OUTLETSAT 50m SPACING. REFER RMSMODEL DRG. MD.R33.A02.A.
TJ010016
REMOVE EXISTING WIRE ROPEGUARDRAIL. REPAIR FOOTINGSAND CONCRETE ANCHOR BLOCKSAND MAKE TRAFFICABLE. REFERTD03 DRG. NO. 3012 FOR DETAILS.
CONSTRUCT NEW TEMPORARYPAVEMENT TYPE T1. REFERDRG. NO. 3012 FOR DETAILS.
TJ010016
TYPE 1(M)W = 0 S = 4:1 D = 0.5
ALIGNMENT AS PERDESIGN LOT TW6.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
09:37
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3102
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
JOIN
SS
HEE
T3JO
INS
SH
EET
1
AF
23/08/13 AF
TI
GENERAL ARRANGEMENT - SHEET 2BALLARDS ROAD INTERSECTION
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3102AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-3003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-3004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-3011.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-3012.
OCOCOC
OC
XXXXXXXXXXXXXXXXX
EE
E EE E
EE E
EE E
EE E
E EE
EE
E EE E
EE E
EE E
EE E
E EE
EE
E EE
E EE
E EE E
EE E
EE E
E EE E
EE E
E EE E
EE
E EE E
EE E
E EE E
EE
E EE E
EE E
E EE
E EE
OC OCOC
OC
OCOCOC
OC
XXXXXXXXXXXXXXXXX
OC OCOC
OC
EE
E EE E
EE E
EE E
EE E
E EE
EE
E EE E
EE E
EE E
EE E
E EE
EE
E EE
E EE
E EE E
EE E
EE E
E EE E
EE E
E EE E
EE
E EE E
EE E
E EE E
EE
E EE E
EE E
E EE
E EE
CONTROL LINE MC50
PACIFIC HIGHWAY SOUTHBOUND
PACIFIC HIGHWAY NORTHBOUND
PROPOSED LINEMARKING TO JOIN NEATLYTO EXISTING AT STATION 600.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
23:45
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3103
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
JOIN
SS
HEE
T2
AF
23/08/13 AF
TI
GENERAL ARRANGEMENT - SHEET 3BALLARDS ROAD INTERSECTION
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3103AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-3003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-3004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-3011.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-3012.
R4-212
60
R4-
212
80
W5-205
W8-207 (L)
300
W5-22
E5
E5
E1
VMS
MO
BILE
/TRA
ILER
VMS
TOBE
PR
OVID
ED
FOR
1W
EEKAN
D2
WEEKS
FRO
MD
AYO
FC
OM
MISSIO
NIN
GN
EAR
TEMPO
RAR
YIN
TERSE
CTIO
N
SC
REEN
1:
LINE
1: CH
ANG
ED
LINE
2: TRA
FFIC
SC
REEN
2:
LINE
1: CO
ND
ITION
S
LINE
2: AHEAD
W2-9(R
)
CONTROL LINE MC50
PACIFIC HIGHWAY SOUTHBOUND
PACIFIC HIGHWAY NORTHBOUND
*SIGN LOCATIONS TO BE CONFIRMEDON SITE DUE TO LIMITS OF EXISTINGGROUND SURVEY.
*
*
*
*ADVANCE ROADWORKS SIGNAGE ISINSTALLED SOUTH OF THE LIMITS OF THISDESIGN. REFER TCP-00XX FOR DETAILS.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
24:46
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3111
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
JOIN
SS
HEE
T2
AF
23/08/13 AF
TI
SIGNS AND LINEMARKING - SHEET 1BALLARDS ROAD INTERSECTION
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3111AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-3003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-3004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-3011.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-3012.
R1-2
D4-1-1
85
E1
BB1
E1L3C1
TB
E1
E1
BB1L3
C1
L3
C1
C1
9R9
85
W2-3
D4-6
BB
W2-9(R
)
SFO
W2-
9(L)
SFO
RELOCATED SIGN
W5-22
10R
10
R4-
212
60R
4-212 60
CONTROL LINE MC50
CONTROL LINE MC60
PACIFIC HIGHWAY SOUTHBOUNDPACIFIC HIGHWAY NORTHBOUND
BALLARDS
ROAD
INSTALL PAVEMENT ARROWSRA5(L) AT 25m SPACING
INSTALL PAVEMENT ARROWSRA2(R) AT 25m SPACING
INSTALL PAVEMENT ARROWSRA2(L) AT 25m SPACING
INSTALL PAVEMENT ARROWSRA5(R) AT 25m SPACING
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
25:47
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3112
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
JOIN
SS
HEE
T3JO
INS
SH
EET
1
AF
23/08/13 AF
TI
SIGNS AND LINEMARKING - SHEET 2BALLARDS ROAD INTERSECTION
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3112AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-3003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-3004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-3011.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-3012.
