ASSIGNMENT ON construction MANAGEMENT

Transcript of Assignment

Page 1: Assignment

ASSIGNMENT ON construction MANAGEMENT

Page 2: Assignment

CONTENT

DEFINITION

BASIC FORM OF CONSTRUCTION MANAGEMENT

SEVEN TYPES OF CONSTRUCTION

CONSTRACTION MANAGEMENT JOB

SECTORS WITH THE CONSTRUCTION INDUSTRY

THREE PHASES OF CONSTRUCTION WORK

REVIEW OF A CONSTRUCTION WORK

SITE PLAN

GANTT CHART

WORK SCHEDULE

UNDER CONSTRUCTION PHOTOS

Page 3: Assignment

What is construction management?

Construction Project Management (CPM) is the overall planning, coordination, and control of a project from beginning to completion.CPM is aimed at meeting a client's requirement in order to produce a functionally and financially viable project. In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Normally, the job is managed by a project manager from cradle to grave, and supervised by a construction manager, design engineer, construction engineer and project architect.

Page 4: Assignment

There are three basic forms of Construction Management:

Pure construction management

Construction management

Construction management at risk

Page 5: Assignment

Pure Construction Management - Where the Construction Manager acts as an advisor to the Owner with no General Contractor involved.

This approach works well when the Owner is knowledgeable and experienced with construction projects

Page 6: Assignment

Construction Management - Where the Construction Manager acts as an advisor with a General Contractor involved.

This approach is characteristically used for very large and complex Projects where the Owner has placed a priority on quality. The Owner does not have to have experience and knowledge of construction projects if they choose a competent Team.

Page 7: Assignment

Construction Management at Risk - Where the Construction Manager is also acting as the General Contractor.

This method is best utilized where the Owner has a great deal of trust and confidence in the Construction Manager and is typically used where an excellent relationship between the Owner and Construction Manager already exists.

Page 8: Assignment

Agricultural: Typically economical buildings, and other improvements, for agricultural purposes. Examples include barns, equipment and animal sheds, specialized fencing, storage silos and elevators, and water supply and drains such as wells, tanks, and ditches.

Residential: Residential construction includes houses, apartments, townhouses, and other smaller, low-rise housing types.

Commercial: This refers to construction for the needs of private commerce, trade, and services. Examples include office buildings, "big box" stores, shopping centers and malls, warehouses, banks, theaters, casinos, resorts, golf courses, and larger residential structures such as high-rise hotels and condominiums.

Institutional: This category is for the needs of government and other public organizations. Examples include schools, fire and police stations, libraries, museums, dormitories, research buildings, hospitals, transportation terminals, some military facilities, and governmental buildings.

Industrial: Buildings and other constructed items used for storage and product production, including chemical and power plants, steel mills, oil refineries and platforms, manufacturing plants, pipelines, and seaports.

Heavy civil: The construction of transportation infrastructure such as roads, bridges, railroads, tunnels, airports, and fortified military facilities. Dams are also included, but most other water-related infrastructure is considered environmental.

Environmental: Environmental construction was part of heavy civil, but is now separate, dealing with projects that improve the environment. Some examples are water and wastewater treatment plants, sanitary and storm sewers, solid waste management, and air

SEVEN TYPES OF CONSTRACTION

Page 9: Assignment

CONSTRACTION MANAGEMENT JOB

Project Manager

Construction Manager

Design Manager

Project coordinator

Planning Engineer

Design Engineer

Field Engineer

Project Engineer

Quantity Surveyor

Estimator

Project Document Controller

Scheduler / Scheduling Engineer

Page 10: Assignment

Sectors within the construction industry :

Page 11: Assignment
Page 12: Assignment

Pre construction phase

Construction phase

Post construction phase

Three phases of completing a construction work :

Page 13: Assignment

REVIEW OF A CONSTRUCTION WORK

Page 14: Assignment

SITE PLAN

Site area

Construction of aMosqueLocation:Sere Bangla agricultureUniversity, Dhaka

Page 15: Assignment

Ti me ( m o n t h s ) I te ms of wo r k

1 N o v 1 5 -1 M a r c h 1 6

1

01 March 16- 30 O ct 16

2

1Nov16 - 17Aug17

3

18Aug17 - 30 Dec17

4

1Jan 18- 30may18

5

1June18-30Oct18

1 Exc ava t io n

2 Fo u n d a t i on

3 O ve r s i te c o n c r e t e

4 Bloc k wo rk

5 C o n c r e t e wo r k s

6 Ro of i n g

7 Do o r s &W i n d o w s

8 Ele c t r ica l work

9 Me c ha nica l Work

10 F i n i s h e s

11 Pa inting & De cora t ing

GANTT CHAT

Gantt Chart showing Work Schedule

Page 16: Assignment

WORK SCHEDULE

No of works running at a time Labor 18

According type of works assign the no 1(roof casting)

labor distribution 6

Shifts 1

MaterialReceiving

Truck & pick up

Storage Yes(2 stores)

material wastage 5-10 percent

Gantt Chart showing Work Schedule

Page 17: Assignment

CONSTRUCTION PHASE

SUPERVISINGCONCRETE MIXING

LEVELING SHUTTERING

Page 18: Assignment

CASTING CURING

SUTTERING SUTTERING

CONSTRUCTION PHASE

Page 19: Assignment

REINFORCEMENT BENDING STEEL PLACEMENT

SUTTERING MATERIAL STORE

CONSTRUCTION PHASE

Page 20: Assignment

S/No Items of Work

Months Total Budgeted Expenses (R)

9–9Feb 12 Mar 2012

April 2012 May 2012

June 2012

1–10 July 12

1 Excavation 370740 370740

2 Foundation 741510 741510

3Oversite Concrete 370776 370776

4 Blockwork 515664 300000 815664

5 Concretewk 233016 233016 53022 519054

6 Roofing 440280 301230 741510

7Doors & Windows 301230 440280 741510

8 Electrcl Wk 185370 185370 370740

9 Plumbg Wk 185370 185406 370776

10 Finishes 953370 529650 1483020

11Painting & Decorating 889800 889800

Total (R) 1112250 1119456 1344036 725028 1393650 1419450 7415100

WORK SCHEDULE

Page 21: Assignment

SUBMITTED TO : NAFISA BARI LECTURER , Department OF ARCHITECTURE SOUTHEAST UNIVERSITY

SUBMITTED BY : ASIF ASHRAF 2012000600009 AMIR HAMZA 201200O60015 REZUOAN MAHMUD 2011200600007 MA DELWAR AZAD CHAYAN 2012000600003 TASNIA MANAR SULTANA 2012000600014 SADIA FERDOUS 2012000600002 NUSHRAT JAHAN ISHA 2012000600029 JANNATUL HADIKA 2012000600026 ASHIFA RAHMAN 2012000600001 TAMZID HOSSAIN 2012000600007 TASMEIA NUR HRIDI 2012000600016