Mumbai, INDIA
www.educorporatebridge.com
Project Finance of
JSW
Prepared by
Liza Dsouza
9011188006
MIT-SOB
https://www.educorporatebridge.com/https://www.educorporatebridge.com/ -
8/11/2019 Assignment 2&3_liza Dsouza
2/67
Corporate Bridge AcademyProject Finance of JSW
TABLE OF CONTENTS
Click on the name of Tab to go to the relevant sheet
Sr. No. Name of Tab Brief Description
1 Industry Overview Overview of the Company and Industry Analysis (Steel)
2 Income statement Historical and forecasted income statement
3 Balance Sheet Historical and forecasted balance sheet
4 Cash Flow Statement Historical and Forecasted cash flow statement
5 Ratio Analysis Ratio Analysis of the Company
6 Assumption Sheet Assumptions to be used for the entire project
7 Project Costs Project cost details
8 Quaterly Capex & Debt Details for calculation of quaterly capex & debt ( Forecasted)
9 Annual Capex & Debt Details for calculation of annual capex & debt ( Forecasted)
10 Profit & Loss Calculation of profit and loss ( Forecasted)
11 Cash Flows Calculation of net cash flows ( Forecasted)
12 Balance Sheet Preparing a balance sheet ( Forecasted)
13 Working Capital Calculating and finding figures of different working capital items (Forecasted)
14 Depreciation Fixed Assets details and forecast
15 DSCR IRR Ratios Calculation of different valuation ratios
16 Recommendation Your Analysis towards the company via your DSCR IRR ratios
-
8/11/2019 Assignment 2&3_liza Dsouza
3/67
Corporate Bridge AcademyProject Finance of JSW Back to Index
Please Find below Name of sheet to done before submitting Excel File
Depreciation
Disclaimer:You Need to use same template for Assignment 2 and 3.
Assignment 2 - 30 Marks
Name of sheet StatusAssumption Sheet (Projections) Completed
Project Costs (Projections) Completed
Quaterly Capex & Debt (Projections) Completed
Annual Capex & Debt (Projections) Completed
Profit & Loss Completed
Cash Flows Completed
Balance Sheet Completed
Working Capital Completed
Completed
-
8/11/2019 Assignment 2&3_liza Dsouza
4/67
Corporate Bridge Academy
Project Finance of JSW
Key Dates
S. No Particulars Dates
1 Start of construction 1-Jul-13
2 Construction Period 36
3 Completion Date 1-Jul-16
4 Commercial Production 4-Jul-16
5 End of first year of operations 31-Mar-17
6 No of months of oprn in 1st year of commencement 9
7 Year End of 1st year of construction 31-Mar-14
8 1st Quarter Ending after start of construction 30-Sep-13
9 1st Quarter Ending after start of operation 30-Sep-16
10 Check for IT Dep-Sep check 30-Sep-16
Means of Financing
Particulars
Project Financing Rs cr.
- Equity 6,798.9
- Debt 10,198.3
Total 16,997.2
% Debt 60%
Debt/ Equity Ratio 1.50
Upfront equity 50%
Term Loan
Conditions- Financial Charges 0.5%
- Interest Rate 9.5%
- Moratorium 4 quarters
- Repayment Starts 31-Mar-18
- Ends 31-Mar-24
- No. of Instalments for quarterly repayment 24
- Value of Instalment 424.93
Working Capital Loan
- Interest Rate 10.00%
Sales / Revenues / Costs
Sales Tonnes ('000) Sales (Cr)
MS Slabs 198.5 725.1
Hot Rolled Coils /Steel Plates / Sheets 4,173.9 15,914.2
Galvanized Coils / Sheets 796.0 4,006.1
Cold Rolled Coils / Sheets 715.2 3,113.4
Hot Rolled Steel Plates 92.5 392.2
Colour Coating Coils / Sheets 171.7 1,049.2
Steel Billets and Bloom 210.4 787.0
Long Rolled Products 1,457.0 6,098.9
7,815.2 32,086.1
Production Installed ('000) % Produc
MS Slabs 8,300.0 35.7% 5,65
Hot Rolled Coils / Steel Plates / Sheets 6,700.0 28.8% 5,26Galvanised / Galvanium Coils / Sheets 925.0 4.0% 91
Cold Rolled Coil / Sheets 1,825.0 7.8% 1,62
H R ll d Pl 320 0 1 4% 9
-
8/11/2019 Assignment 2&3_liza Dsouza
5/67
FG 0.75 month of cost of sa les
Sundry Debtors 1.00 month of sales
Sundry Creditors 0.75 month of purchases
WC Margin 25%
Taxation
Particulars Tax Rates
Excise Duty as per of sales 10%
Corporate Tax Rate 30.00%
MAT Rate 18.00%
Surcharge 10.00%
Dividend Tax Rate 12.50%
-
8/11/2019 Assignment 2&3_liza Dsouza
6/67
Corporate Bridge Academy
Project Finance of JSW
Project Cost Summary
Particulars (Rs Crores)
Land & Site Development 181.70Building & Civil Works 3,488.45
Plant & Machinery 9,334.20
Technical knowhow fees 121.10
Expenses on foreign technicians & training
abroad of local technicians 48.50
Misc. fixed assets 1,097.25
Contingency 713.56
Total Hard Cost 14,984.76
Preliminary & Preoperative Expenses 124.72
Upfront Fee 48.00
IDC 1,469.68
WC Margin 370.02
Total Soft Cost 2,012.43
Total Project Cost 16,997.19
Project Cost Details
S.NoParticulars Cost (Rs Cr) Total Cost
1) Land & Site Development
- Land & Site Devt. 181.70 181.70
Sub-total - 1 181.70
2) Buildings
- Building excluding equipment foundation 3,335.20 3,335.20
- Equipment foundation 153.25 153.25
Sub-total - 2 3,488.45
3) Plant & Machinery
(i) Plant
- Imported 2,017.97
- Indigenous 6,710.42
(ii) Mining Machinery -
-
8/11/2019 Assignment 2&3_liza Dsouza
7/67
(iii) Stores & Spares
- Imported @ 2.5% 2.50% 50.45
- Indigenous @ 2.5% 2.50% 167.76
- Mining Equipment @ 10% 10.00% -
(iv) Installation, Erection & Commissioning charges 387.60
Sub-total - 3 9,334.20
4) Technical knowhow fees 121.10 121.10
5)
Expenses on foreign technicians & training
abroad of local technicians 48.50 48.50
6) Miscellaneous Fixed Assets
- Power distribution equipment & transmission lines 429.90
- Railway siding 545.07
- DG sets -
- Air distribution equipment 12.11
- Equipment for water supply 18.16
- Fire fighting equipment 18.16
- Front end loader 36.33
- Workshop equipment 6.05
- Office equipment & computers 6.05
- Misc. tools & tackles 3.63
- Vehicles 12.11
- Laboratory equipment 6.05
- Furniture 3.63
- Misc. for jetty -
Total - MFA 1,097.25 1,097.25
7) Preoperative Expenses
- Establishment 3.63
- Rent, rates & taxes 6.05
- Travelling expenses 6.05
- Misc. expenses (post/mail/legal etc.) 24.22
- Insurance during construction 36.33
- Geological investigation 24.22
- Startup expenses 24.22
Total - preop. expenses 124.72 124.72
-
8/11/2019 Assignment 2&3_liza Dsouza
8/67
-
8/11/2019 Assignment 2&3_liza Dsouza
9/67
Corporate Bridge Academy
Project Finance of JSW
Profit & Loss Statement (Projections)
31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-2
Value of Production
MS Slabs 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-2
Installed 1,606.3 1,606.3 1,606.3 1,606.3 1,606.3 1,606.3
Capacity Utilization 70% 80% 90% 95% 95% 95%
Production 1,124.4 1,285.1 1,445.7 1,526.0 1,526.0 1,526.0
Average Realization 3.65 3.83 4.03 4.23 4.44 4.6
Average Realization increase (%) 5.0% 5.0% 5.0% 5.0% 5.0%
Total Value of Production 4,106.5 4,927.8 5,821.0 6,451.6 6,774.2 7,112.9
Hot Rolled Coils / Steel Plates / Sheets 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-2
Installed 1,296.7 1,296.7 1,296.7 1,296.7 1,296.7 1,296.7
Capacity Utilization 70% 80% 90% 95% 95% 95%
Production 907.7 1,037.3 1,167.0 1,231.8 1,231.8 1,231.8
Average Realization 3.81 4.00 4.20 4.41 4.63 4.8
Average Realization increase (%) 5.0% 5.0% 5.0% 5.0% 5.0%
Total Value of Production 3,460.7 4,152.9 4,905.6 5,437.0 5,708.9 5,994.3
Galvanized Coils / Sheets 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-2
Installed 179.0 179.0 179.0 179.0 179.0 179.0
Capacity Utilization 70% 80% 90% 95% 95% 95%
Production 125.3 143.2 161.1 170.1 170.1 170.