E1
E5E1
E5
W5-
205
W8-
207(
R)
400
R4- 212
80
R4-
212
60
VM
S
MO
BIL
E/T
RA
ILE
RV
MS
TOBE
PRO
VID
ED
FOR
1W
EE
KA
ND
2W
EEKS
FRO
MD
AY
OF
CO
MM
ISS
ION
ING
NEA
RTE
MPO
RAR
Y
INTE
RSE
CTI
ON
SC
REE
N1:
LIN
E1:
CH
ANG
EDLI
NE
2:TR
AFF
ICS
CR
EEN
2:LI
NE
1:C
ON
DIT
ION
SLI
NE
2:AH
EAD
CONTROL LINE MC50
PACIFIC HIGHWAY SOUTHBOUND
PACIFIC HIGHWAY NORTHBOUND
*SIGN LOCATIONS TO BE CONFIRMEDON SITE DUE TO LIMITS OF EXISTINGGROUND SURVEY.
*
*
*
*
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
26:49
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3113
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
JOIN
SS
HEE
T2
AF
23/08/13 AF
TI
SIGNS AND LINEMARKING - SHEET 3BALLARDS ROAD INTERSECTION
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3113AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-3003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-3004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-3011.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-3012.
CROSSFALL TO MATCH EXISTING
LEVELS TO MATCH EXISTING
0.00
0
145.
000
IP.C
H
IP.C
H
11.4
00
22.5
54
HT
HT
0.00
0
145.
000
11.4
00
22.5
54
HT
HT
BA
LLA
RD
SR
OA
DIN
TER
SE
CTI
ON
DESIGN HEIGHT
NATURAL SURFACE
STATION
VERTICAL DATA
HORIZONTAL DATA
SUPERELEVATION
LONGITUDINAL SECTION MC50
11.4
00
12.9
39
14.4
77
16.0
16
17.5
54
19.0
93
20.6
31
22.1
70
23.7
48
25.2
95
26.8
48
28.3
15
29.7
65
31.2
87
32.7
70
34.0
69
35.0
28
35.6
44
35.8
80
35.7
47
35.2
90
34.5
42
33.5
77
32.4
57
31.2
66
30.0
48
28.7
32
27.4
18
26.0
98
24.7
93
23.5
17
22.5
5322
.553
20.6
82
22.2
05
23.7
48
25.2
95
26.8
48
28.3
15
29.7
65
31.2
87
32.7
70
34.0
69
35.0
28
35.6
44
35.8
80
35.7
47
35.2
90
34.5
42
33.5
77
32.4
57
31.2
66
30.0
48
28.7
32
27.4
18
26.0
98
24.7
93
23.5
17
22.5
5322
.553
0 20 40 60 80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
520
540
560
580
600
615
D=138.948
R=-3000.000 L=91.959 R=415.000 L=188.671
D=195.674
P=7.693% L=145.000
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
26:55
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3201
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 10 20 30 40mHORIZ.
VERT.0 1 2 3 4m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 1LONGITUDINAL SECTION - MC50
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3201AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
CROSSFALL TOMATCH EXISTING
LEVELS TO MATCH EXISTING
17.6
38
59.8
74
75.1
33
IP.C
H
IP.C
H
IP.C
H
36.0
70
34.8
33
34.9
02
HT
HT HT
17.6
38
44.6
16
75.1
33
CH
36.0
70
35.2
80
34.9
02
HT
HT
HT
71.0
62C
H34
.893
HT
PA
CIF
ICH
IGH
WA
YIN
TER
SE
CTI
ON
DESIGN HEIGHT
NATURAL SURFACE
STATION
VERTICAL DATA
HORIZONTAL DATA
SUPERELEVATION
LONGITUDINAL SECTION MC60
35.8
23
36.0
00
35.4
15
34.9
61
34.9
0234
.902
35.8
23
35.9
98
35.3
67
34.8
61
34.8
6634
.866
0
20 40 60 75
D=9.012R=-200.000L=22.182
D=43.939
P=-2.927%L=26.978
R=903.612L=30.517
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
27:03
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3202
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 10 20 30 40mHORIZ.
VERT.0 1 2 3 4m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 1LONGITUDINAL SECTION - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3202AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
-3.0%
MC
50
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
20.6
310.
000
X = 500712.820Y = 6620626.267
CONTROL LINE MC50
DATUM 17.00
STATION 120.00
-3.0%
MC
50DESIGN HEIGHT
EXISTING SURFACE
OFFSET
21.4
000.
000
X = 500709.639Y = 6620635.748
CONTROL LINE MC50
DATUM 18.00
STATION 130.00
-3.0%
ES50
LU51
MC
50LU
50
LU5K
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
21.9
62
22.1
00
22.2
0522
.190
21.9
62
22.1
00
22.1
7022
.205
22.1
90
-6.6
00
-4.0
00
0.00
00.
000
1.37
8
X = 500706.458Y = 6620645.228
CONTROL LINE MC50
DATUM 19.00
STATION 140.00
-2.6%
ES50
LU51
MC
50
LU5K
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
22.7
21
22.8
77
22.9
7822
.959
22.7
21
22.8
77
22.9
7822
.959
-6.5
33
-3.9
17
0.00
01.
