Assignment Linear program

2
Assignment 5 Problem 11.11 Terdapat 24 repetisi section m = 1 unit/ 2 week= 0.5 unit / week Operation Dura si (wee k) A Cap piles 1 B Construct Beams 1.5 C Construct Slab 3 D Initial Pipework 2 E Paint Pipework 0.5 Total Duration 8 By the end of week 30 Production Diagram Aktiv itas Duras i,d Handove r rate Resour ce unit,F Non Product ive time, I Tot al Uni ts, Q Q- F d+ I (7 x8) F x d T To Week Unit/ Gangs 8 7. 5. 2. 1 0

description

System analysis

Transcript of Assignment Linear program

Assignment 5

Problem 11.11

Terdapat 24 repetisi section

m = 1 unit/ 2 week= 0.5 unit / week

Operation Durasi (week)

A Cap piles 1B Construct Beams 1.5C Construct Slab 3D Initial Pipework 2E Paint Pipework 0.5

Total Duration 8

By the end of week 30

Production Diagram

Aktivitas Durasi,d Handover rate

Resource unit,F

Non Productive

time, I

Total Units,

Q

Q-F

d+I (7 x8) F x d T To

Week Unit/week Gangs(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)A 1 O.5 1 1 24 23 2 46 1 47 24B 1.5 O.5 1 0.5 24 23 2 46 1.5 47,5 36C 3 O.5 2 1 24 22 4 88 6 94 72D 2 O.5 1 0 24 23 2 46 2 48 48E O.5 O.5 1 1.5 24 23 2 46 0.5 46,5 12

∑(T-To) = 91 gangs -weeks

8 7.5 5.5 2.5 1 0