Average Realization 5.03 5.28 5.55 5.83 6.12 6.4
Average Realization increase (%) 5.0% 5.0% 5.0% 5.0% 5.0%
Total Value of Production 630.7 756.8 894.0 990.8 1,040.4 1,092.4
Cold Rolled Coils / Sheets 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-2
Installed 353.2 353.2 353.2 353.2 353.2 353.2
Capacity Utilization 70% 80% 90% 95% 95% 95%Production 247.2 282.6 317.9 335.5 335.5 335.5
Average Realization 4.35 4.57 4.80 5.04 5.29 5.5
Average Realization increase (%) 5.0% 5.0% 5.0% 5.0% 5.0%
Total Value of Production 1,076.3 1,291.6 1,525.7 1,691.0 1,775.5 1,864.3
Hot Rolled Steel Plates 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-2
Installed 61.9 61.9 61.9 61.9 61.9 61.9
Capacity Utilization 70% 80% 90% 95% 95% 95%
Production 43.4 49.5 55.7 58.8 58.8 58.8
Average Realization 4.24 4.45 4.67 4.91 5.15 5.4
Average Realization increase (%) 5.0% 5.0% 5.0% 5.0% 5.0%
Total Value of Production 183.7 220.5 260.4 288.7 303.1 318.3
Colour Coating Coils / Sheets 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-2
-
8/11/2019 Assignment 2&3_liza Dsouza
10/67
Installed 44.9 44.9 44.9 44.9 44.9 44.9
Capacity Utilization 70% 80% 90% 95% 95% 95%
Production 31.4 35.9 40.4 42.7 42.7 42.7
Average Realization 6.11 6.41 6.74 7.07 7.43 7.8
Average Realization increase (%) 5.0% 5.0% 5.0% 5.0% 5.0%
Total Value of Production 192.0 230.4 272.2 301.7 316.7 332.6
Steel Billets and Bloom 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-2
Installed 483.8 483.8 483.8 483.8 483.8 483.8
Capacity Utilization 70% 80% 90% 95% 95% 95%
Production 338.7 387.1 435.4 459.6 459.6 459.6
Average Realization 3.74 3.93 4.12 4.33 4.55 4.7
Average Realization increase (%) 5.0% 5.0% 5.0% 5.0% 5.0%
Total Value of Production 1,266.8 1,520.2 1,795.7 1,990.3 2,089.8 2,194.3
Long Rolled Products 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-2
Installed 474.2 474.2 474.2 474.2 474.2 474.2
Capacity Utilization 70% 80% 90% 95% 95% 95%
Production 331.9 379.3 426.7 450.4 450.4 450.4
Average Realization 4.19 4.40 4.62 4.85 5.09 5.3
Average Realization increase (%) 5.0% 5.0% 5.0% 5.0% 5.0%
Total Value of Production 1,389.4 1,667.2 1,969.4 2,182.8 2,291.9 2,406.5
Total Value of Production (12 months) 12,306.21 14,767.45 17,444.05 19,333.82 20,300.51 21,315.54
No. of Operational months 9 12 12 12 12 1
Adjusted Value of Production 9,229.66 14,767.45 17,444.05 19,333.82 20,300.51 21,315.54
Add: Opening Stock of FG - 92.85 110.39 126.11 137.65 144.13
Less: Closing Stock of FG 92.85 110.39 126.11 137.65 144.13 150.57
Gross Sales 10,152.00 16,388.79 19,364.81 21,469.20 22,548.92 23,676.78
Excise Duty 922.35 1,621.34 1,920.76 2,135.38 2,248.41 2,361.24
Net Sales 9,229.66 14,767.45 17,444.05 19,333.82 20,300.51 21,315.54
Costs / Expenses 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-2
Overall Production ('000) 3,150.0 3,600.0 4,050.0 4,275.0 4,275.0 4,275.0
Iron Ore 1.75 5,512.5 6,300.0 7,087.5 7,481.3 7,481.3 7,481.3
Cost per ton 2,936.3 3,083.1 3,237.3 3,399.1 3,569.1 3,747.5 3,934.9
cost escalation 5.0% 5.0% 5.0% 5.0% 5.0% 5.0%
Total Iron Ore Cost (Rs Cr) 1.70 2.04 2.41 2.67 2.80 2.94
Coke 0.75 2,362.5 2,700.0 3,037.5 3,206.3 3,206.3 3,206.3
Cost per ton 13,020.5 13,671.5 14,355.1 15,072.8 15,826.5 16,617.8 17,448.7
cost escalation 5.0% 5.0% 5.0% 5.0% 5.0% 5.0%
Total Coke Cost (Rs Cr) 3.23 3.88 4.58 5.07 5.33 5.59
-
8/11/2019 Assignment 2&3_liza Dsouza
11/67
-
8/11/2019 Assignment 2&3_liza Dsouza
12/67
- TL 811.36 953.53 968.84 867.92 706.45 544.97
- WC 91.84 111.01 130.82 144.87 152.12 159.67
EBT 6,402.98 11,127.37 13,517.36 15,309.37 16,326.55 17,417.42
Tax 1,481.62 3,573.50 4,290.50 4,828.10 4,553.89 4,962.67
PAT 4,921.35 7,553.87 9,226.86 10,481.27 11,772.66 12,454.75
Tax calculation
PBT 6,402.98 11,127.37 13,517.36 15,309.37 16,326.55 17,417.42
Add:Book Deprn. 784.30 784.30 784.30 784.30 784.30 784.30
Less: IT Deprn. 2,248.54 - - - 1,931.21 1,659.49
Adjusted PBT 4,938.74 11,911.67 14,301.66 16,093.67 15,179.64 16,542.22
Losses carried forward - - - - - -
Profit after adjusting losses 4,938.74 11,911.67 14,301.66 16,093.67 15,179.64 16,542.22
Tax
- Corporate Tax 1,481.62 3,573.50 4,290.50 4,828.10 4,553.89 4,962.67
- MAT - - - - - -
Tax payable 1,481.62 3,573.50 4,290.50 4,828.10 4,553.89 4,962.67
Effective tax rate 23.14% 32.11% 31.74% 31.54% 27.89% 28.49%
-
8/11/2019 Assignment 2&3_liza Dsouza
13/67
Corporate Bridge Academy
Project Finance of JSW
Quarterly Capex & Debt Schedule
Particulars 30-Sep-13
31-Mar-14
Land & Site Development 181.70 90.85
Building & Civil Works 3,488.45 348.85
Plant & Machinery 9,334.20 933.42
Engineering, Supervision & Project Mgmt. 121.10 12.11
Expenses on foreign technicians & training
abroad of local technicians 48.50 24.25
Miscellaneous Fixed Assets 1,097.25 109.73
Contingency @ 5% 713.56 75.96
Total Hard Cost 1,595.16
Particulars 30-Sep-13
Preliminary & Preoperative Expenses 12.47
Upfront Fee 48.00
IDC -
WC Margin
Total Soft Cost 60.47
Total Project Cost 1,655.63
Financial Plan 30-Sep-13
Upfront Equity 3399.44
Upfront Equity Drawal 1,655.63
Net Drawal Reqd. -
Debt -
Equity 1,655.63
Debt Schedule 30-Sep-13
Opening Balance -
Add: Debt drawal -
Less: Debt Repayment -
Closing Balance -
-
8/11/2019 Assignment 2&3_liza Dsouza
14/67
Interest -
IDC 1,469.68 -
Interest to P&L
-
8/11/2019 Assignment 2&3_liza Dsouza
15/67