376
X = 500703.258Y = 6620654.702
CONTROL LINE MC50
DATUM 19.00
STATION 150.00
-2.4%
ES50
LU51
MC
50
LU5K
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
23.5
14
23.6
56
23.7
4823
.729
23.5
14
23.6
56
23.7
4823
.729
-6.4
67
-3.8
33
0.00
01.
431
X = 500700.026Y = 6620664.166
CONTROL LINE MC50
DATUM 20.00
STATION 160.00
-3.0%
MC
50
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
20.6
310.
000
X = 500712.820Y = 6620626.267
CONTROL LINE MC50
DATUM 17.00
STATION 120.00
-3.0%
MC
50DESIGN HEIGHT
EXISTING SURFACE
OFFSET
21.4
000.
000
X = 500709.639Y = 6620635.748
CONTROL LINE MC50
DATUM 18.00
STATION 130.00
-3.0%
ES50
LU51
MC
50LU
50
LU5K
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
21.9
62
22.1
00
22.2
0522
.190
21.9
62
22.1
00
22.1
7022
.205
22.1
90
-6.6
00
-4.0
00
0.00
00.
000
1.37
8
X = 500706.458Y = 6620645.228
CONTROL LINE MC50
DATUM 19.00
STATION 140.00
-2.6%
ES50
LU51
MC
50
LU5K
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
22.7
21
22.8
77
22.9
7822
.959
22.7
21
22.8
77
22.9
7822
.959
-6.5
33
-3.9
17
0.00
01.
376
X = 500703.258Y = 6620654.702
CONTROL LINE MC50
DATUM 19.00
STATION 150.00
-2.4%
ES50
LU51
MC
50
LU5K
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
23.5
14
23.6
56
23.7
4823
.729
23.5
14
23.6
56
23.7
4823
.729
-6.4
67
-3.8
33
0.00
01.
431
X = 500700.026Y = 6620664.166
CONTROL LINE MC50
DATUM 20.00
STATION 160.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
27:09
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3301
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 1CROSS SECTIONS - MC50
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3301AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
-2.5%
ES50
LU51
MC
50
LU5K
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
24.2
94
24.4
30
24.5
2524
.508
24.2
94
24.4
30
24.5
2524
.508
-6.4
00
-3.7
50
0.00
01.
545
X = 500696.763Y = 6620673.618
CONTROL LINE MC50
DATUM 20.00
STATION 170.00
-2.4%
ES50
LU51
MC
50
LU5K
LU5L
-2.1%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
25.0
79
25.2
06
25.2
95
25.2
92
25.2
16
25.0
79
25.2
06
25.2
95
25.2
92
25.2
16
-6.3
33
-3.6
67
-0.0
00
1.71
8
5.21
8
X = 500693.468Y = 6620683.060
CONTROL LINE MC50
DATUM 21.00
STATION 180.00
-2.4%
ES50
LU51
MC
50
LA5K
LU5L
ES5L
-2.3%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
25.8
91
25.9
94
26.0
80
26.0
73
25.9
94
25.9
07
25.8
91
25.9
94
26.0
80
26.0
73
25.9
94
25.9
07
-6.2
67
-3.5
83
0.00
0
1.94
9
5.44
9
7.94
9
X = 500690.142Y = 6620692.491
CONTROL LINE MC50
DATUM 22.00
STATION 190.00
-1.9%
ES50
LU51
MC
50
LU5K
LA5K
LU5L
ES5L
-2.9%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
26.6
71
26.7
80
26.8
4826
.843
26.8
33
26.7
32
26.6
57
26.6
71
26.7
80
26.8
4826
.843
26.8
33
26.7
32
26.6
57
-6.2
00
-3.5
00
-0.0
001.
762
2.23
8
5.73
8
8.15
5
X = 500686.785Y = 6620701.910
CONTROL LINE MC50
DATUM 22.00
STATION 200.00
-1.3%
ES50
LU51
MC
50
LU5K
LA5K
LU5L
ES5L
-3.3%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
27.4
12
27.5
39
27.5
9527
.591
27.5
70
27.4
53
27.3
76
27.4
12
27.5
39
27.5
9527
.591
27.5
70
27.4
53
27.3
76
-6.0
20
-3.5
00
0.00
01.
575
2.58
6
6.08
6
8.41
9
X = 500683.396Y = 6620711.319
CONTROL LINE MC50
DATUM 23.00
STATION 210.00
-0.9%
ES50
LU51
MC
50
LU5K
LA5K
LU5L
ES5L
-3.2%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
28.1
58
28.2
70
28.3
1528
.312
28.2
79
28.1
69
28.0
88
28.1
58
28.2
70
28.3
1528
.312
28.2
79
28.1
69
28.0
88
-5.8
40
-3.5
00
-0.0
001.
