EUGAL IN FIGURES 18 m 15 t and at At a length of a pipe is as long as an articulated bus as heavy as 3 elephants 47,000 pipes are needed for the construction Around Up to 55 Bln m 3 of natural gas can be transported annually by EUGAL. By comparison: Germany consumes around 85 billion m³ of natural gas in one year 2037 Transport through EUGAL has already been booked until this year. 140 cm EUGAL has a diameter of First String Second String Completion: end of 2019 Completion: end of 2020 The EUGAL Pipeline was approved in all three German states 2018 A market survey on gas transport needs was conducted prior to construction of EUGAL. EUGAL capacities were sold on the European capacity platform PRISMA. 2015 2017 JAGAL NET4GAS NET4GAS NEL NORD STREAM 2 EUGAL 4 is the number of network links that EUGAL has. They allow gas to be transported flexibly within Germany and to Western and Eastern Europe. long EUGAL is around 480 km FGL306 2020 2021 First gas Full capacity

Transcript of At a length of 18 m 15 t - EUGAL · PRISMA. 2015 2017 L AS AS NEL NORD STREAM 2 EUGAL 4 is the...

Page 1: At a length of 18 m 15 t - EUGAL · PRISMA. 2015 2017 L AS AS NEL NORD STREAM 2 EUGAL 4 is the number of network links that EUGAL has. They allow gas to be transported flexibly within

EUGAL IN FIGURES

18 m 15 tand atAt a length of

a pipe is as long as an articulated bus

as heavy as 3 elephants 47,000

pipesare needed for

the construction

Around

Up to

55 Bln m3

of natural gas can betransported annually byEUGAL. By comparison:

Germany consumes around 85 billion m³ of natural gas in

one year

2037Transport

through EUGAL has already been booked

until this year.

140 cm

EUGALhas a diameter of

First String Second String

Completion:end of 2019

Completion:end of 2020

The EUGAL Pipeline

was approved in all

three German

states

2018

A market survey on gas transport needs

was conducted prior to construction of EUGAL.

EUGAL capacities were sold on the European

capacity platform PRISMA.

2015

2017

JAGAL

NET4GAS

NET

4GA

S

NEL

NORD STREAM 2

EUG

AL

4is the number of network

links that EUGAL has. Theyallow gas to be transportedflexibly within Germany and

to Western and Eastern Europe.

long

EUGAL is around

480 km

FGL306

2020

2021

First gas

Full capacity

Page 2: At a length of 18 m 15 t - EUGAL · PRISMA. 2015 2017 L AS AS NEL NORD STREAM 2 EUGAL 4 is the number of network links that EUGAL has. They allow gas to be transported flexibly within

KEY

Lubmin 2 natural gas receiving station completion at the end of 2019

Compressor station Radeland 2 completion at the end of 2020

Export station Deutschneudorf completion at the end of 2019

1

2

3

Saxony

Czech Republic

Brandenburg

Mecklenburg-Western Pomerania

Berlin

Poland

Baltic Sea

JAMAL

FGL 306NETRA

JAGAL

STEGAL NET4GAS

NET

4GAS

NEL

NORD STREAM 2

1

2

3

Oder–Spreedistrict

Märkisch-Oderland district

Uckermarkdistrict

Barnimdistrict

Western PomeraniaGreifswald district

Dahme-Spreewalddistrict

Meißendistrict

Mittel-Sachsen district Sächsische

Schweiz-Osterzgebirgedistrict

Erzgebirgs- kreis district

Teltow-Flämingdistrict

Elbe-Elsterdistrict

Ober- spreewald-

Lausitz district

ABOUT GASCADE

GASCADE, formerly WINGAS TRANSPORT GmbH, has been planning, building and operating one of Germany’s largest gas networks for two decades. GASCADE thus directly connects five European countries with each other and guarantees secure energy supplies in Germany and Europe.

ABOUT THE PROJECT SHAREHOLDERS

The European gas pipeline link is a joint project between the German transmission system operators GASCADE Gastransport GmbH, Fluxys Deutschland GmbH, Gasunie Deutschland Transport Services GmbH and ONTRAS Gastransport GmbH. GASCADE, as the company in charge of the project, holds 50.5 percent of the shares. The three other shareholders each own 16.5 percent of EUGAL. GASCADE is building EUGAL and will operate in the future.

CONTACT

Would you like more Information or to learn about the current planning status for EUGAL? Then visit our website: www.eugal.de

If you have any questions, please do not hesitate to contact us:

GASCADE Gastransport | GmbH Kölnische Straße 108 – 112 | 34119 Kassel0561-934-2727 [email protected] www.eugal.de

PUBLISHED BY

GASCADE Gastransport

Picture credits: photo archive August 2019

EUGAL – PIPELINE ROUTE AND FACILITIES