31-Dec-13 31-Mar-14 30-Jun-14 30-Sep-14 31-Dec-14 31-Mar-15 30-Jun-15 30-Sep-15
31-Mar-14 31-Mar-14 31-Mar-15 31-Mar-15 31-Mar-15 31-Mar-15 31-Mar-16 31-Mar-16
54.51 18.17 18.17 - - - - -
348.85 348.85 348.85 348.85 348.85 348.85 348.85 348.85
933.42 933.42 933.42 933.42 933.42 933.42 933.42 933.42
18.17 18.17 18.17 18.17 6.06 6.06 6.06 6.06
14.55 9.70 - - - - - -
109.73 109.73 109.73 109.73 109.73 109.73 109.73 54.86
73.96 71.90 71.42 70.51 69.90 69.90 69.90 67.16
1,553.18 1,509.93 1,499.74 1,480.66 1,467.95 1,467.95 1,467.95 1,410.34
31-Dec-13 31-Mar-14 30-Jun-14 30-Sep-14 31-Dec-14 31-Mar-15 30-Jun-15 30-Sep-15
12.47 12.47 12.47 12.47 12.47 12.47 12.47 6.24
- 16.15 50.87 88.21 121.22 147.05 170.41 193.65
12.47 28.63 63.34 100.68 133.70 159.53 182.88 199.88
1,565.65 1,538.55 1,563.08 1,581.35 1,601.64 1,627.47 1,650.83 1,610.23
31-Dec-13 31-Mar-14 30-Jun-14 30-Sep-14 31-Dec-14 31-Mar-15 30-Jun-15 30-Sep-15
1,565.65 178.16 - - - - - -
- 1,360.40 1,563.08 1,581.35 1,601.64 1,627.47 1,650.83 1,610.23
- 1,360.40 1,563.08 1,581.35 1,198.72 976.48 990.50 966.14
1,565.65 178.16 - - 402.93 650.99 660.33 644.09
31-Dec-13 31-Mar-14 30-Jun-14 30-Sep-14 31-Dec-14 31-Mar-15 30-Jun-15 30-Sep-15
- - 1,360.40 2,923.48 4,504.83 5,703.54 6,680.03 7,670.53
- 1,360.40 1,563.08 1,581.35 1,198.72 976.48 990.50 966.14
- - - - - - - -
- 1,360.40 2,923.48 4,504.83 5,703.54 6,680.03 7,670.53 8,636.66
-
8/11/2019 Assignment 2&3_liza Dsouza
16/67
-
8/11/2019 Assignment 2&3_liza Dsouza
17/67
31-Dec-15 31-Mar-16 30-Jun-16 30-Sep-16 31-Dec-16 31-Mar-17 30-Jun-17 30-Sep-17
31-Mar-16 31-Mar-16 31-Mar-17 31-Mar-17 31-Mar-17 31-Mar-17 31-Mar-18 31-Mar-18
- - - - - - - -
348.85 - - - - - - -
933.42 - - - - - - -
6.06 6.06 - -
- - - - -
54.86 54.86 54.86 - - - - -
67.16 3.05 2.74 - - - - -
1,410.34 63.96 57.61 - - - - -
31-Dec-15 31-Mar-16 30-Jun-16 30-Sep-16 31-Dec-16 31-Mar-17 30-Jun-17 30-Sep-17
6.24 6.24 6.24 - - - - -
216.76 230.54 234.81 - - - - -
370.0
222.99 236.77 241.05 - 370.02 - - -
1,633.34 300.74 298.65 - 370.02 - - -
31-Dec-15 31-Mar-16 30-Jun-16 30-Sep-16 31-Dec-16 31-Mar-17 30-Jun-17 30-Sep-17
- - -
1,633.34 300.74 298.65 - 370.02 - - -
980.00 180.44 179.19 - 222.01 - - -
653.33 120.30 119.46 - 148.01 - - -
31-Dec-15 31-Mar-16 30-Jun-16 30-Sep-16 31-Dec-16 31-Mar-17 30-Jun-17 30-Sep-17
8,636.66 9,616.66 9,797.11 9,976.30 9,976.30 10,198.31 10,198.31 10,198.31
980.00 180.44 179.19 - 222.01 - - -
- - - - - - - -
9,616.66 9,797.11 9,976.30 9,976.30 10,198.31 10,198.31 10,198.31 10,198.31
-
8/11/2019 Assignment 2&3_liza Dsouza
18/67
216.76 230.54 234.81 236.94 239.57 242.21 242.21 242.21
216.76 230.54 234.81
236.94 239.57 242.21 242.21 242.21
-
8/11/2019 Assignment 2&3_liza Dsouza
19/67
31-Dec-17 31-Mar-18 30-Jun-18 30-Sep-18 31-Dec-18 31-Mar-19 30-Jun-19
31-Mar-18 31-Mar-18 31-Mar-19 31-Mar-19 31-Mar-19 31-Mar-19 31-Mar-20
- - - - - - -
- - -
- - -
- - - -
- - - -
- - - - - - -
31-Dec-17 31-Mar-18 30-Jun-18 30-Sep-18 31-Dec-18 31-Mar-19 30-Jun-19
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
31-Dec-17 31-Mar-18 30-Jun-18 30-Sep-18 31-Dec-18 31-Mar-19 30-Jun-19
- - - - - - -
- - - - - - -
- - - - - - -
31-Dec-17 31-Mar-18 30-Jun-18 30-Sep-18 31-Dec-18 31-Mar-19 30-Jun-19
10,198.31 10,198.31 9,773.38 9,348.45 8,923.52 8,498.59 8,073.66
- - - - - - -
- 424.93 424.93 424.93 424.93 424.93 424.93
10,198.31 9,773.38 9,348.45 8,923.52 8,498.59 8,073.66 7,648.73
-
8/11/2019 Assignment 2&3_liza Dsouza
20/67
242.21 242.21 232.12 222.03 211.93 201.84 191.75
242.21 242.21 232.12 222.03 211.93 201.84 191.75
-
8/11/2019 Assignment 2&3_liza Dsouza
21/67
30-Sep-19 31-Dec-19 31-Mar-20 30-Jun-20 30-Sep-20 31-Dec-20 31-Mar-21
31-Mar-20 31-Mar-20 31-Mar-20 31-Mar-21 31-Mar-21 31-Mar-21 31-Mar-21
-
-
30-Sep-19 31-Dec-19 31-Mar-20 30-Jun-20 30-Sep-20 31-Dec-20 31-Mar-21
- - - -
- - - - - - -
- - - -
- - - -
30-Sep-19 31-Dec-19 31-Mar-20 30-Jun-20 30-Sep-20 31-Dec-20 31-Mar-21
- - - - - - -
- - - - - - -
- - - - - - -
30-Sep-19 31-Dec-19 31-Mar-20 30-Jun-20 30-Sep-20 31-Dec-20 31-Mar-21
7,648.73 7,223.80 6,798.87 6,373.94 5,949.02 5,524.09 5,099.16
- - - - - - -
424.93 424.93 424.93 424.93 424.93 424.93 424.93
7,223.80 6,798.87 6,373.94 5,949.02 5,524.09 5,099.16 4,674.23
-
8/11/2019 Assignment 2&3_liza Dsouza
22/67
181.66 171.57 161.47 151.38 141.29 131.20 121.10
181.66 171.57 161.47 151.38 141.29 131.20 121.10
-
8/11/2019 Assignment 2&3_liza Dsouza
23/67
30-Jun-21 30-Sep-21 31-Dec-21 31-Mar-22 30-Jun-22 30-Sep-22 31-Dec-22 31-Mar-23
31-Mar-22 31-Mar-22 31-Mar-22 31-Mar-22 31-Mar-23 31-Mar-23 31-Mar-23 31-Mar-23
30-Jun-21 30-Sep-21 31-Dec-21 31-Mar-22 30-Jun-22 30-Sep-22 31-Dec-22 31-Mar-23
30-Jun-21 30-Sep-21 31-Dec-21 31-Mar-22 30-Jun-22 30-Sep-22 31-Dec-22 31-Mar-23
- - - - - - - -
- - - - - - - -
- - - - - - - -
30-Jun-21 30-Sep-21 31-Dec-21 31-Mar-22 30-Jun-22 30-Sep-22 31-Dec-22 31-Mar-23
4,674.23 4,249.30 3,824.37 3,399.44 2,974.51 2,549.58 2,124.65 1,699.72
- - - - - - - -
424.93 424.93 424.93 424.93 424.93 424.93 424.93 424.93
4,249.30 3,824.37 3,399.44 2,974.51 2,549.58 2,124.65 1,699.72 1,274.79
-
8/11/2019 Assignment 2&3_liza Dsouza
24/67
111.01 100.92 90.83 80.74 70.64 60.55 50.46 40.37
111.01 100.92 90.83 80.74 70.64 60.55 50.46 40.37
-
8/11/2019 Assignment 2&3_liza Dsouza
25/67
30-Jun-23 30-Sep-23 31-Dec-23 31-Mar-24 30-Jun-24 30-Sep-24 31-Dec-24 31-Mar-25