388
2.99
3
6.49
3
8.74
3
X = 500679.976Y = 6620720.716
CONTROL LINE MC50
DATUM 23.00
STATION 220.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
27:15
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3302
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 2CROSS SECTIONS - MC50
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3302AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
-0.3%
ES50
LU51
MC
50
LU5K
LA5K
LU5L
ES5L
-2.5%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
28.8
86
29.0
23
29.0
2929
.032
28.9
90
28.9
01
28.8
13
28.8
86
29.0
23
29.0
2929
.032
28.9
90
28.9
01
28.8
13
-5.6
60
-3.5
00
0.00
01.
200
3.45
8
6.95
8
9.12
4
X = 500676.524Y = 6620730.101
CONTROL LINE MC50
DATUM 24.00
STATION 230.00
0.5%
ES50
LU51
MC
50LU
5K
LA5K
LU5L
ES5L
-3.2%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
29.6
85
29.7
88
29.7
6529
.763
29.7
07
29.5
91
29.4
87
29.6
85
29.7
88
29.7
6529
.763
29.7
07
29.5
91
29.4
87
-5.4
80
-3.5
00
-0.0
001.
012
3.84
5
7.34
5
9.42
8
X = 500673.148Y = 6620739.514
CONTROL LINE MC50
DATUM 25.00
STATION 240.00
1.3%-2.0:1
EV50
ES50
LU51
MC
50LU
5K
LA5K
LU5L
ES5L
-3.8%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
29.7
9530
.167
30.5
75
30.5
79
30.5
3130
.522
30.4
35
30.2
98
30.1
91
29.7
9530
.542
30.6
12
30.5
79
30.5
3130
.522
30.4
35
30.2
98
30.1
91
-8.1
95-6
.700
-5.3
00
-3.5
00
0.00
00.
825
3.95
0
7.45
0
9.45
0
X = 500669.998Y = 6620749.004
CONTROL LINE MC50
DATUM 25.00
STATION 250.00
3.0%
-2.0:1
EV50
ES50
LU52
LA51
MC
50LU
5K
LA5K
LU5L
ES5L
-3.9%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
29.8
68
30.8
8731
.257
31.3
8931
.373
31.2
8731
.269
31.1
60
31.0
18
30.8
92
29.8
68
31.3
4031
.410
31.3
9131
.373
31.2
8731
.269
31.1
60
31.0
18
30.8
92
-10.
803
-7.8
60-6
.460
-4.9
00-3
.500
-0.0
000.
638
3.95
0
7.45
0
9.45
0
X = 500667.079Y = 6620758.568
CONTROL LINE MC50
DATUM 26.00
STATION 260.00
3.6%
-2.0:1
EV50
ES50
LU52
LA51
MC
50LU
5K
LA5K
LU5L
ES5L
-4.3%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
29.2
39
31.6
0631
.975
32.1
90
32.1
52
32.0
3932
.023
31.8
75
31.7
2531
.675
29.2
39
32.1
4732
.217
32.1
96
32.1
52
32.0
3932
.023
31.8
75
31.7
2531
.675
-14.
836
-9.0
20-7
.620
-6.3
00
-3.5
00
0.00
00.
450
3.95
0
7.45
08.
650
X = 500664.390Y = 6620768.200
CONTROL LINE MC50
DATUM 27.00
STATION 270.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
27:21
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3303
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 3CROSS SECTIONS - MC50
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3303AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
4.3%
-2.0:1
EV50
ES50
LU52
LA51
MC
50LU
5K
LU5M
LU5L
ES5L
-5.1%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
31.0
29
32.4
7332
.834
32.9
92
32.9
15
32.7
7032
.751
32.5
73
32.3
8932
.335
31.0
29
32.9
7633
.046
33.0
13
32.9
15
32.7
7032
.751
32.5
73
32.3
8932
.335
-13.
495
-9.6
00-8
.200
-7.0
00
-3.5
00
-0.0
000.
450
3.95
0
7.45
08.
650
X = 500661.934Y = 6620777.893
CONTROL LINE MC50
DATUM 29.00
STATION 280.00
5.4%-2.0:1
EV50
ES50
LU52
LA51
MC
50LU
5K
LU5M
LU5L
ES5L
-6.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
33.4
1233
.531
33.7
4333
.729
33.6
29
33.4
4833
.423
33.2
21
33.0
0732
.948
33.4
1233
.696
33.7
6633
.731
33.6
29
33.4
4833
.423
33.2
21
33.0
0732
.948
-10.
167
-9.6
00-8
.200
-7.0
00
-3.5
00
0.00
00.
450
3.95
0
7.45
08.
650
X = 500659.713Y = 6620787.643
CONTROL LINE MC50
DATUM 30.00
STATION 290.00
5.7%-2.0:1
EV50
ES50
LU52
LA51
MC
50LU
5K
LU5M
LU5L
ES5L
-7.1%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.1
8034
.230
34.4
1434
.380
34.2
66
34.0
6934
.041
33.8
07
33.5
5733
.472
34.1
8034
.344
34.4
1434
.380
34.2
66
34.0
6934
.041
33.8
07
33.5
5733
.472
-9.9
28-9
.600
-8.2
00-7
.000
-3.5
00
-0.0
000.