31-Mar-24 31-Mar-24 31-Mar-24 31-Mar-24 31-Mar-25 31-Mar-25 31-Mar-25 31-Mar-25
30-Jun-23 30-Sep-23 31-Dec-23 31-Mar-24 30-Jun-24 30-Sep-24 31-Dec-24 31-Mar-25
30-Jun-23 30-Sep-23 31-Dec-23 31-Mar-24 30-Jun-24 30-Sep-24 31-Dec-24 31-Mar-25
- - - - - - - -
- - - - - - - -
- - - - - - - -
30-Jun-23 30-Sep-23 31-Dec-23 31-Mar-24 30-Jun-24 30-Sep-24 31-Dec-24 31-Mar-25
1,274.79 849.86 424.93 (0.00) (0.00) (0.00) (0.00) (0.00)
- - - - - - - -
424.93 424.93 424.93 - - - - -
849.86 424.93 (0.00) (0.00) (0.00) (0.00) (0.00) (0.00)
-
8/11/2019 Assignment 2&3_liza Dsouza
26/67
30.28 20.18 10.09 (0.00) (0.00) (0.00) (0.00) (0.00)
30.28 20.18 10.09 (0.00) (0.00) (0.00) (0.00) (0.00)
-
8/11/2019 Assignment 2&3_liza Dsouza
27/67
30-Jun-25 30-Sep-25 31-Dec-25 31-Mar-26 30-Jun-26 30-Sep-26 31-Dec-26 31-Mar-27
31-Mar-26 31-Mar-26 31-Mar-26 31-Mar-26 31-Mar-27 31-Mar-27 31-Mar-27 31-Mar-27
30-Jun-25 30-Sep-25 31-Dec-25 31-Mar-26 30-Jun-26 30-Sep-26 31-Dec-26 31-Mar-27
30-Jun-25 30-Sep-25 31-Dec-25 31-Mar-26 30-Jun-26 30-Sep-26 31-Dec-26 31-Mar-27
- - - - - - - -
- - - - - - - -
- - - - - - - -
30-Jun-25 30-Sep-25 31-Dec-25 31-Mar-26 30-Jun-26 30-Sep-26 31-Dec-26 31-Mar-27
(0.00) (0.00) (0.00) (0.00) (0.00) (0.00) (0.00) (0.00)
- - - - - - - -
- - - - - - - -
(0.00) (0.00) (0.00) (0.00) (0.00) (0.00) (0.00) (0.00)
-
8/11/2019 Assignment 2&3_liza Dsouza
28/67
(0.00) (0.00) (0.00) (0.00) (0.00) (0.00) (0.00) (0.00)
(0.00) (0.00) (0.00) (0.00) (0.00) (0.00) (0.00) (0.00)
-
8/11/2019 Assignment 2&3_liza Dsouza
29/67
-
8/11/2019 Assignment 2&3_liza Dsouza
30/67
Corporate Bridge Academy
Project Finance of JSW
Annual Schedule
Particulars
Land & Site Development 181.70
Building & Civil Works 3,488.45
Plant & Machinery 9,334.20
Engineering, Supervision & Project Mgmt. 121.10
Expenses on foreign technicians & training abroad of
local technicians 48.50
Miscellaneous Fixed Assets 1,097.25
Contingency @ 5% 713.56
-
Total Hard Cost 14,984.76
Preliminary & Preoperative Expenses 124.72
Upfront Fee 48.00
IDC 1,469.68
WC Margin 370.02
Total Soft Cost 2,012.43
Total Project Cost16,997.19
Financial Plan
Upfront Equity
Upfront Equity Drawal
Net Drawal Reqd.
Debt
Equity
Debt Schedule
Opening Balance
Add: Debt drawal
Less: Debt Repayment
Closing Balance
Interest
-
8/11/2019 Assignment 2&3_liza Dsouza
31/67
IDC
Interest to P&L
-
8/11/2019 Assignment 2&3_liza Dsouza
32/67
31-Mar-14 31-Mar-15 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19
163.53 18.17 - - - -
1,046.54 1,395.38 1,046.54 - - -
2,800.26 3,733.68 2,800.26 - - -
48.44 48.44 24.22 - - -
48.50 - - - - -
329.18 438.90 274.31 54.86 - -
221.82 281.73 207.27 2.74 - -
-
4,658.26 5,916.30 4,352.59 57.61 - -
37.42 49.89 31.18 6.24 - -
48.00 - - - - -
16.15 407.36 811.36 234.81 - -
- - - 370.02 - -
101.57 457.25 842.54 611.07 - -
4,759.83 6,373.55 5,195.13 668.67 - -
31-Mar-14 31-Mar-15 31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19
- - - - - -
3,399.44 - - - - -
1,360.40 6,373.55 5,195.13 668.67 - -
1,360.40 5,319.63 3,117.08 401.20 - -
3,399.44 1,053.92 2,078.05 267.47 - -
3/31/2014 3/31/2015 3/31/2016 3/31/2017 3/31/2018 3/31/2019
- 14,492.24 32,603.88 39,948.01 40,793.25 36,543.95
1,360.40 5,319.63 3,117.08 401.20 - -
- - - - 424.93 1,699.72
1,360.40 19,811.88 35,720.96 40,349.22 40,368.32 34,844.23
16.15 407.36 811.36 953.53 968.84 867.92
-
8/11/2019 Assignment 2&3_liza Dsouza
33/67
16.15 407.36 811.36 234.81 - -
- - - 718.72 968.84 867.92
-
8/11/2019 Assignment 2&3_liza Dsouza
34/67
31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23 31-Mar-24 31-Mar-25 31-Mar-26
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23 31-Mar-24 31-Mar-25 31-Mar-26
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
3/31/2020 3/31/2021 3/31/2022 3/31/2023 3/31/2024 3/31/2025 3/31/2026
29,745.08 22,946.20 16,147.33 9,348.45 2,549.58 (0.00) (0.00)
- - - - - - -
1,699.72 1,699.72 1,699.72 1,699.72 1,274.79 - -
28,045.36 21,246.48 14,447.61 7,648.73 1,274.79 (0.00) (0.00)
706.45 544.97 383.50 222.03 60.55 (0.00) (0.00)
-
8/11/2019 Assignment 2&3_liza Dsouza
35/67
- - - - - - -
706.45 544.97 383.50 222.03 60.55 (0.00) (0.00)
-
8/11/2019 Assignment 2&3_liza Dsouza
36/67
31-Mar-27
-
-
-
-
-
-
-
-
-
-
-
-
-
-
31-Mar-27
-
-
-
-
-
3/31/2027
(0.00)
-
-
(0.00)
(0.00)
-
8/11/2019 Assignment 2&3_liza Dsouza
37/67
-
(0.00)
-
8/11/2019 Assignment 2&3_liza Dsouza
38/67
Corporate Bridge Academy
Project Finance of JSW
Depreciation Schedule 31-Mar-14 31-Mar-15
SLM Methold
Land
Opening Block 0.0% - 163.53
Additions during the year 163.53 18.17
Gross Block 163.53 181.70
Depreciation - -
Accumulated Depreciation - -
Net Block 163.53 181.70
Building & Civil Works
Opening Block 3.3% - 1,118.20
Additions during the year 1,118.20 1,568.07Gross Block 1,118.20 2,686.28
Depreciation - -
Accumulated Depreciation - -
Net Block 1,118.20 2,686.28
Plant & Machinery
Opening Block 5.3% - 2,992.03
Additions during the year 2,992.03 4,195.76
Gross Block 2,992.03 7,187.79
Depreciation - -
Accumulated Depreciation - -
Net Block 2,992.03 7,187.79
Misc. Fixed Assets (incl. Technical knowhow & training fees)
Opening Block 5.3% - 448.66
Additions during the year 448.66 541.66
Gross Block 448.66 990.32
Depreciation - -
Accumulated Depreciation - -
Net Block 448.66 990.32
Allocation of Contingency & Soft Costs (Except WC Margin)
Land & Site Devt. - -
Building & Civil Works 71.67 172.69Plant & Machinery 191.77 462.08