450
3.95
0
7.45
08.
650
X = 500657.727Y = 6620797.444
CONTROL LINE MC50
DATUM 30.00
STATION 300.00
6.8%-2.0:1
EV50
ES50
LU52
LA51
MC
50LU
5K
LU5M
LU5L
ES5L
-7.9%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.8
2734
.850
34.9
9234
.953
34.8
28
34.5
9234
.559
34.2
94
34.0
1833
.922
34.8
2734
.922
34.9
9234
.953
34.8
28
34.5
9234
.559
34.2
94
34.0
1833
.922
-9.7
91-9
.600
-8.2
00-7
.000
-3.5
00
-0.0
000.
450
3.95
0
7.45
08.
650
X = 500655.977Y = 6620807.289
CONTROL LINE MC50
DATUM 30.00
STATION 310.00
7.7%
EV61
ES61
LU61
LA51
MC
50LU
5K
LU5M
LU5L
ES5L
-8.2%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.4
3935
.423
35.2
97
35.0
2834
.994
34.7
14
34.4
2634
.326
35.4
3935
.423
35.2
97
35.0
2834
.994
34.7
14
34.4
2634
.326
-7.6
00-7
.000
-3.5
00
-0.0
000.
450
3.95
0
7.45
08.
650
X = 500654.466Y = 6620817.174
CONTROL LINE MC50
DATUM 31.00
STATION 320.00
7.4%
EV61
ES61
LU61
MC
50
LU5M
LU5L
ES5L
-8.2%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.7
9235
.778
35.6
42
35.3
84
35.0
63
34.7
7834
.689
35.7
9235
.778
35.6
42
35.3
84
35.0
63
34.7
7834
.689
-7.6
00-7
.000
-3.5
00
-0.0
00
3.95
0
7.45
08.
650
X = 500653.193Y = 6620827.093
CONTROL LINE MC50
DATUM 31.00
STATION 330.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
27:27
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3304
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 4CROSS SECTIONS - MC50
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3304AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
7.1%
MC
60
MC
50
LU55
LU5M
LU5L
ES5L
-8.1%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.0
9236
.076
35.8
93
35.6
44
35.4
2435
.325
35.0
4034
.958
36.0
9236
.076
35.8
93
35.6
44
35.4
2435
.325
35.0
4034
.958
-7.6
00-7
.000
-3.5
00
0.00
0
2.70
93.
950
7.45
08.
650
X = 500652.160Y = 6620837.039
CONTROL LINE MC50
DATUM 31.00
STATION 340.00
6.6%
EV6
KE
S6K
LU6K
MC
50
LU55
LU5M
LU5L
ES5L
-7.9%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.2
5136
.253
36.0
36
35.8
08
35.5
1335
.494
35.2
1935
.124
36.2
5136
.253
36.0
36
35.8
08
35.5
1335
.494
35.2
1935
.124
-7.6
00-7
.000
-3.5
00
0.00
0
3.70
83.
950
7.45
08.
650
X = 500651.366Y = 6620847.007
CONTROL LINE MC50
DATUM 31.00
STATION 350.00
6.9%
ES6
K
LU6K
LU51
MC
50LU
5K
LA5J
LU5L
ES5L
-7.7%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.3
39
36.1
23
35.8
8035
.847
35.5
74
35.3
0935
.212
36.3
39
36.1
23
35.8
8035
.847
35.5
74
35.3
0935
.212
-7.0
00
-3.5
00
0.00
00.
450
3.95
0
7.45
08.
650
X = 500650.813Y = 6620856.992
CONTROL LINE MC50
DATUM 31.00
STATION 360.00
7.4%
ES6
K
LU6K
LU51
MC
50LU
5K
LA5J
LU5L
ES5L
-7.4%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.2
87
36.1
07
35.8
5035
.817
35.5
58
35.2
9735
.178
36.2
87
36.1
07
35.8
5035
.817
35.5
58
35.2
9735
.178
-7.0
00
-3.5
00
0.00
00.
450
3.95
0
7.45
08.
917
X = 500650.500Y = 6620866.986
CONTROL LINE MC50
DATUM 31.00
STATION 370.00
7.1%
ES53
LU53
LU51
MC
50LU
5J
LA5J
LU5L
ES5L
-7.1%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.1
6736
.147
35.9
94
35.7
4735
.720
35.4
84
35.2
33
35.1
10
36.1
6736
.147
35.9
94
35.7
4735
.720
35.4
84
35.2
33
35.1
10
-8.2
00-7
.000
-3.5
00
-0.0
000.