Misc. Fixed Assets 22.54 54.32
Check
Opening Block - 4,722.42
Additions during the year 4,722.42 6,323.66
Gross Block 4,722.42 11,046.08
Depreciation - -
-
8/11/2019 Assignment 2&3_liza Dsouza
39/67
Accumulated Depreciation - -
Net Block 4,722.42 11,046.08
WDV Method of Depreciation
31-Mar-14 31-Mar-15
Land
Opening Block 0% - 163.53
Additions during the year 163.53 18.17
Gross Block 163.53 181.70
Depreciation - -
Net Block 163.53 181.70
Building & Civil Works
Opening Block 10% - 1,118.20
Additions during the year 1,118.20 1,568.07
Gross Block 1,118.20 2,686.28
Depreciation - -Net Block 1,118.20 2,686.28
Plant & Machinery
Opening Block 15% - 2,992.03
Additions during the year 2,992.03 4,195.76
Gross Block 2,992.03 7,187.79
Depreciation - -
Net Block 2,992.03 7,187.79
Misc. Fixed Assets (incl. Technical knowhow & training fees)
Opening Block 15% - 448.66
Additions during the year 448.66 541.66Gross Block 448.66 990.32
Depreciation - -
Net Block 448.66 990.32
Depreciation for the year - -
-
8/11/2019 Assignment 2&3_liza Dsouza
40/67
31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23
181.70 181.70 181.70 181.70 181.70 181.70 181.70 181.70
- - - - - - - -
181.70 181.70 181.70 181.70 181.70 181.70 181.70 181.70
- - - - - - - -
- - - - - - - -
181.70 181.70 181.70 181.70 181.70 181.70 181.70 181.70
2,686.28 3,991.48 3,991.48 3,991.48 3,991.48 3,991.48 3,991.48 3,991.48
1,305.21 - - - - - - -3,991.48 3,991.48 3,991.48 3,991.48 3,991.48 3,991.48 3,991.48 3,991.48
- 133.32 133.32 133.32 133.32 133.32 133.32 133.32
- 133.32 266.63 399.95 533.26 666.58 799.89 933.21
3,991.48 3,858.17 3,724.85 3,591.54 3,458.22 3,324.91 3,191.59 3,058.28
7,187.79 10,680.19 10,680.19 10,680.19 10,680.19 10,680.19 10,680.19 10,680.19
3,492.41 - - - - - - -
10,680.19 10,680.19 10,680.19 10,680.19 10,680.19 10,680.19 10,680.19 10,680.19
- 563.91 563.91 563.91 563.91 563.91 563.91 563.91
- 563.91 1,127.83 1,691.74 2,255.66 2,819.57 3,383.48 3,947.40
10,680.19 10,116.28 9,552.36 8,988.45 8,424.54 7,860.62 7,296.71 6,732.79
990.32 1,356.65 1,649.07 1,649.07 1,649.07 1,649.07 1,649.07 1,649.07
366.33 292.41 - - - - - -
1,356.65 1,649.07 1,649.07 1,649.07 1,649.07 1,649.07 1,649.07 1,649.07
- 87.07 87.07 87.07 87.07 87.07 87.07 87.07
- 87.07 174.14 261.21 348.28 435.35 522.42 609.49
1,356.65 1,561.99 1,474.92 1,387.85 1,300.78 1,213.71 1,126.64 1,039.57
- - - - - - - -
258.67 - - - - - - -692.15 - - - - - - -
67.80 237.55 - - - - - -
11,046.08 16,210.03 16,502.44 16,502.44 16,502.44 16,502.44 16,502.44 16,502.44
5,163.95 292.41 - - - - - -
16,210.03 16,502.44 16,502.44 16,502.44 16,502.44 16,502.44 16,502.44 16,502.44
- 784.30 784.30 784.30 784.30 784.30 784.30 784.30
-
8/11/2019 Assignment 2&3_liza Dsouza
41/67
- 784.30 1,568.60 2,352.90 3,137.20 3,921.50 4,705.80 5,490.10
16,210.03 15,718.14 14,933.84 14,149.54 13,365.24 12,580.94 11,796.64 11,012.34
31-Mar-16 31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23
181.70 181.70 181.70 181.70 181.70 181.70 181.70 181.70
- - - - - - - -
181.70 181.70 181.70 181.70 181.70 181.70 181.70 181.70
- - - - - - - -
181.70 181.70 181.70 181.70 181.70 181.70 181.70 181.70
2,686.28 3,991.48 3,592.34 3,592.34 3,592.34 3,592.34 3,233.10 2,909.79
1,305.21 - - - - - - -
3,991.48 3,991.48 3,592.34 3,592.34 3,592.34 3,592.34 3,233.10 2,909.79
- 399.15 - - - 359.23 323.31 290.983,991.48 3,592.34 3,592.34 3,592.34 3,592.34 3,233.10 2,909.79 2,618.81
7,187.79 10,680.19 9,078.16 9,078.16 9,078.16 9,078.16 7,716.44 6,558.97
3,492.41 - - - - - - -
10,680.19 10,680.19 9,078.16 9,078.16 9,078.16 9,078.16 7,716.44 6,558.97
- 1,602.03 - - - 1,361.72 1,157.47 983.85
10,680.19 9,078.16 9,078.16 9,078.16 9,078.16 7,716.44 6,558.97 5,575.13
990.32 1,356.65 1,401.71 1,401.71 1,401.71 1,401.71 1,191.45 1,012.73
366.33 292.41 - - - - - -1,356.65 1,649.07 1,401.71 1,401.71 1,401.71 1,401.71 1,191.45 1,012.73
- 247.36 - - - 210.26 178.72 151.91
1,356.65 1,401.71 1,401.71 1,401.71 1,401.71 1,191.45 1,012.73 860.82
- 2,248.54 - - - 1,931.21 1,659.49 1,426.74
-
8/11/2019 Assignment 2&3_liza Dsouza
42/67
31-Mar-24 31-Mar-25 31-Mar-26 31-Mar-27
181.70 181.70 181.70 181.70
- - - -
181.70 181.70 181.70 181.70
- - - -
- - - -
181.70 181.70 181.70 181.70
3,991.48 3,991.48 3,991.48 3,991.48
- - - -3,991.48 3,991.48 3,991.48 3,991.48
133.32 - - -
1,066.52 1,066.52 1,066.52 1,066.52
2,924.96 2,924.96 2,924.96 2,924.96
10,680.19 10,680.19 10,680.19 10,680.19
- - - -
10,680.19 10,680.19 10,680.19 10,680.19
563.91 - - -
4,511.31 4,511.31 4,511.31 4,511.31
6,168.88 6,168.88 6,168.88 6,168.88
1,649.07 1,649.07 1,649.07 1,649.07
- - - -
1,649.07 1,649.07 1,649.07 1,649.07
87.07 - - -
696.57 696.57 696.57 696.57
952.50 952.50 952.50 952.50
- - - -
- - - -- - - -
- - - -
16,502.44 16,502.44 16,502.44 16,502.44
- - - -
16,502.44 16,502.44 16,502.44 16,502.44
784.30 - - -
-
8/11/2019 Assignment 2&3_liza Dsouza
43/67
6,274.40 6,274.40 6,274.40 6,274.40
10,228.04 10,228.04 10,228.04 10,228.04
31-Mar-24 31-Mar-25 31-Mar-26 31-Mar-27
181.70 181.70 181.70 181.70
- - - -
181.70 181.70 181.70 181.70
- - - -
181.70 181.70 181.70 181.70
2,618.81 2,356.93 2,121.24 1,909.11
- - - -
2,618.81 2,356.93 2,121.24 1,909.11
261.88 235.69 212.12 190.912,356.93 2,121.24 1,909.11 1,718.20
5,575.13 4,738.86 4,028.03 3,423.82
- - - -
5,575.13 4,738.86 4,028.03 3,423.82
836.27 710.83 604.20 513.57
4,738.86 4,028.03 3,423.82 2,910.25
860.82 731.70 621.94 528.65
- - - -860.82 731.70 621.94 528.65
129.12 109.75 93.29 79.30
731.70 621.94 528.65 449.35
1,227.27 1,056.28 909.62 783.78
-
8/11/2019 Assignment 2&3_liza Dsouza
44/67
-
8/11/2019 Assignment 2&3_liza Dsouza
45/67
Corporate Bridge Academy
Project Finance of JSW
Particulars 31-Mar-14 31-Mar-15 31-Mar-16 31-Mar-17 31-Mar-18
Raw Material 1.50 0.8 0.8
WIP 0.03 3.3 3.6FG 0.75 92.9 110.4
Sundry Debtors 1.00 1,128.0 1,365.7
Total CA 1,225.0 1,480.5
Sundry Creditors 0.75 0.4 0.4
TL Installments due in 1 year 424.9 1,699.7
Total CL 425.4 1,700.1
WC Gap 799.6 (219.6)
WC Gap w/o TL installments 1,224.6 1,480.1
WC Margin 306.1 370.0
WC Margin for PC 370.02
WC Borrowings - - - 918.4 1,110.1
WC Interest - - - 91.8 111.0
Opening RM stock - - - - 0.4
RM Required during the year - - - 4.9 6.0
Closing RM stock 0.4 0.4
Purchases 5.3 6.0
-
8/11/2019 Assignment 2&3_liza Dsouza
46/67
31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23 31-Mar-24 31-Mar-25
0.9 1.0 1.0 1.1 1.1 1.2 1.3
4.0 4.4 4.5 4.7 4.9 5.2 5.4126.1 137.7 144.1 150.6 157.3 164.4 171.8
1,613.7 1,789.1 1,879.1 1,973.1 2,071.7 2,175.3 2,284.1
1,744.8 1,932.1 2,028.8 2,129.5 2,235.1 2,346.0 2,462.5
0.4 0.5 0.5 0.5 0.6 0.6 0.6
1,699.7 1,699.7 1,699.7 1,699.7 1,274.8 - -
1,700.2 1,700.2 1,700.2 1,700.3 1,275.4 0.6 0.6
44.6 231.9 328.6 429.2 959.7 2,345.4 2,461.9
1,744.3 1,931.6 2,028.3 2,128.9 2,234.5 2,345.4 2,461.9
436.1 482.9 507.1 532.2 558.6 586.4 615.5
1,308.2 1,448.7 1,521.2 1,596.7 1,675.9 1,759.1 1,846.4
130.8 144.9 152.1 159.7 167.6 175.9 184.6
0.4 0.4 0.5 0.5 0.5 0.6 0.6
7.1 7.9 8.3 8.7 9.1 9.6 10.1
0.4 0.5 0.5 0.5 0.6 0.6 0.6
7.2 7.9 8.3 8.7 9.1 9.6 10.1
-
8/11/2019 Assignment 2&3_liza Dsouza
47/67
31-Mar-26 31-Mar-27
1.3 1.4
5.6 5.9179.6 187.8
2,398.3 2,518.2
2,584.8 2,713.2
0.7 0.7
- -
0.7 0.7
2,584.1 2,712.5
2,584.1 2,712.5
646.0 678.1
1,938.1 2,034.4
193.8 203.4
0.6 0.7
10.6 11.1
0.7 0.7
10.6 11.1
-
8/11/2019 Assignment 2&3_liza Dsouza
48/67
-
8/11/2019 Assignment 2&3_liza Dsouza
49/67
31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23
4,921.35 7,553.87 9,226.86 10,481.27 11,772.66 12,454.75 13,162.99
784.30 784.30 784.30 784.30 784.30 784.30 784.30
24.94 24.94 24.94 24.94 24.94 - -
267.47 - - - - - -
401.20 - - - - - -
918.43 191.64 198.17 140.46 72.50 75.48 79.22
7,317.70 8,554.76 10,234.28 11,430.98 12,654.41 13,314.53 14,026.50
292.41 - - - - - -
6.24 - - - - - -- 424.93 1,699.72 1,699.72 1,699.72 1,699.72 1,699.72
1,224.57 255.53 264.23 187.28 96.67 100.65 105.62
1,523.22 680.46 1,963.95 1,887.00 1,796.39 1,800.36 1,805.34
- 5,794.48 13,668.78 21,939.12 31,483.09 42,341.11 53,855.28
5,794.48 7,874.30 8,270.33 9,543.98 10,858.02 11,514.17 12,221.16
5,794.48 13,668.78 21,939.12 31,483.09 42,341.11 53,855.28 66,076.44
-
8/11/2019 Assignment 2&3_liza Dsouza
50/67
31-Mar-24 31-Mar-25 31-Mar-26 31-Mar-27
13,914.48 15,493.73 16,262.00 17,032.63
784.30 - - -
- - - -
- - - -
- - - -
83.17 87.33 91.70 96.28
14,781.96 15,581.07 16,353.70 17,128.91
- - - -
- - - -1,274.79 - - -
110.90 116.44 122.27 128.38
1,385.69 116.44 122.27 128.38
66,076.44 79,472.71 94,937.33 111,168.77
13,396.27 15,464.62 16,231.44 17,000.53
79,472.71 94,937.33 111,168.77 128,169.31
-
8/11/2019 Assignment 2&3_liza Dsouza
51/67
Corporate Bridge Academy
Project Finance of JSW
Balance Sheet Projections
Particulars 31-Mar-14 31-Mar-15 31-Mar-16 31-Mar-17
Sources of Funds
Equity 3,399.44 4,453.35 6,531.40 6,798.87
Reserves & Surplus - - - 4,921.35
Total Net Worth 3,399.44 4,453.35 6,531.40 11,720.23
Long term loans 1,360.40 6,680.03 9,797.11 10,198.31
Cash Credit - - - 918.43
Unsecured Loans
Total 1,360.40 6,680.03 9,797.11 11,116.74
TOTAL 4,759.83 11,133.38 16,328.51 22,836.97
Uses of Funds 31-Mar-14 31-Mar-15 31-Mar-16 31-Mar-17
Gross Block 4,722.42 11,046.08 16,210.03 16,502.44
Accumulated Depreciation - - - 784.30Net Block 4,722.42 11,046.08 16,210.03 15,718.14
Current Assets except cash - - - 1,225.01
Current Liabilities - - - 0.44
Net Current Assets except cash - - - 1,224.57
Cash & bank balance - - - 5,794.48
Prelim. Exp. Not w/o 37.42 87.30 118.48 99.78
TOTAL 4,759.83 11,133.38 16,328.51 22,836.97
Difference - - - -
-
8/11/2019 Assignment 2&3_liza Dsouza
52/67
31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23 31-Mar-24
6,798.87 6,798.87 6,798.87 6,798.87 6,798.87 6,798.87 6,798.87
12,475.23 21,702.09 32,183.36 43,956.02 56,410.77 69,573.75 83,488.24
19,274.10 28,500.96 38,982.23 50,754.89 63,209.64 76,372.63 90,287.11
9,773.38 8,073.66 6,373.94 4,674.23 2,974.51 1,274.79 -
1,110.07 1,308.24 1,448.70 1,521.20 1,596.69 1,675.90 1,759.08
10,883.45 9,381.90 7,822.65 6,195.43 4,571.20 2,950.69 1,759.08
30,157.55 37,882.87 46,804.88 56,950.32 67,780.84 79,323.32 92,046.19
31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23 31-Mar-24
16,502.44 16,502.44 16,502.44 16,502.44 16,502.44 16,502.44 16,502.44
1,568.60 2,352.90 3,137.20 3,921.50 4,705.80 5,490.10 6,274.4014,933.84 14,149.54 13,365.24 12,580.94 11,796.64 11,012.34 10,228.04
1,480.47 1,744.77 1,932.10 2,028.79 2,129.46 2,235.11 2,346.04
0.37 0.45 0.50 0.52 0.54 0.57 0.60
1,480.09 1,744.32 1,931.60 2,028.27 2,128.92 2,234.54 2,345.44
13,668.78 21,939.12 31,483.09 42,341.11 53,855.28 66,076.44 79,472.71
74.83 49.89 24.94 - - - -
30,157.55 37,882.87 46,804.88 56,950.32 67,780.84 79,323.32 92,046.19