450
3.95
0
7.45
0
9.18
3
X = 500650.429Y = 6620876.986
CONTROL LINE MC50
DATUM 30.00
STATION 380.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
27:33
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3305
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 5CROSS SECTIONS - MC50
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3305AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
5.9%
ES53
LU53
LU51
MC
50LU
5J
LA5J
LU5L
ES5L
-6.2%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.9
3035
.907
35.7
74
35.5
7235
.543
35.3
28
35.1
10
34.9
85
35.9
3035
.907
35.7
74
35.5
7235
.543
35.3
28
35.1
10
34.9
85
-8.2
00-7
.000
-3.5
00
0.00
00.
450
3.95
0
7.45
0
9.45
0
X = 500650.598Y = 6620886.984
CONTROL LINE MC50
DATUM 29.00
STATION 390.00
3.8%
ES53
LU53
LU51
MC
50LU
5J
LA5J
LU5L
ES5L
-5.2%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET35
.596
35.5
59
35.4
26
35.2
9035
.274
35.0
78
34.9
04
34.8
02
35.5
9635
.559
35.4
26
35.2
9035
.274
35.0
78
34.9
04
34.8
02
-8.2
00-7
.000
-3.5
00
0.00
00.
450
3.95
0
7.45
0
9.45
0
X = 500651.008Y = 6620896.976
CONTROL LINE MC50
DATUM 28.00
STATION 400.00
3.3%
ES53
LU53
LU51
MC
50LU
5J
LA5J
LU5L
ES5L
-4.8%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.1
9335
.161
35.0
60
34.9
4834
.931
34.7
80
34.6
08
34.5
27
35.1
9335
.161
35.0
60
34.9
4834
.931
34.7
80
34.6
08
34.5
27
-8.2
00-7
.000
-3.5
00
0.00
00.
450
3.95
0
7.45
0
9.45
0
X = 500651.659Y = 6620906.954
CONTROL LINE MC50
DATUM 28.00
STATION 410.00
2.4%
ES53
LU53
LA53
MC
50LU
5J
LA5J
LU5L
ES5L
-4.4%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.6
8034
.670
34.6
24
34.5
4234
.532
34.4
06
34.2
52
34.1
91
34.6
8034
.670
34.6
24
34.5
4234
.532
34.4
06
34.2
52
34.1
91
-7.7
63-6
.563
-3.5
00
-0.0
000.
450
3.95
1
7.45
1
9.45
1
X = 500652.550Y = 6620916.914
CONTROL LINE MC50
DATUM 28.00
STATION 420.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
27:39
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3306
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 6CROSS SECTIONS - MC50
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3306AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
1.3%
ES53
LU53
LA53
MC
50LU
5J
LA5J
LU5L
ES5L
-4.2%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.1
5834
.152
34.1
34
34.0
9434
.088
33.9
67
33.8
15
33.7
58
34.1
5834
.152
34.1
34
34.0
9434
.088
33.9
67
33.8
15
33.7
58
-7.3
25-6
.125
-3.5
00
-0.0
000.
450
3.93
2
7.43
2
9.43
2
X = 500653.551Y = 6620926.864
CONTROL LINE MC50
DATUM 28.00
STATION 430.00
0.7%
ES53
LU53
LA53
MC
50LU
5J
LA5J
LU5L
ES5L
-3.5%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
33.5
5133
.574
33.5
90
33.5
7733
.574
33.4
67
33.3
49
33.2
61
33.5
5133
.574
33.5
90
33.5
7733
.574
33.4
67
33.3
49
33.2
61
-6.8
88-5
.688
-3.5
00
-0.0
000.
450
3.83
0
7.33
0
9.33
0
X = 500654.552Y = 6620936.814
CONTROL LINE MC50
DATUM 28.00
STATION 440.00
-0.7%
ES53
LU53
LA53
MC
50
LU5J
LA5J
LU5L
ES5L
-3.9%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
32.9
7632
.994
33.0
09
33.0
35
33.0
15
32.9
56
32.8
16
32.7
19
32.9
7632
.994
33.0
09
33.0
35
33.0
15
32.9
56
32.8
16
32.7
19
-6.4
50-5
.250
-3.5
00
-0.0
00
1.82
2
3.66
3
7.16
3
9.16
3
X = 500655.553Y = 6620946.764
CONTROL LINE MC50
DATUM 28.00
STATION 450.00
-1.4%
ES53
LU53
LA53
MC
50
LU5J
LA5J
LU5L
ES5L
-4.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
32.3
5832
.380
32.4
08
32.4
57
32.4
0132
.391
32.2
45
32.1
42
32.3
5832
.380
32.4
08
32.4
57
32.4
0132
.391
32.2
45
32.1
42
-6.0
12-4
.812
-3.5
00
-0.0
00
3.19
43.
489
6.98
9
8.98
9
X = 500656.554Y = 6620956.713
CONTROL LINE MC50
DATUM 28.00
STATION 460.00
-1.9%
ES53
LU53
LA53
MC
50
LU5J
LU5L
ES5L
-3.9%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
31.7
0031
.764
31.7
84
31.8
52
31.8
01
31.6
61
31.5
56
31.7
0031
.764
31.7
84
31.8
52
31.8
01
31.6
61
31.5
56
-6.1
75-4
.375
-3.5
00
-0.0
00
3.31
6
6.81
6
8.81
6
X = 500657.555Y = 6620966.663
CONTROL LINE MC50
DATUM 29.00
STATION 470.00
-1.8%
ES53
LU53
LA53
MC
50
LU5J
LU5L
ES5L
-3.7%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
31.1
03
31.1
9231
.203
31.2
66
31.2
14
31.0
82
30.9
90
31.1
03
31.1
9231
.203
31.2
66
31.2
14
31.0
82
30.9
90
-6.3
37
-3.9
37-3
.500
-0.0
00
3.14
2
6.64
2
8.64
2
X = 500658.556Y = 6620976.613
CONTROL LINE MC50
DATUM 29.00
STATION 480.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
27:46
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3307
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 7CROSS SECTIONS - MC50
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3307AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
-2.1%
ES53
LU51
MC
50
LU5J
LU5L
ES5L
-3.3%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
30.4
77
30.6
02
30.6
77
30.6
22
30.5
07
30.4
37
30.4
77
30.6
02
30.6
77
30.6
22
30.5
07
30.4
37
-6.5
00
-3.5
00
-0.0
00
2.96
9
6.46
9
8.46
9
X = 500659.556Y = 6620986.563
CONTROL LINE MC50
DATUM 29.00
STATION 490.00
-2.0%ES
53
LU51
MC
50
LU5J
LU5L
ES5L
-3.1%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
29.8
36
29.9
76
30.0
48
29.9
94
29.8
86
29.8
10
29.8
36
29.9
76
30.0
48
29.9
94
29.8
86
29.8
10
-6.5
00
-3.5
00
-0.0
00
2.79
6
6.29
6
8.29
6
X = 500660.557Y = 6620996.512
CONTROL LINE MC50
DATUM 28.00
STATION 500.00
-1.9%
ES53
LU51
MC
50
LU5J
LU5L
ES5L
-2.9%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
29.1
65
29.3
30
29.3
97
29.3
48
29.2
45
29.1
40
29.1
65
29.3
30
29.3
97
29.3
48
29.2
45
29.1
40
-6.5
00
-3.5
00
-0.0
00
2.62
2
6.12
2
8.12
2
X = 500661.558Y = 6621006.462
CONTROL LINE MC50
DATUM 26.00
STATION 510.00
-2.5%
ES53
LU51
MC
50
LU5J
LU5L
ES5L
-3.1%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
28.4
77
28.6
44
28.7
32
28.6
86
28.5
77
28.4
75
28.4
77
28.6
44
28.7
32
28.6
86
28.5
77
28.4
75
-6.5
00
-3.5
00
-0.0
00
2.44
9
5.94
9
7.94
9
X = 500662.559Y = 6621016.412
CONTROL LINE MC50
DATUM 25.00
STATION 520.00
-2.6%
ES53
LU51
MC
50
LU5J
LU5L
ES5L
-3.5%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
27.8
42
27.9
80
28.0
72
28.0
39
27.9
18
27.8
17
27.8
42
27.9
80
28.0
72
28.0
39
27.9
18
27.8
17
-6.3
18
-3.5
00
-0.0
00
2.27
5
5.77
5
7.77
5
X = 500663.560Y = 6621026.362
CONTROL LINE MC50
DATUM 24.00
STATION 530.00
-2.3%
ES53
LU51
MC
50
LU5J
LU5L
ES5L
-3.4%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
27.2
19
27.3
34
27.4
18
27.3
85
27.2
68
27.1
59
27.2
19
27.3
34
27.4
18
27.3
85
27.2
68
27.1
59
-6.1
36
-3.5
00
-0.0
00
2.10
2
5.60
2
7.60
2
X = 500664.561Y = 6621036.312
CONTROL LINE MC50
DATUM 23.00
STATION 540.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
27:52
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3308
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 8CROSS SECTIONS - MC50
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3308AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
-2.0%
ES53
LU51
MC
50
LU5J
LU5L
ES5L
-3.3%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
26.5
85
26.6
84
26.7
55
26.7
23
26.6
09
26.5
05
26.5
85
26.6
84
26.7
55
26.7
23
26.6
09
26.5
05
-5.9
55
-3.5
00
-0.0
00
1.92
9
5.42
9
7.42
9
X = 500665.562Y = 6621046.261
CONTROL LINE MC50
DATUM 22.00
STATION 550.00
-2.2%
ES53
LU51
MC
50
LU5J
LU5L
ES5L
-3.1%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
25.9
30
26.0
16
26.0
98
26.0
66
25.9
55
25.8
49
25.9
30
26.0
16
26.0
98
26.0
66
25.9
55
25.8
49
-5.8
73
-3.6
00
-0.0
00
1.75
5
5.25
5
7.25
5
X = 500666.563Y = 6621056.211
CONTROL LINE MC50
DATUM 21.00
STATION 560.00
-2.5%
ES53
LU51
MC
50
LU5J
LU5L
ES5L
-3.1%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
25.2
51
25.3
45
25.4
43
25.4
20
25.3
11
25.2
06
25.2
51
25.3
45
25.4
43
25.4
20
25.3
11
25.2
06
-5.7
91
-3.7
00
-0.0
00
1.58
2
5.08
2
7.08
2
X = 500667.564Y = 6621066.161
CONTROL LINE MC50
DATUM 20.00
STATION 570.00
-2.7%
ES53
LU51
MC
50
LU5J
LU5L
ES5L
-2.6%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
24.5
80
24.6
87
24.7
9324
.771
24.6
79
24.5
81
24.5
80
24.6
87
24.7
9324
.771
24.6
79
24.5
81
-5.8
00
-3.8
00
-0.0
001.