- - - - - - -
-
8/11/2019 Assignment 2&3_liza Dsouza
53/67
31-Mar-25 31-Mar-26 31-Mar-27
6,798.87 6,798.87 6,798.87
98,981.97 115,243.97 132,276.60
105,780.84 122,042.85 139,075.48
- - -
1,846.41 1,938.11 2,034.40
1,846.41 1,938.11 2,034.40
107,627.26 123,980.96 141,109.87
31-Mar-25 31-Mar-26 31-Mar-27
16,502.44 16,502.44 16,502.44
6,274.40 6,274.40 6,274.4010,228.04 10,228.04 10,228.04
2,462.51 2,584.81 2,713.22
0.63 0.66 0.69
2,461.88 2,584.15 2,712.53
94,937.33 111,168.77 128,169.31
- - -
107,627.26 123,980.96 141,109.87
- - -
-
8/11/2019 Assignment 2&3_liza Dsouza
54/67
Corporate Bridge AcademyProject Finance of JSW Back to Index
Please Find below Name of sheet to done before submitting Excel File
Disclaimer:You Need to use same template for Assignment 2 and 3
Recommendation Completed
Assignment 3 - 25 Marks
Name of sheet StatusDSCR IRR Ratios Completed
-
8/11/2019 Assignment 2&3_liza Dsouza
55/67
Corporate Bridge Academy
Project Finance of JSW
Project Evaluation
DSCR 31-Mar-14 31-Mar-15 31-Mar-16
PAT - - -
Deprn. - - -
Amortization - - -
Interest - TL - - -
Total - - -
TL Repayment - - -
Interest - TL - - -
Total - - -
DSCR
Average DSCR 6.09
Minimum DSCR 4.12
IRR 31-Mar-14 31-Mar-15 31-Mar-16
PAT - - -
Deprn. - - -
Amortization - - -
Interest - tax adjusted - - -
Inflow - - -
Capex 4,743.68 5,966.19 4,383.77
Outflow 4,743.68 5,966.19 4,383.77
Net Flow (4,743.68) (5,966.19) (4,383.77)
IRR 42.87%
Ratios 31-Mar-14 31-Mar-15 31-Mar-16
Gross Sales - - -
Excise duty - - -
Net sales - - -
Other Income - - -
Total expenses - - -
PBDIT - - -
Depreciation - - -
Amortization - - -
-
8/11/2019 Assignment 2&3_liza Dsouza
56/67
PBIT - - -
Interest
- Term loan - - -
- Working capital - - -
PBT - - -
Tax - - -
PAT - - -
Cash accruals - - -
Paid up capital 3,399.44 4,453.35 6,531.40
Current ratio #DIV/0! #DIV/0! #DIV/0!
PBDIT/Interest (Times) #DIV/0! #DIV/0! #DIV/0!
PBDIT/TTA(ROCE)% 0.00% 0.00% 0.00%
Net worth 3,399.44 4,453.35 6,531.40
Adjusted TNW (excl. of
revaluation reserve) 3,362.02 4,366.05 6,412.92
TOL/TNW 0.40 1.53 1.53
Inv/NS +Rec./GS (Days)
Operating profit margin (%) #DIV/0! #DIV/0! #DIV/0!
Net profit margin (%) #DIV/0! #DIV/0! #DIV/0!
DSCR - - -
Min. DSCR 4.12Average DSCR 6.09
IRR 42.87%
Breakeven point 0.00%
Cash breakeven point 0.00%
BEP & Cash BEP 31-Mar-14 31-Mar-15 31-Mar-16
Net Sales - - -
Variable Expenses - - -
Contribution - - -
PV Ratio #DIV/0! #DIV/0! #DIV/0!
Fixed Expenses - - -
Fixed Cash Expenses - - -
BEP NA NA NA
BEP in %
Cash BEP - - -
Cash BEP in % NA NA NA
Average BEP (%) 10%
Average Cash BE 7%
-
8/11/2019 Assignment 2&3_liza Dsouza
57/67
31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23 31-Mar-24
4,921.35 7,553.87 9,226.86 10,481.27 11,772.66 12,454.75 13,162.99 13,914.48
784.30 784.30 784.30 784.30 784.30 784.30 784.30 784.30
24.94 24.94 24.94 24.94 24.94 - - -
811.36 953.53 968.84 867.92 706.45 544.97 383.50 222.03
6,541.96 9,316.65 11,004.95 12,158.43 13,288.35 13,784.02 14,330.79 14,920.81
- 424.93 1,699.72 1,699.72 1,699.72 1,699.72 1,699.72 1,274.79
811.36 953.53 968.84 867.92 706.45 544.97 383.50 222.03
811.36 1,378.46 2,668.56 2,567.64 2,406.16 2,244.69 2,083.22 1,496.81
8.06 6.76 4.12 4.74 5.52 6.14 6.88 9.97
31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23 31-Mar-24
4,921.35 7,553.87 9,226.86 10,481.27 11,772.66 12,454.75 13,162.99 13,914.48
784.30 784.30 784.30 784.30 784.30 784.30 784.30 784.30
24.94 24.94 24.94 24.94 24.94 - - -
623.61 647.31 661.32 594.20 509.40 389.70 272.44 156.92
6,354.21 9,010.42 10,697.43 11,884.72 13,091.30 13,628.74 14,219.73 14,855.70
63.84 - - - - - - -
63.84 - - - - - - -
6,290.37 9,010.42 10,697.43 11,884.72 13,091.30 13,628.74 14,219.73 14,855.70
31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23 31-Mar-24
10152 16389 19365 21469 22549 23677 24861 26104
922 1621 1921 2135 2248 2361 2479 2603
9,229.66 14,767.45 17,444.05 19,333.82 20,300.51 21,315.54 22,381.32 23,500.38
- - - - - - - -
1,114.24 1,766.29 2,017.78 2,202.42 2,306.15 2,409.18 2,516.99 2,630.16
8,115.42 13,001.15 15,426.27 17,131.41 17,994.36 18,906.36 19,864.33 20,870.22
784.30 784.30 784.30 784.30 784.30 784.30 784.30 784.30
24.94 24.94 24.94 24.94 24.94 - - -
-
8/11/2019 Assignment 2&3_liza Dsouza
58/67
7,306.18 12,191.91 14,617.02 16,322.16 17,185.12 18,122.06 19,080.03 20,085.92
811.36 953.53 968.84 867.92 706.45 544.97 383.50 222.03
91.84 111.01 130.82 144.87 152.12 159.67 167.59 175.91
6,402.98 11,127.37 13,517.36 15,309.37 16,326.55 17,417.42 18,528.94 19,687.99
1,481.62 3,573.50 4,290.50 4,828.10 4,553.89 4,962.67 5,365.95 5,773.50
4,921.35 7,553.87 9,226.86 10,481.27 11,772.66 12,454.75 13,162.99 13,914.48
5,730.60 8,363.12 10,036.11 11,290.51 12,581.90 13,239.05 13,947.29 14,698.78
6,798.87 6,798.87 6,798.87 6,798.87 6,798.87 6,798.87 6,798.87 6,798.87
7.64 13.64 18.10 23.06 29.16 35.05 40.75 46.50
10.00 13.63 15.92 19.74 25.47 34.69 51.80 94.00
35.69% 43.22% 40.78% 36.62% 31.60% 27.89% 25.04% 22.67%
11,720.23 19,274.10 28,500.96 38,982.23 50,754.89 63,209.64 76,372.63 90,287.11
11,620.45 19,199.27 28,451.07 38,957.29 50,754.89 63,209.64 76,372.63 90,287.11
0.96 0.57 0.33 0.20 0.12 0.07 0.04 0.02
88% 88% 88% 89% 89% 89% 89% 89%
53% 51% 53% 54% 58% 58% 59% 59%
8.06 6.76 4.12 4.74 5.52 6.14 6.88 9.97
31-Mar-17 31-Mar-18 31-Mar-19 31-Mar-20 31-Mar-21 31-Mar-22 31-Mar-23 31-Mar-24