409
4.90
9
6.90
9
X = 500668.565Y = 6621076.111
CONTROL LINE MC50
DATUM 19.00
STATION 580.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
27:58
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3309
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 9CROSS SECTIONS - MC50
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3309AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13
-0.4%-25.2:1 15.3:1-19.2:1-17.4:1 -5.5:1
EV61
ES61
LU61
MC
60
LU6K
ES6
KE
V6K
-2.4%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.0
50
35.3
7835
.538
35.5
9335
.690
35.8
3235
.866
35.9
44
35.9
98
35.9
22
35.8
19
35.6
2235
.600
35.0
50
35.3
7835
.260
35.2
9335
.356
35.9
1035
.943
35.9
58
36.0
00
35.8
93
35.8
45
35.3
6035
.600
-26.
810
-18.
546
-16.
736
-16.
106
-15.
010
-11.
956
-11.
265
-9.7
00
0.00
0
4.47
5
6.21
6
8.26
69.
218
X = 500632.075Y = 6620837.988
CONTROL LINE MC60
DATUM 31.00
STATION 20.00
1.9%4.0:1 -4.3:1
EV61
ES61
LU61
MC
60
LU6K
ES6
KE
V6K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.8
95
36.0
00
35.9
0535
.866
35.7
56
35.6
51
35.5
00
35.4
1135
.160
35.1
25
35.8
95
35.3
44
35.8
2835
.848
35.8
14
35.7
08
35.6
03
35.5
4235
.042
35.1
25
-11.
776
-9.5
55
-7.4
80-6
.963
-5.7
22
0.00
0
3.50
0
5.20
07.
200
7.53
3
X = 500622.934Y = 6620833.936
CONTROL LINE MC60
DATUM 31.00
STATION 30.00
0.4%3.9:1-4.1:1
EV61
ES61
LU61
MC
60
LU6K
ES6
KE
V6K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.5
22
35.6
1035
.366
35.3
5135
.370
35.3
67
35.2
15
35.0
5834
.770
34.7
62
35.5
22
34.9
3135
.422
35.4
4535
.430
35.4
15
35.3
10
35.2
4934
.749
34.7
62
-9.9
25
-7.5
90-5
.578
-5.0
75-3
.868
-0.0
00
3.50
0
5.20
07.
200
7.25
3
X = 500613.921Y = 6620829.605
CONTROL LINE MC60
DATUM 30.00
STATION 40.00
-1.3%
EV61
ES61
LU61
MC
60
LU6K
ES6
KE
V6K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.4
67
35.4
7335
.087
35.0
9935
.122
35.1
36
34.9
03
34.7
8034
.615
34.5
80
35.4
67
34.5
3135
.031
35.0
5635
.092
35.1
38
35.0
33
34.9
7234
.472
34.5
80
-10.
946
-7.2
00-5
.200
-4.7
00-3
.500
-0.0
00
3.50
0
5.20
07.
200
7.62
8
X = 500604.909Y = 6620825.270
CONTROL LINE MC60
DATUM 30.00
STATION 50.00
-3.0%
EV61
LU61
MC
60
LU6K
EV6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.0
45
35.0
2934
.910
34.8
99
34.8
61
34.7
1234
.664
34.6
05
35.0
45
34.5
2034
.820
34.8
56
34.9
61
34.8
5634
.820
34.6
05
-7.4
77
-5.9
00-4
.700
-3.5
00
-0.0
00
3.50
04.
700
6.15
7
X = 500595.897Y = 6620820.936
CONTROL LINE MC60
DATUM 30.00
STATION 60.00
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.8
94-0
.000
X = 500586.885Y = 6620816.602
CONTROL LINE MC60
DATUM 30.00
STATION 70.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
28:04
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\03
_TW
3\NH2
U-DM
-TW
-3310
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ROAD INTERSECTION SHEET 1CROSS SECTIONS - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW3
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-3310AO AO
AO
AODS2013/000070
PDD
TW3
23/08/13
23/08/13
23/08/13
23/08/13