9,229.66 14,767.45 17,444.05 19,333.82 20,300.51 21,315.54 22,381.32 23,500.38
762.02 1,213.94 1,410.83 1,556.88 1,640.87 1,723.25 1,809.37 1,899.78
8,467.63 13,553.51 16,033.22 17,776.94 18,659.64 19,592.29 20,571.94 21,600.60
91.74% 91.78% 91.91% 91.95% 91.92% 91.92% 91.92% 91.92%
2064.66 2426.14 2515.86 2467.56 2333.09 2174.88 2043.01 1912.62
1,255.41 1,616.89 1,706.62 1,658.32 1,523.85 1,390.58 1,258.71 1,128.32
2,250.46 2,643.44 2,737.24 2,683.67 2,538.26 2,366.17 2,222.70 2,080.83
24% 18% 16% 14% 13% 11% 10% 9%
1,368.39 1,761.71 1,856.79 1,803.55 1,657.85 1,512.88 1,369.41 1,227.55
15% 12% 11% 9% 8% 7% 6% 5%
-
8/11/2019 Assignment 2&3_liza Dsouza
59/67
31-Mar-25 31-Mar-26 31-Mar-27
15,493.73 16,262.00 17,032.63
- - -
- - -
60.55 (0.00) (0.00)
15,554.29 16,262.00 17,032.63
- - -
60.55 (0.00) (0.00)
60.55 (0.00) (0.00)
31-Mar-25 31-Mar-26 31-Mar-27
15,493.73 16,262.00 17,032.63
- - -
- - -
43.27 (0.00) (0.00)
15,537.01 16,262.00 17,032.63
- - -
- - -
15,537.01 16,262.00 17,032.63
31-Mar-25 31-Mar-26 31-Mar-27
27409 28779 30218
2733 2870 3014
24,675.40 25,909.17 27,204.63
- - -
2,748.99 2,873.76 3,004.77
21,926.41 23,035.41 24,199.86
- - -
- - -
-
8/11/2019 Assignment 2&3_liza Dsouza
60/67
21,926.41 23,035.41 24,199.86
60.55 (0.00) (0.00)
184.64 193.81 203.44
21,681.22 22,841.60 23,996.42
6,187.48 6,579.59 6,963.79
15,493.73 16,262.00 17,032.63
15,493.73 16,262.00 17,032.63
6,798.87 6,798.87 6,798.87
52.73 58.67 64.31
362.11 - -
20.37% 18.58% 17.15%
105,780.84 122,042.85 139,075.48
105,780.84 122,042.85 139,075.48
0.02 0.02 0.01
89% 89% 89%
63% 63% 63%
- - -
31-Mar-25 31-Mar-26 31-Mar-27
24,675.40 25,909.17 27,204.63
1,994.70 2,094.37 2,199.03
22,680.70 23,814.80 25,005.60
91.92% 91.92% 91.92%
999.48 973.20 1009.18
999.48 973.20 1,009.18
1,087.38 1,058.78 1,097.93
4% 4% 4%
1,087.38 1,058.78 1,097.93
4% 4% 4%
-
8/11/2019 Assignment 2&3_liza Dsouza
61/67
-
8/11/2019 Assignment 2&3_liza Dsouza
62/67
-
8/11/2019 Assignment 2&3_liza Dsouza
63/67
Your company financial & important ratio information should be included in this t
explained in the word document attached under ratio Analysis
***************************************************************************************
sector being reluctant to invest in the industry, but this sector has shown a
tremendous improvement in the last year.
the oper
-
8/11/2019 Assignment 2&3_liza Dsouza
64/67
f Growth
inance Ratios
t ratio of the company is very high and is se seen to increase over the years,
shows that the company would be able to pay off all its obligations
of the company is seen to decrease over the period but the ROCE is still very
ore we can say that the company will cover its capital cost and would have a
ating and profitable position. The high ROCE also shows that the company is
g its capital very smatly and also working towards generating shareholders
wealth.
nto consideration the stable recovery of the global economy the Indian Steel industry
the fourth largest producer of crude steel in the world. It has been estimated by the
el Association that the usage of steel around the world will increase by 3.1% i.e. 1,527
nes in 2014, followed by a growth of 3.3 per cent i.e. 1,576 million tonnes. The demand
China is also expected to decelerate in the coming year which puts India in a very good
position.
ds an Investment of $210 billion in order to achieve a steel producing capacity of 300nes per annum from its current capacity of 90 million tonnes p.a. India has emphasized
mportance of investment in infrastructure to boost economic growth. This along with
tive government measures will tremendously boost the industry. There is also a very
able estimation of the demand of steel from the automobile industry. Investors are
to improve in the coming financial year due to the stable economy which would result
ase in dividend payout in the fourth coming years. Other sectors which can improve the
f steel like the construction and manufacturing sector are also showing favorable signs
although this is subjected to inflation other problems.
-
8/11/2019 Assignment 2&3_liza Dsouza
65/67
ble
************************************************************************
ating profit margin and the net profit margin is also seen to increase which
also shows a good sign
-
8/11/2019 Assignment 2&3_liza Dsouza
66/67
Years PAT Add Dep Cash Inflow PV Factor @14% DCF
1 2017 4,921.35 784.30 5,705.65 0.877 5,004.96 5,004.96
2 2018 7,553.87 784.30 8,338.17 0.769 6,415.95 11,420.91
3 2019 9,226.86 784.30 10,011.16 0.675 6,757.25 18,178.16
4 2020 10,481.27 784.30 11,265.57 0.592 6,670.12 24,848.285 2021 11,772.66 784.30 12,556.96 0.519 6,521.69 31,369.98
6 2022 12,454.75 784.30 13,239.05 0.456 6,031.53 37,401.51
7 2023 13,162.99 784.30 13,947.29 0.400 5,573.86 42,975.37
8 2024 13,914.48 784.30 14,698.78 0.351 5,152.79 48,128.16
9 2025 15,493.73 - 15,493.73 0.308 4,764.45 52,892.60
10 2026 16,262.00 - 16,262.00 0.270 4,386.58 57,279.18
11 2027 17,032.63 - 17,032.63 0.237 4,030.22 61,309.39
Total DCF 61,309.39
Total Outflow 16,997.00
NPV 44,312.39
2.6070715 260.70715
-
8/11/2019 Assignment 2&3_liza Dsouza
67/67
Discounted Payback Period PV factor @42% ARR
0.704 4,018.07
0.496 4,135.18 7.78
0.349 3,496.39
0.246 2,770.770.173 2,174.92
0.122 1,614.83
44312.39 7.03 0.086 1,198.04
0.060 889.15
0.043 660.03
0.030 487.85
0.021 359.84
21,805.05